{"change_dates":[],"dossier":{"amendments":[{"authors":"Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye, Michel Dantin","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-257","justification":"The prohibition to use congestion revenues to lower network tariffs is not justified.","location":[["Proposal for a regulation","Article 17 \u2013 paragraph 4"]],"meps":[2025,124732,97296],"meta":{"created":"2019-07-03T06:25:00"},"new":["4. Transmission system operators","shall clearly establish beforehand how any","congestion income will be used, and report","on the actual use of that income. On an","annual basis, and by 31 July each year, the","national regulatory authorities shall publish","a report setting out the amount of revenue","collected for the 12-month period ending","on 30 June of the same year and how that","revenue was used, including the specific","projects the income has been used for the","amount placed on a separate account line,","or the amount that has been used when","calculating network tariffs, together with","verification that that use complies with this","Regulation. In such cases where some of","the congestion revenues are used when","calculating network tariffs, the report may","set out the fulfilment by the TSO of the","commitment and balance sheet criteria","pursuant to paragraph 2."],"old":["4. Transmission system operators","shall clearly establish beforehand how any","congestion income will be used, and report","on the actual use of that income. On an","annual basis, and by 31 July each year, the","national regulatory authorities shall publish","a report setting out the amount of revenue","collected for the 12-month period ending","on 30 June of the same year and how that","revenue was used, including the specific","projects the income has been used for or","the amount placed on a separate account","line, together with verification that that use","complies with this Regulation and the","methodology developed pursuant to","paragraph 3."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"257","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Michel Dantin, Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-258","location":[["Proposal for a regulation","Article 18 \u2013 paragraph 1"]],"meps":[97296,2025,124732],"meta":{"created":"2019-07-03T06:25:00"},"new":["1. Member States shall monitor","resource adequacy within their territory","based on the European resource adequacy","assessment pursuant to Article 19 and on a","national and regional assessment where","appropriate."],"old":["1. Member States shall monitor","resource adequacy within their territory","","based on the European resource adequacy","assessment pursuant to Article 19."],"orig_lang":"fr","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"258","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Ivo Belet","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-259","location":[[" Proposal for a regulation","Article 18 \u2013 paragraph 1"]],"meps":[28257],"meta":{"created":"2019-07-03T06:25:00"},"new":["1. Member States shall monitor","resource adequacy within their territory","based on the European resource adequacy","assessment pursuant to Article 19 and on","adequacy assessments having a regional","scope."],"old":["1. Member States shall monitor","resource adequacy within their territory","based on the European resource adequacy","assessment pursuant to Article 19."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"259","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Arne Gericke","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-57","location":[["Proposal for a regulation","Recital 2"]],"meps":[124815],"meta":{"created":"2019-07-03T06:24:59"},"new":["(2) The Energy Union aims at","providing consumers \u2013 household and","business \u2013 secure, sustainable, competitive","and affordable energy. Historically, the","electricity system was dominated by","vertically integrated, often publicly owned,","monopolies with large centralised nuclear","or fossil fuel power plants. The internal","market in electricity, which has been","progressively implemented since 1999,","aims to deliver a real choice for all","consumers in the Union, both citizens and","businesses, open up new business","opportunities for undertakings, encourage","cooperative \u2018citizens\u2019 energy\u2019 models with","regional value added and boost cross-","border trade, so as to achieve efficiency","gains, competitive prices and higher","standards of service, and to contribute to","security of supply and sustainability. The","internal market in electricity has increased","competition, in particular at the wholesale","level, and cross-border trade. It remains the","foundation of an efficient energy market."],"old":["(2) The Energy Union aims at","providing consumers \u2013 household and","business \u2013 secure, sustainable, competitive","and affordable energy. Historically, the","electricity system was dominated by","vertically integrated, often publicly owned,","monopolies with large centralised nuclear","or fossil fuel power plants. The internal","market in electricity, which has been","progressively implemented since 1999,","aims to deliver a real choice for all","consumers in the Union, both citizens and","businesses, new business opportunities and","more cross-border trade, so as to achieve","efficiency gains, competitive prices and","higher standards of service, and to","contribute to security of supply and","sustainability. The internal market in","electricity has increased competition, in","particular at the wholesale level, and cross-","border trade. It remains the foundation of","an efficient energy market."],"orig_lang":"de","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"57","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-260","location":[[" Proposal for a regulation","Article 18 \u2013 paragraph 1"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:00"},"new":["1. Member States shall monitor,","report on and publish resource adequacy","within their territory based on the","European resource adequacy assessment","pursuant to Article 19."],"old":["1. Member States shall monitor","resource adequacy within their territory","based on the European resource adequacy","assessment pursuant to Article 19."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"260","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-58","location":[["Proposal for a regulation","Recital 3"]],"meps":[124736],"meta":{"created":"2019-07-03T06:24:59"},"new":["(3) Europe's energy system is in the","middle of its most profound change in","decades and the electricity market is at the","heart of that change. The common goal to","decarbonise the energy system creates new","opportunities and challenges for market","participants. At the same time,","technological developments allow for new","forms of consumer participation and cross-","border cooperation. These also help to","respond to the lack of access to modern","electricity services."],"old":["(3) Europe's energy system is in the","middle of its most profound change in","","","decades and the electricity market is at the","heart of that change. The common goal to","decarbonise the energy system creates new","opportunities and challenges for market","participants. At the same time,","technological developments allow for new","forms of consumer participation and cross-","border cooperation."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"58","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-261","location":[["Proposal for a regulation","Article 18 \u2013 paragraph 2"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:00"},"new":["2. Where the European resource","adequacy assessment identifies a resource","adequacy concern Member States shall","identify any regulatory distortions and","market failures that caused or contributed","to the emergence of the concern."],"old":["2. Where the European resource","adequacy assessment identifies a resource","adequacy concern Member States shall","identify any regulatory distortions that","caused or contributed to the emergence of","the concern."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"261","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-59","location":[[" Proposal for a regulation","Recital 3 a (new)"]],"meps":[124756],"meta":{"created":"2019-07-03T06:24:59"},"new":["(3a) The 'energy efficiency first'","principle plays an important role in","designing the electricity market. By","fostering a level playing field for demand","side solutions, including demand response","and energy efficiency improvements, it","makes sure that the market can be","effective in delivering the objectives of the","Energy Union and the climate and energy","framework 2030."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"59","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Michel Dantin, Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-262","location":[["Proposal for a regulation","Article 18 \u2013 paragraph 2"]],"meps":[97296,2025,124732],"meta":{"created":"2019-07-03T06:25:00"},"new":["2. If the national resource adequacy","assessment differs from the European","assessment, Member States shall deliver a","report explaining the differences","stemming from national considerations."],"old":["2. Where the European resource","adequacy assessment identifies a resource","adequacy concern Member States shall","identify any regulatory distortions that","caused or contributed to the emergence of","the concern."],"orig_lang":"fr","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"262","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Luke Ming Flanagan","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-60","location":[[" Proposal for a regulation","Recital 4"]],"meps":[124985],"meta":{"created":"2019-07-03T06:24:59"},"new":["(4) State interventions (on wind energy","especially), often designed in an","uncoordinated manner, have led to","increasing distortions of the wholesale","electricity market, with negative","consequences for investments and cross-","border trade."],"old":["(4) State interventions, often designed","in an uncoordinated manner, have led to","","increasing distortions of the wholesale","electricity market, with negative","consequences for investments and cross-","border trade."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"60","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-263","location":[["Proposal for a regulation","Article 18 \u2013 paragraph 3"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:00"},"new":["3. Member States shall publish a","timeline and an implementation plan for","adopting measures to eliminate any","identified regulatory distortions and","market failures. When addressing resource","adequacy concerns Member States shall","first remove those regulatory distortions,","enabling scarcity pricing, developing","interconnection and distributed energy","resources. Member States shall consider","cost-effective alternatives to building","additional generation by carrying out a","cost-benefit analysis of alternative","options, including energy","efficiency/demand side management,","developing interconnection and energy","storage. Member States shall notify the","timelines to the European Commission for","approval. The Commission shall assess","whether these measures are sufficient to","eliminate the market distortion and issue","a decision as to the compatibility of the","notified actions in Member States\u2019","timelines with the overall objectives of the","Energy Union, in particular their","contribution to the EU 2030 climate and","energy targets and 2050 decarbonisation","objectives. Member States shall regularly","report on progress towards implementing","the actions set out in their timelines.","Actions may include:","(a) removal of regulatory distortions and","market failures, notably hurdles to","increased energy efficiency, flexibility and","the deployment of renewable energy;","(b) elimination of the potential oversupply","of capacity in the market by first taking","the most polluting and least flexible","resources off the grid.","(c) removal of price caps;","(d) introduction of an administrative","shortage pricing function as referred to in","Article 44 of [The Commission regulation","establishing a guideline on electricity","balancing];","(e) increasing interconnection capacity","where necessary according to the","adequacy assessment and interconnection","target and reinforce and optimise internal","grid to address congestion;","(f) increasing energy efficiency,","development of demand-side response and","storage capacity;"],"old":["3. Member States shall publish a","timeline for adopting measures to eliminate","any identified regulatory distortions. When","addressing resource adequacy concerns","Member States shall in particular consider","","removing regulatory distortions, enabling","scarcity pricing, developing","interconnection, energy storage, demand","side measures and energy efficiency.","",""],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"263","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Piernicola Pedicini, Eleonora Evi, Dario Tamburrano","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-61","location":[["Proposal for a regulation","Recital 5"]],"meps":[124844,124779,124813],"meta":{"created":"2019-07-03T06:24:59"},"new":["(5) In the past, electricity customers","were purely passive, often buying","electricity at regulated prices which had no","direct relation to the market. In the future,","customers need to be enabled to fully","participate in the market on equal footing","with other market participants. To integrate","growing shares of renewable energy, the","future electricity system should make use","of all available sources of flexibility,","particularly demand response and storage.","To achieve effective decarbonisation at","lowest cost, it also needs to encourage","energy efficiency as well as phasing out","environmentally or economically harmful","subsidies."],"old":["(5) In the past, electricity customers","were purely passive, often buying","electricity at regulated prices which had no","direct relation to the market. In the future,","customers need to be enabled to fully","participate in the market on equal footing","with other market participants. To integrate","growing shares of renewable energy, the","future electricity system should make use","of all available sources of flexibility,","particularly demand response and storage.","To achieve effective decarbonisation at","lowest cost, it also needs to encourage","energy efficiency."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"61","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-264","location":[["Proposal for a regulation","Article 18 \u2013 paragraph 3"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:00"},"new":["3. Member States shall publish a","timeline for adopting measures to eliminate","any identified regulatory distortions. When","addressing resource adequacy concerns","Member States shall in particular consider","removing regulatory distortions, enabling","scarcity pricing, developing","interconnection, energy storage, demand","side measures, self-generation and energy","efficiency."],"old":["3. Member States shall publish a","timeline for adopting measures to eliminate","any identified regulatory distortions. When","addressing resource adequacy concerns","Member States shall in particular consider","removing regulatory distortions, enabling","scarcity pricing, developing","interconnection, energy storage, demand","side measures and energy efficiency."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"264","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Nicola Caputo","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-62","location":[["Proposal for a regulation","Recital 5"]],"meps":[124851],"meta":{"created":"2019-07-03T06:24:59"},"new":["(5) In the past, electricity customers","were purely passive, often buying","electricity at regulated prices which had no","direct relation to the market. In the future,","customers need to be enabled to fully","participate in the market on equal footing","with other market participants. To integrate","growing shares of renewable energy, the","future electricity system should make use","of all available sources of flexibility,","particularly demand response and storage.","To achieve effective decarbonisation at","lowest cost, it also needs to encourage","energy efficiency and to drive investments","on the long term."],"old":["(5) In the past, electricity customers","","were purely passive, often buying","electricity at regulated prices which had no","direct relation to the market. In the future,","customers need to be enabled to fully","participate in the market on equal footing","with other market participants. To integrate","growing shares of renewable energy, the","future electricity system should make use","of all available sources of flexibility,","particularly demand response and storage.","To achieve effective decarbonisation at","lowest cost, it also needs to encourage","energy efficiency."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"62","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-265","location":[["Proposal for a regulation","Article 18 \u2013 paragraph 3 a (new)"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:00"},"new":["3a. Member States shall assess","whether a capacity mechanism in the","form of strategic reserve can address the","adequacy concerns. Where this is not the","case, Member States may implement a","different type of mechanism. Such","mechanisms shall not create unnecessary","market distortions or inhibit cross-border","trade. They shall be open to all generation","technologies, storage, energy efficiency","and demand-side response. The amount","of capacity committed in the mechanism","shall not go beyond what is necessary to","address the concern. The parameters","determining the amount of capacity","procured in the capacity mechanism shall","be approved by the national regulatory","authority."],"old":[""],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"265","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-63","location":[[" Proposal for a regulation","Recital 5"]],"meps":[124736],"meta":{"created":"2019-07-03T06:24:59"},"new":["(5) In the past, electricity customers","were purely passive, often buying","electricity at regulated prices which had no","direct relation to the market. In the future,","customers need to be enabled to fully","participate in the market on equal footing","with other market participants. To integrate","growing shares of renewable energy, the","future electricity system should make use","of all available sources of flexibility,","particularly demand response and storage.","To achieve effective decarbonisation at","lowest cost, it also needs to encourage","energy efficiency and thus reduce the","energy demand."],"old":["(5) In the past, electricity customers","were purely passive, often buying","electricity at regulated prices which had no","direct relation to the market. In the future,","customers need to be enabled to fully","participate in the market on equal footing","with other market participants. To integrate","growing shares of renewable energy, the","future electricity system should make use","of all available sources of flexibility,","particularly demand response and storage.","To achieve effective decarbonisation at","lowest cost, it also needs to encourage","energy efficiency."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"63","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-266","justification":" In line with the provisions linked to Article 23 (and 18 a), capacity mechanisms introduced\n following an identified resource adequacy concern (Article 23 last paragraph) that remains\n after removal of regulatory distortions, shall be of temporary nature and include a timeframe\n for phase-out.","location":[[" Proposal for a regulation","Article 18 \u2013 paragraph 3 a (new)"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:00"},"new":["3a. In case a new capacity mechanism","is introduced, the implementation plan","shall also entail a comprehensive phase-","out strategy including a time frame for","this capacity mechanism according to the","provisions of Article 23 [and Article 18 a]."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"266","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Carolina Punset","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-267","justification":"It is essential to set a framework ensuring that the recourse to capacity mechanism is a last\nresort option. Introducing indicators and an obligation to report on the evolution of the\nidentified concern will limit the distortive effect of the capacity mechanism on the market.","location":[[" Proposal for a regulation","Article 18 \u2013 paragraph 3 a (new)"]],"meps":[90110],"meta":{"created":"2019-07-03T06:25:00"},"new":["3a. Member States shall set indicators","to report on the effectiveness of the","measures adopted pursuant to paragraph","3, and shall review accordingly the","potential capacity mechanism put in","place."],"old":[""],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"267","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Luke Ming Flanagan","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-64","location":[["Proposal for a regulation","Recital 6"]],"meps":[124985],"meta":{"created":"2019-07-03T06:25:00"},"new":["(6) More market integration and the","change towards a more volatile electricity","production requires increased efforts to","coordinate national energy policies with","neighbours and to use the opportunities of","cross-border electricity trade, though care","must be exercised that this is NOT at the","expense of the 'home' market."],"old":["(6) More market integration and the","change towards a more volatile electricity","production requires increased efforts to","coordinate national energy policies with","neighbours and to use the opportunities of","cross-border electricity trade."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"64","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Sirpa Pietik\u00e4inen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-268","location":[["Proposal for a regulation","Article 18 \u2013 paragraph 3 a (new)"]],"meps":[40599],"meta":{"created":"2019-07-03T06:25:00"},"new":["3a. Member States shall report, based","on set indicators, on the effectiveness of","the measures adopted pursuant to","paragraph 3, and shall review the","potential capacity mechanism","accordingly;"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"268","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Nicola Caputo","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-65","location":[["Proposal for a regulation","Recital 6"]],"meps":[124851],"meta":{"created":"2019-07-03T06:25:00"},"new":["(6) More market integration and the","change towards a more distributed and","volatile electricity production requires","increased efforts to coordinate national","energy policies with neighbours and to use","the opportunities of cross-border electricity","trade."],"old":["(6) More market integration and the","change towards a more volatile electricity","production requires increased efforts to","coordinate national energy policies with","neighbours and to use the opportunities of","cross-border electricity trade."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"65","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-269","justification":"Capacity mechanisms can, if not well designed and temporary in nature, create important\nmarket distortions. They shall not be used as a life line for conventional generation capacity.\nIt is paramount that such mechanism are open to all market participants, including across\nborders, and that they include flexibility criteria to effectively being able to provide capacity\nat short notice and with flexible volumes.","location":[["Proposal for a regulation","Article 18 a (new)"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:00"},"new":["Article 18 a","Rules of capacity mechanism","1. In case of an adequacy problem","identified by the European Resource","adequacy assessment, Member States","shall be able to address residual concerns","that cannot be eliminated by the measures","pursuant to Article 18 (3), subject to the","provisions of this Article and Union State","Aid rules.","2. Member States shall assess whether a","capacity mechanism in the form of","strategic reserve can address the adequacy","concerns. Only where this is not the case,","Member States may implement a different","type of mechanism. Such mechanisms","shall not create unnecessary market","distortions or inhibit cross-border trade.","They shall be open to all generation","technologies, storage, energy efficiency","and demand-side response. The amount","of capacity committed in the mechanism","shall not go beyond what is necessary to","address the concern. The sizing procured","in the capacity mechanism shall be","approved by the national regulatory","authority.","3. Where a Member State applies a","capacity mechanism, it shall review that","mechanism before [two years after the","date of entry into force of this Regulation]","and every year thereafter and provide that","no new contracts are concluded under","that mechanism where:","(a) the European resource adequacy","assessment has not identified a resource","adequacy concern; and/or","(b) the measures referred to in paragraph","3 have not been sufficiently implemented","in accordance with paragraph 3e.","4. Capacity mechanisms shall be","temporary. They shall be approved by the","Commission for no longer than four","years. They shall be phased out or at least","phased down, based on the","implementation plan pursuant to Article","18(3) and 18 (3a).","5. Generation capacity shall be eligible to","participate in a capacity mechanism only","if","(a) its total greenhouse gas emissions per","kilowatt hour of electricity produced in","the installation do not exceed 350g of","CO2 per kW/h equivalent from [OP: date","of entry into force of this Regulation];","and","(b) is capable of ramping up and down","on-load at least at the level of 5% of their","capacity per minute and is able to","minimise the necessary level of stable","output below 40% of power plants","benefitting from capacity mechanisms.","6. Capacity providers must comply with","any EU environmental quality standards","and in particular emissions shall not","exceed the stricter levels associated with","BAT and higher range of BAT-associated","energy efficiency levels of all relevant","BAT conclusions set for new plants to","participate in capacity mechanisms.","7. Without prejudice to the immediate","application of the emission limits [and","flexibility] requirements set out in","paragraph 5, by [two years from the entry","into force of this Regulation], Member","States shall complete the review of","existing capacity mechanisms, and of the","related contractual or administrative","arrangement, and bring them in","compliance with the provisions of this","Regulation. They shall submit to the","Commission a detailed report on the","results of the review and of the measures","taken."],"old":["",""],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"269","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Luke Ming Flanagan","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-66","location":[["Proposal for a regulation","Recital 8"]],"meps":[124985],"meta":{"created":"2019-07-03T06:25:00"},"new":["(8) Core market principles should set","out that electricity prices are to be","determined through demand and supply,","though regulation of that market is then","required to ensure that in this most vital","of services, there is neither profiteering","nor cartel operations by the dominant","players. Those prices should signal when","electricity is needed, providing market-","based incentives for investments into","flexibility sources such as flexible","generation, interconnection, demand","response or storage."],"old":["(8) Core market principles should set","","out that electricity prices are to be","determined through demand and supply.","Those prices should signal when electricity","is needed, providing market-based","incentives for investments into flexibility","sources such as flexible generation,","interconnection, demand response or","storage."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"66","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Michel Dantin, Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-270","justification":" An annual assessment would undermine the effectiveness of a mechanism designed to cover\n several years in order to generate appropriate messages for investors.","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 1"]],"meps":[97296,2025,124732],"meta":{"created":"2019-07-03T06:25:01"},"new":["1. The European resource adequacy","assessment shall cover the overall","adequacy of the electricity system to","supply current and projected demands for","electricity for a ten-year period from the","date of that assessment."],"old":["1. The European resource adequacy","assessment shall cover the overall","adequacy of the electricity system to","supply current and projected demands for","electricity for a ten-year period from the","date of that assessment, in a yearly","resolution."],"orig_lang":"fr","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"270","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Carolina Punset","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-67","justification":"The efficient rollout of energy storage has been hampered by tax code provisions that lead\ntodouble-taxation. Member States should therefore take steps to remove these barriers.","location":[[" Proposal for a regulation","Recital 9"]],"meps":[90110],"meta":{"created":"2019-07-03T06:25:00"},"new":["(9) The decarbonisation of the","electricity sector, with renewable energy","becoming a major part of the market, is a","core objective of the Energy Union. As the","Union moves towards the decarbonisation","of the electricity sector and increasing","penetration of renewable energy sources, it","is crucial that the market removes existing","barriers to cross-border trade and","encourages investments into supporting","infrastructure, for example, more flexible","generation, interconnection, demand","response and storage. To support the roll-","out of energy storage solutions, Member","States should take steps to remove out","dated taxation provisions that lead to","double-taxation. To support this shift to","variable and distributed generation, and to","ensure that energy market principles are","the basis for the Union's electricity markets","of the future, a renewed focus on short-","term markets and scarcity pricing is","essential."],"old":["(9) The decarbonisation of the","electricity sector, with renewable energy","becoming a major part of the market, is a","core objective of the Energy Union. As the","Union moves towards the decarbonisation","of the electricity sector and increasing","penetration of renewable energy sources, it","is crucial that the market removes existing","barriers to cross-border trade and","encourages investments into supporting","infrastructure, for example, more flexible","generation, interconnection, demand","response and storage. To support this shift","to variable and distributed generation, and","to ensure that energy market principles are","the basis for the Union's electricity markets","of the future, a renewed focus on short-","term markets and scarcity pricing is","essential."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"67","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-271","justification":" This amendment is intrinsically linked to the amendment on Article 18, paragraph 3","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 4 \u2013 point a a (new)"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:01"},"new":["(aa) is based on appropriate scenarios","that are consistent with the objectives and","targets agreed in the policy framework for","climate and energy covering the period","from 2020 to 2030 and consistent with","reaching the long-term objectives as","expressed in the Paris Agreement;"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"271","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Luke Ming Flanagan","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-68","location":[["Proposal for a regulation","Recital 9"]],"meps":[124985],"meta":{"created":"2019-07-03T06:25:00"},"new":["(9) The decarbonisation of the","electricity sector, with renewable energy","becoming a major part of the market, is a","core objective of the Energy Union. As the","Union moves towards the decarbonisation","of the electricity sector and increasing","penetration of renewable energy sources, it","is crucial that the market removes existing","barriers to cross-border trade (though","provision must also be made to ensure","that the 'home' market in such trade isn't","adversely affected) and encourages","investments into supporting infrastructure,","for example, more flexible generation,","interconnection, demand response and","storage. To support this shift to variable","and distributed generation, and to ensure","that energy market principles are the basis","for the Union's electricity markets of the","future, a renewed focus on short-term","markets and scarcity pricing is essential."],"old":["(9) The decarbonisation of the","electricity sector, with renewable energy","becoming a major part of the market, is a","core objective of the Energy Union. As the","Union moves towards the decarbonisation","of the electricity sector and increasing","penetration of renewable energy sources, it","is crucial that the market removes existing","barriers to cross-border trade and","encourages investments into supporting","infrastructure, for example, more flexible","generation, interconnection, demand","response and storage. To support this shift","to variable and distributed generation, and","to ensure that energy market principles are","the basis for the Union's electricity markets","of the future, a renewed focus on short-","term markets and scarcity pricing is","essential."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"68","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-272","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 4 \u2013 point b"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:01"},"new":["(b) is based on appropriate scenarios of","projected demand and supply including an","economic assessment of the likelihood of","retirement, moth- balling, new-build of","generation assets and measures to reach","energy efficiency and electricity","interconnection targets and appropriate","sensitivities on wholesale prices and","carbon price developments and","appropriately takes account of the","contribution of all resources and their","potential for technological advancement","i.e. via monitoring flexibility available in","the system, including existing and","potential flexibility from generation,","demand-side, interconnections and","storage;"],"old":["(b) is based on appropriate scenarios of","projected demand and supply including an","economic assessment of the likelihood of","retirement, new-build of generation assets","and measures to reach energy efficiency","targets and appropriate sensitivities on","wholesale prices and carbon price","developments;"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"272","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Luke Ming Flanagan","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-69","location":[["Proposal for a regulation","Recital 10"]],"meps":[124985],"meta":{"created":"2019-07-03T06:25:00"},"new":["(10) Short-term markets will improve","liquidity and competition by enabling more","resources to participate fully in the market,","especially those that are more flexible.","Effective scarcity pricing will encourage","market participants to be available when","the market most needs it and ensures that","they can recover their costs in the","wholesale market. It is therefore critical to","ensure that, as far as possible,","administrative and implicit price caps are","removed to allow scarcity prices to","increase up to the value of lost load. When","fully embedded in the market structure,","short-term markets and scarcity pricing","will contribute to the removal of other","measures, such as capacity mechanisms, to","ensure security of supply. At the same","time, scarcity pricing without price caps on","the wholesale market should not jeopardize","the possibility for reasonable, reliable and","stable prices for final customers, in","particular households and SMEs."],"old":["(10) Short-term markets will improve","liquidity and competition by enabling more","resources to participate fully in the market,","especially those that are more flexible.","Effective scarcity pricing will encourage","market participants to be available when","the market most needs it and ensures that","they can recover their costs in the","wholesale market. It is therefore critical to","ensure that, as far as possible,","administrative and implicit price caps are","removed to allow scarcity prices to","increase up to the value of lost load. When","fully embedded in the market structure,","short-term markets and scarcity pricing","will contribute to the removal of other","measures, such as capacity mechanisms, to","ensure security of supply. At the same","time, scarcity pricing without price caps on","the wholesale market should not jeopardize","the possibility for reliable and stable prices","for final customers, in particular","households and SMEs."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"69","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-273","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 6"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:01"},"new":["6. The proposals under paragraphs 2","and 5, the scenarios and assumptions on","which they are based and the results of the","European resource adequacy assessment","under paragraph 3 shall be subject to prior","consultation of all interested stakeholders","and approval by the Agency under the","procedure set out in Article 22."],"old":["6. The proposals under paragraphs 2","and 5 and the results of the European","resource adequacy assessment under","paragraph 3 shall be subject to prior","consultation and approval by the Agency","under the procedure set out in Article 22."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"273","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-70","location":[[" Proposal for a regulation","Recital 10"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:00"},"new":["(10) Short-term markets will improve","liquidity and competition by enabling more","resources to participate fully in the market,","especially those that are more flexible.","Effective scarcity pricing will encourage","market participants to be available when","the market most needs it and ensures that","they can recover their costs in the","wholesale market. It is therefore critical to","ensure that, as far as possible,","administrative and implicit price caps are","removed to allow scarcity prices to","increase up to the value of lost load. When","fully embedded in the market structure,","short-term markets and scarcity pricing","will contribute to the removal of other","measures, such as capacity mechanisms, to","ensure security of supply. At the same","time, scarcity pricing without price caps on","the wholesale market should not jeopardize","the possibility for reliable stable and","affordable prices for final customers, in","particular households and SMEs."],"old":["(10) Short-term markets will improve","liquidity and competition by enabling more","resources to participate fully in the market,","especially those that are more flexible.","Effective scarcity pricing will encourage","market participants to be available when","the market most needs it and ensures that","they can recover their costs in the","wholesale market. It is therefore critical to","ensure that, as far as possible,","","administrative and implicit price caps are","removed to allow scarcity prices to","increase up to the value of lost load. When","fully embedded in the market structure,","short-term markets and scarcity pricing","will contribute to the removal of other","measures, such as capacity mechanisms, to","ensure security of supply. At the same","time, scarcity pricing without price caps on","the wholesale market should not jeopardize","the possibility for reliable and stable prices","for final customers, in particular","households and SMEs."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"70","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Nicola Caputo","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-71","location":[["Proposal for a regulation","Recital 12"]],"meps":[124851],"meta":{"created":"2019-07-03T06:25:00"},"new":["(12) The precondition for effective","competition in the internal market in","electricity is non-discriminatory,","transparent and adequate charges for","network use including interconnecting","lines in the transmission system. The","available capacity of those lines should be","set at the maximum levels consistent with","the safety standards of secure network","operation."],"old":["(12) The precondition for effective","competition in the internal market in","electricity is non-discriminatory and","transparent charges for network use","including interconnecting lines in the","transmission system. The available","capacity of those lines should be set at the","maximum levels consistent with the safety","standards of secure network operation."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"71","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Piernicola Pedicini, Eleonora Evi, Dario Tamburrano","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-274","justification":" The European resource adequacy assessment must be fully transparent, including the\n underlying scenarios and assumptions, to be adequately scrutinised by stakeholders","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 6"]],"meps":[124844,124779,124813],"meta":{"created":"2019-07-03T06:25:01"},"new":["6. The proposals under paragraphs 2","and 5, the scenario and assumptions on","which they are based, and the results of the","European resource adequacy assessment","under paragraph 3 shall be subject to prior","consultation of all relevant stakeholders","and approval by the Agency under the","procedure set out in Article 22."],"old":["6. The proposals under paragraphs 2","and 5 and the results of the European","resource adequacy assessment under","paragraph 3 shall be subject to prior","consultation and approval by the Agency","under the procedure set out in Article 22."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"274","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Arne Gericke","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-72","location":[["Proposal for a regulation","Recital 13 a (new)"]],"meps":[124815],"meta":{"created":"2019-07-03T06:25:00"},"new":["(13a) Supply networks throughout","Europe, whether local or long-distance,","face major challenges which many of","them will be unable to meet. Accordingly,","Member States are required to focus on","modernising and adapting the local power","supply networks in their regions and","taking appropriate measures to coordinate","their development across Europe;"],"orig_lang":"de","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"72","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Carolina Punset","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-275","justification":"The necessary level of security of supply should be established taking into account the value\nthat consumers place on electricity (VoLL \u2013 value of lost load), by the match between the\nincremental cost of insuring consumers against blackouts and the cost of incremental\nblackouts to consumers. In relation to achieving such necessary level and since capacity\nremuneration mechanisms distort the market, they should only be adopted after verification of\nboth their technical necessity and their economic efficiency, after having evaluated other\nalternative options.","location":[[" Proposal for a regulation","Article 20 \u2013 paragraph 1"]],"meps":[90110],"meta":{"created":"2019-07-03T06:25:01"},"new":["1. When applying capacity","mechanisms Member States shall have","liability standard in place indicating the","necessary level of security of supply in","transparent manner. A thorough cost","benefit analysis shall be carried out to","justify the necessity of achieving a certain","level of security of supply, as well as to","justify the need to adopt capacity","mechanisms in order to achieve such","necessary level."],"old":["1. When applying capacity","mechanisms Member States shall have a","reliability standard in place indicating their","desired level of security of supply in a","transparent manner."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"275","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-276","location":[["Proposal for a regulation","Article 20 \u2013 paragraph 1"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:01"},"new":["1. When applying capacity","mechanisms Member States shall have a","reliability standard in place. A reliability","standard shall indicate the necessary level","of security of supply of the Member State","in a transparent manner, and shall be set at","an independently defined level of","technical feasibility and cost-effectivity."],"old":["1. When applying capacity","mechanisms Member States shall have a","reliability standard in place indicating","their desired level of security of supply in","a transparent manner."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"276","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Carolina Punset","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-73","justification":" Ensures that energy storage is recognised as a new energy asset class in EU law.","location":[[" Proposal for a regulation","Recital 14"]],"meps":[90110],"meta":{"created":"2019-07-03T06:25:00"},"new":["(14) To efficiently steer necessary","investments, prices also need to provide","signals where electricity is most needed. In","a zonal electricity system, correct","locational signals require a coherent,","objective and reliable determination of","bidding zones via a transparent process. In","order to ensure efficient operation and","planning of the Union electricity network","and to provide effective price signals for","new generation capacity, demand response,","energy storage or transmission","infrastructure, bidding zones should reflect","structural congestion. In particular, cross-","zonal capacity should not be reduced in","order to resolve internal congestion."],"old":["(14) To efficiently steer necessary","investments, prices also need to provide","signals where electricity is most needed. In","a zonal electricity system, correct","locational signals require a coherent,","objective and reliable determination of","bidding zones via a transparent process. In","order to ensure efficient operation and","planning of the Union electricity network","and to provide effective price signals for","new generation capacity, demand response","or transmission infrastructure, bidding","zones should reflect structural congestion.","In particular, cross-zonal capacity should","not be reduced in order to resolve internal","congestion."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"73","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-277","justification":" When identifying the necessary level of security of supply, Member States shall consider the\n potentially negative environmental impacts of electricity generation and the need to avoid\n environmentally harmful subsidies.","location":[["Proposal for a regulation","Article 20 \u2013 paragraph 1"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:01"},"new":["1. When applying capacity","mechanisms Member States shall have a","reliability standard in place, based on","transparent, objective and verifiable","criteria indicating the level of security of","supply that they deem necessary."],"old":["1. When applying capacity","mechanisms Member States shall have a","reliability standard in place indicating their","desired level of security of supply in a","transparent manner."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"277","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Nicola Caputo","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-74","location":[["Proposal for a regulation","Recital 14"]],"meps":[124851],"meta":{"created":"2019-07-03T06:25:00"},"new":["(14) To efficiently steer necessary","investments, prices also need to provide","signals where electricity is most needed. In","a zonal electricity system, correct","locational signals require a coherent,","objective and reliable determination of","bidding zones via a transparent process. In","order to ensure efficient operation and","planning of the Union electricity network","and to provide effective price signals for","new generation capacity, demand response,","energy storage or transmission","infrastructure, bidding zones should reflect","structural congestion. In particular, cross-","zonal capacity should not be reduced in","order to resolve internal congestion."],"old":["(14) To efficiently steer necessary","investments, prices also need to provide","signals where electricity is most needed. In","a zonal electricity system, correct","locational signals require a coherent,","objective and reliable determination of","bidding zones via a transparent process. In","order to ensure efficient operation and","planning of the Union electricity network","and to provide effective price signals for","new generation capacity, demand response","or transmission infrastructure, bidding","zones should reflect structural congestion.","In particular, cross-zonal capacity should","not be reduced in order to resolve internal","congestion."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"74","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Piernicola Pedicini, Eleonora Evi, Dario Tamburrano","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-278","justification":" When identifying the necessary level of security of supply, Member States shall consider the\n potentially negative environmental impacts of electricity generation and the need to avoid\n environmentally harmful subsidies","location":[[" Proposal for a regulation","Article 20 \u2013 paragraph 1"]],"meps":[124844,124779,124813],"meta":{"created":"2019-07-03T06:25:01"},"new":["1. When applying capacity","mechanisms Member States shall have a","reliability standard in place to determine","the necessary level of security of supply in","a transparent manner."],"old":["1. When applying capacity","mechanisms Member States shall have a","reliability standard in place indicating","their desired level of security of supply in","a transparent manner."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"278","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye, Michel Dantin","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-279","location":[[" Proposal for a regulation","Article 20 \u2013 paragraph 1"]],"meps":[2025,124732,97296],"meta":{"created":"2019-07-03T06:25:01"},"new":["1. Member States shall have a","reliability standard in place indicating their","desired level of security of supply in a","transparent manner."],"old":["1. When applying capacity","mechanisms Member States shall have a","reliability standard in place indicating their","desired level of security of supply in a","transparent manner."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"279","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-75","justification":" Decarbonisation needs to be inclusive, just and agreed by all stakeholders and consider\n societal, economic and environmental impacts, as well as sustainable labour alternatives,\n especially when the phase-out is linked to the closure of mining activities. A preparatory\n action on the establishment of a coal platform dialogue to discuss aspects of governance, just\n transition and decommissioning is about to start and EU Electricty Market rules should be in\n line with those activities.","location":[["Proposal for a regulation","Recital 15"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:00"},"new":["(15) Efficient decarbonisation of the","electricity system via market integration","requires systematically abolishing barriers","to cross-border trade to overcome market","fragmentation and to allow Union energy","customers to fully benefit from the","advantages of integrated electricity markets","and competition. It also needs to provide","for a just transition for coal mining","regions and for those parts of the","electricity market that are still largely","based on electricity production from coal,","as their decommission necessary in the","framework of the transition to a flexible","and sustainable energy system enabling","the EU meeting the Paris Agreement will","have to address the numerous economical","and social challenges."],"old":["(15) Efficient decarbonisation of the","electricity system via market integration","requires systematically abolishing barriers","to cross-border trade to overcome market","fragmentation and to allow Union energy","customers to fully benefit from the","advantages of integrated electricity markets","and competition.",""],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"75","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-280","location":[["Proposal for a regulation","Article 20 \u2013 paragraph 2"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:01"},"new":["2. The reliability standard shall be set","by the national regulatory authority based","on the methodology pursuant to Article19","(5), taking into account the principles of","necessity and proportionality; the","standard shall include a trajectory for the","phasing out of environmentally harmful","subsidies to fossil fuel and nuclear","generation and shall not cause further","market distortions, including","overcapacity."],"old":["2. The reliability standard shall be set","by the national regulatory authority based","on the methodology pursuant to Article","19(5)."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"280","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Sirpa Pietik\u00e4inen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-76","location":[[" Proposal for a regulation","Recital 15"]],"meps":[40599],"meta":{"created":"2019-07-03T06:25:00"},"new":["(15) Efficient decarbonisation of the","electricity system by 2050 via market","integration requires systematically","abolishing barriers to cross-border trade to","overcome market fragmentation and to","allow Union energy customers to fully","benefit from the advantages of integrated","electricity markets and competition."],"old":["(15) Efficient decarbonisation of the","electricity system via market integration","requires systematically abolishing barriers","to cross-border trade to overcome market","fragmentation and to allow Union energy","customers to fully benefit from the","advantages of integrated electricity markets","and competition."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"76","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Piernicola Pedicini, Eleonora Evi, Dario Tamburrano","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-281","justification":" When identifying the necessary level of security of supply, Member States shall consider the\n potentially negative environmental impacts of electricity generation and the need to avoid\n environmentally harmful subsidies","location":[["Proposal for a regulation","Article 20 \u2013 paragraph 2"]],"meps":[124844,124779,124813],"meta":{"created":"2019-07-03T06:25:01"},"new":["2. The reliability standard shall be set","by the national regulatory authority based","on the methodology pursuant to","Article19(5), taking into account the","principles of necessity and proportionality","and the need to avoid the negative impacts","of environmentally harmful subsidies and","market distortions via the creation of","overcapacity."],"old":["2. The reliability standard shall be set","by the national regulatory authority based","on the methodology pursuant to Article","19(5)."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"281","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Sirpa Pietik\u00e4inen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-77","location":[[" Proposal for a regulation","Recital 15 a (new)"]],"meps":[40599],"meta":{"created":"2019-07-03T06:25:00"},"new":["(15a) Priority dispatch for generating","installations using variable renewable","energy sources should be recognised for","its role in supporting the EU to meet","its targets for the use of energy from","renewable sources and reduction of","greenhouse gas emissions;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"77","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-282","justification":" When identifying the necessary level of security of supply, Member States shall consider the\n potentially negative environmental impacts of electricity generation and the need to avoid\n environmentally harmful subsidies and the creation of overcapacity.","location":[[" Proposal for a regulation","Article 20 \u2013 paragraph 2"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:01"},"new":["2. The reliability standard shall be set","by the national regulatory authority based","on the methodology pursuant to Article","19(5), taking into account the principles","of necessity and proportionality and the","need to avoid the negative impacts of","environmentally harmful subsidies and","unnecessary market distortions, including","overcapacity."],"old":["2. The reliability standard shall be set","by the national regulatory authority based","on the methodology pursuant to Article","19(5)."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"282","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Jadwiga Wi\u015bniewska","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-78","location":[["Proposal for a regulation","Recital 28"]],"meps":[124877],"meta":{"created":"2019-07-03T06:25:00"},"new":["(28) Prior to introducing capacity","mechanisms, Member States should assess","regulatory distortions contributing to the","related resource adequacy concern. They","should be required to adopt measures to","eliminate the identified distortions","including a timeline for their","implementation. Capacity mechanisms","should only be introduced for the residual","concerns, such as security of energy","supplies, that cannot be addressed through","removing such distortions."],"old":["(28) Prior to introducing capacity","mechanisms, Member States should assess","regulatory distortions contributing to the","related resource adequacy concern. They","should be required to adopt measures to","eliminate the identified distortions","including a timeline for their","implementation. Capacity mechanisms","should only be introduced for the residual","concerns that cannot be addressed through","removing such distortions."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"78","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Pavel Poc","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-283","justification":"The provisions imposing Member States to allow for participation of cross-border capacity in\nCRM (Art. 21) should be applicable to all types of CRMs, including strategic reserves. This\nwould ensure most efficient use of generation capacity across Europe.","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 1"]],"meps":[96715],"meta":{"created":"2019-07-03T06:25:01"},"new":["1. Mechanisms shall be open to direct","participation of capacity providers located","in another Member State provided there is","a network connection between that","Member State and the bidding zone","applying the mechanism."],"old":["1. Mechanisms other than strategic","reserves shall be open to direct","participation of capacity providers located","in another Member State provided there is","a network connection between that","","Member State and the bidding zone","applying the mechanism."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"283","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Jadwiga Wi\u015bniewska","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-79","location":[["Proposal for a regulation","Recital 30"]],"meps":[124877],"meta":{"created":"2019-07-03T06:25:00"},"new":["(30) Main principles of capacity","mechanisms should be laid down, building","on the environmental and energy State aid","principles and the findings of DG","Competition's Sector Inquiry on capacity","mechanisms. Capacity mechanisms already","in place should be reviewed in light of","these principles. In case a","national resource adequacy assessment","reveals the absence of any adequacy","concern, no new capacity mechanism","should be established and no new capacity","commitments under mechanisms already in","place should be made. The application of","the State aid control rules pursuant to","Articles 107 to 109 TFUE must be","complied with at all times."],"old":["(30) Main principles of capacity","","","mechanisms should be laid down, building","on the environmental and energy State aid","principles and the findings of DG","Competition's Sector Inquiry on capacity","mechanisms. Capacity mechanisms already","in place should be reviewed in light of","these principles. In case the European","resource adequacy assessment reveals the","absence of any adequacy concern, no new","capacity mechanism should be established","and no new capacity commitments under","mechanisms already in place should be","made. The application of the State aid","control rules pursuant to Articles 107 to","109 TFUE must be complied with at all","times."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"79","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye, Michel Dantin","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-284","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 1"]],"meps":[2025,124732,97296],"meta":{"created":"2019-07-03T06:25:02"},"new":["1. Capacity mechanisms shall be open","to direct participation of capacity providers","located in another Member State provided","there is a network connection between that","Member State and the bidding zone","applying the mechanism."],"old":["1. Mechanisms other than strategic","reserves shall be open to direct","participation of capacity providers located","in another Member State provided there is","a network connection between that","Member State and the bidding zone","applying the mechanism."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"284","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Sirpa Pietik\u00e4inen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-80","location":[[" Proposal for a regulation","Recital 30 a (new)"]],"meps":[40599],"meta":{"created":"2019-07-03T06:25:01"},"new":["(30 a) All direct and indirect subsidies for","electricity from fossil fuels should be","phased out by 2023."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"80","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-285","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 6"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:02"},"new":["6. Where capacity mechanisms are","applied, TSOs shall assist relevant","regulatory authorities in calculating the","maximum entry capacity available for the","participation of foreign capacity taking into","account the expected availability of","interconnection and the likely concurrence","of system stress between the system where","the mechanism is applied and the system in","which the foreign capacity is located. A","calculation is required for each bidding","zone border."],"old":["6. Regional operational centres","established pursuant to Article 32 shall","annually calculate the maximum entry","capacity available for the participation of","foreign capacity taking into account the","expected availability of interconnection","and the likely concurrence of system stress","between the system where the mechanism","","is applied and the system in which the","foreign capacity is located. A calculation is","required for each bidding zone border."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"285","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Nicola Caputo","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-81","location":[[" Proposal for a regulation","Recital 31"]],"meps":[124851],"meta":{"created":"2019-07-03T06:25:01"},"new":["(31) Detailed rules for facilitating","effective cross-border participation in","capacity mechanisms other than strategic","reserves should be laid down.","Transmission system operators across the","borders should facilitate interested","generators wanting to participate in","capacity mechanisms in other Member","States. Therefore, they should calculate","capacities up to which cross-border","participation would be possible, enable","participation and check availabilities.","National regulatory authorities should","enforce the cross-border rules in the","Member States."],"old":["(31) Detailed rules for facilitating","effective cross-border participation in","capacity mechanisms other than reserve","","schemes should be laid down.","Transmission system operators across the","borders should facilitate interested","generators wanting to participate in","capacity mechanisms in other Member","States. Therefore, they should calculate","capacities up to which cross-border","participation would be possible, enable","participation and check availabilities.","National regulatory authorities should","enforce the cross-border rules in the","Member States."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"81","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-286","justification":"Capacity mechanisms can, if not well designed and temporary in nature, create important\nmarket distortions. They shall not be used as a life-line for conventional generation capacity\nand only be introduced as a last resort.","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 1"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:02"},"new":["1. To address residual concerns that","cannot be eliminated by the measures","pursuant to Article18(3), Member States","may temporarily introduce capacity","mechanisms as a last resort. The","Commission may adopt a decision","allowing for the requested capacity","mechanism to be granted, subject to the","provisions of this Article and to the Union","State aid rules. The Commission shall","inform all Member States of those","applications before taking a decision,","taking into account confidentiality. That","decision shall be published in the Official","Journal of the European Union. The","Commission may include in its decision","conditions to the implementation of the","capacity mechanism. Remedies that build","on the curtailment of renewable energy","generation, forced disconnections of","household customers, limited feed-","in/dispatch of small-scale self-generators","or direct or indirect support to electricity","generation from form fossil fuels or","nuclear energy shall be excluded. The","decision shall be limited in time and","contain a detailed timeline with measures","to phase out the capacity mechanism as","well as the foreseen date of expiration of","the capacity mechanism."],"old":["1. To address residual concerns that","cannot be eliminated by the measures","pursuant to Article 18(3), Member States","may introduce capacity mechanisms,","subject to the provisions of this Article and","to the Union State aid rules."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"286","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Pavel Poc","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-82","justification":"Cross-border participation shall be allowed in all mechanisms, including strategic reserves,\nto ensure efficient utilization of generation sources across Europe.","location":[["Proposal for a regulation","Recital 31"]],"meps":[96715],"meta":{"created":"2019-07-03T06:25:01"},"new":["(31) Detailed rules for facilitating","effective cross-border participation in","capacity mechanisms should be laid down.","Transmission system operators across the","borders should facilitate interested","generators wanting to participate in","capacity mechanisms in other Member","States. Therefore, they should calculate","capacities up to which cross-border","participation would be possible, enable","participation and check availabilities.","National regulatory authorities should","enforce the cross-border rules in the","Member States."],"old":["(31) Detailed rules for facilitating","effective cross-border participation in","capacity mechanisms other than reserve","schemes should be laid down.","Transmission system operators across the","borders should facilitate interested","generators wanting to participate in","capacity mechanisms in other Member","States. Therefore, they should calculate","capacities up to which cross-border","participation would be possible, enable","participation and check availabilities.","National regulatory authorities should","enforce the cross-border rules in the","Member States."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"82","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Gy\u00f6rgy H\u00f6lv\u00e9nyi","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-287","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 1"]],"meps":[124715],"meta":{"created":"2019-07-03T06:25:02"},"new":["1. Member States may introduce","capacity mechanisms, subject to the","provisions of this Article and to the Union","State aid rules."],"old":["1. To address residual concerns that","cannot be eliminated by the measures","pursuant to Article 18(3), Member States","may introduce capacity mechanisms,","subject to the provisions of this Article and","to the Union State aid rules."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"287","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Kate\u0159ina Kone\u010dn\u00e1","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-83","justification":" Reserve schemes are already today opened to cross-border participation (for instance\n network reserve in Germany). Derogation would be a step back.","location":[[" Proposal for a regulation","Recital 31"]],"meps":[23699],"meta":{"created":"2019-07-03T06:25:01"},"new":["(31) Detailed rules for facilitating","effective cross-border participation in","capacity mechanisms should be laid down.","Transmission system operators across the","borders should facilitate interested","generators wanting to participate in","capacity mechanisms in other Member","States. Therefore, they should calculate","capacities up to which cross-border","participation would be possible, enable","participation and check availabilities.","National regulatory authorities should","enforce the cross-border rules in the","Member States.."],"old":["(31) Detailed rules for facilitating","effective cross-border participation in","capacity mechanisms other than reserve","schemes should be laid down.","Transmission system operators across the","borders should facilitate interested","generators wanting to participate in","capacity mechanisms in other Member","States. Therefore, they should calculate","capacities up to which cross-border","participation would be possible, enable","participation and check availabilities.","National regulatory authorities should","enforce the cross-border rules in the","Member States."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"83","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-288","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 1"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:02"},"new":["1. To address residual concerns that","cannot be eliminated by the measures","pursuant to Article 18(3), Member States","shall prepare a plan providing for","appropriate measures to address the said","concerns, to be implemented within a","maximum period of five years."],"old":["1. To address residual concerns that","cannot be eliminated by the measures","pursuant to Article 18(3), Member States","may introduce capacity mechanisms,","subject to the provisions of this Article","and to the Union State aid rules."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"288","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Nicola Caputo","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-84","location":[[" Proposal for a regulation","Recital 32"]],"meps":[124851],"meta":{"created":"2019-07-03T06:25:01"},"new":["(32) In view of differences in national","energy systems and technical limitations of","existing electricity networks, the best and","the most cost-effective approach to","achieving progress in market integration","will often be at a regional level. Regional","cooperation of transmission system","operators should thus be strengthened. In","order to ensure efficient cooperation, a new","regulatory framework should foresee","stronger regional governance and","regulatory oversight, including by","strengthening the decision-making power","of the Agency for cross-border issues.","Closer cooperation of Member States could","be needed also in crisis situations, to","increase security of supply and limit","market distortions."],"old":["(32) In view of differences in national","energy systems and technical limitations of","existing electricity networks, the best","approach to achieving progress in market","integration will often be at a regional level.","Regional cooperation of transmission","","system operators should thus be","strengthened. In order to ensure efficient","cooperation, a new regulatory framework","should foresee stronger regional","governance and regulatory oversight,","including by strengthening the decision-","making power of the Agency for cross-","border issues. Closer cooperation of","Member States could be needed also in","crisis situations, to increase security of","supply and limit market distortions."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"84","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-289","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 1 a (new)"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:02"},"new":["1a. The plan under paragraph 1 shall","aim at ensuring resource adequacy","without additional recourse to capacity","mechanisms, via one or more of the","following:","a) additional renewable energy generation","capacity;","b) Energy efficiency;","c) Demand side response;","d) Storage;","e) Interconnection."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"289","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Kate\u0159ina Kone\u010dn\u00e1","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-85","justification":" Distribution networks across Europe vary to a great extent: from voltage level, topology,\n natural profile of given area to consumption patterns of users. These specificities have to be\n taken into account in an operation of EU DSO entity.","location":[["Proposal for a regulation","Recital 38"]],"meps":[23699],"meta":{"created":"2019-07-03T06:25:01"},"new":["(38) In order to raise efficiencies in the","electricity distribution networks in the","Union and ensure close cooperation with","transmission system operators and ENTSO","for electricity, a European entity of","distribution system operators in the Union","(\"EU DSO entity\") should be established.","The tasks of the EU DSO entity should be","well-defined and its working method","should ensure efficiency, transparency and","representativeness amongst the Union","distribution system operators, respecting","regional specificities of distribution","networks. The EU DSO Entity should","closely cooperate with ENTSO for","Electricity on the preparation and","implementation of the network codes","where applicable and should work on","providing guidance on the integration inter","alia of distributed generation and storage in","distribution networks or other areas which","relate to the management of distribution","networks."],"old":["(38) In order to raise efficiencies in the","electricity distribution networks in the","Union and ensure close cooperation with","transmission system operators and ENTSO","for electricity, a European entity of","distribution system operators in the Union","(\"EU DSO entity\") should be established.","The tasks of the EU DSO entity should be","well-defined and its working method","should ensure efficiency, transparency and","representativeness amongst the Union","distribution system operators. The EU","DSO Entity should closely cooperate with","ENTSO for Electricity on the preparation","and implementation of the network codes","where applicable and should work on","providing guidance on the integration inter","alia of distributed generation and storage in","distribution networks or other areas which","relate to the management of distribution","networks."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"85","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-290","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 1 b (new)"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:02"},"new":["1b. Pending the implementation of the","plan under paragraph 1, Member States","may introduce capacity mechanisms,","subject to the provisions of this Article","and to the Union State aid rules."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"290","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Nicola Caputo","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-86","location":[[" Proposal for a regulation","Recital 38"]],"meps":[124851],"meta":{"created":"2019-07-03T06:25:01"},"new":["(38) In order to raise efficiencies in the","electricity distribution networks in the","Union and ensure close cooperation with","transmission system operators and ENTSO","for electricity, a European entity of","distribution system operators in the Union","(\"EU DSO entity\") should be established.","The tasks of the EU DSO entity should be","well-defined and its working method","should ensure independence,","neutrality, efficiency, transparency and","representativeness amongst the Union","distribution system operators. The EU","DSO Entity should closely cooperate with","ENTSO for Electricity on the preparation","and implementation of the network codes","where applicable and should work on","providing guidance on the integration inter","alia of distributed generation and storage in","distribution networks or other areas which","relate to the management of distribution","networks."],"old":["(38) In order to raise efficiencies in the","electricity distribution networks in the","Union and ensure close cooperation with","transmission system operators and ENTSO","for electricity, a European entity of","distribution system operators in the Union","(\"EU DSO entity\") should be established.","The tasks of the EU DSO entity should be","well-defined and its working method","should ensure efficiency, transparency and","representativeness amongst the Union","distribution system operators. The EU","DSO Entity should closely cooperate with","ENTSO for Electricity on the preparation","and implementation of the network codes","where applicable and should work on","providing guidance on the integration inter","alia of distributed generation and storage in","distribution networks or other areas which","relate to the management of distribution","networks."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"86","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-291","meps":[124756],"meta":{"created":"2019-07-03T06:25:02"},"new":["2. Where a Member State wishes to","implement a capacity mechanism, it shall","consult on the proposed mechanism at least","with its electrically connected","neighbouring Member States, the Agency","as well as with all relevant stakeholders,","including with consumer organisations.","Prior to submitting a proposal for a","capacity mechanism to public","consultation, the national regulatory","authority shall assess the impact of the","capacity mechanism on energy prices in","particular to energy prices for household","customers. The impact assessment shall","be published."],"old":["2. Where a Member State wishes to","implement a capacity mechanism, it shall","consult on the proposed mechanism at least","with its electrically connected","neighbouring Member States."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"291","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-292","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 2"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:02"},"new":["2. Where a Member State wishes to","implement a capacity mechanism, it shall","consult on the proposed mechanism with","all interested parties, including with its","electrically connected neighbouring","Member States."],"old":["2. Where a Member State wishes to","implement a capacity mechanism, it shall","consult on the proposed mechanism at","least with its electrically connected","neighbouring Member States."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"292","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Davor \u0160krlec on behalf of the Verts/ALE Group","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-87","location":[["Proposal for a regulation","Article 1 \u2013 paragraph 1 \u2013 point a"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:01"},"new":["(a) setting the basis for an efficient","achievement of the objectives of the","European Energy Union and in particular","the climate and energy framework for","203030 by enabling market signals to be","delivered for increased flexibility, energy","efficiency and innovation, taking also","account of the role of interconnectors and","the growing share of renewables for the","transition to a sustainable energy system;","_________________","30","COM/2014/015 final."],"old":["(a) setting the basis for an efficient","achievement of the objectives of the","European Energy Union and in particular","the climate and energy framework for","203030 by enabling market signals to be","delivered for increased flexibility,","decarbonisation and innovation;","_________________","30","COM/2014/015 final."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"87","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Nicola Caputo","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-88","location":[["Proposal for a regulation","Article 1 \u2013 paragraph 1 \u2013 point a"]],"meps":[124851],"meta":{"created":"2019-07-03T06:25:01"},"new":["(a) setting the basis for an efficient","achievement of the objectives of the","European Energy Union and in particular","the climate and energy framework for","203030 by enabling market signals to be","delivered for increased efficiency,","flexibility, decarbonisation and innovation;","_________________","30","COM/2014/015 final."],"old":["(a) setting the basis for an efficient","achievement of the objectives of the","European Energy Union and in particular","the climate and energy framework for","203030 by enabling market signals to be","delivered for increased flexibility,","decarbonisation and innovation;","_________________","30","COM/2014/015 final."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"88","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-293","justification":" Capacity mechanisms can, if not well designed and temporary in nature, create important\n market distortions. They shall not be used as a life-line for conventional generation capacity.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 3"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:02"},"new":["3. Capacity mechanisms shall not","create non-proportionate market","distortions and not limit cross-border trade.","Member States shall introduce","appropriate rules to enable all resources","to participate in capacity mechanisms,","including end-use energy efficiency and","demand response. The amount of capacity","committed in the mechanism shall not go","beyond what is necessary to address the","concern. Where the European adequacy","assessment has not identified a resource","adequacy concern, Member State shall","not apply capacity mechanisms. Capacity","mechanisms shall be applied for a","maximum period of four years. Every four","years, Member States shall assess their","capacity mechanism and in particular:","(a) the level of support received by","capacity providers","(b) the amount of capacity committed in","the mechanism","(c) the design criteria of the mechanism,","including the sustainability criterion."],"old":["3. Capacity mechanisms shall not","create unnecessary market distortions and","not limit cross-border trade. The amount of","capacity committed in the mechanism shall","not go beyond what is necessary to address","the concern."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"293","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Carolina Punset","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-89","location":[[" Proposal for a regulation","Article 1 \u2013 paragraph 1 \u2013 point b"]],"meps":[90110],"meta":{"created":"2019-07-03T06:25:01"},"new":["(b) setting fundamental principles for","well-functioning, integrated electricity","markets, which allow non-discriminatory","market access for all resource providers","and electricity customers, empower","consumers, enable demand response,","energy storage and energy","efficiency,facilitate aggregation of","distributed demand and supply, promote","sufficient levels of electricity","interconnections and contribute to the","decarbonisation of the economy by","enabling market integration and market-","based remuneration of electricity generated","from renewable sources;"],"old":["(b) setting fundamental principles for","well-functioning, integrated electricity","markets, which allow non-discriminatory","market access for all resource providers","and electricity customers, empower","consumers, enable demand response and","energy efficiency, facilitate aggregation of","distributed demand and supply, and","contribute to the decarbonisation of the","economy by enabling market integration","and market-based remuneration of","electricity generated from renewable","sources;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"89","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-294","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 3"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:02"},"new":["3. Capacity mechanisms shall not","create unnecessary market distortions,","particularly by discriminating against","renewable energy sources, discouraging","recourse to flexible consumption and","energy efficiency, or raising costs for","consumers. They shall not limit cross-","border trade. The duration of, and the","amount of capacity committed in, the","mechanism shall not go beyond what is","necessary to address the concern."],"old":["3. Capacity mechanisms shall not","create unnecessary market distortions and","not limit cross-border trade. The amount of","capacity committed in the mechanism shall","","not go beyond what is necessary to address","the concern."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"294","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Luke Ming Flanagan","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-90","location":[[" Proposal for a regulation","Article 1 \u2013 paragraph 1 \u2013 point d"]],"meps":[124985],"meta":{"created":"2019-07-03T06:25:01"},"new":["(d) facilitating the emergence of a well-","functioning and transparent wholesale","market across all Member States,","(including those such as Ireland, Malta","and Cyprus that are offshore from","mainland Europe) with a high level of","security of supply in electricity. It provides","for mechanisms to harmonise the rules for","cross-border exchanges in electricity."],"old":["(d) facilitating the emergence of a well-","functioning and transparent wholesale","market with a high level of security of","supply in electricity. It provides for","mechanisms to harmonise the rules for","cross-border exchanges in electricity."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"90","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Kate\u0159ina Kone\u010dn\u00e1","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-91","justification":"To complement a definition of a bidding zone. Congestions are quite often occurring also\nwithin bidding zones; this should be reflected in the regulation.","location":[["Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point c"]],"meps":[23699],"meta":{"created":"2019-07-03T06:25:01"},"new":["(c) \u2018congestion\u2019 means a situation in","which all requests from market participants","to trade cannot be accommodated because","they would significantly affect the physical","flows on network elements which cannot","accommodate those flows. An","interconnection linking national","transmission networks cannot","accommodate all physical flows resulting","from international trade requested by","market participants, because of a lack of","capacity of the interconnectors and/or the","national transmission systems concerned;"],"old":["(c) \u2018congestion\u2019 means a situation in","which all requests from market participants","to trade between two bidding zones cannot","be accommodated because they would","significantly affect the physical flows on","network elements which cannot","accommodate those flows ;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"91","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-295","justification":"It is paramount that capacity mechanism are open to all market participants, including across\nborders, and that they include flexibility criteria to effectively being able to provide capacity\nat short notice and with flexible volumes.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 3 a (new)"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:02"},"new":["3a. Decentralised resources and","demand response must have non-","discriminatory access to capacity","mechanisms and their structural","advantages shall be reflected in any","mechanism;"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"295","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Pavel Poc","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-92","justification":" Original definition would stipulate that congestions may occur only between two bidding\n zones and not within bidding zone. Amendment is also necessary to align with definition of\n bidding zone.","location":[["Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point c"]],"meps":[96715],"meta":{"created":"2019-07-03T06:25:01"},"new":["(c) \u2018congestion\u2019 means a situation in","which all requests from market participants","to trade cannot be accommodated because","they would significantly affect the physical","flows on network elements which cannot","accommodate those flows ;"],"old":["(c) \u2018congestion\u2019 means a situation in","which all requests from market participants","to trade between two bidding zones cannot","be accommodated because they would","significantly affect the physical flows on","network elements which cannot","accommodate those flows ;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"92","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Carolina Punset","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-93","justification":" The necessary level of security of supply should be established taking into account the value\n that consumers place on electricity (VoLL \u2013 value of lost load), by the match between the\n incremental cost of insuring consumers against blackouts and the cost of incremental\n blackouts to consumers. They should only be adopted after verification of both their technical\n necessity and their economic efficiency, after having evaluated other alternative options less\n distortive to competition.","location":[[" Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point u"]],"meps":[90110],"meta":{"created":"2019-07-03T06:25:01"},"new":["(u) capacity mechanism' means an","administrative measure to ensure the","achievement of the necessary level of","security of supply; a thorough cost-benefit","analysis shall be carried out to justify the","necessity of achieving a certain level of","security of supply, as well as to justify the","need to adopt capacity mechanisms in","order to achieve such necessary level;"],"old":["(u) 'capacity mechanism' means an","administrative measure to ensure the","achievement of the desired level of","security of supply by remunerating","resources for their availability not","including measures relating to ancillary","services;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"93","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-296","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 3 b (new)"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:02"},"new":["3b. When certifying capacities, the","specific characteristics of demand-side","flexibility and energy storage shall be","taken into account, including in product","definitions and prequalification","requirements."],"old":[""],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"296","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-94","justification":"Capacity mechanisms are a form of public intervention in the internal market for electricity.\nAs such, and in light of their potentially distortive effect, they should be subject to the\nprinciple of necessity and be designed as transitory measures.","location":[[" Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point u"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:01"},"new":["(u) 'capacity mechanism' means an","exceptional administrative measure that","remunerates resources for their availability","not including measures relating to ancillary","services, adopted in accordance with the","provisions of this regulation and in","compliance with State aid rules and with","the principles of necessity, proportionality","and non-discrimination;"],"old":["(u) 'capacity mechanism' means an","administrative measure to ensure the","","achievement of the desired level of","security of supply by remunerating","resources for their availability not","including measures relating to ancillary","services;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"94","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Jadwiga Wi\u015bniewska","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-297","justification":" Capacity mechanisms are linked to energy security and as such should stay technologically\n neutral. The Commission has not done any impact assessment and this restriction has been\n introduced in the very last moment for no clear reasons. Its impact on energy prices in coal-\n reliant Member States may be disastrous. Therefore, it should be deleted from the Regulation.","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[124877],"meta":{"created":"2019-07-03T06:25:02"},"new":["deleted"],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity","emitting 550 gr CO2/kWh or more shall","not be committed in capacity mechanisms","5 years after the entry into force of this","Regulation."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"297","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Jadwiga Wi\u015bniewska","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-95","location":[["Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point u"]],"meps":[124877],"meta":{"created":"2019-07-03T06:25:02"},"new":["(u) 'capacity mechanism' means a","market based or administrative measure to","ensure the achievement of the desired level","of security of supply by remunerating","resources for their availability not","including measures relating to ancillary","services;"],"old":["(u) 'capacity mechanism' means an","administrative measure to ensure the","achievement of the desired level of security","of supply by remunerating resources for","their availability not including measures","relating to ancillary services;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"95","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Gy\u00f6rgy H\u00f6lv\u00e9nyi","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-298","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[124715],"meta":{"created":"2019-07-03T06:25:03"},"new":["deleted"],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity","emitting 550 gr CO2/kWh or more shall","not be committed in capacity mechanisms","5 years after the entry into force of this","Regulation."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"298","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Nicola Caputo","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-96","location":[["Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point u"]],"meps":[124851],"meta":{"created":"2019-07-03T06:25:02"},"new":["(u) 'capacity mechanism' means an","administrative measure to ensure the","achievement of the necessary level of","security of supply by remunerating","resources for their availability not","including measures relating to ancillary","services;"],"old":["(u) 'capacity mechanism' means an","administrative measure to ensure the","achievement of the desired level of","","security of supply by remunerating","resources for their availability not","including measures relating to ancillary","services;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"96","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Piernicola Pedicini, Eleonora Evi, Dario Tamburrano","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-299","justification":"The proposed sustainability criteria will directly puts the EU climate commitments in\njeopardy by leaving the option open to subsidise some relatively high efficient coal (and\npotentially lignite) electricity production with heat recovery (i.e. combined heat and power)\nand/or biomass co-firing plants. It is crucial to tighten the level to 350 gCO2/kWh and make\nsure that this level decreases over time. Capacity remuneration should only be warranted\nwhere it contributes towards system stability, and flexibility is a key way to ensure this","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[124844,124779,124813],"meta":{"created":"2019-07-03T06:25:03"},"new":["4. Generation capacity shall only be","eligible to participate in a capacity","mechanism if:","(a) its total greenhouse gas emissions per","kilowatt hour of electricity produced in","the installation do not exceed 350gof CO2","equivalent from [OP: date of entry into","force of this Regulation]; and","(b) it is capable of ramping up and down","on-load at least at the level 5% of their","capacity per minute. Capacity providers","must comply with EU Environmental","Quality Standards and Best Available","Techniques (BATs) to participate in","capacity mechanisms."],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity","emitting 550 gr CO2/kWh or more shall","not be committed in capacity mechanisms","5 years after the entry into force of this","Regulation."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"299","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-97","location":[[" Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point u"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:02"},"new":["(u) 'capacity mechanism' means an","administrative measure to ensure the","achievement of the desired level of","resource adequacy by remunerating","resources for their availability not","including measures relating to ancillary","services;"],"old":["(u) 'capacity mechanism' means an","administrative measure to ensure the","achievement of the desired level of","security of supply by remunerating","resources for their availability not","including measures relating to ancillary","services;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"97","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-300","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:03"},"new":["4. Generation capacity shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh."],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity","emitting 550 gr CO2/kWh or more shall","not be committed in capacity mechanisms","5 years after the entry into force of this","Regulation."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"300","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-98","justification":"For legal certainty, this regulation must provide a clear and strict definition of strategic\nreserves. Capacity in strategic reserves must be kept outside of the market, cannot return\nback to the market and can only be called upon in extreme situations.","location":[[" Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point v"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:02"},"new":["(v) 'strategic reserve' means a capacity","mechanism in which resources are held","and definitively remain outside the day","ahead, intraday, balancing and any other","ancillary services market, and are only","dispatched in case day-ahead and intraday","markets have failed to clear,transmission","system operators have exhausted their","balancing resources to establish an","equilibrium between demand and supply,","and imbalances in the market during","periods where the reserves were dispatched","are settled at technical price limits or at","the value of lost load;"],"old":["(v) 'strategic reserve' means a capacity","mechanism in which resources are only","dispatched in case day-ahead and intraday","markets have failed to clear, transmission","system operators have exhausted their","balancing resources to establish an","equilibrium between demand and supply,","and imbalances in the market during","periods where the reserves were dispatched","are settled at the value of lost load;",""],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"98","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Kate\u0159ina Kone\u010dn\u00e1","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-301","justification":" Operating time of installation in this mechanism is by definition very limited. Limit for\n emission factor proposed by the EC would prevent transfer of installations with high emission\n\nfactor from market to strategic reserve which brings about substantial decrease of emissions.\nIn this case limitation of emission factor undermines decarbonisation effort because only low\nemission generation capacity could be transferred to strategic reserve while high emission\none would stay in the market.","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[23699],"meta":{"created":"2019-07-03T06:25:03"},"new":["4. Capacity mechanisms other than","strategic reserve shall remunerate only","availability of capacity and shall not","reward electricity production."],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity","emitting 550 gr CO2/kWh or more shall","not be committed in capacity mechanisms","5 years after the entry into force of this","Regulation."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"301","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-99","justification":"For legal certainty, this regulation must provide a clear and strict definition of strategic\nreserves that characterise the conditions under which it is deployed. Capacity in strategic\nreserves must be kept outside of the market and can only be called upon in extreme situations.","location":[["Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point v"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:02"},"new":["(v) 'strategic reserve' means a capacity","mechanism in which resources are held","outside the market, remain outside the","market, and are only dispatched in case","day-ahead or intraday markets have failed","to clear, transmission system operators","have exhausted their balancing resources to","establish an equilibrium between demand","and supply, and imbalances in the market","during periods where the reserves were","dispatched are settled at the value of lost","load;"],"old":["(v) 'strategic reserve' means a capacity","mechanism in which resources are only","dispatched in case day-ahead and intraday","markets have failed to clear, transmission","system operators have exhausted their","balancing resources to establish an","equilibrium between demand and supply,","and imbalances in the market during","periods where the reserves were dispatched","are settled at the value of lost load;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"99","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-302","justification":"Capacity mechanisms shall include flexibility criteria to effectively being able to provide\ncapacity at short notice and with flexible volumes.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:03"},"new":["4. Generation capacity shall only be","eligible to participate in a capacity","mechanism if its emissions are below","350gr CO2/kWh and if it is capable of","ramping up and down on-load at least at","the level of 5% of their capacity per","minute."],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity","emitting 550 gr CO2/kWh or more shall","not be committed in capacity mechanisms","5 years after the entry into force of this","Regulation."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"302","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Carolina Punset","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-303","justification":" Phasing out most polluting plants is essential to achieve European emissions target, so the\n introduction of the Emission Performance Standard for existing generation capacity should\n be brought forward, with a 5 years long exception for plants that are part of strategic\n reserves, as it is a much less distortive mechanism.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[90110],"meta":{"created":"2019-07-03T06:25:03"},"new":["Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below","550gr CO2/kWh. Generation capacity","emitting 550 gr CO2/kWh or more shall","not be committed in capacity mechanisms","2 years after the entry into force of this","Regulation, or 5 years for those plants that","are part of strategic reserves."],"old":["4. Generation capacity for which a 4.","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity emitting","","550 gr CO2/kWh or more shall not be","committed in capacity mechanisms 5 years","after the entry into force of this Regulation."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"303","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-100","justification":" The regulation should ensure that strategic reserves are remunerated and used only in cases\n for which the market fails to provide a response to security of supply and balancing\n requirements. Any other impact on the functioning of the market should be prevented.","meps":[33989],"meta":{"created":"2019-07-03T06:25:02"},"new":["(v) 'strategic reserve' means a capacity","mechanism in which resources, otherwise","excluded from the market, are only","dispatched in case day-ahead and intraday","markets have failed to clear, transmission","system operators have exhausted their","balancing resources to establish an","equilibrium between demand and supply,","and imbalances in the market during","periods where the reserves were dispatched","are settled at the value of lost load;"],"old":["(v) 'strategic reserve' means a capacity","mechanism in which resources are only","dispatched in case day-ahead and intraday","markets have failed to clear, transmission","system operators have exhausted their","balancing resources to establish an","equilibrium between demand and supply,","and imbalances in the market during","periods where the reserves were dispatched","are settled at the value of lost load;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"100","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-101","justification":"For the purposes of this Regulation and in line with provisions on priority dispatch for\nelectricity produced from renewable energy, the definition of high efficiency cogeneration\nshould be aligned with the provisions to the Renewable Directive rather than the Energy\nEfficiency Directive.","location":[[" Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point w"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:02"},"new":["(w) \u2018high-efficiency cogeneration\u2019","means renewable cogeneration meeting the","criteria of achieving a conversion","efficiency of at least 85 %."],"old":["(w) \u2018high-efficiency cogeneration\u2019","means cogeneration meeting the criteria","laid down in Annex II of Directive","2012/27/EU of the European Parliament","and of the Council33 ;","_________________","33Directive 2012/27/EU of the European","Parliament and of the Council of 25","October 2012 on energy efficiency,","amending Directives 2009/125/EC and","2010/30/EU and repealing Directives","2004/8/EC and 2006/32/EC (OJ L 315,","14.11.2012, p. 1)."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"101","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-304","justification":"Capacity mechanisms can, if not well designed and temporary in nature, create important\nmarket distortions. They shall not be used as a life line for conventional generation capacity.\nIt is paramount that such mechanism are open to all market participants, including across\nborders, and that they include flexibility criteria to effectively being able to provide capacity\nat short notice and with flexible volumes","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 4 a (new)"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:03"},"new":["4a. Where a Member State wishes to","implement a capacity mechanism, it shall","organize a competitive bidding process for","capacity providers. This competitive","bidding process shall include set of clear","and transparent environmental criteria in","order to prioritise the most sustainable","and energy efficient capacity sources","including demand side response. The","competitive bidding process criteria must","also include flexibility criteria. Eligible","capacities should be capable of ramping","up and down on-load at least at the level","5% of their capacity per minute. Capacity","providers must comply with any EU","environmental quality standards and in","particular emissions shall not exceed the","stricter levels associated with BAT and","higher range of BAT-associated energy","efficiency levels of all relevant BAT","conclusions set for new plants to","participate in capacity mechanisms in","order to be eligible to bid."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"304","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Luke Ming Flanagan","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-102","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point a"]],"meps":[124985],"meta":{"created":"2019-07-03T06:25:02"},"new":["(a) prices shall be formed based on","demand and supply but with the over-","riding principle that fairness in that","pricing shall be at the core;"],"old":["(a) prices shall be formed based on","demand and supply;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"102","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Luke Ming Flanagan","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-103","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point b"]],"meps":[124985],"meta":{"created":"2019-07-03T06:25:02"},"new":["(b) actions which prevent price","formation on the basis of a) demand and","supply, and b) fair pricing, or","which constitute a disincentive to the","development of more flexible generation,","low carbon generation, or more flexible","demand shall be avoided;"],"old":["(b) actions which prevent price","formation on the basis of demand and","supply or constitute a disincentive to the","development of more flexible generation,","low carbon generation, or more flexible","demand shall be avoided;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"103","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Carolina Punset","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-305","justification":"Including flexibility criteria in the selection process of capacity providers will ensure that aid\nis primarily granted to the most efficient back-up capacity. Criteria related to maximising\nramping ability of available capacity, and reducing the level of lower bound of adjustability\nof capacity providers will contribute to addressing the issue of overcapacity of inflexible\nenergy sources.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 4 a (new)"]],"meps":[90110],"meta":{"created":"2019-07-03T06:25:03"},"new":["4a. Capacity mechanisms, if deemed","necessary on the basis of an impact","assessment, shall include flexibility","criteria in the selection process of","generation capacity providers. Such","criteria shall aim at maximising the","ramping ability, and minimising the","necessary level of stable output of power","plants benefitting from capacity","mechanisms."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"305","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Piernicola Pedicini, Eleonora Evi, Dario Tamburrano","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-104","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point b"]],"meps":[124844,124779,124813],"meta":{"created":"2019-07-03T06:25:02"},"new":["(b) actions which prevent price","formation on the basis of demand and","supply or constitute a disincentive to the","development of more flexible generation,","low carbon generation, or more flexible","demand shall be avoided while Member","States ensure that energy poor or","vulnerable consumers are sufficiently","protected;"],"old":["(b) actions which prevent price","formation on the basis of demand and","supply or constitute a disincentive to the","development of more flexible generation,","low carbon generation, or more flexible","demand shall be avoided;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"104","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Piernicola Pedicini, Eleonora Evi, Dario Tamburrano","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-105","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point c"]],"meps":[124844,124779,124813],"meta":{"created":"2019-07-03T06:25:02"},"new":["(c) customers shall be enabled to","benefit from market opportunities and","increased competition on retail markets;","market players shall be required to assess","the risk of detriment that new products","and services present to household","customers and to tailor their offers","accordingly; National Regulatory","Authorities shall monitor the market","developments and modify protections as","required;"],"old":["(c) customers shall be enabled to","benefit from market opportunities and","increased competition on retail markets;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"105","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Carolina Punset","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-106","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point d"]],"meps":[90110],"meta":{"created":"2019-07-03T06:25:02"},"new":["(d) market participation of consumers","and small businesses shall be enabled","individually, collectively, through","participation in a local energy","community, and by aggregation of","generation from multiple generation","facilities or load from multiple demand","facilities to provide joint offers on the","electricity market and be jointly operated","in the electricity system, subject to","compliance with EU treaty rules on","competition;"],"old":["(d) market participation of consumers","and small businesses shall be enabled by","aggregation of generation from multiple","generation facilities or load from multiple","demand facilities to provide joint offers on","the electricity market and be jointly","operated in the electricity system, subject","to compliance with EU treaty rules on","competition;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"106","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Sirpa Pietik\u00e4inen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-306","justification":" Including flexibility criteria in the selection process will ensure that aid is primarily granted\n to the most efficient back-up capacity, with the aim of addressing the issue of overcapacity of\n inflexible energy sources.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 4 a (new)"]],"meps":[40599],"meta":{"created":"2019-07-03T06:25:03"},"new":["4a. Capacity mechanisms shall","include flexibility criteria in the selection","process of generation capacity providers.","Such criteria shall aim to maximise the","ramping ability, and minimise the level of","stable output required from power plants","benefitting from capacity mechanisms."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"306","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-107","justification":" General principles for the EU\u2019s electricity market should provide a basis for acknowledging\n and encouraging all forms of active participation by consumers, not just through aggregation.","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point d"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:02"},"new":["(d) market participation of consumers","and small businesses shall be enabled","individually, collectively through","participation in a local energy","community, and by aggregation of","generation from multiple generation","facilities or load from multiple demand","facilities to provide joint offers on the","electricity market and be jointly operated","in the electricity system, subject to","compliance with EU treaty rules on","competition;"],"old":["(d) market participation of consumers","and small businesses shall be enabled by","aggregation of generation from multiple","generation facilities or load from multiple","demand facilities to provide joint offers on","the electricity market and be jointly","operated in the electricity system, subject","to compliance with EU treaty rules on","competition;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"107","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Ivo Belet","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-307","justification":" Existing units that can operate in very flexible ways to cope with intermittent renewable\n generation should not be excluded from capacity mechanism.","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 4 a (new)"]],"meps":[28257],"meta":{"created":"2019-07-03T06:25:03"},"new":["4a. The CO2 emission factor of an","electricity generation installation shall be","based on the net efficiency at nominal","capacity under ISO conditions."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"307","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Luke Ming Flanagan","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-108","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point d"]],"meps":[124985],"meta":{"created":"2019-07-03T06:25:02"},"new":["(d) market participation of consumers","and small businesses shall be enabled and","encouraged by aggregation of generation","from multiple generation facilities or load","from multiple demand facilities to provide","joint offers on the electricity market and be","jointly operated in the electricity system,","subject to compliance with EU treaty rules","on competition;"],"old":["(d) market participation of consumers","and small businesses shall be enabled by","aggregation of generation from multiple","generation facilities or load from multiple","demand facilities to provide joint offers on","the electricity market and be jointly","operated in the electricity system, subject","to compliance with EU treaty rules on","competition;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"108","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-308","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 4 a (new)"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:03"},"new":["4a. The provisions under paragraph 4","will not apply to strategic reserves which","operate for less than 500 hours per year."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"308","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Luke Ming Flanagan","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-109","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point e"]],"meps":[124985],"meta":{"created":"2019-07-03T06:25:02"},"new":["(e) market rules shall support the","decarbonisation of the economy by","enabling the integration of electricity from","viable renewable energy sources and","providing incentives for energy efficiency;"],"old":["(e) market rules shall support the","decarbonisation of the economy by","enabling the integration of electricity from","renewable energy sources and providing","incentives for energy efficiency;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"109","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye, Michel Dantin","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-110","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point f"]],"meps":[2025,124732,97296],"meta":{"created":"2019-07-03T06:25:03"},"new":["(f) market rules shall deliver","appropriate investment incentives for","generation, in particular long-term","investments in low-carbon generation,","storage, energy efficiency and demand","response to meet market needs and thus","ensure security of supply;"],"old":["(f) market rules shall deliver","appropriate investment incentives for","generation, storage, energy efficiency and","demand response to meet market needs and","thus ensure security of supply;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"110","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-309","justification":"It is paramount that such mechanism are open to all market participants, including across\nborders, and that they include flexibility criteria to effectively being able to provide capacity\nat short notice and with flexible volumes.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 4 b (new)"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:03"},"new":["4b. Capacity mechanisms shall reward","the contribution of all resources in the","same manner, including demand-side","flexibility and aggregated resources. They","shall establish clear provisions on non-","discriminatory product definitions and","include prequalification requirements.","Capacity mechanisms shall reflect the","structural advantage provided by","distributed and demand-side resources."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"309","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Nicola Caputo","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-111","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point g"]],"meps":[124851],"meta":{"created":"2019-07-03T06:25:03"},"new":["(g) barriers to cross-border electricity","flows and cross-border transactions on","electricity markets and related services","markets shall be removed;"],"old":["(g) barriers to cross-border electricity","flows and cross-border transactions on","electricity markets and related services","markets shall be avoided;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"111","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-310","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 4 c (new)"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:03"},"new":["4c. Capacity products should be","defined with a time-horizon of no more","than 4 years. The same contract lengths","should be available to all resources."],"old":[""],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"310","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Piernicola Pedicini, Eleonora Evi, Dario Tamburrano","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-112","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point i"]],"meps":[124844,124779,124813],"meta":{"created":"2019-07-03T06:25:03"},"new":["(i) all generation, storage and demand","resources shall participate on equal footing","in the market in a way that accounts for","the benefits and costs each provide to the","environment and the system, their","sustainability, and their contributions to","the decarbonisation objectives set in the","2015 Paris Agreement and the","[Renewable Energy Directive];"],"old":["(i) all generation, storage and demand","resources shall participate on equal footing","in the market;",""],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"112","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Carolina Punset","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-113","justification":" As storage is defined as a separate activity in the electricity system, storage undertakings\n need to be able to make market entry or exit decisions on the same basis as other market\n players.","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point m"]],"meps":[90110],"meta":{"created":"2019-07-03T06:25:03"},"new":["(m) market rules shall allow for entry","and exit of electricity generation, energy","storage, and electricity supply","undertakings based on their assessment of","the economic and financial viability of","their operations;"],"old":["(m) market rules shall allow for entry","and exit of electricity generation and","electricity supply undertakings based on","their assessment of the economic and","financial viability of their operations;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"113","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-311","justification":" Capacity mechanisms should not be introduced in markets that have not yet been fully opened\n and where interconnection capacity is missing.","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 5"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:03"},"new":["5. Where the European resource","adequacy assessment has not identified a","resource adequacy concern, Member States","shall not apply capacity mechanisms.","Member States shall also not apply","capacity mechanisms in markets with","regulated prices or price caps, in case they","have not reached their interconnection","targets or where network codes and","guidelines are not fully implemented and","applied."],"old":["5. Where the European resource","adequacy assessment has not identified a","resource adequacy concern, Member States","shall not apply capacity mechanisms."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"311","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye, Michel Dantin","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-114","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point n"]],"meps":[2025,124732,97296],"meta":{"created":"2019-07-03T06:25:03"},"new":["(n) long-term hedging opportunities,","which allow market participants to hedge","against price volatility risks on a market","basis, and eliminate uncertainty on future","returns on investment shall be tradable on","exchanges in a transparent manner;","similarly, long-term supply contracts shall","be negotiated over the counter. Both shall","be compliant with EU treaty rules on","competition."],"old":["(n) long-term hedging opportunities,","which allow market participants to hedge","against price volatility risks on a market","basis, and eliminate uncertainty on future","returns on investment shall be tradable on","exchanges in a transparent manner subject","to compliance with EU treaty rules on","","competition."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"114","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Pavel Poc, Martina Werner","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-115","location":[["Proposal for a regulation","Article 3 a (new)"]],"meps":[96715,124826],"meta":{"created":"2019-07-03T06:25:03"},"new":["Article 3a","Just transition","The European Commission shall support","Member States that put in place a","national strategy for the progressive","reduction of installed coal-fired","generating and mining capacity through","all available means, including targeted","financial support to enable a \u201cjust","transition\u201d in regions affected by","structural change. The Commission shall","assist Member States to address the social,","skills and industrial impact of the clean","energy transition. The Commission shall","work in close partnership with the actors","of coal and carbon-intensive regions,","provide guidance, in particular for the","access to and use of available funds and","programmes, and encourage exchange of","good practices, including discussions on","industrial roadmaps and re-skilling needs,","through targeted platforms including","through the just transition initiative for","workers and communities established in","the Governance Regulation."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"115","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Jo Leinen, Martina Werner","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-116","location":[[" Proposal for a regulation","Article 3 a (new)"]],"meps":[4262,124826],"meta":{"created":"2019-07-03T06:25:03"},"new":["Article 3a","Just transition","The European Commission shall support","Member States that put in place a","national strategy for the progressive","reduction of installed coal-fired","generating and mining capacity through","all available means, including targeted","financial support to enable a \u201cjust","transition\u201d in regions affected by","structural change. The Commission shall","assist Member States to address the social,","skills and industrial impact of the clean","energy transition. The Commission shall","work in close partnership with the actors","of coal and carbon-intensive regions,","provide guidance, in particular for the","access to and use of available funds and","programmes, and encourage exchange of","good practices, including discussions on","industrial roadmaps and re-skilling needs,","through targeted platforms including","through the just transition initiative for","workers and communities established in","the Governance Regulation."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"116","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Gy\u00f6rgy H\u00f6lv\u00e9nyi","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-312","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 5"]],"meps":[124715],"meta":{"created":"2019-07-03T06:25:03"},"new":["5. Where a Member State wishes to","implement capacity mechanism, it must","explain its consistency with the European","resource adequacy assessment, especially","regarding the justification, scope, start","and termination, and multi-year","implementation."],"old":["5. Where the European resource","adequacy assessment has not identified a","resource adequacy concern, Member","States shall not apply capacity","","mechanisms."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"312","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Sirpa Pietik\u00e4inen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-117","justification":"Regional or at least national intraday and balancing markets should be in place, with\nsufficient liquidity in terms of market participants and amount of transactions as a\nprecondition for renewable generators to bear balancing responsibility.","location":[[" Proposal for a regulation","Article 4 \u2013 paragraph 1"]],"meps":[40599],"meta":{"created":"2019-07-03T06:25:03"},"new":["1. All market participants shall aim","for system balance and shall be financially","responsible for imbalances they cause in","the system, unless barriers to balancing","markets participation exist. They shall","either be balance responsible parties or","delegate their responsibility to a balance","responsible party of their choice."],"old":["1. All market participants shall aim","for system balance and shall be financially","responsible for imbalances they cause in","","","the system. They shall either be balance","responsible parties or delegate their","responsibility to a balance responsible","party of their choice."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"117","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Jadwiga Wi\u015bniewska","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-313","justification":"The Commission\u2019s proposal does not consider the principle of subsidiarity. While the\nmonitoring and assessing of resource adequacy at the European level is needed and could\nprove helpful, only assessments made on a national level would ensure the sufficient level of\ndetail.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 5"]],"meps":[124877],"meta":{"created":"2019-07-03T06:25:03"},"new":["5. Where a national resource","adequacy assessment has not identified a","resource adequacy concern, Member States","shall not apply capacity mechanisms."],"old":["5. Where the European resource","adequacy assessment has not identified a","resource adequacy concern, Member States","shall not apply capacity mechanisms."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"313","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye, Michel Dantin","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-314","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 5"]],"meps":[2025,124732,97296],"meta":{"created":"2019-07-03T06:25:03"},"new":["5. Member States shall take into","consideration the result of the European","resource adequacy assessment when","deciding to apply capacity mechanisms."],"old":["5. Where the European resource","adequacy assessment has not identified a","resource adequacy concern, Member","States shall not apply capacity","mechanisms."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"314","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Pavel Poc","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-315","justification":" Capacity mechanisms are meant to be a temporary tool till adequacy concerns are resolved.\n Therefore, they should be designed in a way which allows for their effective phase-out once\n the adequacy concern is not present. To this aim a new paragraph in Article 23, detailing the\n need to have an exit clause provision present in each capacity mechanism deployed, is\n suggested.","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 5 a (new)"]],"meps":[96715],"meta":{"created":"2019-07-03T06:25:03"},"new":["5a. When designing capacity","mechanisms, Member States shall include","an exit clause, a provision allowing for","efficient phase-out of capacity mechanism","in case the resource adequacy assessment","proves that the adequacy concern is not","present anymore."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"315","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Piernicola Pedicini, Eleonora Evi, Dario Tamburrano","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-316","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 5 a (new)"]],"meps":[124844,124779,124813],"meta":{"created":"2019-07-03T06:25:03"},"new":["5a. When designing capacity","mechanisms, Member States shall have","regard to the environmental objective of","phasing out environmentally or","economically harmful subsidies"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"316","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Sirpa Pietik\u00e4inen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-118","justification":"Regional or at least national intraday and balancing markets should be in place, with\nsufficient liquidity in terms of market participants and amount of transactions as a\nprecondition for renewable generators to bear balancing responsibility.","location":[["Proposal for a regulation","Article 4 \u2013 paragraph 1 a (new)"]],"meps":[40599],"meta":{"created":"2019-07-03T06:25:03"},"new":["1a. Member States shall establish","markets for the delegation of balancing","responsibility from small-scale generating","installations using variable renewable","sources or high-efficiency cogeneration","with an installed electricity capacity of","less than 500kW and, in the case of wind","energy, 3 MW or 3 generation units."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"118","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-317","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 5 a (new)"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:04"},"new":["5a. Capacity mechanisms shall be","consistent with the objective of phasing","out environmentally harmful subsidies."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"317","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Sirpa Pietik\u00e4inen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-119","justification":" A situation which creates prohibitive barriers for small installations should be avoided. The\n development of centralised renewable energy generation requires maintenance of exemption\n on balancing responsibility unti markets are fully opened to independent aggregators.","location":[["Proposal for a regulation","Article 4 \u2013 paragraph 1 b (new)"]],"meps":[40599],"meta":{"created":"2019-07-03T06:25:03"},"new":["1b. Member States shall ensure that:","(a) the owner of a small scale generating","installation can choose among at least","three services providers for the delegation","of its balancing responsibility;","(b) the contracts offered by the service","providers to the owner of a small scale","generating installation provide clear","information on the costing of the provided","service."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"119","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Ivo Belet","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-318","justification":" The EU is moving towards an energy system which produces energy at low marginal cost, but\n which requires high upfront investments. The current electricity market remunerating energy\n only at the marginal costs does not reflect this shift. Market based remuneration remains a\n challenge. Shifting the fundamentals about how the EU produces and uses energy to build a\n low-carbon future requires a thorough reflection about the energy market design.","location":[["Proposal for a regulation","Article 23 a (new)"]],"meps":[28257],"meta":{"created":"2019-07-03T06:25:04"},"new":["Article 23a","Electricity Market Design Advisory Board","Within 12 months after the entry into","force of this Regulation an Electricity","Market Design Advisory Board shall be","established. The Advisory Board shall be","consisting of high-level experts of EU","Member States and a relevant and","balanced group of experts from the","energy sector, including utilities,","investors, technology providers, network","operators, climate protection groups,","consumer representatives and","representatives of local energy","communities.","The Advisory Board will provide the","Commission with expertise and insight,","and thus advise and assist the","Commission in the preparation of future","policy initiatives related to the European","energy market design. It will do so by","formulating opinions, recommendations","or reports, where appropriate.","Within 24 months after the establishment","of the Advisory Board, the European","Commission should draw its conclusions","from the discussion by means of a","Communication laying out the strategic","priorities for a European electricity","market capable of driving the investments","needed for a sustainable, secure and","affordable energy transition"],"old":[""],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"318","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Sirpa Pietik\u00e4inen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-120","location":[[" Proposal for a regulation","Article 4 \u2013 paragraph 2 \u2013 introductory part"]],"meps":[40599],"meta":{"created":"2019-07-03T06:25:03"},"new":["2. Member States shall provide for","derogation from balance responsibility in","respect of:"],"old":["2. Member States may provide for","derogation from balance responsibility in","respect of:"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"120","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-319","justification":"To create a level playing field, existing capacity market mechanisms have to be aligned with\nthe general provisions as soon as possible, while giving time to Member States to implement\nthe new provisions and, if adequate, also the concerned industry to carry out the necessary\nrefurbishments and investments.","location":[[" Proposal for a regulation","Article 24 \u2013 paragraph 1"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:04"},"new":["Member States applying capacity","mechanisms on [OP: entry into force of","this Regulation] shall adapt their","mechanisms to comply with Articles 18,","[18a,] 21 and 23 of this Regulation.","Without prejudice to the immediate","application of the flexibility requirements","set out in Article 23, by [two years from","the entry into force of this Regulation],","Member States shall complete the review","of existing capacity mechanisms, and of","the related contractual or administrative","arrangement, and bring them in","compliance with the provisions of this","Regulation. They shall submit to the","Commission a detailed report on the","results of the review and of the measures","taken."],"old":["Member States applying capacity","mechanisms on [OP: entry into force of","this Regulation] shall adapt their","mechanisms to comply with Articles 18, 21","and 23 of this Regulation."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"319","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Kate\u0159ina Kone\u010dn\u00e1","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-320","justification":"In line with the goal of creating internal (wholesale) electricity market in Europe, for which\nuniform national market design is needed.","location":[["Proposal for a regulation","Article 24 \u2013 paragraph 1"]],"meps":[23699],"meta":{"created":"2019-07-03T06:25:04"},"new":["Member States applying capacity","mechanisms on [OP: entry into force of","this Regulation] shall adapt their","mechanisms to comply with Articles 18, 21","and 23 of this Regulation within two years","after entry into force of this Regulation."],"old":["Member States applying capacity","mechanisms on [OP: entry into force of","this Regulation] shall adapt their","mechanisms to comply with Articles 18, 21","and 23 of this Regulation."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"320","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Pavel Poc","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-121","justification":"In order to limit market distortions to minimum, there shall be general balancing\nresponsibility for all market players, including the smallest ones. In the current electricity\nmarket, even household consumers are balancing responsible (they delegate their\nresponsibility to the supplier). The regime of exemptions from balancing responsibility shall\nnot continue to exist.","location":[[" Proposal for a regulation","Article 4 \u2013 paragraph 2 \u2013 point a"]],"meps":[96715],"meta":{"created":"2019-07-03T06:25:03"},"new":["deleted"],"old":["(a) demonstration projects;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"121","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Sirpa Pietik\u00e4inen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-122","location":[["Proposal for a regulation","Article 4 \u2013 paragraph 2 \u2013 point b"]],"meps":[40599],"meta":{"created":"2019-07-03T06:25:03"},"new":["deleted"],"old":["(b) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 500 kW;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"122","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Jadwiga Wi\u015bniewska","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-321","justification":" Under the principle of protection of legitimate expectations, it seems that a reasonable\n transitional period should be established for Member States which shall apply a capacity\n mechanism on the date the Electricity Regulation comes into force.","location":[["Proposal for a regulation","Article 24 \u2013 paragraph 1"]],"meps":[124877],"meta":{"created":"2019-07-03T06:25:04"},"new":["Member States applying capacity","mechanisms on [OP: 5 years after entry","into force of this Regulation] shall adapt","their mechanisms to comply with Articles","18, 21 and 23 of this Regulation."],"old":["Member States applying capacity","mechanisms on [OP: entry into force of","this Regulation] shall adapt their","mechanisms to comply with Articles 18, 21","and 23 of this Regulation."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"321","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Pavel Poc","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-123","justification":" In order to limit market distortions to minimum, there shall be general balancing\n responsibility for all market players, including the smallest ones. In the current electricity\n market, even household consumers are balancing responsible (they delegate their\n responsibility to the supplier). The regime of exemptions from balancing responsibility shall\n not continue to exist.","location":[["Proposal for a regulation","Article 4 \u2013 paragraph 2 \u2013 point b"]],"meps":[96715],"meta":{"created":"2019-07-03T06:25:03"},"new":["deleted"],"old":["(b) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 500 kW;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"123","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-322","justification":" Decarbonisation needs to be inclusive, just and agreed by all stakeholders and consider\n societal, economic and environmental impacts, as well as sustainable labour alternatives,\n especially when the phase-out is linked to the closure of mining activities. A preparatory\n action on the establishment of a coal platform dialogue to discuss aspects of governance, just\n transition and decommissioning is about to start and EU Electricity Market rules should be in\n line with those activities.","location":[[" Proposal for a regulation","Article 24 \u2013 paragraph 1 a (new)"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:04"},"new":["Member States and regions that decide -","independently from or as a consequence","of harmonised rules of capacity","mechanisms - to actively phase-out coal","fired electricity generation, shall be","provided with a long-term enabling","framework for a just transition towards a","sustainable and flexible electricity system.","The managed and planned retirement of","coal-fired capacity would help to improve","the functioning of the electricity system in","addition to reaching EU climate and","environmental objectives, for example on","CO2 emissions and clean air."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"322","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-323","justification":"With existing and new tasks conferred to ENTSO-E through this Regulation (for example\naccording to Article 27), transparency and accountability of the body must be increased to\nensure that functions are carried out independent from national or commercial interests.","location":[[" Proposal for a regulation","Article 25 \u2013 paragraph 2"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:04"},"new":["2. In performing its functions under","EU law, the ENTSO for Electricity shall","act for the European good and independent","from individual national interests or the","national interests of transmission system","operators, and shall contribute to the","efficient and sustainable achievement of","the objectives set out in the policy","framework for climate and energy covering","the period from 2020 to 2030, in particular","by contributing to the efficient integration","of electricity generated from renewable","energy sources and to increases in energy","efficiency. In particular, it shall ensure","that the mobilisation of human resources","from national transmission system","operators does not trigger situations of","conflict of interest. The Agency shall be","responsible to monitor the compliance of","the ENTSO for Electricity with the","principles outlined in this Article."],"old":["2. In performing its functions under","EU law, the ENTSO for Electricity shall","act for the European good and independent","from individual national interests or the","national interests of transmission system","operators, and shall contribute to the","efficient and sustainable achievement of","the objectives set out in the policy","framework for climate and energy covering","the period from 2020 to 2030, in particular","by contributing to the efficient integration","of electricity generated from renewable","energy sources and to increases in energy","efficiency."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"323","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Piernicola Pedicini, Eleonora Evi, Dario Tamburrano","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-124","justification":" The proposed threshold for an exemption from balancing responsibility could add additional\n burdens for smaller generating installations, particularly in markets that are not yet\n developed. Therefore, the threshold for an exemption from balancing responsibility should be\n raised to 1MW, which would help simplify the process for smaller generating installations,\n including renewable energy communities and self-producers","location":[[" Proposal for a regulation","Article 4 \u2013 paragraph 2 \u2013 point b"]],"meps":[124844,124779,124813],"meta":{"created":"2019-07-03T06:25:03"},"new":["(b) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 1 MW;"],"old":["(b) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 500 kW;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"124","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Carolina Punset","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-324","location":[["Proposal for a regulation","Article 25 \u2013 paragraph 2"]],"meps":[90110],"meta":{"created":"2019-07-03T06:25:04"},"new":["2. In performing its functions under","EU law, the ENTSO for Electricity shall","act for the European good and independent","from individual national interests or the","national interests of transmission system","operators, and shall contribute to the","efficient and sustainable achievement of","the objectives set out in the policy","framework for climate and energy covering","the period from 2020 to 2030, in particular","by contributing to the efficient integration","of electricity generated from renewable","energy sources in combination with","energy storage and demand response and","to increases in energy efficiency."],"old":["2. In performing its functions under","EU law, the ENTSO for Electricity shall","act for the European good and independent","from individual national interests or the","national interests of transmission system","operators, and shall contribute to the","","efficient and sustainable achievement of","the objectives set out in the policy","framework for climate and energy covering","the period from 2020 to 2030, in particular","by contributing to the efficient integration","of electricity generated from renewable","energy sources and to increases in energy","efficiency."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"324","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-125","justification":"Subjecting smaller generating installations, including newrenewable energy communities, to\nbalancing responsibility could add additionalburdens for their participation in the market,\nparticularly where balancing,forward, and day-ahead markets that are not yet open to such\nactors. Thethreshold for an exemption from balancing responsibility should be raised to1MW\nto help simplify regulatory burdens for these actors.","location":[[" Proposal for a regulation","Article 4 \u2013 paragraph 2 \u2013 point b"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:03"},"new":["(b) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 1 MW;"],"old":["(b) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 500 kW;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"125","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-325","location":[[" Proposal for a regulation","Article 27 \u2013 paragraph 1 \u2013 point e"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:04"},"new":["(e) adopt a framework for the","cooperation and coordination between","regional security coordinators;"],"old":["(e) adopt a framework for the","cooperation and coordination between","regional operational centres;"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"325","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Jadwiga Wi\u015bniewska","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-126","location":[["Proposal for a regulation","Article 4 \u2013 paragraph 2 \u2013 subparagraph 1 (new)"]],"meps":[124877],"meta":{"created":"2019-07-03T06:25:04"},"new":["Distribution system operators shall be","consulted before taking any decision","pursuant to subparagraph 1 of this","paragraph."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"126","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-326","location":[[" Proposal for a regulation","Article 27 \u2013 paragraph 1 \u2013 point f"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:04"},"new":["(f) adopt a proposal defining the","security-coordinated region covered by","each regional security coordinator;"],"old":["(f) adopt a proposal defining the","system operation region covered by each","regional operational centre;"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"326","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Piernicola Pedicini, Eleonora Evi, Dario Tamburrano","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-127","justification":"The proposed threshold under Article 4(3) for an exemption from balancing responsibility\nthat would apply from 1 January 2026 could add additional burdens for current smaller\ngenerating installations, particularly in markets that are not yet developed.","location":[["Proposal for a regulation","Article 4 \u2013 paragraph 3"]],"meps":[124844,124779,124813],"meta":{"created":"2019-07-03T06:25:04"},"new":["deleted"],"old":["3. From 1 January 2026, point (b) of","paragraph 2 shall apply only to","generating installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","capacity of less than 250 kW."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"127","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-327","location":[["Proposal for a regulation","Article 27 \u2013 paragraph 1 \u2013 point j a (new)"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:04"},"new":["(ja) cooperation with relevant DSO","organisations for digitalisation of power","system and electricity market to ensure,","among others, efficient data acquisition","by all relevant parties."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"327","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Pavel Poc","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-128","justification":" Aligned with amendment on Article 4, paragraph 2.","location":[[" Proposal for a regulation","Article 4 \u2013 paragraph 3"]],"meps":[96715],"meta":{"created":"2019-07-03T06:25:04"},"new":["deleted"],"old":["3. From 1 January 2026, point (b) of","paragraph 2 shall apply only to","generating installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","capacity of less than 250 kW."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"128","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-328","location":[["Proposal for a regulation","Article 27 \u2013 paragraph 2"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:04"},"new":["2. The ENTSO for Electricity shall","report to the Agency on shortcomings","identified regarding the establishment and","performance of regional security","coordination."],"old":["2. The ENTSO for Electricity shall","report to the Agency on shortcomings","identified regarding the establishment and","performance of regional operational","centres."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"328","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-129","justification":" Subjecting smaller generating installations, including new renewable energy communities, to\n balancing responsibility could prevent their entry and participation in the market, especially\n before they are provided with access to balancing, forward, and day-ahead markets.\n Development of such markets is likely to take time. The threshold exempting these actors from\n\n\nbalancing responsibility should only belowered to 500 kW after 2026 to help ease their\nregulatory burden.","location":[[" Proposal for a regulation","Article 4 \u2013 paragraph 3"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:04"},"new":["3. From 1 January 2026, point (b) of","paragraph 2 shall apply only to generating","installations using renewable energy","sources or high-efficiency cogeneration","with an installed electricity capacity of less","than 500 kW."],"old":["3. From 1 January 2026, point (b) of","paragraph 2 shall apply only to generating","installations using renewable energy","sources or high-efficiency cogeneration","with an installed electricity capacity of less","than 250 kW."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"129","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye, Michel Dantin","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-329","justification":" This modification should apply to all references made to \"regional operational centres\".","location":[["Proposal for a regulation","Article 32 \u2013 title"]],"meps":[2025,124732,97296],"meta":{"created":"2019-07-03T06:25:05"},"new":["Establishment and mission of regional","coordination centres"],"old":["Establishment and mission of regional","operational centres"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"329","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-130","justification":"The proposal requires that all market participants should have access to the balancing\nmarket. However, smaller actors - including renewable energy communities and active\ncustomers, as a categoryof market participants \u2013 often only have partial or limited access to\nbalancing markets. The proposed amendment will ensure that balancing responsibility is not\nonly a burden for smaller renewable energy generators but also an additional opportunity to\ncontribute to system and market stability.","location":[["Proposal for a regulation","Article 5 \u2013 paragraph 1"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:04"},"new":["1. All market participants shall have","full access to the balancing market, be it","individually or through aggregation.","Balancing market rules and products shall","respect the need to accommodate","increasing shares of variable generation as","well as increased demand responsiveness","and the advent of new technologies."],"old":["1. All market participants shall have","access to the balancing market, be it","individually or through aggregation.","Balancing market rules and products shall","respect the need to accommodate","increasing shares of variable generation as","well as increased demand responsiveness","and the advent of new technologies."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"130","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-330","location":[[" Proposal for a regulation","Article 32 \u2013 paragraph 3"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:05"},"new":["3. Regional security coordinators","shall complement the role of transmission","system operators by performing services of","regional relevance. They shall establish","operational arrangements in order to ensure","the efficient, secure and reliable operation","of the interconnected transmission system."],"old":["3. Regional operational centres shall","complement the role of transmission","system operators by performing functions","of regional relevance. They shall establish","operational arrangements in order to ensure","the efficient, secure and reliable operation","of the interconnected transmission system."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"330","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Piernicola Pedicini, Eleonora Evi, Dario Tamburrano","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-131","justification":" The principle of non-discrimination in balancing markets should be directly enforceable and\n fully effective. In addition, balancing market rules should take into account the necessity of\n creating a level playing field to enable the development of distributed renewable energy\n resources, including by renewable active customers energy communities.","location":[["Proposal for a regulation","Article 5 \u2013 paragraph 2"]],"meps":[124844,124779,124813],"meta":{"created":"2019-07-03T06:25:04"},"new":["2. Balancing markets shall ensure","effective non-discrimination between","market participants taking account of the","different technical capability of generation","from variable renewable sources, including","small decentralised or distributed","generation and generation from active","customers and renewable energy","communities, and demand side response","and storage. Market operators shall","ensure that energy communities have a","proportionate and simple access to the","market."],"old":["2. Balancing markets shall be","organised in such a way as to ensure","effective non-discrimination between","market participants taking account of the","different technical capability of generation","from variable renewable sources and","","demand side response and storage."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"131","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-331","location":[[" Proposal for a regulation","Article 33 \u2013 paragraph 1 \u2013 introductory part"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:05"},"new":["1. By [OP: six months after entry into","force of this Regulation] the ENTSO for","Electricity shall submit to the Agency a","proposal defining security-coordinated","regions for which a cooperative decision-","making process as described in article 62","of [Directive on common rules for the","internal market in electricity as proposed","by COM(2016) 864 final] is established,","taking into account existing regional","security coordinators, on the basis of the","following criteria:"],"old":["1. By [OP: six months after entry into","force of this Regulation] the ENTSO for","Electricity shall submit to the Agency a","proposal defining system operation regions","covered by regional operational centres,","taking into account existing regional","security coordinators, on the basis of the","following criteria:"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"331","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-132","justification":" Smaller actors - including renewable energy communities and active customers, as a category\n of market participants \u2013 often only have partial or limited access to balancing markets, if at\n all. The proposed amendment will ensure that the development of standards for balancing\n products, and terms and conditions for balancing service providers allow smaller actors to\n compete on a level playing field with larger market participants.","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 2"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:04"},"new":["2. Balancing markets shall ensure","effective non-discrimination between","market participants taking account of the","different technical capability of generation","from variable renewable sources, including","in particular small decentralised and","distributed generation, and demand side","response and storage."],"old":["2. Balancing markets shall be","organised in such a way as to ensure","effective non-discrimination between","market participants taking account of the","different technical capability of generation","from variable renewable sources and","demand side response and storage."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"132","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-332","location":[["Proposal for a regulation","Article 33 \u2013 paragraph 1 \u2013 point b"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:05"},"new":["(b) the synchronous connection of the","region;"],"old":["(b) the synchronous connection of the","systems;"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"332","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Carolina Punset","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-133","justification":"It is necessary to redesign the balancing products in order to fully harness the potential of\nrenewables for providing the system with flexibility. Market entry barriers should be removed\nand efforts should focus on increasing the harmonisation of the different balancing markets\non the basis of a model maximizing the participation of renewable energy generators.","location":[["Proposal for a regulation","Article 5 \u2013 paragraph 2"]],"meps":[90110],"meta":{"created":"2019-07-03T06:25:04"},"new":["2. Balancing markets shall be","organised in such a way as to ensure","effective non-discrimination between","market participants. Balancing markets","shall be designed to maximize the","participation of renewables sources."],"old":["2. Balancing markets shall be","organised in such a way as to ensure","effective non-discrimination between","market participants taking account of the","different technical capability of","generation from variable renewable","sources and demand side response and","storage."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"133","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Michel Dantin, Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-333","justification":"The result of stipulating at least one capacity calculation region must be covered may be\nexcessively large geographical areas which do not make for coherent regional cooperation.\nSmaller areas, determined on the basis of the size of the region, would make more sense.","location":[["Proposal for a regulation","Article 33 \u2013 paragraph 1 \u2013 point c"]],"meps":[97296,2025,124732],"meta":{"created":"2019-07-03T06:25:05"},"new":["(c) the size of the region;"],"old":["(c) the size of the region, which shall","cover at least one capacity calculation","region;"],"orig_lang":"fr","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"333","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Kate\u0159ina Kone\u010dn\u00e1","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-134","justification":" Procurement and sizing of reserve capacity is closely related to system specificities, season,\n and thus to security of supply. As national TSOs are held responsible for security of supply,\n they should also preserve right to procure the amount of balancing capacity/reserves, which\n they find sufficient.","location":[["Proposal for a regulation","Article 5 \u2013 paragraph 7"]],"meps":[23699],"meta":{"created":"2019-07-03T06:25:04"},"new":["deleted"],"old":["7. The sizing of reserve capacity shall","be performed at regional level in","accordance with point 7 of Annex I.","Regional operational centres shall","support transmission system operators in","determining the amount of balancing","capacity that needs to be procured in","accordance with point 8 of Annex I."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"134","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-334","location":[["Proposal for a regulation","Article 33 \u2013 paragraph 1 \u2013 point c"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:05"},"new":["(c) the size of the region;"],"old":["(c) the size of the region, which shall","cover at least one capacity calculation","","region;"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"334","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Pavel Poc","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-135","justification":" There is a need for closer integration of the balancing markets; nevertheless this process is\n already foreseen by relevant network codes and guidelines, specifically system operation\n guideline and balancing guideline. Therefore, it is disproportionate to deal with this issue in\n the electricity regulation, as the process foreseen in these guidelines has not been yet tested in\n the practice, and thus it is not possible to effectively suggest new regulation in this field.","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 7"]],"meps":[96715],"meta":{"created":"2019-07-03T06:25:04"},"new":["deleted"],"old":["7. The sizing of reserve capacity shall","be performed at regional level in","accordance with point 7 of Annex I.","Regional operational centres shall","support transmission system operators in","determining the amount of balancing","capacity that needs to be procured in","accordance with point 8 of Annex I."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"135","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-335","location":[[" Proposal for a regulation","Article 33 \u2013 paragraph 1 \u2013 point d"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:05"},"new":["(d) the relationship to the capacity","calculation regions."],"old":["(d) the geographical optimization of","balancing reserves."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"335","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Kate\u0159ina Kone\u010dn\u00e1","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-136","justification":"Procurement and sizing of reserve capacity is closely related to system specificities, season,\nand thus to security of supply. As national TSOs are held responsible for security of supply,\nthey should also preserve right to procure the balancing capacity/reserves. They should also\nhave right to decide whether it is more safe and cost-efficient to procure it domestically or\nabroad.","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 8"]],"meps":[23699],"meta":{"created":"2019-07-03T06:25:04"},"new":["deleted"],"old":["8. The procurement of balancing","capacity shall be facilitated on a regional","level in accordance with point 8 of Annex","","I. The procurement shall be based on a","primary market and organised in such a","way as to be non-discriminatory between","market participants in the","prequalification process individually or","through aggregation."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"136","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-336","location":[[" Proposal for a regulation","Article 33 \u2013 paragraph 2"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:05"},"new":["2. Within three months of receipt, the","Agency shall either approve the proposal","defining the security coordinated regions","or propose amendments. In the latter case,","the Agency shall consult the ENTSO for","Electricity before adopting the","amendments. The adopted proposal shall","be published on the Agency's website."],"old":["2. Within three months of receipt, the","Agency shall either approve the proposal","defining the system operation regions or","propose amendments. In the latter case, the","Agency shall consult the ENTSO for","Electricity before adopting the","amendments. The adopted proposal shall","be published on the Agency's website."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"336","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Pavel Poc","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-137","justification":"Any entity shall have rights corresponding to its responsibilities. This is aligned with the\nresponsibility of ROCs to procure balancing capacity, as Member States (and usually their\nrespective TSOs) are accountable for secure and uninterrupted electricity supplies. Moreover,\nthis process is already foreseen in recently approved guideline on electricity balancing, which\nbinds TSOs to take contribution of foreign capacity providers into account when sizing and\nprocuring balancing reserves.","location":[["Proposal for a regulation","Article 5 \u2013 paragraph 8"]],"meps":[96715],"meta":{"created":"2019-07-03T06:25:04"},"new":["8. The procurement of balancing","capacity shall be based on a primary","market and organised in such a way as to","be non-discriminatory between market","participants in the prequalification process","individually or through aggregation."],"old":["8. The procurement of balancing","capacity shall be facilitated on a regional","level in accordance with point 8 of Annex","I. The procurement shall be based on a","primary market and organised in such a","way as to be non-discriminatory between","market participants in the prequalification","process individually or through","aggregation."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"137","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-337","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 introductory part"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:05"},"new":["1. Each regional security coordinator","shall perform all the following services in","the security coordinated region where they","are established:"],"old":["1. Each regional operational centre","shall perform all the following functions in","the system operation region where it is","established and regional operational","centres shall perform at least the","following functions, set out in more detail","in Annex I:"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"337","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-138","justification":" The principle of non-discriminatory procurement of balancing capacity should have legal\n effect without any additional action from Member States. Furthermore, clarification of\n language is required to ensure an equal footing between smaller and larger market\n participants in balancing markets.","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 8"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:04"},"new":["8. The procurement of balancing","capacity shall be facilitated on a regional","level in accordance with point 8 of Annex","I. The procurement shall be based on a","primary market and be non-discriminatory","between market participants in the","prequalification process, including in","particular where participation takes place","individually or through aggregation."],"old":["8. The procurement of balancing","capacity shall be facilitated on a regional","level in accordance with point 8 of Annex","I. The procurement shall be based on a","primary market and organised in such a","way as to be non-discriminatory between","market participants in the prequalification","process individually or through","aggregation."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"138","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Michel Dantin, Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-338","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point e"]],"meps":[97296,2025,124732],"meta":{"created":"2019-07-03T06:25:05"},"new":["deleted"],"old":["(e) coordination and optimisation of","regional restoration;"],"orig_lang":"fr","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"338","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Piernicola Pedicini, Eleonora Evi, Dario Tamburrano","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-139","justification":"The principle of non-discriminatory procurement of balancing capacity should have legal\neffect without any additional action from Member States. Balancing markets should also\nensure participation either through aggregation or on an individual basis.","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 8"]],"meps":[124844,124779,124813],"meta":{"created":"2019-07-03T06:25:04"},"new":["8. The procurement of balancing","capacity shall be facilitated on a regional","level in accordance with point 8 of Annex","I. The procurement shall be based on a","primary market and be non-discriminatory","between market participants in the","prequalification process to ensure","participation can take place individually","or through aggregation"],"old":["8. The procurement of balancing","capacity shall be facilitated on a regional","level in accordance with point 8 of Annex","I. The procurement shall be based on a","primary market and organised in such a","way as to be non-discriminatory between","market participants in the prequalification","process individually or through","aggregation."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"139","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-339","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point e"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:05"},"new":["deleted"],"old":["(e) coordination and optimization of","regional restoration;"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"339","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye, Michel Dantin","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-140","justification":"It aims at introducing a necessary flexibility in the rules on the procurement of balancing\ncapacities.","location":[["Proposal for a regulation","Article 5 \u2013 paragraph 9"]],"meps":[2025,124732,97296],"meta":{"created":"2019-07-03T06:25:04"},"new":["9. The procurement of upward","balancing capacity and downward","balancing capacity shall be carried out","separately. The contracting shall be","performed for not longer than one day","before the provision of the balancing","capacity and the contracting period shall","have a maximum of one day.","Each TSO may submit a proposal to the","competent regulatory authority requesting","the exemption to the procurement rules","according to this paragraph. The request","for exemption shall include:","(a) specification of the time period during","which the exemption would apply;","(b) specification of the volume of","balancing capacity for which the","exemption would apply;","(c) analysis of the impact of such an","exemption on the participation of","balancing resources;","(d) and justification for the exemption","demonstrating that such an exemption","would lead to higher economic efficiency."],"old":["9. The procurement of upward","balancing capacity and downward","balancing capacity shall be carried out","separately. The contracting shall be","performed for not longer than one day","before the provision of the balancing","capacity and the contracting period shall","have a maximum of one day."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"140","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Pavel Poc","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-141","justification":" It is crucial that TSOs may decide themselves which time period is the most appropriate for\n balancing capacity procurement (for a given service) \u2013 whether it is one year, several weeks\n or hours in advance of delivery. Obligation to contract balancing capacity only one-day prior\n to delivery and for a maximum duration of one day may severely impact security of supply\n and increase the price of balancing capacity.","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 9"]],"meps":[96715],"meta":{"created":"2019-07-03T06:25:04"},"new":["9. The procurement of upward","balancing capacity and downward","balancing capacity shall be carried out","separately."],"old":["9. The procurement of upward","balancing capacity and downward","balancing capacity shall be carried out","separately. The contracting shall be","performed for not longer than one day","before the provision of the balancing","capacity and the contracting period shall","have a maximum of one day."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"141","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Michel Dantin, Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-340","meps":[97296,2025,124732],"meta":{"created":"2019-07-03T06:25:05"},"new":["deleted"],"old":["(f) post-operation and post-","disturbances analysis and reporting;"],"orig_lang":"fr","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"340","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Kate\u0159ina Kone\u010dn\u00e1","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-142","justification":"TSOs shall also have right to decide which time frame they find most suitable and least\nexpensive for procurement of reserves. Obligation to procure all capacity only one day in\nadvance also does not take into account different needs during different periods of the year\n(strong winter, summer).","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 9"]],"meps":[23699],"meta":{"created":"2019-07-03T06:25:04"},"new":["9. The procurement of upward","balancing capacity and downward","balancing capacity shall be carried out","separately."],"old":["9. The procurement of upward","balancing capacity and downward","balancing capacity shall be carried out","separately. The contracting shall be","performed for not longer than one day","before the provision of the balancing","capacity and the contracting period shall","have a maximum of one day."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"142","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-341","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point f"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:05"},"new":["deleted"],"old":["(f) post-operation and post-","disturbances analysis and reporting;"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"341","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-143","justification":"The principle of non-discrimination in day-ahead and intraday markets should have legal\neffect without any additional action from Member States.","location":[["Proposal for a regulation","Article 6 \u2013 paragraph 2 \u2013 point a"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:05"},"new":["(a) be non-discriminatory;"],"old":["(a) be organised in such a way as to","be non-discriminatory;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"143","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Michel Dantin, Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-342","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point g"]],"meps":[97296,2025,124732],"meta":{"created":"2019-07-03T06:25:05"},"new":["deleted"],"old":["(g) regional sizing of reserve capacity;"],"orig_lang":"fr","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"342","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Piernicola Pedicini, Eleonora Evi, Dario Tamburrano","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-144","location":[["Proposal for a regulation","Article 7 \u2013 paragraph 3"]],"meps":[124844,124779,124813],"meta":{"created":"2019-07-03T06:25:05"},"new":["3. Market operators shall provide","products for trading in day-ahead and","intraday markets which are sufficiently","small in size,with minimum bid sizes of 1","Megawatt or less, to allow for the effective","participation of demand-side response,","energy storage and small-scale renewables.","Market operators shall ensure that energy","communities have a proportionate and","simple access to the market."],"old":["3. Market operators shall provide","products for trading in day-ahead and","intraday markets which are sufficiently","small in size, with minimum bid sizes of 1","Megawatt or less, to allow for the effective","participation of demand-side response,","energy storage and small-scale renewables."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"144","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-343","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point g"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:06"},"new":["deleted"],"old":["(g) regional sizing of reserve capacity;"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"343","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Carolina Punset","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-145","justification":" The emergence of new transaction technologies, such as blockchain, will make bid sizes\n increasingly small. Keeping the threshold as low as possible will ensure that new players\n bidding small loads are able to participate in the market.","location":[[" Proposal for a regulation","Article 7 \u2013 paragraph 3"]],"meps":[90110],"meta":{"created":"2019-07-03T06:25:05"},"new":["3. Market operators shall provide","products for trading in day-ahead and","intraday markets which are sufficiently","small in size, with minimum bid sizes of 1","Kilowatt or more, to allow for the effective","participation of demand-side response,","energy storage and small-scale renewables,","including directly by customers."],"old":["3. Market operators shall provide","products for trading in day-ahead and","intraday markets which are sufficiently","small in size, with minimum bid sizes of 1","Megawatt or less, to allow for the effective","participation of demand-side response,","energy storage and small-scale renewables."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"145","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Pavel Poc","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-344","justification":"Aligned with amendment on Article 5, paragraph 7.","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point g"]],"meps":[96715],"meta":{"created":"2019-07-03T06:25:06"},"new":["deleted"],"old":["(g) regional sizing of reserve capacity;"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"344","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye, Michel Dantin","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-146","location":[[" Proposal for a regulation","Article 8 a (new)"]],"meps":[2025,124732,97296],"meta":{"created":"2019-07-03T06:25:05"},"new":["Article 8 a","Forward instruments hedging generation","investments","In the framework of the freedom given to","the electricity market participants to","develop forward hedging products","pursuant to Article 8(3), investors in new","or refurbished generation, storage or","demand response facilities shall be","allowed to conclude contracts whose","maturity is related to the lifetime of the","installations concerned."],"old":[""],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"146","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye, Michel Dantin","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-147","location":[["Proposal for a regulation","Article 9 \u2013 paragraph 1"]],"meps":[2025,124732,97296],"meta":{"created":"2019-07-03T06:25:05"},"new":["deleted"],"old":["1. There shall be no maximum limit","of the wholesale electricity price unless it","is set at the value of lost load as","determined in accordance with Article 10.","There shall be no minimum limit of the","wholesale electricity price unless it is set","at a value of minus 2000 \u20ac or less and, in","the event that it is or anticipated to be","reached, set at a lower value for the","following day. This provision shall apply,","inter alia, to bidding and clearing in all","timeframes and include balancing energy","and imbalance prices."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"147","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Kate\u0159ina Kone\u010dn\u00e1","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-345","justification":"Procurement and sizing of reserve capacity is closely related to system specificities, season,\nand thus to security of supply. As national TSOs are held responsible for security of supply,\nthey should also preserve right to procure the amount of balancing capacity/reserves, which\nthey find sufficient.","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point g"]],"meps":[23699],"meta":{"created":"2019-07-03T06:25:06"},"new":["deleted"],"old":["(g) regional sizing of reserve capacity;"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"345","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Pavel Poc","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-148","justification":" Any restrictions to price formation prevent proper functioning of markets, including cross-\n border electricity markets. Having different price caps and floors at the VoLL (value of lost\n load) for each bidding zone would imply restrictions for cross-border trade. Therefore, there\n should be no price floors or caps allowed, instead the regulatory authorities shall supervise\n the market to make sure there are no undue impacts on competition and prices for end\n consumers.","location":[["Proposal for a regulation","Article 9 \u2013 paragraph 1"]],"meps":[96715],"meta":{"created":"2019-07-03T06:25:05"},"new":["1. There shall be no limit of the","wholesale electricity price. This provision","shall apply, inter alia, to bidding and","clearing in all timeframes and include","balancing energy and imbalance prices."],"old":["1. There shall be no maximum limit","of the wholesale electricity price unless it","is set at the value of lost load as","determined in accordance with Article 10.","There shall be no minimum limit of the","wholesale electricity price unless it is set","","at a value of minus 2000 \u20ac or less and, in","the event that it is or anticipated to be","reached, set at a lower value for the","following day. This provision shall apply,","inter alia, to bidding and clearing in all","timeframes and include balancing energy","and imbalance prices."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"148","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Michel Dantin, Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-346","meps":[97296,2025,124732],"meta":{"created":"2019-07-03T06:25:06"},"new":["deleted"],"old":["(h) facilitate the regional procurement","of balancing capacity;"],"orig_lang":"fr","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"346","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-347","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point h"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:06"},"new":["deleted"],"old":["(h) facilitate the regional procurement","of balancing capacity;"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"347","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Ivo Belet","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-149","justification":"In strongly interconnected markets a uniform technical price limit should be ensured. Without\nsuch uniform limits, inefficiencies could occur at times of scarcity as market participants\nwould be artificially constrained in cross-border competition for energy by differences in the\nability to price bids.","location":[[" Proposal for a regulation","Article 9 \u2013 paragraph 1"]],"meps":[28257],"meta":{"created":"2019-07-03T06:25:05"},"new":["1. There shall be no maximum limit of","the wholesale electricity price unless it is","set at the value of lost load as determined","in accordance with Article 10. In strongly","interconnected markets, these maximum","limits shall be set at the same level among","all bidding zones and markets to avoid","market distortions. There shall be no","minimum limit of the wholesale electricity","price unless it is set at a value of minus","2000 \u20ac or less and, in the event that it is or","anticipated to be reached, set at a lower","value for the following day. This provision","shall apply, inter alia, to bidding and","clearing in all timeframes and include","balancing energy and imbalance prices."],"old":["1. There shall be no maximum limit of","the wholesale electricity price unless it is","set at the value of lost load as determined","in accordance with Article 10. There shall","be no minimum limit of the wholesale","electricity price unless it is set at a value of","minus 2000 \u20ac or less and, in the event that","it is or anticipated to be reached, set at a","lower value for the following day. This","provision shall apply, inter alia, to bidding","and clearing in all timeframes and include","balancing energy and imbalance prices."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"149","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Kate\u0159ina Kone\u010dn\u00e1","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-348","justification":" Procurement and sizing of reserve capacity is closely related to system specificities, season,\n and thus to security of supply. As national TSOs are held responsible for security of supply,\n they should also preserve right to procure the balancing capacity/reserves.","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point h"]],"meps":[23699],"meta":{"created":"2019-07-03T06:25:06"},"new":["deleted"],"old":["(h) facilitate the regional procurement","of balancing capacity;"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"348","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye, Michel Dantin","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-150","location":[["Proposal for a regulation","Article 9 \u2013 paragraph 2"]],"meps":[2025,124732,97296],"meta":{"created":"2019-07-03T06:25:05"},"new":["2. Market operators may apply limits","on maximum clearing prices for day-ahead","and intraday timeframes in accordance","with Articles 41 and 54 of Regulation (EU)","2015/1222. In the event that limits are, or","are anticipated to be, reached, they shall be","raised following an automatic procedure","developed by the Nominated Electricity","Market Operators and approved by the","competent authority."],"old":["2. By way of derogation from","paragraph 1, until [OP: two years after","entry into force] market operators may","apply limits on maximum clearing prices","for day-ahead and intraday timeframes in","accordance with Articles 41 and 54 of","Regulation (EU) 2015/1222. In the event","that limits are, or are anticipated to be,","reached, they shall be raised for the","following day."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"150","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Pavel Poc","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-349","justification":"Aligned with amendment on Article 5, paragraph 8.","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point h"]],"meps":[96715],"meta":{"created":"2019-07-03T06:25:06"},"new":["deleted"],"old":["(h) facilitate the regional procurement","of balancing capacity;"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"349","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-350","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point i"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:06"},"new":["(i) regional week ahead to intraday","system adequacy forecasts;"],"old":["(i) regional week ahead to intraday","system adequacy forecasts and","preparation of risk reducing actions;"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"350","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Sirpa Pietik\u00e4inen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-151","justification":" The priority dispatch regime has been crucial for the development of renewables.","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 1"]],"meps":[40599],"meta":{"created":"2019-07-03T06:25:05"},"new":["deleted"],"old":["1. Dispatching of power generation","facilities and demand response shall be","non-discriminatory and market based","unless otherwise provided under","paragraphs 2 to 4."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"151","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Michel Dantin, Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-351","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point k"]],"meps":[97296,2025,124732],"meta":{"created":"2019-07-03T06:25:06"},"new":["deleted"],"old":["(k) optimisation of compensation","mechanisms between transmission system","operators;"],"orig_lang":"fr","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"351","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-352","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point k"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:06"},"new":["deleted"],"old":["(k) optimisation of compensation","mechanisms between transmission system","operators;"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"352","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-152","justification":" Priority dispatch is an important tool to ensure that renewable energy is used as it is\n produced and thus helps to achieve our climate targets, as well as continues to provide a\n stable investment framework for future projects, in line with the provisions of the current\n renewable energy directive (Directive 2009/28/EC).","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 1"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:05"},"new":["1. Member States shall ensure that","when dispatching electricity-generating","installations, transmission system","operators shall give priority to generating","installations using variable renewable","energy sources in so far as the secure","operation of the national electricity system","permits and based on transparent and","non-discriminatory criteria."],"old":["1. Dispatching of power generation","facilities and demand response shall be","non-discriminatory and market based","unless otherwise provided under","paragraphs 2 to 4."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"152","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-353","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point l"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:06"},"new":["deleted"],"old":["(l) training and certification;"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"353","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Michel Dantin, Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-354","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point l"]],"meps":[97296,2025,124732],"meta":{"created":"2019-07-03T06:25:06"},"new":["deleted"],"old":["(l) training and certification;"],"orig_lang":"fr","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"354","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Carolina Punset","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-153","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 1"]],"meps":[90110],"meta":{"created":"2019-07-03T06:25:05"},"new":["1. Dispatching of power generation","facilities, energy storage facilities and","demand response shall be non-","discriminatory and market based unless","otherwise provided under paragraphs 2 to","4."],"old":["1. Dispatching of power generation","facilities and demand response shall be","non-discriminatory and market based","unless otherwise provided under","paragraphs 2 to 4."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"153","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Michel Dantin, Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-355","meps":[97296,2025,124732],"meta":{"created":"2019-07-03T06:25:06"},"new":["deleted"],"old":["(m) identification of regional crisis","scenarios according to Article 6(1) of","[Regulation on risk preparedness as","proposed by COM(2016) 862] if this task","is delegated by ENTSO for Electricity;"],"orig_lang":"fr","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"355","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Kate\u0159ina Kone\u010dn\u00e1","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-154","justification":"In line with the principle of equal treatment of all market players. Merit order dispatching is\nalso most cost-efficient for customers.","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 1"]],"meps":[23699],"meta":{"created":"2019-07-03T06:25:05"},"new":["1. Dispatching of power generation","facilities and demand response shall be","non-discriminatory and market based."],"old":["1. Dispatching of power generation","facilities and demand response shall be","non-discriminatory and market based","unless otherwise provided under","paragraphs 2 to 4."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"154","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-356","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point m"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:06"},"new":["deleted"],"old":["(m) identification of regional crisis","scenarios according to Article 6(1) of","[Regulation on risk preparedness as","proposed by COM(2016) 862] if this task","is delegated by ENTSO for Electricity;"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"356","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-155","justification":"High efficiency cogeneration shall be granted priority dispatch when based on renewable\nenergy and in case they achieve a high conversion efficiency.","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 1 a (new)"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:05"},"new":["1a. When dispatching electricity","generating installations, transmission","system operators shall also give priority to","renewables based high efficiency","cogeneration achieving a conversion","efficiency of at least 85 %."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"155","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Michel Dantin, Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-357","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point n"]],"meps":[97296,2025,124732],"meta":{"created":"2019-07-03T06:25:07"},"new":["deleted"],"old":["(n) preparation and carrying out of","yearly crisis simulations in cooperation","with competent authorities pursuant to","Article 12(3) of [Regulation on risk","preparedness as proposed by COM(2016)","862];"],"orig_lang":"fr","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"357","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-358","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point n"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:07"},"new":["deleted"],"old":["(n) preparation and carrying out of","yearly crisis simulations in cooperation","with competent authorities pursuant to","Article 12(3) of [Regulation on risk","preparedness as proposed by COM(2016)","862];"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"358","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Kate\u0159ina Kone\u010dn\u00e1","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-156","justification":" In line with the principle of equal treatment of all market players. Merit order dispatching is\n also most cost-efficient for customers.","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 2"]],"meps":[23699],"meta":{"created":"2019-07-03T06:25:05"},"new":["deleted"],"old":["2. When dispatching electricity","generating installations, transmission","system operators shall give priority to","generating installations using renewable","energy sources or high-efficiency","cogeneration from small generating","installations or generating installations","using emerging technologies to the","following extent:","(a) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 500 kW; or","(b) demonstration projects for innovative","technologies."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"156","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Michel Dantin, Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-359","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point o"]],"meps":[97296,2025,124732],"meta":{"created":"2019-07-03T06:25:07"},"new":["deleted"],"old":["(o) tasks related to the identification","of regional crisis scenarios if and to the","extent they are delegated to the regional","operational centres pursuant to Article","6(1) of [Regulation on risk preparedness","as proposed by COM(2016) 862];"],"orig_lang":"fr","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"359","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-157","justification":"This Amendment is linked to the amendment on \u00a7 1 reinstating fully priority dispatch for\nelectricity produced by renewable energy. Priority dispatch is an important tool to ensure\nthat renewable energy is used as it is produced and thus helps to achieve our climate targets,\nas well as continues to provide a stable investment framework for future projects, in line with\nthe provisions of the current renewable energy directive (Directive 2009/28/EC).","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 2"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:06"},"new":["deleted"],"old":["2. When dispatching electricity","generating installations, transmission","system operators shall give priority to","generating installations using renewable","energy sources or high-efficiency","","cogeneration from small generating","installations or generating installations","using emerging technologies to the","following extent:","(a) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 500 kW; or","(b) demonstration projects for innovative","technologies."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"157","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-360","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point o"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:07"},"new":["deleted"],"old":["(o) tasks related to the identification","of regional crisis scenarios if and to the","extent they are delegated to the regional","operational centres pursuant to Article","6(1) of [Regulation on risk preparedness","as proposed by COM(2016) 862];"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"360","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Michel Dantin, Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-361","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point p"]],"meps":[97296,2025,124732],"meta":{"created":"2019-07-03T06:25:07"},"new":["deleted"],"old":["(p) tasks related to the seasonal","adequacy outlooks if and to the extent","they are delegated to the regional","operational centres pursuant to Article","9(2) of [Regulation on risk preparedness","as proposed by COM(2016) 862];"],"orig_lang":"fr","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"361","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Pavel Poc","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-158","justification":" Priority dispatch is in clear contradiction with the goal of achieving a truly equal level-\n playing field for all sources.","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 2"]],"meps":[96715],"meta":{"created":"2019-07-03T06:25:06"},"new":["deleted"],"old":["2. When dispatching electricity","generating installations, transmission","system operators shall give priority to","generating installations using renewable","energy sources or high-efficiency","cogeneration from small generating","installations or generating installations","using emerging technologies to the","following extent:","(a) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 500 kW; or","(b) demonstration projects for innovative","technologies."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"158","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-362","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point p"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:07"},"new":["deleted"],"old":["(p) tasks related to the seasonal","adequacy outlooks if and to the extent","they are delegated to the regional","operational centres pursuant to Article","9(2) of [Regulation on risk preparedness","as proposed by COM(2016) 862];"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"362","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-159","justification":"Rather than take a market-first, wait and see, approach, the removal of priority access for\nrenewable energy generation must be conditioned on a positive review by the Commission\nregarding the effectiveness of efforts to get rid of such market distortions. Until market\ndistortions for inflexible over capacity have been addressed, with drawing priority access and\ndispatch for renewables will harm investment certainty for renewables, make investments in\nflexible demand response less attractive, and should be considered as a subsidy for\nconventional electricity production.","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 introductory part"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:06"},"new":["2. When dispatching electricity","generating installations, transmission","system operators shall give priority to","generating installations using renewable","energy sources or high-efficiency","cogeneration from small generating","installations or generating installations","using emerging technologies. By","December 31, 2023 and every 2 years","thereafter, the Commission shall assess","progresses made by each Member State in","the removal of potential and actual entry","barriers for installations using renewable","energy sources or high-efficiency","cogeneration to balancing, day-ahead,","intraday and forward markets. Such","assessment will take into account the","impact of existing or planned measures,","such as subsidies, must-run arrangements","or capacity mechanisms, on competition,","as well as their exclusionary effects.","When, on the basis of this assessment,","and having consulted the interested","parties, the Commission is satisfied that","removal of priority dispatch would not","negatively affect the deployment of new","generating installations using renewable","sources, it can adopt a decision","authorising one or more Member States to","suspend the application of priority","dispatch obligations. Without prejudice to","the Commission\u2019s decision, transmission","system operators shall continue to give","priority to generating installations using","renewable energy sources or high-","efficiency cogeneration from small","generating installations or generating","installations using emerging technologies","to the following extent:"],"old":["2. When dispatching electricity","generating installations, transmission","system operators shall give priority to","generating installations using renewable","energy sources or high-efficiency","cogeneration from small generating","installations or generating installations","using emerging technologies to the","following extent:",""],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"159","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Michel Dantin, Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-363","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point q"]],"meps":[97296,2025,124732],"meta":{"created":"2019-07-03T06:25:07"},"new":["deleted"],"old":["(q) calculate the maximum entry","capacity available for the participation of","foreign capacity in capacity mechanisms","pursuant to Article 21(6)."],"orig_lang":"fr","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"363","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Piernicola Pedicini, Eleonora Evi, Dario Tamburrano","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-160","justification":" Until market distortions for inflexible overcapacity have been addressed, withdrawing\n priority access and dispatch for renewables will harm investment certainty for renewables,\n make investments in flexible demand response less attractive, and should be considered as a\n subsidy for inflexible conventional electricity production. The EU legislative framework to\n 2030 must maintain priority access for renewables in order to ensure policy stability and\n investor confidence, and to encourage the reduction of market distortions for inflexible\n baseload","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 introductory part"]],"meps":[124844,124779,124813],"meta":{"created":"2019-07-03T06:25:06"},"new":["2. Subject to requirements relating to","the maintenance of the reliability and","safety of the grid, based on transparent","and non-discriminatory criteria defined","by the competent national authorities:","(a) Member States shall ensure that","transmission system operators and","distribution system operators in their","territory guarantee the transmission and","distribution of electricity produced from","renewable energy sources;","(b) Member States shall also provide for","either priority access or guaranteed access","to the grid-system of electricity produced","from renewable energy sources;","(c) Member States shall ensure that when","dispatching electricity generating","installations, transmission system operators","shall give priority to generating","installations using renewable energy","sources in so far as the secure operation","of the national electricity system permits","and based on transparent and non-","discriminatory criteria."],"old":["2. When dispatching electricity","generating installations, transmission","system operators shall give priority to","generating installations using renewable","energy sources or high-efficiency","cogeneration from small generating","installations or generating installations","using emerging technologies to the","following extent:","",""],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"160","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-364","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point q"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:07"},"new":["deleted"],"old":["(q) calculate the maximum entry","capacity available for the participation of","foreign capacity in capacity mechanisms","pursuant to Article 21(6)."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"364","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Carolina Punset","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-161","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 introductory part"]],"meps":[90110],"meta":{"created":"2019-07-03T06:25:06"},"new":["2. When dispatching electricity","generating or energy storage installations,","transmission system operators shall give","priority to generating or energy storage","installations using renewable energy","sources or high-efficiency cogeneration","from small generating installations or","generating installations using emerging","technologies to the following extent:"],"old":["2. When dispatching electricity","generating installations, transmission","system operators shall give priority to","generating installations using renewable","energy sources or high-efficiency","cogeneration from small generating","installations or generating installations","using emerging technologies to the","following extent:"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"161","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Sirpa Pietik\u00e4inen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-162","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 introductory part"]],"meps":[40599],"meta":{"created":"2019-07-03T06:25:06"},"new":["2. When dispatching electricity","generating installations, transmission","system operators shall give priority to","generating installations using","variable renewable energy sources or high-","efficiency cogeneration from small","generating installations or generating","installations using emerging technologies","to the following extent:"],"old":["2. When dispatching electricity","generating installations, transmission","system operators shall give priority to","generating installations using renewable","energy sources or high-efficiency","cogeneration from small generating","installations or generating installations","using emerging technologies to the","following extent:"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"162","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Michel Dantin, Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-365","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 2"]],"meps":[97296,2025,124732],"meta":{"created":"2019-07-03T06:25:07"},"new":["2. Each regional coordination centre","should aim to develop the following","functions:","(a) coordination and optimisation of","regional restoration;","(b) post-operation and post-disturbance","analysis and reporting;","(c) facilitation of the regional dimension","of capacity reserves;","(d) facilitation of the regional","procurement of balancing capacity;","(e) optimisation of compensation","mechanisms between transmission system","operators;","(f) training and certification;","(g) identification of regional crisis","scenarios according to Article 6(1) of","[Regulation on risk preparedness as","proposed by COM(2016) 862] if this task","is delegated by ENTSO for electricity;","(h) tasks related to the identification of","regional crisis scenarios if and to the","extent they are delegated to the regional","coordination centres pursuant to Article","6(1) of [Regulation on risk preparedness","as proposed by COM(2016) 862];","(i) tasks related to the seasonal adequacy","outlooks if and to the extent they are","delegated to the regional operational","centres pursuant to Article 9(2) of","[Regulation on risk preparedness as","proposed by COM(2016) 862];"],"old":["2. The Commission may add other","functions to the regional operational","centres, not involving decision making","power, pursuant to Chapter VII of this","Regulation.",""],"orig_lang":"fr","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"365","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-163","justification":"This amendment is linked to the amendment on \u00a7 1 reinstating fully priority dispatch for\nelectricity produced by renewable energy. Priority dispatch is an important tool to ensure\nthat renewable energy is used as it is produced and thus helps to achieve our climate targets,\nas well as continues to provide a stable investment framework for future projects, in line with\nthe provisions of the current renewable energy directive (Directive 2009/28/EC).","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 point a"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:06"},"new":["deleted"],"old":["(a) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 500 kW; or"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"163","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-366","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 2"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:07"},"new":["2. Other services may be assigned to","the regional security coordinators, when it","is deemed efficient and so agreed by all","relevant parties."],"old":["2. The Commission may add other","functions to the regional operational","centres, not involving decision making","power, pursuant to Chapter VII of this","","Regulation."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"366","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-164","justification":" This Amendment is linked to the amendment on \u00a7 1 reinstating fully priority dispatch for\n electricity produced by renewable energy. Priority dispatch is an important tool to ensure\n that renewable energy is used as it is produced and thus helps to achieve our climate targets,\n as well as continues to provide a stable investment framework for future projects, in line with\n the provisions of the current renewable energy directive (Directive 2009/28/EC).","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 point b"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:06"},"new":["deleted"],"old":["(b) demonstration projects for","innovative technologies."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"164","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Michel Dantin, Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-367","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 4"]],"meps":[97296,2025,124732],"meta":{"created":"2019-07-03T06:25:07"},"new":["deleted"],"old":["4. Regional operational centres shall","provide transmission system operators of","the system operation region with all the","information necessary to implement the","decisions and recommendations proposed","by the regional operational centres."],"orig_lang":"fr","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"367","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-368","location":[[" Proposal for a regulation","Article 35 \u2013 title"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:07"},"new":["Cooperation within and between security-","coordinated regions operational centres"],"old":["Cooperation within regional operational","centres"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"368","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Eleonora Evi, Piernicola Pedicini, Dario Tamburrano","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-165","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 2 a (new)"]],"meps":[124779,124844,124813],"meta":{"created":"2019-07-03T06:25:06"},"new":["2a. Member States shall require","transmission system operators and","distribution system operators to set up and","make public their standard rules relating","to the bearing and sharing of costs of","technical adaptations, such as grid","connections and grid reinforcements,","improved operation of the grid and rules","on the non-discriminatory implementation","of the grid codes, which are necessary in","order to integrate new producers feeding","electricity produced from renewable","energy sources into the interconnected","grid. Those rules shall be based on","objective, transparent and non-","discriminatory criteria taking particular","account of all the costs and benefits","associated with the connection of those","producers to the grid and of the particular","circumstances of producers located in","peripheral regions and in regions of low","population density. Those rules may","provide for different types of connection."],"old":[""],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"165","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-369","location":[[" Proposal for a regulation","Article 35 \u2013 paragraph 1 \u2013 introductory part"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:07"},"new":["1. The day-to-day coordination","within and between security-coordinated","regions operation shall be managed","through cooperative decision-making","process based on:"],"old":["1. The day-to-day operation of","regional operational centres shall be","managed through cooperative decision-","making. The cooperative-decision making","process shall be based on:"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"369","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Carolina Punset","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-166","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 2 a (new)"]],"meps":[90110],"meta":{"created":"2019-07-03T06:25:06"},"new":["2a. When dispatching electricity","generating installations, transmission","system operators (TSOs) shall give","priority to generating installations using","renewable energy sources or high","efficiency cogeneration in case of same","economic costs when compared to other","technologies."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"166","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-370","location":[["Proposal for a regulation","Article 35 \u2013 paragraph 1 \u2013 point c"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:07"},"new":["(c) a procedure for the adoption of","TSO decisions taking into account the","proposals from regional security","coordinators;"],"old":["(c) a procedure for the adoption of","decisions and recommendations in","accordance with Article 38;"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"370","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-371","location":[["Proposal for a regulation","Article 35 \u2013 paragraph 1 \u2013 point d"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:07"},"new":["(d) a procedure for the revision of","recommendations issued by regional","security coordinators in accordance with","Article 39."],"old":["(d) a procedure for the revision of","decisions and recommendations adopted","by regional operational centres in","accordance with Article 39."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"371","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Pavel Poc","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-167","justification":" Priority dispatch is in clear contradiction with the goal of achieving a truly equal level-\n playing field for all sources.","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 3"]],"meps":[96715],"meta":{"created":"2019-07-03T06:25:06"},"new":["deleted"],"old":["3. Where the total capacity of","generating installations subject to priority","dispatch under paragraph 2 is higher","than 15 % of the total installed generating","capacity in a Member State, point (a) of","paragraph 2 shall apply only to additional","generating installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","capacity of less than 250 kW.","","","","From 1 January 2026, point (a) of","paragraph 2 shall apply only to","generating installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","capacity of less than 250 kW or, if the","threshold under the first sentence of this","paragraph has been reached, of less than","125 kW."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"167","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-372","justification":" ROCs will be subject to extensive discussions in the lead committee. However, from an ENVI\n perspective provisions on transparency and participation are key. This Article is hence a\n logical continuation of the previous provisions on ROCs.","meps":[124756],"meta":{"created":"2019-07-03T06:25:08"},"new":["Article 37a","Transparency","1. Regional operational centres shall","organise a process for stakeholder","involvement and organise regular","meetings with stakeholders to discuss","matters relating to the efficient, secure","and reliable operation of the","interconnected system as well as to","identify shortcomings and propose","improvements;","2. ENTSO for electricity and regional","operational centres shall operate in full","transparency towards stakeholders and","the general public. All relevant","documentation shall be published on the","website of the respective regional","operation centre. This paragraph shall","apply to the proposals, justifications and","decisions adopted pursuant to Articles 32,","33 and 35(a) 38 of this Regulation."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"372","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-373","justification":"Requirements in Articles 38 is redundant with that included in the new version of Article 35\n(1), point c.","location":[[" Proposal for a regulation","Article 38"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:08"},"new":["Article 38 deleted","Adoption of decisions and","recommendations"],"old":["","","1. Regional operational centres shall","develop a procedure for the adoption of","decisions and recommendations.","2. Regional operational centres shall","adopt binding decisions addressed to the","transmission system operators in respect","of the functions referred to in points (a),","(b), (g) and (q) of Article 34(1).","Transmission system operators shall","implement the binding decisions issued by","the regional operational centres except in","cases when the safety of the system will be","negatively affected.","3. Regional operational centres shall","adopt recommendations addressed to the","transmission system operators for the","functions referred to in points (c) to (f)","and (h) to (p) of Article 34(1).","4. The regulatory authorities of a system","operation region may jointly decide to","grant binding decision-making powers to","the regional operational centre for one or","more of the functions provided for in","points (c) to (f) and (h) to (l) of Article","34(1)."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"373","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Piernicola Pedicini, Eleonora Evi, Dario Tamburrano","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-168","justification":"The EU legislative framework to 2030 must maintain priority access for renewables in order\nto ensure policy stability and investor confidence. Proposals to condition priority access for\nsmaller installations will reduce investor confidence and harm deployment of new renewable\nenergy installations, putting in jeopardy the EU\u2019s binding 2030 renewable energy target","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 3"]],"meps":[124844,124779,124813],"meta":{"created":"2019-07-03T06:25:06"},"new":["deleted"],"old":["3. Where the total capacity of","generating installations subject to priority","dispatch under paragraph 2 is higher","than 15 % of the total installed generating","capacity in a Member State, point (a) of","paragraph 2 shall apply only to additional","generating installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","capacity of less than 250 kW.","From 1 January 2026, point (a) of","paragraph 2 shall apply only to","generating installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","capacity of less than 250 kW or, if the","threshold under the first sentence of this","paragraph has been reached, of less than","125 kW."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"168","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-169","justification":"This Amendment is linked to the amendment on \u00a7 1 reinstating fully priority dispatch for\nelectricity produced by renewable energy. Priority dispatch is an important tool to ensure\nthat renewable energy is used as it is produced and thus helps to achieve our climate targets,\nas well as continues to provide a stable investment framework for future projects, in line with\nthe provisions of the current renewable energy directive (Directive 2009/28/EC).","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 3"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:06"},"new":["deleted"],"old":["3. Where the total capacity of","generating installations subject to priority","dispatch under paragraph 2 is higher","than 15 % of the total installed generating","capacity in a Member State, point (a) of","paragraph 2 shall apply only to additional","generating installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","capacity of less than 250 kW.","From 1 January 2026, point (a) of","paragraph 2 shall apply only to","generating installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","capacity of less than 250 kW or, if the","threshold under the first sentence of this","paragraph has been reached, of less than","125 kW."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"169","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye, Michel Dantin","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-374","location":[["Proposal for a regulation","Article 39 \u2013 title"]],"meps":[2025,124732,97296],"meta":{"created":"2019-07-03T06:25:08"},"new":["Revision of recommendations"],"old":["Revision of decisions and","recommendations"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"374","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-170","justification":" This amendment is linked to the amendment on \u00a7 1 reinstating fully priority dispatch for\n electricity produced by renewable energy. Priority dispatch is an important tool to ensure\n that renewable energy is used as it is produced and thus helps to achieve our climate targets,\n as well as continues to provide a stable investment framework for future projects, in line with\n the provisions of the current renewable energy directive (Directive 2009/28/EC).","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 3 \u2013 subparagraph 1"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:06"},"new":["deleted"],"old":["Where the total capacity of generating","installations subject to priority dispatch","under paragraph 2 is higher than 15 % of","the total installed generating capacity in a","Member State, point (a) of paragraph 2","shall apply only to additional generating","installations using renewable energy","sources or high-efficiency cogeneration","with an installed electricity capacity of","less than 250 kW."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"170","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye, Michel Dantin","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-375","location":[[" Proposal for a regulation","Article 39 \u2013 paragraph 1"]],"meps":[2025,124732,97296],"meta":{"created":"2019-07-03T06:25:08"},"new":["1. Regional coordination centres and","transmission system operators shall jointly","develop a procedure for the revision of","recommendations."],"old":["1. Regional operational centres shall","develop a procedure for the revision of","decisions and recommendations."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"375","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Sirpa Pietik\u00e4inen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-171","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 3 \u2013 subparagraph 1"]],"meps":[40599],"meta":{"created":"2019-07-03T06:25:06"},"new":["Where the total capacity of generating","installations subject to priority dispatch","under the previous paragraph is higher","than 15 % of the total installed generating","capacity in a Member State, point (a) of the","previous paragraph shall apply only to","additional generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 250 kW."],"old":["Where the total capacity of generating","installations subject to priority dispatch","under paragraph 2 is higher than 15 % of","the total installed generating capacity in a","Member State, point (a) of paragraph 2","shall apply only to additional generating","installations using renewable energy","sources or high-efficiency cogeneration","with an installed electricity capacity of less","","","than 250 kW."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"171","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-376","location":[[" Proposal for a regulation","Article 40 \u2013 title"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:08"},"new":["Management board of regional security","coordinators"],"old":["Management board of regional operational","centres"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"376","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-172","justification":"This amendment is linked to the amendment on \u00a7 1 reinstating fully priority dispatch for\nelectricity produced by renewable energy. Priority dispatch is an important tool to ensure\nthat renewable energy is used as it is produced and thus helps to achieve our climate targets,\nas well as continues to provide a stable investment framework for future projects, in line with\nthe provisions of the current renewable energy directive (Directive 2009/28/EC).","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 3 \u2013 subparagraph 2"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:07"},"new":["deleted"],"old":["From 1 January 2026, point (a) of","paragraph 2 shall apply only to","generating installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","capacity of less than 250 kW or, if the","threshold under the first sentence of this","paragraph has been reached, of less than","125 kW."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"172","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-377","location":[[" Proposal for a regulation","Article 40 \u2013 paragraph 1"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:08"},"new":["1. In order to adopt measures related","to their governance and to monitor their","performance, the regional security","coordinators shall establish a management","board."],"old":["1. In order to adopt measures related","to their governance and to monitor their","performance, the regional operational","centres shall establish a management","","","board."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"377","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Sirpa Pietik\u00e4inen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-173","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 3 \u2013 subparagraph 2"]],"meps":[40599],"meta":{"created":"2019-07-03T06:25:07"},"new":["From 1 January 2026, point (a) of the","previous paragraph shall apply only to","generating installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","capacity of less than 250 kW or, if the","threshold under the first sentence of this","paragraph has been reached, of less than","125 kW."],"old":["From 1 January 2026, point (a) of","paragraph 2 shall apply only to generating","installations using renewable energy","sources or high-efficiency cogeneration","with an installed electricity capacity of less","","than 250 kW or, if the threshold under the","first sentence of this paragraph has been","reached, of less than 125 kW."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"173","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-378","location":[["Proposal for a regulation","Article 40 \u2013 paragraph 3 \u2013 point a"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:08"},"new":["(a) drafting and endorsing the statutes","and rules of procedure of the regional","security coordinators;"],"old":["(a) drafting and endorsing the statutes","and rules of procedure of the regional","operational centre;"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"378","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-174","justification":"This amendment is linked to the amendment on \u00a7 1 reinstating fully priority dispatch for\nelectricity produced by renewable energy. Priority dispatch is an important tool to ensure\nthat renewable energy is used as it is produced and thus helps to achieve our climate targets,\nas well as continues to provide a stable investment framework for future projects, in line with\nthe provisions of the current renewable energy directive (Directive 2009/28/EC).","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 4"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:07"},"new":["deleted"],"old":["4. Generating installations using","renewable energy sources or high-","efficiency cogeneration which have been","commissioned prior to [OP: entry into","force] and have, when commissioned,","been subject to priority dispatch under","Article 15(5) of Directive 2012/27/EU of","the European Parliament and of the","Council or Article 16(2) of Directive","2009/28/EC of the European Parliament","and of the Council35 shall remain subject","to priority dispatch. Priority dispatch shall","no longer be applicable from the date","where the generating installation is","subject to significant modifications, which","shall be the case at least where a new","connection agreement is required or the","generation capacity is increased.","_________________","35Directive 2009/28/EC of the European","Parliament and of the Council of 23 April","2009 on the promotion of the use of","energy from renewable sources and","amending and subsequently repealing","Directives 2001/77/EC and 2003/30/EC","(OJ L 140, 5.6.2009, p. 16)."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"174","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-379","location":[["Proposal for a regulation","Article 40 \u2013 paragraph 4"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:08"},"new":["4. The competences of the","management board shall exclude those that","are related to the day-to-day activities of","regional security coordinators and the","performance of its services."],"old":["4. The competences of the","management board shall exclude those that","are related to the day-to-day activities of","regional operational centres and the","performance of its functions."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"379","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Carolina Punset","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-175","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 4"]],"meps":[90110],"meta":{"created":"2019-07-03T06:25:07"},"new":["4. In order to maintain a stable","regulatory framework for investors,","generating or energy storage installations","using renewable energy sources or high-","efficiency cogeneration which have been","commissioned prior to [OP: entry into","force] and have, when commissioned, been","subject to priority dispatch under","Article15(5) of Directive 2012/27/EU of","the European Parliament and of the","Council or Article 16(2) of Directive","2009/28/EC of the European Parliament","and of the Council 35 shall remain subject","to priority dispatch. Priority dispatch shall","no longer be applicable from the date","where the generating or energy storage","installation is subject to significant","modifications, which shall be the case at","least where a new connection agreement is","required or the generation or energy","storage capacity is increased."],"old":["4. Generating installations using","renewable energy sources or high-","efficiency cogeneration which have been","commissioned prior to [OP: entry into","force] and have, when commissioned, been","subject to priority dispatch under Article","15(5) of Directive 2012/27/EU of the","European Parliament and of the Council or","Article 16(2) of Directive 2009/28/EC of","the European Parliament and of the","Council35 shall remain subject to priority","dispatch. Priority dispatch shall no longer","be applicable from the date where the","generating installation is subject to","significant modifications, which shall be","the case at least where a new connection","agreement is required or the generation","capacity is increased.","_________________","35","Directive 2009/28/EC of the European","Parliament and of the Council of 23 April","2009 on the promotion of the use of energy","from renewable sources and amending and","subsequently repealing Directives","2001/77/EC and 2003/30/EC (OJ L 140,","5.6.2009, p. 16)."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"175","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-380","justification":" ROCs representatives should act transparently and independently of commercial or national\n interests.","location":[["Proposal for a regulation","Article 41 \u2013 paragraph 1 \u2013 introductory part"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:08"},"new":["1. Regional operational centres shall","set up and manage their organisation","according to a structure that supports the","safety of their functions and that they","exercise their powers independent from","any market players. Regional operational","centres shall ensure that their staff and","the persons responsible for their","management act independently from any","market interest and do not seek or take","direct instructions from any government","or other public or private entity when","carrying out their tasks. Their","organisational structure shall specify"],"old":["1. Regional operational centres shall","set up and manage their organisation","according to a structure that supports the","safety of their functions.","Their organisational structure shall specify:"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"380","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Sirpa Pietik\u00e4inen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-176","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 4"]],"meps":[40599],"meta":{"created":"2019-07-03T06:25:07"},"new":["4. Generating installations using","variable renewable energy sources or high-","efficiency cogeneration which have been","commissioned prior to [OP: entry into","force] and have, when commissioned, been","subject to priority dispatch under Article","15(5) of Directive 2012/27/EU of the","European Parliament and of the Council or","Article 16(2) of Directive 2009/28/EC of","the European Parliament and of the","Council35 shall remain subject to priority","dispatch. Priority dispatch shall no longer","be applicable from the date where the","generating installation is subject to","significant modifications, which shall be","the case at least where a new connection","agreement is required or the generation","capacity is increased.","_________________","35","Directive 2009/28/EC of the European","Parliament and of the Council of 23 April","2009 on the promotion of the use of energy","from renewable sources and amending and","subsequently repealing Directives","2001/77/EC and 2003/30/EC (OJ L 140,","5.6.2009, p. 16)."],"old":["4. Generating installations using","renewable energy sources or high-","efficiency cogeneration which have been","commissioned prior to [OP: entry into","force] and have, when commissioned, been","subject to priority dispatch under Article","15(5) of Directive 2012/27/EU of the","European Parliament and of the Council or","Article 16(2) of Directive 2009/28/EC of","the European Parliament and of the","Council35 shall remain subject to priority","dispatch. Priority dispatch shall no longer","be applicable from the date where the","generating installation is subject to","significant modifications, which shall be","the case at least where a new connection","agreement is required or the generation","capacity is increased.","_________________","35","Directive 2009/28/EC of the European","Parliament and of the Council of 23 April","2009 on the promotion of the use of energy","from renewable sources and amending and","subsequently repealing Directives","2001/77/EC and 2003/30/EC (OJ L 140,","5.6.2009, p. 16)."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"176","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-381","location":[[" Proposal for a regulation","Article 41 \u2013 paragraph 1 \u2013 introductory part"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:08"},"new":["1. TSOs shall establish the necessary","arrangements for regional security","coordinators to manage their organisation","according to a structure that supports the","safety of their services.","Their organisational structure shall specify:"],"old":["1. Regional operational centres shall","set up and manage their organisation","according to a structure that supports the","safety of their functions.","Their organisational structure shall specify:"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"381","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Carolina Punset","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-177","meps":[90110],"meta":{"created":"2019-07-03T06:25:07"},"new":["4a. Member States shall comply with","the provisions of this article through the","porting process on the internal energy","market as provided in the Regulation on","the Governance of the Energy Union","(Art.21). They shall notably ensure that","dispatching rules are fully transparent","and market-based, and that the removal of","priority dispatch for generating","installations using renewable energy","sources would not undermine their","contribution to:","(a) the EU target for 2030 as provided in","the Directive on the promotion of the use","of energy from renewable sources;","(b) the reduction of the overall","greenhouse gas emissions of the Union by","at least 40% below 1990 levels by 2030 as","provided in the intended nationally","determined reduction commitment of the","Union and its Member States submitted to","the Secretariat of the United Nations","Framework Convention on Climate","Change."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"177","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-382","location":[[" Proposal for a regulation","Article 41 \u2013 paragraph 2"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:09"},"new":["2. Regional security","coordinators may set up regional desks to","address local specificities or back-up","regional security coordinators for the","efficient and reliable exercise of their","functions."],"old":["2. Regional operational centres may","set up regional desks to address local","specificities or back-up operational","centres for the efficient and reliable","exercise of their functions."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"382","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Piernicola Pedicini, Eleonora Evi, Dario Tamburrano","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-178","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 4 a (new)"]],"meps":[124844,124779,124813],"meta":{"created":"2019-07-03T06:25:07"},"new":["4a. Member States shall comply with","the provisions of this article through the","reporting process on the internal energy","market as provided in the Regulation on","the Governance of the Energy Union(Art.","21). They shall notably ensure that","dispatching rules are fully transparent","and market-based, and that the removal of","priority dispatch for generating","installations using renewable energy","sources would not undermine their","contribution to:","(a) the EU target for 2030 as provided in","the Directive on the promotion of the use","of energy from renewable sources;","(b) the reduction of the overall","greenhouse gas emissions of the Union."],"old":["",""],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"178","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-383","location":[["Proposal for a regulation","Article 42 \u2013 paragraph 1"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:09"},"new":["Regional operational centres shall be","equipped with all the human, technical,","physical and financial resources necessary","for fulfilling their obligations under this","Regulation and carrying out their functions","independently and impartially."],"old":["Regional operational centres shall be","equipped with all the human, technical,","physical and financial resources necessary","for fulfilling their obligations under this","Regulation and carrying out their","functions."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"383","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Ivo Belet","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-179","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 4 a (new)"]],"meps":[28257],"meta":{"created":"2019-07-03T06:25:07"},"new":["4a. Member States may, subject to","Union state aid rules, incentivize market","participants which are subject to priority","access to opt out of priority dispatch","against appropriate compensation."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"179","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-384","location":[["Proposal for a regulation","Article 42 \u2013 paragraph 1"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:09"},"new":["Regional security coordinators shall be","equipped with all the human, technical,","physical and financial resources necessary","for fulfilling their obligations under this","Regulation and carrying out their","functions."],"old":["Regional operational centres shall be","equipped with all the human, technical,","physical and financial resources necessary","for fulfilling their obligations under this","Regulation and carrying out their","functions."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"384","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Sirpa Pietik\u00e4inen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-180","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 4 a (new)"]],"meps":[40599],"meta":{"created":"2019-07-03T06:25:07"},"new":["4a. Prior to the phasing out of priority","dispatch for variable renewable energy","sources, Member States shall ensure that","the dispatching rules are fully transparent","and market-based."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"180","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-385","location":[[" Proposal for a regulation","Article 43 \u2013 paragraph 1 \u2013 introductory part"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:09"},"new":["1. Regional security coordinators","shall establish a process for the continuous","monitoring of at least:"],"old":["1. Regional operational centres shall","establish a process for the continuous","monitoring of at least:"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"385","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-181","justification":"This Amendment is linked to the amendment on \u00a7 1 reinstating fully priority dispatch for\nelectricity produced by renewable energy. Priority dispatch is an important tool to ensure\nthat renewable energy is used as it is produced and thus helps to achieve our climate targets,\nas well as continues to provide a stable investment framework for future projects, in line with\nthe provisions of the current renewable energy directive (Directive 2009/28/EC).","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 5"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:07"},"new":["deleted"],"old":["5. Priority dispatch shall not","endanger the secure operation of the","electricity system, shall not be used as a","justification for curtailment of cross-","border capacities beyond what is provided","for in Article 14 and shall be based on","transparent and non-discriminatory","criteria."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"181","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-386","location":[[" Proposal for a regulation","Article 43 \u2013 paragraph 1 \u2013 point b"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:09"},"new":["(b) the recommendations issued and","the outcome achieved;"],"old":["(b) the decisions and recommendations","issued and the outcome achieved;"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"386","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-182","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 5 a (new)"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:07"},"new":["5a. Member States shall ensure that","when dispatching electricity-generating","installations, transmission system","operators shall give priority to generating","installations using variable renewable","energy sources in so far as the secure","operation of the national electricity system","permits and based on transparent and","non-discriminatory criteria."],"old":[""],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"182","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-387","location":[[" Proposal for a regulation","Article 43 \u2013 paragraph 1 \u2013 point c"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:09"},"new":["(c) the effectiveness and efficiency of","each of the services for which they are","responsible."],"old":["(c) the effectiveness and efficiency of","each of the functions for which they are","responsible."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"387","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Jadwiga Wi\u015bniewska","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-183","justification":" The current legal framework in Article 15(4) of Directive 2009/72/EC allows Member States\n to provide for a priority dispatch for generating installations using indigenous primary\n energy fuel sources to the extent not exceeding, in any calendar year, 15% of the overall\n primary energy necessary to produce the electricity consumed in such Member State.","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 5 a (new)"]],"meps":[124877],"meta":{"created":"2019-07-03T06:25:07"},"new":["5a. A Member State may, for reasons","of security of supply, direct that priority","be given to the dispatch of generating","installations using indigenous primary","energy fuel sources, to an extent not","exceeding, in any calendar year, 15% of","the overall primary energy necessary to","produce the electricity consumed in the","Member State concerned."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"183","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-388","location":[["Proposal for a regulation","Article 43 \u2013 paragraph 2"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:09"},"new":["deleted"],"old":["2. Regional operational centres shall","submit to the Agency and to the","regulatory authorities of the system","operation region the data resulting from","their continuous monitoring at least","annually."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"388","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-184","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 2"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:07"},"new":["2. The resources curtailed or","redispatched maybe selected amongst","generation, storage or demand facilities","submitting offers for curtailment or","redispatching using market-based","mechanisms and be financially fully paid.","Payment shall amount to the value of the","income that the operator would have got","from the market and from support","mechanism, where applicable, pursuant to","paragraph 6(b). Submission of an offer","for curtailment or redispatch shall be","voluntary. Non-market-based curtailment","or redispatching of generation or","redispatching of demand response may be","used for operational security reasons","where no market-based alternative is","available, where all available market-based","resources have been used, or where the","number of generation or demand facilities","available in the area where suitable","generation or demand facilities for the","provision of the service are located is too","low to ensure effective competition.","Market-based redispatch may not be used","when it could lead to significant","curtailment of electricity generated in","installations using renewable sources.","Regulators shall assess market interest at","least every five years. The provision of","market-based resources shall be open to all","generation technologies, storage and","demand response, including operators","located in other Member States unless","technically not feasible."],"old":["2. The resources curtailed or","redispatched shall be selected amongst","generation or demand facilities submitting","offers for curtailment or redispatching","using market-based mechanisms and be","financially compensated. Non-market-","","based curtailment or redispatching of","generation or redispatching of demand","response shall only be used where no","market-based alternative is available,","where all available market-based resources","have been used, or where the number of","generation or demand facilities available in","the area where suitable generation or","demand facilities for the provision of the","service are located is too low to ensure","effective competition. The provision of","market-based resources shall be open to all","generation technologies, storage and","demand response, including operators","located in other Member States unless","technically not feasible."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"184","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-185","justification":" For smaller market participants, in particular local energy communities that own production\n that they supply to their members, their aim may be to contribute to meeting as much local\n demand as possible. It needs to be clarified that participation in market-based mechanisms\n for curtailment and redispatch is strictly voluntary for all market actors, and that they may\n choose to be subject only to non-market based curtailment according to specified conditions,\n where no other alternatives are available to the system operator.","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 2"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:07"},"new":["2. The resources curtailed or","redispatched shall be selected amongst","generation or demand facilities submitting","offers for curtailment or redispatching","using market-based mechanisms and be","financially compensated. Participation in","market-based mechanisms shall be","voluntary for all market participants,","including in particular small","decentralised and distributed generation.","Non-market-based curtailment or","redispatching of generation or","redispatching of demand response shall","only be used where no market-based","alternative is available, where all available","market-based resources have been used, or","where the number of generation or demand","facilities available in the area where","suitable generation or demand facilities for","the provision of the service are located is","too low to ensure effective competition.","The provision of market-based resources","shall be open to all generation","technologies, storage and demand","response, including operators located in","other Member States unless technically not","feasible."],"old":["2. The resources curtailed or","redispatched shall be selected amongst","generation or demand facilities submitting","offers for curtailment or redispatching","using market-based mechanisms and be","financially compensated. Non-market-","","based curtailment or redispatching of","generation or redispatching of demand","response shall only be used where no","market-based alternative is available,","where all available market-based resources","have been used, or where the number of","generation or demand facilities available in","the area where suitable generation or","demand facilities for the provision of the","service are located is too low to ensure","effective competition. The provision of","market-based resources shall be open to all","generation technologies, storage and","demand response, including operators","located in other Member States unless","technically not feasible."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"185","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Michel Dantin, Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-389","location":[["Proposal for a regulation","Article 43 \u2013 paragraph 2"]],"meps":[97296,2025,124732],"meta":{"created":"2019-07-03T06:25:09"},"new":["2. Regional operational centres shall","submit to the Agency and to the regulatory","authorities of the system operation region","the data resulting from their continuous","monitoring at least annually. The regional","coordination centres shall publish an","annual report explaining how their","recommendations have been","implemented. The report should provide","details of cases where operators have","departed from the recommendations and","of the justifications they have provided."],"old":["2. Regional operational centres shall","submit to the Agency and to the regulatory","authorities of the system operation region","the data resulting from their continuous","monitoring at least annually."],"orig_lang":"fr","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"389","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Piernicola Pedicini, Eleonora Evi, Dario Tamburrano","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-186","justification":"For many energy communities that own their own production that they supply to their\nmembers, the aim is not simply to receive a return for renewables exported to the grid.\nInstead, their aim is to have such installations contributing to as much of their consumption\nneeds as possible. It needs to be clarified that market actors may freely choose to participate\nin market-based curtailment, or to be subject only to non-market based curtailment according\nto specified conditions.","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 2 a (new)"]],"meps":[124844,124779,124813],"meta":{"created":"2019-07-03T06:25:07"},"new":["2a. Self-generated electricity from","generating installations using renewable","energy sources by active customers, and","electricity generated from installations","using renewable sources by local energy","communities, which is primarily intended","the supply of its members, shall be entitled","to elect whether to participate in market-","based or non-market based mechanisms.","To this effect, they shall not be required to","submit of an offer for curtailment or","redispatch. The decision not to participate","in market-based mechanisms shall not","preclude the active customer or local","energy community from electing to","participate in the future."],"old":[""],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"186","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-390","meps":[124736],"meta":{"created":"2019-07-03T06:25:09"},"new":["3. Regional security coordinators","shall establish their costs in a transparent","manner and report them to the Agency and","to the regulatory authorities of the security-","coordinated region."],"old":["3. Regional operational centres shall","establish their costs in a transparent","manner and report them to the Agency and","to the regulatory authorities of the system","operation region."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"390","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-187","justification":" For the energy efficiency of the system and to fully reap the benefits of electricity produced by\n renewable energy with relation to climate targets, curtailment rules have to be clear,\n transparent and enforceable so as to minimise curtailment in accordance with the following\n provisions of this Article.","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 3"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:07"},"new":["3. The responsible system operators","shall ensure that they efficiently","accommodate renewable electricity to","deliver Union-wide targets, including on","greenhouse gas emissions, at least cost as","set out in Article 51 (2) of the [Electricity","Directive]. They must report at least once","per year to the competent regulatory","authority and ACER:","- on the level of development and","effectiveness of market-based curtailment","or redispatching mechanisms for","generation and demand-side","management; - on the reasons, volumes","and types of technologies subject to","curtailment or downward redispatching;","- on measures taken to reduce the need of","curtailment or downwards dispatching of","generating installations using renewable","energy sources or high-efficiency","cogeneration; and","- on requests and contractual","arrangements made with generating units","for them to operate at a certain level of","electricity infeed. System operators shall","justify the necessity of such","arrangements, and in what extent these","services could not be provided by other","resources; setting out whether this was in","line with the least cost delivery of Union-","wide targets.","Where this was not the case, they must set","out measures taken to reduce the need for","such curtailment or downward","redispatching in the future. Curtailment or","redispatching of generating installations","using renewable energy sources or high-","efficiency cogeneration shall be subject to","payment pursuant to paragraph 6."],"old":["3. The responsible system operators","shall report at least once per year to the","competent regulatory authority on","curtailment or downward redispatching of","generating installations using renewable","energy sources or high-efficiency","cogeneration and on measures taken to","reduce the need for such curtailment or","downward redispatching in the future.","Curtailment or redispatching of generating","installations using renewable energy","sources or high-efficiency cogeneration","shall be subject to compensation pursuant","to paragraph 6.",""],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"187","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-391","location":[[" Proposal for a regulation","Article 43 \u2013 paragraph 4"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:09"},"new":["4. Regional security coordinators","shall submit an annual report concerning","their performance to ENTSO for","Electricity, the Agency, the regulatory","authorities of the security-coordinated","region and the Electricity Coordination","Group established pursuant to Article 1 of","Commission Decision 2012/C 353/0237 .","_________________","37","Commission Decision of 15 November","2012 setting up the Electricity","Coordination Group (OJ C 353,","17.11.2012, p.2)."],"old":["4. Regional operational centres shall","submit an annual report concerning their","performance to ENTSO for Electricity, the","Agency, the regulatory authorities of the","system operation region and the Electricity","Coordination Group established pursuant","to Article 1 of Commission Decision","2012/C 353/0237 .","_________________","37","Commission Decision of 15 November","2012 setting up the Electricity","Coordination Group (OJ C 353,","17.11.2012, p.2)."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"391","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-392","location":[[" Proposal for a regulation","Article 43 \u2013 paragraph 5"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:09"},"new":["5. Regional security coordinators","shall report shortcomings identified in the","monitoring process under paragraph 1 to","ENTSO for electricity, the regulatory","authorities of the security-coordinated","region, the Agency and the competent","authorities of Member States responsible","for the prevention and management of","crisis situations."],"old":["5. Regional operational centres shall","report shortcomings identified in the","monitoring process under paragraph 1 to","ENTSO for electricity, the regulatory","authorities of the system operation region,","the Agency and the competent authorities","of Member States responsible for the","prevention and management of crisis","situations."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"392","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Piernicola Pedicini, Eleonora Evi, Dario Tamburrano","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-188","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 3"]],"meps":[124844,124779,124813],"meta":{"created":"2019-07-03T06:25:07"},"new":["3. The responsible system operators","shall report at least once per year to the","competent regulatory authority and ACER:","(a) on the level of development and","effectiveness of market-based curtailment","or redispatching mechanisms for","generation and demand facilities,","(b) on the reasons, volumes and types of","energy covered by curtailment or","downward redispatching of generating","installations using renewable energy","sources or high-efficiency cogeneration","(c) and on measures taken to reduce the","need for such curtailment or downward","redispatching in the future.","(d) on requests and contractual","arrangements made with generating units","for them to operate at a certain level of","electricity infeed. System operators shall","justify the necessity of such","arrangements, and in what extent these","services could not be provided by other","units. Curtailment or redispatching of","generating installations using renewable","energy sources or high-efficiency","cogeneration shall be subject to","compensation pursuant to paragraph 6."],"old":["3. The responsible system operators","shall report at least once per year to the","competent regulatory authority on","curtailment or downward redispatching of","","generating installations using renewable","energy sources or high-efficiency","cogeneration and on measures taken to","reduce the need for such curtailment or","downward redispatching in the future.","Curtailment or redispatching of generating","installations using renewable energy","sources or high-efficiency cogeneration","shall be subject to compensation pursuant","to paragraph 6."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"188","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-393","location":[["Proposal for a regulation","Article 44 \u2013 paragraph 1"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:09"},"new":["Regional security coordinators shall take","the necessary steps to cover liability related","to the execution of their tasks, in particular,","where they adopt decisions binding on","transmission system operators. The method","employed to provide the cover shall take","into account the legal status of the regional","security coordinator and the level of","commercial insurance cover available."],"old":["Regional operational centres shall take the","necessary steps to cover liability related to","the execution of their tasks, in particular,","where they adopt decisions binding on","transmission system operators. The method","employed to provide the cover shall take","into account the legal status of the regional","operational centre and the level of","commercial insurance cover available."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"393","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Kate\u0159ina Kone\u010dn\u00e1","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-394","justification":" Distribution networks across Europe vary to a great extent: from voltage level, topology,\n natural profile of given area to consumption patterns of users. These specificities has to be\n taken into account in an operation of EU DSO entity.","location":[["Proposal for a regulation","Article 49 \u2013 paragraph 1"]],"meps":[23699],"meta":{"created":"2019-07-03T06:25:09"},"new":["Distribution system operators which are","not part of a vertically integrated","undertaking or which are unbundled","according to the provisions of Article 35","[recast of Directive 2009/72/EC as","proposed by COM(2016) 864/2], shall","cooperate at Union level through a","European Entity for Distribution system","operators (\"EU DSO entity\"), in order to","promote the completion and functioning of","the internal market in electricity, and to","promote optimal management and a","coordinated operation of distribution and","transmission systems. Distribution system","operators who wish to participate in the EU","DSO entity shall become registered","members of the entity. Statuses shall","ensure that decision-making process takes","into account regional differences of","distribution network."],"old":["Distribution system operators which are","not part of a vertically integrated","undertaking or which are unbundled","according to the provisions of Article 35","","[recast of Directive 2009/72/EC as","proposed by COM(2016) 864/2], shall","cooperate at Union level through a","European Entity for Distribution system","operators (\"EU DSO entity\"), in order to","promote the completion and functioning of","the internal market in electricity, and to","promote optimal management and a","coordinated operation of distribution and","transmission systems. Distribution system","operators who wish to participate in the EU","DSO entity shall become registered","members of the entity."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"394","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-395","location":[[" Proposal for a regulation","Article 49 \u2013 paragraph 1"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:09"},"new":["Distribution system operators which are","not part of a vertically integrated","undertaking or which are unbundled","according to the provisions of Article 35","[recast of Directive 2009/72/EC as","proposed by COM(2016) 864/2], or which","are financially unbundled and fully","independent from energy related entities","shall cooperate at Union level through a","European Entity for Distribution system","operators (\"EU DSO entity\"), in order to","promote the completion and functioning of","the internal market in electricity, and to","promote optimal management and a","coordinated operation of distribution and","transmission systems. Distribution system","operators who wish to participate in the EU","DSO entity shall become registered","members of the entity."],"old":["Distribution system operators which are","not part of a vertically integrated","undertaking or which are unbundled","according to the provisions of Article 35","[recast of Directive 2009/72/EC as","proposed by COM(2016) 864/2], shall","cooperate at Union level through a","European Entity for Distribution system","operators (\"EU DSO entity\"), in order to","promote the completion and functioning of","the internal market in electricity, and to","promote optimal management and a","coordinated operation of distribution and","","transmission systems. Distribution system","operators who wish to participate in the EU","DSO entity shall become registered","members of the entity."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"395","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Carolina Punset","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-189","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 3"]],"meps":[90110],"meta":{"created":"2019-07-03T06:25:07"},"new":["3. The responsible system operators","shall report at least once per year to the","competent regulatory authority on","curtailment or downward redispatching of","generating, energy storage or demand-","response installations using renewable","energy sources or high-efficiency","cogeneration and on measures taken to","reduce the need for such curtailment or","downward redispatching in the future.","Curtailment or redispatching of generating","installations using renewable energy","sources, energy storage, demand-response","or high-efficiency cogeneration shall be","subject to compensation pursuant to","paragraph 6."],"old":["3. The responsible system operators","shall report at least once per year to the","competent regulatory authority on","curtailment or downward redispatching of","generating installations using renewable","energy sources or high-efficiency","cogeneration and on measures taken to","reduce the need for such curtailment or","downward redispatching in the future.","Curtailment or redispatching of generating","installations using renewable energy","sources or high-efficiency cogeneration","","shall be subject to compensation pursuant","to paragraph 6."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"189","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Ivo Belet","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-396","location":[["Proposal for a regulation","Article 49 \u2013 paragraph 1"]],"meps":[28257],"meta":{"created":"2019-07-03T06:25:10"},"new":["All distribution system operators shall","cooperate at Union level through a","European Entity for Distribution system","operators (\"EU DSO entity\"), in order to","promote the completion and functioning of","the internal market in electricity and gas to","support the development of a sustainable,","decentralized and more integrated energy","system, and to promote optimal","management and a coordinated operation","of distribution and transmission systems.","Distribution system operators and","associations that represent them at Union","level who wish to participate in the EU","DSO entity shall become registered","members of the entity."],"old":["Distribution system operators which are","not part of a vertically integrated","undertaking or which are unbundled","according to the provisions of Article 35","[recast of Directive 2009/72/EC as","proposed by COM(2016) 864/2], shall","cooperate at Union level through a","European Entity for Distribution system","operators (\"EU DSO entity\"), in order to","promote the completion and functioning of","the internal market in electricity, and to","promote optimal management and a","coordinated operation of distribution and","transmission systems. Distribution system","operators who wish to participate in the EU","DSO entity shall become registered","members of the entity."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"396","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Piernicola Pedicini, Eleonora Evi, Dario Tamburrano","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-190","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 4 \u2013 point a"]],"meps":[124844,124779,124813],"meta":{"created":"2019-07-03T06:25:08"},"new":["(a) guarantee the capability of","transmission and distribution networks to","transmit electricity produced from","renewable energysources or high-","efficiency cogeneration with minimum","possible curtailment or redispatching. That","shall not prevent network planning by","distribution system operator from taking","into account limited curtailment or","redispatching where it can demonstrate in","a transparent way that it is more","economically efficient and does not exceed","5 % of installed capacities using renewable","energy sources or high-efficiency","cogeneration at the connection point.","Such decision should result from a","voluntary agreement between the","distribution system operator and the","generator;"],"old":["(a) guarantee the capability of","transmission and distribution networks to","transmit electricity produced from","renewable energy sources or high-","efficiency cogeneration with minimum","possible curtailment or redispatching. That","shall not prevent network planning from","taking into account limited curtailment or","redispatching where this is shown to be","more economically efficient and does not","exceed 5 % of installed capacities using","renewable energy sources or high-","efficiency cogeneration in their area;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"190","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-397","justification":" Given the tasks ascribed to the new EU DSO entity (in particular the tasks related to the\n development of network codes and best practices), the entity should have an obligation to act\n in the interest of Europe, to act independently, and to contribute to the achievement of EU\n energy and climate objectives. Such an obligation has been proposed to be imposed on\n ENTSO for Electricity (ENTSO-E) in Article 25(2) of this Regulation and should be replicated\n for the new EU DSO in order to ensure consistency.","location":[["Proposal for a regulation","Article 49 \u2013 paragraph 1 a (new)"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:10"},"new":["In performing its functions under EU law,","the EU DSO entity shall act for the","European good and independent from","individual national interests or the","national interests of distribution system","operators, and shall contribute to the","efficient and sustainable achievement of","the objectives set out in the policy","framework for climate and energy","covering the period from 2020 to 2030, in","particular by removing obstacles to the","integration of electricity generated from","renewable energy sources and to","increases in energy efficiency."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"397","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-398","justification":"Language in this provision should be strengthened to ensure that the process for establishing\nthe new entity is sufficiently and adequately monitored. Specifically, the Electricity Regulation\nshould provide the Agency (ACER) with explicit power to define criteria ensuring that the\nstatus, rules of procedure, and membership of the EUDSO entity (i) reflect the need to\nmaintain independence and conformity with unbundling rules, and; (ii) guarantee\neffectiveness and diverse representation of different DSOs in decision-making.","location":[[" Proposal for a regulation","Article 50 \u2013 paragraph 1"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:10"},"new":["1. By [OP: twelve months after entry","into force], the distribution system","operators, with the administrative support","of the Agency and on the basis of the","criteria defined pursuant to paragraph 2,","shall submit to the Commission and to the","Agency the draft statutes, a list of","registered members, the draft rules of","procedure, including the rules of","procedures on the consultation with","ENTSO for Electricity and other","stakeholders and the financing rules, of the","EU DSO entity to be established."],"old":["1. By [OP: twelve months after entry","into force], the distribution system","operators, with the administrative support","of the Agency, shall submit to the","Commission and to the Agency the draft","statutes, a list of registered members, the","draft rules of procedure, including the rules","of procedures on the consultation with","ENTSO for Electricity and other","stakeholders and the financing rules, of the","","","EU DSO entity to be established."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"398","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Sirpa Pietik\u00e4inen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-191","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 4 \u2013 point a"]],"meps":[40599],"meta":{"created":"2019-07-03T06:25:08"},"new":["(a) guarantee the capability of","transmission and distribution networks to","transmit electricity produced from","renewable energy sources or high-","efficiency cogeneration with minimum","possible curtailment or redispatching. That","shall not prevent network planning by","distribution system operators from taking","into account limited curtailment or","redispatching where it can","objectively demonstrate that it is more","economically efficient and does not exceed","5 % of installed capacities using renewable","energy sources or high-efficiency","cogeneration at the connection point.","Such a decision should be jointly reached","by the distribution system operator and","the generator;"],"old":["(a) guarantee the capability of","transmission and distribution networks to","transmit electricity produced from","renewable energy sources or high-","efficiency cogeneration with minimum","possible curtailment or redispatching. That","shall not prevent network planning from","taking into account limited curtailment or","redispatching where this is shown to be","more economically efficient and does not","exceed 5 % of installed capacities using","renewable energy sources or high-","efficiency cogeneration in their area;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"191","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-399","location":[["Proposal for a regulation","Article 50 \u2013 paragraph 1"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:10"},"new":["1. Distribution system operators shall","cooperate at Union level to contribute to","the achievement of the EU climate and","energy objectives including the integration","of high levels of electricity generated by","variable renewable energy sources, to","promote the completion and functioning","of the internal market in electricity, and to","promote optimal management and a","coordinated operation of distribution and","transmission systems."],"old":["1. By [OP: twelve months after entry","into force], the distribution system","operators, with the administrative support","of the Agency, shall submit to the","Commission and to the Agency the draft","statutes, a list of registered members, the","draft rules of procedure, including the","rules of procedures on the consultation","with ENTSO for Electricity and other","stakeholders and the financing rules, of","the EU DSO entity to be established."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"399","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Carolina Punset","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-192","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 4 \u2013 point a"]],"meps":[90110],"meta":{"created":"2019-07-03T06:25:08"},"new":["(a) guarantee the capability of","transmission and distribution networks to","transmit electricity produced from","renewable energy sources, energy storage,","demand-response or high-efficiency","cogeneration with minimum possible","curtailment or dispatching. That shall not","prevent network planning from taking into","account limited curtailment or","redispatching where this is shown to be","more economically efficient and does not","exceed 5 % of installed capacities using","renewable energy sources, energy storage,","demand-response or high-efficiency","cogeneration in their area, provided that an","appropriate consultation with","stakeholders is carried out before its","approval;"],"old":["(a) guarantee the capability of","transmission and distribution networks to","transmit electricity produced from","renewable energy sources or high-","efficiency cogeneration with minimum","possible curtailment or redispatching. That","shall not prevent network planning from","taking into account limited curtailment or","redispatching where this is shown to be","more economically efficient and does not","exceed 5 % of installed capacities using","renewable energy sources or high-","efficiency cogeneration in their area;",""],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"192","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-400","justification":" The process for establishing the new entity should be sufficiently and adequately monitored.\n Specifically, the Electricity Regulation should provide ACER with explicit power to define\n criteria ensuring that the status, rules of procedure, and membership of the EU DSO entity (i)\n reflect the need to maintain independence and conformity with unbundling rules, and; (ii)\n guarantee effectiveness and diverse representation of different DSOs in decision-making.","location":[["Proposal for a regulation","Article 50 \u2013 paragraph 1 \u2013 point 1 (new)"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:10"},"new":["(1) By [OP: six months after entry","into force], the Agency shall define","criteria for the elaboration of the draft","statutes, the list of registered members,","and the draft rules of procedure referred","to in paragraph 1 with a view to","maintaining independence of the EU DSO","entity from its members and to ensuring a","balanced representation as well as","equitable treatment of all member","distribution system operators. The Agency","shall formally consult organisations","representing all stakeholders on the","criteria."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"400","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-193","justification":" The clarification is necessary to ensure an effective implementation of the principle of\n minimum possible curtailment.","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 4 \u2013 point a"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:08"},"new":["(a) guarantee the capability of","transmission and distribution networks to","transmit electricity produced from","renewable energy sources or high-","efficiency cogeneration in line with the","least cost delivery of Union wide targets,","including climate targets, with minimum","possible curtailment or redispatching. That","shall not prevent network planning from","taking into account limited curtailment or","redispatching where they can demonstrate","in a transparent way that this is more","economically efficient and does not exceed","1 % of installed capacities of installations","using renewable energy sources or high-","efficiency cogeneration at the connection","point;"],"old":["(a) guarantee the capability of","transmission and distribution networks to","transmit electricity produced from","renewable energy sources or high-","efficiency cogeneration with minimum","possible curtailment or redispatching. That","shall not prevent network planning from","taking into account limited curtailment or","redispatching where this is shown to be","more economically efficient and does not","exceed 5 % of installed capacities using","renewable energy sources or high-","efficiency cogeneration in their area;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"193","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-401","justification":"Language in this provision should be strengthened to ensure that the process for establishing\nthe new entity is sufficiently monitored. Specifically, the adoption of the draft statutes, the list\nof registered members, and the draft rules of procedure and financing rules should be\nconditional upon the favourable opinion of the Agency. In addition, the Electricity Regulation\nshould enable the Agency to amend, where necessary, the draft statutes, the list of registered\nmembers, and the draft rules of procedure and financing rules.","location":[[" Proposal for a regulation","Article 50 \u2013 paragraph 2"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:10"},"new":["2. Within two months of receipt, the","Agency, after formally consulting the","organisations representing all stakeholders,","in particular distribution system users, shall","either provide a positive opinion to the","Commission on the draft statutes, the list of","members and the draft rules of procedure,","or propose amendments. In the latter","case, the Agency shall consult distribution","system operators and all stakeholders","before adopting the amendments."],"old":["2. Within two months of receipt, the","Agency, after formally consulting the","organisations representing all stakeholders,","in particular distribution system users, shall","provide an opinion to the Commission on","the draft statutes, the list of members and","the draft rules of procedure."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"401","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-194","justification":"To truly enable active customers, encourage their participation and keep citizens engagement\nin being part of the energy transition, self-generated energy should not be curtailed. In\naddition \"network security issues\" is an unclear concept and thus not adequate for the\npurpose of this Regulation.","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 4 \u2013 point b"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:08"},"new":["(b) take appropriate grid and market-","related operational measures in order to","efficiently accommodate all electricity","produced from renewable energy sources","or high-efficiency cogeneration and","minimise their curtailment or downward","redispacthing."],"old":["(b) take appropriate grid and market-","related operational measures in order to","minimise the curtailment or downward","redispatching of electricity produced from","renewable energy sources or high-","efficiency cogeneration."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"194","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-402","location":[["Proposal for a regulation","Article 50 \u2013 paragraph 2"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:10"},"new":["2. Within two months of receipt, the","Agency, after formally consulting the","organisations representing all stakeholders,","in particular distribution system users,","consumer organisations and demand","response aggregators, shall provide an","opinion to the Commission on the draft","statutes, the list of members and the draft","rules of procedure."],"old":["2. Within two months of receipt, the","Agency, after formally consulting the","organisations representing all stakeholders,","in particular distribution system users, shall","provide an opinion to the Commission on","the draft statutes, the list of members and","the draft rules of procedure."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"402","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-195","justification":"In line with the provisions of Article 51 of the Electricity Directive, TSOs, DSOs and NRAs\nshall ensure network flexibility","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 4 \u2013 point b a (new)"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:08"},"new":["(ba) ensure that their networks are","sufficiently flexible such that they are in a","position to manage their networks as set","out in Article 51 of the [Electricity","Directive]."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"195","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Pavel Poc","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-196","justification":" Concerning non-market based curtailment as well as redispatching, these measures are the\n last possibilities for TSOs to keep system in balance and secure electricity supply. TSOs shall\n have all the possibilities to rebalance the grid, therefore it is suggested to delete \u201clast\n curtailment and redispatching\u201d rule for renewables and high-efficiency cogeneration. This\n rule is also not compliant with the aim of having equal-level playing field.","meps":[96715],"meta":{"created":"2019-07-03T06:25:08"},"new":["deleted"],"old":["5. Where non-market-based","downward redispatching or curtailment is","used, the following principles shall apply:","(a) generating installations using","renewable energy sources shall only be","subject to downward redispatching or","curtailment if no other alternative exists","or if other solutions would result in","disproportionate costs or risks to network","security;","(b) generating installations using high-","efficiency cogeneration shall only be","subject to downward redispatching or","curtailment if, other than curtailment or","downward redispatching of generating","installations using renewable energy","sources, no other alternative exists or if","other solutions would result in","disproportionate costs or risks to network","security;","(c) self-generated electricity from","generating installations using renewable","energy sources or high-efficiency","cogeneration which is not fed into the","transmission or distribution network shall","not be curtailed unless no other solution","would resolve network security issues;","(d) downward redispatching or","curtailment under letters a to c shall be","duly and transparently justified. The","justification shall be included in the","report under paragraph 3."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"196","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-403","justification":" Language in this provision should be strengthened to ensure that the process for establishing\n the new entity is sufficiently monitored. Specifically, the Electricity Regulation should enable\n the Commission to take an official decision whether to approve the draft statutes, the list of\n registered members, the draft rules of procedure and the financing rules.","location":[["Proposal for a regulation","Article 50 \u2013 paragraph 3"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:10"},"new":["3. The Commission shall deliver a","decision on the draft statutes, the list of","members and the draft rules of procedure","taking into account the opinion of the","Agency provided for in paragraph 3, within","three months of receipt of the opinion of","the Agency."],"old":["3. The Commission shall deliver an","opinion on the draft statutes, the list of","members and the draft rules of procedure","taking into account the opinion of the","Agency provided for in paragraph 2, within","three months of receipt of the opinion of","the Agency."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"403","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Kate\u0159ina Kone\u010dn\u00e1","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-197","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 introductory part"]],"meps":[23699],"meta":{"created":"2019-07-03T06:25:08"},"new":["5. Where non-market-based","downward redispatching or curtailment is","used, it shall be duly and transparently","justified. The justification shall be","included in the report under paragraph 3."],"old":["5. Where non-market-based","downward redispatching or curtailment is","used, the following principles shall apply:"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"197","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-404","justification":" Language in this provision should be strengthened to ensure that the process for establishing\n the new entity is sufficiently monitored. Specifically, the Electricity Regulation should enable\n the Commission to approve the draft statutes, the list of registered members, and the draft\n rules of procedure and financing rules.","location":[[" Proposal for a regulation","Article 50 \u2013 paragraph 4"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:10"},"new":["4. Within three months of the day of","receipt of the Commission\u2019s approval, the","distribution system operators shall","establish the EU DSO entity and adopt and","publish its statutes and rules of procedure."],"old":["4. Within three months of the day of","receipt of the Commission\u2019s positive","opinion, the distribution system operators","shall establish the EU DSO entity and","adopt and publish its statutes and rules of","procedure."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"404","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-405","justification":"The Electricity Regulation should enable ACER and the Commission to monitor, review, and\napprove any change to the draft statutes, the list of registered members, and the draft rules of\nprocedure and financing rules.","location":[[" Proposal for a regulation","Article 50 \u2013 paragraph 5"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:10"},"new":["5. The documents referred to in","paragraph 1 shall be submitted to the","Commission and to the Agency in case of","changes thereof or upon their reasoned","request. The process set out in paragraphs","2 to 4 shall be followed."],"old":["5. The documents referred to in","paragraph 1 shall be submitted to the","Commission and to the Agency in case of","changes thereof or upon their reasoned","","request. The Agency and the Commission","shall deliver an opinion in line with the","process set out in paragraphs 2 to 4."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"405","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Pavel Poc","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-198","justification":"Concerning non-market based curtailment as well as redispatching, these measures are the\nlast possibilities for TSOs to keep system in balance and secure electricity supply. TSOs shall\nhave all the possibilities to rebalance the grid, therefore it is suggested to delete \u201clast\ncurtailment and redispatching\u201d rule for renewables and high-efficiency cogeneration. This\nrule is also not compliant with the aim of having equal-level playing field.","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 introductory part"]],"meps":[96715],"meta":{"created":"2019-07-03T06:25:08"},"new":["5. Where non-market-based","downward redispatching or curtailment is","used, it shall be duly and transparently","justified. The justification shall be","included in the report under paragraph 3."],"old":["5. Where non-market-based","downward redispatching or curtailment is","used, the following principles shall apply:"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"198","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-406","location":[["Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 introductory part"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:10"},"new":["1. The discussions within the EU","DSO entity shall encompass the following:"],"old":["1. The tasks of the EU DSO entity","shall be the following:"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"406","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Kate\u0159ina Kone\u010dn\u00e1","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-199","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point a"]],"meps":[23699],"meta":{"created":"2019-07-03T06:25:08"},"new":["deleted"],"old":["(a) generating installations using","renewable energy sources shall only be","subject to downward redispatching or","curtailment if no other alternative exists","or if other solutions would result in","disproportionate costs or risks to network","security;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"199","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-407","justification":"The main purpose of Article51 paragraph 1 is not to define specific and concrete duties for\nthe EU DSO entity, but to lay out the general objectives of the new entity. However, existing\nlanguage can be interpreted as placing the DSO entity as the main force for developing the\ntasks listed under (a) to (e) (e.g. integration of renewable energy resources and development\n\n\n of demand response). This is not an appropriate role of an organisation representing industry\n interests, particularly as not all DSOs are supportive of demand response and self-\n consumption. The suggested modification would clarify that the DSO entity is required to\n promote the deployment of specific resources and technologies, and the development of\n particular activities - but will not act as the driving force.","location":[["Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 introductory part"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:10"},"new":["1. The EU DSO entity shall promote:"],"old":["1. The tasks of the EU DSO entity","shall be the following:"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"407","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-200","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point a"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:08"},"new":["(a) generating installations using","renewable energy sources shall only be","subject to downward redispatching or","curtailment if no other alternative exists;"],"old":["(a) generating installations using","renewable energy sources shall only be","subject to downward redispatching or","curtailment if no other alternative exists or","if other solutions would result in","disproportionate costs or risks to network","security;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"200","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-408","justification":" The main purpose of Article51 paragraph 1 is not to define specific and concrete duties for\n the EU DSO entity, but to lay out the general objectives of the new entity. The task to\n coordinate the \u201coperation and planning of transmission and distribution networks\u201d relates to\n a specific and concrete duty of the new entity (and not a general objective) and should be\n moved to another sub-paragraph.","location":[[" Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 point a"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:10"},"new":["deleted"],"old":["(a) coordinated operation and","planning of transmission and distribution","networks;"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"408","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Piernicola Pedicini, Eleonora Evi, Dario Tamburrano","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-201","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point a"]],"meps":[124844,124779,124813],"meta":{"created":"2019-07-03T06:25:08"},"new":["(a) generating installations using","renewable energy sources shall only be","subject to downward re-dispatching or","curtailment if no other alternative exists or","if other solutions would result in highly","disproportionate costs or severe risks to","network security"],"old":["(a) generating installations using","renewable energy sources shall only be","subject to downward redispatching or","curtailment if no other alternative exists or","","if other solutions would result in","disproportionate costs or risks to network","security;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"201","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-202","justification":"Self-production from renewables, which is consumed behind the connection point of the\ncustomer without going onto the grid, mustnot be subject to curtailment under any\ncircumstances. For excess self-production that gets exported to the grid, the curtailment and\nredispatch of such generation must be subject only to the most limited circumstances,either\ndetermined by the national regulatory authority through a public consultation, or through an\nagreement between the relevant system operator and the customer that is engaging in self-\nproduction. Such arrangements will provide investment and policy certainty for self-\nproduction, and it will encourage and stimulate further investment in flexibility or storage\ntechnology that can help stabilise the grid, particularly as more renewable energy enters into\nthe power system.","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point a a (new)"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:09"},"new":["(aa) electricity generated by local","energy communities from generating","installations using renewable energies or","high-efficiency cogeneration, as long as it","can be considered small decentralised or","distributed generation that is primarily","intended for supply to its members, shall","not be subject to downward redispatching","or curtailment unless no other alternative","exists or if other solutions would result in","disproportionate risks to network security;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"202","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-409","location":[[" Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 point b"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:10"},"new":["(b) integration of renewable energy","resources, distributed generation and other","resources embedded in the distribution","network such as energy storage;"],"old":["(b) integration of renewable energy","resources, distributed generation and other","resources embedded in the distribution","network such as energy storage;"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"409","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Kate\u0159ina Kone\u010dn\u00e1","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-203","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point b"]],"meps":[23699],"meta":{"created":"2019-07-03T06:25:09"},"new":["deleted"],"old":["(b) generating installations using","high-efficiency cogeneration shall only be","subject to downward redispatching or","curtailment if, other than curtailment or","downward redispatching of generating","installations using renewable energy","sources, no other alternative exists or if","other solutions would result in","disproportionate costs or risks to network","security;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"203","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Carolina Punset","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-410","location":[["Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 point c"]],"meps":[90110],"meta":{"created":"2019-07-03T06:25:10"},"new":["(c) development of demand response","and energy storage;"],"old":["(c) development of demand response;"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"410","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Carolina Punset","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-204","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point b"]],"meps":[90110],"meta":{"created":"2019-07-03T06:25:09"},"new":["(b) generating installations using high-","efficiency cogeneration and, especially, in","those cases in which:","i) the primary purpose of those facilities is","to produce heat for production processes","of the industrial site concerned;","ii) heat and power-generating is","inextricably interlinked, in a way that any","change of heat generation results","inadvertently in a change of active power","generating and vice versa;","shall only be subject to downward","redispatching or curtailment if, other than","curtailment or downward redispatching of","generating installations using renewable","energy sources, no other alternative exists","or if other solutions would result in","disproportionate costs or risks to network","security;"],"old":["(b) generating installations using high-","efficiency cogeneration shall only be","subject to downward redispatching or","curtailment if, other than curtailment or","downward redispatching of generating","installations using renewable energy","sources, no other alternative exists or if","other solutions would result in","disproportionate costs or risks to network","security;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"204","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-205","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point b"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:09"},"new":["(b) electricity generated in a high-","efficiency cogeneration process shall only","be subject to downward redispatching or","curtailment if, no other alternative exists","except curtailment or downward","redispatchingof generating installations","using renewable energy sources, or if other","solutions would result in highly","disproportionate costs or severe risks to","network security"],"old":["(b) generating installations using","high-efficiency cogeneration shall only be","subject to downward redispatching or","curtailment if, other than curtailment or","downward redispatching of generating","installations using renewable energy","sources, no other alternative exists or if","other solutions would result in","disproportionate costs or risks to network","security;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"205","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-411","justification":"The suggested amendment promotes consistency with other changes to Article 51 paragraph\n1. Given that one key barrier preventing new market entrants from participating across the\nelectricity sector is discriminatory or unequal treatment, it should be clarified that one of the\nobjectives of the EUDSO entity will be to guarantee DSOs' neutrality in their new functions,\nparticularly in terms of data management and in terms of ensuring that data can be accessed\nunder non-discriminatory conditions, regardless of the data management model chosen by\nMember States.","location":[["Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 point e"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:11"},"new":["(e) a high level of cyber security and","data protection, and impartiality in data","management."],"old":["(e) data management, cyber security","and data protection;"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"411","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Piernicola Pedicini, Eleonora Evi, Dario Tamburrano","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-206","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point b"]],"meps":[124844,124779,124813],"meta":{"created":"2019-07-03T06:25:09"},"new":["(b) generating installations using high-","efficiency cogeneration shall only be","subject to downward re-dispatching or","curtailment if no other alternative exists","except curtailment or downward re-","dispatching of generating installations","using renewable energy sources, or if other","solutions would result in highly","disproportionate costs or severe risks to","network security;"],"old":["(b) generating installations using high-","efficiency cogeneration shall only be","subject to downward redispatching or","curtailment if, other than curtailment or","downward redispatching of generating","installations using renewable energy","sources, no other alternative exists or if","other solutions would result in","disproportionate costs or risks to network","security;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"206","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-412","justification":" The DSO entity should not have a key responsibility for drafting and submitting proposals for\n network codes. Instead, the Electricity Regulation should require the EU DSO entity to\n participate, as a formal participant, in the network codes \u201cdrafting committees\u201d along with\n other affected stakeholders. These \u201cdrafting committees\u201d should be renamed \u201cstakeholder\n committees\u201d in accordance with amendments 52, 54, and 58.","location":[["Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 point f"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:11"},"new":["deleted"],"old":["(f) participation in the elaboration of","network codes pursuant to Article 55."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"412","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-207","justification":" To truly enable active customers, encourage their participation and keep citizens engagement\n in being part of the energy transition, self-generated energy should not be curtailed. In\n addition \"network security issues\" is an unclear concept and thus not adequate for the\n purpose of this Regulation.","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point c"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:09"},"new":["deleted"],"old":["(c) self-generated electricity from","generating installations using renewable","energy sources or high-efficiency","cogeneration which is not fed into the","transmission or distribution network shall","not be curtailed unless no other solution","would resolve network security issues;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"207","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-413","location":[[" Proposal for a regulation","Article 51 \u2013 paragraph 2 \u2013 introductory part"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:11"},"new":["2. In addition the EU DSO entity shall","deliberate on the following:"],"old":["2. In addition the EU DSO entity","shall:"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"413","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Kate\u0159ina Kone\u010dn\u00e1","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-208","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point c"]],"meps":[23699],"meta":{"created":"2019-07-03T06:25:09"},"new":["deleted"],"old":["(c) self-generated electricity from","generating installations using renewable","energy sources or high-efficiency","cogeneration which is not fed into the","transmission or distribution network shall","not be curtailed unless no other solution","would resolve network security issues;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"208","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-414","justification":"It is not appropriate for associations representing industry stakeholders(i.e. ENTSO-E and\nthe DSO entity) to monitor the implementation of network codes. The formal task of\nmonitoring the implementation of and ensuring compliance with the network codes should be\nattributed to ACER and/or national regulators (as neutral actors promoting the general\ninterest), possibly with the technical support of the EU DSO entity and ENTSO-E.","location":[[" Proposal for a regulation","Article 51 \u2013 paragraph 2 \u2013 point a"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:11"},"new":["(a) cooperate with ENTSO for","electricity to examine problems and","formulate recommendations related to the","monitoring of implementation of the","network codes and guidelines which are","relevant to the operation and planning of","distribution grids and the coordinated","operation of the transmission and","distribution networks and which are","adopted pursuant to this Regulation;"],"old":["(a) cooperate with ENTSO for","electricity on the monitoring of","implementation of the network codes and","guidelines which are relevant to the","operation and planning of distribution grids","and the coordinated operation of the","transmission and distribution networks and","which are adopted pursuant to this","Regulation;"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"414","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Piernicola Pedicini, Eleonora Evi, Dario Tamburrano","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-209","justification":"Renewable energy that is self-produced and consumed without being put on the grid should\nnot be subject to any curtailment whatsoever. For excess electricity that is exported to the\ngrid by active customers, in order to ensure confidence and investor certainty there is a need\nto clarify the circumstances that would allow their installations to be curtailed or subject to\nredispatch","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point c"]],"meps":[124844,124779,124813],"meta":{"created":"2019-07-03T06:25:09"},"new":["(c) self-generated electricity from","generating installations using renewable","energies or high-efficiency cogeneration,","for the amount which is not fed into the","transmission or distribution network shall","not be curtailed unless, based on","conditions pre-determined by the national","energy regulator through a consultation,","no other solution would resolve network","security issues;"],"old":["(c) self-generated electricity from","generating installations using renewable","energy sources or high-efficiency","cogeneration which is not fed into the","transmission or distribution network shall","not be curtailed unless no other solution","would resolve network security issues;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"209","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-415","location":[["Proposal for a regulation","Article 51 \u2013 paragraph 2 \u2013 point e"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:11"},"new":["deleted"],"old":["(e) operate in full compliance with","competition rules."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"415","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-210","justification":" Smaller renewable energy generation installations owned by local energy communities have\n less impact on the grid, and are located close to consumption of the community\u2019s members. In\n order to ensure confidence and investor certainty for such actors, there is a need to clarify\n and to limit the circumstances through which such installations can be subjected to\n curtailment or downward redispatch.","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point c"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:09"},"new":["(c) self-generated electricity from","generating installations using renewable","energies or high-efficiency cogeneration,","for the amount which is not fed into the","transmission or distribution network shall","not be curtailed unless, based on","conditions pre-determined by the national","energy regulator or otherwise mutually","agreed to between the owner of the","generating installation and the","transmission or distribution system","operator, no other solution would resolve","network security issues;"],"old":["(c) self-generated electricity from","generating installations using renewable","energy sources or high-efficiency","cogeneration which is not fed into the","transmission or distribution network shall","not be curtailed unless no other solution","would resolve network security issues;",""],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"210","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-416","justification":"The suggested amendment clarifies that the DSO entity should not have a key responsibility\nfor drafting and submitting proposals for network codes. Instead, the Electricity Regulation\nshould require the EU DSO entity to participate, as a formal participant, in the network codes\n\u201cdrafting committees\u201d along with other affected stakeholders. In accordance with suggested\n\n amendments 52, 54, and 58, these \u201cdrafting committees\u201d should be renamed \u201cstakeholder\n committees\u201d to prevent any misinterpretation regarding their role (i.e. the committees should\n have a consultative, supporting role but should not be the main platform for the drafting of\n network codes).","location":[["Proposal for a regulation","Article 51 \u2013 paragraph 2 \u2013 point e a (new)"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:11"},"new":["(ea) participate, as a formal participant","in relevant stakeholder committees","referred to in Article 55(2), in the","elaboration of network codes pursuant to","Article 56."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"416","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Carolina Punset","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-211","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point c"]],"meps":[90110],"meta":{"created":"2019-07-03T06:25:09"},"new":["(c) self-generated electricity from","generating installations using renewable","energy sources, energy storage, demand-","response or high-efficiency cogeneration","which is not fed into the transmission or","distribution network shall not be curtailed","unless no other solution would resolve","network security issues;"],"old":["(c) self-generated electricity from","generating installations using renewable","energy sources or high-efficiency","cogeneration which is not fed into the","transmission or distribution network shall","not be curtailed unless no other solution","would resolve network security issues;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"211","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-417","justification":" This suggested amendment promotes consistency with other changes to Article 51. It is\n important that the activity of the EU DSO entity does not result in agreements, concerted\n practices or unilateral behaviours incompatible with the principle of undistorted competition.","location":[[" Proposal for a regulation","Article 51 \u2013 paragraph 2 a (new)"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:11"},"new":["2a. The EU DSO entity shall operate","in full compliance with EU and national","competition rules."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"417","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Piernicola Pedicini, Eleonora Evi, Dario Tamburrano","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-212","justification":"For many local energy communities that own their own production, which they supply to their\nmembers, the aim is to have such installations contributing to as much of their consumption\nneeds as possible. Such installations are usually smaller, owned by ordinary citizens, have\nless impact on the grid, and are located close to consumption. In order to ensure confidence\nand investor certainty for such actors, there is a need to clarify under which circumstances\ninstallations owned and operated by local energy communities can be curtailment or\nredispatch","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point c a (new)"]],"meps":[124844,124779,124813],"meta":{"created":"2019-07-03T06:25:09"},"new":["(ca) electricity generated from","installations using renewable energy","sources by renewable energy","communities, which is intended for the","consumption of its members, shall not be","subject to downward re-dispatching or","curtailment unless, based on conditions","pre-determined by the national energy","regulator through a consultation, no","other solution would resolve network","security issues;"],"old":[""],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"212","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-418","justification":"It is important that the activity of the EU DSO entity does not result in agreements, concerted\npractices or unilateral behaviours incompatible with the principle of undistorted competition.\nFor this reason, the Regulation should ensure that the Commission keeps the EU DSO entity\u2019s\nactivities under regular scrutiny.","location":[[" Proposal for a regulation","Article 51 \u2013 paragraph 2 b (new)"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:11"},"new":["2b. The Commission shall periodically","review, and at least on a biannual basis or","on the basis of third party complaints, the","activities and deliberation of the EU DSO","entity, in view of ascertaining its","compliance with Articles 101 and 102 of","the Treaty and shall adopt the appropriate","measures on the basis of Regulation (EC)","No 1/2003."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"418","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Kate\u0159ina Kone\u010dn\u00e1","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-213","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point d"]],"meps":[23699],"meta":{"created":"2019-07-03T06:25:09"},"new":["deleted"],"old":["(d) downward redispatching or","curtailment under letters a to c shall be","duly and transparently justified. The","justification shall be included in the","report under paragraph 3."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"213","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-419","justification":"It is important that the activities of the EU DSO entity do not result in agreements, concerted\npractices or unilateral behaviours incompatible with the principle of undistorted competition.\nFor this reason, the Regulation should promote public scrutiny over the activities of the EU\nDSO entity and ensure that timely and accurate disclosure is made on all material matters\n(e.g. agendas, minutes, and documents) of the EU DSO entity, similar to what is currently\nproposed for ENTSO-E under Article 27(3) of this Regulation.","location":[["Proposal for a regulation","Article 51 \u2013 paragraph 2 c (new)"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:11"},"new":["2c. The EU DSO entity shall provide","the public with regular information on its","decision-making and activities, including","of meetings and deliberations."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"419","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-214","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point d"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:09"},"new":["(d) downward redispatching or","curtailment shall be duly and transparently","justified. The justification shall be included","in the report under paragraph 3."],"old":["(d) downward redispatching or","","curtailment under letters a to c shall be","duly and transparently justified. The","justification shall be included in the report","under paragraph 3."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"214","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Carolina Punset","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-215","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 6 \u2013 introductory part"]],"meps":[90110],"meta":{"created":"2019-07-03T06:25:09"},"new":["6. Where non-market based","curtailment or redispatching is used, it shall","be subject to financial compensation by the","system operator requesting the curtailment","or redispatching to the owner of the","curtailed or redispatched generation,","energy storage or demand facility.","Financial compensation shall at least be","equal to the highest of the following","elements:"],"old":["6. Where non-market based","curtailment or redispatching is used, it shall","be subject to financial compensation by the","system operator requesting the curtailment","or redispatching to the owner of the","curtailed or redispatched generation or","demand facility. Financial compensation","shall at least be equal to the highest of the","following elements:"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"215","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-420","justification":" In order to provide effective oversight of the DSO entity, ACER should have the authority to\n obtain relevant information upon request from the EU DSO entity, and correspondingly from\n DSOs.","location":[["Proposal for a regulation","Article 51 \u2013 paragraph 2 d (new)"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:12"},"new":["2d. The EU DSO and its members","shall make available all information","required by the Agency to fulfil its tasks","under Article 52a of this Regulation."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"420","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-216","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 6 \u2013 introductory part"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:09"},"new":["6. Where non-market based","curtailment or redispatching is used, it shall","be subject to payment by the system","operator requesting the curtailment or","redispatching to the owner of the curtailed","or redispatched generation or demand","facility. Payment shall at least be equal to","the highest of the following elements:"],"old":["6. Where non-market based","curtailment or redispatching is used, it shall","be subject to financial compensation by","the system operator requesting the","curtailment or redispatching to the owner","of the curtailed or redispatched generation","or demand facility. Financial","compensation shall at least be equal to the","","highest of the following elements:"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"216","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-421","location":[[" Proposal for a regulation","Article 52 \u2013 paragraph 1"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:12"},"new":["1. While preparing possible network","codes pursuant to Article 55, the an","inclusive drafting committee also","comprising the EU DSO entity shall","conduct an extensive consultation process,","at an early stage and in an open and","transparent manner, involving all relevant","stakeholders, and, in particular, the","organisations representing all stakeholders,","in accordance with the rules of procedure","referred to in Article 50. That consultation","shall also involve national regulatory","authorities and other national authorities,","supply and generation undertakings,","system users including customers,","distribution system operators, including","relevant industry associations, technical","bodies and stakeholder platforms. It shall","aim at identifying the views and proposals","of all relevant parties during the decision-","making process."],"old":["1. While preparing possible network","codes pursuant to Article 55, the EU DSO","entity shall conduct an extensive","consultation process, at an early stage and","in an open and transparent manner,","involving all relevant stakeholders, and, in","particular, the organisations representing","all stakeholders, in accordance with the","rules of procedure referred to in Article 50.","That consultation shall also involve","national regulatory authorities and other","national authorities, supply and generation","undertakings, system users including","customers, distribution system operators,","including relevant industry associations,","technical bodies and stakeholder platforms.","It shall aim at identifying the views and","proposals of all relevant parties during the","decision-making process."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"421","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-217","justification":"In line with compensation requirements for conventional fuel suppliers in most markets, and\nfollowing the principle of level playing field, full compensation should be granted in case of\ncurtailment or redispatching.","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 6 \u2013 point b"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:10"},"new":["(b) 100 % of the net revenues from the","sale of electricity on the day-ahead market","that the generating or demand facility","would have generated without the","curtailment or redispatching request.","Where financial support is granted to","generating or demand facilities based on","the electricity volume generated or","consumed, lost financial support shall be","deemed part of the net revenues and","compensated at 100%. The full","compensation shall be settled within a","reasonable timeframe after the","curtailment has occurred. This paragraph","shall apply to installations using a high-","efficiency cogeneration process within the","limit of the share of renewable energy","sources in the fuel they use."],"old":["(b) 90 % of the net revenues from the","sale of electricity on the day-ahead market","that the generating or demand facility","would have generated without the","curtailment or redispatching request.","Where financial support is granted to","generating or demand facilities based on","the electricity volume generated or","consumed, lost financial support shall be","deemed part of the net revenues."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"217","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Carolina Punset","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-218","justification":" Full compensation should be ensured in case of unavoidable solar curtailment, so that clean\n generation facilities capable of reducing their electricity output at a lower cost than\n competitors are not penalised for being flexible. It also reflects that the plants which keep\n running because of their cost structure and inflexible technical characteristics will receive\n 100% of the market revenues during that period. This is essential to reduce the risk of\n discrimination and volume related investment and to ensure that financing costs for capital\n intensive technologies are minimized.","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 6 \u2013 point b"]],"meps":[90110],"meta":{"created":"2019-07-03T06:25:10"},"new":["(b) 100% of the net revenues from the","sale of electricity on the day-ahead market","that the generating, energy storage or","demand facility would have generated","without the curtailment or redispatching","request. Where financial support is granted","to generating or demand facilities based on","the electricity volume generated, stored or","consumed, lost financial support shall be","deemed part of the net revenues. The full","compensation should be settled within","reasonable time after the curtailment has","occurred."],"old":["(b) 90 % of the net revenues from the","sale of electricity on the day-ahead market","that the generating or demand facility","would have generated without the","curtailment or redispatching request.","Where financial support is granted to","generating or demand facilities based on","the electricity volume generated or","consumed, lost financial support shall be","deemed part of the net revenues."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"218","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-422","justification":"ACER should be formally empowered to exercise more robust oversight over the EU DSO\nentity. In particular, there should be a formal requirement on ACER to ensure the EU DSO\nentity complies with the criteria contained in its governing statute, in particular that the EU\nDSO entity complies with criteria for maintaining independence and adequate representation\nof individual member DSOs. Such changes to the remit of ACER should be cross-referenced\nin the Recast Regulation713/2009 as proposed by COM(2016) 863.","location":[[" Proposal for a regulation","Article 52 \u2013 paragraph 1 a (new)"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:12"},"new":["1a. The Agency shall monitor the","execution of the tasks attributed to the EU","DSO entity in Article 51 and ensure its","compliance with the obligations under","this Regulation and other relevant Union","legislation, notably as regards the","independence of the EU DSO entity and","the requirement to ensure a balanced","representation of all distribution system","operators across the Union. The Agency","shall include the results of monitoring in","its annual report pursuant to Article 16","[of the proposed Recast Regulation","713/2009 as proposed by COM(2016)","863]."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"422","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Piernicola Pedicini, Eleonora Evi, Dario Tamburrano","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-219","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 6 \u2013 point b"]],"meps":[124844,124779,124813],"meta":{"created":"2019-07-03T06:25:10"},"new":["(b) 90 % of the net revenues from the","sale of electricity on the day-ahead market","that the generating or demand facility","would have generated without the","curtailment or redispatching request.","Where financial support is granted to","generating or demand facilities based on","the electricity volume generated or","consumed, lost financial support shall","bedeemed part of the net revenues and","compensated at 100%. The full","compensation should be settled within a","reasonable time after the curtailment has","occurred"],"old":["(b) 90 % of the net revenues from the","sale of electricity on the day-ahead market","that the generating or demand facility","would have generated without the","curtailment or redispatching request.","Where financial support is granted to","generating or demand facilities based on","the electricity volume generated or","consumed, lost financial support shall be","","deemed part of the net revenues."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"219","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-423","justification":" ACER should be empowered to provide recommendations to the EU DSO entity where it finds\n that the draft annual programme of the EU DSO entity does not comply with EU rules or are\n inconsistent with EU level objectives. Such changes to the remit of ACER should be cross-\n referenced in the Recast Regulation 713/2009 as proposed by COM(2016) 863.","location":[["Proposal for a regulation","Article 52 \u2013 paragraph 1 b (new)"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:12"},"new":["1b. The EU DSO entity shall submit","the draft annual work programme","provided for in Article 51 to the Agency","for its opinion. Within two months from","the day of receipt, the Agency shall","provide a duly reasoned opinion as well as","recommendations to the EU DSO entity","and to the Commission where it considers","that the draft annual work programme","submitted by the EU DSO entity does not","contribute to non-discrimination, effective","competition, the efficient functioning of","the market or an optimal management","and a coordinated operation of","distribution and transmission systems."],"old":["",""],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"423","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Sirpa Pietik\u00e4inen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-220","justification":"Full compensation should be ensured for variable renewable energy sources to ensure that\nclean energy facilities which are technically able to reduce their electricity output at a lower\ncost than their competitors are not penalised for being flexible.","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 6 \u2013 point b"]],"meps":[40599],"meta":{"created":"2019-07-03T06:25:10"},"new":["(b) 100 % of the net revenues from the","sale of electricity on the day-ahead market","that the generating or demand facility","would have generated without the","curtailment or redispatching request.","Where financial support is granted to","generating or demand facilities based on","the electricity volume generated or","consumed, lost financial support shall be","deemed part of the net revenues."],"old":["(b) 90 % of the net revenues from the","sale of electricity on the day-ahead market","that the generating or demand facility","would have generated without the","curtailment or redispatching request.","Where financial support is granted to","generating or demand facilities based on","the electricity volume generated or","consumed, lost financial support shall be","deemed part of the net revenues."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"220","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-424","location":[[" Proposal for a regulation","Article 52 \u2013 paragraph 3"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:12"},"new":["3. The drafting committee shall take","into consideration the views provided","during the consultations. Before adopting","proposals for network codes referred to in","Article 55 the EU DSO entity shall indicate","how the observations received during the","consultation have been taken into","consideration. It shall provide reasons","where observations have not been taken","into account."],"old":["3. The EU DSO entity shall take into","consideration the views provided during","the consultations. Before adopting","proposals for network codes referred to in","Article 55 the EU DSO entity shall indicate","how the observations received during the","consultation have been taken into","consideration. It shall provide reasons","where observations have not been taken","into account."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"424","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Ivo Belet","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-221","justification":" Transferring part of the network constraints costs could result in insufficient incentives\n towards TSOs to deal with the congestions as it would entail a discount to the congestion\n costs. By allocating the full costs of network constraints TSOs are fully incentivised to tackle\n congestions (with tools that are in their remit such as bidding zone review, counter-trading,\n re-dispatching, grid re-inforcement, etc.).","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 6 \u2013 point b"]],"meps":[28257],"meta":{"created":"2019-07-03T06:25:10"},"new":["(b) All of the net revenues from the","sale of electricity on the day-ahead market","that the generating or demand facility","would have generated without the","curtailment or redispatching request.","Where financial support is granted to","generating or demand facilities based on","the electricity volume generated or","consumed, lost financial support shall be","deemed part of the net revenues."],"old":["(b) 90 % of the net revenues from the","sale of electricity on the day-ahead market","that the generating or demand facility","","would have generated without the","curtailment or redispatching request.","Where financial support is granted to","generating or demand facilities based on","the electricity volume generated or","consumed, lost financial support shall be","deemed part of the net revenues."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"221","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Kate\u0159ina Kone\u010dn\u00e1","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-222","justification":" For sake of stability on the electricity market, market parties should be fully remunerated for\n involuntary curtailment or redispatching.","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 6 \u2013 point b"]],"meps":[23699],"meta":{"created":"2019-07-03T06:25:10"},"new":["(b) net revenues from the sale of","electricity on the day-ahead market that the","generating or demand facility would have","generated without the curtailment or","redispatching request. Where financial","support is granted to generating or demand","facilities based on the electricity volume","generated or consumed, lost financial","support shall be deemed part of the net","revenues.."],"old":["(b) 90 % of the net revenues from the","sale of electricity on the day-ahead market","that the generating or demand facility","would have generated without the","curtailment or redispatching request.","Where financial support is granted to","generating or demand facilities based on","the electricity volume generated or","consumed, lost financial support shall be","deemed part of the net revenues."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"222","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-425","justification":"It is not appropriate for the DSO entity to be in a privileged position to draft network codes\n(particularly when their subject matter relates to the operation of the distribution\nsystem),which will govern the DSOs\u2019 own conduct, as well as the conduct of other market\nparticipants such as generators, suppliers, consumers, and aggregators. The EUDSO entity\nwould be in a position to influence the drafting of rules and best practices that will\nsignificantly impact the deployment of renewables and demand response, which not all DSOs\nare supporting. This could increase the risk of network codes that impose additional barriers\nto demand response and self-consumption. This risk is exacerbated by the fact that EU\nunbundling rules for DSOs are not very stringent, which would allow large DSOs connected\nto parent utilities to exert undue influence via the DSO entity.","location":[[" Proposal for a regulation","Article 54 \u2013 paragraph 1"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:12"},"new":["1. The Commission may, subject to","the empowerments in Articles 55 and 57,","adopt delegated acts. Such delegated acts","can either be adopted as network codes on","the basis of text proposals developed by the","ENTSO for Electricity, or, where so","decided in the priority list pursuant to","Article 55 paragraph 2, by the Agency","pursuant to the procedure in Article 55 or","as guidelines pursuant to the procedure in","Article 57."],"old":["1. The Commission may, subject to","the empowerments in Articles 55 and 57,","adopt delegated acts. Such delegated acts","can either be adopted as network codes on","the basis of text proposals developed by the","ENTSO for Electricity, or, where so","decided in the priority list pursuant to","Article 55 paragraph 2, by the EU DSO","entity and the Agency pursuant to the","procedure in Article 55 or as guidelines","pursuant to the procedure in Article 57."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"425","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Pavel Poc","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-223","justification":"In case of involuntary curtailment or redispatching, all associated costs shall be compensated\nto relevant providers. They shall not be held accountable for imbalance which was caused by\nother market players.","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 6 \u2013 point b"]],"meps":[96715],"meta":{"created":"2019-07-03T06:25:10"},"new":["(b) net revenues from the sale of","electricity on the day-ahead market that the","generating or demand facility would have","generated without the curtailment or","redispatching request. Where financial","support is granted to generating or demand","facilities based on the electricity volume","generated or consumed, lost financial","support shall be deemed part of the net","revenues."],"old":["(b) 90 % of the net revenues from the","sale of electricity on the day-ahead market","that the generating or demand facility","would have generated without the","curtailment or redispatching request.","Where financial support is granted to","generating or demand facilities based on","the electricity volume generated or","consumed, lost financial support shall be","deemed part of the net revenues."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"223","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-224","justification":"Reporting procedures should be streamline under the Governance regulation to reduce\nadministrative burden.","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 6 a (new)"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:10"},"new":["6a. Member States shall ensure that","the information reported under paragraph","3 is reflected through the national","reporting process on the internal energy","market, as provided for in Article 21 of","the [Governance Regulation]."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"224","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Kate\u0159ina Kone\u010dn\u00e1","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-426","justification":" Network codes shall continue to take regional specificities into account.","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 introductory part"]],"meps":[23699],"meta":{"created":"2019-07-03T06:25:12"},"new":["1. The Commission is empowered to","adopt delegated acts in accordance with","Article 63 concerning the establishment of","network codes in the following areas,","taking into account, if appropriate,","regional specificities:"],"old":["1. The Commission is empowered to","adopt delegated acts in accordance with","Article 63 concerning the establishment of","network codes in the following areas:"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"426","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-225","justification":" The provisions of this Article shall also include arrangements for cross-border redispatching\n and counter-trading across national borders and this logically follow from earlier\n paragraphs of this Article.","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 6 b (new)"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:10"},"new":["6b. Where applicable, transmission","system operators of different Member","States shall agree on a fair repartition of","the costs of cross-border redispatching","and counter-trading."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"225","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-226","justification":"In line with the provisions on energy efficiency and demand response of Articles 3 (1 e,f), 16\n(2,8), 18 (3), 19 (4b), 25 (2) and 55 (1,l), the logic of the regulation has to be also applied to\ncongestion management.","location":[[" Proposal for a regulation","Article 14 \u2013 paragraph 1"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:10"},"new":["1. Network congestion problems shall","be addressed with non-discriminatory","market-based solutions including energy","efficiency/demand-side management","solutions which give efficient economic","signals to the market participants and","transmission system operators involved.","Network congestion problems shall be","solved with non-transaction based","methods, i.e. methods that do not involve a","selection between the contracts of","individual market participants. When","taking operational measures to ensure that","its transmission system remains in the","normal state, the transmission system","operator shall take into account the effect","of those measures on neighbouring control","areas and coordinate such measures with","other affected transmission system","operators as provided for in Regulation","(EU) 1222/2015."],"old":["1. Network congestion problems shall","be addressed with non-discriminatory","market-based solutions which give","efficient economic signals to the market","participants and transmission system","operators involved. Network congestion","problems shall be solved with non-","transaction based methods, i.e. methods","that do not involve a selection between the","contracts of individual market participants.","When taking operational measures to","ensure that its transmission system remains","in the normal state, the transmission system","operator shall take into account the effect","of those measures on neighbouring control","","areas and coordinate such measures with","other affected transmission system","operators as provided for in Regulation","(EU) 1222/2015."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"226","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Pavel Poc","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-427","justification":" Aligned with amendment on Article 12.","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 point g"]],"meps":[96715],"meta":{"created":"2019-07-03T06:25:12"},"new":["(g) capacity-allocation and congestion-","management rules;"],"old":["(g) capacity-allocation and congestion-","management rules including curtailment","of generation and redispatch of","generation and demand ;"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"427","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-227","location":[["Proposal for a regulation","Article 14 \u2013 paragraph 3"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:10"},"new":["3. The maximum capacity of the","interconnections and/or the transmission","networks affecting cross-border flows shall","be made available to market participants,","complying with safety standards of secure","network operation. Counter-trading and","redispatch, including cross-border","redispatch, shall be used to guarantee the","firmness of the exchange scheduled in","case of reductions of the available net","transfer capacity due to system security","reasons."],"old":["3. The maximum capacity of the","interconnections and/or the transmission","networks affecting cross-border flows shall","be made available to market participants,","complying with safety standards of secure","network operation. Counter-trading and","redispatch, including cross-border","redispatch, shall be used to maximise","available capacities unless it is","demonstrated that it is not beneficial to","economic efficiency at Union level."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"227","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Jadwiga Wi\u015bniewska","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-228","justification":" It should be possible for regulatory bodies concerned to manage so called uncontrolled loop-\n flows between systems.","location":[["Proposal for a regulation","Article 14 \u2013 paragraph 7 \u2013 subparagraph 1"]],"meps":[124877],"meta":{"created":"2019-07-03T06:25:10"},"new":["Transmission system operators shall not","limit the volume of interconnection","capacity to be made available to other","market participants in order to solve","congestion inside their own control area","except for congestion on internal network","elements with cross-border relevance.","Transmission system operators may limit","the volume of interconnection capacity to","be made available to market participants","as a means of managing flows on a border","between two control areas observed even","without any transaction, that is to say flows","over control areas caused by origin and","destination within one control area, which","are below the level of threshold","established within the capacity calculation","region."],"old":["Transmission system operators shall not","limit the volume of interconnection","capacity to be made available to other","market participants in order to solve","congestion inside their own control area or","as a means of managing flows on a border","between two control areas observed even","without any transaction, that is to say flows","over control areas caused by origin and","destination within one control area."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"228","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Pavel Poc","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-428","justification":" Distribution system operation is very locally specific given the different topology of the grid\n and consumption patterns. Therefore, it is not advised to harmonise its structure via network\n\n\ncodes or guidelines. Set of high-level principles as stated in Article 16: Charges for access to\nnetworks is sufficient for the purpose of transparency and fair tariff-setting.","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 point k"]],"meps":[96715],"meta":{"created":"2019-07-03T06:25:12"},"new":["(k) rules regarding harmonised","transmission tariff structures and","connection charges including locational","signals and inter-transmission system","operator compensation rules;"],"old":["(k) rules regarding harmonised","transmission and distribution tariff","structures and connection charges","including locational signals and inter-","transmission system operator compensation","rules;"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"428","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-229","justification":"A derogation from the general principle established in Article 14, paragraph 7 shall not be\ngranted.","location":[[" Proposal for a regulation","Article 14 \u2013 paragraph 7 \u2013 subparagraph 2"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:11"},"new":["deleted"],"old":["Upon request by a transmission system","operator, the relevant regulatory authority","may grant a derogation from the first","subparagraph where it is necessary for","maintaining operational security or where","it is beneficial to economic efficiency at","Union level. Such a derogation, which","may not relate to curtailment of already","allocated capacities pursuant to","paragraph 5, shall be limited in time,","","","strictly limited to what is necessary, and","avoid discrimination between internal and","cross-zonal exchanges. Before granting a","derogation, the relevant regulatory","authority shall consult the regulatory","authorities of other Member States","forming part of an affected capacity","calculation region. In case a regulatory","authority disagrees with the proposed","derogation, the Agency shall decide on the","derogation pursuant to Article 6(8)(a)","[recast of Regulation (EC) No 713/2009","as proposed by COM(2016) 863/2]. The","justification and reasons for the","derogation shall be published. Where a","derogation is granted, the relevant","transmission system operators shall","develop and publish a methodology and","projects that shall provide a long-term","solution to the issue that the derogation","seeks to address. The derogation shall","expire when the time limit is reached or,","once the solution is applied, whichever is","earlier."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"229","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Kate\u0159ina Kone\u010dn\u00e1","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-429","justification":"Distribution networks across Europe vary to a great extent: from voltage level, topology,\nnatural profile of given area to consumption patterns of users. Structure of distribution tariff\ntherefore needs to be unique; national regulatory authorities are best equipped to do this.","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 point k"]],"meps":[23699],"meta":{"created":"2019-07-03T06:25:12"},"new":["(k) rules regarding harmonised","transmission tariff structures and","connection charges including locational","signals and inter-transmission system","operator compensation rules;"],"old":["(k) rules regarding harmonised","transmission and distribution tariff","structures and connection charges","including locational signals and inter-","transmission system operator compensation","rules;"],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"429","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Jadwiga Wi\u015bniewska","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-230","justification":" It should be possible for regulatory bodies concerned to manage so called uncontrolled loop-\n flows between systems.","location":[["Proposal for a regulation","Article 14 \u2013 paragraph 7 \u2013 subparagraph 2"]],"meps":[124877],"meta":{"created":"2019-07-03T06:25:11"},"new":["Upon request by a transmission system","operator, the relevant regulatory authority","may grant a derogation from the first","subparagraph where it is necessary for","maintaining operational security or where","it is beneficial to economic efficiency at","Union level. Such a derogation, which may","not relate to curtailment of already","allocated capacities pursuant to paragraph","5, shall be limited in time, strictly limited","to what is necessary, and avoid","discrimination between internal and cross-","zonal exchanges. The relevant regulatory","authority shall inform without delay the","regulatory authorities of other Member","States forming part of an affected capacity","calculation region. The justification and","reasons for the derogation shall be","published. Where a derogation is granted,","the relevant transmission system operators","shall develop and publish a methodology","and projects that shall provide a long-term","solution to the issue that the derogation","seeks to address. The derogation shall","expire when the time limit is reached or,","once the solution is applied, whichever is","earlier."],"old":["Upon request by a transmission system","operator, the relevant regulatory authority","may grant a derogation from the first","subparagraph where it is necessary for","maintaining operational security or where","it is beneficial to economic efficiency at","","Union level. Such a derogation, which may","not relate to curtailment of already","allocated capacities pursuant to paragraph","5, shall be limited in time, strictly limited","to what is necessary, and avoid","discrimination between internal and cross-","zonal exchanges. Before granting a","derogation, the relevant regulatory","authority shall consult the regulatory","authorities of other Member States forming","part of an affected capacity calculation","region. In case a regulatory authority","disagrees with the proposed derogation,","the Agency shall decide on the derogation","pursuant to Article 6(8)(a) [recast of","Regulation (EC) No 713/2009 as proposed","by COM(2016) 863/2]. The justification","and reasons for the derogation shall be","published. Where a derogation is granted,","the relevant transmission system operators","shall develop and publish a methodology","and projects that shall provide a long-term","solution to the issue that the derogation","seeks to address. The derogation shall","expire when the time limit is reached or,","once the solution is applied, whichever is","earlier."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"230","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-430","justification":" It is not appropriate for the DSO entity to be in a privileged position to draft network codes.\n In order to prevent conflicts of interests, tasks concerning the development of network codes\n which relate to the operation of the distribution system should be transferred to ACER.\n Furthermore, ACER should also have the authority to convene the network codes \u201cdrafting\n committees\u201d. These \u201cdrafting committees\u201d should be renamed \u201cstakeholder committees\u201d to\n prevent any misinterpretation regarding their role: the committees should have a\n consultative, supporting role but should not \u201chold the pen\u201d in the drafting of network codes.","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 2"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:12"},"new":["2. The Commission shall, after","consulting the Agency, the ENTSO for","Electricity and the other relevant","stakeholders, establish a priority list every","three years, identifying the areas set out in","paragraph 1 to be included in the","development of network codes. If the","subject-matter of the network code is","directly related to the operation of the","distribution system and less relevant for the","transmission system, the Commission may","require the Agency instead of the ENTSO","for Electricity to convene a stakeholder","committee and submit a proposal for a","network code."],"old":["2. The Commission shall, after","consulting the Agency, the ENTSO for","Electricity and the other relevant","stakeholders, establish a priority list every","three years, identifying the areas set out in","paragraph 1 to be included in the","development of network codes. If the","subject-matter of the network code is","directly related to the operation of the","distribution system and less relevant for the","transmission system, the Commission may","","require the EU DSO entity for electricity","instead of the ENTSO for Electricity to","convene a drafting committee and submit a","proposal for a network code to the agency."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"430","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Piernicola Pedicini, Eleonora Evi, Dario Tamburrano","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-231","justification":"The CJEU has ruled that the general principle of equality prohibits \u201ctreating similar\nsituations differently and treating different situations in the same way, unless there are\nobjective reasons to do so.\u201d It is intended to make sure groups or companies cannot block\nmarket entrance through indirect discrimination. Therefore, it would appear that under the\ngeneral principle of equality, certain generation assets could be treated differently, regardless\nof the voltage levels at which they are embedded, if similar treatment would prevent them\nfrom effectively competing on an equal playing field with other generation assets.","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 1"]],"meps":[124844,124779,124813],"meta":{"created":"2019-07-03T06:25:11"},"new":["1. Charges applied by network","operators for access to networks, including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual costs","incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner.","They shall not be set at a level that hinders","the development of production connected","at the distribution level. They shall not","discriminate against energy storage and","shall not create disincentives for","participation in demand response or","renewables self-consumption. Without","prejudice to paragraph 3, those charges","shall not be distance-related."],"old":["1. Charges applied by network","operators for access to networks , including","charges for connection to the networks,","","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual costs","incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner. In","particular, they shall be applied in a way","which does not discriminate between","production connected at the distribution","level and production connected at the","transmission level, either positively or","negatively. They shall not discriminate","against energy storage and shall not create","disincentives for participation in demand","response. Without prejudice to paragraph","3, those charges shall not be distance-","related."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"231","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-431","justification":" In order to provide clarify around the distinct roles and responsibilities to elaborate network\n codes, provisions on network codes related to the distribution grid should be dealt with in\n another sub-paragraph. Hence, the content of this paragraph is limited to network codes\n falling within the scope of ENTSO-E\u2019s remit.","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 8"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:12"},"new":["8. Where so decided in the priority list","pursuant to paragraph 2, the Commission","shall request the ENTSO for Electricity to","submit a proposal for a network code","which is in line with the relevant","framework guideline, to the Agency within","a reasonable period of time not exceeding","12 months."],"old":["8. The Commission shall request the","ENTSO for Electricity or, where so","decided in the priority list pursuant to","paragraph 2, the EU DSO entity for","Electricity , to submit a proposal for a","network code which is in line with the","relevant framework guideline, to the","Agency within a reasonable period of time","not exceeding 12 months."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"431","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Kate\u0159ina Kone\u010dn\u00e1","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-232","justification":" Paragraph needs to be brought in accord with article 15 of Directive 20212/27/EU which\n provides for binding conditions for network tariffs and stipulates that MS may require\n transmission system operators and distribution system operators to encourage high-efficiency\n cogeneration to be sited close to areas of demand by reducing the connection and use-of-\n system charges. In order to preserve level playing field network tariffs should not be used in\n order to provide incentive for energy storage.","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 1"]],"meps":[23699],"meta":{"created":"2019-07-03T06:25:11"},"new":["1. Charges applied by network","operators for access to networks, including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual costs","incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner.","Without prejudice to Article 15(1) and (6)","and the criteria in Annex XI of Directive","2012/27/EU they shall, in particular, be","applied in a way which does not","discriminate between production connected","at the distribution level and production","connected at the transmission level, either","positively or negatively. They shall not","unduly discriminate either positively or","negatively against energy storage and shall","not create disincentives for participation in","demand response. Without prejudice to","paragraph 3, those charges shall not be","distance-related."],"old":["1. Charges applied by network","operators for access to networks , including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual costs","incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner. In","particular, they shall be applied in a way","which does not discriminate between","production connected at the distribution","level and production connected at the","transmission level, either positively or","negatively. They shall not discriminate","against energy storage and shall not create","disincentives for participation in demand","response. Without prejudice to paragraph","3, those charges shall not be distance-","related."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"232","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-432","justification":"Existing language on the \u201cdrafting committee\u201d (renamed \u201cstakeholder committee\u201d) including\n\"a limited number of the main affected stakeholders\" is too vague and could limit\nparticipation. In order to ensure that the process is not captured by large industry\nassociations, the Electricity Regulation should ensure that all relevant stakeholders who are\nlikely to have an interest in the network code, particularly smaller less-resourced ones, can\nsupport the network code development process and are adequately represented. Furthermore,\nin order to provide clarity around the distinct roles and responsibilities to elaborate network\ncodes, provisions on network codes related to the distribution grid should be moved to\nanother sub-paragraph. Hence, the content of this paragraph is limited to network codes\nfalling within the scope of ENTSO-E\u2019s remit.","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 9"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:12"},"new":["9. The ENTSO for Electricity shall","convene a stakeholder committee to","support it in the network code development","process. The stakeholder committee shall","consist of representatives of the ENTSO","for Electricity, the Agency, the EU DSO","entity, where appropriate of nominated","electricity market operators and of other","affected stakeholders who are likely to","have an interest in the network code,","including system users, relevant industry","associations, technical bodies and","consumer associations. The ENTSO for","Electricity shall elaborate proposals for","network codes in the areas referred to in","paragraph 1 upon a request addressed to it","by the Commission in accordance with","paragraph 8."],"old":["9. The ENTSO for Electricity, or","where so decided in the priority list","pursuant to paragraph 2, the EU DSO","entity, shall convene a drafting committee","to support it in the network code","development process. The drafting","committee shall consist of representatives","of the ENTSO for Electricity, the Agency,","the EU DSO entity, where appropriate of","nominated electricity market operators and","a limited number of the main affected","stakeholders. The ENTSO for Electricity","or where so decided in the priority list","pursuant to paragraph 2 the EU DSO","entity, shall elaborate proposals for","network codes in the areas referred to in","paragraph 1 upon a request addressed to it","by the Commission in accordance with","paragraph 8."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"432","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Carolina Punset","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-233","justification":"As demand response, self-generation and self-consumption play a fundamental role in the\ndevelopment of active contribution of consumers in the electricity system. It is essential to\nguarantee that network charges do not create disincentives for persons willing to use their\nright to self-generate and self-consume and do not discriminate against energy storage.","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 1"]],"meps":[90110],"meta":{"created":"2019-07-03T06:25:11"},"new":["1. Charges applied by network","operators for access to networks, including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual costs","incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner. In","particular, they shall be applied in a way","which does not discriminate between","production or energy storage connected at","the distribution level and production","connected at the transmission level, either","positively or negatively. They shall not","discriminate against energy storage,","specifically not double charging energy","storage, and aggregation and shall not","create disincentives for self-generation,","self-consumption, and for participation in","demand response. Without prejudice to","paragraph 3, those charges shall not be","distance-related."],"old":["1. Charges applied by network","operators for access to networks , including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual costs","incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner. In","particular, they shall be applied in a way","which does not discriminate between","production connected at the distribution","level and production connected at the","transmission level, either positively or","negatively. They shall not discriminate","against energy storage and shall not create","disincentives for participation in demand","response. Without prejudice to paragraph","3, those charges shall not be distance-","related."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"233","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-234","justification":" Charges applied by network operators for access to networks should take into account the\n necessity of the development of renewables self-consumption, not just demand response.\n Language prohibiting positive or negative discrimination does not add anything substantial in\n terms of preventing discriminatory treatment and should be deleted to prevent any\n misinterpretations. Under the principle of equality or non-discrimination,network operators\n should not be prevented from treating certain generation assets differently in order to remedy\n a market failure, in particular if similar treatment would prevent effective competition on an\n equal playing field between different generation assets.","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 1"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:11"},"new":["1. Charges applied by network","operators for access to networks, including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual costs","incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner. In","particular, they shall be applied in a way","which does not unduly discriminate","between production connected at the","distribution level and production connected","at the transmission level. They shall not","discriminate against energy storage and","shall not create disincentives for","participation in demand response or","renewables self-consumption. Without","prejudice to paragraph 3, those charges","shall not be distance-related."],"old":["1. Charges applied by network","operators for access to networks , including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","","and flexibility and reflect actual costs","incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner. In","particular, they shall be applied in a way","which does not discriminate between","production connected at the distribution","level and production connected at the","transmission level, either positively or","negatively. They shall not discriminate","against energy storage and shall not create","disincentives for participation in demand","response. Without prejudice to paragraph","3, those charges shall not be distance-","related."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"234","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-433","justification":" It is important to ensure that consumers\u00b4 perspectives are adequately represented in the\n development of network codes.","meps":[124736],"meta":{"created":"2019-07-03T06:25:12"},"new":["9. The ENTSO for Electricity, or","where so decided in the priority list","pursuant to paragraph 2, the EU DSO","entity, shall convene a drafting committee","to support it in the network code","development process. The drafting","committee shall consist of representatives","of the ENTSO for Electricity, the Agency,","the EU DSO entity, where appropriate of","nominated electricity market operators and","representatives of a limited number of the","main affected stakeholders, such as the","consumers. The ENTSO for Electricity or","where so decided in the priority list","pursuant to paragraph 2 the EU DSO","entity, shall elaborate proposals for","network codes in the areas referred to in","paragraph 1 upon a request addressed to it","by the Commission in accordance with","paragraph 8."],"old":["9. The ENTSO for Electricity, or","where so decided in the priority list","pursuant to paragraph 2, the EU DSO","entity, shall convene a drafting committee","to support it in the network code","development process. The drafting","committee shall consist of representatives","of the ENTSO for Electricity, the Agency,","the EU DSO entity, where appropriate of","nominated electricity market operators and","a limited number of the main affected","stakeholders. The ENTSO for Electricity or","where so decided in the priority list","pursuant to paragraph 2 the EU DSO","entity, shall elaborate proposals for","network codes in the areas referred to in","paragraph 1 upon a request addressed to it","by the Commission in accordance with","paragraph 8."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"433","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Sirpa Pietik\u00e4inen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-235","justification":"Necessary for the development of active contribution of consumers to the electricity system.","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 1"]],"meps":[40599],"meta":{"created":"2019-07-03T06:25:11"},"new":["1. Charges applied by network","operators for access to networks , including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual costs","incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner. In","particular, they shall be applied in a way","which does not discriminate between","production connected at the distribution","level and production connected at the","transmission level, either positively or","negatively. They shall not discriminate","against energy storage and aggregation","and shall not create disincentives for self-","generation, self-consumption, and for","participation in demand response. Without","prejudice to paragraph 3, those charges","shall not be distance-related."],"old":["1. Charges applied by network","operators for access to networks , including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual costs","","incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner. In","particular, they shall be applied in a way","which does not discriminate between","production connected at the distribution","level and production connected at the","transmission level, either positively or","negatively. They shall not discriminate","against energy storage and shall not create","disincentives for participation in demand","response. Without prejudice to paragraph","3, those charges shall not be distance-","related."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"235","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-434","justification":"In order to provide clarify around the distinct roles and responsibilities to elaborate network\ncodes, provisions on network codes related to the distribution grid should be moved to\nanother sub-paragraph. Hence, the content of this paragraph is limited to network codes\nfalling within the scope of ENTSO-E\u2019s remit.","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 10"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:13"},"new":["10. The Agency shall revise the","network code elaborated by the ENTSO","for Electricity and ensure that the network","code is in line with the relevant framework","guideline and contributes to market","integration, non-discrimination, effective","competition, and the efficient functioning","of the market and, submit the revised","network code to the Commission within six","months of the day of the receipt of the","proposal. In the proposal submitted to the","Commission, the Agency shall take into","account the views provided by all involved","parties during the drafting of the proposal","led by the ENTSO for Electricity and shall","formally consult the relevant stakeholders","on the version to be submitted to the","Commission."],"old":["10. The Agency shall revise the","network code and ensure that the network","code is in line with the relevant framework","guideline and contributes to market","integration, non-discrimination, effective","competition, and the efficient functioning","of the market and , submit the revised","","network code to the Commission within six","months of the day of the receipt of the","proposal . In the proposal submitted to the","Commission, the Agency shall take into","account the views provided by all involved","parties during the drafting of the proposal","led by the ENTSO for Electricity or the","EU DSO entity and shall formally consult","the relevant stakeholders on the version to","be submitted to the Commission."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"434","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-236","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 1"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:11"},"new":["1. Charges applied by network","operators for access to networks , including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual","costs incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner. In","particular, they shall be applied in a way","which does not discriminate between","production connected at the distribution","level and production connected at the","transmission level, either positively or","negatively. They shall not discriminate","against energy storage and shall not create","disincentives for participation in demand","response or for self-generation. Without","prejudice to paragraph 3, those charges","shall not be distance-related."],"old":["1. Charges applied by network","operators for access to networks , including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual costs","incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner. In","particular, they shall be applied in a way","which does not discriminate between","production connected at the distribution","","level and production connected at the","transmission level, either positively or","negatively. They shall not discriminate","against energy storage and shall not create","disincentives for participation in demand","response. Without prejudice to paragraph","3, those charges shall not be distance-","related."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"236","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-435","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 10"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:13"},"new":["10. The Agency shall revise the","network code and ensure that the network","code is in line with the relevant framework","guideline and contributes to market","integration, non-discrimination, effective","competition, and the efficient functioning","of the market and , submit the","revised network code to the Commission","within six months of the day of the receipt","of the proposal . In the proposal submitted","to the Commission, the Agency shall take","into account the views provided by all","involved parties, in particular the","consumers\u00b4 ones, during the drafting of the","proposal led by the ENTSO for Electricity","or the EU DSO entity and shall formally","consult the relevant stakeholders on the","version to be submitted to the Commission."],"old":["10. The Agency shall revise the","network code and ensure that the network","code is in line with the relevant framework","guideline and contributes to market","integration, non-discrimination, effective","competition, and the efficient functioning","of the market and , submit the revised","network code to the Commission within six","months of the day of the receipt of the","proposal . In the proposal submitted to the","Commission, the Agency shall take into","account the views provided by all involved","parties during the drafting of the proposal","led by the ENTSO for Electricity or the EU","DSO entity and shall formally consult the","relevant stakeholders on the version to be","submitted to the Commission.",""],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"435","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Merja Kyll\u00f6nen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-237","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 2"]],"meps":[124736],"meta":{"created":"2019-07-03T06:25:11"},"new":["2. Tariffs shall grant appropriate","incentives to transmission and distribution","system operators, over both the short and","long term, to increase efficiencies,","including energy efficiency and self-","generation, promote participation in","voluntary demand response, foster market","integration and security of supply, and","support investments and the related","research activities."],"old":["2. Tariffs shall grant appropriate","incentives to transmission and distribution","system operators, over both the short and","long term, to increase efficiencies,","including energy efficiency, foster market","integration and security of supply, and","support investments and the related","research activities."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"237","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Piernicola Pedicini, Eleonora Evi, Dario Tamburrano","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-238","justification":"In order to promote the development of an internal energy market that fully achieves its\nrenewable energy potential, tariffs should incentivise transmission and distribution system\noperators to foster the integration of energy from renewable sources more explicitly","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 2"]],"meps":[124844,124779,124813],"meta":{"created":"2019-07-03T06:25:11"},"new":["2. Tariffs shall grant appropriate","incentives to transmission and distribution","system operators, over both the short and","long term, to increase efficiencies,","including energy efficiency, foster market","integration, including from renewable","sources, and security of supply, and","support investments and the related","research activities."],"old":["2. Tariffs shall grant appropriate","incentives to transmission and distribution","system operators, over both the short and","long term, to increase efficiencies,","","including energy efficiency, foster market","integration and security of supply, and","support investments and the related","research activities."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"238","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-436","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 11"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:13"},"new":["11. Where the ENTSO for Electricity","has failed to develop a network code","within the period of time set by the","Commission under paragraph 8, the","Commission may request the Agency to","prepare a draft network code on the basis","of the relevant framework guideline. The","Agency may launch a further consultation","in the course of preparing a draft network","code under this paragraph. The Agency","shall submit a draft network code prepared","under this paragraph to the Commission","and may recommend that it be adopted."],"old":["11. Where the ENTSO for Electricity","or the EU DSO entity have failed to","develop a network code within the period","of time set by the Commission under","paragraph 8, the Commission may request","the Agency to prepare a draft network code","on the basis of the relevant framework","guideline. The Agency may launch a","further consultation in the course of","preparing a draft network code under this","paragraph. The Agency shall submit a draft","network code prepared under this","paragraph to the Commission and may","recommend that it be adopted."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"436","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-239","justification":"In order to promote the development of an internal energy market that fully achieves its\nrenewable energy potential, tariffs should incentivise transmission and distribution system\noperators to foster the integration of energy from renewable sources more explicitely.","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 2"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:12"},"new":["2. Tariffs shall grant appropriate","incentives to transmission and distribution","system operators, over both the short and","long term, to increase efficiencies,","including energy efficiency, foster market","integration, including from renewable","sources, and security of supply, and","support investments and the related","research activities."],"old":["2. Tariffs shall grant appropriate","incentives to transmission and distribution","system operators, over both the short and","long term, to increase efficiencies,","including energy efficiency, foster market","integration and security of supply, and","support investments and the related","research activities."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"239","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Carolina Punset","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-240","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 2"]],"meps":[90110],"meta":{"created":"2019-07-03T06:25:12"},"new":["2. Tariffs shall grant appropriate","incentives to transmission and distribution","system operators, over both the short and","long term, to increase efficiencies,","including energy efficiency and energy","storage, foster market integration and","security of supply, and support investments","and the related research activities."],"old":["2. Tariffs shall grant appropriate","incentives to transmission and distribution","system operators, over both the short and","long term, to increase efficiencies,","including energy efficiency, foster market","integration and security of supply, and","support investments and the related","research activities."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"240","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-437","justification":"In order to provide clarity around the distinct roles and responsibilities to elaborate network\ncodes, provisions on network codes related to the distribution grid should be moved to\nanother sub-paragraph. Hence, the content of this paragraph is limited to network codes\nfalling within the scope of ENTSO-E\u2019s remit.","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 12"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:13"},"new":["12. The Commission may adopt, on its","own initiative, where the ENTSO for","Electricity or the Agency have failed to","develop a network code as referred to in","paragraphs 8 and 12 of this Article, or the","Agency has failed to develop a draft","network code as referred to in paragraph 11","of this Article, or upon recommendation of","the Agency under paragraph 10 of this","Article, one or more network codes in the","areas listed in paragraph 1."],"old":["12. The Commission may adopt, on its","own initiative, where the ENTSO for","Electricity or the EU DSO entity have","failed to develop a network code, or the","Agency has failed to develop a draft","network code as referred to in paragraph 11","of this Article, or upon recommendation of","","the Agency under paragraph 10 of this","Article, one or more network codes in the","areas listed in paragraph 1."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"437","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-241","justification":"In line with the provisions of the Electricity Directive, Member States may allow subsidies\nand exemptions to energy poor consumers.","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 7"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:12"},"new":["7. Distribution tariffs shall reflect the","cost and benefits related to the use of the","distribution network by system users and","the benefits of those users including lower","transmission losses and load reduction","including active customers and may be","differentiated based on system users'","consumption or generation profiles and","grid connection capacities, whilst","avoiding disincentives for energy","efficiency. Where Member States have","implemented the deployment of smart","metering systems, regulatory authorities","may introduce time differentiated network","tariffs, reflecting the use of the network, in","a transparent and foreseeable way for the","consumer. The tariffs shall be set in a","manner that incentivises investment in","demand response flexibility systems and","energy savings; subsequently they shall","not include additional capacity-based","elements. Member states shall ensure that","tariffs are not discriminatory, and that","there are no subsidies to specific groups","of users, including exemptions to pay.","Member States may allow subsidies and","exemptions for measures aiming at","preventing fuel poverty as set in Article 28","and Article 29 of the [Electricity","Directive]."],"old":["7. Distribution tariffs shall reflect the","cost of use of the distribution network by","system users including active customers,","and may be differentiated based on system","users' consumption or generation profiles.","Where Member States have implemented","the deployment of smart metering systems,","regulatory authorities may introduce time","differentiated network tariffs, reflecting the","use of the network, in a transparent and","foreseeable way for the consumer.",""],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"241","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-438","justification":" The suggested amendment lays out the process for elaborating network codes related to the\n distribution grid. In order to prevent conflicts of interests, the proposed tasks of the EU DSO\n entity concerning the development of network codes which relate to the operation of the\n distribution system should be transferred to ACER. ACER should also have the authority to\n convene the \u201cdrafting committees\u201d (renamed \u201cstakeholder committees\u201d) to support it in the\n network code development process.","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 13 \u2013 point 1 (new)"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:13"},"new":["(1) Where the subject-matter of the","network code is directly related to the","operation of the distribution system and","less relevant for the transmission system,","and where so decided in the priority list","pursuant to paragraph 2, the Agency shall","submit a proposal for a network code to","the Commission within a reasonable","period of time not exceeding 12 months.","The Agency shall convene a stakeholder","committee to support it in the network","code development process. The","stakeholder committee shall consist of","representatives of the Agency, the ENTSO","for Electricity, the EU DSO entity, where","appropriate of nominated electricity","market operators and other affected","stakeholders who are likely to have an","interest in the network code, including","system users, relevant industry","associations, technical bodies and","consumer platforms. The Agency shall","ensure that the network code is in line","with the relevant framework guideline","and contributes to market integration,","non-discrimination, effective competition,","and the efficient functioning of the","market, and submit the network code to","the Commission. In the proposal","submitted to the Commission, the Agency","shall take into account the views provided","by all involved parties during the drafting","of the proposal and shall formally consult","the relevant stakeholders on the version to","be submitted to the Commission."],"old":[""],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"438","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Carolina Punset","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-242","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 7"]],"meps":[90110],"meta":{"created":"2019-07-03T06:25:12"},"new":["7. Distribution tariffs shall reflect the","cost and benefits related to the use of the","distribution network by system users","including active customers, and may be","differentiated based on system users'","consumption, energy storage or generation","profiles. Where Member States have","implemented the deployment of smart","metering systems, regulatory authorities","may introduce time differentiated network","tariffs, reflecting the use of the network, in","a transparent and foreseeable way for the","consumer."],"old":["7. Distribution tariffs shall reflect the","cost of use of the distribution network by","system users including active customers,","and may be differentiated based on system","users' consumption or generation profiles.","Where Member States have implemented","the deployment of smart metering systems,","regulatory authorities may introduce time","differentiated network tariffs, reflecting the","use of the network, in a transparent and","foreseeable way for the consumer."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"242","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Kate\u0159ina Kone\u010dn\u00e1","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-439","justification":"Distribution networks across Europe vary to a great extent: from voltage level, topology,\nnatural profile of given area to consumption patterns of users. Structure of distribution tariff\ntherefore needs to be unique; national regulatory authorities are best equipped to do this.","location":[[" Proposal for a regulation","Article 57 \u2013 paragraph 4 \u2013 subparagraph 1"]],"meps":[23699],"meta":{"created":"2019-07-03T06:25:13"},"new":["Guidelines may also determine appropriate","rules relating to charges applied to","producers, energy storage and customers","(load) under national transmission tariff","systems and connection regimes, including","the reflection of the inter-transmission","system operator compensation mechanism","in national network charges and the","provision of appropriate and efficient","locational signals, in accordance with the","principles set out in Article 16."],"old":["Guidelines may also determine appropriate","rules relating to charges applied to","producers, energy storage and customers","(load) under national distribution and","transmission tariff systems and connection","regimes , including the reflection of the","inter-transmission system operator","compensation mechanism in national","network charges and the provision of","appropriate and efficient locational signals,","in accordance with the principles set out in","Article 16."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"439","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":"Piernicola Pedicini, Eleonora Evi, Dario Tamburrano","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-243","justification":" In order to incentivise smarter renewables integration technologies and motivate consumers\n to make investment decisions that mutually benefit the customer and the grid, distribution\n tariffs need to acknowledge the benefits that active consumers provide for the grid and allow\n self-consumption activities to be valued more broadly. Furthermore, consumers should be\n enabled to participate in all forms of demand response, including implicit demand response\n through time-differentiated network tariffs.","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 7"]],"meps":[124844,124779,124813],"meta":{"created":"2019-07-03T06:25:12"},"new":["7. Distribution tariffs shall reflect the","cost and benefits of use of the distribution","network by system users including active","customers, and may be differentiated based","on system users' consumption or generation","profiles. Where Member States have","implemented the deployment of smart","metering systems, regulatory authorities","shall endeavour to may introduce time","differentiated network tariffs, reflecting the","use of the network, in a transparent and","foreseeable way for the consumer."],"old":["7. Distribution tariffs shall reflect the","cost of use of the distribution network by","system users including active customers,","and may be differentiated based on system","users' consumption or generation profiles.","Where Member States have implemented","the deployment of smart metering systems,","regulatory authorities may introduce time","differentiated network tariffs, reflecting the","use of the network, in a transparent and","foreseeable way for the consumer."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"243","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Pavel Poc","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE612.144-440","justification":"Aligned with amendment on Article 55, paragraph 1, point k.","location":[["Proposal for a regulation","Article 57 \u2013 paragraph 4 \u2013 subparagraph 1"]],"meps":[96715],"meta":{"created":"2019-07-03T06:25:13"},"new":["Guidelines may also determine appropriate","rules relating to charges applied to","producers, energy storage and customers","(load) under national transmission tariff","systems and connection regimes, including","the reflection of the inter-transmission","system operator compensation mechanism","in national network charges and the","provision of appropriate and efficient","locational signals, in accordance with the","principles set out in Article 16."],"old":["Guidelines may also determine appropriate","rules relating to charges applied to","producers, energy storage and customers","(load) under national distribution and","transmission tariff systems and connection","regimes , including the reflection of the","inter-transmission system operator","compensation mechanism in national","network charges and the provision of","appropriate and efficient locational signals,","in accordance with the principles set out in","Article 16."],"orig_lang":"en","peid":"PE612.144v01-00","reference":"2016/0379(COD)","seq":"440","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-612144_EN.pdf"},{"authors":" Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-244","justification":"Existing language only reflects the cost of use of the distribution network by system users. In\norder to incentivise smarter renewables integration technologies and motivate consumers to\nmake investment decisions that mutually benefit the customer and the grid, distribution tariffs\nneed to acknowledge the benefits that active consumers provide for the grid and allow self-\nconsumption activities to be valued more broadly (e.g. their contribution to avoided costs\nrelated to grid upgrades for the DSO, reduced transmission losses, avoided CO2 emissions,\npublic health, etc.). Furthermore, consumers should be enabled to participate in all forms of\ndemand response, including implicit demand response through time-differentiated network\ntariffs.","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 7"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:12"},"new":["7. Distribution tariffs shall reflect the","cost and benefits of use of the distribution","network by system users including active","customers, and may be differentiated based","on system users' consumption or generation","profiles. Where Member States have","implemented the deployment of smart","metering systems, regulatory authorities","shall endeavour to introduce time","differentiated network tariffs, reflecting the","use of the network, in a transparent and","foreseeable way for the consumer."],"old":["7. Distribution tariffs shall reflect the","cost of use of the distribution network by","system users including active customers,","and may be differentiated based on system","users' consumption or generation profiles.","Where Member States have implemented","the deployment of smart metering systems,","regulatory authorities may introduce time","differentiated network tariffs, reflecting the","use of the network, in a transparent and","foreseeable way for the consumer."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"244","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Sirpa Pietik\u00e4inen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-245","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 7"]],"meps":[40599],"meta":{"created":"2019-07-03T06:25:12"},"new":["7. Distribution tariffs shall reflect the","cost and benefits related to the use of the","distribution network by system users","including active customers, and may be","differentiated based on system users'","consumption or generation profiles. Where","Member States have implemented the","deployment of smart metering systems,","regulatory authorities may introduce time","differentiated network tariffs, reflecting the","use of the network, in a transparent and","foreseeable way for the consumer."],"old":["7. Distribution tariffs shall reflect the","cost of use of the distribution network by","system users including active customers,","and may be differentiated based on system","users' consumption or generation profiles.","Where Member States have implemented","the deployment of smart metering systems,","regulatory authorities may introduce time","differentiated network tariffs, reflecting the","use of the network, in a transparent and","foreseeable way for the consumer."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"245","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Piernicola Pedicini, Eleonora Evi, Dario Tamburrano","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-246","justification":" Existing language only reflects the need to raise efficiencies in the distribution networks.\n Distribution system operators should also be encouraged to promote flexiblity in the grid and\n the integration of energy from renewable sources, in accordance with the language used\n Article 59(1)(k) of Recast Directive 2009/72/EC as proposed by COM(2016) 864","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 8"]],"meps":[124844,124779,124813],"meta":{"created":"2019-07-03T06:25:12"},"new":["8. Regulatory authorities shall provide","incentives to distribution system operators","to procure services for the operation and","development of their networks and","integrate innovative solutions in the","distribution systems. For that purpose","regulatory authorities shall recognize as","eligible and include all relevant costs in","distribution tariffs and introduce","performance targets in order to incentivise","distribution system operators to raise","efficiencies, including energy efficiency","and flexibility, in their networks and","promote the integration of energy from","renewable sources."],"old":["8. Regulatory authorities shall provide","incentives to distribution system operators","to procure services for the operation and","development of their networks and","integrate innovative solutions in the","distribution systems. For that purpose","regulatory authorities shall recognise as","eligible and include all relevant costs in","distribution tariffs and introduce","performance targets in order to incentivise","distribution system operators to raise","efficiencies, including energy efficiency, in","their networks."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"246","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-247","justification":"Existing language only reflects the need to raise efficiencies in the distribution networks.\nDistribution system operators should also be encouraged to promote flexiblity in the grid and\nthe integration of energy from renewable sources, in accordance with the language used\nArticle 59(1)(k) of Recast Directive 2009/72/EC as proposed by COM(2016) 864.","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 8"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:12"},"new":["8. Regulatory authorities shall provide","incentives to distribution system operators","to procure services for the operation and","development of their networks and","integrate innovative solutions in the","distribution systems. For that purpose","regulatory authorities shall recognise as","eligible and include all relevant costs in","distribution tariffs and introduce","performance targets in order to incentivise","distribution system operators to raise","efficiencies, including energy efficiency","and flexibility, in their networks and","promote the integration of energy from","renewable sources."],"old":["8. Regulatory authorities shall provide","incentives to distribution system operators","to procure services for the operation and","development of their networks and","integrate innovative solutions in the","distribution systems. For that purpose","regulatory authorities shall recognise as","eligible and include all relevant costs in","distribution tariffs and introduce","performance targets in order to incentivise","distribution system operators to raise","efficiencies, including energy efficiency, in","their networks.",""],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"247","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Carolina Punset","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-248","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 8"]],"meps":[90110],"meta":{"created":"2019-07-03T06:25:12"},"new":["8. Regulatory authorities shall provide","incentives to distribution system operators","to procure services for the operation and","development of their networks and","integrate innovative solutions in the","distribution systems. For that purpose","regulatory authorities shall recognise as","eligible and include all relevant costs in","distribution tariffs and introduce","performance targets in order to incentivise","distribution system operators to raise","efficiencies, including energy efficiency,","and energy storage in their networks."],"old":["8. Regulatory authorities shall provide","incentives to distribution system operators","to procure services for the operation and","development of their networks and","integrate innovative solutions in the","distribution systems. For that purpose","regulatory authorities shall recognise as","eligible and include all relevant costs in","distribution tariffs and introduce","performance targets in order to incentivise","distribution system operators to raise","efficiencies, including energy efficiency, in","their networks."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"248","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Davor \u0160krlec","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-249","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 9 \u2013 point d a (new)"]],"meps":[124756],"meta":{"created":"2019-07-03T06:25:12"},"new":["(da) the removal of incentives which","are detrimental to energy efficiency/","demand-side management"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"249","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Sirpa Pietik\u00e4inen","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-250","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 9 \u2013 point g a (new)"]],"meps":[40599],"meta":{"created":"2019-07-03T06:25:12"},"new":["(ga) methods to calculate the benefits","of self-consumption, decentralised","generation, storage and demand response,","as well as their complementarity;"],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"250","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Carolina Punset","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-251","justification":" The evolution of transmission and distribution tariff methodologies shall introduce principles\n to assess the real economic, technical and social impacts of active consumers. The\n consideration of costs shall therefore be complemented by the consideration of benefits\n provided by the development of self-consumption, self-generation, storage and demand\n response. Those benefits shall notably take into account avoided CO2 emissions, reduced\n feed-in tariffs, and reduced network upgrade needs.","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 9 \u2013 point g a (new)"]],"meps":[90110],"meta":{"created":"2019-07-03T06:25:12"},"new":["(ga) methods to calculate the benefits","of self-consumption, decentralised","generation, storage and demand response,","as well as their complementarity."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"251","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Daciana Octavia S\u00e2rbu","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-252","justification":"In order to incentivise smarter renewables integration technologies and motivate consumers\nto make investment decisions that mutually benefit the customer and the grid, market design\nrules need to allow self-consumption activities to be valued more broadly (e.g. their\ncontribution to avoided costs related to grid upgrades for the DSO, reduced transmission\nlosses, avoided CO2 emissions, etc). Hence, the recommendations provided by the Agency on\nthe progressive convergence of transmission and distribution tariff methodologies should also\naddress the assessment of costs and benefits of distributed energy resources.","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 9 \u2013 point g a (new)"]],"meps":[33989],"meta":{"created":"2019-07-03T06:25:12"},"new":["(ga) cost benefit analysis for distributed","energy resources."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"252","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Piernicola Pedicini, Eleonora Evi, Dario Tamburrano","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-253","justification":"The market design rules need to allow self-consumption activities to be valued more broadly\n(e.g. their contribution to avoided costs related to grid upgrades for the DSO, reduced\ntransmission losses, avoided CO2 emissions, etc). Hence, the recommendations provided by\nthe Agency on the progressive convergence of transmission and distribution tariff\nmethodologies should also address the assessment of costs and benefits of distributed energy\nresources.","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 9 a (new)"]],"meps":[124844,124779,124813],"meta":{"created":"2019-07-03T06:25:12"},"new":["9a. cost benefit analysis for distributed","energy resources. ."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"253","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye, Michel Dantin","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-254","location":[[" Proposal for a regulation","Article 17 \u2013 paragraph 2 \u2013 subparagraph 1 \u2013 point b"]],"meps":[2025,124732,97296],"meta":{"created":"2019-07-03T06:25:13"},"new":["(b) maintaining or increasing","interconnection capacities through","coordinated remedial actions and/or","network investments."],"old":["(b) maintaining or increasing","interconnection capacities through network","investments, in particular in new","interconnectors."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"254","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Ivo Belet","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-255","justification":" In order to ensure maximum availability of the interconnection capacity to the market,\n revenues could be also used for additional tools, such as countertrading and re-dispatching.","location":[[" Proposal for a regulation","Article 17 \u2013 paragraph 2 \u2013 subparagraph 1 \u2013 point b a (new)"]],"meps":[28257],"meta":{"created":"2019-07-03T06:25:13"},"new":["(ba) ensuring that the maximum","amount of available capacity is allocated","to the market through countertrading and","redispatching, including cross-border","redispatching."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"255","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":" Fran\u00e7oise Grosset\u00eate, Ang\u00e9lique Delahaye, Michel Dantin","changes":{},"committee":["ENVI"],"date":"2017-10-11T00:00:00","id":"PE610.826-256","justification":"Although the idea that congestion revenues should be used to increase and to guarantee the\nfirmness of cross-border capacity provided for in Regulation 714/2009 is agreed and\nsupported by the Agency, the prohibition to use congestion revenues to lower network tariffs\nis not justified.","location":[[" Proposal for a regulation","Article 17 \u2013 paragraph 2 \u2013 subparagraph 2"]],"meps":[2025,124732,97296],"meta":{"created":"2019-07-03T06:25:13"},"new":["If the revenues cannot be efficiently used","for the purposes set out in points (a) or (b)","of the first subparagraph, as a residual","option, they may be used, subject to","approval by the regulatory authorities of","the Member States concerned, up to a","maximum amount to be decided by those","regulatory authorities, as income to be","taken into account by the regulatory","authorities when approving the","methodology for calculating network","tariffs and/or fixing network tariffs.","Regulatory authorities may only approve","this option in cases where the","transmission system operator takes a","commitment decision to undertake all","interconnector projects that have a","positive net benefit and has a balance","sheet that is sufficient to finance these","investments.","The rest of revenues shall be placed on a","separate internal account line until such","time as it can be spent on the purposes set","out in points (a) and/or (b) of the first","subparagraph. The regulatory authority","shall inform the Agency of the approval","referred to in the second subparagraph."],"old":["If the revenues cannot be efficiently used","for the purposes set out in points (a) or (b)","of the first subparagraph, they shall be","placed on a separate internal account line","for future use on these purposes."],"orig_lang":"en","peid":"PE610.826v01-00","reference":"2016/0379(COD)","seq":"256","src":"http://www.europarl.europa.eu/doceo/document/ENVI-AM-610826_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-130","justification":"According to the enlargement of the scope of the Regulation in Article 1 a) and b) to include a\nspecial focus on renewable energy sources, the above provisions need to be added to place\nthe addition in the adequate context.","location":[["Proposal for a regulation","Recital 2 a (new)"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:07"},"new":["(2a) The achievement of the internal","energy market is not a final goal in itself","but an effective instrument to reach the","EU climate and energy targets for 2030","and 2050, notably the integration of a","nearly 100% share of renewable energy","sources in the power system as the only","sustainable pathway to comply with the","climate objectives deriving from the Paris","Accord to hold the increase in the global","average temperature to well below 2\u00b0C","above pre-industrial levels and pursuing","efforts to limit the temperature increase to","1.5\u00b0C above pre-industrial levels."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"130","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-131","location":[["Proposal for a regulation","Recital 3 a (new)"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:07"},"new":["(3a) The 'energy efficiency first'","principle plays an important role in","designing the electricity market. By","fostering a level playing field for demand","side solutions, including demand response","and energy efficiency improvements, it","makes sure that the market can be","effective in delivering the objectives of the","Energy Union and the climate and energy","framework 2030."],"old":[""],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"131","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Kaja Kallas, Pavel Teli\u010dka, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar, Carolina Punset, Gerben-Jan Gerbrandy","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-132","location":[[" Proposal for a regulation","Recital 5"]],"meps":[124697,124706,124989,124872,125026,90110,96940],"meta":{"created":"2020-11-15T15:52:07"},"new":["(5) In the past, electricity customers","were purely passive, often buying","electricity at regulated prices which had no","direct relation to the market. In the future,","customers need to be enabled to fully","participate in the market on equal footing","with other market participants and be","empowered to manage their energy","consumption. To integrate growing shares","of renewable energy, the future electricity","system should make use of all available","sources of flexibility, particularly demand","response and storage and of digitalisation","through the integration of innovative","technologies with the electricity system.","To achieve effective decarbonisation at","lowest cost, it also needs to encourage","energy efficiency."],"old":["(5) In the past, electricity customers","were purely passive, often buying","electricity at regulated prices which had no","direct relation to the market. In the future,","customers need to be enabled to fully","participate in the market on equal footing","with other market participants. To integrate","growing shares of renewable energy, the","future electricity system should make use","of all available sources of flexibility,","particularly demand response and storage.","To achieve effective decarbonisation at","lowest cost, it also needs to encourage","energy efficiency."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"132","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Pervenche Ber\u00e8s, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-133","justification":"Market signal should be strengthened and should give incentives and instruments for market\noperators and investors.","location":[[" Proposal for a regulation","Recital 5"]],"meps":[1985,124947],"meta":{"created":"2020-11-15T15:52:07"},"new":["(5) In the past, electricity customers","were purely passive, often buying","electricity at regulated prices which had no","direct relation to the market. In the future,","customers need to be enabled to fully","participate in the market on equal footing","with other market participants. To integrate","growing shares of renewable energy, the","future electricity system should make use","of all available sources of flexibility,","particularly demand response and storage.","To achieve effective decarbonisation at","lowest cost, it also needs to encourage","energy efficiency and to drive investments","on the long term."],"old":["(5) In the past, electricity customers","were purely passive, often buying","electricity at regulated prices which had no","direct relation to the market. In the future,","customers need to be enabled to fully","participate in the market on equal footing","with other market participants. To integrate","growing shares of renewable energy, the","future electricity system should make use","of all available sources of flexibility,","particularly demand response and storage.","To achieve effective decarbonisation at","lowest cost, it also needs to encourage","energy efficiency."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"133","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Eugen Freund, Patrizia Toia, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-134","location":[["Proposal for a regulation","Recital 6"]],"meps":[124826,124870,124739,124735,125018,28340,124699,125041,125044,124947],"meta":{"created":"2020-11-15T15:52:07"},"new":["(6) More market integration and the","change towards a more distributed and","volatile electricity production requires","increased efforts to coordinate national","energy policies with neighbours and to use","the opportunities of cross-border electricity","trade."],"old":["(6) More market integration and the","change towards a more volatile electricity","production requires increased efforts to","coordinate national energy policies with","neighbours and to use the opportunities of","cross-border electricity trade."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"134","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Claude Turmes","changes":{},"committee":["ITRE"],"compromise":[" on behalf of the Verts/ALE Group"],"date":"2017-09-25T00:00:00","id":"PE609.623-135","justification":" This Amendment is linked to Article 16, \u00a7 1, 16 \u00a7 6 and Article 46.","location":[[" Proposal for a regulation","Recital 6 a (new)"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:07"},"new":["(6a) This Regulation should allow the","Union, if it decides to do so, in the next","Multiannual Financial Framework, to","collect levies on electricity trading in","order to secure an additional stream of","own resources."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"135","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Eugen Freund, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-136","location":[[" Proposal for a regulation","Recital 7"]],"meps":[124826,124870,124739,124735,125018,124699,125041,125044,124947],"meta":{"created":"2020-11-15T15:52:07"},"new":["(7) Regulatory frameworks have","developed, allowing electricity to be traded","across the Union. That development has","been supported by the adoption of several","network codes and guidelines for the","integration of the electricity markets.","Those network codes and guidelines for","precise and technically detailed rules with","cross-border relevance contain provisions","on market rules, system operation and","network connection. To ensure full","transparency and increase legal certainty,","the main principles of market functioning","and capacity allocation in the balancing,","intraday, day ahead and forward market","timeframes should also be adopted","pursuant to the ordinary legislative","procedure and incorporated in a single act."],"old":["(7) Regulatory frameworks have","developed, allowing electricity to be traded","across the Union. That development has","been supported by the adoption of several","network codes and guidelines for the","integration of the electricity markets.","Those network codes and guidelines","contain provisions on market rules, system","operation and network connection. To","ensure full transparency and increase legal","certainty, the main principles of market","functioning and capacity allocation in the","balancing, intraday, day ahead and forward","market timeframes should also be adopted","pursuant to the ordinary legislative","procedure and incorporated in a single act."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"136","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Kathleen Van Brempt, Ivo Belet","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-137","location":[["Proposal for a regulation","Recital 8"]],"meps":[5729,28257],"meta":{"created":"2020-11-15T15:52:07"},"new":["(8) Core market principles should set","out that electricity prices are to be","determined through demand and supply.","While respecting principles of solidarity","and fair distribution of costs, those prices","should signal when electricity is needed,","providing market-based incentives for","investments into flexibility sources such as","flexible generation, interconnection,","demand response or storage."],"old":["(8) Core market principles should set","out that electricity prices are to be","determined through demand and supply.","Those prices should signal when electricity","is needed, providing market-based","incentives for investments into flexibility","sources such as flexible generation,","interconnection, demand response or","storage."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"137","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-138","location":[["Proposal for a regulation","Recital 9"]],"meps":[2278],"meta":{"created":"2020-11-15T15:52:07"},"new":["(9) The decarbonisation of the","electricity sector, with renewable energy","becoming a major part of the market, is a","core objective of the Energy Union. As the","Union moves towards the decarbonisation","of the electricity sector and increasing","penetration of renewable energy sources, it","is crucial that the market removes existing","barriers to cross-border trade and","encourages investments into supporting","infrastructure, for example, more flexible","generation, interconnection, demand","response and storage. In order to facilitate","the roll-out of energy storage solutions,","the Member States should take steps to","remove out-dated taxation provisions that","lead to double-taxation. To support this","shift to variable and distributed generation,","and to ensure that energy market principles","are the basis for the Union's electricity","markets of the future, a renewed focus on","short-term markets and scarcity pricing is","essential."],"old":["(9) The decarbonisation of the","electricity sector, with renewable energy","becoming a major part of the market, is a","core objective of the Energy Union. As the","Union moves towards the decarbonisation","of the electricity sector and increasing","penetration of renewable energy sources, it","is crucial that the market removes existing","barriers to cross-border trade and","encourages investments into supporting","infrastructure, for example, more flexible","generation, interconnection, demand","response and storage. To support this shift","to variable and distributed generation, and","to ensure that energy market principles are","","the basis for the Union's electricity markets","of the future, a renewed focus on short-","term markets and scarcity pricing is","essential."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"138","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-139","justification":"The efficient rollout of energy storage has been hampered by tax code provisions that lead to\ndouble-taxation. Member States should therefore take steps to remove these barriers.","location":[[" Proposal for a regulation","Recital 9"]],"meps":[90110],"meta":{"created":"2020-11-15T15:52:07"},"new":["(9) The decarbonisation of the","electricity sector, with renewable energy","becoming a major part of the market, is a","core objective of the Energy Union. As the","Union moves towards the decarbonisation","of the electricity sector and increasing","penetration of renewable energy sources, it","is crucial that the market removes existing","barriers to cross-border trade and","encourages investments into supporting","infrastructure, for example, more flexible","generation, interconnection, demand","response and storage. To support the roll-","out of energy storage solutions, Member","States should take steps to remove out-","dated taxation provisions that lead to","double-taxation. To support this shift to","variable and distributed generation, and to","ensure that energy market principles are","the basis for the Union's electricity markets","of the future, a renewed focus on short-","term markets and scarcity pricing is","essential."],"old":["(9) The decarbonisation of the","electricity sector, with renewable energy","becoming a major part of the market, is a","core objective of the Energy Union. As the","Union moves towards the decarbonisation","of the electricity sector and increasing","penetration of renewable energy sources, it","is crucial that the market removes existing","barriers to cross-border trade and","encourages investments into supporting","infrastructure, for example, more flexible","generation, interconnection, demand","response and storage. To support this shift","to variable and distributed generation, and","to ensure that energy market principles are","the basis for the Union's electricity markets","of the future, a renewed focus on short-","term markets and scarcity pricing is","essential."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"139","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-140","location":[["Proposal for a regulation","Recital 9"]],"meps":[124706],"meta":{"created":"2020-11-15T15:52:07"},"new":["(9) The decarbonisation of the","electricity sector, with renewable energy","becoming a major part of the market, is a","core objective of the Energy Union. As the","Union moves towards the decarbonisation","of the electricity sector and increasing","penetration of renewable energy sources, it","is crucial that the market removes existing","barriers to cross-border trade and","encourages investments into supporting","infrastructure, for example, more flexible","generation, interconnection, demand","response and storage. To support this shift","to variable and distributed generation, and","to ensure that energy market principles are","the basis for the Union's electricity markets","of the future, a renewed focus on short-","term markets, scarcity pricing as well as","technology neutral approach is essential."],"old":["(9) The decarbonisation of the","electricity sector, with renewable energy","becoming a major part of the market, is a","core objective of the Energy Union. As the","Union moves towards the decarbonisation","of the electricity sector and increasing","penetration of renewable energy sources, it","is crucial that the market removes existing","barriers to cross-border trade and","encourages investments into supporting","infrastructure, for example, more flexible","generation, interconnection, demand","response and storage. To support this shift","to variable and distributed generation, and","to ensure that energy market principles are","the basis for the Union's electricity markets","of the future, a renewed focus on short-","term markets and scarcity pricing is","essential."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"140","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-141","location":[["Proposal for a regulation","Recital 10"]],"meps":[124706],"meta":{"created":"2020-11-15T15:52:07"},"new":["(10) Short-term markets will improve","liquidity and competition by enabling more","resources to participate fully in the market,","especially those that are more flexible.","Effective scarcity pricing will encourage","market participants to be available when","the market most needs it and ensures that","they can recover their costs in the","wholesale market. It is therefore critical to","ensure that, as far as possible,","administrative and implicit price caps are","removed to allow scarcity prices to","increase up to the value of lost load. When","fully embedded in the market structure,","short-term markets and scarcity pricing","will contribute to the removal of other","measures, such as capacity mechanisms, to","ensure security of supply. At the same","time, scarcity pricing without price caps on","the wholesale market should not jeopardize","the possibility for reliable and stable prices","for final customers, both for households as","well as industrial consumers."],"old":["(10) Short-term markets will improve","liquidity and competition by enabling more","resources to participate fully in the market,","","especially those that are more flexible.","Effective scarcity pricing will encourage","market participants to be available when","the market most needs it and ensures that","they can recover their costs in the","wholesale market. It is therefore critical to","ensure that, as far as possible,","administrative and implicit price caps are","removed to allow scarcity prices to","increase up to the value of lost load. When","fully embedded in the market structure,","short-term markets and scarcity pricing","will contribute to the removal of other","measures, such as capacity mechanisms, to","ensure security of supply. At the same","time, scarcity pricing without price caps on","the wholesale market should not jeopardize","the possibility for reliable and stable prices","for final customers, in particular","households and SMEs."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"141","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Marian-Jean Marinescu","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-142","location":[[" Proposal for a regulation","Recital 10"]],"meps":[33982],"meta":{"created":"2020-11-15T15:52:07"},"new":["(10) Short-term markets will improve","liquidity and competition by enabling more","resources to participate fully in the market,","especially those that are more flexible.","Effective scarcity pricing will encourage","market participants to be available when","the market most needs it and ensures that","they can recover their costs in the","wholesale market. It is therefore critical to","ensure that, as far as possible,","administrative and implicit price caps are","removed to allow scarcity prices to","increase up to the value of lost load. When","fully embedded in the market structure,","short-term markets and scarcity pricing","will contribute to the removal of other","measures, such as capacity mechanisms, to","ensure security of supply. At the same","time, scarcity pricing without price caps on","the wholesale market should not jeopardize","the possibility for reliable and stable prices","for final customers, in particular","households, SMEs and industrial","consumers."],"old":["(10) Short-term markets will improve","liquidity and competition by enabling more","resources to participate fully in the market,","especially those that are more flexible.","Effective scarcity pricing will encourage","market participants to be available when","the market most needs it and ensures that","they can recover their costs in the","wholesale market. It is therefore critical to","ensure that, as far as possible,","administrative and implicit price caps are","removed to allow scarcity prices to","increase up to the value of lost load. When","fully embedded in the market structure,","short-term markets and scarcity pricing","will contribute to the removal of other","","measures, such as capacity mechanisms, to","ensure security of supply. At the same","time, scarcity pricing without price caps on","the wholesale market should not jeopardize","the possibility for reliable and stable prices","for final customers, in particular","households and SMEs."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"142","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-143","location":[["Proposal for a regulation","Recital 10"]],"meps":[2278],"meta":{"created":"2020-11-15T15:52:07"},"new":["(10) Short-term markets will improve","liquidity and competition by enabling more","resources to participate fully in the market,","especially those that are more flexible.","Effective scarcity pricing will encourage","market participants to be available when","the market most needs it and ensures that","they can recover their costs in the","wholesale market. It is therefore critical to","ensure that, as far as possible,","administrative and implicit price caps are","removed to allow scarcity prices to","increase up to the value of lost load. When","fully embedded in the market structure,","short-term markets and scarcity pricing","will contribute to the removal of other","measures, such as capacity mechanisms, to","ensure security of supply. At the same","time, scarcity pricing without price caps on","the wholesale market should not jeopardize","the possibility for reliable and stable prices","for final customers, in particular","households, SMEs and industry."],"old":["(10) Short-term markets will improve","liquidity and competition by enabling more","resources to participate fully in the market,","especially those that are more flexible.","Effective scarcity pricing will encourage","market participants to be available when","the market most needs it and ensures that","they can recover their costs in the","wholesale market. It is therefore critical to","ensure that, as far as possible,","administrative and implicit price caps are","removed to allow scarcity prices to","increase up to the value of lost load. When","fully embedded in the market structure,","short-term markets and scarcity pricing","will contribute to the removal of other","measures, such as capacity mechanisms, to","ensure security of supply. At the same","time, scarcity pricing without price caps on","the wholesale market should not jeopardize","the possibility for reliable and stable prices","for final customers, in particular","households and SMEs."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"143","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Patrizia Toia, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-144","location":[[" Proposal for a regulation","Recital 10"]],"meps":[124826,124870,124739,124735,28340,124699,125041,125044],"meta":{"created":"2020-11-15T15:52:07"},"new":["(10) Short-term markets will improve","liquidity and competition by enabling more","resources to participate fully in the market,","especially those that are more flexible.","Effective scarcity pricing will encourage","market participants to react to market","signals and to be available when the","market most needs it and ensures that they","can recover their costs in the wholesale","market. It is therefore critical to ensure that","administrative and implicit price caps are","removed to allow scarcity pricing. When","fully embedded in the market structure,","short-term markets and scarcity pricing","will contribute to the removal of other","market distortive measures, such as","capacity mechanisms, to ensure security of","supply. At the same time, scarcity pricing","without price caps on the wholesale market","should not jeopardize the possibility for","reliable and stable prices for final","customers, in particular households and","SMEs."],"old":["(10) Short-term markets will improve","liquidity and competition by enabling more","resources to participate fully in the market,","especially those that are more flexible.","Effective scarcity pricing will encourage","market participants to be available when","the market most needs it and ensures that","they can recover their costs in the","wholesale market. It is therefore critical to","ensure that, as far as possible,","administrative and implicit price caps are","removed to allow scarcity prices to","increase up to the value of lost load. When","fully embedded in the market structure,","short-term markets and scarcity pricing","will contribute to the removal of other","measures, such as capacity mechanisms, to","ensure security of supply. At the same","time, scarcity pricing without price caps on","the wholesale market should not jeopardize","the possibility for reliable and stable prices","for final customers, in particular","households and SMEs."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"144","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Kaja Kallas, Morten Helveg Petersen, Angelika Mlinar, Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-145","location":[[" Proposal for a regulation","Recital 11"]],"meps":[124697,124872,125026,90110],"meta":{"created":"2020-11-15T15:52:07"},"new":["(11) Derogations to fundamental market","principles such as balancing responsibility,","market-based dispatch, or curtailment and","redispatch reduce flexibility signals and act","as barriers to the development of solutions","such as storage, demand response or","aggregation. Broad derogations covering","entire technologies are not consistent with","the objective of achieving market-based","and efficient decarbonisation and should","therefore only be maintained for","installations that were benefiting from","these derogations before the entering into","force of this Regulation in order to avoid","the negative impact of retroactivity","measures. Member states should at the","same time ensure full access to all market","participants to competitive balancing","markets and high transparency of","curtailment and redispatch measures in","order for the energy market to function."],"old":["(11) Derogations to fundamental market","principles such as balancing responsibility,","market-based dispatch, or curtailment and","redispatch reduce flexibility signals and act","","as barriers to the development of solutions","such as storage, demand response or","aggregation. While derogations are still","necessary to avoid unnecessary","administrative burden for certain actors,","in particular households and SMEs,","broad derogations covering entire","technologies are not consistent with the","objective of achieving market-based and","efficient decarbonisation and should thus","be replaced by more targeted measures."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"145","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-146","location":[["Proposal for a regulation","Recital 11"]],"meps":[124706],"meta":{"created":"2020-11-15T15:52:07"},"new":["(11) Derogations to fundamental market","principles such as balancing responsibility,","market-based dispatch, or curtailment and","redispatch reduce flexibility signals and act","as barriers to the development of solutions","such as storage, demand response or","aggregation. Broad derogations covering","entire technologies are not consistent with","the objective of achieving market-based","and efficient decarbonisation and should","thus be replaced by more targeted","measures."],"old":["(11) Derogations to fundamental market","principles such as balancing responsibility,","market-based dispatch, or curtailment and","redispatch reduce flexibility signals and act","as barriers to the development of solutions","such as storage, demand response or","aggregation. While derogations are still","necessary to avoid unnecessary","administrative burden for certain actors,","in particular households and SMEs, broad","derogations covering entire technologies","are not consistent with the objective of","achieving market-based and efficient","decarbonisation and should thus be","replaced by more targeted measures."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"146","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-147","justification":" This is necessary for pressing reasons relating to the internal logic of the text or because the\n amendments are inextricably linked to other admissible amendments","location":[[" Proposal for a regulation","Recital 11 a (new)"]],"meps":[124947,1985],"meta":{"created":"2020-11-15T15:52:07"},"new":["(11a) Contractual long term hedging","offer already exists on the electricity","European market, but such offer is","practically restricted to mid-term hedging","contracts, without exceeding three to four","years. This reflects a market failure","hindering certain operators which request","a long term visibility to ensure the","viability of their business model. This is","particularly true for the electro-intensive","industrial consumers, knowing that they","are in the same time able to contribute","significantly to balancing the electricity","market and to managing efficiently the","transportation system, notably through","demand side response. Long term supply","contracts offer can cope with a market","failure."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"147","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Eugen Freund, Patrizia Toia, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-148","justification":"This amendment is intrinsically linked to other amendments tabled to provisions which have\nbeen modified by the Commission","location":[[" Proposal for a regulation","Recital 12"]],"meps":[124826,124870,124739,124735,125018,28340,124699,125041,125044],"meta":{"created":"2020-11-15T15:52:07"},"new":["(12) The precondition for effective","competition in the internal market in","electricity is non-discriminatory,","transparent and adequate charges for","network use including interconnecting","lines in the transmission system. The","available capacity of those lines should be","set at the maximum levels consistent with","the safety standards of secure network","operation."],"old":["(12) The precondition for effective","competition in the internal market in","electricity is non-discriminatory and","transparent charges for network use","including interconnecting lines in the","","transmission system. The available","capacity of those lines should be set at the","maximum levels consistent with the safety","standards of secure network operation."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"148","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-149","justification":"Ensures that energy storage is recognised as a new energy asset class in EU law.","location":[["Proposal for a regulation","Recital 14"]],"meps":[90110],"meta":{"created":"2020-11-15T15:52:07"},"new":["(14) To efficiently steer necessary","investments, prices also need to provide","signals where electricity is most needed. In","a zonal electricity system, correct","locational signals require a coherent,","objective and reliable determination of","bidding zones via a transparent process. In","order to ensure efficient operation and","planning of the Union electricity network","and to provide effective price signals for","new generation capacity, demand response,","energy storage or transmission","infrastructure, bidding zones should reflect","structural congestion. In particular, cross-","zonal capacity should not be reduced in","order to resolve internal congestion."],"old":["(14) To efficiently steer necessary","investments, prices also need to provide","signals where electricity is most needed. In","a zonal electricity system, correct","locational signals require a coherent,","objective and reliable determination of","bidding zones via a transparent process. In","order to ensure efficient operation and","planning of the Union electricity network","and to provide effective price signals for","new generation capacity, demand response","or transmission infrastructure, bidding","zones should reflect structural congestion.","In particular, cross-zonal capacity should","not be reduced in order to resolve internal","congestion."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"149","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-150","location":[[" Proposal for a regulation","Recital 14"]],"meps":[2278],"meta":{"created":"2020-11-15T15:52:07"},"new":["(14) To efficiently steer necessary","investments, prices also need to provide","signals where electricity is most needed. In","a zonal electricity system, correct","locational signals require a coherent,","objective and reliable determination of","bidding zones via a transparent process. In","order to ensure efficient operation and","planning of the Union electricity network","and to provide effective price signals for","new generation capacity, demand response,","energy storage or transmission","infrastructure, bidding zones should reflect","structural congestion. In particular, cross-","zonal capacity should not be reduced in","order to resolve internal congestion."],"old":["(14) To efficiently steer necessary","investments, prices also need to provide","signals where electricity is most needed. In","a zonal electricity system, correct","locational signals require a coherent,","objective and reliable determination of","bidding zones via a transparent process. In","order to ensure efficient operation and","planning of the Union electricity network","and to provide effective price signals for","new generation capacity, demand response","or transmission infrastructure, bidding","zones should reflect structural congestion.","In particular, cross-zonal capacity should","not be reduced in order to resolve internal","congestion."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"150","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Jens Geier, Eugen Freund, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-151","location":[[" Proposal for a regulation","Recital 14"]],"meps":[124826,124870,124739,124735,96833,125018,124699,125041,125044],"meta":{"created":"2020-11-15T15:52:07"},"new":["(14) To efficiently steer necessary","investments, prices also need to provide","signals where electricity is most needed. In","a zonal electricity system, correct","locational signals require a coherent,","objective and reliable determination of","bidding zones via a transparent process","involving all relevant stakeholders. In","order to ensure efficient operation and","planning of the Union electricity network","and to provide effective price signals for","new generation capacity, demand response","or transmission infrastructure, bidding","zones should be as stable, liquid and large","as possible also taking into account","structural congestion."],"old":["(14) To efficiently steer necessary","investments, prices also need to provide","signals where electricity is most needed. In","a zonal electricity system, correct","locational signals require a coherent,","objective and reliable determination of","bidding zones via a transparent process. In","order to ensure efficient operation and","planning of the Union electricity network","and to provide effective price signals for","new generation capacity, demand response","or transmission infrastructure, bidding","zones should reflect structural congestion.","","In particular, cross-zonal capacity should","not be reduced in order to resolve internal","congestion."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"151","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Martina Werner, Peter Kouroumbashev, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Eugen Freund, Patrizia Toia, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-152","location":[["Proposal for a regulation","Recital 15"]],"meps":[124826,124857,124870,124739,124735,125018,28340,124699,125041,125044],"meta":{"created":"2020-11-15T15:52:07"},"new":["(15) Efficient decarbonisation of the","electricity system via market integration of","renewable energy and the increase of","flexibility sources such as flexible","generation, interconnection, demand","response or storage requires large, liquid","and stable bidding zones and","systematically abolishing barriers to cross-","border trade to overcome market","fragmentation and to allow Union energy","customers to fully benefit from the","advantages of integrated electricity markets","and competition."],"old":["(15) Efficient decarbonisation of the","electricity system via market integration","requires systematically abolishing barriers","to cross-border trade to overcome market","fragmentation and to allow Union energy","customers to fully benefit from the","advantages of integrated electricity markets","and competition."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"152","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Pervenche Ber\u00e8s, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-153","justification":" Electricity market should give incentives and a secure environment to invest.","location":[["Proposal for a regulation","Recital 15"]],"meps":[1985,124947],"meta":{"created":"2020-11-15T15:52:07"},"new":["(15) Efficient decarbonisation of the","electricity system via market integration","requires systematically abolishing barriers","to cross-border trade to overcome market","fragmentation and to allow Union energy","customers to fully benefit from the","advantages of integrated electricity markets","and competition. It also requires to set up","a complementary secure environment for","capital intensive long term investment in","clean energy."],"old":["(15) Efficient decarbonisation of the","electricity system via market integration","requires systematically abolishing barriers","to cross-border trade to overcome market","fragmentation and to allow Union energy","","customers to fully benefit from the","advantages of integrated electricity markets","and competition."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"153","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Patrizia Toia, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-154","location":[[" Proposal for a regulation","Recital 15 a (new)"]],"meps":[124826,124870,124739,124735,28340,124699,125041,125044],"meta":{"created":"2020-11-15T15:52:07"},"new":["(15a) According to the modelling of the","European Commission, reaching the","EU\u2019s 2030 climate and energy targets in a","cost-effective way would imply a reduction","in the use of coal in power generation by","65 percent and a decommissioning of","roughly half of the current coal fleet [EU","COM 2011, Impact Assessment on EU","2050 Roadmap, \u201cDiversified technologies","scenarios\u201d]."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"154","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Eugen Freund, Patrizia Toia, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-155","location":[[" Proposal for a regulation","Recital 15 b (new)"]],"meps":[124826,124870,124739,124735,125018,28340,124699,125041,125044,124947],"meta":{"created":"2020-11-15T15:52:07"},"new":["(15b) It is crucial to put in place an","enabling framework for a just transition","towards a decarbonised and flexible","electricity system. A long-term and","consensual framework for the progressive","phase-out of carbon-intensive and","inflexible generation capacity at national","level will allow for a just and gradual","transition for employees and regions, for","power plant and mining operators and for","investors."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"155","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-156","location":[["Proposal for a regulation","Recital 15 c (new)"]],"meps":[124826,124870,124739,124735,124699,125041,125044],"meta":{"created":"2020-11-15T15:52:07"},"new":["(15c) A long-term and consensual","framework allows Member States to plan","ahead at national level for the structural","social and economic changes associated","with the progressive phase-out of coal for","power-generation, since the EU ETS is","only addressing cost-effective reductions","of greenhouse gas emissions from the","power sector, but not the broader social","and economic changes associated with","retiring coal-generating capacity,","particularly where linked to mining","activities."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"156","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula\u2013Natri, Eugen Freund, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-157","location":[["Proposal for a regulation","Recital 15 d (new)"]],"meps":[124826,124870,124739,124735,125018,124699,125041,125044],"meta":{"created":"2020-11-15T15:52:07"},"new":["(15d) The managed and planned","retirement of coal-fired capacity would","help to improve the functioning of","electricity markets, in addition to benefits","for health, clean air and climate","protection. The European institutions","should support Member States that decide","to actively phase down or phase out coal-","fired generation, assisting them with the","management of the economic and societal","costs, particularly for Member States with","low GDP per capita."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"157","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-158","justification":" This amendment is intrinsically linked to other amendments tabled to provisions which have\n been modified by the Commission","location":[[" Proposal for a regulation","Recital 17"]],"meps":[124826,124870,124739,124735,124699,125041,125044],"meta":{"created":"2020-11-15T15:52:07"},"new":["(17) The management of congestion","problems should provide correct economic","signals to transmission system operators","and market participants and should be","based on market mechanisms. The","measures to overcome congestions","problems should not negatively impact the","liquidity of trade in wholesale markets."],"old":["(17) The management of congestion","problems should provide correct economic","signals to transmission system operators","and market participants and should be","based on market mechanisms."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"158","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-159","location":[["Proposal for a regulation","Recital 24"]],"meps":[124826,124870,124739,124735,124699,125041,125044],"meta":{"created":"2020-11-15T15:52:07"},"new":["(24) To better ensure optimum","investment in the trans-European grid and","address the challenge where viable","interconnection projects cannot be built for","lack of prioritisation at national level, the","use of congestion rents should be used to","guarantee availability and maintain or","increase interconnection capacities."],"old":["(24) To better ensure optimum","investment in the trans-European grid and","address the challenge where viable","interconnection projects cannot be built for","lack of prioritisation at national level, the","use of congestion rents should be","reconsidered and only allowed in order to","guarantee availability and maintain or","increase interconnection capacities."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"159","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Martina Werner, Carlos Zorrinho, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-474","location":[["Proposal for a regulation","Article 10"]],"meps":[124826,124739,124699],"meta":{"created":"2019-07-03T06:30:31"},"new":["Article 10 deleted","Value of lost load"],"old":["1. By [OP: one year after entry into force]","Member States shall establish a single","estimate of the Value of Lost Load (VoLL)","for their territory, expressed in \u20ac/MWh.","That estimate shall be reported to the","Commission and made publically","available. Member States may establish","different VoLL per bidding zone if they","have several bidding zones in their","territory. In establishing VoLL, Member","States shall apply the methodology","developed pursuant to Article 19(5).","2. Member States shall update their","estimate at least every five years."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"474","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski, Edward Czesak","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-475","location":[["Proposal for a regulation","Article 10 \u2013 paragraph 1"]],"meps":[124891,132925],"meta":{"created":"2019-07-03T06:30:31"},"new":["1. By [OP: one year after entry into","force] Member States shall establish a","single estimate of the Value of Lost Load","(VoLL) for their territory, expressed in","\u20ac/MWh. That estimate shall take into","account economic conditions of","consumers (eg. GDP per capita) and shall","be reported to the Commission and made","publically available. Member States may","establish different VoLL per bidding zone","if they have several bidding zones in their","territory. Member States may establish","different VoLL per group of similar","consumers. In establishing VoLL, Member","States shall apply the methodology","developed pursuant to Article 19(5)."],"old":["1. By [OP: one year after entry into","force] Member States shall establish a","single estimate of the Value of Lost Load","(VoLL) for their territory, expressed in","\u20ac/MWh. That estimate shall be reported to","the Commission and made publically","available. Member States may establish","different VoLL per bidding zone if they","have several bidding zones in their","territory. In establishing VoLL, Member","","States shall apply the methodology","developed pursuant to Article 19(5)."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"475","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Jens Geier, Eugen Freund, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-160","location":[["Proposal for a regulation","Recital 26"]],"meps":[124826,124870,124739,124735,96833,125018,124699,125041,125044],"meta":{"created":"2020-11-15T15:52:07"},"new":["(26) A robust methodology for the long-","term Union level resource adequacy","assessment should be carried out by the","ENTSO for Electricity to provide an","objective basis for the assessment of","adequacy concerns at the Union, regional","and Member State level. The resource","adequacy concern that capacity","mechanisms address should be based on","the EU assessment. Capacity mechanisms","should only be allowed to be introduced if","the Union level resource adequacy","assessment has identified adequacy","concerns."],"old":["(26) A robust medium to long-term","Union level resource adequacy assessment","should be carried out by the ENTSO for","Electricity to provide an objective basis for","the assessment of adequacy concerns. The","resource adequacy concern that capacity","mechanisms address should be based on","the EU assessment."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"160","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-476","location":[[" Proposal for a regulation","Article 10 \u2013 paragraph 1"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:31"},"new":["1. By [OP: one year after entry into","force] Member States shall establish a","single estimate of the Value of Lost Load","(VoLL) for each of the bidding zones","situated on their territory, expressed in","\u20ac/MWh. Where bidding zones cover more","than one Member State, all Member","States involved shall agree on a single","estimate. That estimate shall be reported to","the Commission and made publically","available. Member States may establish","different VoLL per bidding zone if they","have several bidding zones in their","territory. In establishing VoLL, Member","States shall apply the methodology","developed pursuant to Article 19(5)."],"old":["1. By [OP: one year after entry into","force] Member States shall establish a","single estimate of the Value of Lost Load","(VoLL) for their territory, expressed in","\u20ac/MWh. That estimate shall be reported to","the Commission and made publically","available. Member States may establish","different VoLL per bidding zone if they","have several bidding zones in their","territory. In establishing VoLL, Member","States shall apply the methodology","developed pursuant to Article 19(5)."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"476","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Massimiliano Salini, Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-161","location":[[" Proposal for a regulation","Recital 27"]],"meps":[125670,36392],"meta":{"created":"2020-11-15T15:52:07"},"new":["(27) The medium to long-term resource","adequacy assessment (from 10 year-ahead","to year-ahead) set out in this regulation has","a different purpose than the seasonal","outlooks (six months ahead) as set out in","Article 9 [Regulation on risk preparedness","as proposed by COM(2016) 862].","Medium- to long-term assessments are","mainly used to assess the resource","adequacy at EU level based on national","assessments whereas seasonal outlooks are","used to alert to risks that might occur in the","following six months that are likely to","result in a significant deterioration of the","electricity supply situation. In addition,","Regional Coordination Centres also carry","out regional adequacy assessments as","defined in European legislation on","electricity transmission system operation.","These are very short-term adequacy","assessments (from weak-ahead to day-","ahead) used in the context of system","operation."],"old":["(27) The medium to long-term resource","adequacy assessment (from 10 year-ahead","to year-ahead) set out in this regulation has","a different purpose than the seasonal","outlooks (six months ahead) as set out in","Article 9 [Regulation on risk preparedness","as proposed by COM(2016) 862].","Medium- to long-term assessments are","mainly used to assess the need for capacity","mechanisms whereas seasonal outlooks are","used to alert to risks that might occur in the","following six months that are likely to","result in a significant deterioration of the","electricity supply situation. In addition,","Regional Operational Centres also carry","out regional adequacy assessments as","defined in European legislation on","electricity transmission system operation.","These are very short-term adequacy","assessments (from weak-ahead to day-","ahead) used in the context of system","operation."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"161","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Kaja Kallas, Morten Helveg Petersen, Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-477","location":[[" Proposal for a regulation","Article 10 \u2013 paragraph 1"]],"meps":[124697,124872,90110],"meta":{"created":"2019-07-03T06:30:31"},"new":["1. By [OP: one year after entry into","force] Member states shall establish a","single estimate of the Value of Lost Load","(VoLL) for their territory, expressed in","\u20ac/MWh. In case of cross-border bidding","zones, Member states shall establish a","common estimate of the VoLL. These","estimates shall be reported to the","Commission and made publically","available. Member States may establish","different VoLL per bidding zone if they","have several bidding zones in their","territory. In establishing VoLL, Member","States shall apply the methodology","developed pursuant to Article 19(5)."],"old":["1. By [OP: one year after entry into","force] Member States shall establish a","single estimate of the Value of Lost Load","(VoLL) for their territory, expressed in","\u20ac/MWh. That estimate shall be reported to","the Commission and made publically","available. Member States may establish","different VoLL per bidding zone if they","have several bidding zones in their","territory. In establishing VoLL, Member","States shall apply the methodology","developed pursuant to Article 19(5)."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"477","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-162","location":[[" Proposal for a regulation","Recital 27"]],"meps":[124826,124870,124739,124735,124699,125041,125044],"meta":{"created":"2020-11-15T15:52:07"},"new":["(27) The methodology for the long-term","resource adequacy assessment (from 10","year-ahead to year-ahead) set out in this","regulation has a different purpose than the","seasonal outlooks (six months ahead) as set","out in Article 9 [Regulation on risk","preparedness as proposed by COM(2016)","862].Medium- to long-term assessments","are mainly used to identify adequacy","concerns whereas seasonal outlooks are","used to alert to short-term risks that might","occur in the following six months that are","likely to result in a significant deterioration","of the electricity supply situation. In","addition, Regional Coordination Centres","also carry out regional adequacy","assessments as defined in European","legislation on electricity transmission","system operation. These are very short-","term adequacy assessments (from weak-","ahead to day-ahead) used in the context of","system operation."],"old":["(27) The medium to long-term resource","adequacy assessment (from 10 year-ahead","to year-ahead) set out in this regulation has","a different purpose than the seasonal","outlooks (six months ahead) as set out in","","Article 9 [Regulation on risk preparedness","as proposed by COM(2016) 862].","Medium- to long-term assessments are","mainly used to assess the need for capacity","mechanisms whereas seasonal outlooks are","used to alert to risks that might occur in the","following six months that are likely to","result in a significant deterioration of the","electricity supply situation. In addition,","Regional Operational Centres also carry","out regional adequacy assessments as","defined in European legislation on","electricity transmission system operation.","These are very short-term adequacy","assessments (from weak-ahead to day-","ahead) used in the context of system","operation."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"162","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-478","justification":"It is unclear why Member State should be responsible for establishment of VoLL while\naccording to article 19 para 5 ENTSO-E will be responsible for development of methodology\nfor calculation of VoLL. We propose to directly specify that under Member State\u00b4s\n\n responsibility the TSO will be setting VoLL, or possibly another entity. Such requirement may\n be upon approval of competent authority (Ministry, NRA).","location":[["Proposal for a regulation","Article 10 \u2013 paragraph 1"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:31"},"new":["1. By [OP: one year after entry into","force] Member States or by the Member","States designated authority shall establish","a single estimate of the Value of Lost Load","(VoLL) for their territory, expressed in","\u20ac/MWh. That estimate shall be reported to","the Commission and made publically","available. Member States may establish","different VoLL per bidding zone if they","have several bidding zones in their","territory. In establishing VoLL, Member","States shall apply the methodology","developed pursuant to Article 19(5)."],"old":["1. By [OP: one year after entry into","force] Member States shall establish a","single estimate of the Value of Lost Load","(VoLL) for their territory, expressed in","\u20ac/MWh. That estimate shall be reported to","the Commission and made publically","available. Member States may establish","different VoLL per bidding zone if they","have several bidding zones in their","territory. In establishing VoLL, Member","States shall apply the methodology","developed pursuant to Article 19(5)."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"478","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Fulvio Martusciello","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-163","location":[["Proposal for a regulation","Recital 28"]],"meps":[124828],"meta":{"created":"2020-11-15T15:52:07"},"new":["(28) Member States should assess","regulatory distortions contributing to the","related resource adequacy concern. They","should be required to adopt measures to","eliminate the identified distortions","including a timeline for their","implementation."],"old":["(28) Prior to introducing capacity","mechanisms, Member States should assess","regulatory distortions contributing to the","related resource adequacy concern. They","should be required to adopt measures to","eliminate the identified distortions","including a timeline for their","implementation. Capacity mechanisms","should only be introduced for the residual","concerns that cannot be addressed","through removing such distortions."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"163","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-479","location":[[" Proposal for a regulation","Article 10 \u2013 paragraph 1"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:31"},"new":["1. By [OP: one year after entry into","force] Member States or by the Member","state designated authority shall establish a","single estimate of the Value of Lost Load","(VoLL) for their territory, expressed in","\u20ac/MWh. That estimate shall be reported to","the Commission and made publically","available. Member States may establish","different VoLL per bidding zone if they","have several bidding zones in their","territory. In establishing VoLL, Member","States shall apply the methodology","developed pursuant to Article 19(5)."],"old":["1. By [OP: one year after entry into","force] Member States shall establish a","single estimate of the Value of Lost Load","(VoLL) for their territory, expressed in","\u20ac/MWh. That estimate shall be reported to","the Commission and made publically","available. Member States may establish","different VoLL per bidding zone if they","have several bidding zones in their","territory. In establishing VoLL, Member","States shall apply the methodology","developed pursuant to Article 19(5)."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"479","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Eugen Freund, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-164","location":[[" Proposal for a regulation","Recital 28"]],"meps":[124826,124870,124739,124735,125018,124699,125041,125044],"meta":{"created":"2020-11-15T15:52:07"},"new":["(28) Prior to introducing capacity","mechanisms to overcome any adequacy","concerns identified by the Union level","resource adequacy assessment, Member","States should assess regulatory distortions","contributing to the related resource","adequacy concern. They should be required","to draw up an implementation plan and","adopt concrete measures on how to","eliminate the identified distortions. The","implementation plan should be made","public and should be regularly reviewed","by the Commission and the Agency."],"old":["(28) Prior to introducing capacity","mechanisms, Member States should assess","regulatory distortions contributing to the","related resource adequacy concern. They","should be required to adopt measures to","eliminate the identified distortions","including a timeline for their","implementation. Capacity mechanisms","should only be introduced for the residual","concerns that cannot be addressed","through removing such distortions."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"164","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-480","location":[[" Proposal for a regulation","Article 10 \u2013 paragraph 1 a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:31"},"new":["1 a. By way of derogation from","paragraph 1, Member States may choose","to delegate to system operators the task to","act as default balance responsible party","for generating installations using","renewable energy sources. In this case,","system operators shall be allowed by","national regulatory authorities to recover","their costs in network tariffs."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"480","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Angelika Niebler, Sven Schulze","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-481","justification":"Article 194 of the Treaty on the Functioning of the European Union lays down that decisions\non conditions for exploiting energy resources, choosing between different energy sources and\nthe general energy-supply structure are a matter for Member States alone. Dispatching\ndecisions do not therefore come within the European Union\u2019s remit.","location":[["Proposal for a regulation","Article 11"]],"meps":[124809],"meta":{"created":"2019-07-03T06:30:31"},"new":["deleted"],"old":["[...]"],"orig_lang":"de","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"481","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Massimiliano Salini, Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-165","location":[[" Proposal for a regulation","Recital 28"]],"meps":[125670,36392],"meta":{"created":"2020-11-15T15:52:07"},"new":["(28) Prior to introducing capacity","mechanisms, Member States should assess","regulatory and market distortions","contributing to the related resource","adequacy concern. They should be required","to draw up an implementation plan with","concrete measures to address the effects of","the identified distortions. The","implementation plan should be made","public and should be regularly reviewed","by the Commission and the Agency."],"old":["(28) Prior to introducing capacity","mechanisms, Member States should assess","regulatory distortions contributing to the","related resource adequacy concern. They","should be required to adopt measures to","eliminate the identified distortions","including a timeline for their","implementation. Capacity mechanisms","should only be introduced for the residual","concerns that cannot be addressed","through removing such distortions."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"165","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Rebecca Harms, Jakop Dalunde, Reinhard B\u00fctikofer, Davor \u0160krlec, Yannick Jadot, Michel Reimon, Benedek J\u00e1vor, Florent Marcellesi on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-482","justification":" Priority dispatch is an important tool to ensure that renewable energy is used as it is\n produced and thus helps to achieve our climate targets, as well as continues to provide a\n stable investment framework for future projects, in line with the provisions of the current\n renewable energy directive (Directive 2009/28/EC).","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 1"]],"meps":[28233,183338,96739,124756,96740,124935,124721,26146],"meta":{"created":"2019-07-03T06:30:32"},"new":["1. Member States shall ensure that","when dispatching electricity-generating","installations, transmission system","operators shall give priority to generating","installations using variable renewable","energy sources in so far as the secure","operation of the national electricity system","permits and based on transparent and","non-discriminatory criteria."],"old":["1. Dispatching of power generation","facilities and demand response shall be","non-discriminatory and market based","unless otherwise provided under","paragraphs 2 to 4."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"482","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Eugen Freund, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-166","location":[["Proposal for a regulation","Recital 28 a (new)"]],"meps":[124826,124870,124739,124735,125018,124699,125041,125044],"meta":{"created":"2020-11-15T15:52:07"},"new":["(28a) Member States should only","introduce capacity mechanisms as a last","resort, where adequacy concerns cannot","be addressed through the removal of","existing market distortions. Before","introducing a capacity mechanism which","operates within the electricity market and","therefore is market-distortive, Member","States should evaluate whether strategic","reserves would be sufficient to address","their adequacy concerns. Strategic","reserves are less distortive since they","operate only outside the market and only","in rare cases when markets can no longer","clear, which would lead to financial","consequences to market operators not","fulfilling their balancing responsibilities","and consequently bear a significant cost."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"166","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-483","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 1"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:32"},"new":["1. Dispatching of power generation","facilities and demand response shall be","non-discriminatory taking into account","system costs and be market based unless","otherwise provided under paragraphs 2 to","4."],"old":["1. Dispatching of power generation","facilities and demand response shall be","non-discriminatory and market based","unless otherwise provided under","paragraphs 2 to 4."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"483","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Martina Werner, Peter Kouroumbashev, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-167","location":[["Proposal for a regulation","Recital 29"]],"meps":[124826,124857,124870,124739,124735,124699,125041,125044],"meta":{"created":"2020-11-15T15:52:07"},"new":["(29) Member States intending to","introduce capacity mechanisms should","derive resource adequacy targets following","a transparent and verifiable process.","National regulatory authorities should set","the required level of security of supply."],"old":["(29) Member States intending to","introduce capacity mechanisms should","derive resource adequacy targets following","a transparent and verifiable process.","Member States should have the freedom","to set their own desired level of security of","supply."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"167","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-484","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 1"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:32"},"new":["1. Dispatching of power generation","facilities, energy storage facilities and","demand response shall be non-","discriminatory and market based unless","otherwise provided under paragraphs 2 to","4."],"old":["1. Dispatching of power generation","facilities and demand response shall be","non-discriminatory and market based","unless otherwise provided under","paragraphs 2 to 4."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"484","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-762","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 8"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:31"},"new":["8. Regulatory authorities shall provide","incentives to distribution system operators","to procure services for the operation and","development of their networks and","integrate innovative solutions in the","distribution systems. For that purpose","regulatory authorities shall recognise as","eligible and include all relevant costs in","distribution tariffs and introduce","performance targets in order to incentivise","distribution system operators to raise","efficiencies, including energy efficiency, in","their networks. DSOs and TSOs shall be","entitled to approve flexibility services that","secure grid stability via network operating","resources, i.e. costs for procuring such","flexibility services or building and","operating a storage installation providing","the needed flexibility must be considered","as grid infrastructure and must be treated","equally as investments in grid expansion."],"old":["8. Regulatory authorities shall provide","incentives to distribution system operators","to procure services for the operation and","development of their networks and","integrate innovative solutions in the","distribution systems. For that purpose","regulatory authorities shall recognise as","eligible and include all relevant costs in","distribution tariffs and introduce","performance targets in order to incentivise","distribution system operators to raise","efficiencies, including energy efficiency, in","their networks."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"762","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Massimiliano Salini, Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-168","location":[[" Proposal for a regulation","Recital 30"]],"meps":[125670,36392],"meta":{"created":"2020-11-15T15:52:07"},"new":["(30) Main principles of capacity","mechanisms are laid down, building on the","environmental and energy State aid","principles and the findings of DG","Competition's Sector Inquiry on capacity","mechanisms. Capacity mechanisms already","in place were approved in light of these","principles. The application of the State aid","control rules pursuant to Articles 107 to","109 TFUE must be complied with at all","times."],"old":["(30) Main principles of capacity","mechanisms should be laid down, building","on the environmental and energy State aid","principles and the findings of DG","Competition's Sector Inquiry on capacity","mechanisms. Capacity mechanisms already","in place should be reviewed in light of","these principles. In case the European","resource adequacy assessment reveals the","absence of any adequacy concern, no new","capacity mechanism should be established","and no new capacity commitments under","mechanisms already in place should be","made. The application of the State aid","control rules pursuant to Articles 107 to","109 TFUE must be complied with at all","times."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"168","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1117","justification":"This AM is intrinsically linked to the provisions of the ACER Regulation, as well as several\nprovisions on monitoring and control functions of the Agency in this Regulation, such as for\nexample in Article 29 or 19 (6).","location":[["Proposal for a regulation","Article 25 \u2013 paragraph 1"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:32"},"new":["1. Transmission system operators","shall cooperate at Union level through the","ENTSO for Electricity, in order to promote","the completion and functioning of the","internal market in electricity and cross-","border trade and to ensure the optimal","management, coordinated operation and","sound technical evolution of the European","electricity transmission network under the","supervision of the Agency."],"old":["1. Transmission system operators","shall cooperate at Union level through the","ENTSO for Electricity, in order to promote","the completion and functioning of the","internal market in electricity and cross-","border trade and to ensure the optimal","management, coordinated operation and","sound technical evolution of the European","electricity transmission network."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1117","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-485","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 1"]],"meps":[90110],"meta":{"created":"2019-07-03T06:30:32"},"new":["1. Dispatching of power generation","facilities, energy storage facilities and","demand response shall be non-","discriminatory and market based unless","otherwise provided under paragraphs2 to","4."],"old":["1. Dispatching of power generation","facilities and demand response shall be","non-discriminatory and market based","unless otherwise provided under","paragraphs 2 to 4."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"485","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Hans-Olaf Henkel","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-763","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 8"]],"meps":[124823],"meta":{"created":"2019-07-03T06:30:31"},"new":["8. Regulatory authorities shall provide","incentives to distribution system operators","to procure services for the operation and","development of their networks and","integrate innovative solutions in the","distribution systems. For that purpose","regulatory authorities shall recognise as","eligible and include all relevant costs in","distribution tariffs and introduce","performance targets in order to incentivise","distribution system operators to raise","efficiencies, including energy efficiency, in","their networks. DSOs and TSOs shall be","allowed to approve flexibility services that","secure grid stability via network operating","resources. Costs for procuring such","flexibility services or building and","operating storage installation providing","the needed flexibility must be considered","as grid infrastructure and must be treated","equally as investments in grid expansion."],"old":["8. Regulatory authorities shall provide","incentives to distribution system operators","to procure services for the operation and","development of their networks and","integrate innovative solutions in the","distribution systems. For that purpose","","","regulatory authorities shall recognise as","eligible and include all relevant costs in","distribution tariffs and introduce","performance targets in order to incentivise","distribution system operators to raise","efficiencies, including energy efficiency, in","their networks."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"763","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1118","justification":" With existing and new tasks conferred to ENTSO-E through this Regulation (for example\n according to Article 27), transparency and accountability of the body must be increased to\n ensure that functions are carried out independent from national or commercial interests.","location":[["Proposal for a regulation","Article 25 \u2013 paragraph 2"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:32"},"new":["2. In performing its functions under","EU law, the ENTSO for Electricity shall","act for the European good and independent","from individual national interests or the","national interests of transmission system","operators, and shall contribute to the","efficient and sustainable achievement of","the objectives set out in the policy","framework for climate and energy covering","the period from 2020 to 2030, in particular","by contributing to the efficient integration","of electricity generated from renewable","energy sources and to increases in energy","efficiency. In particular, it shall ensure","that the mobilisation of human resources","from national transmission system","operators does not trigger situations of","conflict of interest. The Agency shall be","responsible to monitor the compliance of","the ENTSO for Electricity with the","principles outlined in this Article."],"old":["2. In performing its functions under","EU law, the ENTSO for Electricity shall","act for the European good and independent","from individual national interests or the","national interests of transmission system","operators, and shall contribute to the","efficient and sustainable achievement of","the objectives set out in the policy","framework for climate and energy covering","the period from 2020 to 2030, in particular","by contributing to the efficient integration","","of electricity generated from renewable","energy sources and to increases in energy","efficiency."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1118","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Fulvio Martusciello","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-169","location":[[" Proposal for a regulation","Recital 30"]],"meps":[124828],"meta":{"created":"2020-11-15T15:52:07"},"new":["(30) Main principles of capacity","mechanisms should be laid down, building","on the environmental and energy State aid","principles and the findings of DG","Competition's Sector Inquiry on capacity","mechanisms. The design of capacity","mechanisms should incorporate long-term","price signals in order to reduce investor","risk and related capital and financing","costs, notably by introducing appropriate","and sufficiently long lead times and","contract durations. The application of the","State aid control rules pursuant to Articles","107 to 109 TFUE must be complied with at","all times."],"old":["(30) Main principles of capacity","mechanisms should be laid down, building","on the environmental and energy State aid","principles and the findings of DG","Competition's Sector Inquiry on capacity","mechanisms. Capacity mechanisms","already in place should be reviewed in","light of these principles. In case the","European resource adequacy assessment","","","reveals the absence of any adequacy","concern, no new capacity mechanism","should be established and no new capacity","commitments under mechanisms already","in place should be made. The application","of the State aid control rules pursuant to","Articles 107 to 109 TFUE must be","complied with at all times."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"169","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-486","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 1"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:32"},"new":["1. Dispatching of power generation","facilities and demand response shall be","non-discriminatory and market based."],"old":["1. Dispatching of power generation","facilities and demand response shall be","non-discriminatory and market based","unless otherwise provided under","paragraphs 2 to 4."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"486","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Kathleen Van Brempt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-764","justification":"The need for innovation in the distribution networks is rightly highlighted. Because DSOs are\nnatural monopolies and regulated businesses, they have to develop these innovative concepts\nunder a certain regulatory framework that incentivises them. Innovative solutions will be\nsuccessful through the close cooperation between DSOs and service providers. DSOs need\ncost efficient incentives for R&D, piloting and the introduction of new technologies into the\noperation of the grid. Regulators should acknowledge that innovative grids will necessarily\ninvest in OPEX and CAPEX and that new technologies may not always be successful and fail.\nA regulation that burdens the risk of failure only on DSOs causes DSOs to avoid the risk of\ninnovation. Therefore it is justified to share the risk of innovation and if needed recognize the\ncosts of failed innovation, because in the end DSOs will also share the benefits of innovation\nwith the customers.","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 8"]],"meps":[5729],"meta":{"created":"2019-07-03T06:30:32"},"new":["8. Regulatory authorities shall provide","incentives to distribution system operators","for innovative solutions in the distribution","network. For that purpose, regulatory","authorities will recognise all the","reasonable costs of the distribution system","operators for innovative solutions. These","include, among others, research and","development, pilot project implementation","and the launch of new technologies, as","well as service contracts that network","operators award for the operation and","development of their networks. These","costs are taken into account by the","distribution network operators in the","distribution tariffs. The regulatory","systems give the distribution network","operators incentives to raise efficiencies,","including energy efficiency in their","networks."],"old":["8. Regulatory authorities shall provide","incentives to distribution system operators","to procure services for the operation and","development of their networks and","integrate innovative solutions in the","distribution systems. For that purpose","regulatory authorities shall recognise as","eligible and include all relevant costs in","distribution tariffs and introduce","performance targets in order to","incentivise distribution system operators to","raise efficiencies, including energy","efficiency, in their networks."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"764","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Patrizia Toia, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-170","location":[["Proposal for a regulation","Recital 30"]],"meps":[124826,124870,124739,124735,28340,124699,125041,125044],"meta":{"created":"2020-11-15T15:52:07"},"new":["(30) Main principles of capacity","mechanisms should be laid down in this","Regulation, building on the environmental","and energy State aid principles and the","findings of DG Competition's Sector","Inquiry on capacity mechanisms. Capacity","mechanisms already in place should be","reviewed in light of these principles. In","case the European resource adequacy","assessment reveals the absence of any","adequacy concern, no new capacity","mechanism should be established and no","new capacity commitments under","mechanisms already in place should be","made. The application of the State aid","control rules pursuant to Articles 107 to","109 TFUE must be complied with at all","times."],"old":["(30) Main principles of capacity","mechanisms should be laid down, building","on the environmental and energy State aid","principles and the findings of DG","Competition's Sector Inquiry on capacity","mechanisms. Capacity mechanisms already","in place should be reviewed in light of","these principles. In case the European","resource adequacy assessment reveals the","absence of any adequacy concern, no new","capacity mechanism should be established","and no new capacity commitments under","mechanisms already in place should be","made. The application of the State aid","control rules pursuant to Articles 107 to","109 TFUE must be complied with at all","times."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"170","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Carolina Punset, Gerben-Jan Gerbrandy","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1119","justification":" ENTSO-e's role is also to ensure sources of flexibility are developed and deployed to the\n benefit of the system.","location":[[" Proposal for a regulation","Article 25 \u2013 paragraph 2"]],"meps":[90110,96940],"meta":{"created":"2019-07-03T06:30:32"},"new":["2. In performing its functions under","EU law, the ENTSO for Electricity shall","act for the European good and independent","from individual national interests or the","national interests of transmission system","operators, and shall contribute to the","efficient and sustainable achievement of","the objectives set out in the policy","framework for climate and energy covering","the period from 2020 to 2030, in particular","by contributing to the efficient integration","of electricity generated from renewable","energy sources in combination with","energy storage and demand response and","to increases in energy efficiency."],"old":["2. In performing its functions under","EU law, the ENTSO for Electricity shall","act for the European good and independent","from individual national interests or the","national interests of transmission system","operators, and shall contribute to the","efficient and sustainable achievement of","the objectives set out in the policy","framework for climate and energy covering","the period from 2020 to 2030, in particular","by contributing to the efficient integration","of electricity generated from renewable","energy sources and to increases in energy","efficiency."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1119","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-765","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 8"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:32"},"new":["8. Regulatory authorities shall provide","incentives to distribution system for the","most efficient operation and development","of their networks and integrate innovative","solutions in the distribution systems,","notably via services procurement,","including reduction of load through","demand side response instead of network","developments and aggregation of storage","for ancillary services. For that purpose","regulatory authorities shall recognise as","eligible and include all relevant costs in","distribution tariffs and introduce","performance targets in order to incentivise","distribution system operators to raise","efficiencies, including energy efficiency,","enable and incentivise reduction of","demand and flexibility in their networks."],"old":["8. Regulatory authorities shall provide","incentives to distribution system operators","to procure services for the operation and","development of their networks and","integrate innovative solutions in the","distribution systems. For that purpose","regulatory authorities shall recognise as","eligible and include all relevant costs in","distribution tariffs and introduce","performance targets in order to incentivise","distribution system operators to raise","efficiencies, including energy efficiency, in","their networks."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"765","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-487","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 1"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:32"},"new":["1. Dispatching of power generation","facilities and demand response shall be","non-discriminatory and market based."],"old":["1. Dispatching of power generation","facilities and demand response shall be","non-discriminatory and market based","unless otherwise provided under","paragraphs 2 to 4."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"487","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Patrizia Toia, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-171","location":[[" Proposal for a regulation","Recital 30 a (new)"]],"meps":[124826,124870,124739,124735,28340,124699,125041,125044],"meta":{"created":"2020-11-15T15:52:07"},"new":["(30a) For the further decarbonisation of","the electricity system and in line with the","2030 climate and energy framework,","capacity mechanisms that operate within","the electricity market should apply an","emission performance standard in line","with the Council conclusions of 16","December 2014 and 25th July2013 where","Member States called for the phase-out of","subsidies for fossil fuels."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"171","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1120","location":[["Proposal for a regulation","Article 25 \u2013 paragraph 2"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:32"},"new":["2. In performing its functions under","EU law, the ENTSO for Electricity shall","act for the European good and independent","from individual national interests or the","national interests of transmission system","operators, and shall contribute to the","efficient and sustainable achievement of","the objectives set out in the policy","framework for climate and energy covering","the period from 2020 to 2030, in particular","by contributing to the efficient integration","of electricity generated from renewable","energy sources combined with demand","response and energy storage and to","increases in energy efficiency."],"old":["2. In performing its functions under","EU law, the ENTSO for Electricity shall","act for the European good and independent","from individual national interests or the","national interests of transmission system","operators, and shall contribute to the","efficient and sustainable achievement of","the objectives set out in the policy","framework for climate and energy covering","the period from 2020 to 2030, in particular","by contributing to the efficient integration","of electricity generated from renewable","energy sources and to increases in energy","efficiency."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1120","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-766","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 8"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:32"},"new":["8. Regulatory authorities may provide","incentives to distribution system operators","to procure services for the operation and","development of their networks and","integrate innovative solutions in the","distribution systems, when such incentives","are deemed to bring relevant benefits for","the consumers and always taking into","account local specificities. For that","purpose regulatory authorities shall","recognise as eligible and include","reasonable and efficient costs in allowed","revenues covered by distribution tariffs and","introduce performance targets in order to","incentivise distribution system operators to","raise efficiencies, including energy","efficiency, in their networks."],"old":["8. Regulatory authorities shall provide","incentives to distribution system operators","to procure services for the operation and","development of their networks and","integrate innovative solutions in the","distribution systems. For that purpose","regulatory authorities shall recognise as","eligible and include all relevant costs in","distribution tariffs and introduce","performance targets in order to incentivise","distribution system operators to raise","efficiencies, including energy efficiency, in","their networks."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"766","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Gunnar H\u00f6kmark","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-488","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 1"]],"meps":[28124],"meta":{"created":"2019-07-03T06:30:32"},"new":["1. Dispatching of power generation","facilities and demand response shall be","non-discriminatory and fully market based."],"old":["1. Dispatching of power generation","facilities and demand response shall be","non-discriminatory and market based","unless otherwise provided under","paragraphs 2 to 4."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"488","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Eugen Freund, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-172","location":[[" Proposal for a regulation","Recital 30 b (new)"]],"meps":[124826,124870,124739,124735,125018,124699],"meta":{"created":"2020-11-15T15:52:07"},"new":["(30b) To allow for a fair transition","towards a low-carbon electricity system,","the emission performance standard","should not apply to strategic reserves that","operate outside the electricity market and","that are only used exceptionally. In this","way the most polluting generating","installations currently regularly operating","on the market could be encouraged to","enter strategic reserves."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"172","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Martina Werner, Flavio Zanonato, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula- Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1121","location":[["Proposal for a regulation","Article 27 \u2013 paragraph 1 \u2013 point a"]],"meps":[124826,124800,124870,124739,124735,124699,125041,125044,124947],"meta":{"created":"2019-07-03T06:30:32"},"new":["(a) elaborate network codes for","technical details of Union legislative acts","providing the general political framework","with a view to achieving the objectives set","out in Article 25."],"old":["(a) elaborate network codes in the","areas set out in Article 55(1) with a view","to achieving the objectives set out in","Article 25 ."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1121","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Eugen Freund, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-767","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 8"]],"meps":[124826,124870,124739,124735,125018,124699,125041,125044,124784],"meta":{"created":"2019-07-03T06:30:32"},"new":["8. Regulatory authorities shall provide","incentives to distribution system operators","for the operation and development of their","networks and integrate innovative solutions","in the distribution systems, including","through the procurement of services. For","that purpose regulatory authorities shall","recognise as eligible and include all","relevant costs in distribution tariffs and","introduce performance targets in order to","incentivise distribution system operators to","raise efficiencies, including energy","efficiency and the digitalisation of the","distribution networks including the","deployment of smart grids and intelligent","metering systems, in their networks."],"old":["8. Regulatory authorities shall provide","incentives to distribution system operators","to procure services for the operation and","development of their networks and","integrate innovative solutions in the","distribution systems. For that purpose","regulatory authorities shall recognise as","eligible and include all relevant costs in","distribution tariffs and introduce","performance targets in order to incentivise","","distribution system operators to raise","efficiencies, including energy efficiency, in","their networks."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"767","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Eugen Freund, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-173","meps":[124826,124870,124739,124735,125018,124699,125041,125044],"meta":{"created":"2020-11-15T15:52:07"},"new":["(31) Detailed rules for facilitating","effective cross-border participation in","capacity mechanisms other than strategic","reserves should be laid down in this","regulation. Transmission system operators","across the borders should facilitate the","participation of interested generators in","capacity mechanisms in other Member","States. Therefore, they should calculate","capacities up to which cross-border","participation would be technically possible","taking into account the interconnection","capacity between the concerned Member","States, enable participation and check","availabilities. National regulatory","authorities should enforce the cross-border","rules in the Member States."],"old":["(31) Detailed rules for facilitating","effective cross-border participation in","capacity mechanisms other than reserve","schemes should be laid down.","Transmission system operators across the","borders should facilitate interested","generators wanting to participate in","capacity mechanisms in other Member","States. Therefore, they should calculate","capacities up to which cross-border","participation would be possible, enable","participation and check availabilities.","National regulatory authorities should","enforce the cross-border rules in the","Member States."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"173","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1122","justification":" This Amendment is linked to the Articles on network codes and the roles for DSOs, notably in\n Article 54 of this Regulation.","location":[[" Proposal for a regulation","Article 27 \u2013 paragraph 1 \u2013 point a"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:33"},"new":["(a) contribute to the elaboration","of network codes in the areas set out in","Article 55(1) with a view to achieving the","objectives set out in Article 25 ."],"old":["(a) elaborate network codes in the","areas set out in Article 55(1) with a view to","achieving the objectives set out in Article","25 ."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1122","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Claude Turmes","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-489","justification":" The inclusion of 4a has to be read in connection with the additional provisions laid out in the\n relevant amendment.","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 1"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:32"},"new":["1. Dispatching of power generation","facilities and demand response shall be","non-discriminatory and market based","unless otherwise provided under","paragraphs 2 to 4a (new)."],"old":["1. Dispatching of power generation","facilities and demand response shall be","non-discriminatory and market based","unless otherwise provided under","paragraphs 2 to 4."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"489","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-174","location":[["Proposal for a regulation","Recital 31"]],"meps":[124706],"meta":{"created":"2020-11-15T15:52:07"},"new":["(31) Detailed rules for facilitating","effective cross-border participation in","capacity mechanisms should be laid down.","Transmission system operators across the","borders should facilitate interested","generators wanting to participate in","capacity mechanisms in other Member","States. Therefore, they should calculate","capacities up to which cross-border","participation would be possible, enable","participation and check availabilities.","National regulatory authorities should","enforce the cross-border rules in the","Member States."],"old":["(31) Detailed rules for facilitating","effective cross-border participation in","capacity mechanisms other than reserve","schemes should be laid down.","Transmission system operators across the","borders should facilitate interested","generators wanting to participate in","capacity mechanisms in other Member","States. Therefore, they should calculate","capacities up to which cross-border","participation would be possible, enable","participation and check availabilities.","National regulatory authorities should","enforce the cross-border rules in the","Member States."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"174","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1123","justification":" These provisions are intrinsically linked to Articles 19 (6) and 29 of this Regulation, as well\n as other Union legislation.","location":[[" Proposal for a regulation","Article 27 \u2013 paragraph 1 \u2013 point b"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:33"},"new":["(b) adopt and publish a non-binding","Union -wide ten-year network","development plan, (Union -wide network","development plan), every two years, based","on independent modelling and","calculations under the supervision of the","Agency, while underlying assumptions,","criteria and indicators are defined by","targets enshrined in EU law, including on","interconnection capacity and greenhouse","gas emissions;The plan shall include","different options, notably a high-","renewables uptake and a high efficiency","scenario;"],"old":["(b) adopt and publish a non-binding","Union -wide ten-year network","development plan, ( Union -wide network","development plan), every two years;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1123","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Kaja Kallas, Pavel Teli\u010dka, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar, Carolina Punset, Gerben-Jan Gerbrandy","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-490","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 1"]],"meps":[124697,124706,124989,124872,125026,90110,96940],"meta":{"created":"2019-07-03T06:30:32"},"new":["1. Dispatching of power generation","facilities and demand response shall be","transparent, non-discriminatory and","market based."],"old":["1. Dispatching of power generation","facilities and demand response shall be","non-discriminatory and market based","unless otherwise provided under","paragraphs 2 to 4."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"490","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Patrizia Toia, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-175","location":[[" Proposal for a regulation","Recital 32"]],"meps":[124826,124870,124739,124735,28340,124699,125041,125044],"meta":{"created":"2020-11-15T15:52:07"},"new":["(32) In view of differences in national","energy systems and technical limitations of","existing electricity networks, the best and","most cost-effective approach to achieving","progress in market integration will often be","at a regional level. Regional cooperation of","transmission system operators should thus","be strengthened. In order to ensure efficient","cooperation, a new regulatory framework","should foresee stronger regional","governance and regulatory oversight,","including by strengthening the decision-","making power of the Agency for cross-","border issues. Closer cooperation of","Member States could be needed also in","crisis situations, to increase security of","supply and limit market distortions."],"old":["(32) In view of differences in national","energy systems and technical limitations of","existing electricity networks, the best","approach to achieving progress in market","integration will often be at a regional level.","Regional cooperation of transmission","system operators should thus be","strengthened. In order to ensure efficient","cooperation, a new regulatory framework","should foresee stronger regional","governance and regulatory oversight,","including by strengthening the decision-","making power of the Agency for cross-","border issues. Closer cooperation of","Member States could be needed also in","crisis situations, to increase security of","supply and limit market distortions."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"175","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Dan Nica, Peter Kouroumbashev, Zigmantas Bal\u010dytis","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-768","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 8"]],"meps":[124784,124857,96680],"meta":{"created":"2019-07-03T06:30:32"},"new":["8. Regulatory authorities shall provide","incentives to distribution system operators","to procure services for the operation and","development of their networks and","integrate innovative solutions in the","distribution systems. For that purpose","regulatory authorities shall recognise as","eligible and include only relevant costs in","distribution tariffs and introduce","performance targets in order to upgrade","existing grids and deploy smart grids in a","transparent way, to incentivise distribution","system operators to raise efficiencies,","including energy efficiency and energy","storage, in their networks."],"old":["8. Regulatory authorities shall provide","incentives to distribution system operators","to procure services for the operation and","development of their networks and","integrate innovative solutions in the","distribution systems. For that purpose","regulatory authorities shall recognise as","eligible and include all relevant costs in","distribution tariffs and introduce","performance targets in order to incentivise","distribution system operators to raise","efficiencies, including energy efficiency, in","their networks."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"768","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1124","location":[["Proposal for a regulation","Article 27 \u2013 paragraph 1 \u2013 point c a (new)"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:33"},"new":["(c a) define the methodology for","calculating future system flexibility","requirements;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1124","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Angelika Niebler, Sven Schulze","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-176","justification":"It is not at all clear how much value would be added by creating regional operational centres.\nThe ENTSO for electricity is an existing grouping of transmission system operators at EU\nlevel. An additional body would result in a disproportionately high administrative and\nbureaucratic burden. Duplicate structures must be avoided. The reference to regional\noperational centres should be deleted from the proposal for a regulation.","location":[[" Proposal for a regulation","Recital 33"]],"meps":[4289,124809],"meta":{"created":"2020-11-15T15:52:07"},"new":["deleted"],"old":["(33) The coordination between","transmission system operators at regional","level has been formalised with the","mandatory participation of transmission","system operators in regional security","coordinators, which should be","complemented by an enhanced","","institutional framework via the","establishment of regional operational","centres. The creation of regional","operational centres should take into","account existing regional coordination","initiatives and support the increasingly","integrated operation of electricity systems","across the Union, ensuring their efficient","and secure performance."],"orig_lang":"de","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"176","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Eva Kaili","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-491","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 1"]],"meps":[125109],"meta":{"created":"2019-07-03T06:30:33"},"new":["1. Dispatching of power generation","facilities and demand response shall be","non-discriminatory and market based","unless otherwise provided under","paragraphs 2 to 5."],"old":["1. Dispatching of power generation","facilities and demand response shall be","non-discriminatory and market based","unless otherwise provided under","paragraphs 2 to 4."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"491","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1125","justification":"These provisions are intrinsically linked to Articles 19 (6) and 29 of this Regulation, as well\nas other Union legislation.","location":[["Proposal for a regulation","Article 27 \u2013 paragraph 1 \u2013 point c a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:33"},"new":["(c a) define the methodology for","calculating future system flexibility","requirements;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1125","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-769","justification":" Existing language only reflects the need to raise efficiencies in the distribution networks.\n Distribution system operators should also be encouraged to promote flexibility in the grid and\n the integration of energy from renewable sources, in accordance with the language used\n Article 59(1)(k) of Recast Directive 2009/72/EC as proposed by COM(2016) 864.","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 8"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:32"},"new":["8. Regulatory authorities shall provide","incentives to distribution system operators","to procure services for the operation and","development of their networks and","integrate innovative solutions in the","distribution systems. For that purpose","regulatory authorities shall recognise as","eligible and include all relevant costs in","distribution tariffs and introduce","performance targets in order to incentivise","distribution system operators to raise","efficiencies, including energy efficiency","and flexibility, in their networks and","promote the integration of energy from","renewable sources."],"old":["8. Regulatory authorities shall provide","incentives to distribution system operators","","to procure services for the operation and","development of their networks and","integrate innovative solutions in the","distribution systems. For that purpose","regulatory authorities shall recognise as","eligible and include all relevant costs in","distribution tariffs and introduce","performance targets in order to incentivise","distribution system operators to raise","efficiencies, including energy efficiency, in","their networks."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"769","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Martina Werner, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-177","location":[["Proposal for a regulation","Recital 33"]],"meps":[124826,124739,124735,124699,124947],"meta":{"created":"2020-11-15T15:52:07"},"new":["(33) The coordination between","transmission system operators at regional","level has been formalised with the","mandatory participation of transmission","system operators in regional security","coordinators pursuant to the multilateral","agreement on regional operational","security coordination. This formalised","coordination between transmission system","operators at regional level should be","transposed to Union legislation within this","Regulation. The regional security","coordinators should be complemented by","an enhanced institutional framework via","their upgrade to regional coordination","centres. The creation of regional","coordination centres should take into","account existing regional coordination","initiatives and support the increasingly","integrated operation of electricity systems","across the Union, ensuring their efficient","and secure performance."],"old":["(33) The coordination between","transmission system operators at regional","level has been formalised with the","mandatory participation of transmission","system operators in regional security","coordinators, which should be","complemented by an enhanced institutional","framework via the establishment of","regional operational centres. The creation","of regional operational centres should take","into account existing regional coordination","initiatives and support the increasingly","integrated operation of electricity systems","across the Union, ensuring their efficient","and secure performance.",""],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"177","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1126","justification":" These provisions are intrinsically linked to Articles 19 (6) and 29 of this Regulation, as well\n as other Union legislation.","location":[["Proposal for a regulation","Article 27 \u2013 paragraph 1 \u2013 point c b (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:33"},"new":["(c b) define guidance for establishing","targets and trajectories for the","development of demand response;"],"old":[""],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1126","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-770","justification":"Existing language only reflects the need to raise efficiencies in the distribution networks.\nDistribution system operators should also be encouraged to promote flexibility in the grid and\nthe integration of energy from renewable sources, in accordance with the language used\nArticle 59(1)(k) of Recast Directive 2009/72/EC as proposed by COM(2016) 864.","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 8"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:32"},"new":["8. Regulatory authorities shall provide","incentives to distribution system operators","to procure services for the operation and","development of their networks and","integrate innovative solutions in the","distribution systems. For that purpose","regulatory authorities shall recognise as","eligible and include all relevant costs in","distribution tariffs and introduce","performance targets in order to incentivise","distribution system operators to raise","efficiencies, including energy efficiency","and flexibility, in their networks and","promote the integration of energy from","renewable sources."],"old":["8. Regulatory authorities shall provide","incentives to distribution system operators","to procure services for the operation and","development of their networks and","integrate innovative solutions in the","distribution systems. For that purpose","regulatory authorities shall recognise as","eligible and include all relevant costs in","distribution tariffs and introduce","performance targets in order to incentivise","distribution system operators to raise","efficiencies, including energy efficiency, in","their networks."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"770","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Kaja Kallas, Pavel Teli\u010dka, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-492","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 2"]],"meps":[124697,124706,124989,124872,125026],"meta":{"created":"2019-07-03T06:30:33"},"new":["deleted"],"old":["2. When dispatching electricity","generating installations, transmission","system operators shall give priority to","generating installations using renewable","energy sources or high-efficiency","cogeneration from small generating","installations or generating installations","using emerging technologies to the","following extent:","(a) generating installations using","","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 500 kW; or","(b) demonstration projects for innovative","technologies."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"492","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-178","justification":" Title of the newly established entity should be changed to \"regional coordination centres\";\n this title should be used throughout the proposal for Regulation.","location":[[" Proposal for a regulation","Recital 33"]],"meps":[124706],"meta":{"created":"2020-11-15T15:52:07"},"new":["(33) The coordination between","transmission system operators at regional","level has been formalised with the","mandatory participation of transmission","system operators in regional security","coordinators, which should be","complemented by an enhanced institutional","framework via the establishment of","regional coordination centres. The creation","of regional coordination centres should be","based on existing regional coordination","initiatives and support the increasingly","integrated operation of electricity systems","across the Union, ensuring their efficient","and secure performance."],"old":["(33) The coordination between","transmission system operators at regional","level has been formalised with the","mandatory participation of transmission","system operators in regional security","coordinators, which should be","complemented by an enhanced institutional","framework via the establishment of","regional operational centres. The creation","of regional operational centres should take","into account existing regional coordination","initiatives and support the increasingly","integrated operation of electricity systems","across the Union, ensuring their efficient","and secure performance."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"178","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Kaja Kallas, Pavel Teli\u010dka, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar, Carolina Punset, Gerben-Jan Gerbrandy","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-771","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 8"]],"meps":[124697,124706,124989,124872,125026,90110,96940],"meta":{"created":"2019-07-03T06:30:32"},"new":["8. Regulatory authorities shall provide","incentives to distribution system operators","to procure services for the operation and","development of their networks and","integrate innovative solutions in the","distribution systems. For that purpose","regulatory authorities shall recognise as","eligible and include all relevant costs in","distribution tariffs and introduce","performance targets in order to incentivise","distribution system operators to raise","efficiencies, including energy efficiency,","digitalisation and flexibility, in their","networks."],"old":["8. Regulatory authorities shall provide","incentives to distribution system operators","to procure services for the operation and","development of their networks and","integrate innovative solutions in the","distribution systems. For that purpose","regulatory authorities shall recognise as","eligible and include all relevant costs in","distribution tariffs and introduce","performance targets in order to incentivise","distribution system operators to raise","efficiencies, including energy efficiency, in","their networks."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"771","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1127","location":[[" Proposal for a regulation","Article 27 \u2013 paragraph 1 \u2013 point c b (new)"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:33"},"new":["(c b) define guidance for establishing","targets and trajectories for the","development of demand response;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1127","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Angelika Niebler, Sven Schulze","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-179","justification":"It is not at all clear how much value would be added by creating regional operational centres.\nThe ENTSO for electricity is an existing grouping of transmission system operators at EU\nlevel. An additional body would result in a disproportionately high administrative and\nbureaucratic burden. Duplicate structures must be avoided.","location":[[" Proposal for a regulation","Recital 34"]],"meps":[4289,124809],"meta":{"created":"2020-11-15T15:52:07"},"new":["deleted"],"old":["(34) The geographical scope of","regional operational centres should allow","them to play an effective coordination role","by optimising the operations of","transmission system operators over larger","regions."],"orig_lang":"de","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"179","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-493","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 2"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:33"},"new":["deleted"],"old":["2. When dispatching electricity","generating installations, transmission","system operators shall give priority to","generating installations using renewable","energy sources or high-efficiency","cogeneration from small generating","installations or generating installations","using emerging technologies to the","following extent:","(a) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 500 kW; or","(b) demonstration projects for innovative","technologies."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"493","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-772","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 8"]],"meps":[90110],"meta":{"created":"2019-07-03T06:30:32"},"new":["8. Regulatory authorities shall provide","incentives to distribution system operators","to procure services for the operation and","development of their networks and","integrate innovative solutions in the","distribution systems. For that purpose","regulatory authorities shall recognise as","eligible and include all relevant costs in","distribution tariffs and introduce","performance targets in order to incentivise","distribution system operators to raise","efficiencies, including energy efficiency","and energy storage, in their networks."],"old":["8. Regulatory authorities shall provide","incentives to distribution system operators","to procure services for the operation and","","development of their networks and","integrate innovative solutions in the","distribution systems. For that purpose","regulatory authorities shall recognise as","eligible and include all relevant costs in","distribution tariffs and introduce","performance targets in order to incentivise","distribution system operators to raise","efficiencies, including energy efficiency, in","their networks."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"772","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1128","location":[[" Proposal for a regulation","Article 27 \u2013 paragraph 1 \u2013 point e"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:33"},"new":["(e) adopt a framework for the","cooperation and coordination between","regional security coordinators;","(This amendment applies throughout the","text.Adopting it will necessitate","corresponding changes throughout)"],"old":["(e) adopt a framework for the","cooperation and coordination between","regional operational centres;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1128","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-180","justification":"Title of the newly established entity should be changed to \"regional coordination centres\";\nthis title should be used throughout the proposal for Regulation.","location":[["Proposal for a regulation","Recital 34"]],"meps":[124706],"meta":{"created":"2020-11-15T15:52:07"},"new":["(34) The geographical scope of regional","coordination centres should allow them to","play an effective coordination role by","optimising the operations of transmission","system operators over larger regions.","Geographically balanced representation","and equitable treatment between members","should be ensured."],"old":["(34) The geographical scope of regional","operational centres should allow them to","play an effective coordination role by","optimising the operations of transmission","system operators over larger regions."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"180","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-494","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 2"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:33"},"new":["deleted"],"old":["2. When dispatching electricity","generating installations, transmission","","system operators shall give priority to","generating installations using renewable","energy sources or high-efficiency","cogeneration from small generating","installations or generating installations","using emerging technologies to the","following extent:","(a) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 500 kW; or","(b) demonstration projects for innovative","technologies."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"494","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Angelika Niebler, Sven Schulze","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1129","justification":"The ENTSO for Electricity should coordinate cooperation between transmission system\noperators as effectively as possible.","location":[[" Proposal for a regulation","Article 27 \u2013 paragraph 1 \u2013 point e"]],"meps":[124809],"meta":{"created":"2019-07-03T06:30:33"},"new":["(e) adopt a framework for cooperation","and coordination between transmission","system operators;"],"old":["(e) adopt a framework for the","cooperation and coordination between","regional operational centres;"],"orig_lang":"de","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1129","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Pilar del Castillo Vera, Pilar Ayuso, Francesc Gamb\u00fas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-773","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 8"]],"meps":[28390,4319,125006],"meta":{"created":"2019-07-03T06:30:32"},"new":["8. Member States shall provide","incentives to distribution system operators","to procure services for the operation and","development of their networks and","integrate innovative solutions in the","distribution systems. For that purpose","Member States shall recognise as eligible","and include all relevant costs in","distribution tariffs and introduce","performance targets in order to incentivise","distribution system operators to raise","efficiencies, including energy efficiency, in","their networks."],"old":["8. Regulatory authorities shall","provide incentives to distribution system","operators to procure services for the","operation and development of their","networks and integrate innovative solutions","in the distribution systems. For that","purpose regulatory authorities shall","recognise as eligible and include all","relevant costs in distribution tariffs and","introduce performance targets in order to","incentivise distribution system operators to","raise efficiencies, including energy","efficiency, in their networks."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"773","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Martina Werner, Peter Kouroumbashev, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-181","location":[["Proposal for a regulation","Recital 34"]],"meps":[124826,124857,124739,124735,124699,125041,125044,124947],"meta":{"created":"2020-11-15T15:52:07"},"new":["(34) The geographical scope of regional","coordination centres should allow them to","play an effective coordination role by","optimising the operations of transmission","system operators over larger regions.","(This amendment applies throughout the","text. Adopting it will necessitate","corresponding changes throughout.)"],"old":["(34) The geographical scope of regional","operational centres should allow them to","play an effective coordination role by","optimising the operations of transmission","system operators over larger regions."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"181","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Rebecca Harms, Jakop Dalunde, Reinhard B\u00fctikofer, Davor \u0160krlec, Yannick Jadot, Michel Reimon, Benedek J\u00e1vor, Florent Marcellesi on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-495","justification":" Priority dispatch is an important tool to ensure that renewable energy is used as it is\n produced and thus helps to achieve our climate targets, as well as continues to provide a\n stable investment framework for future projects, in line with the provisions of the current\n renewable energy directive (Directive 2009/28/EC).","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 2"]],"meps":[28233,183338,96739,124756,96740,124935,124721,26146],"meta":{"created":"2019-07-03T06:30:33"},"new":["deleted"],"old":["2. When dispatching electricity","generating installations, transmission","system operators shall give priority to","generating installations using renewable","energy sources or high-efficiency","cogeneration from small generating","installations or generating installations","using emerging technologies to the","following extent:","(a) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 500 kW; or","(b) demonstration projects for innovative","technologies."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"495","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1130","location":[["Proposal for a regulation","Article 27 \u2013 paragraph 1 \u2013 point f"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:33"},"new":["deleted"],"old":["(f) adopt a proposal defining the","system operation region covered by each","regional operational centre;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1130","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Angelika Niebler, Sven Schulze","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-774","justification":"Methods of setting tariffs, and network tariffs, are based on national and regional influences.\nHarmonisation of network tariffs would be contrary to the subsidiarity principle. It is\ntherefore not the role of ACER to issue a recommendation on this.","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 9"]],"meps":[124809],"meta":{"created":"2019-07-03T06:30:32"},"new":["deleted"],"old":["9. By [OP: please add specific date \u2013","three months after entry into force] the","Agency shall provide a recommendation","addressed to regulatory authorities on the","progressive convergence of transmission","and distribution tariff methodologies.","That recommendation shall address at","least:","(a) the ratio of tariffs applied to producers","and to consumers;","(b) the costs to be recovered by tariffs;","(c) time differentiated network tariffs;","(d) locational signals;","(e) the relationship between transmission","and distribution tariffs, including","principles relating to non-discrimination;","(f) methods to ensure transparency in the","setting and structure of tariffs;","(g) groups of network users subject to","tariffs, including tariff exemptions."],"orig_lang":"de","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"774","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Angelika Niebler, Sven Schulze","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-182","justification":" Areas such as central security of supply or risk-preparedness should remain the responsibility\n of the Member States and the transmission system operators.","location":[[" Proposal for a regulation","Recital 35"]],"meps":[4289,124809],"meta":{"created":"2020-11-15T15:52:07"},"new":["deleted"],"old":["(35) Regional operational centres","should carry out functions where their","regionalisation brings added value","compared to functions performed at","national level. The functions of regional","operational centres should cover the","functions carried out by regional security","coordinators as well as additional system","operation, market operation and risk","preparedness functions. The functions","carried out by regional operational","centres should exclude real time operation","of the electricity system."],"orig_lang":"de","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"182","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Claude Turmes","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-496","justification":"Priority dispatch for renewable energy sources shall be kept, in order to cater for the\ncharacteristics of the latter namely variability and zero carbon emissions. In cases where\nMember States have met all climate and energy targets and have established open markets,\nancillary services and curtailment rules, derogations may be possible, if a significant share of\nvariable RES in the final electricity consumption of the Member State has already been\nreached, which would justify such derogation.","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 introductory part"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:33"},"new":["2. When dispatching electricity","generating installations, transmission","system operators or distribution system","operators where the installations are","connected to the distribution network,","shall give priority to generating","installations using renewable energy","sources, including high efficiency","cogeneration, in so far that the secure","operation of the electricity system is not","under threat.","Where TSOs or DSOs derogate from that","principle, all of following conditions shall","be met:","(a) the share of variable renewable energy","sources in the final electricity","consumption of the Member State","concerned is equivalent to at least33%;","(b) the Member State concerned is on","track to meet its national renewable","energy targets for2030;","(c) the Member State concerned has fully","opened all its markets, including all","ancillary services, to the participation of","renewable energy sources and established","a transparent methodology related to the","curtailment rules.","Where a Member State considers","removing priority dispatch for new","renewable energy capacities on the basis","of those criteria, it shall adopt grid and","market-related measures in order to","mitigate the negative effects and shall","provide reasons why such a removal of","priority dispatch does not affect the target","of reduction of the overall greenhouse gas","emissions of the Union. The Member","State concerned shall notify its intention","to the Commission. Within three months","after receipt of such a notification, the","Commission shall, after assessing whether","all necessary conditions are met, take a","decision granting or refusing","authorisation for the removal of priority","dispatch. Priority dispatch shall, in any","event, be maintained for installations","using renewable sources with a maximum","capacity of 1 MW, for demonstration","projects and for installations operated by","renewable energy communities."],"old":["2. When dispatching electricity","generating installations, transmission","system operators shall give priority to","generating installations using renewable","energy sources or high-efficiency","cogeneration from small generating","installations or generating installations","using emerging technologies to the","following extent:","",""],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"496","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Kaja Kallas, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar, Carolina Punset, Gerben-Jan Gerbrandy","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1131","location":[["Proposal for a regulation","Article 27 \u2013 paragraph 1 \u2013 point new (h a (new)"]],"meps":[124697,124989,124872,125026,90110,96940],"meta":{"created":"2019-07-03T06:30:33"},"new":["new (h a) standardisation, in","cooperation with the EU DSO entity, of","relevant data formats and protocols to","facilitate crossborder exchange of data ;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1131","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-497","justification":"Until market distortions for inflexible overcapacity have been addressed, withdrawing\npriority access and dispatch for renewables will harm investment certainty for renewables,\nmake investments in flexible demand response less attractive, and should be considered as a\nsubsidy for inflexible conventional electricity production. The EU legislative framework to\n2030 must maintain priority access for renewables in order to ensure policy stability and\ninvestor confidence, and to encourage the reduction of market distortions for inflexible\nbaseload.","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 introductory part"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:33"},"new":["2. Subject to requirements relating to","the maintenance of the reliability and","safety of the grid, based on transparent","and non-discriminatory criteria defined","by the competent national authorities:","(a) Member States shall ensure that","transmission system operators and","distribution system operators in their","territory guarantee the transmission and","distribution of electricity produced from","renewable energy sources;","(b) Member States shall also provide for","either priority access or guaranteed access","to the grid-system of electricity produced","from renewable energy sources;","(c) Member States shall ensure that when","dispatching electricity generating","installations, transmission system operators","shall give priority to generating","installations using renewable energy","sources in so far as the secure operation","of the national electricity system permits","and based on transparent and non-","discriminatory criteria.","3. Member States shall require","transmission system operators and","distribution system operators to set up and","make public their standard rules relating","to the bearing and sharing of costs of","technical adaptations, such as grid","connections and grid reinforcements,","improved operation of the grid and rules","on the non-discriminatory implementation","of the grid codes, which are necessary in","order to integrate new producers feeding","electricity produced from renewable","energy sources into the interconnected","grid. Those rules shall be based on","objective, transparent and non-","discriminatory criteria taking particular","account of all the costs and benefits","associated with the connection of those","producers to the grid and of the particular","circumstances of producers located in","peripheral regions and in regions of low","population density. Those rules may","provide for different types of connection."],"old":["2. When dispatching electricity","generating installations, transmission","system operators shall give priority to","generating installations using renewable","energy sources or high-efficiency","cogeneration from small generating","installations or generating installations","using emerging technologies to the","following extent:",""],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"497","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-775","justification":" Distribution tariffs have to reflect structural and regional circumstances consumption-\n dependent, the added value is therefore questionable. A harmonised structure and two year\n update cycle could cause significant distortions in tariffing system e.g. in terms of\n predictability of regulatory decisions.","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 9"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:32"},"new":["deleted"],"old":["9. By [OP: please add specific date \u2013","three months after entry into force] the","Agency shall provide a recommendation","addressed to regulatory authorities on the","progressive convergence of transmission","and distribution tariff methodologies.","That recommendation shall address at","","least:","(a) the ratio of tariffs applied to producers","and to consumers;","(b) the costs to be recovered by tariffs;","(c) time differentiated network tariffs;","(d) locational signals;","(e) the relationship between transmission","and distribution tariffs, including","principles relating to non-discrimination;","(f) methods to ensure transparency in the","setting and structure of tariffs;","(g) groups of network users subject to","tariffs, including tariff exemptions."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"775","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-183","justification":"Title of the newly established entity should be changed to \"regional coordination centres\";\nthis title should be used throughout the proposal for Regulation.","location":[["Proposal for a regulation","Recital 35"]],"meps":[124706],"meta":{"created":"2020-11-15T15:52:07"},"new":["(35) Regional coordination centres","should carry out functions where their","regionalisation brings added value","compared to functions performed at","national level. The functions of regional","coordination centres should cover the","functions carried out by regional security","coordinators as well as additional task of","regional importance. The functions carried","out by regional coordination centres","should exclude real time operation of the","electricity system."],"old":["(35) Regional operational centres","should carry out functions where their","regionalisation brings added value","compared to functions performed at","national level. The functions of regional","operational centres should cover the","functions carried out by regional security","coordinators as well as additional system","operation, market operation and risk","preparedness functions. The functions","carried out by regional operational centres","should exclude real time operation of the","electricity system."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"183","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1132","location":[[" Proposal for a regulation","Article 27 \u2013 paragraph 1 \u2013 point j a (new)"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:33"},"new":["(j a) cooperate with EU DSO entity and","adopt best practice on the coordinated","operation and planning of transmission","and distribution systems including issues","such as exchange of data between","operators and coordination of distributed","energy resources;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1132","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Martina Werner, Peter Kouroumbashev, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-184","location":[["Proposal for a regulation","Recital 35"]],"meps":[124826,124857,124739,124735,124699,125041,125044,124947],"meta":{"created":"2020-11-15T15:52:07"},"new":["(35) Regional coordination centres","should carry out functions where their","regionalisation brings added value","compared to functions performed at","national level. The functions of regional","operational centres should cover the","functions carried out by regional security","coordinators as well as additional","functions with regional importance. The","functions carried out by regional","coordination centres should exclude real","time operation of the electricity system."],"old":["(35) Regional operational centres","should carry out functions where their","regionalisation brings added value","compared to functions performed at","national level. The functions of regional","operational centres should cover the","functions carried out by regional security","coordinators as well as additional system","operation, market operation and risk","preparedness functions. The functions","carried out by regional operational centres","should exclude real time operation of the","","electricity system."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"184","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-498","justification":" Until market distortions for inflexible overcapacity have been addressed, withdrawing\n priority access and dispatch for renewables will harm investment certainty for renewables,\n make investments in flexible demand response less attractive, and should be considered as a\n subsidy for inflexible conventional electricity production. Therefore, until the Commission\n determines that reforms undertaken as a result of the EU\u2019s market design initiative have been\n effective in removing market distortions favouring dirty, inflexible overcapacity, priority\n dispatch should be maintained.","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 introductory part"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:33"},"new":["2. When dispatching electricity","generating installations, transmission","system operators shall give priority to","generating installations using renewable","energy sources, high-efficiency","cogeneration from small generating","installations and generating installations","using emerging renewable energy","technologies.","By December 31, 2023 and every 2 years","thereafter, the Commission shall assess","the extent to which market distortions,","such as subsidies or implementation of","capacity mechanisms favoring inflexible","generation installations powered by fossil","fuels or nuclear, have been phased out by","each Member State, as well as the extent","of access by installations using renewable","energy sources and high-efficiency","cogeneration to forward, balancing, day-","ahead and intraday markets. Until the","Commission determines that as a result of","the implementation of measures","contained in this regulation that removal","of priority dispatch would not result in","discrimination or negative impacts on the","deployment of installations using","renewable sources, the Member States","concerned shall continue to provide","priority dispatch for such installations.","Without prejudice to the Commission\u2019s","determination, transmission system","operators shall continue to give priority to","generating installations using renewable","energy sources, high-efficiency","cogeneration from small generating","installations, generating installations using","emerging renewable energy technologies","to the following extent:"],"old":["2. When dispatching electricity","generating installations, transmission","system operators shall give priority to","generating installations using renewable","energy sources or high-efficiency","cogeneration from small generating","installations or generating installations","using emerging technologies to the","following extent:","",""],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"498","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-776","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 9 \u2013 introductory part"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:32"},"new":["9. By [OP: please add specific date \u2013","three months after entry into force] NRAs","cooperating in the framework of the","Agency shall define a publication template","to favour transparency in the setting and","structure of transmission tariffs. The","template shall address at least the","following Minimum Publication","Requirements regarding Tariff Charges:","(a) the ratio of tariffs applied to producers","and to consumers;","(b) the costs and/or allowed or target","revenue of the transmission system","operator to be recovered by tariffs;","(c) time differentiated network tariffs;","(d) locational signals;","(e) the relationship between transmission","and distribution tariffs","(f) groups of network users subject to","tariffs, including tariff exemptions.","By [OP: please add specific date \u2013 six","months after entry into force], and","afterwards regularly every two years, the","national regulatory authority or the","transmission system operator(s), as","decided by the national regulatory","authority, shall publish information","according to the Minimum Publication","Requirements template, on the","methodology for calculating the respective","network tariffs."],"old":["9. By [OP: please add specific date \u2013","three months after entry into force] the","Agency shall provide a recommendation","addressed to regulatory authorities on the","progressive convergence of transmission","and distribution tariff methodologies. That","recommendation shall address at least:",""],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"776","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Martina Werner, Peter Kouroumbashev, Carlos Zorrinho, Miapetra Kumpula-Natri, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1133","location":[[" Proposal for a regulation","Article 27 \u2013 paragraph 1 \u2013 point j a (new)"]],"meps":[124826,124857,124739,124735,124947],"meta":{"created":"2019-07-03T06:30:33"},"new":["(j a) to promote digitalisation of","transmission systems to ensure, inter alia,","efficient real time data acquisition and","use and smart substations;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1133","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Angelika Niebler, Sven Schulze","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-185","justification":" Areas such as central security of supply or risk-preparedness should remain the responsibility\n of the Member States and the transmission system operators.","location":[[" Proposal for a regulation","Recital 36"]],"meps":[4289,124809],"meta":{"created":"2020-11-15T15:52:07"},"new":["deleted"],"old":["(36) Regional operational centres","should primarily act in the interest of","system and market operation of the region","over the interests of any single entity.","Hence, regional operational centres","should be entrusted with decision-making","powers to act and to direct actions to be","taken by transmission system operators of","the system operation region for certain","functions and with an enhanced advisory","role for the remaining functions."],"orig_lang":"de","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"185","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-777","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 9 \u2013 introductory part"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:33"},"new":["9. By [OP: please add specific date \u2013","three months after entry into force] the","Agency shall define a publication template","to favour transparency in the setting and","structure of transmission tariffs. The","template shall address at least the","following minimum publication","requirements regarding tariff charges:"],"old":["9. By [OP: please add specific date \u2013","three months after entry into force] the","Agency shall provide a recommendation","addressed to regulatory authorities on the","progressive convergence of transmission","and distribution tariff methodologies.","That recommendation shall address at","least:"],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"777","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Martina Werner, Flavio Zanonato, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula- Natri, Eugen Freund, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-499","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 introductory part"]],"meps":[124826,124800,124870,124739,124735,125018,124699,125041,125044,124947],"meta":{"created":"2019-07-03T06:30:33"},"new":["2. Member States shall provide for","provisions that give priority for :"],"old":["2. When dispatching electricity","generating installations, transmission","system operators shall give priority to","generating installations using renewable","energy sources or high-efficiency","cogeneration from small generating","installations or generating installations","using emerging technologies to the","following extent:"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"499","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Martina Werner, Peter Kouroumbashev, Carlos Zorrinho, Miapetra Kumpula-Natri, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1134","location":[[" Proposal for a regulation","Article 27 \u2013 paragraph 1 \u2013 point j b (new)"]],"meps":[124826,124857,124739,124735,124947],"meta":{"created":"2019-07-03T06:30:33"},"new":["(j b) to promote data management,","cyber security and data protection in","cooperation with relevant authorities and","regulated entities;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1134","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Kathleen Van Brempt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-186","location":[[" Proposal for a regulation","Recital 36"]],"meps":[5729],"meta":{"created":"2020-11-15T15:52:07"},"new":["(36) Regional operational centres should","primarily act in the interest of system and","market operation of the region over the","interests of any single entity. Hence,","regional operational centres should be","entrusted with decision-making powers to","act and to direct actions to be taken by","transmission system operators of the","system operation region for certain","functions and with an enhanced advisory","role for the remaining functions. If one or","more transmission system operators","disagree with a binding decision that a","regional operational centre is willing to","take, they should have the right to ask the","Commission to suspend or change the","decision. The Commission can do so, after","gaining advice from the Agency."],"old":["(36) Regional operational centres should","primarily act in the interest of system and","market operation of the region over the","interests of any single entity. Hence,","regional operational centres should be","entrusted with decision-making powers to","act and to direct actions to be taken by","","transmission system operators of the","system operation region for certain","functions and with an enhanced advisory","role for the remaining functions."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"186","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Morten Helveg Petersen","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-778","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 9 \u2013 introductory part"]],"meps":[124872],"meta":{"created":"2019-07-03T06:30:33"},"new":["9. By [OP: please add specific date \u2013","three months after entry into force] the","Agency shall provide a recommendation","addressed to regulatory authorities on the","progressive harmonisation of transmission","and distribution tariff methodologies. That","recommendation shall address at least:"],"old":["9. By [OP: please add specific date \u2013","three months after entry into force] the","Agency shall provide a recommendation","addressed to regulatory authorities on the","progressive convergence of transmission","and distribution tariff methodologies. That","recommendation shall address at least:"],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"778","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Pilar del Castillo Vera, Pilar Ayuso, Francesc Gamb\u00fas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-500","justification":"Member States should be given the possibility to allow priority dispatch when economic\nconditions are the same. In case of equality of offerings, priority dispatch would not increase\nthe overall costs of dispatch.","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 introductory part"]],"meps":[28390,4319,125006],"meta":{"created":"2019-07-03T06:30:33"},"new":["2. When dispatching electricity","generating installations, transmission","system operators may give priority to","generating installations using renewable","energy sources or high-efficiency","cogeneration ensuring a level playing field","in the market, without prejudice to the","requirements for the reliability and","security of the system, in accordance with","national legislation."],"old":["2. When dispatching electricity","generating installations, transmission","system operators shall give priority to","generating installations using renewable","energy sources or high-efficiency","cogeneration from small generating","installations or generating installations","using emerging technologies to the","following extent:"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"500","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Eugen Freund, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1135","location":[["Proposal for a regulation","Article 27 \u2013 paragraph 1 \u2013 point j c (new)"]],"meps":[124826,124870,124739,124735,125018,124699,125041,125044,124784],"meta":{"created":"2019-07-03T06:30:33"},"new":["(j c) to develop demand response in","cooperation with DSOs."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1135","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Martina Werner, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-187","location":[["Proposal for a regulation","Recital 36"]],"meps":[124826,124739,124735,124699],"meta":{"created":"2020-11-15T15:52:07"},"new":["(36) Regional coordination centres","should act independently from national","interests and from the interests of any","market participant. They should act in the","interest of the Union, the functioning of","the internal electricity market, system and","market stability of the region and to","contribute to the achievement of the EU","climate and energy targets. Hence,","regional coordination centres should be","entrusted with decision-making powers to","act and to direct actions to be taken by","transmission system operators of the","system operation region for functions with","particular regional importance and with","an enhanced advisory role for the","remaining functions through","recommendations."],"old":["(36) Regional operational centres","should primarily act in the interest of","system and market operation of the region","over the interests of any single entity.","Hence, regional operational centres should","be entrusted with decision-making powers","to act and to direct actions to be taken by","transmission system operators of the","system operation region for certain","functions and with an enhanced advisory","role for the remaining functions."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"187","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-501","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 introductory part"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:33"},"new":["2. When dispatching electricity","generating or energy storage installations,","transmission system operators shall give","priority to generating or energy","storage installations using renewable","energy sources or high-efficiency","cogeneration from small generating","installations or generating installations","using emerging technologies to the","following extent:"],"old":["2. When dispatching electricity","generating installations, transmission","system operators shall give priority to","generating installations using renewable","energy sources or high-efficiency","cogeneration from small generating","installations or generating installations","using emerging technologies to the","following extent:"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"501","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Pervenche Ber\u00e8s, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-779","justification":" The 3-month period proposed by the European Commission is too short to consult with all\n stakeholders. There is great heterogeneity in terms of distribution and tariffs. The\n convergence proposed by the Commission is early. However a true coherence would be a big\n step forward.","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 9 \u2013 introductory part"]],"meps":[1985,124947],"meta":{"created":"2019-07-03T06:30:33"},"new":["9. By [OP: please add specific date \u2013","one year after entry into force] the Agency","shall provide a recommendation addressed","to regulatory authorities on the progressive","coherence of transmission and distribution","tariff methodologies. That recommendation","shall address at least:"],"old":["9. By [OP: please add specific date \u2013","three months after entry into force] the","Agency shall provide a recommendation","addressed to regulatory authorities on the","progressive convergence of transmission","and distribution tariff methodologies. That","recommendation shall address at least:"],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"779","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1136","location":[["Proposal for a regulation","Article 27 \u2013 paragraph 2"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:33"},"new":["2. The ENTSO for Electricity shall","report to the Agency on shortcomings","identified regarding the establishment and","performance of regional coordination","centres.","(This amendment applies throughout the","text.Adopting it will necessitate","corresponding changes throughout.)"],"old":["2. The ENTSO for Electricity shall","report to the Agency on shortcomings","identified regarding the establishment and","performance of regional operational","centres."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1136","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Kaja Kallas, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar, Carolina Punset, Gerben-Jan Gerbrandy","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-188","location":[[" Proposal for a regulation","Recital 36"]],"meps":[124697,124989,124872,125026,90110,96940],"meta":{"created":"2020-11-15T15:52:07"},"new":["(36) Regional operational centres should","primarily act in the interest of system and","market operation of the region over the","interests of any single entity. Hence,","regional operational centres should be","entrusted with decision-making powers to","act and to direct actions to be taken by","transmission system operators of the","system operation region for certain","functions and with an enhanced advisory","role for the remaining functions. Regional","operational centres should ensure that","decision-making processes are based on","equitable treatment, geographical balance","and inclusiveness, in order to ensure the","representation of all transmission systems","of the region."],"old":["(36) Regional operational centres should","primarily act in the interest of system and","market operation of the region over the","interests of any single entity. Hence,","regional operational centres should be","entrusted with decision-making powers to","act and to direct actions to be taken by","transmission system operators of the","system operation region for certain","functions and with an enhanced advisory","role for the remaining functions."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"188","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-780","justification":"Due to regional varieties, distribution tariff methodologies should not be harmonised at this\npoint.","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 9 \u2013 introductory part"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:33"},"new":["9. By [OP: please add specific date \u2013","three months after entry into force] the","Agency shall provide a recommendation","addressed to regulatory authorities on the","progressive convergence of transmission","tariff methodologies. That recommendation","shall address at least:"],"old":["9. By [OP: please add specific date \u2013","three months after entry into force] the","Agency shall provide a recommendation","addressed to regulatory authorities on the","progressive convergence of transmission","and distribution tariff methodologies. That","recommendation shall address at least:"],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"780","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-502","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 introductory part"]],"meps":[90110],"meta":{"created":"2019-07-03T06:30:33"},"new":["2. When dispatching electricity","generating or energy storage installations,","transmission system operators shall give","priority to generating or energy storage","installations using renewable energy","sources or high-efficiency cogeneration","from small generating installations or","generating installations using emerging","technologies to the following extent:"],"old":["2. When dispatching electricity","generating installations, transmission","system operators shall give priority to","generating installations using renewable","energy sources or high-efficiency","cogeneration from small generating","installations or generating installations","using emerging technologies to the","following extent:"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"502","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Miapetra Kumpula-Natri","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-781","justification":"Given the fast paced evolution of energy systems, there\u2019s no need for progressive convergence\nof distribution tariff structure it is not justified given their low cross-border impact and their\nstrong interlink with local specificities.","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 9 \u2013 introductory part"]],"meps":[124735],"meta":{"created":"2019-07-03T06:30:33"},"new":["9. By [OP: please add specific date \u2013","three months after entry into force] the","Agency shall provide a recommendation","addressed to regulatory authorities on the","progressive convergence of transmission","tariff methodologies. That recommendation","shall address at least:"],"old":["9. By [OP: please add specific date \u2013","three months after entry into force] the","Agency shall provide a recommendation","addressed to regulatory authorities on the","progressive convergence of transmission","and distribution tariff methodologies. That","recommendation shall address at least:"],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"781","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-189","location":[[" Proposal for a regulation","Recital 36"]],"meps":[124706],"meta":{"created":"2020-11-15T15:52:07"},"new":["(36) Regional coordination centres","should primarily act in the interest of","system and market operation of the region","over the interests of any single entity.","Regional coordination centres should have","an enhanced advisory role."],"old":["(36) Regional operational centres","should primarily act in the interest of","system and market operation of the region","over the interests of any single entity.","Hence, regional operational centres should","be entrusted with decision-making powers","to act and to direct actions to be taken by","transmission system operators of the","system operation region for certain","functions and with an enhanced advisory","role for the remaining functions."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"189","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1137","justification":" A greater focus is required within the stakeholder consultation process to ensure that\n investments offer the greatest value for consumers.The process must take into account the\n limited resources and technical expertise of many system users as well as the importance of\n designing in consumer needs from the outset.","location":[["Proposal for a regulation","Article 28 \u2013 paragraph 1"]],"meps":[124699],"meta":{"created":"2019-07-03T06:30:33"},"new":["1. While preparing the - proposals","pursuant to the tasks referred to in Article","27(1) the ENTSO for Electricity shall","conduct an extensive consultation process,","at an early stage and in an open and","transparent manner, involving all relevant","stakeholders and, in particular, the","organisations representing all stakeholders,","in accordance with the rules of procedure","referred to in Article 26. That consultation","shall also involve national regulatory","authorities and other national authorities,","supply and generation undertakings,","system users including customers and their","representatives,distribution system","operators, including relevant industry","associations, technical bodies and","stakeholder platforms. It shall aim at","identifying the views and proposals of all","relevant parties during the decision-making","process.","An Independent Advisory Council of","stakeholder representatives, in particular","system users and final customers, shall be","established to provide independent advice","to the Board of the ENTSO for Electricity","on:","(a) the elaboration of network codes as set","out in Article 27(1) (a) (i) the Union wide","development plans as set out in Article","27(1)(b)","(b) the annual work-programme as set out","in Article 27(1)(h) and","(c) the annual report as set out in Article","27 (1)(i)."],"old":["1. While preparing the proposals","pursuant to the tasks referred to in Article","27(1) , the ENTSO for Electricity shall","conduct an extensive consultation process,","at an early stage and in an open and","transparent manner, involving all relevant","stakeholders , and, in particular, the","organisations representing all stakeholders,","in accordance with the rules of procedure","referred to in Article 26 . That consultation","shall also involve national regulatory","authorities and other national authorities,","supply and generation undertakings,","system users including customers,","distribution system operators, including","relevant industry associations, technical","bodies and stakeholder platforms. It shall","aim at identifying the views and proposals","of all relevant parties during the decision-","making process."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1137","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Kathleen Van Brempt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-782","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 9 \u2013 point e"]],"meps":[5729],"meta":{"created":"2019-07-03T06:30:33"},"new":["(e) the relationship between","transmission and distribution tariffs,","including principles relating to non-","discrimination, as agreed with the EU","DSO entity;"],"old":["(e) the relationship between","transmission and distribution tariffs,","including principles relating to non-","discrimination;"],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"782","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Werner Langen","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-190","justification":"Adding sectoral integration to the regulation will ensure stability and a level playing field\namong all the market-based resources, which will help achieve the objectives of the EU's\ninternal energy market.","location":[["Proposal for a regulation","Recital 36"]],"meps":[1928],"meta":{"created":"2020-11-15T15:52:07"},"new":["(36) Regional operational centres should","primarily act in the interest of system and","market operation as well as sectoral","integration of the region over the interests","of any single entity. Hence, regional","operational centres should be entrusted","with decision-making powers to act and to","direct actions to be taken by transmission","system operators of the system operation","region for certain functions. They should","have an enhanced advisory role for the","remaining functions."],"old":["(36) Regional operational centres should","primarily act in the interest of system and","market operation of the region over the","interests of any single entity. Hence,","regional operational centres should be","entrusted with decision-making powers to","act and to direct actions to be taken by","transmission system operators of the","system operation region for certain","functions and with an enhanced advisory","role for the remaining functions."],"orig_lang":"de","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"190","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1138","justification":"This Amendment is necessary to enable fulfilling the obligations of paragraph 3 of this\nArticle.","location":[[" Proposal for a regulation","Article 28 \u2013 paragraph 1"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:34"},"new":["1. While preparing the opinions","pursuant to the tasks referred to in Article","27(1) , the ENTSO for Electricity shall","conduct an extensive consultation process,","at an early stage and structured in a way to","enable accommodating stakeholder","comments before final adoption and in an","open and transparent manner, involving all","relevant stakeholders , and, in particular,","the organisations representing all","stakeholders, in accordance with the rules","of procedure referred to in Article 26 . That","consultation shall also involve national","regulatory authorities and other national","authorities, supply and generation","undertakings, system users including","customers and their representatives,","distribution system operators, including","relevant industry associations, technical","bodies and stakeholder platforms. It shall","aim at identifying the views and proposals","of all relevant parties during the decision-","making process."],"old":["1. While preparing the proposals","pursuant to the tasks referred to in Article","27(1) , the ENTSO for Electricity shall","conduct an extensive consultation process,","at an early stage and in an open and","transparent manner, involving all relevant","stakeholders , and, in particular, the","organisations representing all stakeholders,","in accordance with the rules of procedure","referred to in Article 26 . That consultation","shall also involve national regulatory","authorities and other national authorities,","supply and generation undertakings,","system users including customers,","distribution system operators, including","relevant industry associations, technical","bodies and stakeholder platforms. It shall","aim at identifying the views and proposals","of all relevant parties during the decision-","making process."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1138","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Kathleen Van Brempt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-783","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 9 \u2013 point g"]],"meps":[5729],"meta":{"created":"2019-07-03T06:30:33"},"new":["(g) groups of network users subject to","tariffs, and the way the different tariffs","applied on them reflect a fair distribution","of costs and avoid unjustifiable state aid."],"old":["(g) groups of network users subject to","tariffs, including tariff exemptions."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"783","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Angelika Niebler, Sven Schulze","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-191","justification":" It is not at all clear how much value would be added by creating regional operational centres.\n The ENTSO for electricity is an existing grouping of transmission system operators at EU\n level. An additional body would result in a disproportionately high administrative and\n bureaucratic burden. Duplicate structures must be avoided.","location":[["Proposal for a regulation","Recital 37"]],"meps":[4289,124809],"meta":{"created":"2020-11-15T15:52:07"},"new":["deleted"],"old":["(37) ENTSO for Electricity should","ensure that the actions of regional","operational centres are coordinated","across the regions' boundaries."],"orig_lang":"de","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"191","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-503","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 introductory part"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:33"},"new":["2. When dispatching electricity","generating installations, transmission","system operators shall give priority to","generating installations using renewable","energy sources or high-efficiency","cogeneration from generating installations","to the following extent:"],"old":["2. When dispatching electricity","generating installations, transmission","system operators shall give priority to","generating installations using renewable","energy sources or high-efficiency","cogeneration from small generating","installations or generating installations","using emerging technologies to the","following extent:"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"503","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Pilar del Castillo Vera, Pilar Ayuso, Francesc Gamb\u00fas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-784","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 9 \u2013 point g"]],"meps":[28390,4319,125006],"meta":{"created":"2019-07-03T06:30:33"},"new":["(g) groups of network users subject to","tariffs according to characteristics and","forms of consumption, including tariff","exemptions."],"old":["(g) groups of network users subject to","tariffs, including tariff exemptions."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"784","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1139","justification":" This amendment is intrinsically linked to Article 27 and 28 of this Regulation to formalise\n existing consultations, as well as the advisory body that have been established to concretise\n the consultation process required by the provisions of this Article.","location":[["Proposal for a regulation","Article 28 \u2013 paragraph 1 a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:34"},"new":["1 a. An Independent Advisory Council","of stakeholder representatives, in","particular system users and final","customers, shall be formally established to","provide independent advice to the Board","of the ENTSO for Electricity on:","(a) the elaboration of network codes as set","out in Article 27(1) (a);","(b) the Union wide development plans as","set out in Article 27(1);","(c) the annual work-programme as set out","in Article 27 (1)(h) and","(d) the annual report as set out in Article","27 (1)(i)."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1139","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-192","justification":" The proposal to create a EU DSO entity should be scrapped to eliminate the risks of conflicts\n of interests. As such, the creation of a new EU DSO entity contains significant risks of\n obstructing competition and discrimination on sensitive issues (in particular on issues\n relating to consumers and treatment of distributed energy resources, such as solar PV and\n demand response).EU unbundling rules for DSOs are not very stringent, which would allow\n\n\nlarge DSOs connected to parent utilities to exert undue influence via the DSO entity. This risk\nis compounded by the fact that the EU DSO entity would be in a position to influence the\ndrafting of Network Codes that will significantly impact the deployment of renewables and\ndemand response, which not all DSOs are supporting. This could increase the risk of Network\nCodes that impose additional barriers to demand response and self-consumption and that\nallow DSOs to dominate markets for aggregation, storage and EV charging infrastructure","location":[[" Proposal for a regulation","Recital 38"]],"meps":[124813,124796],"meta":{"created":"2020-11-15T15:52:07"},"new":["deleted"],"old":["(38) In order to raise efficiencies in the","electricity distribution networks in the","Union and ensure close cooperation with","transmission system operators and","ENTSO for electricity, a European entity","of distribution system operators in the","Union (\"EU DSO entity\") should be","established. The tasks of the EU DSO","entity should be well-defined and its","working method should ensure efficiency,","transparency and representativeness","amongst the Union distribution system","operators. The EU DSO Entity should","closely cooperate with ENTSO for","Electricity on the preparation and","implementation of the network codes","where applicable and should work on","providing guidance on the integration","inter alia of distributed generation and","storage in distribution networks or other","areas which relate to the management of","distribution networks."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"192","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Kathleen Van Brempt, Ivo Belet","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-504","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 introductory part"]],"meps":[5729,28257],"meta":{"created":"2019-07-03T06:30:33"},"new":["2. When dispatching electricity","generating installations, transmission and","distribution system operators shall give","priority to generating installations using","renewable energy sources or high-","efficiency cogeneration from small","generating installations or generating","installations using emerging technologies","to the following extent:"],"old":["2. When dispatching electricity","generating installations, transmission","system operators shall give priority to","generating installations using renewable","energy sources or high-efficiency","cogeneration from small generating","installations or generating installations","using emerging technologies to the","following extent:"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"504","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1140","location":[[" Proposal for a regulation","Article 28 \u2013 paragraph 3"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:34"},"new":["3. Before adopting the opinions","pursuant to Article 27(1) the ENTSO for","Electricity shall indicate how the","observations received during the","consultation have been taken into","consideration. It shall provide reasons","where observations have not been taken","into account."],"old":["3. Before adopting the proposals","pursuant to Article 27(1) the ENTSO for","Electricity shall indicate how the","observations received during the","consultation have been taken into","consideration. It shall provide reasons","where observations have not been taken","into account."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1140","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Kaja Kallas, Pavel Teli\u010dka, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar, Carolina Punset, Gerben-Jan Gerbrandy","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-193","location":[["Proposal for a regulation","Recital 38"]],"meps":[124697,124706,124989,124872,125026,90110,96940],"meta":{"created":"2020-11-15T15:52:07"},"new":["(38) In order to raise efficiencies in the","electricity distribution networks in the","Union and ensure close cooperation with","transmission system operators and ENTSO","for electricity, a European entity of","distribution system operators in the Union","(\"EU DSO entity\") should be established.","The tasks of the EU DSO entity should be","well-defined and its working method","should ensure efficiency, transparency,","independence and representativeness","amongst the Union distribution system","operators. The EU DSO Entity should","closely cooperate with ENTSO for","Electricity on the preparation and","implementation of the network codes","where applicable, on the need for","standardisation to facilitate crossborder","data exchange between transmission","system operators and distribution system","operators, and should work on providing","guidance on the integration inter alia of","distributed generation and storage in","distribution networks or other areas which","relate to the management of distribution","networks."],"old":["(38) In order to raise efficiencies in the","electricity distribution networks in the","Union and ensure close cooperation with","transmission system operators and ENTSO","for electricity, a European entity of","distribution system operators in the Union","(\"EU DSO entity\") should be established.","The tasks of the EU DSO entity should be","well-defined and its working method","should ensure efficiency, transparency and","representativeness amongst the Union","distribution system operators. The EU","DSO Entity should closely cooperate with","ENTSO for Electricity on the preparation","and implementation of the network codes","where applicable and should work on","providing guidance on the integration inter","alia of distributed generation and storage in","distribution networks or other areas which","relate to the management of distribution","networks."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"193","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-785","justification":"The evolution of transmission and distribution tariff methodologies shall introduce principles\nto assess the real economic, technical and social impacts of active consumers. The\nconsideration of costs shall therefore be complemented by the consideration of benefits\nprovided by the development of self-consumption, self-generation, storage and demand\nresponse. Those benefits shall notably take into account avoided CO2 emissions, reduced\nfeed-in tariffs, and reduced network upgrade needs.","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 9 \u2013 point g a (new)"]],"meps":[90110],"meta":{"created":"2019-07-03T06:30:33"},"new":["(ga) methods to calculate the benefits","of self-consumption, decentralised","generation, storage and demand response,","as well as their complementarity."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"785","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1141","location":[[" Proposal for a regulation","Article 31"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:34"},"new":["Article 31 deleted","system operators"],"old":["Regional cooperation of transmission","1. Transmission system operators shall","establish regional cooperation within the","ENTSO for Electricity to contribute to the","activities referred to in Article 27(1), (2)","and (3). In particular, they shall publish a","regional investment plan every two years,","and may take investment decisions based","on that regional investment plan. The","ENTSO for Electricity shall promote","cooperation between transmission system","operators at regional level ensuring","interoperability, communication and","monitoring of regional performance in","those areas which are not yet harmonised","at Union level.","2. Transmission system operators shall","promote operational arrangements in","order to ensure the optimum management","of the network and shall promote the","development of energy exchanges, the","coordinated allocation of cross-border","capacity through non-discriminatory","market-based solutions, paying due","attention to the specific merits of implicit","auctions for short-term allocations, and","the integration of balancing and reserve","power mechanisms.","3. For the purposes of achieving the goals","set in paragraphs 1 and 2 of this Article,","the geographical area covered by each","regional cooperation structure may be","defined by the Commission, taking into","account existing regional cooperation","structures. Each Member State shall be","allowed to promote cooperation in more","than one geographical area. The","Commission is empowered to adopt","delegated acts in accordance with Article","63 concerning the geographical area","covered by each regional cooperation","structure. For that purpose, the","Commission shall consult the Agency and","the ENTSO for Electricity."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1141","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Eugen Freund, Patrizia Toia, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-194","location":[[" Proposal for a regulation","Recital 38"]],"meps":[124826,124870,124739,124735,125018,28340,124699,125041,125044,124947],"meta":{"created":"2020-11-15T15:52:07"},"new":["(38) In order to increase efficiencies in","the electricity distribution networks in the","Union and ensure close cooperation with","transmission system operators and ENTSO","for electricity, a European entity of","distribution system operators in the Union","(\"EU DSO entity\") should be established.","The tasks of the EU DSO entity should be","well-defined and its working method","should ensure independence, neutrality,","efficiency, transparency and","representativeness amongst the Union","distribution system operators. The EU","DSO Entity should closely cooperate with","ENTSO for Electricity on the preparation","and implementation of the network codes","where applicable and should work on","providing guidance on the integration of","distributed generation and storage in","distribution networks, digitalisation of the","distribution networks including","deployment of smart grids and intelligent","metering systems or other areas which","relate to the management of distribution","networks."],"old":["(38) In order to raise efficiencies in the","electricity distribution networks in the","Union and ensure close cooperation with","transmission system operators and ENTSO","for electricity, a European entity of","distribution system operators in the Union","(\"EU DSO entity\") should be established.","The tasks of the EU DSO entity should be","well-defined and its working method","should ensure efficiency, transparency and","representativeness amongst the Union","distribution system operators. The EU","DSO Entity should closely cooperate with","ENTSO for Electricity on the preparation","and implementation of the network codes","where applicable and should work on","providing guidance on the integration inter","alia of distributed generation and storage","in distribution networks or other areas","which relate to the management of","distribution networks."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"194","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Kate\u0159ina Kone\u010dn\u00e1, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-505","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 introductory part"]],"meps":[23699,96713],"meta":{"created":"2019-07-03T06:30:33"},"new":["2. When dispatching electricity","generating installations, transmission","system operators may give priority to","generating installations using renewable","energy sources or high-efficiency","cogeneration from small generating","installations or generating installations","using emerging technologies to the","following extent:"],"old":["2. When dispatching electricity","generating installations, transmission","system operators shall give priority to","generating installations using renewable","energy sources or high-efficiency","cogeneration from small generating","installations or generating installations","using emerging technologies to the","following extent:"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"505","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-786","justification":"New actors should be included in the provisions of this Article in line with a broader scope of\nthe regulation set out in Article 1.","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 9 \u2013 point g a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:33"},"new":["(ga) methods to calculate the benefits","of self-consumption, decentralised","generation, storage and demand response,","as well as their complementarity."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"786","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1142","justification":"It is our position that Articles 31 to 44 and all reference regarding ROCs in the Clean Energy\nPackage to All Europeans shall be deleted without any substitution.It is of particular concern\nthat establishment of ROCs violates subsidiarity and proportionality principle according to\nart. 194 SFEU","location":[[" Proposal for a regulation","Article 31"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:34"},"new":["Article 31 deleted","system operators"],"old":["Regional cooperation of transmission","1. Transmission system operators shall","establish regional cooperation within the","ENTSO for Electricity to contribute to the","activities referred to in Article 27(1), (2)","and (3). In particular, they shall publish a","regional investment plan every two years,","and may take investment decisions based","on that regional investment plan. The","ENTSO for Electricity shall promote","cooperation between transmission system","operators at regional level ensuring","interoperability, communication and","monitoring of regional performance in","those areas which are not yet harmonised","at Union level.","2. Transmission system operators shall","promote operational arrangements in","order to ensure the optimum management","of the network and shall promote the","development of energy exchanges, the","coordinated allocation of cross-border","capacity through non-discriminatory","market-based solutions, paying due","attention to the specific merits of implicit","auctions for short-term allocations, and","the integration of balancing and reserve","power mechanisms.","3. For the purposes of achieving the goals","set in paragraphs 1 and 2 of this Article,","the geographical area covered by each","regional cooperation structure may be","defined by the Commission, taking into","account existing regional cooperation","structures. Each Member State shall be","allowed to promote cooperation in more","than one geographical area. The","Commission is empowered to adopt","delegated acts in accordance with Article","63 concerning the geographical area","covered by each regional cooperation","structure. For that purpose, the","Commission shall consult the Agency and","the ENTSO for Electricity."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1142","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-195","justification":"There is a need to ensure that DSOs are proportionally geographically represented in the EU\nDSO to ensure that it takes into account the specificities of respective regions when drafting\nrespective documents or legislation.","location":[[" Proposal for a regulation","Recital 38"]],"meps":[124699],"meta":{"created":"2020-11-15T15:52:07"},"new":["(38) In order to raise efficiencies in the","electricity distribution networks in the","Union and ensure close cooperation with","transmission system operators and ENTSO","for electricity, a European entity of","distribution system operators in the Union","(\"EU DSO entity\") should be established.","The tasks of the EU DSO entity should be","well-defined and its working method","should ensure efficiency, transparency and","geographical representativeness amongst","the Union distribution system operators.","The EU DSO Entity should closely","cooperate with ENTSO for Electricity on","the preparation and implementation of the","network codes where applicable and should","work on providing guidance on the","integration inter alia of distributed","generation and storage in distribution","networks or other areas which relate to the","management of distribution networks."],"old":["(38) In order to raise efficiencies in the","","electricity distribution networks in the","Union and ensure close cooperation with","transmission system operators and ENTSO","for electricity, a European entity of","distribution system operators in the Union","(\"EU DSO entity\") should be established.","The tasks of the EU DSO entity should be","well-defined and its working method","should ensure efficiency, transparency and","representativeness amongst the Union","distribution system operators. The EU","DSO Entity should closely cooperate with","ENTSO for Electricity on the preparation","and implementation of the network codes","where applicable and should work on","providing guidance on the integration inter","alia of distributed generation and storage in","distribution networks or other areas which","relate to the management of distribution","networks."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"195","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-506","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 introductory part"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:33"},"new":["2. When dispatching electricity","generating installations, transmission","system operators may give priority to","generating installations using renewable","energy sources or high-efficiency","cogeneration from small generating","installations or generating installations","using emerging technologies to the","following extent:"],"old":["2. When dispatching electricity","","generating installations, transmission","system operators shall give priority to","generating installations using renewable","energy sources or high-efficiency","cogeneration from small generating","installations or generating installations","using emerging technologies to the","following extent:"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"506","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Kate\u0159ina Kone\u010dn\u00e1, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1143","location":[["Proposal for a regulation","Article 31 \u2013 paragraph 1"]],"meps":[23699,96713],"meta":{"created":"2019-07-03T06:30:34"},"new":["1. Transmission system operators","shall establish regional cooperation within","the ENTSO for Electricity to contribute to","the activities referred to in Article 27(1),","(2) and (3). In particular, they shall publish","a regional investment plan every two years,","and may take investment decisions based","on that regional investment plan."],"old":["1. Transmission system operators","shall establish regional cooperation within","the ENTSO for Electricity to contribute to","the activities referred to in Article 27(1),","(2) and (3). In particular, they shall publish","a regional investment plan every two years,","and may take investment decisions based","on that regional investment plan. The","ENTSO for Electricity shall promote","cooperation between transmission system","operators at regional level ensuring","interoperability, communication and","monitoring of regional performance in","those areas which are not yet harmonised","at Union level."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1143","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-787","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 9 \u2013 subparagraph 1 (new)"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:33"},"new":["(h) cost benefit analysis for distributed","energy resources."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"787","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Werner Langen","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-196","location":[["Proposal for a regulation","Recital 39"]],"meps":[1928],"meta":{"created":"2020-11-15T15:52:07"},"new":["(39) Increased cooperation and","coordination among transmission system","operators is required to create network","codes for providing and managing effective","and transparent access to the transmission","networks across borders, and to ensure","coordinated and sufficiently forward-","looking planning and sound technical","evolution of the transmission system in","the Union, including the creation of","interconnection capacities and capacity for","sectoral integration, with due regard to the","environment. Those network codes should","be in line with framework guidelines,","which are non-binding in nature","(framework guidelines) and which are","developed by the Agency. The Agency","should have a role in reviewing, based on","matters of fact, draft network codes,","including their compliance with the","framework guidelines, and it should be","enabled to recommend them for adoption","by the Commission. The Agency should","assess proposed amendments to the","network codes and it should be enabled to","recommend them for adoption by the","Commission. Transmission system","operators should operate their networks in","accordance with those network codes."],"old":["(39) Increased cooperation and","coordination among transmission system","operators is required to create network","codes for providing and managing effective","and transparent access to the transmission","networks across borders, and to ensure","coordinated and sufficiently forward-","looking planning and sound technical","evolution of the transmission system in","the Union , including the creation of","","interconnection capacities, with due regard","to the environment. Those network codes","should be in line with framework","guidelines, which are non-binding in nature","(framework guidelines) and which are","developed by the Agency. The Agency","should have a role in reviewing, based on","matters of fact, draft network codes,","including their compliance with the","framework guidelines, and it should be","enabled to recommend them for adoption","by the Commission. The Agency should","assess proposed amendments to the","network codes and it should be enabled to","recommend them for adoption by the","Commission. Transmission system","operators should operate their networks in","accordance with those network codes."],"orig_lang":"de","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"196","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1144","location":[["Proposal for a regulation","Article 31 \u2013 paragraph 3"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:34"},"new":["3. For the purposes of achieving the","goals set in paragraphs 1 and 2 of this","Article, the geographical area covered by","each regional cooperation structure may be","defined by the Commission, taking into","account existing regional cooperation","structures. Each Member State shall be","allowed to promote cooperation in more","than one geographical area."],"old":["3. For the purposes of achieving the","goals set in paragraphs 1 and 2 of this","Article, the geographical area covered by","each regional cooperation structure may be","defined by the Commission, taking into","account existing regional cooperation","structures. Each Member State shall be","allowed to promote cooperation in more","than one geographical area. The","Commission is empowered to adopt","delegated acts in accordance with Article","63 concerning the geographical area","covered by each regional cooperation","structure. For that purpose, the","Commission shall consult the Agency and","the ENTSO for Electricity."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1144","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-507","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 point a"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:33"},"new":["deleted"],"old":["(a) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 500 kW; or"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"507","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-788","justification":" In order to incentivise smarter renewables integration technologies and motivate consumers\n to make investment decisions that mutually benefit the customer and the grid, market design\n rules need to allow self-consumption activities to be valued more broadly (e.g. their\n contribution to avoided costs related to grid upgrades for the DSO, reduced transmission\n losses, avoided CO2 emissions, etc.).Hence, the recommendations provided by the Agency on\n the progressive convergence of transmission and distribution tariff methodologies should also\n address the assessment of costs and benefits of distributed energy resources.","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 9 \u2013 point g a (new)"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:33"},"new":["(ga) cost benefit analysis for distributed","energy resources."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"788","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-197","justification":"This amendment is intrinsically linked to other amendments tabled to provisions which have\nbeen modified by the Commission","location":[[" Proposal for a regulation","Recital 44"]],"meps":[96713],"meta":{"created":"2020-11-15T15:52:07"},"new":["(44) Investments in major new","infrastructure should be promoted strongly","while ensuring the proper functioning of","the internal market in electricity. In order","to enhance the positive effect of exempted","direct current interconnectors on","competition and security of supply, market","interest during the project-planning phase","should be tested and congestion-","management rules should be adopted","including explicit total system cost-benefit","examination of effect on overall","interconnector costs from including","energy storage of all plausible scales on","one or both interconnector ends. Where","direct current interconnectors are located in","the territory of more than one Member","State, the Agency should handle as a last","resort the exemption request in order to","take better account of its cross-border","implications and to facilitate its","administrative handling. Moreover, given","the exceptional risk profile of constructing","those exempt major infrastructure projects,","undertakings with supply and production","interests should be able to benefit from a","temporary derogation from the full","unbundling rules for the projects","concerned. Exemptions granted under","Regulation (EC) No 1228/200328 continue","to apply until the scheduled expiry date as","decided in the granted exemption decision.","_________________","28","Regulation (EC) No 1228/2003 of the","European Parliament and of the Council of","26 June 2003 on conditions for access to","the network for cross-border exchanges in","electricity (OJ L 176, 15.7.2003, p. 1)."],"old":["(44) Investments in major new","infrastructure should be promoted strongly","while ensuring the proper functioning of","the internal market in electricity. In order","to enhance the positive effect of exempted","direct current interconnectors on","competition and security of supply, market","interest during the project-planning phase","should be tested and congestion-","management rules should be adopted.","Where direct current interconnectors are","located in the territory of more than one","Member State, the Agency should handle","as a last resort the exemption request in","order to take better account of its cross-","border implications and to facilitate its","administrative handling. Moreover, given","","the exceptional risk profile of constructing","those exempt major infrastructure projects,","undertakings with supply and production","interests should be able to benefit from a","temporary derogation from the full","unbundling rules for the projects","concerned. Exemptions granted under","Regulation (EC) No 1228/200328 continue","to apply until the scheduled expiry date as","decided in the granted exemption decision.","_________________","28","Regulation (EC) No 1228/2003 of the","European Parliament and of the Council of","26 June 2003 on conditions for access to","the network for cross-border exchanges in","electricity (OJ L 176, 15.7.2003, p. 1)."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"197","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Benedek J\u00e1vor, Davor \u0160krlec, Rebecca Harms, Jakop Dalunde, Florent Marcellesi, Yannick Jadot, Michel Reimon, Reinhard B\u00fctikofer on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-508","justification":"Priority dispatch is an important tool to ensure that renewable energy is used as it is\nproduced and thus helps to achieve our climate targets, as well as continues to provide a\nstable investment framework for future projects, in line with the provisions of the current\nrenewable energy directive (Directive 2009/28/EC).","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 point a"]],"meps":[124721,124756,28233,183338,26146,96740,124935,96739],"meta":{"created":"2019-07-03T06:30:34"},"new":["deleted"],"old":["(a) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 500 kW; or"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"508","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Kate\u0159ina Kone\u010dn\u00e1, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1145","location":[[" Proposal for a regulation","Article 31 \u2013 paragraph 3"]],"meps":[23699,96713],"meta":{"created":"2019-07-03T06:30:34"},"new":["3. For the purposes of achieving the","goals set in paragraphs 1 and 2 of this","Article, the geographical area covered by","each regional cooperation structure may be","defined by the Commission, taking into","account existing regional cooperation","structures. Each Member State shall be","allowed to promote cooperation in more","than one geographical area. For that","purpose, the Commission shall consult the","Agency and the ENTSO for Electricity."],"old":["3. For the purposes of achieving the","goals set in paragraphs 1 and 2 of this","Article, the geographical area covered by","each regional cooperation structure may be","defined by the Commission, taking into","account existing regional cooperation","structures. Each Member State shall be","allowed to promote cooperation in more","than one geographical area. The","Commission is empowered to adopt","delegated acts in accordance with Article","63 concerning the geographical area","covered by each regional cooperation","structure. For that purpose, the","Commission shall consult the Agency and","the ENTSO for Electricity."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1145","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Dan Nica, Peter Kouroumbashev, Zigmantas Bal\u010dytis","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-789","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 9 a (new)"]],"meps":[124784,124857,96680],"meta":{"created":"2019-07-03T06:30:34"},"new":["9a. For the purposes of point (b) of","paragraph (9), when providing","recommendations for the costs to be","recovered by tariffs, the losses and","congestion caused that exceed the Union","average shall not be recognized as eligible","costs."],"old":[""],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"789","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Theresa Griffin, Jude Kirton-Darling, Clare Moody","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-198","location":[["Proposal for a regulation","Recital 48 a (new)"]],"meps":[124961,124953,124944],"meta":{"created":"2020-11-15T15:52:07"},"new":["(48a) Cooperation with third countries","through the internal energy market can","bring significant benefits to EU","consumers by way of enhanced security of","supply, market efficiencies and","integration of low-carbon energy. The","European Commission and Member","States should seek to closely cooperate","with third countries connected to the EU","electricity network, to foster the","development of integrated markets,","harmonised trading mechanisms and","regulatory convergence with these","countries."],"old":["",""],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"198","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-509","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 point a"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:34"},"new":["deleted"],"old":["(a) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 500 kW; or"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"509","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1146","location":[["Proposal for a regulation","Article 31 \u2013 paragraph 3"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:34"},"new":["3. Without prejudice to Articles 32 to","44 of this Regulation and for the purposes","of achieving the goals set in paragraphs 1","and 2 of this Article, the geographical area","covered by each regional cooperation","structure may be defined by the","Commission, taking into account existing","regional cooperation structures. Each","Member State shall be allowed to promote","cooperation in more than one geographical","area. The Commission is empowered to","adopt delegated acts in accordance with","Article 63 concerning the geographical","area covered by each regional cooperation","structure. For that purpose, the","Commission shall consult the Agency and","the ENTSO for Electricity."],"old":["3. For the purposes of achieving the","goals set in paragraphs 1 and 2 of this","Article, the geographical area covered by","each regional cooperation structure may be","defined by the Commission, taking into","account existing regional cooperation","structures. Each Member State shall be","allowed to promote cooperation in more","than one geographical area. The","Commission is empowered to adopt","delegated acts in accordance with Article","63 concerning the geographical area","covered by each regional cooperation","structure. For that purpose, the","Commission shall consult the Agency and","the ENTSO for Electricity."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1146","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Dan Nica, Jos\u00e9 Blanco L\u00f3pez, Peter Kouroumbashev, Zigmantas Bal\u010dytis, Soledad Cabez\u00f3n Ruiz, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-790","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 9 b (new)"]],"meps":[124784,125044,124857,96680,125041,124699],"meta":{"created":"2019-07-03T06:30:34"},"new":["9b. Regulatory authorities shall adopt","a set of indicators for measuring the","performance of transmission and","distribution system operators, which","should at least include all of the","following:","- volume of curtailed energy in MWh,","disaggregated per type of generation","source;","- percentage of the length of lines","operated under dynamic line ratings;","- percentage of substations remotely","monitored and controlled in real-time;","- percentage of the length of lines","operated under dynamic line ratings;","- losses in high, medium and low-voltage","grids;","- the frequency and duration of power","interruptions on the grid.","By [two years after the entry into force of","this Regulation], and every two years","thereafter, regulatory authorities shall","publish a report on the performance of","transmission and distribution system","operators, together with recommendations","for improvement where necessary."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"790","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Claude Turmes","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-510","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 point a"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:34"},"new":["deleted"],"old":["(a) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 500 kW; or"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"510","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-199","justification":" Achieving the internal energy market as well as the EU climate and energy targets for 2030\n and 2050 requires for the integration of a high share of variable renewable energy sources in\n the power system, which must be designed adequately to achieve this integration in the most\n efficient and cost effective way.","location":[[" Proposal for a regulation","Article 1 \u2013 paragraph 1 \u2013 point a"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:07"},"new":["(a) setting the basis for an efficient","achievement of the objectives of the","European Energy Union and in particular","the climate and energy framework for","203030 by enabling market signals to be","delivered for increased flexibility,","decarbonisation and innovation and","making the market fit to accommodate a","high share of variable renewable energy","sources by 2030;","_________________","30","COM/2014/015 final. COM/2014/015 final."],"old":["(a) setting the basis for an efficient","achievement of the objectives of the","European Energy Union and in particular","the climate and energy framework for","203030 by enabling market signals to be","delivered for increased flexibility,","decarbonisation and innovation;","_________________","30"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"199","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Dan Nica, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1147","location":[["Proposal for a regulation","Article 31 \u2013 paragraph 3"]],"meps":[124826,124870,124739,124735,124699,125041,125044,124784,124947],"meta":{"created":"2019-07-03T06:30:34"},"new":["3. For the purposes of achieving the","goals set in paragraphs 1 and 2 of this","Article, the geographical area covered by","each regional cooperation structure may be","defined by the Commission, taking into","account existing regional cooperation","structures. Each Member State shall be","allowed to promote cooperation in more","than one geographical area. The","Commission is empowered to adopt","delegated acts in accordance with Article","63 concerning the geographical area","covered by each regional cooperation","structure. For that purpose, the","Commission shall consult the regulatory","authorities of Member States, the Agency","and the ENTSO for Electricity."],"old":["3. For the purposes of achieving the","goals set in paragraphs 1 and 2 of this","Article, the geographical area covered by","each regional cooperation structure may be","defined by the Commission, taking into","account existing regional cooperation","structures. Each Member State shall be","allowed to promote cooperation in more","than one geographical area. The","Commission is empowered to adopt","delegated acts in accordance with Article","63 concerning the geographical area","covered by each regional cooperation","structure. For that purpose, the","Commission shall consult the Agency and","the ENTSO for Electricity."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1147","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Angelika Niebler, Sven Schulze","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-791","justification":" Methods of setting tariffs, and network tariffs, are based on national and regional influences.\n Harmonisation of network tariffs would be contrary to the subsidiarity principle. It is\n therefore not the role of ACER to issue a recommendation on this. There is no need for a\n delegated act.","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 10"]],"meps":[124809],"meta":{"created":"2019-07-03T06:30:34"},"new":["deleted"],"old":["10. Without prejudice to further","harmonisation by way of delegated acts","pursuant to Article 55(1)(k), regulatory","authorities shall take the Agency's","recommendation duly into consideration","when approving or fixing transmission","tariffs or their methodologies in","accordance with Article 59(6)(a) of [recast","of Directive 2009/72/EC as proposed by","COM(2016) 864/2]."],"orig_lang":"de","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"791","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Martina Werner, Flavio Zanonato, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula- Natri, Eugen Freund, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-511","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 point a"]],"meps":[124826,124800,124870,124739,124735,125018,124699,125041,125044,124947],"meta":{"created":"2019-07-03T06:30:34"},"new":["(a) generating installations using","renewable energy sources; or"],"old":["(a) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 500 kW; or"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"511","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Kate\u0159ina Kone\u010dn\u00e1, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1148","location":[[" Proposal for a regulation","Article 32"]],"meps":[23699,96713],"meta":{"created":"2019-07-03T06:30:34"},"new":["Article 32 deleted","Establishment and mission of regional","operational centres"],"old":["1. By [OP: twelve months after entry into","force], all transmission system operators","shall establish regional operational","centres in accordance with the criteria set","out in this chapter. Regional operational","centres shall be established in the territory","of one of the Member States of the region","where it will operate.","2. Regional operational centres shall be","organised in a legal form as referred to in","Article 1 of Directive 2009/101/EC of the","European Parliament and of the","Council.36","3. Regional operational centres shall","complement the role of transmission","system operators by performing functions","of regional relevance. They shall establish","operational arrangements in order to","ensure the efficient, secure and reliable","operation of the interconnected","transmission system.","_________________","36","Directive 2009/101/EC of the European","Parliament and of the Council of 16","September 2009 on coordination of","safeguards which, for the protection of","the interests of members and third parties,","are required by Member States of","companies within the meaning of the","second paragraph of Article 48 of the","Treaty, with a view to making such","safeguards equivalent (OJ L 258,","1.10.2009, p. 11)."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1148","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-200","location":[[" Proposal for a regulation","Article 1 \u2013 paragraph 1 \u2013 point a"]],"meps":[90110],"meta":{"created":"2020-11-15T15:52:07"},"new":["(a) setting the basis for an efficient","achievement of the objectives of the","European Energy Union, among them a","minimum interconnection level of 10%","and an indicative target of 15% for 2030,","and in particular the climate and energy","framework for 203030 by enabling market","signals to be delivered for increased","flexibility, decarbonisation and innovation;","_________________","30","COM/2014/015 final."],"old":["(a) setting the basis for an efficient","achievement of the objectives of the","European Energy Union and in particular","the climate and energy framework for","203030 by enabling market signals to be","delivered for increased flexibility,","decarbonisation and innovation;","_________________","30","COM/2014/015 final."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"200","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-792","justification":"Distribution tariffs have to reflect structural and regional circumstances consumption-\ndependent, the added value is therefore questionable. A harmonised structure and two year\nupdate cycle could cause significant distortions in tariffing system e.g. in terms of\npredictability of regulatory decisions.","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 10"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:34"},"new":["deleted"],"old":["10. Without prejudice to further","harmonisation by way of delegated acts","pursuant to Article 55(1)(k), regulatory","authorities shall take the Agency's","recommendation duly into consideration","when approving or fixing transmission","tariffs or their methodologies in","accordance with Article 59(6)(a) of [recast","of Directive 2009/72/EC as proposed by","COM(2016) 864/2]."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"792","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-512","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 point a"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:34"},"new":["(a) generating or energy","storage installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","capacity of less than 500 kW; or"],"old":["(a) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 500 kW; or"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"512","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Angelika Niebler, Sven Schulze","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1149","justification":" It is not at all clear how much value would be added by creating regional operational\n centres.The ENTSO for electricity is an existing grouping of transmission system operators at\n EU level.An additional body would result in a disproportionately high administrative and\n bureaucratic burden.Duplicate structures must be avoided.Areas such as central security of\n supply or risk-preparedness should remain the responsibility of the Member States and the\n transmission system operators.The reference to regional operational centres should be\n deleted from the proposal for a regulation.","location":[["Proposal for a regulation","Article 32"]],"meps":[124809],"meta":{"created":"2019-07-03T06:30:34"},"new":["Article 32 deleted","operational centres"],"old":["Establishment and mission of regional","1. By [OP: twelve months after entry into","force], all transmission system operators","shall establish regional operational","centres in accordance with the criteria set","out in this chapter. Regional operational","centres shall be established in the territory","of one of the Member States of the region","where it will operate.","2. Regional operational centres shall be","organised in a legal form as referred to in","Article 1 of Directive 2009/101/EC of the","European Parliament and of the","Council.36 genannten Rechtsformen.","3. Regional operational centres shall","complement the role of transmission","system operators by performing functions","of regional relevance. They shall establish","operational arrangements in order to","ensure the efficient, secure and reliable","operation of the interconnected","transmission system.","_________________","36","Directive 2009/101/EC of the European","Parliament and of the Council of 16","September 2009 on coordination of","safeguards which, for the protection of","the interests of members and third parties,","are required by Member States of","companies within the meaning of the","second paragraph of Article 48 of the","Treaty, with a view to making such","safeguards equivalent (OJ L 258,","1.10.2009, p. 11)."],"orig_lang":"de","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1149","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-793","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 10"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:34"},"new":["deleted"],"old":["10. Without prejudice to further","harmonisation by way of delegated acts","pursuant to Article 55(1)(k), regulatory","authorities shall take the Agency's","recommendation duly into consideration","when approving or fixing transmission","tariffs or their methodologies in","accordance with Article 59(6)(a) of [recast","of Directive 2009/72/EC as proposed by","COM(2016) 864/2]."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"793","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Eugen Freund, Patrizia Toia, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-201","location":[["Proposal for a regulation","Article 1 \u2013 paragraph 1 \u2013 point a"]],"meps":[124826,124870,124739,124735,125018,28340,124699,125041,125044,124947],"meta":{"created":"2020-11-15T15:52:07"},"new":["(a) setting the basis for an efficient","achievement of the objectives of the","European Energy Union and in particular","the climate and energy framework for 2030","by enabling market signals to be delivered","for increased efficiency, flexibility,","decarbonisation and innovation;"],"old":["(a) setting the basis for an efficient","achievement of the objectives of the","European Energy Union and in particular","the climate and energy framework for","203030 by enabling market signals to be","delivered for increased flexibility,","decarbonisation and innovation;","_________________","30","COM/2014/015 final."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"201","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Kate\u0159ina Kone\u010dn\u00e1, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-513","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 point a"]],"meps":[23699,96713],"meta":{"created":"2019-07-03T06:30:34"},"new":["(a) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 100 kW; or"],"old":["(a) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 500 kW; or"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"513","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-794","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 10"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:34"},"new":["10. The information published","pursuant to Article 16(9) shall be","accessible to the public, free of charge","and of any limitations as to its use. It shall","be published: a) in a user-friendly","manner; b) in a clear, easily accessible","way and on a non-discriminatory basis; c)","in a downloadable format; d) in one or","more of the official languages of the","Member State and, unless one of the","official languages of the Member State is","German, to the extent possible, in","German."],"old":["10. Without prejudice to further","harmonisation by way of delegated acts","pursuant to Article 55(1)(k), regulatory","authorities shall take the Agency's","recommendation duly into consideration","when approving or fixing transmission","tariffs or their methodologies in","accordance with Article 59(6)(a) of [recast","","of Directive 2009/72/EC as proposed by","COM(2016) 864/2]."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"794","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-514","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 point a"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:34"},"new":["(a) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 100 kW; or"],"old":["(a) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 500 kW; or"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"514","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski, Edward Czesak, Nikolay Barekov","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-202","justification":" Decarbonisation objective is dealt with in other existing legislation such as the EU ETS and\n should not be put at the centre of the electricity market design.","location":[["Proposal for a regulation","Article 1 \u2013 paragraph 1 \u2013 point a"]],"meps":[124891,132925,124871],"meta":{"created":"2020-11-15T15:52:07"},"new":["(a) setting the basis for an efficient","achievement of the objectives of the","European Energy Union and in particular","the climate and energy framework for","203030 by enabling market signals to be","delivered for increased flexibility and","innovation;","_________________","30","COM/2014/015 final. COM/2014/015 final."],"old":["(a) setting the basis for an efficient","achievement of the objectives of the","European Energy Union and in particular","the climate and energy framework for","203030 by enabling market signals to be","delivered for increased flexibility,","decarbonisation and innovation;","_________________","30"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"202","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-795","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 10"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:34"},"new":["10. By six months after entry into","force, and afterwards every two years, the","national regulatory authority or the","competent transmission system operators,","as decided by the national regulatory","authority, shall publish information","according to the Minimum Publication","Requirements Template, the methodology","and all cost information for calculating","the respective network tariffs."],"old":["10. Without prejudice to further","harmonisation by way of delegated acts","pursuant to Article 55(1)(k), regulatory","authorities shall take the Agency's","recommendation duly into consideration","when approving or fixing transmission","tariffs or their methodologies in","accordance with Article 59(6)(a) of [recast","of Directive 2009/72/EC as proposed by","COM(2016) 864/2]."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"795","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1150","location":[[" Proposal for a regulation","Article 32"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:34"},"new":["Article 32 deleted","operational centres"],"old":["Establishment and mission of regional","1. By [OP: twelve months after entry into","force], all transmission system operators","shall establish regional operational","centres in accordance with the criteria set","out in this chapter. Regional operational","centres shall be established in the territory","of one of the Member States of the region","where it will operate.","2. Regional operational centres shall be","organised in a legal form as referred to in","Article 1 of Directive 2009/101/EC of the","European Parliament and of the","Council.36","3. Regional operational centres shall","complement the role of transmission","system operators by performing functions","of regional relevance. They shall establish","operational arrangements in order to","ensure the efficient, secure and reliable","operation of the interconnected","transmission system.","_________________","36","Directive 2009/101/EC of the European","Parliament and of the Council of 16","September 2009 on coordination of","safeguards which, for the protection of","the interests of members and third parties,","are required by Member States of","companies within the meaning of the","second paragraph of Article 48 of the","Treaty, with a view to making such","safeguards equivalent (OJ L 258,","1.10.2009, p. 11)."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1150","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Carolina Punset, Gerben-Jan Gerbrandy","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-203","location":[[" Proposal for a regulation","Article 1 \u2013 paragraph 1 \u2013 point b"]],"meps":[90110,96940],"meta":{"created":"2020-11-15T15:52:07"},"new":["(b) setting fundamental principles for","well-functioning, integrated electricity","markets, which allow non-discriminatory","market access for all resource providers","and electricity customers, empower","consumers, enable demand response,","energy storage and energy efficiency,","facilitate aggregation of distributed","demand and supply, and contribute to the","decarbonisation of the economy by","enabling market integration and market-","based remuneration of electricity generated","from renewable sources. Interconnections","between Member States further contribute","to an efficient integration of electricity","from renewable energy sources to","countervail their variability, reduce","balancing costs and encourage","competition. Each Member State shall","ensure that its level of electricity","interconnection is equivalent to at least","10% of their installed production capacity","by 2020, with a view to reaching a more","ambitious level by2030;"],"old":["(b) setting fundamental principles for","well-functioning, integrated electricity","markets, which allow non-discriminatory","market access for all resource providers","and electricity customers, empower","consumers, enable demand response and","energy efficiency, facilitate aggregation of","distributed demand and supply, and","contribute to the decarbonisation of the","economy by enabling market integration","and market-based remuneration of","electricity generated from renewable","sources;",""],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"203","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-796","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 10"]],"meps":[124826,124870,124739,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:34"},"new":["10. Without prejudice to further","harmonisation by way of the ordinary","legislative procedure, regulatory","authorities shall apply the Agency's","guidelines when approving or fixing","transmission tariffs or their methodologies","in accordance with Article59(6)(a) of","[recast of Directive 2009/72/EC as","proposed by COM(2016) 864/2]."],"old":["10. Without prejudice to further","harmonisation by way of delegated acts","pursuant to Article 55(1)(k), regulatory","authorities shall take the Agency's","recommendation duly into consideration","when approving or fixing transmission","tariffs or their methodologies in accordance","","with Article 59(6)(a) of [recast of Directive","2009/72/EC as proposed by COM(2016)","864/2]."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"796","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-515","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 point a"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:34"},"new":["(a) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 1 MW; or"],"old":["(a) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 500 kW; or"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"515","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1151","justification":"This modification should apply to all references made to \"regional operational centres\".","location":[["Proposal for a regulation","Article 32 \u2013 title"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:34"},"new":["Establishment and mission of regional","coordination centres","(This amendment applies throughout the","text.Adopting it will necessitate","corresponding changes throughout.)"],"old":["Establishment and mission of regional","operational centres"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1151","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-797","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 11"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:34"},"new":["deleted"],"old":["11. The Agency shall monitor the","implementation of its recommendation","and provide a report to the Commission by","31st January each year. It shall update","the recommendation at least once every","two years."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"797","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-204","location":[["Proposal for a regulation","Article 1 \u2013 paragraph 1 \u2013 point b"]],"meps":[2278],"meta":{"created":"2020-11-15T15:52:07"},"new":["(b) setting fundamental principles for","well-functioning, integrated electricity","markets, which allow non-discriminatory","market access for all resource providers","and electricity customers, empower","consumers, enable demand response and","energy efficiency, facilitate aggregation of","distributed demand and supply,","recognizing energy storage as a separate","asset class besides generation,","distribution/ transmission and","consumption as well as contribute to the","achievement of a cost-efficient low-","carbon economy by enabling market","integration and market-based remuneration","of electricity generated from renewable","sources;"],"old":["(b) setting fundamental principles for","well-functioning, integrated electricity","markets, which allow non-discriminatory","market access for all resource providers","and electricity customers, empower","consumers, enable demand response and","energy efficiency, facilitate aggregation of","distributed demand and supply, and","contribute to the decarbonisation of the","economy by enabling market integration","and market-based remuneration of","electricity generated from renewable","sources;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"204","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Martina Werner, Flavio Zanonato, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula- Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-516","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 point a a (new)"]],"meps":[124826,124800,124870,124739,124735,124699,125041,125044,124947],"meta":{"created":"2019-07-03T06:30:34"},"new":["(a a) generating installations using","high-efficiency cogeneration with an","installed electricity capacity of less than","500 kW; or"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"516","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-798","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 11"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:34"},"new":["deleted"],"old":["11. The Agency shall monitor the","implementation of its recommendation","and provide a report to the Commission by","31st January each year. It shall update","the recommendation at least once every","two years."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"798","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-205","location":[["Proposal for a regulation","Article 1 \u2013 paragraph 1 \u2013 point b"]],"meps":[28331],"meta":{"created":"2020-11-15T15:52:07"},"new":["(b) setting fundamental principles for","well-functioning, integrated electricity","markets, which allow non-discriminatory","market access for all resource providers","and electricity customers, empower","consumers, enable demand response and","energy efficiency, facilitate aggregation of","distributed demand and supply, and","contribute to the decarbonisation of the","economy by enabling market integration","and market-based remuneration of","electricity generated from renewable","sources via an innovative sector coupling","technologies that provide flexibility and","security of supply in an energy system","increasingly based on RES."],"old":["(b) setting fundamental principles for","well-functioning, integrated electricity","","markets, which allow non-discriminatory","market access for all resource providers","and electricity customers, empower","consumers, enable demand response and","energy efficiency, facilitate aggregation of","distributed demand and supply, and","contribute to the decarbonisation of the","economy by enabling market integration","and market-based remuneration of","electricity generated from renewable","sources;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"205","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1152","location":[["Proposal for a regulation","Article 32 \u2013 title"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:34"},"new":["Establishment of regional operational","centres"],"old":["Establishment and mission of regional","operational centres"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1152","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-517","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 point b"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:34"},"new":["deleted"],"old":["(b) demonstration projects for","innovative technologies."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"517","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Angelika Niebler, Sven Schulze","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-799","justification":" Methods of setting tariffs, and network tariffs, are based on national and regional influences.\n Harmonisation of network tariffs would be contrary to the subsidiarity principle. It is\n therefore not the role of ACER to issue a recommendation on this.","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 11"]],"meps":[124809],"meta":{"created":"2019-07-03T06:30:34"},"new":["deleted"],"old":["11. The Agency shall monitor the","implementation of its recommendation","and provide a report to the Commission by","31st January each year. It shall update","the recommendation at least once every","two years."],"orig_lang":"de","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"799","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Hans-Olaf Henkel","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-206","location":[[" Proposal for a regulation","Article 1 \u2013 paragraph 1 \u2013 point b"]],"meps":[124823],"meta":{"created":"2020-11-15T15:52:07"},"new":["(b) setting fundamental principles for","well-functioning, integrated electricity","markets, which allow non-discriminatory","market access for all resource providers","and electricity customers, empower","consumers, enable demand response and","energy efficiency, facilitate aggregation of","distributed demand and supply, and","contribute to the decarbonisation of the","economy by enabling market integration","and market-based remuneration of","electricity generated from renewable","sources through sector coupling","technologies providing flexibility and","contributing to security of supply."],"old":["(b) setting fundamental principles for","well-functioning, integrated electricity","markets, which allow non-discriminatory","market access for all resource providers","and electricity customers, empower","consumers, enable demand response and","energy efficiency, facilitate aggregation of","distributed demand and supply, and","contribute to the decarbonisation of the","economy by enabling market integration","and market-based remuneration of","electricity generated from renewable","sources;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"206","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1153","location":[[" Proposal for a regulation","Article 32 \u2013 paragraph 1"]],"meps":[124826,124870,124739,124735,124699,125041,125044,124947],"meta":{"created":"2019-07-03T06:30:35"},"new":["1. By [OP: twelve months after entry","into force], regional coordination centres","shall replace regional security","coordinators established in accordance","with the Commission Regulation","establishing a Guideline on Electricity","Transmission System Operation pursuant","to the criteria set out in this chapter.","Regional coordination centers shall cover","all the functions of the regional security","coordinators established in accordance","with Regulation ... [The Commission","Regulation establishing a guideline on","Electricity Transmission System","Operation] by 1 January 2022.","All transmission system operators shall","adhere to a regional coordination centre.","If a region is not covered by an existing or","planned regional security coordinator, the","transmission system operators of that","region shall establish a regional","coordination centre. To this effect they","shall submit to the regulatory authorities","of the region a proposal for the","establishment of a regional coordination","centre in accordance with the criteria set","out in this chapter.","The proposal shall include the following","requirements:","(a) Member State where the regional","coordination centre will be located;","(b) the organisational, financial and","operational arrangements necessary to","ensure the efficient, secure and reliable","operation of the interconnected","transmission system;","(c) an implementation plan for the entry","into operation of the regional","coordination centres;","(d) the statutes and rules of procedure of","regional coordination centres;","(e) a description of cooperative processes","in accordance with Article 35;","(f) a description of the arrangements","concerning the liability of regional","coordination centres in accordance with","Article 44."],"old":["1. By [OP: twelve months after entry","into force], all transmission system","operators shall establish regional","operational centres in accordance with the","criteria set out in this chapter. Regional","operational centres shall be established in","the territory of one of the Member States","of the region where it will operate."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1153","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Barbara Kappel, Lorenzo Fontana, Angelo Ciocca","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-800","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 11"]],"meps":[125024,96993,183793],"meta":{"created":"2019-07-03T06:30:34"},"new":["11. The Agency shall regularly publish","a summary report on the information","published by the national regulatory","authorities or transmission system","operators pursuant to Article 16(9). After","two editions of the summary report, the","Agency may provide an opinion addressed","to regulatory authorities on the","transparency of transmission tariffs."],"old":["11. The Agency shall monitor the","implementation of its recommendation","and provide a report to the Commission by","31st January each year. It shall update","the recommendation at least once every","two years."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"800","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-207","location":[["Proposal for a regulation","Article 1 \u2013 paragraph 1 \u2013 point b"]],"meps":[124706],"meta":{"created":"2020-11-15T15:52:07"},"new":["(b) setting fundamental principles for","well-functioning, integrated electricity","markets, which allow non-discriminatory","market access for all resource providers","and electricity customers, empower","consumers, enable demand response and","energy efficiency, enable global","competitiveness of the EU economy,","facilitate aggregation of distributed","demand and supply, and contribute to the","decarbonisation of the economy by","enabling market integration and market-","based remuneration of electricity generated","from renewable sources;"],"old":["(b) setting fundamental principles for","well-functioning, integrated electricity","markets, which allow non-discriminatory","market access for all resource providers","and electricity customers, empower","consumers, enable demand response and","energy efficiency, facilitate aggregation of","distributed demand and supply, and","contribute to the decarbonisation of the","economy by enabling market integration","and market-based remuneration of","electricity generated from renewable","sources;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"207","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1154","location":[["Proposal for a regulation","Article 32 \u2013 paragraph 1"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:35"},"new":["1. By [OP: twelve months after entry","into force], all transmission system","operators of a system operation region","shall submit to the regulatory authorities","of the region for a review a proposal for","the establishment of regional","coordination centres in accordance with","the criteria set out in this chapter.","The proposal shall include the following","information:","(a) Member State where the regional","coordination centre will be located;","(b) the organisational, financial and","operational arrangements necessary to","ensure the efficient, secure and reliable","operation of the interconnected","transmission system;","(c) an implementation plan for the entry","into operation of the regional","coordination centres;","(d) the statutes and rules of procedure of","regional coordination centres;","(e) a description of cooperative processes","in accordance with Article 35;","(f) a description of the arrangements","concerning the liability of regional","coordination centres in accordance with","Article 44."],"old":["1. By [OP: twelve months after entry","into force], all transmission system","operators shall establish regional","operational centres in accordance with the","criteria set out in this chapter. Regional","operational centres shall be established in","the territory of one of the Member States","of the region where it will operate."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1154","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-801","justification":"Not only the construction of new but also the optimisation of existing interconnectors shall be\nfinanced by congestion incomes, as this could equally lead to a remediation of congestion.\nThis Amendment imposes itself also in the context of the principle established in paragraph 1\nof this Article (\"nor provide a disincentive to reduce congestion\"), and is intrinsically linked\nto Article 59, paragraph 3 (\"shall also apply to significant increases of capacity in existing\ninterconnectors\").","location":[[" Proposal for a regulation","Article 17 \u2013 paragraph 2 \u2013 subparagraph 1 \u2013 point b"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:34"},"new":["(b) maintaining or increasing","interconnection capacities through","optimisation of the usage of existing","interconnectors, network investments, in","particular in new interconnectors. If the","revenues cannot be efficiently used for the","purposes set out in points (a) and/or (b) of","the first subparagraph, they may be used,","subject to approval by the regulatory","authorities of the Member State","concerned, as income to be taken into","account when approving the methodology","for calculating network tariffs and/or","fixing network tariffs.","Or. en","(The last part of the wording stems from the original regulation.)"],"old":["(b) maintaining or increasing","interconnection capacities through network","investments, in particular in new","interconnectors.","",""],"peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"801","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Rebecca Harms, Jakop Dalunde, Reinhard B\u00fctikofer, Davor \u0160krlec, Yannick Jadot, Michel Reimon, Benedek J\u00e1vor, Florent Marcellesi on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-518","justification":" Priority dispatch is an important tool to ensure that renewable energy is used as it is\n produced and thus helps to achieve our climate targets, as well as continues to provide a\n stable investment framework for future projects, in line with the provisions of the current\n renewable energy directive (Directive 2009/28/EC).","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 point b"]],"meps":[28233,183338,96739,124756,96740,124935,124721,26146],"meta":{"created":"2019-07-03T06:30:34"},"new":["deleted"],"old":["(b) demonstration projects for","innovative technologies."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"518","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-802","justification":" The proposal that congestion revenues should be used to increase and to guarantee the\n firmness of cross-border capacity is fully supported. However the prohibition to use\n congestion revenues to lower network tariffs provided for in Regulation 714/2009 is not\n justified and would even go against economic efficiency. Investments by TSOs were made to\n build interconnection capacity. Such investments are usually financed by the increase of\n national tariffs. Therefore, it is justified to use congestion income in order to lower tariffs,\n thus \u201cpaying back\u201d grid users for an investment in the past. The option to use interconnector\n congestion revenues to lower transmission tariffs, subject to national regulatory agreement,\n should be therefore maintained also to the benefit of consumers.","location":[["Proposal for a regulation","Article 17 \u2013 paragraph 2 \u2013 subparagraph 1 \u2013 point b"]],"meps":[96993],"meta":{"created":"2019-07-03T06:30:35"},"new":["(b) maintaining or increasing","interconnection capacities through","coordinated remedial actions and/or","network investments, in particular up to","the target value for transfer capacity at","each cross-border boundary."],"old":["(b) maintaining or increasing","interconnection capacities through network","investments, in particular in new","interconnectors."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"802","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1155","location":[[" Proposal for a regulation","Article 32 \u2013 paragraph 1"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:35"},"new":["1. By [OP: twelve months after entry","into force], all transmission system","operators of a system operation region","shall submit to the regulatory authorities","of the region a proposal for the","establishment of regional operational","centres in accordance with the criteria set","out in this chapter. The proposal shall","include at least:","(a) The Member State where the regional","operational centre will be established,","which shall be one of the Member States","of the region where it will operate.","(b) The statutes and rules of procedure of","regional operational centres;","(c) The cooperative decision-making","processes in accordance with Article 35;","(d) The arrangements concerning the","liability of regional operational centres in","accordance with Article 44."],"old":["1. By [OP: twelve months after entry","into force], all transmission system","operators shall establish regional","operational centres in accordance with the","criteria set out in this chapter. Regional","operational centres shall be established in","the territory of one of the Member States","of the region where it will operate."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1155","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Marian-Jean Marinescu","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-208","location":[["Proposal for a regulation","Article 1 \u2013 paragraph 1 \u2013 point b"]],"meps":[33982],"meta":{"created":"2020-11-15T15:52:07"},"new":["(b) setting fundamental principles for","well-functioning, integrated electricity","markets, which allow non-discriminatory","market access for all resource providers","and electricity customers, empower","consumers, enable competitiveness on the","global market, demand response and","energy efficiency, facilitate aggregation of","distributed demand and supply, and","contribute to the decarbonisation of the","economy by enabling market integration","and market-based remuneration of","electricity generated from renewable","sources;"],"old":["(b) setting fundamental principles for","well-functioning, integrated electricity","markets, which allow non-discriminatory","market access for all resource providers","and electricity customers, empower","consumers, enable demand response and","energy efficiency, facilitate aggregation of","distributed demand and supply, and","contribute to the decarbonisation of the","economy by enabling market integration","and market-based remuneration of","electricity generated from renewable","sources;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"208","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Claude Turmes","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-519","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 point b"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:34"},"new":["deleted"],"old":["(b) demonstration projects for","innovative technologies."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"519","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Patrizia Toia, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-209","location":[[" Proposal for a regulation","Article 1 \u2013 paragraph 1 \u2013 point b"]],"meps":[124826,124870,124739,124735,28340,124699,125041,125044],"meta":{"created":"2020-11-15T15:52:07"},"new":["(b) setting fundamental principles for","well-functioning cross-border, integrated","and liquid electricity markets, which allow","non-discriminatory market access for all","resource providers and electricity","customers, empower consumers, enable","demand response and energy efficiency,","facilitate aggregation of distributed","demand and supply, and contribute to the","decarbonisation of the economy by","enabling market integration and market-","based remuneration of electricity generated","from renewable sources;"],"old":["(b) setting fundamental principles for","well-functioning, integrated electricity","markets, which allow non-discriminatory","market access for all resource providers","and electricity customers, empower","consumers, enable demand response and","energy efficiency, facilitate aggregation of","distributed demand and supply, and","contribute to the decarbonisation of the","economy by enabling market integration","and market-based remuneration of","electricity generated from renewable","sources;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"209","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Massimiliano Salini, Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-803","location":[[" Proposal for a regulation","Article 17 \u2013 paragraph 2 \u2013 subparagraph 1 \u2013 point b"]],"meps":[125670,36392],"meta":{"created":"2019-07-03T06:30:35"},"new":["(b) maintaining or increasing","interconnection capacities through","coordinated remedial actions and/or","network investments up to the target value","for transfer capacity at each cross- border","boundary."],"old":["(b) maintaining or increasing","interconnection capacities through network","investments, in particular in new","interconnectors."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"803","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Werner Langen","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-210","location":[[" Proposal for a regulation","Article 1 \u2013 paragraph 1 \u2013 point b"]],"meps":[1928],"meta":{"created":"2020-11-15T15:52:07"},"new":["(b) setting fundamental principles for","well-functioning, integrated electricity","markets, which allow non-discriminatory","market access for all resource providers","and electricity customers, empower","consumers, enable demand response and","energy efficiency, facilitate aggregation of","distributed demand and supply, and","contribute to the decarbonisation of the","economy by enabling market and sectoral","integration and market-based remuneration","of electricity generated from renewable","sources;"],"old":["(b) setting fundamental principles for","well-functioning, integrated electricity","markets, which allow non-discriminatory","market access for all resource providers","and electricity customers, empower","consumers, enable demand response and","energy efficiency, facilitate aggregation of","distributed demand and supply, and","contribute to the decarbonisation of the","economy by enabling market integration","and market-based remuneration of","electricity generated from renewable","","","sources;"],"orig_lang":"de","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"210","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Martina Werner, Flavio Zanonato, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula- Natri, Miroslav Poche, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-520","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 point b"]],"meps":[124826,124800,124870,124739,124735,124699,124947],"meta":{"created":"2019-07-03T06:30:34"},"new":["(b) generating installations that are","demonstration projects for innovative","technologies with an installed electricity","capacity of less than 500 kW."],"old":["(b) demonstration projects for","innovative technologies."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"520","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski, Edward Czesak, Nikolay Barekov","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1156","justification":"The existing TSO\u2019 Regional Security Coordination Initiatives have proved to establish an\neffective way to cooperate at the regional level thus the RSCs should be created instead of\nROCs, which are unnecessary also in light of the proportionality principle.The transfer of the\nkey functions of TSOs to ROCs would in fact be substitutive thus in contradiction to the\nprinciple of subsidiarity.","location":[[" Proposal for a regulation","Article 32 \u2013 paragraph 1"]],"meps":[124891,132925,124871],"meta":{"created":"2019-07-03T06:30:35"},"new":["1. By [OP: twelve months after entry","into force], all transmission system","operators shall establish regional security","coordinators in accordance with the","criteria set out in this chapter. Regional","security coordinators shall be established","in the territory of one of the Member States","of the capacity calculation region where it","will operate."],"old":["1. By [OP: twelve months after entry","into force], all transmission system","operators shall establish regional","operational centres in accordance with the","criteria set out in this chapter. Regional","operational centres shall be established in","the territory of one of the Member States of","the region where it will operate."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1156","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-804","location":[[" Proposal for a regulation","Article 17 \u2013 paragraph 2 \u2013 subparagraph 1 \u2013 point b"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:35"},"new":["(b) maintaining or increasing","interconnection capacities through","coordinated remedial actions and/or","network investments."],"old":["(b) maintaining or increasing","interconnection capacities through network","investments, in particular in new","interconnectors."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"804","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski, Edward Czesak, Nikolay Barekov, Hans-Olaf Henkel","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-211","justification":"Decarbonisation objective is dealt with in other existing legislation such as the EU ETS and\nshould not be put at the centre of the electricity market design.","location":[["Proposal for a regulation","Article 1 \u2013 paragraph 1 \u2013 point b"]],"meps":[124891,132925,124871,124823],"meta":{"created":"2020-11-15T15:52:07"},"new":["(b) setting fundamental principles for","well-functioning, integrated electricity","markets, which allow non-discriminatory","market access for all resource providers","and electricity customers, empower","consumers, enable demand response and","energy efficiency, facilitate aggregation of","distributed demand and supply, as well as","enable market integration and market-","based remuneration of electricity generated","from renewable sources;"],"old":["(b) setting fundamental principles for","well-functioning, integrated electricity","markets, which allow non-discriminatory","market access for all resource providers","and electricity customers, empower","consumers, enable demand response and","energy efficiency, facilitate aggregation of","distributed demand and supply, and","contribute to the decarbonisation of the","economy by enabling market integration","and market-based remuneration of","electricity generated from renewable","sources;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"211","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-521","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 point b"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:34"},"new":["(b) demonstration projects for","innovative technologies with an installed","electricity capacity of less than 500kW."],"old":["(b) demonstration projects for","innovative technologies."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"521","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-805","location":[["Proposal for a regulation","Article 17 \u2013 paragraph 2 \u2013 subparagraph 1 \u2013 point b"]],"meps":[124826,124870,124739,124735,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:35"},"new":["(b) increasing interconnection","capacities through network investments, in","particular in new interconnectors."],"old":["(b) maintaining or increasing","interconnection capacities through network","investments, in particular in new","interconnectors."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"805","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-212","justification":" The EU is bound to its climate commitments and its Member States to fulfil the relevant\n targets. With regards to the addition of recital 48 in its revision, it must therefore be clarified\n that interactions between the internal energy market and third countries should not result in\n so-called carbon dumping and that there is a level playing field among EU and third country\n energy producers.","location":[["Proposal for a regulation","Article 1 \u2013 paragraph 1 \u2013 point c"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:07"},"new":["(c) setting fair rules for intra-EU","cross-border exchanges in electricity, thus","enhancing competition within the internal","market in electricity, taking into account","the particular characteristics of national","and regional markets. This includes the","establishment of a compensation","mechanism for cross-border flows of","electricity and the setting of harmonised","principles on cross-border transmission","charges and the allocation of available","capacities of interconnections between","national transmission systems; while","establishing the necessary restrictions to","cross-border exchanges with third","countries to avoid \u201ccarbon dumping\u201d via","the import of electricity generated by","high-carbon assets located in non EU","Member States;"],"old":["(c) setting fair rules for cross-border","exchanges in electricity, thus enhancing","competition within the internal market in","electricity, taking into account the","","particular characteristics of national and","regional markets. This includes the","establishment of a compensation","mechanism for cross-border flows of","electricity and the setting of harmonised","principles on cross-border transmission","charges and the allocation of available","capacities of interconnections between","national transmission systems;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"212","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-522","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 2 \u2013 point b"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:34"},"new":["(b) demonstration projects for","innovative renewable energy technologies."],"old":["(b) demonstration projects for","innovative technologies."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"522","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-213","justification":"This amendment is intrinsically linked to other amendments tabled to provisions which have\nbeen modified by the Commission","location":[[" Proposal for a regulation","Article 1 \u2013 paragraph 1 \u2013 point d"]],"meps":[124826,124870,124739,124735,124699,125041,125044],"meta":{"created":"2020-11-15T15:52:07"},"new":["(d) facilitating the emergence of a well-","functioning, liquid and transparent","wholesale market contributing to a high","level of security of supply in electricity. It","provides for mechanisms to harmonise the","rules for cross-border exchanges in","electricity, pursuant to the Capacity","Allocation and Congestion Management","(CACM) network codes."],"old":["(d) facilitating the emergence of a well-","functioning and transparent wholesale","market with a high level of security of","supply in electricity. It provides for","mechanisms to harmonise the rules for","cross-border exchanges in electricity."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"213","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1157","location":[["Proposal for a regulation","Article 32 \u2013 paragraph 1 a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:35"},"new":["1 a. Regional operational centres shall","enter into operation by [insert deadline","OP:12 months after the entry into","force].Regional operational centres shall","supersede the regional security","coordinators established in accordance","with [Commission Regulation establishing","a guideline on electricity transmission","system operation]."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1157","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Kathleen Van Brempt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-806","location":[["Proposal for a regulation","Article 17 \u2013 paragraph 2 \u2013 subparagraph 1 \u2013 point b a (new)"]],"meps":[5729],"meta":{"created":"2019-07-03T06:30:35"},"new":["(ba) integrating offshore electricity grid","development and connecting offshore","production to the onshore transmission","grid.;"],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"806","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-523","justification":" The priority for generating installations using renewable energy sources or high-efficiency\n co-generation when such priority does not increase dispatching costs implies giving priority\n to such installations against other installations in case of equal bids or economic conditions.\n In those situations, giving priority to generators using renewable energy sources or high-\n efficiency cogeneration does not increase dispatching costs while increases the integration of\n green technologies without a negative impact on the efficiency of the market.","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 2 a (new)"]],"meps":[90110],"meta":{"created":"2019-07-03T06:30:34"},"new":["2 a. When dispatching electricity","generating installations, transmission","system operators (TSOs)shall give priority","to generating installations using","renewable energy sources or high-","efficiency cogeneration in case of same","economic costs when compared to other","technologies."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"523","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Carlos Zorrinho","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-214","location":[["Proposal for a regulation","Article 1 \u2013 paragraph 1 \u2013 point d a (new)"]],"meps":[124739],"meta":{"created":"2020-11-15T15:52:07"},"new":["(da) The objectives concerning cross-","border trade referred to in the previous","points are subject to the prerequisite of","achieving a level of electricity","interconnections of at least 10% and an","indicative target of 15% for 2030, as laid","down in Article 3 of the recast of Directive","2009/72/EC proposed by COM (2016) 864","final /2."],"orig_lang":"pt","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"214","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-807","location":[["Proposal for a regulation","Article 17 \u2013 paragraph 2 \u2013 subparagraph 1 \u2013 point b a (new)"]],"meps":[124826,124870,124739,124735,125041,125044],"meta":{"created":"2019-07-03T06:30:35"},"new":["(ba) lovering tariffs"],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"807","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Martina Werner, Carlos Zorrinho, Miapetra Kumpula-Natri, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Edouard Martin, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1158","location":[[" Proposal for a regulation","Article 32 \u2013 paragraph 2 a (new)"]],"meps":[124826,124739,124735,125041,125044,124947,124784],"meta":{"created":"2019-07-03T06:30:35"},"new":["2 a. Regional coordination centres","shall enter into operation by 1 January","2022.Regional coordination centres shall","replace the regional security coordinators","established in accordance with Regulation","... [The Commission Regulation","establishing a guideline on Electricity","Transmission System Operation]."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1158","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-524","justification":"The EU legislative framework to 2030 must maintain priority access for renewables in order\nto ensure policy stability and investor confidence. Proposals to condition priority access for\nsmaller installations will reduce investor confidence and harm deployment of new renewable\nenergy installations, putting in jeopardy the EU\u2019s binding 2030 renewable energy target.","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 3"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:34"},"new":["deleted"],"old":["3. Where the total capacity of","generating installations subject to priority","dispatch under paragraph 2 is higher","than 15 % of the total installed generating","capacity in a Member State, point (a) of","paragraph 2 shall apply only to additional","generating installations using renewable","energy sources or high-efficiency","","cogeneration with an installed electricity","capacity of less than 250 kW.","From 1 January 2026, point (a) of","paragraph 2 shall apply only to","generating installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","capacity of less than 250 kW or, if the","threshold under the first sentence of this","paragraph has been reached, of less than","125 kW."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"524","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-215","location":[["Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point c"]],"meps":[124891],"meta":{"created":"2020-11-15T15:52:08"},"new":["(c) \u2018congestion\u2019 means a situation in","which all requests from market participants","to trade cannot be accommodated because","they would significantly affect the physical","flows on network elements which cannot","accommodate those flows ;"],"old":["(c) \u2018congestion\u2019 means a situation in","which all requests from market participants","to trade between two bidding zones cannot","be accommodated because they would","significantly affect the physical flows on","network elements which cannot","accommodate those flows ;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"215","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Kathleen Van Brempt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-808","location":[[" Proposal for a regulation","Article 17 \u2013 paragraph 2 \u2013 subparagraph 1 \u2013 point b b (new)"]],"meps":[5729],"meta":{"created":"2019-07-03T06:30:35"},"new":["(bb) developing of pumped hydro","storage."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"808","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1159","location":[[" Proposal for a regulation","Article 32 \u2013 paragraph 3"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:35"},"new":["deleted"],"old":["3. Regional operational centres shall","complement the role of transmission","system operators by performing functions","of regional relevance. They shall establish","operational arrangements in order to","ensure the efficient, secure and reliable","operation of the interconnected","transmission system."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1159","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-525","justification":" Regulation does not take into account gradual removal of priority dispatch for all market\n participants including small RES and CHP, but on the contrary preserves their priority\n dispatch. Such requirement is in direct conflict with technological neutrality and equal\n treatment of all market participants. Moreover economic substance of RES (zero fuel costs)\n already de facto provides priority dispatch to RES without explicit provision for such\n treatment.","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 3"]],"meps":[124699],"meta":{"created":"2019-07-03T06:30:34"},"new":["deleted"],"old":["3. Where the total capacity of","generating installations subject to priority","dispatch under paragraph 2 is higher","than 15 % of the total installed generating","capacity in a Member State, point (a) of","paragraph 2 shall apply only to additional","generating installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","capacity of less than 250 kW.","From 1 January 2026, point (a) of","paragraph 2 shall apply only to","generating installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","capacity of less than 250 kW or, if the","threshold under the first sentence of this","","","paragraph has been reached, of less than","125 kW."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"525","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-216","justification":" According to the understanding of original definition, the congestion could only exist between\n two bidding zones which would not reflect real conditions of transmission system and must be\n considered as well (typical example would be case of DE with internal congestions inside one\n bidding zone).Definition should be also aligned with definitions used in the network codes\n and guidelines.","location":[[" Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point c"]],"meps":[28331],"meta":{"created":"2020-11-15T15:52:08"},"new":["(c) \u2018congestion\u2019 means a situation in","which all requests from market participants","to trade cannot be accommodated because","they would significantly affect the physical","flows on network elements which cannot","accommodate those flows ;"],"old":["(c) \u2018congestion\u2019 means a situation in","which all requests from market participants","to trade between two bidding zones cannot","be accommodated because they would","significantly affect the physical flows on","network elements which cannot","accommodate those flows ;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"216","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Eugen Freund, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-809","location":[[" Proposal for a regulation","Article 17 \u2013 paragraph 2 \u2013 subparagraph 2"]],"meps":[124826,124870,124739,124735,125018,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:35"},"new":["deleted"],"old":["If the revenues cannot be efficiently used","for the purposes set out in points (a) or (b)","of the first subparagraph, they shall be","placed on a separate internal account line","for future use on these purposes."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"809","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Kate\u0159ina Kone\u010dn\u00e1, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-526","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 3"]],"meps":[23699,96713],"meta":{"created":"2019-07-03T06:30:35"},"new":["deleted"],"old":["3. Where the total capacity of","generating installations subject to priority","dispatch under paragraph 2 is higher","than 15 % of the total installed generating","capacity in a Member State, point (a) of","paragraph 2 shall apply only to additional","generating installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","capacity of less than 250 kW.","From 1 January 2026, point (a) of","paragraph 2 shall apply only to","generating installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","capacity of less than 250 kW or, if the","threshold under the first sentence of this","paragraph has been reached, of less than","125 kW."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"526","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1160","location":[[" Proposal for a regulation","Article 32 \u2013 paragraph 3"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:35"},"new":["3. Regional coordination centres shall","complement the role of transmission","system operators by performing functions","of regional relevance. The transmission","system operators shall be responsible for","managing electricity flows and ensuring a","secure, reliable and efficient electricity","system in accordance with Article 40 of","the [recast of Directive 2009/72/EC as","proposed by COM(2016) 864/2]. Effective","operation of the transmission system shall","be the responsibility of each transmission","system operator."],"old":["3. Regional operational centres shall","complement the role of transmission","system operators by performing functions","of regional relevance. They shall establish","operational arrangements in order to","ensure the efficient, secure and reliable","operation of the interconnected","transmission system."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1160","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-527","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 3"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:35"},"new":["deleted"],"old":["3. Where the total capacity of","generating installations subject to priority","dispatch under paragraph 2 is higher","than 15 % of the total installed generating","capacity in a Member State, point (a) of","paragraph 2 shall apply only to additional","generating installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","capacity of less than 250 kW.","From 1 January 2026, point (a) of","paragraph 2 shall apply only to","generating installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","capacity of less than 250 kW or, if the","threshold under the first sentence of this","paragraph has been reached, of less than","125 kW."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"527","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-810","justification":"Although the idea that congestion revenues should be used to increase and to guarantee the\nfirmness of cross-border capacity provided for in Regulation 714/2009 is agreed and\nsupported by the Agency, the prohibition to use congestion revenues to lower network tariffs\nis not justified.","location":[[" Proposal for a regulation","Article 17 \u2013 paragraph 2 \u2013 subparagraph 2"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:35"},"new":["If the revenues cannot be efficiently used","for the purposes set out in points (a) or (b)","of the first subparagraph, as a residual","option, they may be used, subject to","approval by the regulatory authorities of","the Member States concerned, up to a","maximum amount to be decided by those","regulatory authorities, as income to be","taken into account by the regulatory","authorities when approving the","methodology for calculating network","tariffs and/or fixing network tariffs.","Regulatory authorities may only approve","this option in cases where the","transmission system operator takes a","commitment decision to undertake all","interconnector projects that have a","positive net benefit and has a balance","sheet that is sufficient to finance these","investments.","The rest of revenues shall be placed on a","separate internal account line until such","time as it can be spent on the purposes set","out in points (a) and/or (b) of the first","subparagraph. The regulatory authority","shall inform the Agency of the approval","referred to in the second subparagraph."],"old":["If the revenues cannot be efficiently used","for the purposes set out in points (a) or (b)","of the first subparagraph, they shall be","placed on a separate internal account line","for future use on these purposes.",""],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"810","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-217","location":[[" Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point c"]],"meps":[96713],"meta":{"created":"2020-11-15T15:52:08"},"new":["(c) \u2018congestion\u2019 means a situation in","which all requests from market participants","to trade cannot be accommodated because","they would significantly affect the physical","flows on network elements which cannot","accommodate those flows ;"],"old":["(c) \u2018congestion\u2019 means a situation in","which all requests from market participants","to trade between two bidding zones cannot","be accommodated because they would","significantly affect the physical flows on","network elements which cannot","accommodate those flows ;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"217","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-528","justification":" Regulation does not take into account gradual removal of priority dispatch for all market\n participants including small RES and CHP, but in the contrary preserves their priority\n dispatch. Such requirement is in our opinion in direct conflict with technological neutrality\n and equal treatment of all market participants. Moreover economic substance of RES (zero\n fuel costs) already de facto provides priority dispatch to RES without explicit provision for\n such treatment. It is also important to highlight development of RES in the near future which\n will take place on the level of distribution (small scale sources), which will have cumulative\n impact on the market. For these reasons we support removal of priority dispatch for all\n market participants to avoid preservation of current and avoid new market distortions.","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 3"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:35"},"new":["deleted"],"old":["3. Where the total capacity of","generating installations subject to priority","dispatch under paragraph 2 is higher","than 15 % of the total installed generating","capacity in a Member State, point (a) of","paragraph 2 shall apply only to additional","generating installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","","","capacity of less than 250 kW.","From 1 January 2026, point (a) of","paragraph 2 shall apply only to","generating installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","capacity of less than 250 kW or, if the","threshold under the first sentence of this","paragraph has been reached, of less than","125 kW."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"528","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Massimiliano Salini, Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-811","location":[["Proposal for a regulation","Article 17 \u2013 paragraph 2 \u2013 subparagraph 2"]],"meps":[125670,36392],"meta":{"created":"2019-07-03T06:30:35"},"new":["If the revenues cannot be efficiently used","for the purposes set out in points (a) or(b)","of the first subparagraph, they shall be","placed on a separate internal account line","for future use on these purposes.","Alternatively, they may be used, subject to","approval by the regulatory authorities of","the Member States concerned, up to a","maximum amount to be decided by those","regulatory authorities, as income to be","taken into account by the regulatory","authorities when approving the","methodology for calculating network","tariffs and/or fixing network tariffs.","The rest of revenues shall be placed on a","separate internal account line until such","time as it can be spent on the purposes set","out in points (a) and/or (b) of the first","subparagraph. The regulatory authority","shall inform the Agency of the approval","referred to in the second subparagraph."],"old":["If the revenues cannot be efficiently used","for the purposes set out in points (a) or (b)","of the first subparagraph, they shall be","placed on a separate internal account line","for future use on these purposes.",""],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"811","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Martina Werner, Carlos Zorrinho, Miapetra Kumpula-Natri, Edouard Martin, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1161","location":[["Proposal for a regulation","Article 32 \u2013 paragraph 3"]],"meps":[124826,124739,124735,124947,124784],"meta":{"created":"2019-07-03T06:30:35"},"new":["3. Regional coordination centres shall","complement the role of transmission","system operators by performing functions","of regional relevance. Transmission","system operators shall be responsible for","ensuring the efficient, secure and reliable","operation of the interconnected","transmission system. The effective","operation of the transmission system shall","be the responsibility of each transmission","system operator."],"old":["3. Regional operational centres shall","complement the role of transmission","system operators by performing functions","of regional relevance. They shall establish","operational arrangements in order to","ensure the efficient, secure and reliable","operation of the interconnected","transmission system."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1161","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Martina Werner, Flavio Zanonato, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula- Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-529","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 3 \u2013 subparagraph 1"]],"meps":[124826,124800,124870,124739,124735,124699,125041,125044,124947],"meta":{"created":"2019-07-03T06:30:35"},"new":["deleted"],"old":["Where the total capacity of generating","installations subject to priority dispatch","under paragraph 2 is higher than 15 % of","the total installed generating capacity in a","Member State, point (a) of paragraph 2","shall apply only to additional generating","installations using renewable energy","sources or high-efficiency cogeneration","with an installed electricity capacity of","less than 250 kW."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"529","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Patrizia Toia","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-812","justification":" The proposed amendment is aimed to re-establish the possibility to use congestion revenues\n as a way to reduce the level of network tariffs as it was set in the third electricity package.\n\nIt shall be maintained the possibility for NRAs to use congestion revenues when setting the\nmethodology for calculating network tariffs. By using the congestion income for tariff\nreduction a sufficiently wide range of options remain available. This would permit NRAs to\nimplement the solution that best suits national laws, taxes and accounting, standards and\nrules, and take into account the specific situation of the TSO. It would also make certain that\nEuropean consumers are fully behind interconnector projects and can benefit from them.\n\nFurthermore, congestion income is an additional revenue which is not \u201cowned\u201d by TSOs but\nonly collected by them. It is therefore logical that the corresponding congestion income from\ninterconnectors flows back to grid users through a reduction of grid tariffs. This would also\naids in ensuring public acceptance of new interconnectors because the revenues from\ncongestion eventually go back to energy consumers.","location":[[" Proposal for a regulation","Article 17 \u2013 paragraph 2 \u2013 subparagraph 2"]],"meps":[28340],"meta":{"created":"2019-07-03T06:30:35"},"new":["If the revenues cannot be efficiently used","for the purposes set out in points (a) or (b)","of the first subparagraph. They may be","used, subject to approval by the regulatory","authorities of the Member States","concerned, up to a maximum amount to","be decided by those regulatory authorities,","as income to be taken into account by the","regulatory authorities when approving the","methodology for calculating network","tariffs and/or fixing network tariffs. The","rest of revenues shall be placed on a","separate internal account line until such","time as it can be spent on the purposes set","out in points (a) and/or (b) of the first","subparagraph. The regulatory authority","shall inform the Agency of the approval","referred to in the second subparagraph."],"old":["If the revenues cannot be efficiently used","for the purposes set out in points (a) or (b)","of the first subparagraph, they shall be","placed on a separate internal account line","for future use on these purposes."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"812","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Patrizia Toia, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-218","location":[["Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point e"]],"meps":[124826,124870,124739,124735,28340,124699,125041,125044],"meta":{"created":"2020-11-15T15:52:08"},"new":["(e) 'structural congestion' means","congestion in the transmission system that","is predictable, geographically stable over","time, and frequently reoccurring under","normal power system conditions;"],"old":["(e) 'structural congestion' means","congestion in the transmission system that","is predictable, is geographically stable over","time, and is frequently reoccurring under","normal power system conditions;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"218","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Kaja Kallas, Pavel Teli\u010dka, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-530","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 3 \u2013 subparagraph 1"]],"meps":[124697,124706,124989,124872,125026],"meta":{"created":"2019-07-03T06:30:35"},"new":["deleted"],"old":["Where the total capacity of generating","installations subject to priority dispatch","under paragraph 2 is higher than 15 % of","the total installed generating capacity in a","Member State, point (a) of paragraph 2","shall apply only to additional generating","installations using renewable energy","sources or high-efficiency cogeneration","with an installed electricity capacity of","less than 250 kW."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"530","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Kathleen Van Brempt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-813","location":[["Proposal for a regulation","Article 17 \u2013 paragraph 2 \u2013 subparagraph 2"]],"meps":[5729],"meta":{"created":"2019-07-03T06:30:35"},"new":["If the revenues cannot be efficiently used","for the purposes set out in points (a),","(b), (ba) or (bc) of the first subparagraph,","they shall be placed on a separate internal","account line for future use on these","purposes.","Notwithstanding the second","subparagraph, in Member States where","the Union's interconnection target of 15","% is met and not any congestion on","the interconnectors takes place or is","predicted, the residual revenues may be","used as income to be taken into account","by the national regulatory authorities of","the Member State concerned when","approving the methodology for","calculating network tariffs and/or fixing","network tariffs."],"old":["If the revenues cannot be efficiently used","for the purposes set out in points (a) or (b)","of the first subparagraph, they shall be","placed on a separate internal account line","for future use on these purposes."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"813","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-219","location":[["Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point f"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["(f) 'market operator' means a","nominated electricity market operator or","any other entity that provides a service","whereby the offers to sell electricity are","matched with bids to buy electricity;"],"old":["(f) 'market operator' means an entity","that provides a service whereby the offers","to sell electricity are matched with bids to","buy electricity;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"219","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-531","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 3 \u2013 subparagraph 1"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:35"},"new":["deleted"],"old":["Where the total capacity of generating","installations subject to priority dispatch","under paragraph 2 is higher than 15 % of","the total installed generating capacity in a","Member State, point (a) of paragraph 2","shall apply only to additional generating","installations using renewable energy","sources or high-efficiency cogeneration","with an installed electricity capacity of","less than 250 kW."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"531","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-814","location":[[" Proposal for a regulation","Article 17 \u2013 paragraph 2 \u2013 subparagraph 2"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:35"},"new":["If the revenues cannot be efficiently used","for the purposes set out in points (a) or (b)","of the first subparagraph, they may be","used, subject to approval by the regulatory","authorities of the Member States","concerned, as an income to be taken into","account by the regulatory authorities","when approving the methodology for","calculating network tariffs and/or fixing","network tariffs."],"old":["If the revenues cannot be efficiently used","for the purposes set out in points (a) or (b)","of the first subparagraph, they shall be","placed on a separate internal account line","for future use on these purposes."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"814","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Rebecca Harms, Jakop Dalunde, Reinhard B\u00fctikofer, Davor \u0160krlec, Yannick Jadot, Michel Reimon, Benedek J\u00e1vor, Florent Marcellesi on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-532","justification":" Priority dispatch is an important tool to ensure that renewable energy is used as it is\n produced and thus helps to achieve our climate targets, as well as continues to provide a\n stable investment framework for future projects, in line with the provisions of the current\n renewable energy directive (Directive 2009/28/EC).","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 3 \u2013 subparagraph 1"]],"meps":[28233,183338,96739,124756,96740,124935,124721,26146],"meta":{"created":"2019-07-03T06:30:35"},"new":["deleted"],"old":["Where the total capacity of generating","installations subject to priority dispatch","under paragraph 2 is higher than 15 % of","the total installed generating capacity in a","Member State, point (a) of paragraph 2","shall apply only to additional generating","installations using renewable energy","sources or high-efficiency cogeneration","with an installed electricity capacity of","less than 250 kW."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"532","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-220","justification":" The value of lost load are to be considered separately in each single bidding zone.","location":[["Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point h"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["(h) 'value of lost load' means an","estimation in \u20ac/MWh, of the maximum","electricity price that customers are willing","to pay to avoid an outage within a given","bidding zone;"],"old":["(h) 'value of lost load' means an","estimation in \u20ac/MWh, of the maximum","electricity price that customers are willing","to pay to avoid an outage;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"220","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski, Edward Czesak, Nikolay Barekov","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1162","location":[["Proposal for a regulation","Article 32 \u2013 paragraph 3"]],"meps":[124891,132925,124871],"meta":{"created":"2019-07-03T06:30:35"},"new":["3. Regional security coordinators","shall support transmission system","operators by performing advisory services","of regional relevance. They shall advise","and issue recommendations in order to","ensure the efficient, secure and reliable","operation of the interconnected","transmission system."],"old":["3. Regional operational centres shall","complement the role of transmission","system operators by performing functions","of regional relevance. They shall establish","operational arrangements in order to","ensure the efficient, secure and reliable","operation of the interconnected","transmission system."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1162","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-815","justification":" We suggest to remove proposed text and preserve existing text from 714/2009 as in par. 2 (a).","location":[[" Proposal for a regulation","Article 17 \u2013 paragraph 2 \u2013 subparagraph 2"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:35"},"new":["If the revenues cannot be efficiently used","for the purposes set out in points (a) or (b)","of the first subparagraph."],"old":["If the revenues cannot be efficiently used","for the purposes set out in points (a) or (b)","of the first subparagraph, they shall be","placed on a separate internal account line","for future use on these purposes."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"815","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski, Hans-Olaf Henkel","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-533","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 3 \u2013 subparagraph 1"]],"meps":[124891,124823],"meta":{"created":"2019-07-03T06:30:35"},"new":["deleted"],"old":["Where the total capacity of generating","installations subject to priority dispatch","under paragraph 2 is higher than 15 % of","the total installed generating capacity in a","Member State, point (a) of paragraph 2","shall apply only to additional generating","installations using renewable energy","sources or high-efficiency cogeneration","with an installed electricity capacity of","","","less than 250 kW."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"533","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-816","location":[[" Proposal for a regulation","Article 17 \u2013 paragraph 2 \u2013 subparagraph 2"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:36"},"new":["If the revenues cannot be efficiently used","for the purposes set out in points (a) or (b)","of the first subparagraph."],"old":["If the revenues cannot be efficiently used","for the purposes set out in points (a) or (b)","of the first subparagraph, they shall be","placed on a separate internal account line","for future use on these purposes."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"816","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-221","location":[[" Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point h"]],"meps":[124826,124870,124739,124735,124699],"meta":{"created":"2020-11-15T15:52:08"},"new":["(h) 'value of lost load' means an","artificial estimation in \u20ac/MWh, of the","maximum electricity price that customers","are willing to pay to avoid an outage;"],"old":["(h) 'value of lost load' means an","estimation in \u20ac/MWh, of the maximum","electricity price that customers are willing","to pay to avoid an outage;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"221","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-817","location":[["Proposal for a regulation","Article 17 \u2013 paragraph 2 \u2013 subparagraph 2"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:36"},"new":["If the revenues cannot be efficiently used","for the purposes set out in points (a) or (b)","of the first subparagraph., they may be","used for reduction of tariffs."],"old":["If the revenues cannot be efficiently used","for the purposes set out in points (a) or (b)","of the first subparagraph, they shall be","placed on a separate internal account line","for future use on these purposes."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"817","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-534","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 3 \u2013 subparagraph 1"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:35"},"new":["deleted"],"old":["Where the total capacity of generating","installations subject to priority dispatch","under paragraph 2 is higher than 15 % of","the total installed generating capacity in a","Member State, point (a) of paragraph 2","shall apply only to additional generating","installations using renewable energy","sources or high-efficiency cogeneration","with an installed electricity capacity of","less than 250 kW."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"534","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Martina Werner, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-818","location":[["Proposal for a regulation","Article 17 \u2013 paragraph 2 a (new)"]],"meps":[124826,124739,124735,124699],"meta":{"created":"2019-07-03T06:30:36"},"new":["2a. Where the objectives set out in","points (a) and (b) of the first","subparagraph are met, the residual","revenues shall be used as income to be","taken into account by national regulatory","authorities when approving the","methodology for calculating network","tariffs and/or fixing network tariffs."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"818","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Martina Werner, Peter Kouroumbashev, Carlos Zorrinho, Miapetra Kumpula-Natri, Edouard Martin, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1163","location":[[" Proposal for a regulation","Article 32 \u2013 paragraph 3 a (new)"]],"meps":[124826,124857,124739,124735,124947,124784],"meta":{"created":"2019-07-03T06:30:35"},"new":["3 a. In performing its functions under","EU law, the regional coordination centres","shall act independently from individual","national interests or the national interests","of transmission system operators, and","shall contribute to the efficient and","sustainable achievement of the objectives","set out in the policy framework for climate","and energy covering the period from 2020","to 2030, in particular by contributing to","the efficient integration of electricity","generated from renewable energy sources","and to increases in energy efficiency."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1163","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-819","justification":" This amendment is intrinsically linked to the previous paragraph.","location":[[" Proposal for a regulation","Article 17 \u2013 paragraph 3"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:36"},"new":["deleted"],"old":["3. The use of revenues in accordance","with points (a) and (b) of paragraph 2","shall be subject to a methodology","proposed by the Agency and approved by","the Commission. The Agency's proposal","shall be submitted to the Commission by","[OP: 12 months after entry into force] and","be approved within six months.","The Agency may, at its own initiative or","upon a request from the Commission","update the methodology and the","Commission shall approve the updated","methodology not later than six months","from its submission.","Before submission to the Commission, the","Agency shall consult on the methodology","pursuant to Article 15 [recast of","Regulation (EC) No 713/2009 as proposed","by COM(2016) 863/2].","The methodology shall detail as a","minimum the conditions under which the","revenues can be used for points (a) and","(b) of paragraph 2 and the conditions","under which, and for how long, they may","be placed on a separate internal account","line for future use on those purposes."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"819","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-222","justification":" To clarify and distinguish different concepts relevant especially in the context of Articles 11-\n 12, this definition is added here.","location":[[" Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point r a (new)"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["(ra) \u2018priority access\u2019 means the first","right to feed in renewable electricity in","case of local grid congestion."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"222","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-820","justification":"The Regulation establishes competency of the ACER to propose methodology for use of\ncongestion income. Such requirement directly influences exclusive competence of TSOs to\nbear full responsibility over investments into transmission system. This requirement for new\ncompetency for ACER may lead to sunk costs in case of misused investments. For these\nreasons we propose to remove para 3 of this article","meps":[28331],"meta":{"created":"2019-07-03T06:30:36"},"new":["deleted"],"old":["3. The use of revenues in accordance","with points (a) and (b) of paragraph 2","shall be subject to a methodology","proposed by the Agency and approved by","the Commission. The Agency's proposal","shall be submitted to the Commission by","[OP: 12 months after entry into force] and","be approved within six months.","The Agency may, at its own initiative or","upon a request from the Commission","update the methodology and the","Commission shall approve the updated","methodology not later than six months","from its submission.","Before submission to the Commission, the","Agency shall consult on the methodology","pursuant to Article 15 [recast of","Regulation (EC) No 713/2009 as proposed","by COM(2016) 863/2].","The methodology shall detail as a","minimum the conditions under which the","revenues can be used for points (a) and","(b) of paragraph 2 and the conditions","under which, and for how long, they may","be placed on a separate internal account","line for future use on those purposes."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"820","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-535","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 3 \u2013 subparagraph 1"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:35"},"new":["Where the total capacity of generating or","energy storage installations subject to","priority dispatch under paragraph 2 is","higher than 15 % of the total installed","generating capacity in a Member State,","point (a) of paragraph 2 shall apply only to","additional generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 250 kW."],"old":["Where the total capacity of generating","installations subject to priority dispatch","under paragraph 2 is higher than 15 % of","the total installed generating capacity in a","Member State, point (a) of paragraph 2","shall apply only to additional generating","installations using renewable energy","sources or high-efficiency cogeneration","with an installed electricity capacity of less","than 250 kW."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"535","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-821","location":[["Proposal for a regulation","Article 17 \u2013 paragraph 3 \u2013 subparagraph 1"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:36"},"new":["deleted"],"old":["The use of revenues in accordance with","points (a) and (b) of paragraph 2 shall be","subject to a methodology proposed by the","Agency and approved by the Commission.","The Agency's proposal shall be submitted","to the Commission by [OP: 12 months","after entry into force] and be approved","within six months."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"821","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1164","location":[[" Proposal for a regulation","Article 32 \u2013 paragraph 3 a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:36"},"new":["3 a. Regional operational centres shall","submit individually to the Agency their","draft statutes and rules of procedure","taking into account the guidelines and","recommendations issued by the Agency","pursuant to paragraph 3.Within two","months, the Agency shall decide to","approve the statutes and rules of","procedure, or propose amendments."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1164","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-822","location":[[" Proposal for a regulation","Article 17 \u2013 paragraph 3 \u2013 subparagraph 1"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:36"},"new":["deleted"],"old":["The use of revenues in accordance with","points (a) and (b) of paragraph 2 shall be","subject to a methodology proposed by the","Agency and approved by the Commission.","The Agency's proposal shall be submitted","to the Commission by [OP: 12 months","after entry into force] and be approved","within six months."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"822","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Claude Turmes","changes":{},"committee":["ITRE"],"compromise":["on behalf of the Verts/ALE Group"],"date":"2017-09-25T00:00:00","id":"PE609.623-223","justification":"Market and network issues should be treated separately. Priority dispatch is a term only used\nin connection with markets.","location":[["Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point s"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["(s) 'priority dispatch' means the","prioritization of the dispatch of power","plants on the basis of criteria different from","the economic merit order of market bids,","giving priority to the dispatch of particular","generation technologies;"],"old":["(s) 'priority dispatch' means the","dispatch of power plants on the basis of","criteria different from the economic order","of bids and, in central dispatch systems,","network constraints, giving priority to the","dispatch of particular generation","technologies;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"223","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1165","location":[["Proposal for a regulation","Article 32 \u2013 paragraph 3 b (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:36"},"new":["3 b. By [OP:six months after entry into","force], the Agency shall issue guidelines","and recommendations to the TSOs of the","system operation region for the","elaboration of the statutes and rules of","procedure proposal referred to in","paragraph 41with a view to ensuring","consistent, efficient and effective","functioning of the regional operational","centres and the common and consistent","application of Union","law.Recommendations referred to in this","paragraph may be general to all regional","operational centres or specific to one or","more several regional operational centres","if they address cross-border relevant","issues."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1165","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-823","location":[[" Proposal for a regulation","Article 17 \u2013 paragraph 3 \u2013 subparagraph 2"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:36"},"new":["deleted"],"old":["The Agency may, at its own initiative or","upon a request from the Commission","update the methodology and the","Commission shall approve the updated","methodology not later than six months","","from its submission."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"823","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-536","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 3 \u2013 subparagraph 1"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:35"},"new":["Where the total capacity of generating or","energy storage installations subject to","priority dispatch under paragraph 2 is","higher than 15 % of the total installed","generating capacity in a Member State,","point (a) of paragraph 2 shall apply only to","additional generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 250 kW."],"old":["Where the total capacity of generating","installations subject to priority dispatch","under paragraph 2 is higher than 15 % of","the total installed generating capacity in a","Member State, point (a) of paragraph 2","shall apply only to additional generating","installations using renewable energy","sources or high-efficiency cogeneration","with an installed electricity capacity of less","than 250 kW."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"536","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-224","justification":"This definition is necessary in view of the provisions of Article 12.","location":[["Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point s a (new)"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["(sa) 'redispatch' means the","rescheduling of generation, storage or","demand facilities in case of network","constraints, by the responsible system","operators through upward or downward","power regulation, in order to ensure the","secure and efficient operation of the","network within technical limits and to","maintain overall network stability."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"224","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-824","location":[["Proposal for a regulation","Article 17 \u2013 paragraph 3 \u2013 subparagraph 3"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:36"},"new":["deleted"],"old":["Before submission to the Commission, the","Agency shall consult on the methodology","pursuant to Article 15 [recast of","Regulation (EC) No 713/2009 as proposed","by COM(2016) 863/2]."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"824","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1166","location":[["Proposal for a regulation","Article 32 \u2013 paragraph 3 c (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:36"},"new":["3 c. During the development of the","proposal referred to in paragraph 1 (3a),","the transmission system operators of each","system operation region shall take into","account the guidelines and","recommendations issued by the","Agency.Within two months after","submission, the Agency shall decide to","approve the statutes and the rules of","procedure, or to propose amendments."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1166","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Kaja Kallas, Pavel Teli\u010dka, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-537","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 3 \u2013 subparagraph 2"]],"meps":[124697,124706,124989,124872,125026],"meta":{"created":"2019-07-03T06:30:35"},"new":["deleted"],"old":["From 1 January 2026, point (a) of","paragraph 2 shall apply only to","generating installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","capacity of less than 250 kW or, if the","threshold under the first sentence of this","paragraph has been reached, of less than","125 kW."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"537","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-825","location":[["Proposal for a regulation","Article 17 \u2013 paragraph 3 \u2013 subparagraph 4"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:36"},"new":["deleted"],"old":["The methodology shall detail as a","minimum the conditions under which the","revenues can be used for points (a) and","(b) of paragraph 2 and the conditions","under which, and for how long, they may","be placed on a separate internal account","line for future use on those purposes."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"825","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1167","justification":"It seems more logic to split the provisions on establishment and on mission of the regional\noperational centres.Additionally, ROCs should adhere to similar principles than ENTSO-E,\nwhich is why certain provisions applicable to the latter are repeated here (especially Articles\n25-27).","location":[[" Proposal for a regulation","Article 32 a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:36"},"new":["Article 32 a","Mission of regional operational centres","1.Regional operational centres shall","complement the role of transmission","system operators by performing functions","of regional relevance.They shall establish","operational arrangements in order to","ensure the efficient, secure and reliable","operation of the interconnected","transmission system.","2. Regional operational centres shall act","in the interest of the system and the","market operation of the region over the","interests of any single entity, and","independently from national interests or","the interests of an individual transmission","system operator.","3. In performing their functions, regional","operational centres shall contribute to the","achievement of the 2030 and 2050","objectives set out in the climate and","energy policy framework."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1167","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Martina Werner, Flavio Zanonato, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula- Natri, Jens Geier","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-225","location":[[" Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point u"]],"meps":[124826,124800,124870,124739,124735,96833],"meta":{"created":"2020-11-15T15:52:08"},"new":["(u) 'capacity mechanism' means","measures taken by Member States to fill","the expected capacity gap for electricity","supply to match electricity demand in the","medium and long term and designed to","attract investment by offering additional","payments to capacity providers that","operate within the electricity market, on","top of income obtained by selling","electricity on the market in return for the","availability of existing capacity or","investment in new capacity to guarantee","the required level of resource adequacy;"],"old":["(u) 'capacity mechanism' means an","administrative measure to ensure the","achievement of the desired level of","security of supply by remunerating","resources for their availability not","including measures relating to ancillary","services;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"225","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Martina Werner, Flavio Zanonato, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula- Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-538","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 3 \u2013 subparagraph 2"]],"meps":[124826,124800,124870,124739,124735,124699,125041,125044,124947],"meta":{"created":"2019-07-03T06:30:35"},"new":["deleted"],"old":["From 1 January 2026, point (a) of","paragraph 2 shall apply only to","generating installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","capacity of less than 250 kW or, if the","threshold under the first sentence of this","paragraph has been reached, of less than","125 kW."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"538","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-826","location":[["Proposal for a regulation","Article 17 \u2013 paragraph 3 \u2013 subparagraph 4"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:36"},"new":["deleted"],"old":["The methodology shall detail as a","minimum the conditions under which the","revenues can be used for points (a) and","(b) of paragraph 2 and the conditions","under which, and for how long, they may","be placed on a separate internal account","line for future use on those purposes."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"826","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Kate\u0159ina Kone\u010dn\u00e1, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1168","location":[["Proposal for a regulation","Article 33"]],"meps":[23699,96713],"meta":{"created":"2019-07-03T06:30:36"},"new":["Article 33 deleted","operational centres"],"old":["Geographical scope of regional","1. By [OP: six months after entry into","force of this Regulation] the ENTSO for","Electricity shall submit to the Agency a","proposal defining system operation","regions covered by regional operational","centres, taking into account existing","regional security coordinators, on the","basis of the following criteria:","(a) The grid topology, including the","degree of interconnection and of","interdependency of the power systems in","terms of flows;","(b) the synchronous connection of the","systems;","(c) the size of the region, which shall","cover at least one capacity calculation","region;","(d) the geographical optimization of","balancing reserves.","2. Within three months of receipt, the","Agency shall either approve the proposal","defining the system operation regions or","propose amendments. In the latter case,","the Agency shall consult the ENTSO for","Electricity before adopting the","amendments. The adopted proposal shall","be published on the Agency's website."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1168","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-539","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 3 \u2013 subparagraph 2"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:35"},"new":["deleted"],"old":["From 1 January 2026, point (a) of","paragraph 2 shall apply only to","generating installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","capacity of less than 250 kW or, if the","threshold under the first sentence of this","paragraph has been reached, of less than","125 kW."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"539","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Kathleen Van Brempt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-226","location":[[" Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point u"]],"meps":[5729],"meta":{"created":"2020-11-15T15:52:08"},"new":["(u) 'capacity mechanism' means an","administrative measure to ensure the","achievement of the necessary level of","security of supply by remunerating","resources, including renewable energy,","storage facilities and demand side","management services, for their availability","during certain periods or time windows to","generate electricity or reduce demand, not","including measures relating to ancillary","services;"],"old":["(u) 'capacity mechanism' means an","administrative measure to ensure the","achievement of the desired level of","security of supply by remunerating","resources for their availability not","including measures relating to ancillary","services;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"226","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Ashley Fox","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-827","location":[[" Proposal for a regulation","Article 17 \u2013 paragraph 3 a (new)"]],"meps":[96957],"meta":{"created":"2019-07-03T06:30:37"},"new":["3a. In Member States or third","countries which use interconnector","revenues as income to be taken into","account when calculating network tariffs","as part of a policy explicitly designed to","attract new investment into","interconnection capacity, any revenues","resulting from the allocation of capacity","on interconnectors that are owned and","operated by a separate legal entity from","the main transmission system may be","used, subject to approval by the regulatory","authorities of the Member States","concerned, up to a maximum amount to","be determined by those regulatory","authorities, as income to be taken into","account by the regulatory authorities","when approving the methodology for","calculating network tariffs and/or fixing","network tariffs."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"827","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1169","justification":"It is our position that Articles 31 to 44 and all reference regarding ROCs in the Clean Energy\nPackage to All Europeans shall be deleted without any substitution.It is of particular concern\nthat establishment of ROCs violates subsidiarity and proportionality principle according to\nart. 194 SFEU","location":[[" Proposal for a regulation","Article 33"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:36"},"new":["Article 33 deleted","Geographical scope of regional","operational centres"],"old":["1. By [OP: six months after entry into","force of this Regulation] the ENTSO for","Electricity shall submit to the Agency a","proposal defining system operation","regions covered by regional operational","centres, taking into account existing","regional security coordinators, on the","basis of the following criteria:","(a) The grid topology, including the","degree of interconnection and of","interdependency of the power systems in","terms of flows;","(b) the synchronous connection of the","systems;","(c) the size of the region, which shall","cover at least one capacity calculation","region;","(d) the geographical optimization of","balancing reserves.","2. Within three months of receipt, the","Agency shall either approve the proposal","defining the system operation regions or","propose amendments. In the latter case,","the Agency shall consult the ENTSO for","Electricity before adopting the","amendments. The adopted proposal shall","be published on the Agency's website."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1169","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-540","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 3 \u2013 subparagraph 2"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:35"},"new":["deleted"],"old":["From 1 January 2026, point (a) of","paragraph 2 shall apply only to","generating installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","capacity of less than 250 kW or, if the","threshold under the first sentence of this","paragraph has been reached, of less than","125 kW."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"540","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1170","location":[["Proposal for a regulation","Article 33 \u2013 paragraph 1"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:36"},"new":["deleted"],"old":["1. By [OP: six months after entry","into force of this Regulation] the ENTSO","for Electricity shall submit to the Agency","a proposal defining system operation","regions covered by regional operational","centres, taking into account existing","regional security coordinators, on the","basis of the following criteria:","(a) The grid topology, including the","degree of interconnection and of","interdependency of the power systems in","terms of flows;","(b) the synchronous connection of the","systems;","(c) the size of the region, which shall","cover at least one capacity calculation","region;","(d) the geographical optimization of","balancing reserves."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1170","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-227","justification":"The necessary level of security of supply should be established taking into account the value\nthat consumers place on electricity (VoLL \u2013 value of lost load), by the match between the\nincremental cost of insuring consumers against blackouts and the cost of incremental\nblackouts to consumers. They should only be adopted after verification of both their technical\nnecessity and their economic efficiency, after having evaluated other alternative options less\ndistortive to competition.","location":[["Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point u"]],"meps":[90110],"meta":{"created":"2020-11-15T15:52:08"},"new":["(u) 'capacity mechanism' means an","administrative measure to ensure the","achievement of the necessary level of","security of supply; A thorough cost-","benefit analysis shall be carried out to","justify the necessity of achieving a certain","level of security of supply, as well as to","justify the need to adopt capacity","mechanisms in order to achieve such","necessary level."],"old":["(u) 'capacity mechanism' means an","administrative measure to ensure the","achievement of the desired level of","security of supply by remunerating","resources for their availability not","including measures relating to ancillary","services;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"227","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Rebecca Harms, Jakop Dalunde, Florent Marcellesi, Benedek J\u00e1vor, Reinhard B\u00fctikofer, Davor \u0160krlec, Michel Reimon, Yannick Jadot on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-541","justification":" Priority dispatch is an important tool to ensure that renewable energy is used as it is\n produced and thus helps to achieve our climate targets, as well as continues to provide a\n stable investment framework for future projects, in line with the provisions of the current\n renewable energy directive (Directive 2009/28/EC).","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 3 \u2013 subparagraph 2"]],"meps":[28233,183338,26146,124721,96739,124756,124935,96740],"meta":{"created":"2019-07-03T06:30:35"},"new":["deleted"],"old":["From 1 January 2026, point (a) of","paragraph 2 shall apply only to","generating installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","capacity of less than 250 kW or, if the","threshold under the first sentence of this","paragraph has been reached, of less than","125 kW."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"541","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-828","location":[["Proposal for a regulation","Article 17 \u2013 paragraph 4"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:37"},"new":["4. Transmission system operators","shall report on the actual use of that","income. On an annual basis the national","regulatory authorities shall publish a report","setting out the amount of revenue collected","for the 12-month period ending on","31 December of the same year and how","that revenue was used."],"old":["4. Transmission system operators","shall clearly establish beforehand how any","congestion income will be used, and report","on the actual use of that income. On an","annual basis, and by 31 July each year, the","national regulatory authorities shall publish","a report setting out the amount of revenue","collected for the 12-month period ending","on 30 June of the same year and how that","revenue was used, including the specific","projects the income has been used for or","the amount placed on a separate account","line, together with verification that that","use complies with this Regulation and the","methodology developed pursuant to","paragraph 3."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"828","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-228","justification":" Capacity mechanisms are a form of public intervention in the internal market for electricity.\n As such, and in light of their potentially distortive effect, they should be subject to the\n principle of necessity and be designed as transitory measures. Financial contributions to\n capacity mechanisms should be limited to compensating the additional costs in which\n operators incur to ensure the availability of the capacity.","location":[["Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point u"]],"meps":[96852],"meta":{"created":"2020-11-15T15:52:08"},"new":["(u) 'capacity mechanism' means a","transitory administrative measure to ensure","the achievement of the necessary level of","security of supply by compensating","resources for all or part of the additional","costs in which they incur to ensure","availability not including measures relating","to ancillary services;"],"old":["(u) 'capacity mechanism' means an","administrative measure to ensure the","achievement of the desired level of","security of supply by remunerating","resources for their availability not","including measures relating to ancillary","services;","",""],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"228","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-542","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 3 \u2013 subparagraph 2"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:36"},"new":["deleted"],"old":["From 1 January 2026, point (a) of","paragraph 2 shall apply only to","generating installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","capacity of less than 250 kW or, if the","threshold under the first sentence of this","paragraph has been reached, of less than","125 kW."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"542","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Anneleen Van Bossuyt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1171","location":[["Proposal for a regulation","Article 33 \u2013 paragraph 1 \u2013 introductory part"]],"meps":[117491],"meta":{"created":"2019-07-03T06:30:36"},"new":["1. By [OP: six months after entry into","force of this Regulation] the ENTSO for","Electricity shall submit to the Agency a","proposal defining system operation regions","for which a cooperative process as","described in Art. 62 of [directive on","common rules for the internal market in","electricity recast, COM (2016)864] is","established, taking into account existing","regional security coordinators, on the basis","of the following criteria:"],"old":["1. By [OP: six months after entry into","force of this Regulation] the ENTSO for","Electricity shall submit to the Agency a","proposal defining system operation regions","covered by regional operational centres,","taking into account existing regional","security coordinators, on the basis of the","following criteria:"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1171","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-229","justification":" Capacity mechanisms are a form of public intervention in the internal market for electricity.\n As such, and in light of their potentially distortive effect, they should be subject to the\n principle of necessity and be designed as transitory measures.","location":[[" Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point u"]],"meps":[124813,124796],"meta":{"created":"2020-11-15T15:52:08"},"new":["(u) 'capacity mechanism' means an","exceptional and temporary administrative","measure to ensure the achievement of the","necessary level of security of supply by","remunerating resources for their","availability not including measures relating","to ancillary services;"],"old":["(u) 'capacity mechanism' means an","administrative measure to ensure the","achievement of the desired level of","security of supply by remunerating","resources for their availability not","including measures relating to ancillary","services;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"229","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-829","justification":" The Commission proposes to scrap the possibility for TSOs to use congestion income to\n reduce the level of transmission tariffs. ENTSO-E fully supports the Commission\u2019s objective\n to invest in and maintain cross-border transmission capacity for the benefit of European\n welfare. However, the present proposals could actually have the opposite effect and reduce\n incentives for interconnectors, through two conflicting effects: - considering that congestion\n revenues should mandatorily be spent sooner (points (a) and (b)) or later (separate account)\n for implementing operational measures and investing may result in costs that are\n economically not justified for the community,- Preventing the use of congestion income to\n reduce tariffs would lead to tariff increases which may undermine public acceptance for new\n interconnectors. Today, cross-border investments are, in many cases, funded by national TSO\n tariffs during the corresponding depreciation period, which provide financial leverage to\n foster investments. Similarly, operational measures to guarantee the availability of capacity\n are funded by TSO tariffs. Those costs are accepted by national regulators when they are\n economically justified for the community. Since all TSO \u201cefficient\u201d costs are covered by TSO\n tariffs, congestion income is an additional revenue which is not \u201cowned\u201d by TSOs but only\n collected by them. It is therefore only logical that the corresponding congestion income from\n interconnectors should flow back to grid users through a reduction of grid tariffs. This helps\n ensuring public acceptance since the revenues from congestion eventually go back to energy\n consumers.","location":[["Proposal for a regulation","Article 17 \u2013 paragraph 4"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:37"},"new":["4. Transmission system operators","shall report on the actual use of congestion","income. On an annual basis, the national","regulatory authorities shall publish a report","setting out the amount of revenue collected","for the 12-month period ending on 31","December of the same year and how that","revenue was used."],"old":["4. Transmission system operators","shall clearly establish beforehand how any","congestion income will be used, and report","on the actual use of that income. On an","annual basis, and by 31 July each year, the","national regulatory authorities shall publish","a report setting out the amount of revenue","collected for the 12-month period ending","on 30 June of the same year and how that","revenue was used, including the specific","projects the income has been used for or","the amount placed on a separate account","line, together with verification that that","","use complies with this Regulation and the","methodology developed pursuant to","paragraph 3."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"829","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Rebecca Harms, Jakop Dalunde, Reinhard B\u00fctikofer, Davor \u0160krlec, Yannick Jadot, Michel Reimon, Benedek J\u00e1vor, Florent Marcellesi on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-543","justification":" Priority dispatch is an important tool to ensure that renewable energy is used as it is\n produced and thus helps to achieve our climate targets, as well as continues to provide a\n stable investment framework for future projects, in line with the provisions of the current\n renewable energy directive (Directive 2009/28/EC).","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 4"]],"meps":[28233,183338,96739,124756,96740,124935,124721,26146],"meta":{"created":"2019-07-03T06:30:36"},"new":["deleted"],"old":["4. Generating installations using","renewable energy sources or high-","efficiency cogeneration which have been","commissioned prior to [OP: entry into","force] and have, when commissioned,","been subject to priority dispatch under","Article 15(5) of Directive 2012/27/EU of","the European Parliament and of the","Council or Article 16(2) of Directive","2009/28/EC of the European Parliament","and of the Council35 shall remain subject","to priority dispatch. Priority dispatch shall","no longer be applicable from the date","where the generating installation is","subject to significant modifications, which","shall be the case at least where a new","connection agreement is required or the","generation capacity is increased.","","","","_________________","35","Directive 2009/28/EC of the European","Parliament and of the Council of 23 April","2009 on the promotion of the use of","energy from renewable sources and","amending and subsequently repealing","Directives 2001/77/EC and 2003/30/EC","(OJ L 140, 5.6.2009, p. 16)."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"543","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Pilar del Castillo Vera, Pilar Ayuso, Francesc Gamb\u00fas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1172","location":[[" Proposal for a regulation","Article 33 \u2013 paragraph 1 \u2013 introductory part"]],"meps":[28390,4319,125006],"meta":{"created":"2019-07-03T06:30:36"},"new":["1. By [OP: six months after entry into","force of this Regulation] the transmission","system operators shall submit a proposal","to the relevant Member States defining","system operation regions covered by","regional coordination centres, taking into","account existing regional security","coordinators, on the basis of the following","criteria:"],"old":["1. By [OP: six months after entry into","force of this Regulation] the ENTSO for","Electricity shall submit to the Agency a","proposal defining system operation regions","covered by regional operational centres,","taking into account existing regional","security coordinators, on the basis of the","following criteria:"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1172","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-830","justification":"The Commission proposes to delete the possibility for TSOs to use congestion income to\nreduce the level of transmission tariffs.","location":[[" Proposal for a regulation","Article 17 \u2013 paragraph 4"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:37"},"new":["4. Transmission system operators","shall report on use of the congestion","income. On an annual basis, the national","regulatory authorities shall publish a report","setting out the amount of revenue collected","for the 12-month period ending on 31","December of the same year and how that","revenue was used, including the specific","projects the income has been used."],"old":["4. Transmission system operators","shall clearly establish beforehand how any","congestion income will be used, and report","on the actual use of that income. On an","annual basis, and by 31 July each year, the","national regulatory authorities shall publish","a report setting out the amount of revenue","collected for the 12-month period ending","on 30 June of the same year and how that","revenue was used, including the specific","projects the income has been used for or","","the amount placed on a separate account","line, together with verification that that","use complies with this Regulation and the","methodology developed pursuant to","paragraph 3."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"830","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Massimiliano Salini, Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-230","location":[[" Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point u"]],"meps":[125670,36392],"meta":{"created":"2020-11-15T15:52:08"},"new":["(u) 'capacity mechanism' means a","market-based measure to ensure the","achievement of a Member State\u2019s","necessary level of security of supply by","remunerating resources for their","availability not including measures relating","to ancillary services;"],"old":["(u) 'capacity mechanism' means an","administrative measure to ensure the","","achievement of the desired level of","security of supply by remunerating","resources for their availability not","including measures relating to ancillary","services;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"230","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Martina Werner, Peter Kouroumbashev, Flavio Zanonato, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-544","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 4"]],"meps":[124826,124857,124800,124870,124739,124735,124699,125041,125044,124784],"meta":{"created":"2019-07-03T06:30:36"},"new":["4. Generating installations using","renewable energy sources or high-","efficiency cogeneration which have been","commissioned prior to [OP: entry into","force] and have, when commissioned, been","subject to priority dispatch under Article","15(5) of Directive 2012/27/EU of the","European Parliament and of the Council or","Article 16(2) of Directive 2009/28/EC of","the European Parliament and of the","Council shall remain subject to priority","dispatch."],"old":["4. Generating installations using","renewable energy sources or high-","efficiency cogeneration which have been","commissioned prior to [OP: entry into","force] and have, when commissioned, been","subject to priority dispatch under Article","15(5) of Directive 2012/27/EU of the","European Parliament and of the Council or","Article 16(2) of Directive 2009/28/EC of","the European Parliament and of the","Council35 shall remain subject to priority","dispatch. Priority dispatch shall no longer","be applicable from the date where the","generating installation is subject to","significant modifications, which shall be","the case at least where a new connection","agreement is required or the generation","capacity is increased.","","","_________________","35","Directive 2009/28/EC of the European","Parliament and of the Council of 23 April","2009 on the promotion of the use of energy","from renewable sources and amending and","subsequently repealing Directives","2001/77/EC and 2003/30/EC (OJ L 140,","5.6.2009, p. 16)."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"544","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Anneleen Van Bossuyt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1173","location":[[" Proposal for a regulation","Article 33 \u2013 paragraph 1 \u2013 point b"]],"meps":[117491],"meta":{"created":"2019-07-03T06:30:36"},"new":["(b) the synchronous connection of the","region;"],"old":["(b) the synchronous connection of the","systems;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1173","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-831","justification":" The prohibition to use congestion revenues to lower network tariffs is not justified.","location":[["Proposal for a regulation","Article 17 \u2013 paragraph 4"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:37"},"new":["4. Transmission system operators","shall clearly establish beforehand how any","congestion income will be used, and report","on the actual use of that income. On an","annual basis, and by 31 July each year, the","national regulatory authorities shall publish","a report setting out the amount of revenue","collected for the 12-month period ending","on 30 June of the same year and how that","revenue was used, including the specific","projects the income has been used for the","amount placed on a separate account line,","or the amount that has been used when","calculating network tariffs, together with","verification that that use complies with this","Regulation. In such cases where some of","the congestion revenues are used when","calculating network tariffs, the report may","set out the fulfilment by the TSO of the","commitment and balance sheet criteria","pursuant to paragraph 2."],"old":["4. Transmission system operators","shall clearly establish beforehand how any","congestion income will be used, and report","on the actual use of that income. On an","annual basis, and by 31 July each year, the","national regulatory authorities shall publish","a report setting out the amount of revenue","collected for the 12-month period ending","on 30 June of the same year and how that","revenue was used, including the specific","projects the income has been used for or","the amount placed on a separate account","line, together with verification that that use","complies with this Regulation and the","methodology developed pursuant to","paragraph 3."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"831","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Adam Gierek, Krystyna \u0141ybacka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-231","justification":"Energy supply is also a market mechanism. The purpose of the amendment is to reflect this\ncharacteristic in the proposed definition.","location":[["Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point u Regulation (EC) No 714/2009 of the European Parliament and of the Council"]],"meps":[28379,124883],"meta":{"created":"2020-11-15T15:52:08"},"new":["(u) 'capacity mechanism' means an","administrative or market-based measure to","ensure the achievement of the desired level","of security of supply by remunerating","resources for their availability not","including measures relating to ancillary","services;"],"old":["(u) 'capacity mechanism' means an","administrative measure to ensure the","achievement of the desired level of security","of supply by remunerating resources for","their availability not including measures","relating to ancillary services;"],"orig_lang":"pl","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"231","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-545","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 4"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:36"},"new":["4. Generating installations using","renewable energy sources and high-","efficiency cogeneration which have been","commissioned prior to [OP: entry into","force] and have, when commissioned, been","subject to priority dispatch under Article","15(5) of Directive 2012/27/EU of the","European Parliament and of the Council or","Article 16(2) of Directive 2009/28/EC of","the European Parliament and of the","Council35 shall remain subject to priority","dispatch.","_________________","35","Directive 2009/28/EC of the European","Parliament and of the Council of 23 April","2009 on the promotion of the use of energy","from renewable sources and amending and","subsequently repealing Directives","2001/77/EC and 2003/30/EC (OJ L 140,","5.6.2009, p. 16)."],"old":["4. Generating installations using","renewable energy sources or high-","efficiency cogeneration which have been","commissioned prior to [OP: entry into","force] and have, when commissioned, been","subject to priority dispatch under Article","15(5) of Directive 2012/27/EU of the","European Parliament and of the Council or","Article 16(2) of Directive 2009/28/EC of","the European Parliament and of the","Council35 shall remain subject to priority","dispatch. Priority dispatch shall no longer","be applicable from the date where the","generating installation is subject to","significant modifications, which shall be","the case at least where a new connection","agreement is required or the generation","capacity is increased.","_________________","35","Directive 2009/28/EC of the European","Parliament and of the Council of 23 April","2009 on the promotion of the use of energy","from renewable sources and amending and","subsequently repealing Directives","2001/77/EC and 2003/30/EC (OJ L 140,","5.6.2009, p. 16)."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"545","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Anneleen Van Bossuyt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1174","location":[["Proposal for a regulation","Article 33 \u2013 paragraph 1 \u2013 point c"]],"meps":[117491],"meta":{"created":"2019-07-03T06:30:37"},"new":["(c) the size of the region;"],"old":["(c) the size of the region, which shall","cover at least one capacity calculation","region;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1174","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Theresa Griffin, Jude Kirton-Darling, Clare Moody","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-832","justification":" Regulatory discretion to return congestion revenues to consumers via network tariffs outlined\n in Art 17 (2) of the Regulation on the International Electricity Market provides a foundation\n for private 3rd party interconnector models, such as the \u2018cap and floor\u2019 regime used in the\n UK and the Netherlands. This regime has stimulated great investment and interest to date and\n creates a market to further the Commission\u2019s goal of greater interconnection. The removal of\n this discretion would prevent both the continued operation of the \u2018cap and floor\u2019 regime and\n the possibility of other Member States adopting similar approaches. This amendment will\n allow the continued delivery on the Commission\u2019s interconnector targets, via innovative\n solutions that incentivise private 3rd parties to provide the necessary incentives to correct for\n what would otherwise be market failures.","location":[[" Proposal for a regulation","Article 17 \u2013 paragraph 4 a (new)"]],"meps":[124961,124953,124944],"meta":{"created":"2019-07-03T06:30:37"},"new":["4a. In Member States or third","countries which use interconnector","revenues as income to be taken into","account when calculating network tariffs","as part of a policy explicitly designed to","attract new investment into","interconnection capacity, any revenues","resulting from the allocation of capacity","on interconnectors that are owned and","operated by a separate legal entity from","the main transmission system may be","used, subject to approval by the regulatory","authorities of the Member States","concerned, up to a maximum amount to","be determined by those regulatory","authorities, as income to be taken into","account by the regulatory authorities","when approving the methodology for","calculating network tariffs and/or fixing","network tariffs."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"832","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Kaja Kallas, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar, Carolina Punset, Gerben-Jan Gerbrandy","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-232","location":[["Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point u"]],"meps":[124697,124989,124872,125026,90110,96940],"meta":{"created":"2020-11-15T15:52:08"},"new":["(u) 'capacity mechanism' means a","temporary administrative measure to","ensure the achievement of the necessary","level of security of supply by remunerating","resources for their availability not","including measures relating to ancillary","services;"],"old":["(u) 'capacity mechanism' means an","administrative measure to ensure the","achievement of the desired level of","security of supply by remunerating","resources for their availability not","","including measures relating to ancillary","services;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"232","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Se\u00e1n Kelly","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-833","location":[["Proposal for a regulation","Article 17 \u2013 paragraph 4 a (new)"]],"meps":[96668],"meta":{"created":"2019-07-03T06:30:37"},"new":["4a. In Member States or third","countries which use interconnector","revenues as income to be taken into","account when calculating network tariffs","as part of a policy explicitly designed to","attract new investment into","interconnection capacity, any revenues","resulting from the allocation of capacity","on interconnectors that are owned and","operated by a separate legal entity from","the main transmission system may be","used, subject to approval by the regulatory","authorities of the Member States","concerned, up to a maximum amount to","be determined by those regulatory","authorities, as income to be taken into","account by the regulatory authorities","when approving the methodology for","calculating network tariffs and/or fixing","network tariffs."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"833","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Claude Turmes","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-546","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 4"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:36"},"new":["4. In order to maintain a stable","regulatory framework for investors,","generating installations using renewable","energy sources or high-efficiency","cogeneration which have been","commissioned prior to [OP: entry into","force] and have, when commissioned, been","subject to priority dispatch under Article","15(5) of Directive 2012/27/EU of the","European Parliament and of the Council or","Article 16(2) of Directive 2009/28/EC of","the European Parliament and of the","Council35 shall remain subject to priority","dispatch.","_________________","35","Directive 2009/28/EC of the European","Parliament and of the Council of 23 April","2009 on the promotion of the use of energy","from renewable sources and amending and","subsequently repealing Directives","2001/77/EC and 2003/30/EC (OJ L 140,","5.6.2009, p. 16)."],"old":["4. Generating installations using","renewable energy sources or high-","efficiency cogeneration which have been","commissioned prior to [OP: entry into","force] and have, when commissioned, been","subject to priority dispatch under Article","15(5) of Directive 2012/27/EU of the","European Parliament and of the Council or","Article 16(2) of Directive 2009/28/EC of","the European Parliament and of the","Council35 shall remain subject to priority","dispatch. Priority dispatch shall no longer","be applicable from the date where the","generating installation is subject to","significant modifications, which shall be","the case at least where a new connection","agreement is required or the generation","capacity is increased.","_________________","35","Directive 2009/28/EC of the European","Parliament and of the Council of 23 April","2009 on the promotion of the use of energy","from renewable sources and amending and","subsequently repealing Directives","2001/77/EC and 2003/30/EC (OJ L 140,","5.6.2009, p. 16)."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"546","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Anneleen Van Bossuyt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1175","location":[["Proposal for a regulation","Article 33 \u2013 paragraph 1 \u2013 point d"]],"meps":[117491],"meta":{"created":"2019-07-03T06:30:37"},"new":["(d) the relationship to the capacity","calculation regions."],"old":["(d) the geographical optimization of","balancing reserves."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1175","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Jerzy Buzek, Janusz Lewandowski, Marian-Jean Marinescu","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-233","justification":" The capacity mechanisms may become a second, fully-fledged segment of the energy market.\n The aim of the proposed amendment is to supplement the capacity mechanism definition by\n stating that it may not only be an administrative, but also a market-based measure.","location":[[" Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point u"]],"meps":[28269,23781,33982],"meta":{"created":"2020-11-15T15:52:08"},"new":["(u) 'capacity mechanism' means a","market or administrative measure to ensure","the achievement of the desired level of","security of supply by remunerating","resources for their availability not","including measures relating to ancillary","services;"],"old":["(u) 'capacity mechanism' means an","administrative measure to ensure the","achievement of the desired level of security","of supply by remunerating resources for","their availability not including measures","relating to ancillary services;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"233","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Rolandas Paksas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-834","location":[["Proposal for a regulation","Article 18 \u2013 paragraph 1"]],"meps":[96694],"meta":{"created":"2019-07-03T06:30:37"},"new":["1. Member States shall monitor","resource adequacy within their territory","based on the national resource adequacy","assessment, which shall consider the","European resource adequacy assessment","pursuant to Article 19. The methodology","for a national resource adequacy","assessment shall be determined by a","Member State and shall take into account","the methodology referred to in Article","19(4)."],"old":["1. Member States shall monitor","resource adequacy within their territory","based on the European resource adequacy","assessment pursuant to Article 19.","",""],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"834","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Gerben-Jan Gerbrandy, Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-547","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 4"]],"meps":[96940,90110],"meta":{"created":"2019-07-03T06:30:36"},"new":["4. In order to maintain a","stable regulatory framework for investors,","generating or energy storage installations","using renewable energy sources or high-","efficiency cogeneration which have been","commissioned prior to [OP: entry into","force] and have, when commissioned, been","subject to priority dispatch under Article","15(5) of Directive 2012/27/EU of the","European Parliament and of the Council or","Article 16(2) of Directive 2009/28/EC of","the European Parliament and of the","Council 35 shall remain subject to priority","dispatch. Priority dispatch shall no longer","be applicable from the date where the","generating or energy storage installation is","subject to significant modifications, which","shall be the case at least where anew","connection agreement is required or the","generation or energy storage capacity is","increased"],"old":["4. Generating installations using","renewable energy sources or high-","efficiency cogeneration which have been","commissioned prior to [OP: entry into","force] and have, when commissioned, been","subject to priority dispatch under Article","15(5) of Directive 2012/27/EU of the","European Parliament and of the Council or","Article 16(2) of Directive 2009/28/EC of","the European Parliament and of the","Council35 shall remain subject to priority","dispatch. Priority dispatch shall no longer","be applicable from the date where the","generating installation is subject to","significant modifications, which shall be","the case at least where a new connection","agreement is required or the generation","capacity is increased.","_________________","35","Directive 2009/28/EC of the European","Parliament and of the Council of 23 April","2009 on the promotion of the use of energy","from renewable sources and amending and","subsequently repealing Directives","2001/77/EC and 2003/30/EC (OJ L 140,","5.6.2009, p. 16)."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"547","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1176","location":[["Proposal for a regulation","Article 33 \u2013 paragraph 1 \u2013 point d a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:37"},"new":["(d a) the macro-regional partnerships as","defined in the [Governance Regulation]."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1176","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Cristian-Silviu Bu\u015foi","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-234","location":[[" Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point u"]],"meps":[38420],"meta":{"created":"2020-11-15T15:52:08"},"new":["(u) 'capacity mechanism' means a","market or administrative measure to ensure","the achievement of the desired level of","security of supply by remunerating","resources for their availability not","including measures relating to ancillary","services;"],"old":["(u) 'capacity mechanism' means an","administrative measure to ensure the","achievement of the desired level of security","of supply by remunerating resources for","their availability not including measures","relating to ancillary services;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"234","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Adam Gierek, Krystyna \u0141ybacka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-835","justification":" The main reference for the introduction of capacity mechanisms should be the national\n resource adequacy assessment.","location":[[" Proposal for a regulation","Article 18 \u2013 paragraph 1 Regulation (EC) No 714/2009 of the European Parliament and of the Council"]],"meps":[28379,124883],"meta":{"created":"2019-07-03T06:30:37"},"new":["1. Member States shall monitor","resource adequacy within their territory","based on a national resource adequacy","assessment, which should take into","account the European resource adequacy","assessment pursuant to Article 19. The","methodology for conducting the national","resource adequacy assessment shall be","defined by the Member States and shall","take into account the methodology set out","in Article 19(4)."],"old":["1. Member States shall monitor","resource adequacy within their territory","based on the European resource adequacy","assessment pursuant to Article 19."],"orig_lang":"pl","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"835","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-548","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 4"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:36"},"new":["4. Generating installations using","renewable energy sources or high-","efficiency cogeneration which have been","commissioned prior to [OP: entry into","force] and have, when commissioned, been","subject to priority dispatch under Article","15(5) of Directive 2012/27/EU of the","European Parliament and of the Council or","Article 16(2) of Directive 2009/28/EC of","the European Parliament and of the","Council35 shall remain subject to priority","dispatch. Priority dispatch shall no longer","be applicable from the date where the","generating installation is subject to","significant modifications, which shall be","the case at least where a new connection","agreement is required or the generation","capacity is increased. Member States shall","phase out priority dispatch for the above-","mentioned cases.","_________________","35","Directive 2009/28/EC of the European","Parliament and of the Council of 23 April","2009 on the promotion of the use of energy","from renewable sources and amending and","subsequently repealing Directives","2001/77/EC and 2003/30/EC (OJ L 140,","5.6.2009, p. 16)."],"old":["4. Generating installations using","renewable energy sources or high-","efficiency cogeneration which have been","commissioned prior to [OP: entry into","","force] and have, when commissioned, been","subject to priority dispatch under Article","15(5) of Directive 2012/27/EU of the","European Parliament and of the Council or","Article 16(2) of Directive 2009/28/EC of","the European Parliament and of the","Council35 shall remain subject to priority","dispatch. Priority dispatch shall no longer","be applicable from the date where the","generating installation is subject to","significant modifications, which shall be","the case at least where a new connection","agreement is required or the generation","capacity is increased.","_________________","35","Directive 2009/28/EC of the European","Parliament and of the Council of 23 April","2009 on the promotion of the use of energy","from renewable sources and amending and","subsequently repealing Directives","2001/77/EC and 2003/30/EC (OJ L 140,","5.6.2009, p. 16)."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"548","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1177","location":[[" Proposal for a regulation","Article 33 \u2013 paragraph 1 a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:37"},"new":["1 a. The proposal in paragraph 1 shall","at least specify which transmission system","operators, load frequency control blocks,","load frequency control areas and bidding","zone borders are covered by each of the","system operation regions.Where a","transmission system operator is","responsible forbidding zone borders","belonging to different system operation","regions, it may be covered by more than","one regional operational centre."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1177","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski, Edward Czesak, Nikolay Barekov, Ashley Fox, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-836","justification":"The security of electricity supply will only be if the competence to carry out a resource\nadequacy assessment is left to Member States. While the monitoring and assessing of resource\nadequacy at the European level could be helpful, it should complement and support the\nnational assessment. At the European level, one is unable to include all national requirements\nwith the necessary level of detail and thus, to properly assess the system adequacy.","location":[[" Proposal for a regulation","Article 18 \u2013 paragraph 1"]],"meps":[124891,132925,124871,96957,96713],"meta":{"created":"2019-07-03T06:30:37"},"new":["1. Member States shall monitor","resource adequacy within their territory","based on the national resource adequacy","assessment, which shall consider the","European resource adequacy assessment","pursuant to Article 19. The methodology","for a national resource adequacy","assessment shall be determined by a","Member State and shall take into account","the methodology referred to in Article","19(4)."],"old":["1. Member States shall monitor","","resource adequacy within their territory","based on the European resource adequacy","assessment pursuant to Article 19."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"836","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-235","justification":"In accordance of the provisions in Article 22 (and Article 18a), a capacity mechanism\naddresses a resource adequacy problem.","location":[["Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point u"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["(u) 'capacity mechanism' means an","administrative measure to ensure the","achievement of the necessary level of","resource adequacy by remunerating","resources for their availability not","including measures relating to ancillary","services;"],"old":["(u) 'capacity mechanism' means an","administrative measure to ensure the","achievement of the desired level of","security of supply by remunerating","resources for their availability not","including measures relating to ancillary","services;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"235","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-549","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 4"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:36"},"new":["4. In order to maintain a stable","regulatory framework for investors,","generating installations using renewable","energy sources or high-efficiency","cogeneration which have been","commissioned prior to [OP: entry into","force] and have, when commissioned, been","subject to priority dispatch under Article","15(5) of Directive 2012/27/EU of the","European Parliament and of the Council or","Article 16(2) of Directive 2009/28/EC of","the European Parliament and of the","Council35 shall remain subject to priority","dispatch. Priority dispatch shall no longer","be applicable from the date where the","generating installation is subject to","significant modifications, which shall be","the case at least where a new connection","agreement is required or the generation","capacity is increased.","_________________","35","Directive 2009/28/EC of the European","Parliament and of the Council of 23 April","2009 on the promotion of the use of energy","from renewable sources and amending and","subsequently repealing Directives","2001/77/EC and 2003/30/EC (OJ L 140,","5.6.2009, p. 16)."],"old":["4. Generating installations using","renewable energy sources or high-","efficiency cogeneration which have been","commissioned prior to [OP: entry into","force] and have, when commissioned, been","subject to priority dispatch under Article","15(5) of Directive 2012/27/EU of the","European Parliament and of the Council or","Article 16(2) of Directive 2009/28/EC of","the European Parliament and of the","Council35 shall remain subject to priority","","dispatch. Priority dispatch shall no longer","be applicable from the date where the","generating installation is subject to","significant modifications, which shall be","the case at least where a new connection","agreement is required or the generation","capacity is increased.","_________________","35","Directive 2009/28/EC of the European","Parliament and of the Council of 23 April","2009 on the promotion of the use of energy","from renewable sources and amending and","subsequently repealing Directives","2001/77/EC and 2003/30/EC (OJ L 140,","5.6.2009, p. 16)."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"549","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1178","location":[[" Proposal for a regulation","Article 33 \u2013 paragraph 2"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:37"},"new":["deleted"],"old":["2. Within three months of receipt, the","Agency shall either approve the proposal","defining the system operation regions or","propose amendments. In the latter case,","the Agency shall consult the ENTSO for","Electricity before adopting the","amendments. The adopted proposal shall","be published on the Agency's website."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1178","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Jerzy Buzek, Janusz Lewandowski, Marian-Jean Marinescu","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-837","justification":"Commission proposal doesn't consider the principle of subsidiarity. While the monitoring and\nassessing of resource adequacy at the European level is needed and could prove helpful, the\n\n ERAA should only complement and support the national resource adequacy assessment. Only\n assessments made on a national level would ensure sufficient level of detail. ERAA is unable\n to include all national conditions with the necessary level of detail and thus, to properly\n assess the system adequacy.","location":[["Proposal for a regulation","Article 18 \u2013 paragraph 1"]],"meps":[23781,33982],"meta":{"created":"2019-07-03T06:30:37"},"new":["1. Member States shall monitor","resource adequacy within their territory","based on the national resource adequacy","assessment, which shall consider the","European resource adequacy assessment","pursuant to Article 19. The methodology","for a national resource adequacy","assessment shall be determined by a","Member State and shall take into account","the methodology referred to in Article","19(4)."],"old":["1. Member States shall monitor","resource adequacy within their territory","based on the European resource adequacy","assessment pursuant to Article 19."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"837","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-550","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 4"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:36"},"new":["4. Generating or energy storage","installations using renewable energy","sources or high-efficiency cogeneration","which have been commissioned prior to","[OP: entry into force] and have, when","commissioned, been subject to priority","dispatch under Article 15(5) of Directive","2012/27/EU of the European Parliament","and of the Council or Article 16(2) of","Directive 2009/28/EC of the European","Parliament and of the Council35 shall","remain subject to priority dispatch. Priority","dispatch shall no longer be applicable from","the date where the generating or energy","storage installation is subject to significant","modifications, which shall be the case at","least where a new connection agreement is","required or the generation or storage","capacity is increased.","_________________","35","Directive 2009/28/EC of the European","Parliament and of the Council of 23 April","2009 on the promotion of the use of energy","from renewable sources and amending and","subsequently repealing Directives","2001/77/EC and 2003/30/EC (OJ L 140,","5.6.2009, p. 16)."],"old":["4. Generating installations using","renewable energy sources or high-","efficiency cogeneration which have been","commissioned prior to [OP: entry into","force] and have, when commissioned, been","subject to priority dispatch under Article","15(5) of Directive 2012/27/EU of the","European Parliament and of the Council or","Article 16(2) of Directive 2009/28/EC of","the European Parliament and of the","Council35 shall remain subject to priority","dispatch. Priority dispatch shall no longer","be applicable from the date where the","generating installation is subject to","significant modifications, which shall be","the case at least where a new connection","agreement is required or the generation","capacity is increased.","","_________________","35","Directive 2009/28/EC of the European","Parliament and of the Council of 23 April","2009 on the promotion of the use of energy","from renewable sources and amending and","subsequently repealing Directives","2001/77/EC and 2003/30/EC (OJ L 140,","5.6.2009, p. 16)."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"550","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski, Edward Czesak, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-236","location":[["Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point u"]],"meps":[124891,132925,96713],"meta":{"created":"2020-11-15T15:52:08"},"new":["(u) 'capacity mechanism' means a","market-based measure to ensure the","achievement of the desired level of security","of supply by remunerating resources for","their availability not including measures","relating to ancillary services;"],"old":["(u) 'capacity mechanism' means an","administrative measure to ensure the","achievement of the desired level of security","of supply by remunerating resources for","their availability not including measures","relating to ancillary services;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"236","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Cristian-Silviu Bu\u015foi","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-838","location":[[" Proposal for a regulation","Article 18 \u2013 paragraph 1"]],"meps":[38420],"meta":{"created":"2019-07-03T06:30:38"},"new":["1. Member States shall monitor","resource adequacy within their territory","based on the national resource adequacy","assessment, which shall consider the","European resource adequacy assessment","pursuant to Article 19. The methodology","for a national resource adequacy","assessment shall be determined by a","Member State and shall take into account","the methodology referred to in Article","19(4)."],"old":["1. Member States shall monitor","resource adequacy within their territory","based on the European resource adequacy","assessment pursuant to Article 19."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"838","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Kaja Kallas, Pavel Teli\u010dka, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-551","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 4"]],"meps":[124697,124706,124989,124872,125026],"meta":{"created":"2019-07-03T06:30:36"},"new":["4. By way of derogation from","paragraph 1, generating installations using","renewable energy sources or high-","efficiency cogeneration which have been","commissioned prior to [OP: entry into","force] and have, when commissioned, been","subject to priority dispatch under Article","15(5) of Directive 2012/27/EU of the","European Parliament and of the Council or","Article 16(2) of Directive 2009/28/EC of","the European Parliament and of the","Council35 shall remain subject to priority","dispatch. Priority dispatch shall no longer","be applicable from the date where the","generating installation is subject to","significant modifications, which shall be","the case at least where a new connection","agreement is required or the generation","capacity is increased.","_________________","35","Directive 2009/28/EC of the European","Parliament and of the Council of 23 April","2009 on the promotion of the use of energy","from renewable sources and amending and","subsequently repealing Directives","2001/77/EC and 2003/30/EC (OJ L 140,","5.6.2009, p. 16)."],"old":["4. Generating installations using","renewable energy sources or high-","efficiency cogeneration which have been","commissioned prior to [OP: entry into","force] and have, when commissioned, been","subject to priority dispatch under Article","15(5) of Directive 2012/27/EU of the","European Parliament and of the Council or","Article 16(2) of Directive 2009/28/EC of","the European Parliament and of the","Council35 shall remain subject to priority","dispatch. Priority dispatch shall no longer","be applicable from the date where the","generating installation is subject to","significant modifications, which shall be","the case at least where a new connection","agreement is required or the generation","capacity is increased.","_________________","35","Directive 2009/28/EC of the European","Parliament and of the Council of 23 April","2009 on the promotion of the use of energy","from renewable sources and amending and","","subsequently repealing Directives","2001/77/EC and 2003/30/EC (OJ L 140,","5.6.2009, p. 16)."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"551","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-839","location":[[" Proposal for a regulation","Article 18 \u2013 paragraph 1"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:38"},"new":["1. Member States shall monitor","resource adequacy within their territory","based on the European resource adequacy","assessment pursuant to Article 19 and on","adequacy assessment having a regional","and national geographical scope that","includes territory of the Member State","and follows the methodology as defined in","Article 19."],"old":["1. Member States shall monitor","resource adequacy within their territory","based on the European resource adequacy","assessment pursuant to Article 19."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"839","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Pilar del Castillo Vera, Pilar Ayuso, Francesc Gamb\u00fas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1179","location":[[" Proposal for a regulation","Article 33 \u2013 paragraph 2"]],"meps":[28390,4319,125006],"meta":{"created":"2019-07-03T06:30:37"},"new":["2. Within six months of receipt, the","relevant Member States shall come to a","unanimous decision. Other Member","States may submit comments. The","decision shall be reasoned, in accordance","with relevant Union law. The relevant","Member States shall notify the","Commission and the Agency their","decision. The adopted proposal shall be","published on the Agency's website."],"old":["2. Within three months of receipt, the","Agency shall either approve the proposal","defining the system operation regions or","propose amendments. In the latter case,","the Agency shall consult the ENTSO for","Electricity before adopting the","amendments. The adopted proposal shall","be published on the Agency's website."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1179","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Lud\u011bk Niedermayer","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-237","location":[[" Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point v"]],"meps":[124701],"meta":{"created":"2020-11-15T15:52:08"},"new":["(v) 'strategic reserve' means a capacity","mechanism in which resources are only","dispatched in case day-ahead and intraday","markets have failed to clear, transmission","system operators have exhausted their","balancing resources to establish an","equilibrium between demand and supply,","and imbalances in the market during","periods where the reserves were dispatched","are settled at the value of lost load. The","conditions for setting up strategic reserves","must be set in a way that they will by no","means encourage the new build of","electricity generation. Strategic reserve,","that is created, must be operated only","according to transparent and pre-agreed","rules. The strategic reserve should not be","used to reduce volatility of market","electricity price or to reduce incentives of","market participants to own, operate or","invest into the generation/storage focused","on benefiting from market price peaks.","Strategic reserve must be acquired","through transparent and open bidding, in","line with the unbundling rules and it","cannot be owned neither by TSOs,","DSOs or public sector."],"old":["(v) 'strategic reserve' means a capacity","mechanism in which resources are only","dispatched in case day-ahead and intraday","markets have failed to clear, transmission","system operators have exhausted their","balancing resources to establish an","equilibrium between demand and supply,","and imbalances in the market during","periods where the reserves were dispatched","are settled at the value of lost load;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"237","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Claude Turmes","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-552","justification":" Priority dispatch for renewable energy sources is linked to the achievement of other targets,\n namely under the Directive on the promotion of the use of energy from renewable sources, as\n well as under climate legislation.","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 4 a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:36"},"new":["4 a. Member States shall comply with","the provisions of this Article through the","reporting process on the internal energy","market pursuant to Article21 of the","[Regulation on the Governance of the","Energy Union].","They shall notably ensure that","dispatching rules are fully transparent","and market-based, and that any removal","of priority dispatch for generating","installations using renewable energy","sources would not undermine their","contribution to:","(a) the EU target for 2030 as provided in","the Directive on the promotion of the use","of energy from renewable sources;","(b) the reduction of the overall","greenhouse gas emissions of the Union by","at least 40% below 1990 levels by 2030 as","provided in the intended nationally","determined reduction commitment of the","Union and its Member States submitted to","the Secretariat of the United Nations","Framework Convention on Climate","Change."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"552","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-840","location":[["Proposal for a regulation","Article 18 \u2013 paragraph 1"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:38"},"new":["1. Member States shall monitor","resource adequacy within their territory","based on the European resource adequacy","assessment pursuant to Article 19. Any","methodology for assessing resource","adequacy shall duly take the evolution of","electricity demand and the Union's","legislation on energy efficiency into","account."],"old":["1. Member States shall monitor","resource adequacy within their territory","based on the European resource adequacy","assessment pursuant to Article 19."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"840","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1180","location":[["Proposal for a regulation","Article 33 \u2013 paragraph 2 a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:37"},"new":["2 a. The Agency may request the","ENTSO for Electricity to review the","system operation regions covered by","regional operational centres.ENTSO for","Electricity shall submit to the Agency a","proposal to maintain or amend the system","operation regions covered by regional","operational centres within six","months.Within three months of receipt,","the Agency shall either approve, reject or","propose amendments to the proposal in","accordance with the procedure referred to","in paragraph 2."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1180","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-238","justification":"For legal certainty, this regulation must provide a clear and strict definition of strategic\nreserves. Capacity in strategic reserves must be kept outside of the market, cannot return\nback to the market and can only be called upon in extreme situations.","location":[[" Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point v"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["(v) 'strategic reserve' means a capacity","mechanism in which resources are held","and definitively remain outside the day","ahead, intraday, balancing and any other","ancillary services market, and are only","dispatched in case day-ahead and intraday","markets have failed to clear, transmission","system operators have exhausted their","balancing resources to establish an","equilibrium between demand and supply,","and imbalances in the market during","periods where the reserves were dispatched","are settled at technical price limits or at","the value of lost load;"],"old":["(v) 'strategic reserve' means a capacity","","mechanism in which resources are only","dispatched in case day-ahead and intraday","markets have failed to clear, transmission","system operators have exhausted their","balancing resources to establish an","equilibrium between demand and supply,","and imbalances in the market during","periods where the reserves were dispatched","are settled at the value of lost load;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"238","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Massimiliano Salini, Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-841","location":[["Proposal for a regulation","Article 18 \u2013 paragraph 1"]],"meps":[125670,36392],"meta":{"created":"2019-07-03T06:30:38"},"new":["1. Member States shall monitor","resource adequacy within their territory","based on the national resource adequacy","assessment. Member States may refer to","the European resource adequacy","methodology pursuant to Article 19."],"old":["1. Member States shall monitor","resource adequacy within their territory","based on the European resource adequacy","assessment pursuant to Article 19."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"841","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-553","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 4 a (new)"]],"meps":[90110],"meta":{"created":"2019-07-03T06:30:36"},"new":["4 a. 4 a. Member States shall comply","with the provisions of this article through","the reporting process on the internal","energy market as provided in the","Regulation on the Governance of the","Energy Union (Art. 21). They shall","notably ensure that dispatching rules are","fully transparent and market-based, and","that the removal of priority dispatch for","generating installations using","renewable energy sources would not","undermine their contribution to:","(a) the EU target for 2030 as provided in","the Directive on the promotion of the use","of energy from renewable sources;","(b) the reduction of the overall","greenhouse gas emissions of the Union by","at least 35% below 1990 levels by 2030 as","provided in the intended nationally","determined reduction commitment of the","Union and its Member States submitted to","the Secretariat of the United","Nations Framework Convention on","Climate Change."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"553","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1181","justification":" It is our position that Articles 31 to 44 and all reference regarding ROCs in the Clean Energy\n Package to All Europeans shall be deleted without any substitution.It is of particular concern\n that establishment of ROCs violates subsidiarity and proportionality principle according to\n art. 194 SFEU","location":[["Proposal for a regulation","Article 34"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:37"},"new":["deleted"],"old":["[...]"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1181","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Martina Werner, Flavio Zanonato, Jeppe Kofod, Carlos Zorrinho","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-239","location":[["Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point v"]],"meps":[124826,124800,124870,124739],"meta":{"created":"2020-11-15T15:52:08"},"new":["(v) 'strategic reserve' means a capacity","mechanism in which resources are held","outside the electricity market and are only","dispatched in case day-ahead and intraday","markets have failed to clear, transmission","system operators have exhausted their","balancing resources to establish an","equilibrium between demand and supply,","and imbalances in the market during","periods where the reserves were dispatched","are settled at least at technical price limits;"],"old":["(v) 'strategic reserve' means a capacity","mechanism in which resources are only","dispatched in case day-ahead and intraday","markets have failed to clear, transmission","system operators have exhausted their","balancing resources to establish an","equilibrium between demand and supply,","and imbalances in the market during","periods where the reserves were dispatched","are settled at the value of lost load;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"239","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Ashley Fox","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-842","location":[["Proposal for a regulation","Article 18 \u2013 paragraph 1"]],"meps":[96957],"meta":{"created":"2019-07-03T06:30:38"},"new":["1. Member States shall monitor","resource adequacy within their territory","based on the European resource adequacy","assessment pursuant to Article 19, which","shall complement national resource","adequacy assessments."],"old":["1. Member States shall monitor","resource adequacy within their territory","based on the European resource adequacy","assessment pursuant to Article 19."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"842","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Se\u00e1n Kelly","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-554","meps":[96668],"meta":{"created":"2019-07-03T06:30:37"},"new":["4 a. Member States shall phase out","priority dispatch for installations under","paragraph 4 only if all of the following","apply:","- For energy intensive industry","cogenerating electricity and heat from","high efficiency CHP, where alternative","solutions to produce useful process heat","could be implemented in an economically","and technically feasible manner, that","guarantees continued operation of the","facility.","- There is a fully operational liquid","wholesale electricity market operating in","the Member State with no identified","resource adequacy concerns.","- All the barriers identified in Article 3","have been eliminated, and Article 3 is","fully implemented.","Producers may opt-out of priority dispatch","at any time if such actions include fair","financial compensation or another form","of agreement between the producer and","the Member State."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"554","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Kate\u0159ina Kone\u010dn\u00e1, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1182","location":[[" Proposal for a regulation","Article 34"]],"meps":[23699,96713],"meta":{"created":"2019-07-03T06:30:37"},"new":["deleted"],"old":["[...]"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1182","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-843","location":[[" Proposal for a regulation","Article 18 \u2013 paragraph 1"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:38"},"new":["1. Member States shall conduct an","assessment of resource adequacy within","their territory taking into account system","interconnectivity and the data from the","European resource adequacy assessment","pursuant to Article 19."],"old":["1. Member States shall monitor","resource adequacy within their territory","based on the European resource adequacy","assessment pursuant to Article 19."],"orig_lang":"fr","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"843","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Henna Virkkunen","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-240","justification":" Strategic reserves are used for ensuring that the day-ahead market can clear.","location":[[" Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point v"]],"meps":[124726],"meta":{"created":"2020-11-15T15:52:08"},"new":["(v) 'strategic reserve' means a capacity","mechanism in which resources are only","dispatched in case day-ahead markets have","failed to clear or transmission system","operators have exhausted their balancing","resources to establish an equilibrium","between demand and supply"],"old":["(v) 'strategic reserve' means a capacity","mechanism in which resources are only","dispatched in case day-ahead and intraday","markets have failed to clear, transmission","system operators have exhausted their","balancing resources to establish an","equilibrium between demand and supply,","and imbalances in the market during","periods where the reserves were","dispatched are settled at the value of lost","load;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"240","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-555","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 4 a (new)"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:37"},"new":["4 a. Member States shall comply with","the provisions of this article through the","reporting process on the internal energy","market as provided in the Regulation on","the Governance of the Energy Union(Art.","21). They shall notably ensure that","dispatching rules are fully transparent","and market-based, and that the removal of","priority dispatch for generating","installations using renewable energy","sources would not undermine their","contribution to:","(a) the EU target for 2030 as provided in","the Directive on the promotion of the use","of energy from renewable sources;","(b) the reduction of the overall","greenhouse gas emissions of the Union ."],"old":[""],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"555","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-844","location":[[" Proposal for a regulation","Article 18 \u2013 paragraph 1"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:38"},"new":["1. Member States shall use the results","of the European resource adequacy","assessment pursuant to Article 19 to verify","the resource adequacy concerns within","their territory."],"old":["1. Member States shall monitor","resource adequacy within their territory","based on the European resource adequacy","assessment pursuant to Article 19."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"844","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Anneleen Van Bossuyt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1183","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 introductory part"]],"meps":[117491],"meta":{"created":"2019-07-03T06:30:37"},"new":["1. Regional coordination centres shall","provide all the following services in the","system operation region where they are","established:"],"old":["1. Each regional operational centre","shall perform all the following functions","in the system operation region where it is","established and regional operational","centres shall perform at least the","following functions, set out in more detail","in Annex I:"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1183","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Miapetra Kumpula-Natri","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-241","justification":"Strategic reserves are used for ensuring that the day-ahead markets can clear, and hence the\nmarket deliver price formation also in scarcity situations. Only in these situations, when\nthere\u2019s not enough market based offers to meet demand, the reserves would be activated with\nclear rules. The proposal as such would mean, that either day-ahead markets would not clear\n(which would have wide effects) or that purchase bids would be curtailed.","location":[[" Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point v"]],"meps":[124735],"meta":{"created":"2020-11-15T15:52:08"},"new":["(v) 'strategic reserve' means a capacity","mechanism in which resources are only","dispatched in case day-ahead markets have","failed to clear or transmission system","operators have exhausted their balancing","resources to establish an equilibrium","between demand and supply;"],"old":["(v) 'strategic reserve' means a capacity","mechanism in which resources are only","dispatched in case day-ahead and intraday","markets have failed to clear, transmission","system operators have exhausted their","balancing resources to establish an","equilibrium between demand and supply,","and imbalances in the market during","periods where the reserves were","dispatched are settled at the value of lost","load;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"241","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Kathleen Van Brempt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-556","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 4 a (new)"]],"meps":[5729],"meta":{"created":"2019-07-03T06:30:37"},"new":["4 a. Prior to the removal of priority","dispatch for generating installations using","renewable energy sources in accordance","with paragraphs 2 and 3, Member States","shall ensure that dispatching rules are","fully transparent and market-based and","that the removal would not undermine","Member States\u2019 contribution to Union","climate and energy targets;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"556","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-845","location":[["Proposal for a regulation","Article 18 \u2013 paragraph 1"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:38"},"new":["1. Member States shall monitor,","report on and publish resource adequacy","within their territory based on the","European resource adequacy assessment","pursuant to Article 19."],"old":["1. Member States shall monitor","resource adequacy within their territory","based on the European resource adequacy","assessment pursuant to Article 19."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"845","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Kathleen Van Brempt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-846","location":[["Proposal for a regulation","Article 18 \u2013 paragraph 1"]],"meps":[5729],"meta":{"created":"2019-07-03T06:30:38"},"new":["1. Member States shall monitor,","report and publish resource adequacy","within their territory based on the","European resource adequacy assessment","pursuant to Article 19."],"old":["1. Member States shall monitor","resource adequacy within their territory","based on the European resource adequacy","assessment pursuant to Article 19."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"846","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1184","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 introductory part"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:37"},"new":["1. Each regional security coordinator","shall perform the following services in","the capacity calculation region where it is","established:"],"old":["1. Each regional operational centre","shall perform all the following functions in","the system operation region where it is","established and regional operational","centres shall perform at least the","following functions, set out in more detail","in Annex I:"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1184","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Marian-Jean Marinescu","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-242","location":[["Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point v"]],"meps":[33982],"meta":{"created":"2020-11-15T15:52:08"},"new":["(v) 'strategic reserve' means a capacity","mechanism in which resources are only","dispatched in case day-ahead and intraday","markets have failed to clear, transmission","system operators prove that their dispatch","is necessary to ensure grid security, and","have exhausted their balancing resources to","establish an equilibrium between demand","and supply, and imbalances in the market","during periods where the reserves were","dispatched are settled at the value of lost","load;"],"old":["(v) 'strategic reserve' means a capacity","mechanism in which resources are only","dispatched in case day-ahead and intraday","markets have failed to clear, transmission","system operators have exhausted their","balancing resources to establish an","equilibrium between demand and supply,","and imbalances in the market during","periods where the reserves were dispatched","are settled at the value of lost load;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"242","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1361","justification":"The proposal to create a EU DSO entity should be scrapped to eliminate the risks of conflicts\nof interests. As such, the creation of a new EU DSO entity contains significant risks of\nobstructing competition and discrimination on sensitive issues (in particular on issues\nrelating to consumers and treatment of distributed energy resources, such as solar PV and\ndemand response).EU unbundling rules for DSOs are not very stringent, which would allow\nlarge DSOs connected to parent utilities to exert undue influence via the DSO entity. This risk\nis compounded by the fact that the EU DSO entity would be in a position to influence the\ndrafting of Network Codes that will significantly impact the deployment of renewables and\ndemand response, which not all DSOs are supporting. This could increase the risk of Network\nCodes that impose additional barriers to demand response and self-consumption and that\nallow DSOs to dominate markets for aggregation, storage and EV charging infrastructure","location":[["Proposal for a regulation","Article 49"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:32"},"new":["Article 49 deleted","operators"],"old":["European entity for distribution system","Distribution system operators which are","not part of a vertically integrated","undertaking or which are unbundled","according to the provisions of Article 35","[recast of Directive 2009/72/EC as","proposed by COM(2016) 864/2], shall","cooperate at Union level through a","European Entity for Distribution system","operators (\"EU DSO entity\"), in order to","promote the completion and functioning","of the internal market in electricity, and to","promote optimal management and a","coordinated operation of distribution and","transmission systems. Distribution system","operators who wish to participate in the","EU DSO entity shall become registered","members of the entity."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1361","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Flavio Zanonato","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-847","justification":" Common rules and EU methodologies for generation adequacy assessment are needed in\n order to harmonize the different level of assessment (pan-European and national) and to\n possibly compare outcomes among different studies and assessments.","location":[["Proposal for a regulation","Article 18 \u2013 paragraph 1"]],"meps":[124800],"meta":{"created":"2019-07-03T06:30:38"},"new":["1. Member States shall monitor","resource adequacy within their territory in","compliance with the European resource","adequacy methodology pursuant to Article","19, par. 4."],"old":["1. Member States shall monitor","resource adequacy within their territory","based on the European resource adequacy","","assessment pursuant to Article 19."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"847","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Martina Werner, Flavio Zanonato, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula- Natri, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-557","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 4 a (new)"]],"meps":[124826,124800,124870,124739,124735,124699],"meta":{"created":"2019-07-03T06:30:37"},"new":["4 a. Member States shall no longer be","allowed to give that priority to the","dispatch of other generating installations."],"old":["",""],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"557","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Miapetra Kumpula-Natri","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1185","justification":"While enhanced regional operations are needed, it is questionable whether the common\nregional operations require the new entities (ROCs), and with such detailed\ndescription.Instead the TSOs should be given the possibility to work together within a systems\noperating region when it comes to tasks listed in 34 (1).","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 introductory part"]],"meps":[124735],"meta":{"created":"2019-07-03T06:30:37"},"new":["1. In the system operation region, the","Transmission System Operators shall","perform at least the following functions","jointly, within the scope of regional","security centres, regional operational","centres or other format for joint","operations, set out in more detail in Annex","I:"],"old":["1. Each regional operational centre","shall perform all the following functions in","the system operation region where it is","established and regional operational","centres shall perform at least the","following functions, set out in more detail","in Annex I:"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1185","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-243","justification":" The regulation should ensure that strategic reserves are remunerated and used only in cases\n for which the market fails to provide a response to security of supply and balancing\n requirements. Any other impact on the functioning of the market should be prevented.","location":[["Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point v"]],"meps":[124813,124796],"meta":{"created":"2020-11-15T15:52:08"},"new":["(v) 'strategic reserve' means a capacity","mechanism in which resources are held","outside the market, remain outside the","market, and are only dispatched in case","day-ahead and intraday markets have failed","to clear, transmission system operators","have exhausted their balancing resources to","establish an equilibrium between demand","and supply, and imbalances in the market","during periods where the reserves were","dispatched are settled at the value of lost","load;"],"old":["(v) 'strategic reserve' means a capacity","mechanism in which resources are only","dispatched in case day-ahead and intraday","markets have failed to clear, transmission","system operators have exhausted their","balancing resources to establish an","equilibrium between demand and supply,","","and imbalances in the market during","periods where the reserves were dispatched","are settled at the value of lost load;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"243","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Patrizia Toia","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-848","justification":" Member States, being the ultimate subjects responsible for security of electricity supply shall\n monitor resource adequacy within their territory and shall carry out their own adequacy\n assessments and studies by adopting specific detailed representation of network topology and\n market structure (typically at European level due to computational reasons both market and\n power models have simplified representation/clustering of generation units/assets of\n transmission, therefore further details for internal network might be necessary in order to\n evaluate internal congestions and or local scarcity situation).Common rules and EU\n methodologies for generation adequacy assessment are needed in order to harmonize the\n different level of assessment (pan-European and National) and to make possible the\n comparison of results among different studies and assessments.","location":[[" Proposal for a regulation","Article 18 \u2013 paragraph 1"]],"meps":[28340],"meta":{"created":"2019-07-03T06:30:39"},"new":["1. Member States shall monitor","resource adequacy within their territory","based in compliance with the European","resource adequacy methodology pursuant","to Article 19, par. 4."],"old":["1. Member States shall monitor","resource adequacy within their territory","based on the European resource adequacy","assessment pursuant to Article 19."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"848","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Rebecca Harms, Jakop Dalunde, Reinhard B\u00fctikofer, Davor \u0160krlec, Yannick Jadot, Michel Reimon, Benedek J\u00e1vor, Florent Marcellesi on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-558","justification":"Priority dispatch is an important tool to ensure that renewable energy is used as it is\nproduced and thus helps to achieve our climate targets, as well as continues to provide a\nstable investment framework for future projects, in line with the provisions of the current\nrenewable energy directive (Directive 2009/28/EC).","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 5"]],"meps":[28233,183338,96739,124756,96740,124935,124721,26146],"meta":{"created":"2019-07-03T06:30:37"},"new":["deleted"],"old":["5. Priority dispatch shall not","endanger the secure operation of the","electricity system, shall not be used as a","justification for curtailment of cross-","border capacities beyond what is provided","for in Article 14 and shall be based on","transparent and non-discriminatory","criteria."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"558","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Martina Werner, Carlos Zorrinho, Miapetra Kumpula-Natri, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1186","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point a"]],"meps":[124826,124739,124735,124784],"meta":{"created":"2019-07-03T06:30:37"},"new":["(a) coordinated capacity calculation in","accordance with the methodologies","developed pursuant to Regulation (EU)","2015/1222;"],"old":["(a) coordinated capacity calculation;",""],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1186","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-244","justification":" The regulation should ensure that strategic reserves are remunerated and used only in cases\n for which the market fails to provide a response to security of supply and balancing\n requirements. Any other impact on the functioning of the market should be prevented.","location":[[" Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point v"]],"meps":[96852],"meta":{"created":"2020-11-15T15:52:08"},"new":["(v) 'strategic reserve' means a capacity","mechanism in which resources are","excluded from the market to be only","dispatched in case day-ahead and intraday","markets have failed to clear, transmission","system operators have exhausted their","balancing resources to establish an","equilibrium between demand and supply,","and imbalances in the market during","periods where the reserves were dispatched","are settled at the value of lost load;"],"old":["(v) 'strategic reserve' means a capacity","mechanism in which resources are only","dispatched in case day-ahead and intraday","markets have failed to clear, transmission","system operators have exhausted their","balancing resources to establish an","equilibrium between demand and supply,","and imbalances in the market during","periods where the reserves were dispatched","are settled at the value of lost load;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"244","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Marian-Jean Marinescu","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-849","justification":"Only assessments made on a national level would ensure the sufficient level of detail.","location":[[" Proposal for a regulation","Article 18 \u2013 paragraph 1"]],"meps":[33982],"meta":{"created":"2019-07-03T06:30:39"},"new":["1. Member States shall monitor","resource adequacy within their territory","based on the national resource adequacy","assessment pursuant to Article 19."],"old":["1. Member States shall monitor","resource adequacy within their territory","based on the European resource adequacy","assessment pursuant to Article 19."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"849","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Massimiliano Salini","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1362","location":[[" Proposal for a regulation","Article 49 \u2013 paragraph 1"]],"meps":[125670],"meta":{"created":"2019-07-03T06:30:32"},"new":["Distribution system operators which are","not part of a vertically integrated","undertaking or which are unbundled","according to the provisions of Article 35","[recast of Directive 2009/72/EC as","proposed by COM(2016) 864/2], shall","cooperate at Union level through a","European Entity for Distribution system","operators (\"EU DSO entity\"), in order to","promote the completion and functioning of","the internal market in electricity, and to","promote optimal management and a","coordinated operation of distribution and","transmission systems. Distribution system","operators who wish to participate in the EU","DSO entity shall become registered","members of the entity. For issues of cross-","sectorial relevance, the EU DSO entity for","electricity Distribution system operators","shall ensure coordination, on an equal","footing, with Gas Distribution operators","represented by a permanent standing","committee till an equivalent entity","representing gas DSOs is established and","the modalities for liaison between the two","entities have been set."],"old":["Distribution system operators which are","not part of a vertically integrated","undertaking or which are unbundled","according to the provisions of Article 35","[recast of Directive 2009/72/EC as","proposed by COM(2016) 864/2], shall","cooperate at Union level through a","European Entity for Distribution system","operators (\"EU DSO entity\"), in order to","promote the completion and functioning of","the internal market in electricity, and to","promote optimal management and a","coordinated operation of distribution and","transmission systems. Distribution system","operators who wish to participate in the EU","DSO entity shall become registered","members of the entity."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1362","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-850","location":[["Proposal for a regulation","Article 18 \u2013 paragraph 2"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:39"},"new":["2. Where the national resource","adequacy assessment (taking into account","system interconnectivity and the data from","the resource adequacy assessment) reveals","a concern, Member States shall identify","any regulatory distortions that caused or","contributed to the emergence of the","concern."],"old":["2. Where the European resource","adequacy assessment identifies a resource","adequacy concern Member States shall","identify any regulatory distortions that","caused or contributed to the emergence of","the concern."],"orig_lang":"fr","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"850","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Eva Kaili","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-559","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 5"]],"meps":[125109],"meta":{"created":"2019-07-03T06:30:37"},"new":["5. Priority dispatch shall not endanger","the secure operation of the electricity","system, shall not be used as a justification","for curtailment of cross-border capacities","beyond what is provided for in Article 14","and shall be based on transparent and non-","discriminatory criteria. Before abolishing","priority dispatch for any generating","installation using renewable energy","sources, Member States shall ensure that","dispatching rules are fully transparent","and market-based, and that the removal of","priority dispatch for generating","installations using renewable energy","sources would not undermine their","contribution to:(a) the EU target for 2030","as provided in the Directive on the","promotion of the use of energy from","renewable sources;(b) the reduction of the","overall greenhouse gas emissions of the","Union by at least 40% below 1990 levels","by 2030 as provided in the intended","nationally determined reduction","commitment of the Union and its Member","States submitted to the Secretariat of the","United Nations Framework Convention","on Climate Change."],"old":["5. Priority dispatch shall not endanger","the secure operation of the electricity","system, shall not be used as a justification","for curtailment of cross-border capacities","beyond what is provided for in Article 14","and shall be based on transparent and non-","","discriminatory criteria."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"559","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Kaja Kallas, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar, Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-245","location":[["Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point v"]],"meps":[124697,124989,124872,125026,90110],"meta":{"created":"2020-11-15T15:52:08"},"new":["(v) 'strategic reserve' means a capacity","mechanism in which resources are","excluded from the market and only","dispatched in case day-ahead and intraday","markets have failed to clear, transmission","system operators have exhausted their","balancing resources to establish an","equilibrium between demand and supply,","and imbalances in the market during","periods where the reserves were dispatched","are settled at the value of lost load;"],"old":["(v) 'strategic reserve' means a capacity","mechanism in which resources are only","dispatched in case day-ahead and intraday","markets have failed to clear, transmission","system operators have exhausted their","balancing resources to establish an","equilibrium between demand and supply,","and imbalances in the market during","periods where the reserves were dispatched","are settled at the value of lost load;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"245","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Martina Werner, Carlos Zorrinho, Miapetra Kumpula-Natri, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1187","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point b"]],"meps":[124826,124739,124735,124784],"meta":{"created":"2019-07-03T06:30:38"},"new":["(b) coordinated security analysis in","accordance with the methodologies","developed pursuant to Regulation ... [The","Commission Regulation establishing a","Guideline on electricity transmission","system operation];"],"old":["(b) coordinated security analysis;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1187","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Massimiliano Salini, Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-851","location":[["Proposal for a regulation","Article 18 \u2013 paragraph 2"]],"meps":[125670,36392],"meta":{"created":"2019-07-03T06:30:39"},"new":["2. Where the national resource","adequacy assessment identifies a resource","adequacy concern Member States shall","identify any market and regulatory","distortions that caused or contributed to the","emergence and endurance of the concern."],"old":["2. Where the European resource","adequacy assessment identifies a resource","adequacy concern Member States shall","identify any regulatory distortions that","caused or contributed to the emergence of","","","the concern."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"851","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Anneleen Van Bossuyt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1188","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point c"]],"meps":[117491],"meta":{"created":"2019-07-03T06:30:38"},"new":["(c) creation of common grid models in","accordance with the methodologies and","procedures developed pursuant to Articles","68 - 70 and 79 of Regulation ... [The","Commission Regulation establishing a","Guideline on electricity transmission","system operation];"],"old":["(c) creation of common system models;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1188","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-560","location":[[" Proposal for a regulation","Article 11 \u2013 paragraph 5"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:37"},"new":["5. Priority dispatch for generating","installations using renewable energy","sources or high-efficiency cogeneration","which have been commissioned prior to","[OP: entry into force] and have, when","commissioned, been subject to priority","dispatch under Article 15(5) of Directive","2012/27/EU of the European Parliament","and of the Council or Article 16(2) of","Directive 2009/28/EC of the European","Parliament and of the Council, shall not","endanger the secure operation of the","electricity system, shall not be used as a","justification for curtailment of cross-border","capacities beyond what is provided for in","Article 14 and shall be based on","transparent and non-discriminatory criteria."],"old":["5. Priority dispatch shall not endanger","the secure operation of the electricity","system, shall not be used as a justification","for curtailment of cross-border capacities","beyond what is provided for in Article 14","and shall be based on transparent and non-","discriminatory criteria.",""],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"560","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Morten Helveg Petersen","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1363","location":[[" Proposal for a regulation","Article 49 \u2013 paragraph 1"]],"meps":[124872],"meta":{"created":"2019-07-03T06:30:32"},"new":["Distribution system operators shall","cooperate at Union level through a","European Entity for Distribution system","operators (\"EU DSO entity\"), in order to","promote the completion and functioning of","the internal market in electricity, and to","promote optimal management and a","coordinated operation of distribution and","transmission systems. Distribution system","operators who wish to participate in the EU","DSO entity shall become registered","members of the entity."],"old":["Distribution system operators which are","not part of a vertically integrated","undertaking or which are unbundled","","according to the provisions of Article 35","[recast of Directive 2009/72/EC as","proposed by COM(2016) 864/2], shall","cooperate at Union level through a","European Entity for Distribution system","operators (\"EU DSO entity\"), in order to","promote the completion and functioning of","the internal market in electricity, and to","promote optimal management and a","coordinated operation of distribution and","transmission systems. Distribution system","operators who wish to participate in the EU","DSO entity shall become registered","members of the entity."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1363","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Ashley Fox","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-852","location":[[" Proposal for a regulation","Article 18 \u2013 paragraph 2"]],"meps":[96957],"meta":{"created":"2019-07-03T06:30:39"},"new":["2. Where national assessments or the","European resource adequacy assessment","identifies a resource adequacy concern","Member States shall identify any","regulatory distortions that caused or","contributed to the emergence of the","concern."],"old":["2. Where the European resource","adequacy assessment identifies a resource","adequacy concern Member States shall","identify any regulatory distortions that","caused or contributed to the emergence of","the concern."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"852","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-246","justification":"As appliances, technologies, grids, processes, goods and buildings get more interconnected\nand smart, innovative models should be included in this definition.","location":[["Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point x"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["(x) \u2018demonstration project\u2019 means a","project demonstrating a technology or","renewable energy or energy","efficiency integration model as a first of its","kind in the Union and representing a","significant innovation that goes well","beyond the state of the art."],"old":["(x) \u2018demonstration project\u2019 means a","project demonstrating a technology as a","first of its kind in the Union and","representing a significant innovation that","goes well beyond the state of the art."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"246","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Martina Werner, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1189","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point c"]],"meps":[124826,124739,124735,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:38"},"new":["(c) creation of common system models","in accordance with the methodologies and","procedures developed pursuant to","Regulation ... [The Commission","Regulation establishing a Guideline one","electricity transmission system operation];"],"old":["(c) creation of common system","models;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1189","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-561","location":[["Proposal for a regulation","Article 11 \u2013 paragraph 5"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:37"},"new":["5. Priority dispatch shall not endanger","the secure operation of the electricity","system. Where priority dispatch is used as","a justification for curtailment of cross-","border capacities beyond what is provided","for in Article 14, the responsible TSOs","shall make transparent the scale, duration","and justification of the measure. Priority","dispatch shall be based on transparent and","non-discriminatory criteria."],"old":["5. Priority dispatch shall not endanger","the secure operation of the electricity","system, shall not be used as a justification","for curtailment of cross-border capacities","beyond what is provided for in Article 14","and shall be based on transparent and non-","discriminatory criteria."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"561","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1364","location":[["Proposal for a regulation","Article 49 \u2013 paragraph 1"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:32"},"new":["Distribution system operators which are","not part of a vertically integrated","undertaking, which are unbundled","according to the provisions of Article 35","[recast of Directive 2009/72/EC as","proposed by COM(2016) 864/2], or which","are financially unbundled and fully","independent from energy related entities","according to the provisions of Article [50","c], shall cooperate at Union level through a","European Entity for Distribution system","operators (\"EU DSO entity\"), in order to","promote the completion and functioning of","the internal market in electricity, and to","promote optimal management and a","coordinated operation of distribution and","transmission systems. Distribution system","operators who wish to participate in the EU","DSO entity shall become registered","members of the entity."],"old":["Distribution system operators which are","not part of a vertically integrated","undertaking or which are unbundled","according to the provisions of Article 35","[recast of Directive 2009/72/EC as","proposed by COM(2016) 864/2], shall","cooperate at Union level through a","European Entity for Distribution system","operators (\"EU DSO entity\"), in order to","promote the completion and functioning of","the internal market in electricity, and to","promote optimal management and a","coordinated operation of distribution and","transmission systems. Distribution system","operators who wish to participate in the EU","DSO entity shall become registered","members of the entity."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1364","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Martina Werner, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1190","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point d"]],"meps":[124826,124739,124735,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:38"},"new":["(d) consistency assessment of","transmission system operators' defense","plans and restoration plans in accordance","with the procedure set out in Regulation","... [The Commission Regulation","establishing a network code on electricity","emergency and restoration];"],"old":["(d) consistency assessment of","transmission system operators' defense","plans and restoration plans;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1190","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-853","location":[[" Proposal for a regulation","Article 18 \u2013 paragraph 2"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:39"},"new":["2. Where the European resource","adequacy assessment identifies a resource","adequacy concern Member States shall","identify any market failures and/or","regulatory distortions that caused or","contributed to the emergence of the","concern."],"old":["2. Where the European resource","adequacy assessment identifies a resource","adequacy concern Member States shall","identify any regulatory distortions that","caused or contributed to the emergence of","the concern."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"853","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1365","justification":" There is a need to ensure that DSOs are proportionally geographically represented in the EU\n DSO to ensure that it takes into account the specificities of respective regions when drafting\n respective documents or legislation.","location":[[" Proposal for a regulation","Article 49 \u2013 paragraph 1"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:32"},"new":["Distribution system operators which are","not part of a vertically integrated","undertaking or which are unbundled","according to the provisions of Article 35","[recast of Directive 2009/72/EC as","proposed by COM(2016) 864/2], shall","cooperate at Union level through a","European Entity for Distribution system","operators (\"EU DSO entity\"), in order to","promote the completion and functioning of","the internal market in electricity, and to","promote optimal management and a","coordinated operation of distribution and","transmission systems. Distribution system","operators who wish to participate in the EU","DSO entity shall become registered","members of the entity. Decision-making","process shall ensure for proportional","geographical representation of DSOs in","the EU DSO entity."],"old":["Distribution system operators which are","not part of a vertically integrated","undertaking or which are unbundled","according to the provisions of Article 35","[recast of Directive 2009/72/EC as","proposed by COM(2016) 864/2], shall","cooperate at Union level through a","European Entity for Distribution system","operators (\"EU DSO entity\"), in order to","promote the completion and functioning of","the internal market in electricity, and to","promote optimal management and a","coordinated operation of distribution and","transmission systems. Distribution system","operators who wish to participate in the EU","DSO entity shall become registered","members of the entity."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1365","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Anneleen Van Bossuyt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1191","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point e"]],"meps":[117491],"meta":{"created":"2019-07-03T06:30:38"},"new":["deleted"],"old":["(e) coordination and optimization of","regional restoration;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1191","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-562","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 2"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:37"},"new":["2. The resources curtailed or","redispatched shall be selected amongst","generation or demand facilities submitting","offers for curtailment or redispatching","using market-based mechanisms and be","financially compensated. In the event of","critical grid situations caused by regional","excess demand or supply of electricity a","flexible configuration of demand, storage","or supply facilities, shall be exempted","from grid fees and other charges when","helping to avoid costly grid congestion","and subsequent curtailment measures. In","case of incremental electricity","consumption via demand response","measures, grid fee exemption is granted","irrespective of the end use of the","electricity. That includes flexible demand","units shifting their load (electricity","consumption) to a later point of time via","energy storage units. Likewise, electricity","from flexible renewable generation units","that increase system efficiency by offering","market-based flexibility options instead of","curtailment measures shall be","compensated by exemption from any","charges and taxes related to the electricity","retail prices. Non-market-based","curtailment or redispatching of generation","or redispatching of demand response shall","only be used where no market-based","alternative is available, where all available","market-based resources have been used, or","where the number of generation or demand","facilities available in the area where","suitable generation or demand facilities for","the provision of the service are located is","too low to ensure effective competition.","The provision of market-based resources","shall be open to all generation","technologies, storage and demand response","and sector coupling technologies,","including operators located in other","Member States unless technically not","feasible. In order to fulfil the EU emission","target the eligibility of market-based","flexibility options should depend on their","carbon emission intensity. Facilities","should only be eligible to participate in a","marked-based procurement model if its","emissions are below 450 gr CO2/kWh and","at least 10% of fuel requirements (in","terms of calorific value) are based on","renewable energy sources. In case the","consumed fuel has a RES share","physically below 10% the remaining","fraction can be offset by virtual blending","activities via Guarantees of Origin. Also","small-scale units of at least 100kW","capacity should be eligible to participate."],"old":["2. The resources curtailed or","redispatched shall be selected amongst","generation or demand facilities submitting","offers for curtailment or redispatching","using market-based mechanisms and be","financially compensated. Non-market-","based curtailment or redispatching of","generation or redispatching of demand","response shall only be used where no","market-based alternative is available,","where all available market-based resources","","have been used, or where the number of","generation or demand facilities available in","the area where suitable generation or","demand facilities for the provision of the","service are located is too low to ensure","effective competition. The provision of","market-based resources shall be open to all","generation technologies, storage and","demand response, including operators","located in other Member States unless","technically not feasible.","",""],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"562","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Werner Langen","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-247","location":[[" Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point x a (new)"]],"meps":[1928],"meta":{"created":"2020-11-15T15:52:08"},"new":["(xa) 'Sectoral integration' means","integrating the transport, industry,","heating and air-conditioning sectors and","gas and electricity networks by using all","energy sources such as electricity and","hydrogen to ensure the most efficient","allocation possible of energy sources to","the different energy networks and help","achieve the EU's climate and energy","objectives."],"orig_lang":"de","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"247","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1366","justification":"There is a need to ensure that DSOs are proportionally geographically represented in the EU\nDSO to ensure that it takes into account the specificities of respective regions when drafting\nrespective documents or legislation.","location":[[" Proposal for a regulation","Article 49 \u2013 paragraph 1"]],"meps":[124699],"meta":{"created":"2019-07-03T06:30:32"},"new":["Distribution system operators which are","not part of a vertically integrated","undertaking or which are unbundled","according to the provisions of Article 35","[recast of Directive 2009/72/EC as","proposed by COM(2016) 864/2], shall","cooperate at Union level through a","European Entity for Distribution system","operators (\"EU DSO entity\"), in order to","promote the completion and functioning of","the internal market in electricity, and to","promote optimal management and a","coordinated operation of distribution and","transmission systems. Distribution system","operators who wish to participate in the EU","DSO entity shall become registered","members of the entity. Decision-making","process shall ensure for proportional","geographical representation of DSOs in","the EU DSO entity."],"old":["Distribution system operators which are","not part of a vertically integrated","undertaking or which are unbundled","according to the provisions of Article 35","[recast of Directive 2009/72/EC as","proposed by COM(2016) 864/2], shall","cooperate at Union level through a","European Entity for Distribution system","operators (\"EU DSO entity\"), in order to","promote the completion and functioning of","the internal market in electricity, and to","promote optimal management and a","coordinated operation of distribution and","transmission systems. Distribution system","operators who wish to participate in the EU","DSO entity shall become registered","members of the entity."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1366","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1192","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point e"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:38"},"new":["deleted"],"old":["(e) coordination and optimization of","regional restoration;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1192","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-248","location":[[" Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 point x a (new)"]],"meps":[96713],"meta":{"created":"2020-11-15T15:52:08"},"new":["(xa) (new)\u2018system cost\u2019 means the cost","impact of a power plant on the electricity","system as a whole - comprising","transmission and distribution","maintenance, grid losses, balancing costs,","and basic electricity service provision."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"248","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1193","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point f"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:38"},"new":["deleted"],"old":["(f) post-operation and post-","disturbances analysis and reporting;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1193","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Angelika Niebler, Sven Schulze","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1367","justification":" Small distribution system operators must not be excluded from the European Entity for\n Distribution System Operators.","location":[["Proposal for a regulation","Article 49 \u2013 paragraph 1"]],"meps":[124809],"meta":{"created":"2019-07-03T06:30:32"},"new":["Distribution system operators, including de","minimis distribution system operators,","shall cooperate at Union level through a","European Entity for Distribution system","operators (\"EU DSO entity\"), in order to","promote the completion and functioning of","the internal market in electricity, and to","promote optimal management and a","coordinated operation of distribution and","transmission systems. Distribution system","operators who wish to participate in the EU","DSO entity shall have the right to become","registered members of the entity."],"old":["Distribution system operators which are","not part of a vertically integrated","undertaking or which are unbundled","according to the provisions of Article 35","[recast of Directive 2009/72/EC as","proposed by COM(2016) 864/2], shall","cooperate at Union level through a","European Entity for Distribution system","","","operators (\"EU DSO entity\"), in order to","promote the completion and functioning of","the internal market in electricity, and to","promote optimal management and a","coordinated operation of distribution and","transmission systems. Distribution system","operators who wish to participate in the EU","DSO entity shall become registered","members of the entity."],"orig_lang":"de","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1367","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-854","justification":"As market failures can also be the cause of adequacy concerns, these market failures should\nalso be identified and tackled.","location":[["Proposal for a regulation","Article 18 \u2013 paragraph 2"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:39"},"new":["2. Where the European resource","adequacy assessment identifies a resource","adequacy concern Member States shall","identify any market failures","and/or regulatory distortions that caused or","contributed to the emergence of the","concern."],"old":["2. Where the European resource","adequacy assessment identifies a resource","adequacy concern Member States shall","identify any regulatory distortions that","caused or contributed to the emergence of","the concern."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"854","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-563","justification":" For many energy communities that own their own production that they supply to their\n members, the aim is not simply to receive a return for renewables exported to the grid.\n Instead, their aim is to have such installations contributing to as much of their consumption\n needs as possible. Therefore, it may not be in their interest to simply be compensated for\n redispatch or curtailment. It needs to be clarified that market actors may freely choose to\n participate in market-based curtailment, or to be subject only to non-market based\n curtailment according to specified conditions","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 2"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:37"},"new":["2. The resources curtailed or","redispatched shall be selected amongst","generation or demand facilities submitting","offers for curtailment or redispatching","using market-based mechanisms and be","financially compensated. Non-market-","based curtailment or redispatching of","generation or redispatching of demand","response shall only be used where no","market-based alternative is available,","where all available market-based resources","have been used, or where the number of","generation or demand facilities available in","the area where suitable generation or","demand facilities for the provision of the","service are located is too low to ensure","effective competition. The provision of","market-based resources shall be open to all","generation technologies, storage and","demand response, including operators","located in other Member States unless","technically not feasible. Self-generated","electricity from generating installations","using renewable energy sources by active","customers, and electricity generated from","installations using renewable sources by","local energy communities, which is","primarily intended the supply of its","members, shall be entitled to elect whether","to participate in market-based or non-","market based mechanisms. To this effect,","they shall not be required to submit of an","offer for curtailment or redispatch. The","decision not to participate in market-","based mechanisms shall not preclude the","active customer or local energy","community from electing to participate in","the future."],"old":["2. The resources curtailed or","redispatched shall be selected amongst","generation or demand facilities submitting","offers for curtailment or redispatching","using market-based mechanisms and be","financially compensated. Non-market-","based curtailment or redispatching of","generation or redispatching of demand","response shall only be used where no","market-based alternative is available,","where all available market-based resources","have been used, or where the number of","generation or demand facilities available in","the area where suitable generation or","demand facilities for the provision of the","service are located is too low to ensure","effective competition. The provision of","market-based resources shall be open to all","generation technologies, storage and","demand response, including operators","located in other Member States unless","technically not feasible.",""],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"563","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-249","location":[[" Proposal for a regulation","Article 2 \u2013 paragraph 2 \u2013 subparagraph 1 (new)"]],"meps":[96713],"meta":{"created":"2020-11-15T15:52:08"},"new":["(new)\u2018decarbonisation\u2019 means the","reduction or removal of carbon dioxide","from energy sources with a view to","producing half of the EU\u2019s electricity","from low-carbon energy sources in 2030","and a completely carbon-free electricity","system by 2050."],"old":[""],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"249","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1194","justification":" Based on recently approved guideline on electricity balancing, national TSOs shall take into\n account contribution of other than national balancing reserves providers into account when\n setting their size.TSOs also have right to procure part of balancing capacity in the region,\n closely cooperating with other TSOs.This provides for possibility for optimization of\n balancing reserves and capacity, as well as sufficient space for TSOs to decide whether it is\n more efficient and safe to procure the capacity regionally or domestically.","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point g"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:38"},"new":["deleted"],"old":["(g) regional sizing of reserve capacity;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1194","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Martina Werner, Carlos Zorrinho, Miapetra Kumpula-Natri, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1368","location":[[" Proposal for a regulation","Article 49 \u2013 paragraph 1"]],"meps":[124826,124739,124735,124947],"meta":{"created":"2019-07-03T06:30:32"},"new":["Distribution system operators shall","cooperate at Union level through a","European Entity for Distribution system","operators (\"EU DSO entity\"), in order to","promote the completion and functioning of","the internal market in electricity, to","promote optimal management and a","coordinated operation of distribution and","transmission systems and to exchange","best-practices for the different challenges","the distribution system operators face","within the Union, including the","digitalization of distribution networks, the","deployment of smart grids and intelligent","metering systems."],"old":["Distribution system operators which are","not part of a vertically integrated","undertaking or which are unbundled","according to the provisions of Article 35","[recast of Directive 2009/72/EC as","proposed by COM(2016) 864/2], shall","cooperate at Union level through a","European Entity for Distribution system","operators (\"EU DSO entity\"), in order to","promote the completion and functioning of","the internal market in electricity, and to","promote optimal management and a","coordinated operation of distribution and","transmission systems. Distribution system","operators who wish to participate in the","EU DSO entity shall become registered","members of the entity."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1368","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-855","justification":"Not only regulatory distortions but also market failures, such as barriers to market entry,\nanti-competitive behaviours, limited access to finance, can disproportionally burden certain\ntechnologies or players, and thus contributing to creating adequacy concerns.","location":[["Proposal for a regulation","Article 18 \u2013 paragraph 2"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:39"},"new":["2. Where the European resource","adequacy assessment identifies a resource","adequacy concern Member States shall","identify any regulatory distortions and","market failures that caused or contributed","to the emergence of the concern."],"old":["2. Where the European resource","adequacy assessment identifies a resource","adequacy concern Member States shall","identify any regulatory distortions that","caused or contributed to the emergence of","the concern."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"855","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1195","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point g"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:38"},"new":["deleted"],"old":["(g) regional sizing of reserve capacity;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1195","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1369","location":[["Proposal for a regulation","Article 49 \u2013 paragraph 1"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:32"},"new":["Distribution system operators shall","cooperate at Union level through a","European Entity for Distribution system","operators (\"EU DSO entity\"), in order to","promote the completion and functioning of","the internal market in electricity, and to","promote optimal management and a","coordinated operation of distribution and","transmission systems. Distribution system","operators who wish to participate in the EU","DSO entity shall become registered","members of the entity. Registered","members may participate in the EU DSO","entity directly or be represented by the","national or European association of their","choice."],"old":["Distribution system operators which are","not part of a vertically integrated","undertaking or which are unbundled","according to the provisions of Article 35","[recast of Directive 2009/72/EC as","proposed by COM(2016) 864/2], shall","cooperate at Union level through a","European Entity for Distribution system","operators (\"EU DSO entity\"), in order to","promote the completion and functioning of","the internal market in electricity, and to","promote optimal management and a","coordinated operation of distribution and","transmission systems. Distribution system","operators who wish to participate in the EU","DSO entity shall become registered","members of the entity."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1369","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-564","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 2"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:37"},"new":["2. The resources curtailed or","redispatched may be selected amongst","generation, storage or demand facilities","submitting offers for curtailment or","redispatching using market-based","mechanisms and be financially fully paid.","Payment shall amount to the value of the","income that the operator would have got","from the market and from support","mechanism, where applicable, pursuant to","paragraph 6(b). Submission of an offer","for curtailment or redispatch shall be","voluntary. Non-market-based curtailment","or redispatching of generation or","redispatching of demand response may be","used for operational security reasons","where no market-based alternative is","available, where all available market-based","resources have been used, or where the","number of generation or demand facilities","available in the area where suitable","generation or demand facilities for the","provision of the service are located is too","low to ensure effective competition.","Market-based redispatch may not be used","when it could lead to significant","curtailment of electricity generated in","installations using renewable sources.","Regulators shall assess market interest at","least every five years. The provision of","market-based resources shall be open to all","generation technologies, storage and","demand response, including operators","located in other Member States unless","technically not feasible."],"old":["2. The resources curtailed or","redispatched shall be selected amongst","generation or demand facilities submitting","offers for curtailment or redispatching","using market-based mechanisms and be","financially compensated. Non-market-","based curtailment or redispatching of","generation or redispatching of demand","response shall only be used where no","market-based alternative is available,","where all available market-based resources","have been used, or where the number of","generation or demand facilities available in","the area where suitable generation or","demand facilities for the provision of the","service are located is too low to ensure","effective competition. The provision of","market-based resources shall be open to all","generation technologies, storage and","demand response, including operators","located in other Member States unless","technically not feasible.",""],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"564","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-250","justification":"Also new actors and delegates shall respect market operating principles.","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 introductory part"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["1. Member States, national regulatory","authorities, transmission system operators,","distribution system operators, market","operators and third parties to whom","responsibilities have been delegated or","assigned, shall ensure that electricity","markets are operated in accordance with","the following principles:"],"old":["1. Member States, national regulatory","authorities, transmission system operators,","distribution system operators, and market","operators shall ensure that electricity","markets are operated in accordance with","the following principles:"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"250","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Kathleen Van Brempt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-856","location":[[" Proposal for a regulation","Article 18 \u2013 paragraph 2"]],"meps":[5729],"meta":{"created":"2019-07-03T06:30:39"},"new":["2. Where the European resource","adequacy assessment identifies a resource","adequacy concern Member States shall","identify any regulatory distortions and","market failures that caused or contributed","to the emergence of the concern."],"old":["2. Where the European resource","adequacy assessment identifies a resource","adequacy concern Member States shall","identify any regulatory distortions that","caused or contributed to the emergence of","the concern."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"856","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Anneleen Van Bossuyt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1196","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point g"]],"meps":[117491],"meta":{"created":"2019-07-03T06:30:38"},"new":["deleted"],"old":["(g) regional sizing of reserve capacity;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1196","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Kathleen Van Brempt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1370","location":[["Proposal for a regulation","Article 49 \u2013 paragraph 1"]],"meps":[5729],"meta":{"created":"2019-07-03T06:30:32"},"new":["All distribution system operators shall","cooperate at Union level through a","European Entity for Distribution system","operators (\"EU DSO entity\"), in order to","promote the completion and functioning of","the internal market in electricity, to support","the development of a sustainable,","decentralised and more integrated energy","system, and to promote optimal","management and a coordinated operation","of distribution and transmission systems.","Distribution system operators and","associations that represent them at Union","level who wish to participate in the EU","DSO entity shall become registered","members of the entity."],"old":["Distribution system operators which are","not part of a vertically integrated","undertaking or which are unbundled","according to the provisions of Article 35","[recast of Directive 2009/72/EC as","proposed by COM(2016) 864/2], shall","cooperate at Union level through a","European Entity for Distribution system","operators (\"EU DSO entity\"), in order to","promote the completion and functioning of","the internal market in electricity, and to","","promote optimal management and a","coordinated operation of distribution and","transmission systems. Distribution system","operators who wish to participate in the EU","DSO entity shall become registered","members of the entity."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1370","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-565","justification":" For local energy communities that own their own production that they supply to their\n members, the aim is not simply to receive a return for renewables exported to the grid.\n Instead, their aim is to have such installations contributing to as much of their consumption\n needs as possible. Therefore, it may not be in their interest to simply be compensated for\n redispatch or curtailment. It needs to be clarified that such market actors may choose to\n forego participation in market-based curtailment, and to be subject only to non-market based\n curtailment according to specified conditions.","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 2"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:37"},"new":["2. The resources curtailed or","redispatched shall be selected amongst","generation or demand facilities submitting","offers for curtailment or redispatching","using market-based mechanisms and be","financially compensated. Submission of an","offer for curtailment or redispatch shall","not be mandatory for local energy","communities that generate electricity from","renewable sources and supply such","electricity to their members\u2019 to meet their","consumption needs. Non-market-based","curtailment or redispatching of generation","or redispatching of demand response shall","only be used where no market-based","alternative is available, where all available","market-based resources have been used, or","where the number of generation or demand","facilities available in the area where","suitable generation or demand facilities for","the provision of the service are located is","too low to ensure effective competition.","The provision of market-based resources","shall be open to all generation","technologies, storage and demand","response, including operators located in","other Member States unless technically not","feasible."],"old":["2. The resources curtailed or","redispatched shall be selected amongst","generation or demand facilities submitting","offers for curtailment or redispatching","using market-based mechanisms and be","financially compensated. Non-market-","based curtailment or redispatching of","generation or redispatching of demand","response shall only be used where no","market-based alternative is available,","where all available market-based resources","have been used, or where the number of","generation or demand facilities available in","the area where suitable generation or","demand facilities for the provision of the","service are located is too low to ensure","effective competition. The provision of","market-based resources shall be open to all","generation technologies, storage and","demand response, including operators","located in other Member States unless","technically not feasible.",""],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"565","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-857","justification":" Beyond regulatory distortions, market failures, such as barriers to market entry, anti-\n competitive behaviours, limited access to finance, can disproportionally burden certain\n technologies or market players, and can contribute to creating adequacy concerns. It is\n important to look beyond purely regulatory barriers.","location":[[" Proposal for a regulation","Article 18 \u2013 paragraph 2"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:39"},"new":["2. Where the European resource","adequacy assessment identifies a resource","adequacy concern Member States shall","identify any regulatory distortions and","market failures that caused or contributed","to the emergence of the concern."],"old":["2. Where the European resource","adequacy assessment identifies a resource","adequacy concern Member States shall","identify any regulatory distortions that","caused or contributed to the emergence of","the concern."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"857","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Anneleen Van Bossuyt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1197","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point h"]],"meps":[117491],"meta":{"created":"2019-07-03T06:30:38"},"new":["deleted"],"old":["(h) facilitate the regional procurement","of balancing capacity;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1197","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Kathleen Van Brempt, Ivo Belet","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-251","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point a"]],"meps":[5729,28257],"meta":{"created":"2020-11-15T15:52:08"},"new":["(a) prices shall in general reflect","demand and supply;"],"old":["(a) prices shall be formed based on","demand and supply;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"251","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-566","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 2"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:37"},"new":["2. The resources curtailed or","redispatched shall be selected amongst","generation, energy storage, and/or demand","response facilities submitting offers for","curtailment or redispatching using market-","based mechanisms and be financially","compensated. Non-market-based","curtailment or redispatching of generation","or redispatching of energy storage and/or","demand response shall only be used where","no market-based alternative is available,","where all available market-based resources","have been used, or where the number of","generation, energy storage or demand","facilities available in the area where","suitable generation, energy storage or","demand facilities for the provision of the","service are located is too low to ensure","effective competition. The provision of","market-based resources shall be open to all","generation technologies, storage and","demand response, including operators","located in other Member States unless","technically not feasible."],"old":["2. The resources curtailed or","redispatched shall be selected amongst","generation or demand facilities submitting","offers for curtailment or redispatching","using market-based mechanisms and be","financially compensated. Non-market-","based curtailment or redispatching of","generation or redispatching of demand","response shall only be used where no","market-based alternative is available,","where all available market-based resources","have been used, or where the number of","generation or demand facilities available in","the area where suitable generation or","demand facilities for the provision of the","service are located is too low to ensure","effective competition. The provision of","market-based resources shall be open to all","generation technologies, storage and","demand response, including operators","located in other Member States unless","","technically not feasible."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"566","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Werner Langen","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1371","justification":" The EU DSO entity will draft rules for the functioning of the European internal market which,\n once promulgated by the European Commission, will be applicable to all DSOs, irrespective\n of size or organisational structure. It should therefore be possible for all European DSOs,\n including de minimis DSOs, to participate in the EU DSO entity (participation should remain\n voluntary).","location":[[" Proposal for a regulation","Article 49 \u2013 paragraph 1"]],"meps":[1928],"meta":{"created":"2019-07-03T06:30:33"},"new":["Distribution system operators which are","not part of a vertically integrated","undertaking or which are unbundled","according to the provisions of Article 35","[recast of Directive 2009/72/EC as","proposed by COM(2016) 864/2], shall","cooperate at Union level through a","European Entity for Distribution system","operators (\"EU DSO entity\"), in order to","promote the completion and functioning of","the internal market in electricity, and to","promote optimal management and a","coordinated operation of distribution and","transmission systems. Distribution system","operators who wish to participate in the EU","DSO entity shall have the right to become","registered members of the entity."],"old":["Distribution system operators which are","not part of a vertically integrated","undertaking or which are unbundled","according to the provisions of Article 35","[recast of Directive 2009/72/EC as","proposed by COM(2016) 864/2], shall","cooperate at Union level through a","European Entity for Distribution system","operators (\"EU DSO entity\"), in order to","promote the completion and functioning of","the internal market in electricity, and to","promote optimal management and a","coordinated operation of distribution and","transmission systems. Distribution system","operators who wish to participate in the EU","DSO entity shall become registered","members of the entity."],"orig_lang":"de","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1371","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-858","location":[[" Proposal for a regulation","Article 18 \u2013 paragraph 2"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:39"},"new":["2. Where the European resource","adequacy assessment identifies a resource","adequacy concern Member States shall","identify any regulatory distortions and","market failures that caused or contributed","to the emergence of the concern."],"old":["2. Where the European resource","adequacy assessment identifies a resource","adequacy concern Member States shall","identify any regulatory distortions that","caused or contributed to the emergence of","the concern."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"858","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-252","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point b"]],"meps":[96852],"meta":{"created":"2020-11-15T15:52:08"},"new":["(b) actions which prevent price","formation on the basis of demand and","supply or constitute a disincentive to the","development of more flexible generation,","low carbon generation, or more flexible","demand shall be avoided while Member","States shall ensure that energy poor or","vulnerable customers are sufficiently","protected;"],"old":["(b) actions which prevent price","formation on the basis of demand and","supply or constitute a disincentive to the","development of more flexible generation,","low carbon generation, or more flexible","demand shall be avoided;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"252","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1198","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point h"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:38"},"new":["deleted"],"old":["(h) facilitate the regional procurement","of balancing capacity;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1198","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-567","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 2"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:37"},"new":["2. The resources curtailed or","redispatched shall be selected amongst","generation or demand facilities submitting","offers for curtailment or redispatching","using market-based mechanisms and be","financially paid. Non-market-based","curtailment or redispatching of generation","or redispatching of demand response shall","only be used upon a decision of national","regulatory authority, in cases where no","market-based alternative is available,","where all available market-based resources","have been used, or where the number of","generation or demand facilities available in","the area where suitable generation or","demand facilities for the provision of the","service are located is too low to ensure","effective competition. The provision of","market-based resources shall be open to all","generation technologies, storage and","demand response, including operators","located in other Member States unless","technically not feasible."],"old":["2. The resources curtailed or","redispatched shall be selected amongst","generation or demand facilities submitting","offers for curtailment or redispatching","using market-based mechanisms and be","financially compensated. Non-market-","based curtailment or redispatching of","generation or redispatching of demand","response shall only be used where no","market-based alternative is available,","where all available market-based resources","have been used, or where the number of","generation or demand facilities available in","the area where suitable generation or","demand facilities for the provision of the","service are located is too low to ensure","effective competition. The provision of","market-based resources shall be open to all","generation technologies, storage and","demand response, including operators","located in other Member States unless","technically not feasible."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"567","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Martina Werner, Carlos Zorrinho","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1372","location":[["Proposal for a regulation","Article 49 \u2013 paragraph 1 a (new)"]],"meps":[124826,124739],"meta":{"created":"2019-07-03T06:30:33"},"new":["In performing its functions under EU law,","the EU DSO entity shall act independently","from individual national interests or the","national interests of transmission system","operators, and shall contribute to the","efficient and sustainable achievement of","the objectives set out in the policy","framework for climate and energy","covering the period from 2020 to 2030, in","particular by contributing to the efficient","integration of electricity generated from","renewable energy sources and to","increases in energy efficiency."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1372","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Cristian-Silviu Bu\u015foi","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-859","location":[["Proposal for a regulation","Article 18 \u2013 paragraph 2"]],"meps":[38420],"meta":{"created":"2019-07-03T06:30:39"},"new":["2. Where the a national resource","adequacy assessment identifies a resource","adequacy concern Member States shall","identify any regulatory distortions that","caused or contributed to the emergence of","the concern."],"old":["2. Where the European resource","adequacy assessment identifies a resource","adequacy concern Member States shall","identify any regulatory distortions that","caused or contributed to the emergence of","the concern."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"859","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-253","justification":" Energy poverty is a growing problem in the Community. It is necessary to protect the energy\n poor to vulnerable customers.","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point b"]],"meps":[124699],"meta":{"created":"2020-11-15T15:52:08"},"new":["(b) actions which prevent price","formation on the basis of demand and","supply or constitute a disincentive to the","development of more flexible generation,","low carbon generation, or more flexible","demand shall be avoided while Member","States shall ensure that energy poor or","vulnerable customers are sufficiently","protected;"],"old":["(b) actions which prevent price","formation on the basis of demand and","supply or constitute a disincentive to the","development of more flexible generation,","low carbon generation, or more flexible","demand shall be avoided;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"253","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1199","justification":" Based on recently approved guideline on electricity balancing, national TSOs shall take into\n account contribution of other than national balancing reserves providers into account when\n setting their size.TSOs also have right to procure part of balancing capacity in the region,\n closely cooperating with other TSOs.This provides for possibility for optimization of\n balancing reserves and capacity, as well as sufficient space for TSOs to decide whether it is\n more efficient and safe to procure the capacity regionally or domestically.","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point h"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:38"},"new":["deleted"],"old":["(h) facilitate the regional procurement","of balancing capacity;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1199","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Hans-Olaf Henkel","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-568","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 2"]],"meps":[124823],"meta":{"created":"2019-07-03T06:30:37"},"new":["2. The resources curtailed or","redispatched shall be selected amongst","generation or demand facilities submitting","offers for curtailment or redispatching","using market-based mechanisms and be","financially compensated. Non-market-","based curtailment or redispatching of","generation or redispatching of demand","response shall only be used where no","market-based alternative is available,","where all available market-based resources","have been used, or where the number of","generation or demand facilities available in","the area where suitable generation or","demand facilities for the provision of the","service are located is too low to ensure","effective competition. The provision of","market-based resources shall be open to all","generation technologies, storage and","demand response and sector coupling","technologies, including operators located","in other Member States unless technically","not feasible."],"old":["2. The resources curtailed or","redispatched shall be selected amongst","generation or demand facilities submitting","offers for curtailment or redispatching","using market-based mechanisms and be","financially compensated. Non-market-","based curtailment or redispatching of","generation or redispatching of demand","response shall only be used where no","market-based alternative is available,","where all available market-based resources","have been used, or where the number of","generation or demand facilities available in","the area where suitable generation or","demand facilities for the provision of the","service are located is too low to ensure","effective competition. The provision of","market-based resources shall be open to all","generation technologies, storage and","demand response, including operators","located in other Member States unless","technically not feasible."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"568","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Morten Helveg Petersen","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1373","location":[["Proposal for a regulation","Article 49 \u2013 paragraph 1 a (new)"]],"meps":[124872],"meta":{"created":"2019-07-03T06:30:33"},"new":["The DSOs of each country shall be given","the opportunity to elect a country DSO-","representative responsible for","coordinating inputs, nominating experts","to working groups and voting."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1373","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Patrizia Toia","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-860","justification":" Adequacy assessments should be performed by Member States, approved by NRAs and based\n on a common European methodology defined by ENTSO-E","location":[["Proposal for a regulation","Article 18 \u2013 paragraph 2"]],"meps":[28340],"meta":{"created":"2019-07-03T06:30:39"},"new":["2. Where the national resource","adequacy assessment identifies a resource","adequacy concern Member States shall","identify any regulatory distortions that","caused or contributed to the emergence of","the concern."],"old":["2. Where the European resource","adequacy assessment identifies a resource","adequacy concern Member States shall","identify any regulatory distortions that","caused or contributed to the emergence of","the concern."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"860","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-254","justification":"It should be enshrined in the principles that the protection of vulnerable customers is integral\npart of the internal market.","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point b"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["(b) actions which prevent price","formation on the basis of demand and","supply or constitute a disincentive to the","development of more flexible generation,","renewable generation, or more flexible","demand shall be avoided, while Member","States shall ensure that energy poor or","vulnerable customers are sufficiently","protected;"],"old":["(b) actions which prevent price","formation on the basis of demand and","supply or constitute a disincentive to the","development of more flexible generation,","low carbon generation, or more flexible","demand shall be avoided;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"254","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1200","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point h"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:38"},"new":["deleted"],"old":["(h) facilitate the regional procurement","of balancing capacity;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1200","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Morten Helveg Petersen","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1374","location":[["Proposal for a regulation","Article 49 \u2013 paragraph 1 b (new)"]],"meps":[124872],"meta":{"created":"2019-07-03T06:30:33"},"new":["The weighting of votes between country","DSO-representatives shall be in","accordance with the voting procedure of","the Council as defined in the consolidated","Treaty of the European Union Article 16","(4), as amended by the Treaty of Lisbon","(\u201cdouble majority\u201d)."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1374","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Patrizia Toia","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-569","justification":"It is necessary to ensure coherence with Electricity Balancing Guidelines (EBGL) in order to\nallow the possibility to use balancing energy bids for multiple purposes (i.e. congestion\nmanagement or redispatching).\n\nAccording to the EBGL, electricity balancing bids can be used for balancing and congestion\nmanagement/redispatching as part of the same market. Instead, the EC proposal, with Article\n12(2), of the draft Regulation would result in creating separate markets for balancing and for\ncongestion management (curtailment or redispatching).","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 2"]],"meps":[28340],"meta":{"created":"2019-07-03T06:30:38"},"new":["2. The resources curtailed or","redispatched shall be selected amongst","generation or demand facilities using","market-based mechanisms and be","financially compensated. Non-market-","based curtailment or redispatching of","generation or redispatching of demand","response shall only be used where no","market-based alternative is available,","where all available market-based resources","have been used, or where the number of","generation or demand facilities available in","the area where suitable generation or","demand facilities for the provision of the","service are located is too low to ensure","effective competition. The provision of","market-based resources shall be open to all","generation technologies, storage and","demand response, including operators","located in other Member States unless","technically not feasible."],"old":["2. The resources curtailed or","redispatched shall be selected amongst","generation or demand facilities submitting","offers for curtailment or redispatching","using market-based mechanisms and be","financially compensated. Non-market-","based curtailment or redispatching of","generation or redispatching of demand","response shall only be used where no","market-based alternative is available,","","where all available market-based resources","have been used, or where the number of","generation or demand facilities available in","the area where suitable generation or","demand facilities for the provision of the","service are located is too low to ensure","effective competition. The provision of","market-based resources shall be open to all","generation technologies, storage and","demand response, including operators","located in other Member States unless","technically not feasible."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"569","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Jerzy Buzek, Janusz Lewandowski, Marian-Jean Marinescu","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-861","justification":" Commission proposal doesn't consider the principle of subsidiarity. While the monitoring and\n assessing of resource adequacy at the European level is needed and could prove helpful, the\n ERAA should only complement and support the national resource adequacy assessment. Only\n assessments made on a national level would ensure sufficient level of detail. ERAA is unable\n to include all national conditions with the necessary level of detail and thus, to properly\n assess the system adequacy.","location":[[" Proposal for a regulation","Article 18 \u2013 paragraph 2"]],"meps":[23781,33982],"meta":{"created":"2019-07-03T06:30:39"},"new":["2. Where a national resource","adequacy assessment identifies a resource","adequacy concern Member States shall","identify any regulatory distortions that","caused or contributed to the emergence of","the concern."],"old":["2. Where the European resource","adequacy assessment identifies a resource","adequacy concern Member States shall","identify any regulatory distortions that","caused or contributed to the emergence of","the concern."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"861","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-255","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point b"]],"meps":[124813,124796],"meta":{"created":"2020-11-15T15:52:08"},"new":["(b) actions which prevent price","formation on the basis of demand and","supply or constitute a disincentive to the","development of more flexible generation,","low carbon generation, or more flexible","demand shall be avoided while Member","States ensure that energy poor or","vulnerable consumers are sufficiently","protected;"],"old":["(b) actions which prevent price","formation on the basis of demand and","supply or constitute a disincentive to the","development of more flexible generation,","low carbon generation, or more flexible","demand shall be avoided;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"255","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1375","location":[[" Proposal for a regulation","Article 49 a (new)"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:33"},"new":["Article 49 a","Tasks of the Consultation Forum","1.The tasks of the members of the","Consultation Forum shall be to advise the","Commission on matters relating to the","operation and management of distribution","networks.","2.The Commission may consult the","Consultation Forum on any matter","relating to the implementation of this","Regulation and of recast of Directive","2009/72/EC as proposed by COM(2016)","864/2 and in respect of the adoption of","network codes and guidelines referred to","in Article 54.The Consultation Forum","may also be consulted by the Commission","and by the Agency in respect of other","measures.","3.The Consultation Forum may:","(a) develop best practices, of their own","accord or at the request of the","Commission or the Agency, on matters","relating to the development of demand","response, the integration of renewable","energy resources, distributed generation","and other resources embedded in the","distribution network;","(b) inform the Commission or the Agency","of problems relating to the","implementation of network codes referred","to in Article 54 and submit","recommendations and suggestions","addressing such problems to the","Commission or the Agency;","(c) conduct any other activities necessary","to fulfil its function. The Consultation","Forum shall inform the Commission of its","activities."],"old":[""],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1375","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Kaja Kallas, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar, Carolina Punset, Gerben-Jan Gerbrandy","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1201","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point h"]],"meps":[124697,124989,124872,125026,90110,96940],"meta":{"created":"2019-07-03T06:30:38"},"new":["(h) facilitate the crossborder and","regional procurement of balancing","capacity;"],"old":["(h) facilitate the regional procurement","of balancing capacity;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1201","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-570","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 2"]],"meps":[124826,124870,124739,124735,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:38"},"new":["2. The resources curtailed or","redispatched shall be selected amongst","generation or demand facilities using","market-based mechanisms and be","financially compensated. Non-market-","based curtailment or redispatching of","generation or redispatching of demand","response shall only be used for operational","security reasons and where no market-","based alternative is available, where all","available market-based resources have","been used, or where the number of","generation or demand facilities available in","the area where suitable generation or","demand facilities for the provision of the","service are located is too low to ensure","effective competition. The provision of","market-based resources shall be open to all","generation technologies, storage and","demand response, including operators","located in other Member States unless","technically not feasible."],"old":["2. The resources curtailed or","redispatched shall be selected amongst","generation or demand facilities submitting","offers for curtailment or redispatching","using market-based mechanisms and be","financially compensated. Non-market-","based curtailment or redispatching of","generation or redispatching of demand","response shall only be used where no","market-based alternative is available,","where all available market-based resources","have been used, or where the number of","","","generation or demand facilities available in","the area where suitable generation or","demand facilities for the provision of the","service are located is too low to ensure","effective competition. The provision of","market-based resources shall be open to all","generation technologies, storage and","demand response, including operators","located in other Member States unless","technically not feasible."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"570","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski, Edward Czesak, Nikolay Barekov","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-862","location":[[" Proposal for a regulation","Article 18 \u2013 paragraph 2"]],"meps":[124891,132925,124871],"meta":{"created":"2019-07-03T06:30:40"},"new":["2. Where a national resource","adequacy assessment identifies a resource","adequacy concern Member States shall","identify any regulatory distortions that","caused or contributed to the emergence of","the concern."],"old":["2. Where the European resource","adequacy assessment identifies a resource","adequacy concern Member States shall","identify any regulatory distortions that","caused or contributed to the emergence of","the concern."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"862","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-256","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point b"]],"meps":[124826,124870,124739,124735,125041,125044,124784],"meta":{"created":"2020-11-15T15:52:08"},"new":["(b) actions which prevent price","formation on the basis of demand and","supply shall be avoided"],"old":["(b) actions which prevent price","formation on the basis of demand and","supply or constitute a disincentive to the","development of more flexible generation,","low carbon generation, or more flexible","demand shall be avoided;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"256","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Martina Werner, Peter Kouroumbashev, Carlos Zorrinho, Miapetra Kumpula-Natri, Eugen Freund, Miroslav Poche, Edouard Martin, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1376","location":[["Proposal for a regulation","Article 49 a (new)"]],"meps":[124826,124857,124739,124735,125018,124699,124947,124784],"meta":{"created":"2019-07-03T06:30:33"},"new":["Article 49 a","Membership in the European Entity for","Distribution System Operators (EU DSO","Entity)","The participation of individual","distribution system operators in the EU","DSO Entity shall be voluntarily.","Distribution system operators who wish to","participate in the EU DSO Entity shall","become registered members of the EU","DSO Entity.","The EU DSO Entity shall ensure an","equitable treatment of all member","distribution system operators regardless of","their size.","The EU DSO Entity shall ensure that","smaller or independent DSOs are","adequately represented, including in the","decision-making procedures."],"old":[""],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1376","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-571","justification":"For the energy efficiency of the system and to fully reap the benefits of electricity produced by\nrenewable energy with relation to climate targets, curtailment rules have to be clear,\ntransparent and enforceable so as to minimise curtailment in accordance with the following\nprovisions of this Article.","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 3"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:38"},"new":["3. The responsible system operators","shall ensure that they efficiently","accommodate renewable electricity or","high-efficiency cogeneration to deliver","Union-wide targets, including on","greenhouse gas emissions, at least cost as","set out in Article 51 (2) of the [Electricity","Directive]. They must report at least once","per year to the competent regulatory","authority and ACER:","- on the level of development and","effectiveness of market-based curtailment","or redispatching mechanisms for","generation and demand-side","management;","- on the reasons, volumes and types of","technologies subject to curtailment or","downward redispatching;","- on measures taken to reduce the need of","curtailment or downwards dispatching of","generating installations using renewable","energy sources or high-efficiency","cogeneration; and","- on requests and contractual","arrangements made with generating units","for them to operate at a certain level of","electricity infeed. System operators shall","justify the necessity of such","arrangements, and in what extent these","services could not be provided by other","resources;","setting out whether this was in line with","the least cost delivery of Union-wide","targets.","Where this was not the case, they must set","out measures taken to reduce the need for","such curtailment or downward","redispatching in the future.","Curtailment or redispatching of generating","installations using renewable energy","sources or high-efficiency cogeneration","shall be subject to payment pursuant to","paragraph 6."],"old":["3. The responsible system operators","shall report at least once per year to the","competent regulatory authority on","curtailment or downward redispatching of","generating installations using renewable","energy sources or high-efficiency","cogeneration and on measures taken to","reduce the need for such curtailment or","downward redispatching in the future.","Curtailment or redispatching of generating","installations using renewable energy","sources or high-efficiency cogeneration","shall be subject to compensation pursuant","to paragraph 6.",""],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"571","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Anneleen Van Bossuyt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1202","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point i"]],"meps":[117491],"meta":{"created":"2019-07-03T06:30:38"},"new":["(i) regional week ahead up to day","ahead system adequacy forecasts and","preparation of risk reducing actions in","accordance with the methodology set out","Article 8 of [Regulation on risk","preparedness as proposed by COM(2016)","862] and the procedures set out in Article","81 of [The Commission Regulation","establishing a Guideline on electricity","transmission system operation];"],"old":["(i) regional week ahead to intraday","system adequacy forecasts and preparation","of risk reducing actions;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1202","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-257","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point b"]],"meps":[124891],"meta":{"created":"2020-11-15T15:52:08"},"new":["(b) actions which prevent price","formation on the basis of demand and","supply shall be avoided;"],"old":["(b) actions which prevent price","formation on the basis of demand and","supply or constitute a disincentive to the","development of more flexible generation,","low carbon generation, or more flexible","demand shall be avoided;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"257","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Adam Gierek, Krystyna \u0141ybacka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-863","justification":"The main reference for the introduction of capacity mechanisms should be the national\nresource adequacy assessment.","location":[["Proposal for a regulation","Article 18 \u2013 paragraph 2 Regulation (EC) No 714/2009 of the European Parliament and of the Council"]],"meps":[28379,124883],"meta":{"created":"2019-07-03T06:30:40"},"new":["2. Where the national resource","adequacy assessment identifies a resource","adequacy concern Member States shall","identify any regulatory distortions that","caused or contributed to the emergence of","the concern."],"old":["2. Where the European resource","adequacy assessment identifies a resource","adequacy concern Member States shall","identify any regulatory distortions that","caused or contributed to the emergence of","the concern."],"orig_lang":"pl","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"863","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1377","justification":" Instead of requiring the establishment of a EU DSO entity, the Commission should create a\n Consultation Forum on the operation and management of distribution networks. The\n Consultation Forum would significantly reduce the risk of self-regulation by DSOs given the\n fact that it would be purely advisory in nature. In addition, the Consultation Forum would\n include a wider range of stakeholders in the Consultation Forum.","location":[[" Proposal for a regulation","Article 49 a (new)"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:33"},"new":["Article 49 a","Consultation Forum","The Commission shall establish a","Consultation Forum on the operation and","management of distribution networks.","The Commission shall ensure that the","Consultation Forum observes a balanced","participation of all interested parties","concerned with the operation and","management of distribution networks,","such as system operators, system users,","aggregators, relevant industry","associations, environmental protection","groups and consumer organisations. The","rules of procedure of the Forum shall be","established by the Commission."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1377","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Kathleen Van Brempt, Ivo Belet","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-258","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point b"]],"meps":[5729,28257],"meta":{"created":"2020-11-15T15:52:08"},"new":["(b) actions which prevent price","formation on the basis of demand and","supply or constitute a disincentive to the","development of more flexible generation,","low carbon generation, or more flexible","demand shall be avoided, unless they aim","to establish solidarity and fair distribution","of costs;"],"old":["(b) actions which prevent price","formation on the basis of demand and","supply or constitute a disincentive to the","development of more flexible generation,","","low carbon generation, or more flexible","demand shall be avoided;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"258","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Dan Nica, Jos\u00e9 Blanco L\u00f3pez, Peter Kouroumbashev, Zigmantas Bal\u010dytis, Soledad Cabez\u00f3n Ruiz","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-572","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 3"]],"meps":[124784,125044,124857,96680,125041],"meta":{"created":"2019-07-03T06:30:38"},"new":["3. The responsible system operators","shall report at least once per year to the","competent regulatory authority on:","(a) the level of development and","effectiveness of market-based curtailment","or redispatching mechanisms for","generation and demand facilities;","(b) the reasons, volumes in MWh and type","of generation source subject to","curtailment or downward redispatching;","(c) the measures taken to reduce the need","for the curtailment or downward","redispatching of generating installations","using renewable energy sources or high-","efficiency cogeneration in the future.","Progress on such measures should be","assessed via indicators taking into","account the percentage of substations","remotely monitored and controlled in","real-time, the percentage of the length of","lines operated under dynamic line ratings;","losses in high, medium and low-voltage","grids; frequency of outages; duration of","outage.","The competent regulatory authority","should publish these indicators together","with recommendations for improvement","where necessary.","Curtailment or redispatching of generating","installations using renewable energy","sources or high-efficiency cogeneration","shall be subject to compensation pursuant","to paragraph 6."],"old":["3. The responsible system operators","shall report at least once per year to the","competent regulatory authority on","curtailment or downward redispatching of","generating installations using renewable","energy sources or high-efficiency","cogeneration and on measures taken to","reduce the need for such curtailment or","downward redispatching in the future.","Curtailment or redispatching of generating","","installations using renewable energy","sources or high-efficiency cogeneration","shall be subject to compensation pursuant","to paragraph 6.",""],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"572","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Martina Werner, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1203","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point i"]],"meps":[124826,124739,124735,124699,125041,125044,124947],"meta":{"created":"2019-07-03T06:30:38"},"new":["(i) regional week ahead to intraday","system adequacy forecasts and preparation","of risk reducing actions in accordance","with the methodology set out Article 8 of","[Regulation on risk preparedness as","proposed by COM(2016)862] and the","procedures set out in Article 81 of [The","Commission Regulation establishing a","Guideline on electricity transmission","system operation];"],"old":["(i) regional week ahead to intraday","system adequacy forecasts and preparation","of risk reducing actions;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1203","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1378","justification":" The proposal to create a EU DSO entity should be scrapped to eliminate the risks of conflicts\n of interests. This amendment promotes consistency with other amendments.","location":[[" Proposal for a regulation","Article 50"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:33"},"new":["Article 50 deleted","electricity"],"old":["Establishment of the EU DSO entity for","1. By [OP: twelve months after entry into","force], the distribution system operators,","with the administrative support of the","Agency, shall submit to the Commission","and to the Agency the draft statutes, a list","of registered members, the draft rules of","procedure, including the rules of","procedures on the consultation with","ENTSO for Electricity and other","stakeholders and the financing rules, of","the EU DSO entity to be established.","2. Within two months of receipt, the","Agency, after formally consulting the","organisations representing all","stakeholders, in particular distribution","system users, shall provide an opinion to","the Commission on the draft statutes, the","list of members and the draft rules of","procedure.","3. The Commission shall deliver an","opinion on the draft statutes, the list of","members and the draft rules of procedure","taking into account the opinion of the","Agency provided for in paragraph 2,","within three months of receipt of the","opinion of the Agency.","4. Within three months of the day of","receipt of the Commission\u2019s positive","opinion, the distribution system operators","shall establish the EU DSO entity and","adopt and publish its statutes and rules of","procedure.","5. The documents referred to in","paragraph 1 shall be submitted to the","Commission and to the Agency in case of","changes thereof or upon their reasoned","request. The Agency and the Commission","shall deliver an opinion in line with the","process set out in paragraphs 2 to 4.","6. The costs related to the activities of the","EU DSO entity shall be borne by","","distribution system operators who are","registered members and shall be taken","into account in the calculation of tariffs.","Regulatory authorities shall approve those","costs only if they are reasonable and","proportionate."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1378","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Rolandas Paksas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-864","location":[["Proposal for a regulation","Article 18 \u2013 paragraph 2"]],"meps":[96694],"meta":{"created":"2019-07-03T06:30:40"},"new":["2. Where a national resource","adequacy assessment identifies a resource","adequacy concern Member States shall","identify any regulatory distortions that","caused or contributed to the emergence of","the concern."],"old":["2. Where the European resource","adequacy assessment identifies a resource","adequacy concern Member States shall","identify any regulatory distortions that","caused or contributed to the emergence of","the concern."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"864","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Eugen Freund, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-259","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point b a (new)"]],"meps":[124826,124870,124739,124735,125018,125041,125044,124784],"meta":{"created":"2020-11-15T15:52:08"},"new":["(ba) the development of more flexible","generation, low carbon generation, or","more flexible demand shall be promoted;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"259","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-573","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 3"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:38"},"new":["3. The responsible system operators","shall report at least once per year to the","competent regulatory authority and ACER:","(a) on the level of development and","effectiveness of market-based curtailment","or redispatching mechanisms for","generation and demand facilities,","(b) on the reasons, volumes and types of","energy covered by curtailment or","downward redispatching of generating","installations using renewable energy","sources or high-efficiency cogeneration","(c) and on measures taken to reduce the","need for such curtailment or downward","redispatching in the future.","(d) on requests and contractual","arrangements made with generating units","for them to operate at a certain level of","electricity infeed. System operators shall","justify the necessity of such","arrangements, and in what extent these","services could not be provided by other","units.","Curtailment or redispatching of generating","installations using renewable energy","sources or high-efficiency cogeneration","shall be subject to compensation pursuant","to paragraph 6."],"old":["3. The responsible system operators","shall report at least once per year to the","competent regulatory authority on","curtailment or downward redispatching of","generating installations using renewable","energy sources or high-efficiency","cogeneration and on measures taken to","reduce the need for such curtailment or","downward redispatching in the future.","Curtailment or redispatching of generating","installations using renewable energy","sources or high-efficiency cogeneration","","shall be subject to compensation pursuant","to paragraph 6."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"573","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Martina Werner, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1204","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point j"]],"meps":[124826,124739,124735,124699,125041,125044,124947],"meta":{"created":"2019-07-03T06:30:38"},"new":["(j) outage planning coordination in","accordance with the procedures set out in","Article 80 of Regulation ... [Commission","Regulation establishing a Guideline on","electricity transmission system operation];"],"old":["(j) outage planning coordination;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1204","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Morten Helveg Petersen","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1379","location":[[" Proposal for a regulation","Article 50 \u2013 paragraph \u20131 (new)"]],"meps":[124872],"meta":{"created":"2019-07-03T06:30:33"},"new":["-1. Within [OP: two months after","entry into force], each Member State shall","ensure that the Member States\u2019","distribution system operators are given the","opportunity to elect a country DSO-","representative for the EU DSO entity in a","fair and transparent manner. The","Member State shall ensure that the","representative is re-elected every second","year and on request of a majority of the","Member States\u2019 distribution system","operators."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1379","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Andr\u00e1s Gy\u00fcrk, Gy\u00f6rgy H\u00f6lv\u00e9nyi","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-865","location":[[" Proposal for a regulation","Article 18 \u2013 paragraph 3"]],"meps":[23816,124715],"meta":{"created":"2019-07-03T06:30:40"},"new":["deleted"],"old":["3. Member States shall publish a","timeline for adopting measures to","eliminate any identified regulatory","distortions. When addressing resource","adequacy concerns Member States shall","in particular consider removing","regulatory distortions, enabling scarcity","pricing, developing interconnection,","energy storage, demand side measures","and energy efficiency."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"865","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-260","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point c"]],"meps":[124813,124796],"meta":{"created":"2020-11-15T15:52:08"},"new":["(c) customers shall be enabled to","benefit from market opportunities and","increased competition on retail markets;","Market operators shall be required to","assess the risk that new products and","services present to household customers","and to tailor their offers accordingly;","National Regulatory Authorities shall","monitor the market developments and","modify customers protections where","necessary;"],"old":["(c) customers shall be enabled to","benefit from market opportunities and","increased competition on retail markets;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"260","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Eva Kaili","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-574","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 3"]],"meps":[125109],"meta":{"created":"2019-07-03T06:30:38"},"new":["3. The responsible system operators","shall report at least once per year to the","competent regulatory authority and ACER:","(a) on the level of development and","effectiveness of market-based curtailment","or redispatching mechanisms for","generation and demand facilities,","(b) on the reasons, volumes and types of","energy covered by curtailment or","downward redispatching of generating","installations using renewable energy","sources or high-efficiency cogeneration","(c) and on measures taken to reduce the","need for such curtailment or downward","redispatching in the future.","(d) on requests and contractual","arrangements made with generating units","for them to operate at a certain level of","electricity in feed. System operators shall","justify the necessity of such","arrangements, and in what extent these","services could not be provided by other","units.","Curtailment or redispatching of generating","installations using renewable energy","sources or high-efficiency cogeneration","shall be subject to compensation pursuant","to paragraph 6."],"old":["3. The responsible system operators","shall report at least once per year to the","competent regulatory authority on","curtailment or downward redispatching of","generating installations using renewable","energy sources or high-efficiency","cogeneration and on measures taken to","reduce the need for such curtailment or","downward redispatching in the future.","Curtailment or redispatching of generating","installations using renewable energy","sources or high-efficiency cogeneration","shall be subject to compensation pursuant","to paragraph 6.",""],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"574","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1205","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point k"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:38"},"new":["deleted"],"old":["(k) optimisation of compensation","mechanisms between transmission system","operators;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1205","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1380","location":[[" Proposal for a regulation","Article 50 \u2013 paragraph 1"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:33"},"new":["deleted"],"old":["1. By [OP: twelve months after entry","into force], the distribution system","operators, with the administrative support","of the Agency, shall submit to the","Commission and to the Agency the draft","statutes, a list of registered members, the","draft rules of procedure, including the","rules of procedures on the consultation","with ENTSO for Electricity and other","stakeholders and the financing rules, of","the EU DSO entity to be established."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1380","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-866","justification":"Resource adequacy provisions have to encompass in a inclusive way all market principles set\nout in earlier Articles, such as for example in Article 3, or 16, so that the result can be the\nbasis for capacity decisions. It is therefore necessary to list them here all together.","location":[[" Proposal for a regulation","Article 18 \u2013 paragraph 3"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:40"},"new":["3. Member States shall publish a","timeline and an implementation plan for","adopting measures to eliminate any","identified regulatory distortions and","market failures. When addressing resource","adequacy concerns Member States shall in","particular ensure they contribute to EU","2030 climate and energy targets and 2050","decarbonisation objectives and shall","remove regulatory distortions, enabling","scarcity pricing, developing","interconnection, energy storage, demand","side flexibility and distributed energy","resources and energy efficiency. Member","States shall notify the timelines to the","European Commission for approval. The","Commission shall assess whether these","measures are sufficient to eliminate the","market distortion and issue a decision as","to the compatibility of the notified actions","in Member States\u2019 timelines with the","overall objectives of the Energy Union.","Member States shall regularly report on","progress towards implementing the","actions set out in their timelines.","Actions may include:","(a) remove regulatory distortions and","market failures, notably hurdles to","increased energy efficiency, flexibility and","the deployment of renewable energy;","(b) eliminate the potential oversupply of","capacity in the market by first taking the","most polluting and least flexible resources","off the grid.","(c) remove price caps;","(d) introduce an administrative shortage","pricing function as referred to in Article","44 of [The Commission regulation","establishing a guideline on electricity","balancing];","(e) increase interconnection capacity","where necessary according to the","adequacy assessment and interconnection","target and reinforce and optimise internal","grid to address congestion;","(f) increase energy efficiency, develop","demand-side response and storage","capacity;"],"old":["3. Member States shall publish a","timeline for adopting measures to eliminate","any identified regulatory distortions. When","addressing resource adequacy concerns","Member States shall in particular consider","removing regulatory distortions, enabling","scarcity pricing, developing","interconnection, energy storage, demand","side measures and energy efficiency.",""],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"866","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Kaja Kallas, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar, Carolina Punset, Gerben-Jan Gerbrandy","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-575","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 3"]],"meps":[124697,124989,124872,125026,90110,96940],"meta":{"created":"2019-07-03T06:30:38"},"new":["3. The responsible system operators","shall report at least once per year to the","competent regulatory authority, which","shall be transmitted to the Agency, on","curtailment or downward redispatching of","generating installations using renewable","energy sources or high-efficiency","cogeneration and on measures taken to","reduce the need for such curtailment or","downward redispatching in the future,","including investments in digitalisation of","the grid infrastructure and in services that","increase flexibility. Curtailment or","redispatching of generating installations","using renewable energy sources or high-","efficiency cogeneration shall be subject to","compensation pursuant to paragraph 6."],"old":["3. The responsible system operators","shall report at least once per year to the","competent regulatory authority on","curtailment or downward redispatching of","generating installations using renewable","energy sources or high-efficiency","cogeneration and on measures taken to","reduce the need for such curtailment or","downward redispatching in the future.","Curtailment or redispatching of generating","installations using renewable energy","sources or high-efficiency cogeneration","shall be subject to compensation pursuant","to paragraph 6."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"575","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1206","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point l"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:39"},"new":["deleted"],"old":["(l) training and certification;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1206","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-261","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point c"]],"meps":[96852],"meta":{"created":"2020-11-15T15:52:08"},"new":["(c) customers shall be enabled to","benefit from market opportunities and","increased competition on retail markets;","Market operators shall be required to","assess the risk that new products and","services present to household customers","and to tailor their offers accordingly;","National Regulatory Authorities shall","monitor the market developments and","modify customers protections where","necessary;"],"old":["(c) customers shall be enabled to","benefit from market opportunities and","increased competition on retail markets;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"261","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-576","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 3"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:38"},"new":["3. The responsible system operators","shall report at least once per year to the","competent regulatory authority on","curtailment or downward redispatching of","generating installations using renewable","energy sources or high-efficiency","cogeneration and on measures taken to","reduce the need for such curtailment or","downward redispatching in the future."],"old":["3. The responsible system operators","shall report at least once per year to the","competent regulatory authority on","curtailment or downward redispatching of","generating installations using renewable","energy sources or high-efficiency","cogeneration and on measures taken to","reduce the need for such curtailment or","downward redispatching in the future.","Curtailment or redispatching of","generating installations using renewable","energy sources or high-efficiency","cogeneration shall be subject to","compensation pursuant to paragraph 6."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"576","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Kathleen Van Brempt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1381","location":[["Proposal for a regulation","Article 50 \u2013 paragraph 1"]],"meps":[5729],"meta":{"created":"2019-07-03T06:30:33"},"new":["1. By [OP: twelve months after entry","into force], the distribution system","operators, with the administrative support","of the Agency, shall submit to the","Commission and to the Agency the draft","the outline of a governance structure that","guarantees a fair and balanced","representation of interests between","members and Member States. This shall","include the draft statutes, a list of","registered members, the draft rules of","procedure, including the rules of","procedures on the consultation with","ENTSO for Electricity and other","stakeholders and the financing rules, of the","EU DSO entity to be established."],"old":["1. By [OP: twelve months after entry","into force], the distribution system","operators, with the administrative support","of the Agency, shall submit to the","Commission and to the Agency the draft","statutes, a list of registered members, the","draft rules of procedure, including the rules","of procedures on the consultation with","ENTSO for Electricity and other","stakeholders and the financing rules, of the","EU DSO entity to be established."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1381","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1207","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point l"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:39"},"new":["(l) training;"],"old":["(l) training and certification;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1207","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-867","location":[["Proposal for a regulation","Article 18 \u2013 paragraph 3"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:40"},"new":["3. The decision to introduce a","capacity mechanism shall be a last resort","option. The decision regarding the","introduction of capacity mechanisms must","be based on regional adequacy","assessments. These assessments shall be","the decisive factor whether to introduce","capacity mechanisms. Member States shall","publish a timeline for adopting measures to","eliminate any identified regulatory","distortions. When addressing resource","adequacy concerns Member States shall in","particular consider increasing the share of","renewable energy, removing regulatory","distortions, enabling scarcity pricing,","developing interconnection, energy","storage, demand side measures and energy","efficiency. When addressing resource","adequacy concerns Member States shall","follow a set of clear and transparent","criteria prioritizing the most sustainable","options as beneficiaries of capacity","mechanisms after having consulted on the","proposed mechanism at least with its","electrically connected neighbouring","Member States. Member States shall in","particular:"],"old":["3. Member States shall publish a","","timeline for adopting measures to eliminate","any identified regulatory distortions. When","addressing resource adequacy concerns","Member States shall in particular consider","removing regulatory distortions, enabling","scarcity pricing, developing","interconnection, energy storage, demand","side measures and energy efficiency."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"867","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-262","justification":"Whereas benefits and opportunities should be accessible to consumers, possible risks have to\nbe equally assessed.","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point c"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["(c) customers shall be enabled to","benefit from market opportunities and","increased competition on retail markets;","Market operators shall be required to","assess the risk that new products and","services present to household customers","and to tailor their offers accordingly;","National Regulatory Authorities shall","monitor the market developments and","modify customers protections where","necessary;"],"old":["(c) customers shall be enabled to","benefit from market opportunities and","increased competition on retail markets;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"262","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Kate\u0159ina Kone\u010dn\u00e1, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-577","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 3"]],"meps":[23699,96713],"meta":{"created":"2019-07-03T06:30:38"},"new":["3. The responsible system operators","shall report at least once per year to the","competent regulatory authority on","curtailment or downward redispatching of","generating installations using renewable","energy sources or high-efficiency","cogeneration and on measures taken to","reduce the need for such curtailment or","downward redispatching in the future."],"old":["3. The responsible system operators","shall report at least once per year to the","competent regulatory authority on","curtailment or downward redispatching of","generating installations using renewable","energy sources or high-efficiency","cogeneration and on measures taken to","reduce the need for such curtailment or","downward redispatching in the future.","Curtailment or redispatching of","generating installations using renewable","energy sources or high-efficiency","cogeneration shall be subject to","compensation pursuant to paragraph 6."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"577","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1208","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point m"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:39"},"new":["deleted"],"old":["(m) identification of regional crisis","scenarios according to Article 6(1) of","[Regulation on risk preparedness as","proposed by COM(2016) 862] if this task","is delegated by ENTSO for Electricity;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1208","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1382","meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:33"},"new":["1. By [OP: twelve months after entry","into force], the registered members, either","participating directly or being represented","by the national or European associations","of their choice, with the administrative","support of the Agency, shall submit to the","Commission and to the Agency the draft","statutes, a list of registered members, the","draft rules of procedure, including the rules","of procedures on the consultation with","ENTSO - E and other stakeholders and the","financing rules, of the EU DSO entity to be","established."],"old":["1. By [OP: twelve months after entry","into force], the distribution system","operators, with the administrative support","of the Agency, shall submit to the","Commission and to the Agency the draft","statutes, a list of registered members, the","draft rules of procedure, including the rules","of procedures on the consultation with","ENTSO for Electricity and other","stakeholders and the financing rules, of the","EU DSO entity to be established."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1382","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-578","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 3"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:38"},"new":["3. The responsible system operators","shall report at least once per year to the","competent regulatory authority on","curtailment or downward redispatching of","generating installations using renewable","energy sources or high-efficiency","cogeneration and on measures taken to","reduce the need for such curtailment or","downward redispatching in the future."],"old":["3. The responsible system operators","shall report at least once per year to the","competent regulatory authority on","curtailment or downward redispatching of","generating installations using renewable","energy sources or high-efficiency","cogeneration and on measures taken to","reduce the need for such curtailment or","downward redispatching in the future.","Curtailment or redispatching of","generating installations using renewable","energy sources or high-efficiency","cogeneration shall be subject to","compensation pursuant to paragraph 6."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"578","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Kathleen Van Brempt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-263","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point c"]],"meps":[5729],"meta":{"created":"2020-11-15T15:52:08"},"new":["(c) customers shall be enabled to","benefit from market opportunities and","increased competition on retail markets;","the offering of bundles that combines the","sale of a commodity with the sale of","energy services may not form a barrier to","switch from supplier;"],"old":["(c) customers shall be enabled to","benefit from market opportunities and","increased competition on retail markets;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"263","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Carolina Punset, Gerben-Jan Gerbrandy","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-579","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 3"]],"meps":[90110,96940],"meta":{"created":"2019-07-03T06:30:38"},"new":["3. The responsible system operators","shall report at least once per year to the","competent regulatory authority on","curtailment or downward redispatching of","generating, energy storage or demand-","response installations using renewable","energy sources or high-efficiency","cogeneration and on measures taken to","reduce the need for such curtailment or","downward redispatching in the future.","Curtailment or redispatching of generating","installations using renewable energy","sources, energy storage, demand-response","or high-efficiency cogeneration shall be","subject to compensation pursuant to","paragraph 6."],"old":["3. The responsible system operators","shall report at least once per year to the","competent regulatory authority on","curtailment or downward redispatching of","generating installations using renewable","energy sources or high-efficiency","cogeneration and on measures taken to","reduce the need for such curtailment or","downward redispatching in the future.","Curtailment or redispatching of generating","installations using renewable energy","sources or high-efficiency cogeneration","shall be subject to compensation pursuant","to paragraph 6.",""],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"579","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1209","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point m"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:39"},"new":["(m) upfront identification of potential","regional crisis scenarios according to","Article 6(1) of [Regulation on risk","preparedness as proposed by COM(2016)","862] if this task is delegated by ENTSO for","Electricity, tore the original Commission\u2019s","text."],"old":["(m) identification of regional crisis","scenarios according to Article 6(1) of","[Regulation on risk preparedness as","","proposed by COM(2016) 862] if this task","is delegated by ENTSO for Electricity;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1209","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-868","location":[[" Proposal for a regulation","Article 18 \u2013 paragraph 3"]],"meps":[124826,124870,124739,124735,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:40"},"new":["3. Member States that have a","resource adequacy concern shall publish a","roadmap with a timeline for adopting","measures to eliminate any identified","regulatory distortions. When addressing","resource adequacy concerns Member","States shall address the principles in Art. 3","and in particular consider:","a) removing regulatory distortions","b) removing existing price caps","c) enabling scarcity pricing via free price","formation","d) increasing interconnection capacity","e) allowing for undistorted market access","for all market participants","f) developing energy storage","g) developing demand side measures","h) investing in energy efficiency"],"old":["3. Member States shall publish a","timeline for adopting measures to eliminate","any identified regulatory distortions. When","addressing resource adequacy concerns","Member States shall in particular consider","removing regulatory distortions, enabling","scarcity pricing, developing","interconnection, energy storage, demand","side measures and energy efficiency.",""],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"868","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Martina Werner, Carlos Zorrinho, Miapetra Kumpula-Natri, Eugen Freund, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1383","location":[[" Proposal for a regulation","Article 50 \u2013 paragraph 1"]],"meps":[124826,124739,124735,125018,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:33"},"new":["1. By [OP: twelve months after entry","into force], the distribution system","operators, with the administrative support","of the Agency, shall submit to the","Commission and to the Agency the draft","statutes, a list of registered members, the","draft rules of procedure, including the rules","of procedures on the consultation with","ENTSO for Electricity and other","stakeholders, the decision-making","procedures and the financing rules, of the","EU DSO entity to be established."],"old":["1. By [OP: twelve months after entry","into force], the distribution system","operators, with the administrative support","of the Agency, shall submit to the","Commission and to the Agency the draft","statutes, a list of registered members, the","draft rules of procedure, including the rules","of procedures on the consultation with","ENTSO for Electricity and other","stakeholders and the financing rules, of the","EU DSO entity to be established."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1383","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Kaja Kallas, Pavel Teli\u010dka, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar, Carolina Punset, Gerben-Jan Gerbrandy","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-264","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point c"]],"meps":[124697,124706,124989,124872,125026,90110,96940],"meta":{"created":"2020-11-15T15:52:08"},"new":["(c) customers shall be enabled to","benefit from market opportunities and","increased competition on retail markets","and be empowered to act as participant in","the energy market and the energy","transition;"],"old":["(c) customers shall be enabled to","benefit from market opportunities and","increased competition on retail markets;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"264","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-580","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 3"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:38"},"new":["3. The responsible system operators","shall report at least once per year to the","competent regulatory authority on","curtailment or downward redispatching of","generating, energy storage or demand-","response installations using renewable","energy sources or high-efficiency","cogeneration and on measures taken to","reduce the need for such curtailment or","downward redispatching in the future.","Curtailment or redispatching of generating","installations using renewable energy","sources, energy storage, demand-","response or high-efficiency cogeneration","shall be subject to compensation pursuant","to paragraph 6."],"old":["3. The responsible system operators","shall report at least once per year to the","competent regulatory authority on","curtailment or downward redispatching of","generating installations using renewable","energy sources or high-efficiency","cogeneration and on measures taken to","reduce the need for such curtailment or","downward redispatching in the future.","Curtailment or redispatching of generating","installations using renewable energy","sources or high-efficiency cogeneration","shall be subject to compensation pursuant","to paragraph 6."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"580","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1210","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point m"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:39"},"new":["(m) identification of regional crisis","scenarios according to Article 6(1) of","[Regulation on risk preparedness as","proposed by COM(2016) 862];"],"old":["(m) identification of regional crisis","scenarios according to Article 6(1) of","[Regulation on risk preparedness as","proposed by COM(2016) 862] if this task","is delegated by ENTSO for Electricity;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1210","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-581","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 4 \u2013 point a"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:38"},"new":["(a) guarantee the capability of","transmission and distribution networks to","transmit electricity produced from","renewable energy sources or high-","efficiency cogeneration with minimum","possible curtailment or redispatching. That","shall not prevent network planning by","distribution system operator from taking","into account limited curtailment or","redispatching where it can demonstrate in","a transparent way that it is more","economically efficient and does not exceed","5 % of installed capacities using renewable","energy sources or high-efficiency","cogeneration at the connection point.","Such decision should result from a","voluntary agreement between the","distribution system operator and the","generator;"],"old":["(a) guarantee the capability of","transmission and distribution networks to","transmit electricity produced from","renewable energy sources or high-","efficiency cogeneration with minimum","","possible curtailment or redispatching. That","shall not prevent network planning from","taking into account limited curtailment or","redispatching where this is shown to be","more economically efficient and does not","exceed 5 % of installed capacities using","renewable energy sources or high-","efficiency cogeneration in their area;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"581","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Eugen Freund, Patrizia Toia, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-265","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point c a (new)"]],"meps":[124826,124870,124739,124735,125018,28340,124699,125041,125044,124784],"meta":{"created":"2020-11-15T15:52:08"},"new":["(ca) consumers and small businesses","shall be enabled to actively participate in","the energy market through demand","response and self-generation"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"265","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Morten Helveg Petersen","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1384","location":[["Proposal for a regulation","Article 50 \u2013 paragraph 1"]],"meps":[124872],"meta":{"created":"2019-07-03T06:30:33"},"new":["1. By [OP: twelve months after entry","into force], the country DSO-","representatives, with the administrative","support of the Agency, shall submit to the","Commission and to the Agency the draft","statutes, a list of registered members, the","draft rules of procedure, including the rules","of procedures on the consultation with","ENTSO for Electricity and other","stakeholders and the financing rules, of the","EU DSO entity to be established."],"old":["1. By [OP: twelve months after entry","into force], the distribution system","operators, with the administrative support","of the Agency, shall submit to the","Commission and to the Agency the draft","statutes, a list of registered members, the","draft rules of procedure, including the rules","of procedures on the consultation with","ENTSO for Electricity and other","stakeholders and the financing rules, of the","EU DSO entity to be established."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1384","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-869","location":[["Proposal for a regulation","Article 18 \u2013 paragraph 3"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:40"},"new":["3. When addressing resource","adequacy concerns Member States shall","consider removing regulatory distortions,","enabling scarcity pricing, developing","interconnection, energy storage, demand","side measures and energy efficiency."],"old":["3. Member States shall publish a","timeline for adopting measures to","eliminate any identified regulatory","distortions. When addressing resource","adequacy concerns Member States shall in","particular consider removing regulatory","distortions, enabling scarcity pricing,","developing interconnection, energy","storage, demand side measures and energy","efficiency."],"orig_lang":"fr","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"869","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Carolina Punset, Gerben-Jan Gerbrandy","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-582","justification":"Although being limited, curtailment or redispatching of renewable or high-efficiency\ncogeneration power plants significantly affect their profitability and operation as well as\nbeing incompatible with the common objective of renewable energy penetration. Therefore a\nproper consultation is needed to analyse its inclusion in the network planning.","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 4 \u2013 point a"]],"meps":[90110,96940],"meta":{"created":"2019-07-03T06:30:38"},"new":["(a) guarantee the capability of","transmission and distribution networks to","transmit electricity produced from","renewable energy sources, energy storage,","demand-response or high-efficiency","cogeneration with minimum possible","curtailment or redispatching. That shall not","prevent network planning from taking into","account limited curtailment or","redispatching where this is shown to be","more economically efficient and does not","exceed 5 % of installed capacities using","renewable energy sources, energy storage,","demand-response or high-efficiency","cogeneration in their area, provided that an","appropriate consultation with","stakeholders is carried out before its","approval;"],"old":["(a) guarantee the capability of","transmission and distribution networks to","transmit electricity produced from","renewable energy sources or high-","efficiency cogeneration with minimum","possible curtailment or redispatching. That","shall not prevent network planning from","taking into account limited curtailment or","redispatching where this is shown to be","more economically efficient and does not","exceed 5 % of installed capacities using","renewable energy sources or high-","efficiency cogeneration in their area;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"582","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-266","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point d"]],"meps":[2278],"meta":{"created":"2020-11-15T15:52:08"},"new":["(d) market participation of consumers","and small businesses shall be enabled by","aggregation of generation or energy","storage from multiple generation and","energy storage facilities or load from","multiple demand facilities, energy storage","capacity from multiple facilities, to","provide joint offers on organised","electricity markets and be jointly operated","in the electricity system, subject to","compliance with EU treaty rules on","competition;"],"old":["(d) market participation of consumers","and small businesses shall be enabled by","aggregation of generation from multiple","generation facilities or load from multiple","demand facilities to provide joint offers on","the electricity market and be jointly","operated in the electricity system, subject","to compliance with EU treaty rules on","competition;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"266","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1211","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point n"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:39"},"new":["deleted"],"old":["(n) preparation and carrying out of","yearly crisis simulations in cooperation","with competent authorities pursuant to","Article 12(3) of [Regulation on risk","preparedness as proposed by COM(2016)","862];"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1211","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1385","location":[["Proposal for a regulation","Article 50 \u2013 paragraph 1"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:33"},"new":["1. Distribution system operators shall","cooperate at Union level to contribute to","the achievement of the EU climate and","energy objectives including the","integration of high levels of electricity","generated by variable renewable energy","sources, to promote the completion and","functioning of the internal market in","electricity, and to promote optimal","management and a coordinated operation","of distribution and transmission systems."],"old":["1. By [OP: twelve months after entry","into force], the distribution system","operators, with the administrative support","of the Agency, shall submit to the","Commission and to the Agency the draft","statutes, a list of registered members, the","draft rules of procedure, including the","rules of procedures on the consultation","with ENTSO for Electricity and other","stakeholders and the financing rules, of","the EU DSO entity to be established."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1385","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-583","justification":"The clarification is necessary to ensure an effective implementation of the principle of\nminimum possible curtailment.","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 4 \u2013 point a"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:38"},"new":["(a) guarantee the capability of","transmission and distribution networks to","transmit electricity produced from","renewable energy sources or high-","efficiency cogeneration in line with the","least cost delivery of Union wide targets,","including climate targets, with minimum","possible curtailment or redispatching. That","shall not prevent network planning from","taking into account limited curtailment or","redispatching where they can demonstrate","in a transparent way that this is more","economically efficient and does not exceed","1 % of installed capacities of installations","using renewable energy sources or high-","efficiency cogeneration at the connection","point;"],"old":["(a) guarantee the capability of","transmission and distribution networks to","transmit electricity produced from","renewable energy sources or high-","efficiency cogeneration with minimum","possible curtailment or redispatching. That","shall not prevent network planning from","taking into account limited curtailment or","redispatching where this is shown to be","more economically efficient and does not","exceed 5 % of installed capacities using","renewable energy sources or high-","efficiency cogeneration in their area;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"583","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Kathleen Van Brempt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-870","location":[["Proposal for a regulation","Article 18 \u2013 paragraph 3"]],"meps":[5729],"meta":{"created":"2019-07-03T06:30:40"},"new":["3. Member States shall publish a","timeline for adopting measures to eliminate","any identified regulatory distortions and","actions to address market failures. When","addressing resource adequacy concerns","Member States shall in particular consider","removing regulatory distortions, enabling","scarcity pricing, developing","interconnection, energy storage, demand","side measures and energy efficiency."],"old":["3. Member States shall publish a","timeline for adopting measures to eliminate","any identified regulatory distortions. When","addressing resource adequacy concerns","","Member States shall in particular consider","removing regulatory distortions, enabling","scarcity pricing, developing","interconnection, energy storage, demand","side measures and energy efficiency."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"870","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-267","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point d"]],"meps":[90110],"meta":{"created":"2020-11-15T15:52:08"},"new":["(d) market participation of consumers","and small businesses shall be enabled","individually, collectively, through","participation in a local energy","community, and by aggregation of","generation from multiple generation","facilities or load from multiple demand","facilities to provide joint offers on the","electricity market and be jointly operated","in the electricity system, subject to","compliance with EU treaty rules on","competition;"],"old":["(d) market participation of consumers","and small businesses shall be enabled by","aggregation of generation from multiple","generation facilities or load from multiple","demand facilities to provide joint offers on","the electricity market and be jointly","operated in the electricity system, subject","to compliance with EU treaty rules on","competition;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"267","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1386","location":[[" Proposal for a regulation","Article 50 \u2013 paragraph 2"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:33"},"new":["deleted"],"old":["2. Within two months of receipt, the","Agency, after formally consulting the","organisations representing all","stakeholders, in particular distribution","system users, shall provide an opinion to","the Commission on the draft statutes, the","list of members and the draft rules of","procedure."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1386","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-584","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 4 \u2013 point a"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:38"},"new":["(a) guarantee the capability of","transmission and distribution networks to","transmit electricity produced from","renewable energy sources, energy","storage, demand-response or high-","efficiency cogeneration with minimum","possible curtailment or redispatching. That","shall not prevent network planning from","taking into account limited curtailment or","redispatching where this is shown to be","more economically efficient and does not","exceed 5 % of installed capacities using","renewable energy sources, energy storage,","demand-response or high-efficiency","cogeneration in their area;"],"old":["(a) guarantee the capability of","transmission and distribution networks to","transmit electricity produced from","renewable energy sources or high-","efficiency cogeneration with minimum","possible curtailment or redispatching. That","shall not prevent network planning from","taking into account limited curtailment or","redispatching where this is shown to be","more economically efficient and does not","exceed 5 % of installed capacities using","renewable energy sources or high-","efficiency cogeneration in their area;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"584","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1212","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point o"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:39"},"new":["deleted"],"old":["(o) tasks related to the identification","of regional crisis scenarios if and to the","extent they are delegated to the regional","operational centres pursuant to Article","6(1) of [Regulation on risk preparedness","as proposed by COM(2016) 862];"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1212","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Marian-Jean Marinescu","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-871","location":[[" Proposal for a regulation","Article 18 \u2013 paragraph 3"]],"meps":[33982],"meta":{"created":"2019-07-03T06:30:40"},"new":["3. Member States shall publish a","timeline for adopting measures to eliminate","any identified regulatory distortions. When","addressing resource adequacy concerns","Member States shall in particular consider","removing regulatory distortions, enabling","scarcity pricing, developing","interconnection, energy storage, demand","side measures, self-generation and energy","efficiency."],"old":["3. Member States shall publish a","timeline for adopting measures to eliminate","any identified regulatory distortions. When","addressing resource adequacy concerns","Member States shall in particular consider","removing regulatory distortions, enabling","scarcity pricing, developing","interconnection, energy storage, demand","side measures and energy efficiency."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"871","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-268","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point d"]],"meps":[124813,124796],"meta":{"created":"2020-11-15T15:52:08"},"new":["(d) market participation of consumers","and small businesses shall be enabled, but","not unduly encouraged or mandated,","individually or by aggregation of","generation from multiple generation","facilities or load from multiple demand","facilities to provide joint offers on the","electricity market and be jointly operated","in the electricity system, subject to","compliance with EU treaty rules on","competition;"],"old":["(d) market participation of consumers","and small businesses shall be enabled by","aggregation of generation from multiple","generation facilities or load from multiple","demand facilities to provide joint offers on","the electricity market and be jointly","operated in the electricity system, subject","to compliance with EU treaty rules on","competition;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"268","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1213","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point o"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:39"},"new":["deleted"],"old":["(o) tasks related to the identification","of regional crisis scenarios if and to the","extent they are delegated to the regional","operational centres pursuant to Article","6(1) of [Regulation on risk preparedness","as proposed by COM(2016) 862];"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1213","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Kaja Kallas, Pavel Teli\u010dka, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar, Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1387","location":[[" Proposal for a regulation","Article 50 \u2013 paragraph 2"]],"meps":[124697,124706,124989,124872,125026,90110],"meta":{"created":"2019-07-03T06:30:33"},"new":["2. Within two months of receipt, the","Agency, after formally consulting the","organisations representing all stakeholders,","in particular distribution system users, shall","provide an opinion to the Commission on","the draft statutes, the list of members and","the draft rules of procedure, taking into","account in particular the rules related to","the independence of the EU DSO entity","from its members, to the prevention of","conflicts of interests, and to the necessity","to ensure geographically- balanced","representation and equitable treatment","between its Members, in particular for","small or independent Distribution system","operators."],"old":["2. Within two months of receipt, the","Agency, after formally consulting the","organisations representing all stakeholders,","in particular distribution system users, shall","provide an opinion to the Commission on","the draft statutes, the list of members and","the draft rules of procedure."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1387","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Hans-Olaf Henkel","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-585","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 4 \u2013 point a"]],"meps":[124823],"meta":{"created":"2019-07-03T06:30:38"},"new":["(a) guarantee the capability of","transmission and distribution networks to","transmit electricity produced from","renewable energy sources or high-","efficiency cogeneration with minimum","possible curtailment or redispatching. That","shall not prevent network planning from","taking into account limited curtailment or","redispatching where this is shown to be","more economically efficient and does not","exceed 2 % of installed capacities using","renewable energy sources or high-","efficiency cogeneration in their area;"],"old":["(a) guarantee the capability of","transmission and distribution networks to","transmit electricity produced from","renewable energy sources or high-","efficiency cogeneration with minimum","possible curtailment or redispatching. That","shall not prevent network planning from","taking into account limited curtailment or","redispatching where this is shown to be","more economically efficient and does not","exceed 5 % of installed capacities using","renewable energy sources or high-","efficiency cogeneration in their area;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"585","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-872","location":[[" Proposal for a regulation","Article 18 \u2013 paragraph 3"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:40"},"new":["3. Member States shall publish a","timeline for adopting measures to eliminate","any identified regulatory distortions. When","addressing resource adequacy concerns","Member States shall in particular consider","removing regulatory distortions, enabling","scarcity pricing, self-generation,","developing interconnection, energy","storage, demand side measures and energy","efficiency."],"old":["3. Member States shall publish a","timeline for adopting measures to eliminate","any identified regulatory distortions. When","addressing resource adequacy concerns","Member States shall in particular consider","removing regulatory distortions, enabling","scarcity pricing, developing","","interconnection, energy storage, demand","side measures and energy efficiency."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"872","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1214","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point p"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:39"},"new":["deleted"],"old":["(p) tasks related to the seasonal","adequacy outlooks if and to the extent","they are delegated to the regional","operational centres pursuant to Article","9(2) of [Regulation on risk preparedness","as proposed by COM(2016) 862];"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1214","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-269","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point d"]],"meps":[96852],"meta":{"created":"2020-11-15T15:52:08"},"new":["(d) market participation of consumers","and small businesses shall be enabled, but","not unduly encouraged or mandated,","individually or by aggregation of","generation from multiple generation","facilities or load from multiple demand","facilities to provide joint offers on the","electricity market and be jointly operated","in the electricity system, subject to","compliance with EU treaty rules on","competition;"],"old":["(d) market participation of consumers","and small businesses shall be enabled by","aggregation of generation from multiple","generation facilities or load from multiple","demand facilities to provide joint offers on","the electricity market and be jointly","operated in the electricity system, subject","to compliance with EU treaty rules on","competition;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"269","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1388","location":[["Proposal for a regulation","Article 50 \u2013 paragraph 2"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:33"},"new":["2. Distribution system operators who","comply with the principles established in","Article 50c (new) may establish","themselves in a common European entity","for distribution system operators in the","field of electricity (\u201cEU DSO","entity\u201d)structured with the administrative","support of the Agency."],"old":["2. Within two months of receipt, the","Agency, after formally consulting the","organisations representing all","stakeholders, in particular distribution","system users, shall provide an opinion to","the Commission on the draft statutes, the","list of members and the draft rules of","procedure."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1388","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Massimiliano Salini, Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-873","location":[["Proposal for a regulation","Article 18 \u2013 paragraph 3"]],"meps":[125670,36392],"meta":{"created":"2019-07-03T06:30:40"},"new":["3. Member States with identified","adequacy concerns shall publish an","implementation plan with a coherent","timeline for adopting measures to eliminate","any identified regulatory and market","distortions. When addressing resource","adequacy concerns Member States shall","comply with Article 3,and shall, in","particular:"],"old":["3. Member States shall publish a","timeline for adopting measures to eliminate","any identified regulatory distortions. When","addressing resource adequacy concerns","Member States shall in particular consider","removing regulatory distortions, enabling","scarcity pricing, developing","interconnection, energy storage, demand","side measures and energy efficiency."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"873","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1215","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point p"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:39"},"new":["(p) tasks related to the seasonal","adequacy outlooks pursuant to Article 9(2)","of [Regulation on risk preparedness as","proposed by COM(2016) 862];"],"old":["(p) tasks related to the seasonal","adequacy outlooks if and to the extent they","are delegated to the regional operational","centres pursuant to Article 9(2) of","[Regulation on risk preparedness as","proposed by COM(2016) 862];"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1215","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-586","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 4 \u2013 point a"]],"meps":[124826,124870,124739,124699],"meta":{"created":"2019-07-03T06:30:39"},"new":["(a) guarantee the capability of","transmission and distribution networks to","transmit electricity produced from","renewable energy sources or high-","efficiency cogeneration with minimum","possible curtailment or redispatching. That","shall not prevent network planning from","taking into account limited curtailment or","redispatching where this is shown to be","more economically efficient and does not","exceed 3 % of installed capacities using","renewable energy sources or high-","efficiency cogeneration in their area;"],"old":["(a) guarantee the capability of","transmission and distribution networks to","transmit electricity produced from","renewable energy sources or high-","efficiency cogeneration with minimum","possible curtailment or redispatching. That","shall not prevent network planning from","taking into account limited curtailment or","redispatching where this is shown to be","more economically efficient and does not","exceed 5 % of installed capacities using","renewable energy sources or high-","efficiency cogeneration in their area;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"586","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-270","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point e"]],"meps":[124813,124796],"meta":{"created":"2020-11-15T15:52:08"},"new":["(e) market rules shall support the","decarbonisation of the economy by","enabling the integration of electricity from","renewable energy sources, providing","incentives for energy efficiency and","incentivising demand side response at","times when there is overreliance on","carbon intensive generation ;"],"old":["(e) market rules shall support the","decarbonisation of the economy by","enabling the integration of electricity from","renewable energy sources and providing","incentives for energy efficiency;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"270","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Martina Werner, Peter Kouroumbashev, Carlos Zorrinho, Miapetra Kumpula-Natri, Eugen Freund, Miroslav Poche, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1389","location":[["Proposal for a regulation","Article 50 \u2013 paragraph 2"]],"meps":[124826,124857,124739,124735,125018,124699,124784],"meta":{"created":"2019-07-03T06:30:34"},"new":["2. Within two months of receipt, the","Agency, after formally consulting the","organisations representing all stakeholders,","in particular distribution system users and","consumer protection organisations shall","provide an opinion to the Commission on","the draft statutes, the list of members and","the draft rules of procedure."],"old":["2. Within two months of receipt, the","Agency, after formally consulting the","organisations representing all stakeholders,","in particular distribution system users, shall","provide an opinion to the Commission on","the draft statutes, the list of members and","the draft rules of procedure."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1389","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-874","location":[["Proposal for a regulation","Article 18 \u2013 paragraph 3 \u2013 point a (new)"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:40"},"new":["(a) remove regulatory distortions and","market failures, notably hurdles to energy","efficiency and the deployment of","renewable energy;"],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"874","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1216","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point p a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:39"},"new":["(p a) tasks related to the development of","a methodology for identifying the most","relevant electricity crisis scenarios in a","regional context pursuant to Article 5(4)","of [Regulation on risk preparedness as","proposed by COM (2016) 862"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1216","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-587","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 4 \u2013 point a"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:39"},"new":["(a) guarantee the capability of","transmission and distribution networks to","transmit electricity produced from","renewable energy sources or high-","efficiency cogeneration with minimum","possible curtailment or redispatching. That","shall not prevent network planning from","taking into account limited curtailment or","redispatching where this is shown to be","more economically efficient and does not","exceed 2 % of installed capacities using","renewable energy sources or high-","efficiency cogeneration in their area;"],"old":["(a) guarantee the capability of","transmission and distribution networks to","transmit electricity produced from","renewable energy sources or high-","efficiency cogeneration with minimum","possible curtailment or redispatching. That","shall not prevent network planning from","taking into account limited curtailment or","redispatching where this is shown to be","more economically efficient and does not","exceed 5 % of installed capacities using","renewable energy sources or high-","efficiency cogeneration in their area;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"587","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-271","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point e"]],"meps":[96852],"meta":{"created":"2020-11-15T15:52:08"},"new":["(e) market rules shall support the","decarbonisation of the economy by","enabling the integration of electricity from","renewable energy sources, providing","incentives for energy efficiency and","incentivizing demand side response at","times when there is overreliance on","carbon intensive generation;"],"old":["(e) market rules shall support the","decarbonisation of the economy by","","","enabling the integration of electricity from","renewable energy sources and providing","incentives for energy efficiency;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"271","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-875","location":[[" Proposal for a regulation","Article 18 \u2013 paragraph 3 \u2013 point b (new)"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:41"},"new":["(b) eliminate the potential oversupply","of capacity in the market by first taking","the most polluting and least flexible","resources off the grid;"],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"875","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1390","location":[["Proposal for a regulation","Article 50 \u2013 paragraph 3"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:34"},"new":["deleted"],"old":["3. The Commission shall deliver an","opinion on the draft statutes, the list of","members and the draft rules of procedure","taking into account the opinion of the","Agency provided for in paragraph 2,","within three months of receipt of the","opinion of the Agency."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1390","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-588","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 4 \u2013 point b"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:39"},"new":["(b) take appropriate grid and market-","related operational measures in order to","minimise the curtailment or downward","redispatching of electricity produced from","renewable energy sources, energy storage,","demand-response or high-efficiency","cogeneration."],"old":["(b) take appropriate grid and market-","related operational measures in order to","minimise the curtailment or downward","redispatching of electricity produced from","renewable energy sources or high-","efficiency cogeneration."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"588","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Martina Werner, Peter Kouroumbashev, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Edouard Martin, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-272","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point e"]],"meps":[124826,124857,124870,124739,124735,124699,125041,125044,124947,124784],"meta":{"created":"2020-11-15T15:52:08"},"new":["(e) market rules shall support the","decarbonisation of the electricity system","and thus the economy by enabling the","integration of electricity from renewable","energy sources and providing incentives","for energy efficiency;"],"old":["(e) market rules shall support the","decarbonisation of the economy by","enabling the integration of electricity from","renewable energy sources and providing","incentives for energy efficiency;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"272","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1217","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point p b (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:39"},"new":["(p b) tasks related to the development of","a methodology for short-term adequacy","assessments pursuant to Article 8(2)","of[Regulation on risk preparedness as","proposed by COM(2016) 862"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1217","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-876","location":[[" Proposal for a regulation","Article 18 \u2013 paragraph 3 \u2013 point c (new)"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:41"},"new":["(c) increase interconnection capacity","where necessary and address internal grid","congestion;"],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"876","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1391","location":[[" Proposal for a regulation","Article 50 \u2013 paragraph 3"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:34"},"new":["3. The EU DSO entity shall submit to","the Commission and to the Agency the","draft statutes, a list of registered members,","the draft rules of procedure, including the","rules of procedures on the consultation","with ENTSO for Electricity and other","stakeholders and the financing rules, of","the EU DSO entity to be established."],"old":["3. The Commission shall deliver an","opinion on the draft statutes, the list of","members and the draft rules of procedure","taking into account the opinion of the","Agency provided for in paragraph 2,","within three months of receipt of the","opinion of the Agency."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1391","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-589","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 4 \u2013 point b"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:39"},"new":["(b) take appropriate grid and market-","related operational measures in order to","efficiently accommodate all electricity","produced from renewable energy sources","or high-efficiency cogeneration and","minimise their curtailment or downward","redispacthing."],"old":["(b) take appropriate grid and market-","related operational measures in order to","minimise the curtailment or downward","redispatching of electricity produced from","renewable energy sources or high-","efficiency cogeneration."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"589","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-273","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point e"]],"meps":[2278],"meta":{"created":"2020-11-15T15:52:08"},"new":["(e) market rules shall support the","decarbonisation of the economy by","enabling the integration of electricity from","renewable energy sources including","energy storage and providing incentives","for energy efficiency;"],"old":["(e) market rules shall support the","decarbonisation of the economy by","enabling the integration of electricity from","renewable energy sources and providing","incentives for energy efficiency;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"273","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-877","location":[[" Proposal for a regulation","Article 18 \u2013 paragraph 3 \u2013 point d (new)"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:41"},"new":["(d) increase energy efficiency, develop","demand-side response measures and","storage capacity;"],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"877","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1218","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point p c (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:39"},"new":["(p c) co-ordination of the","harmonisation of regional measures to be","included in the national risk-preparedness","plans of Member States concerned","pursuant Articles 10(4) and 12(2) of","[Regulation on risk preparedness as","proposed by COM(2016) 862]"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1218","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Martina Werner, Peter Kouroumbashev, Carlos Zorrinho, Miapetra Kumpula-Natri, Patrizia Toia, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1392","location":[[" Proposal for a regulation","Article 50 \u2013 paragraph 3"]],"meps":[124826,124857,124739,124735,28340,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:34"},"new":["3. The Commission shall deliver an","opinion on the draft statutes, the list of","members and the draft rules of procedure","and the decision-making procedure taking","into account the opinion of the Agency","provided for in paragraph 2, within three","months of receipt of the opinion of the","Agency."],"old":["3. The Commission shall deliver an","opinion on the draft statutes, the list of","members and the draft rules of procedure","taking into account the opinion of the","","Agency provided for in paragraph 2, within","three months of receipt of the opinion of","the Agency."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1392","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-878","justification":"It is essential to set a framework ensuring that the recourse to capacity mechanism is a last-\nresort option. Introducing indicators and an obligation to report on the evolution of the\nidentified concern will contribute to limit the distortive effect of the capacity mechanism on\nthe market.","location":[["Proposal for a regulation","Article 18 \u2013 paragraph 3 a (new)"]],"meps":[90110],"meta":{"created":"2019-07-03T06:30:41"},"new":["3a. Member States shall set indicators","to report on the effectiveness of the","measures adopted pursuant to paragraph","3, and shall review accordingly the","potential capacity mechanism put in","place."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"878","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-590","justification":"In line with the provisions of Article 51 of the Electricity Directive, TSOs, DSOs and NRAs\nshall ensure network flexibility.","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 4 \u2013 point b a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:39"},"new":["(b a) ensure that their networks are","sufficiently flexible such that they are in a","position to manage their networks as set","out in Article 51 of the [Electricity","Directive]."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"590","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1219","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point q"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:39"},"new":["deleted"],"old":["(q) calculate the maximum entry","capacity available for the participation of","foreign capacity in capacity mechanisms","pursuant to Article 21(6)."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1219","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski, Edward Czesak, Nikolay Barekov","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-274","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point e"]],"meps":[124891,132925,124871],"meta":{"created":"2020-11-15T15:52:08"},"new":["(e) market rules shall enable the","integration of electricity from renewable","energy sources and provide incentives for","energy efficiency;"],"old":["(e) market rules shall support the","decarbonisation of the economy by","enabling the integration of electricity from","renewable energy sources and providing","incentives for energy efficiency;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"274","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1393","location":[["Proposal for a regulation","Article 50 \u2013 paragraph 4"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:34"},"new":["deleted"],"old":["4. Within three months of the day of","receipt of the Commission\u2019s positive","opinion, the distribution system operators","shall establish the EU DSO entity and","adopt and publish its statutes and rules of","procedure."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1393","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-879","justification":"In line with the provisions linked to Article 23 (and 18 a), capacity mechanisms introduced\nfollowing a resource adequacy concern (Article 23 last paragraph) shall be of temporary\nnature and include a timeframe for phase-out.","location":[["Proposal for a regulation","Article 18 \u2013 paragraph 3 a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:41"},"new":["3a. In case a new capacity mechanism","is introduced, the implementation plan","shall also entail a comprehensive phase","out strategy including a time frame for","this capacity mechanism."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"879","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-591","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 5"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:39"},"new":["deleted"],"old":["5. Where non-market-based","downward redispatching or curtailment is","used, the following principles shall apply:","(a) generating installations using","renewable energy sources shall only be","subject to downward redispatching or","curtailment if no other alternative exists","or if other solutions would result in","disproportionate costs or risks to network","security;","(b) generating installations using high-","efficiency cogeneration shall only be","subject to downward redispatching or","curtailment if, other than curtailment or","downward redispatching of generating","installations using renewable energy","sources, no other alternative exists or if","other solutions would result in","disproportionate costs or risks to network","security;","(c) self-generated electricity from","generating installations using renewable","energy sources or high-efficiency","","cogeneration which is not fed into the","transmission or distribution network shall","not be curtailed unless no other solution","would resolve network security issues;","(d) downward redispatching or","curtailment under letters a to c shall be","duly and transparently justified. The","justification shall be included in the","report under paragraph 3."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"591","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-275","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point e"]],"meps":[96713],"meta":{"created":"2020-11-15T15:52:08"},"new":["(e) market rules shall support the","decarbonisation of the economy through","incentives for the development and","deployment of capital-intensive, low-","carbon generation and energy efficiency;"],"old":["(e) market rules shall support the","decarbonisation of the economy by","enabling the integration of electricity","from renewable energy sources and","providing incentives for energy efficiency;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"275","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1394","location":[["Proposal for a regulation","Article 50 \u2013 paragraph 4"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:34"},"new":["4. Within two months of receipt, the","Agency, after formally consulting the","organisations representing all","stakeholders, in particular distribution","system users, shall provide an opinion to","the Commission on the draft statutes, the","list of members and the draft rules of","procedure establishing at least a General","Assembly, a Board of Directors, an","Independent Advisory Council, a","Secretary-General and a Secretariat and","complying with the principles outlined in","Article 50a (new)."],"old":["4. Within three months of the day of","receipt of the Commission\u2019s positive","opinion, the distribution system operators","shall establish the EU DSO entity and","adopt and publish its statutes and rules of","procedure.",""],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1394","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1220","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point q"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:39"},"new":["deleted"],"old":["(q) calculate the maximum entry","capacity available for the participation of","foreign capacity in capacity mechanisms","pursuant to Article 21(6)."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1220","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Martina Werner, Flavio Zanonato, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula- Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-880","location":[[" Proposal for a regulation","Article 18 \u2013 paragraph 3 a (new)"]],"meps":[124826,124800,124870,124739,124735,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:41"},"new":["3a. Member States shall submit the","roadmap with a timeline for adopting","measures to eliminate any identified","regulatory distortions to the Commission","for review."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"880","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-592","justification":" Concerning non-market based curtailment as well as redispatching, these measures are the\n last possibilities for TSOs to keep system in balance and secure electricity supply. TSOs shall\n have all the possibilities to rebalance the grid, therefore it is suggested to delete \u201clast\n curtailment and redispatching\u201d rule for renewables and high-efficiency cogeneration. This\n rule is also not compliant with the aim of having equal-level playing field.","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 introductory part"]],"meps":[124699],"meta":{"created":"2019-07-03T06:30:39"},"new":["5. Where non-market-based","downward redispatching or curtailment is","used, it shall be duly and transparently","justified. The justification shall be","included in the report under paragraph 3."],"old":["5. Where non-market-based","downward redispatching or curtailment is","used, the following principles shall apply:"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"592","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1395","location":[[" Proposal for a regulation","Article 50 \u2013 paragraph 5"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:34"},"new":["deleted"],"old":["5. The documents referred to in","paragraph 1 shall be submitted to the","Commission and to the Agency in case of","changes thereof or upon their reasoned","request. The Agency and the Commission","shall deliver an opinion in line with the","process set out in paragraphs 2 to 4."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1395","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-276","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point f"]],"meps":[2025],"meta":{"created":"2020-11-15T15:52:08"},"new":["(f) market rules shall deliver","appropriate investment incentives for","generation, in particular long-term","investments in low-carbon generation,","storage, energy efficiency and demand","response to meet market needs and thus","ensure security of supply;"],"old":["(f) market rules shall deliver","appropriate investment incentives for","generation, storage, energy efficiency and","demand response to meet market needs and","","thus ensure security of supply;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"276","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Eugen Freund, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-881","location":[[" Proposal for a regulation","Article 18 \u2013 paragraph 3 b (new)"]],"meps":[124826,124870,124739,124735,125018,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:41"},"new":["3b. The Commission may decide,","within two months of receipt of the","roadmap whether the measures are","sufficient to eliminate the regulatory","distortions and may require Member","States to amend the roadmap accordingly."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"881","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1221","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 1 \u2013 point q a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:39"},"new":["(q a) tasks related to support","transmission system operators on the","identification of transmission capacity","needs."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1221","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1396","location":[[" Proposal for a regulation","Article 50 \u2013 paragraph 5"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:34"},"new":["deleted"],"old":["5. The documents referred to in","paragraph 1 shall be submitted to the","Commission and to the Agency in case of","changes thereof or upon their reasoned","request. The Agency and the Commission","shall deliver an opinion in line with the","process set out in paragraphs 2 to 4."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1396","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Theresa Griffin, Jude Kirton-Darling, Clare Moody","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-277","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point f"]],"meps":[124961,124953,124944],"meta":{"created":"2020-11-15T15:52:08"},"new":["(f) market rules shall deliver","appropriate investment incentives with a","long-term view for generation, including","low-carbon generation, storage, energy","efficiency and demand response to meet","market needs and thus ensure security of","supply;"],"old":["(f) market rules shall deliver","appropriate investment incentives for","generation, storage, energy efficiency and","demand response to meet market needs and","thus ensure security of supply;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"277","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Kate\u0159ina Kone\u010dn\u00e1, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-593","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 introductory part"]],"meps":[23699,96713],"meta":{"created":"2019-07-03T06:30:39"},"new":["5. Where non-market-based","downward redispatching or curtailment is","used, it shall be duly and transparently","justified. The justification shall be","included in the report under paragraph 3."],"old":["5. Where non-market-based","","downward redispatching or curtailment is","used, the following principles shall apply:"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"593","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1222","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 2"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:39"},"new":["deleted"],"old":["2. The Commission may add other","functions to the regional operational","centres, not involving decision making","power, pursuant to Chapter VII of this","Regulation."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1222","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Claude Turmes","changes":{},"committee":["ITRE"],"compromise":["on behalf of the Verts/ALE Group"],"date":"2017-09-25T00:00:00","id":"PE610.751-1397","location":[["Proposal for a regulation","Article 50 \u2013 paragraph 6"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:34"},"new":["deleted"],"old":["6. The costs related to the activities of","the EU DSO entity shall be borne by","distribution system operators who are","registered members and shall be taken","into account in the calculation of tariffs.","Regulatory authorities shall approve those","costs only if they are reasonable and","proportionate."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1397","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-882","location":[[" Proposal for a regulation","Article 18 \u2013 paragraph 3 c (new)"]],"meps":[124826,124870,124739,124735,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:41"},"new":["3c. Member States shall monitor the","application of the roadmap and shall","publish the results in an annual report."],"old":["",""],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"882","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Pervenche Ber\u00e8s, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-278","justification":"The current market design should solve the investment challenge on the long-term period,\nensuring investors a better visibility.","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point f"]],"meps":[1985,124947],"meta":{"created":"2020-11-15T15:52:08"},"new":["(f) market rules shall deliver","appropriate investment incentives for","generation, in particular long-term","investments, storage, energy efficiency and","demand response to meet market needs and","thus ensure security of supply;"],"old":["(f) market rules shall deliver","appropriate investment incentives for","generation, storage, energy efficiency and","demand response to meet market needs and","thus ensure security of supply;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"278","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1398","justification":"Clarification of the Article: costs related to the participation of DSOs in the EU DSO shall be\nconsidered as eligible costs by national Regulatory authorities and shall be recognized in\ntariffs accordingly. Otherwise we risk de-incentivizing DSOs from being members of the EU\nDSO entity.","location":[["Proposal for a regulation","Article 50 \u2013 paragraph 6"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:34"},"new":["6. The costs related to the activities of","the EU DSO entity shall be borne by","distribution system operators who are","registered members and shall be","considered as eligible cost and taken into","account by regulatory authority in the","calculation of tariffs. Regulatory","authorities shall approve those costs only if","they are reasonable and proportionate."],"old":["6. The costs related to the activities of","the EU DSO entity shall be borne by","distribution system operators who are","registered members and shall be taken into","account in the calculation of tariffs.","Regulatory authorities shall approve those","costs only if they are reasonable and","proportionate."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1398","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-594","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 introductory part"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:39"},"new":["5. Where non-market-based","downward redispatching or curtailment is","used, it:"],"old":["5. Where non-market-based","downward redispatching or curtailment is","used, the following principles shall apply:"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"594","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Kathleen Van Brempt, Ivo Belet","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-279","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point f"]],"meps":[5729,28257],"meta":{"created":"2020-11-15T15:52:08"},"new":["(f) market rules shall aim to deliver","appropriate investment incentives for","generation, storage, energy efficiency and","demand response to meet market needs and","thus ensure security of supply;"],"old":["(f) market rules shall deliver","appropriate investment incentives for","generation, storage, energy efficiency and","demand response to meet market needs and","thus ensure security of supply;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"279","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1223","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 2"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:40"},"new":["2. The Commission may add other","functions to the regional operational","centres pursuant to Chapter VII of this","Regulation."],"old":["2. The Commission may add other","functions to the regional operational","centres, not involving decision making","power, pursuant to Chapter VII of this","Regulation."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1223","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-883","location":[["Proposal for a regulation","Article 18 \u2013 paragraph 3 d (new)"]],"meps":[124826,124870,124739,124735,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:41"},"new":["3d. Member States shall submit a","report relating to their monitoring of the","application of the implementation plan to","the Agency for an opinion."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"883","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Morten Helveg Petersen","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1399","location":[[" Proposal for a regulation","Article 50 \u2013 paragraph 6"]],"meps":[124872],"meta":{"created":"2019-07-03T06:30:34"},"new":["6. The costs related to the activities of","the EU DSO entity shall be borne by all","European distribution system operators","and shall be taken into account in the","calculation of tariffs. Regulatory","authorities shall approve those costs only if","they are reasonable and proportionate."],"old":["6. The costs related to the activities of","the EU DSO entity shall be borne by","distribution system operators who are","registered members and shall be taken into","account in the calculation of tariffs.","Regulatory authorities shall approve those","costs only if they are reasonable and","proportionate."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1399","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-280","justification":" This clarification is necessary in the logic of amendments in relation to third countries.","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point g"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["(g) barriers to intra-EU cross-border","electricity flows and cross-border","transactions on electricity markets and","related services markets shall be avoided;"],"old":["(g) barriers to cross-border electricity","flows and cross-border transactions on","electricity markets and related services","markets shall be avoided;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"280","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-595","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point a"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:39"},"new":["deleted"],"old":["(a) generating installations using","renewable energy sources shall only be","subject to downward redispatching or","curtailment if no other alternative exists","or if other solutions would result in","disproportionate costs or risks to network","security;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"595","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1400","justification":" This Article follows on logically from the establishment of an EU DSO entity in the previous\n Article.","location":[[" Proposal for a regulation","Article 50 a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:34"},"new":["Article 50 a","Rules and procedures for the EU DSO","entity for electricity","1.The statutes and rules of procedures of","the EU DSO entity adopted in accordance","with Article 50 shall safeguard the","following organization principles:","(a) participation in the works of the EU","DSO entity is limited to registered","members;","(b) strategic decisions regarding the","activities of the EU DSO entity as well as","guidelines for the Board of Directors are","adopted by the General Assembly;","(c) decisions of the General Assembly are","adopted by 65% of the votes casted by","members based in at least 55% of Member","States;","(d) decisions of the General Assembly can","be blocked by 35% of the votes casted by","members based in at least four Member","States;","(e) the Board of Directors is elected by the","General Assembly for a mandate of","maximum 4 years, renewable once;","(f) the Board of Directors nominates the","President and the three vice Presidents","among its members;","(g) DSO-TSO cooperation pursuant to","Articles 52 and 53 is led by the Board of","Directors;","(h) decisions of the Board of Directors are","adopted by simple majority of 11 votes or","qualified majority of 15 votes;","(i) the Secretary General is appointed by","the General Assembly among its members","for a four years mandate, renewable once;","(j) Expert Groups are appointed by the","General Assembly.","2.The statutes and rules of procedures of","the EU DSO entity adopted in accordance","with Article 50 shall safeguard the fair","and proportionate treatment of its","members and reflect the diverse","geographical and economic structure of","its membership. In particular, the","procedures shall foresee that:","(a) the number of voting rights in the","General Assembly is assigned to its","members on the basis of objective,","transparent criteria reflecting the scope of","their economic activity;","(b) the Board of Directors is composed by","the President of the Board and 19","members' representatives, of which:10 are","representatives of members with more","than 1 million grid users;5 are","representatives of members with more","than 100,000 and less than 1 million grid","users; and 5 are be representatives of","members with less than 100,000 grid","users;","(c) the Board of Directors shall not","consist of more than 3 representatives of","members based in the same Member","State;","(d) the vice-Presidents of the Board shall","be nominated among representatives of","members out of each group representing","the respective number of grid users;","3.The statutes and rules of procedures of","the EU DSO entity adopted in accordance","with Article 50 shall ensure the proper","functioning of the Independent Advisory","Council and notably:","(a) ensure that the Independent Advisory","Council is composed of representatives of","system users, final users and any other","relevant stakeholder;","(b) works on identifying best practices for","the tasks outlined in Article 51;","(c) delivers input to the works of the EU","DSO entity and notably its contribution to","the elaboration of network codes, annual","work programme and annual reporting."],"old":["","",""],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1400","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-884","location":[["Proposal for a regulation","Article 18 \u2013 paragraph 3 e (new)"]],"meps":[124826,124870,124739,124735,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:41"},"new":["3e. The Agency shall submit its","opinion under paragraph 3.d to the","Commission. The Commission shall","decide whether the reforms have been","sufficiently implemented."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"884","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Martina Werner, Peter Kouroumbashev, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-281","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point g"]],"meps":[124826,124857,124870,124739,124735,124699,125041,125044,124784],"meta":{"created":"2020-11-15T15:52:08"},"new":["(g) (i) barriers to cross-border","electricity flows and cross-border","transactions on electricity markets and","related services markets shall be removed ;"],"old":["(g) barriers to cross-border electricity","flows and cross-border transactions on","electricity markets and related services","markets shall be avoided;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"281","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1224","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 3"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:40"},"new":["3. Transmission system operators","shall provide their regional security","coordinator with the information necessary","to carry out its services."],"old":["3. Transmission system operators","shall provide their regional operational","centre with the information necessary to","carry out its functions."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1224","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Kate\u0159ina Kone\u010dn\u00e1, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-596","meps":[23699,96713],"meta":{"created":"2019-07-03T06:30:39"},"new":["deleted"],"old":["(a) generating installations using","renewable energy sources shall only be","subject to downward redispatching or","curtailment if no other alternative exists","or if other solutions would result in","disproportionate costs or risks to network","security;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"596","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1401","justification":"This Article follows on logically from Article 50 on the establishment of a EU DSO entity.","location":[[" Proposal for a regulation","Article 50 b (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:34"},"new":["Article 50 b","Agency oversight of the EU DSO entity","1.While preparing the proposals pursuant","to the tasks referred to in Article 51, the","EU DSO entity shall submit to the Agency","the draft texts of the proposals. Within","two months of receipt, the Agency shall","provide an opinion to the EU DSO entity","and propose amendments. In case of a","negative opinion, the EU DSO entity shall","propose a revised version of the text.","2. Any natural or legal person affected by","a decision can lodge an appeal to the","Agency against a decision taken by the","EUDSO entity where the entity has actual","decision-making powers."],"old":[""],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1401","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-282","justification":"In the whole text of the Regulation as well as Directive it is necessary to differentiate between\n\u201ccross-border flows\u201d and \u201ccross-border transactions\u201d to avoid conclusions that Member\nState should allow unscheduled electricity flows over its borders (art. 2:definitions, art. 3\npara 1 letter (g)","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point g"]],"meps":[28331],"meta":{"created":"2020-11-15T15:52:08"},"new":["(g) barriers to cross-zonal electricity","flows and cross-zonal transactions on","electricity markets and related services","markets shall be avoided;"],"old":["(g) barriers to cross-border electricity","flows and cross-border transactions on","electricity markets and related services","markets shall be avoided;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"282","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-885","justification":" Capacity mechanisms can, if not well designed and temporary in nature, create important\n market distortions. They shall not be used as a life line for conventional generation capacity.\n It is paramount that such mechanism are open to all market participants, including across\n borders, and that they include flexibility criteria to effectively being able to provide capacity\n at short notice and with flexible volumes.","location":[["Proposal for a regulation","Article 18 a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:41"},"new":["Article 18 a","Rules of capacity mechanisms","1. In case of an adequacy problem","identified by the European Resource","adequacy assessment, Member States","shall be able to address residual concerns","that cannot be eliminated by the measures","pursuant to Article 18 (3), subject to the","provisions of this Article and Union State","Aid rules.","2. Member States shall assess whether a","capacity mechanism in the form of","strategic reserve can address the adequacy","concerns. Only where this is not the case,","Member States may implement a different","type of mechanism. Such mechanisms","shall not create unnecessary market","distortions or inhibit cross-border trade.","They shall be open to all generation","technologies, storage, energy efficiency","and demand-side response. The amount","of capacity committed in the mechanism","shall not go beyond what is necessary to","address the concern. The sizing procured","in the capacity mechanism shall be","approved by the national regulatory","authority.","3. Where a Member State applies a","capacity mechanism, it shall review that","mechanism before [two years after the","date of entry into force of this Regulation]","and every year thereafter and provide that","no new contracts are concluded under","that mechanism where:","(a) the European resource adequacy","assessment has not identified a resource","adequacy concern; and/or","(b) the measures referred to in paragraph","3 have not been sufficiently implemented","in accordance with paragraph 3e.","4. Capacity mechanisms shall be","temporary.","They shall be approved by the","Commission for no longer than four","years. They shall be phased out or at least","phased down, based on the","implementation plan pursuant to Article","18(3) and 18 (3a).","5. Generation capacity shall be eligible to","participate in a capacity mechanism only","if","(a) its total greenhouse gas emissions per","kilowatt hour of electricity produced in","the installation do not exceed 350g of","CO2 equivalent from [OP:date of entry","into force of this Regulation];and","(b) is capable of ramping up and down","on-load at least at the level of 5% of their","capacity per minute and is able","to minimise the necessary level of stable","output below 40% of power plants","benefitting from capacity mechanisms.","6. Capacity providers must comply with","EU Environmental Quality Standards","and performance shall not exceed the","stricter emission levels associated with","BAT and higher range of BAT-associated","energy efficiency levels of all relevant","BAT Conclusions set for new plants to","participate in capacity mechanisms.","7. Without prejudice to the","immediate application of the emission","limits [and flexibility] requirements set","out in paragraph 5, by [two years from the","entry into force of this Regulation],","Member States shall complete the review","of existing capacity mechanisms, and of","the related contractual or","administrative arrangement, and bring","them in compliance with the provisions of","this Regulation. They shall submit to","the Commission a detailed report on","the results of the review and of the","measures taken."],"old":["",""],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"885","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1402","justification":"This Amendment is intrinsically linked to Article 50 and further details the provisions for the\nestablishment of a DSO entity.","location":[["Proposal for a regulation","Article 50 c (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:34"},"new":["Article 50 c","Participation of Distribution System","Operators","1.In order to ensure the independence of","the EU DSO entity, all distribution system","operators shall apply the following","provisions in order to become members of","the EU DSO entity:","(a) distribution system operators shall","establish and implement a compliance","programme which sets out the measures","taken in order to ensure that","discriminatory conduct is excluded, and","ensure that the compliance with that","programme is adequately monitored. The","compliance programme shall set out the","specific obligations of employees to meet","those objectives. It shall be subject to","approval by the regulatory authority.","Without prejudice to the powers of the","national regulator, compliance with the","program shall be independently","monitored by a compliance officer;","(b) the distribution system operator shall","inform the regulatory authority of the","financial resources, referred available for","future investment projects and/or for the","replacement of existing assets.","2.Distribution system operators who are","part of a vertically integrated undertaking","shall apply the additional following","provisions in order to become members of","the EU DSO entity:","(a) the overall management structure and","the corporate statutes of the distribution","system operator shall ensure effective","independence of the distribution system","operator. The vertically integrated","undertaking shall not determine, directly","or indirectly, the competitive behaviour of","the distribution system operator in","relation to the day-to-day activities of the","distribution system operator and","management of the network or in relation","to activities necessary for the network","development;","(b) the distribution system operator shall","not discriminate against different persons","or entities and shall not restrict, distort or","prevent competition in generation or","supply;","(c) distribution system operator may,","however, provide services to the vertically","integrated undertaking as long as the","provision of those services does not","discriminate between system users, is","available to all system users on the same","terms and conditions and does not restrict,","distort or prevent competition in","generation or supply;","(d) the distribution system operator shall","have the power to raise money on the","capital market in particular through","borrowing and capital increase;","(e) any commercial and financial","relations between the vertically integrated","undertaking and the distribution system","operator, including loans from the","distribution system operator to the","vertically integrated undertaking, shall","comply with market conditions. The","distribution system operator shall keep","detailed records of such commercial and","financial relations and make them","available to the regulatory authority upon","request. The distribution system operator","shall submit for approval by the","regulatory authority all commercial and","financial agreements with the vertically","integrated undertaking.","(f) The distribution system operator shall","not share IT systems or equipment,","physical premises and security access","systems with any part of the vertically","integrated undertaking nor use the same","consultants or external contractors for IT","systems or equipment, and security access","systems.","(g) The distribution system operator shall","not, in its corporate identity,","communication, branding and premises,","create confusion in respect of the separate","identity of the vertically integrated","undertaking or any part thereof.","(h) The distribution system operator shall","establish a Supervisory Body which shall","be in charge of taking decisions which","may have a significant impact on the","value of the assets of the shareholders","within the distribution system operator, in","particular decisions regarding the","approval of the annual and longer-term","financial plans, the level of indebtedness","of the distribution system operator and the","amount of dividends distributed to","shareholders. The decisions falling under","the remit of the Supervisory Body shall","exclude those that are related to the day-","to-day activities of the distribution system","operator and management of the network,","and to activities necessary for the","preparation of the ten-year network","development plan. The Supervisory Body","shall be composed of members","representing the vertically integrated","undertaking, members representing third","party shareholders and, where the","relevant legislation of a Member State so","provides, members representing other","interested parties such as employees of the","distribution system operator","(i) Decisions regarding the appointment","and renewal, working conditions","including remuneration, and termination","of the term of office of the persons","responsible for the management and/or","members of the administrative bodies of","the distribution system operator shall be","taken by the Supervisory Body of the","distribution system operator.","(j) No professional position or","responsibility, interest or business","relationship, directly or indirectly, with","the vertically integrated undertaking or","any part of it or its controlling","shareholders other than the distribution","system operator shall be exercised for a","period of three years before the","appointment of the persons responsible","for the management and/or members of","the administrative bodies of the","distribution system operator who are","subject to this paragraph.","(k) The persons responsible for the","management and/or members of the","administrative bodies, and employees of","the distribution system operator shall have","no other professional position or","responsibility, interest or business","relationship, directly or indirectly, with","any other part of the vertically integrated","undertaking or with its controlling","shareholders.","(l) The persons responsible for the","management and/or members of the","administrative bodies, and employees of","the distribution system operator shall hold","no interest in or receive any financial","benefit, directly or indirectly, from any","part of the vertically integrated","undertaking other than the distribution","system operator. Their remuneration shall","not depend on activities or results of the","vertically integrated undertaking other","than those of the distribution system","operator.","(m) After termination of their term of","office in the distribution system operator,","the persons responsible for its","management and/or members of its","administrative bodies shall have no","professional position or responsibility,","interest or business relationship with any","part of the vertically integrated","undertaking other than the distribution","system operator, or with its controlling","shareholders for a period of not less than","four years."],"old":["","","",""],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1402","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Martina Werner, Carlos Zorrinho, Miapetra Kumpula-Natri, Edouard Martin, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1225","location":[["Proposal for a regulation","Article 34 \u2013 paragraph 4"]],"meps":[124826,124739,124735,124947,124784],"meta":{"created":"2019-07-03T06:30:40"},"new":["4. Regional coordination centres shall","provide transmission system operators of","the system operation region with all the","information necessary to ensure system","stability and security of supply."],"old":["4. Regional operational centres shall","provide transmission system operators of","the system operation region with all the","information necessary to implement the","decisions and recommendations proposed","by the regional operational centres."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1225","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-283","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point g"]],"meps":[96713],"meta":{"created":"2020-11-15T15:52:08"},"new":["(g) barriers to cross-zonal electricity","flows and cross-zonal transactions on","electricity markets and related services","markets shall be avoided;"],"old":["(g) barriers to cross-border electricity","flows and cross-border transactions on","electricity markets and related services","markets shall be avoided;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"283","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-597","justification":" Concerning non-market based curtailment as well as redispatching, these measures are the\n last possibilities for TSOs to keep system in balance and secure electricity supply. TSOs shall\n have all the possibilities to rebalance the grid, therefore it is suggested to delete \u201clast\n curtailment and redispatching\u201d rule for renewables and high-efficiency cogeneration. This\n rule is also not compliant with the aim of having equal-level playing field.","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point a"]],"meps":[124699],"meta":{"created":"2019-07-03T06:30:39"},"new":["deleted"],"old":["(a) generating installations using","renewable energy sources shall only be","subject to downward redispatching or","curtailment if no other alternative exists","or if other solutions would result in","disproportionate costs or risks to network","security;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"597","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-886","location":[[" Proposal for a regulation","Article 18 a (new)"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:41"},"new":["Article 18 a","Rules of the capacity mechanism","1. Member States shall assess whether a","capacity mechanism in the form of","strategic reserve can address the adequacy","concerns. Where this is not the case,","Member States may implement a different","type of mechanism. Such mechanisms","shall not create unnecessary market","distortions or inhibit cross-border trade.","They shall be open to all generation","technologies, storage, energy efficiency","and demand-side response. The amount","of capacity committed in the mechanism","shall not go beyond what is necessary to","address the concern. The parameters","determining the amount of capacity","procured in the capacity mechanism shall","be approved by the national regulatory","authority.","2. Where a Member State applies a","capacity mechanism, it shall review that","mechanism before [two years after the","date of entry into force of this Regulation]","and provide that no new contracts are","concluded under that mechanism","where:(a) the European resource","adequacy assessment has not identified a","resource adequacy concern; and/or(b) the","measures referred to in paragraph 3 have","not been sufficiently implemented.","3. Capacity mechanisms shall be","temporary. They shall be approved by the","Commission for no longer than four","years. They shall be phased out or at least","phased down, based on the","implementation plan pursuant to Article","18(3).","Generation capacity shall be eligible to","participate in a capacity mechanism only","if:","(a) its total greenhouse gas emissions per","kilowatt hour of electricity produced in","the installation do not exceed 350gof CO2","equivalent from [OP:date of entry into","force of this Regulation];and","(b) it is capable of ramping up and down","on-load at least at the level 5% of their","capacity per minute.","4. Capacity providers must comply with","EU Environmental Quality Standards and","Best Available Techniques (BATs) to","participate in capacity mechanisms."],"old":[""],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"886","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1403","justification":" The proposal to create a EU DSO entity should be scrapped to eliminate the risks of conflicts\n of interests. This amendment promotes consistency with other amendments.","location":[["Proposal for a regulation","Article 51"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:34"},"new":["Article 51 deleted"],"old":["Tasks of the EU DSO entity","1. The tasks of the EU DSO entity shall be","the following:","(a) coordinated operation and planning of","transmission and distribution networks;","(b) integration of renewable energy","resources, distributed generation and","other resources embedded in the","distribution network such as energy","","storage;","(c) development of demand response;","(d) digitalisation of distribution networks","including deployment of smart grids and","intelligent metering systems;","(e) data management, cyber security and","data protection;","(f) participation in the elaboration of","network codes pursuant to Article 55.","2. In addition the EU DSO entity shall:","(a) cooperate with ENTSO for electricity","on the monitoring of implementation of","the network codes and guidelines which","are relevant to the operation and planning","of distribution grids and the coordinated","operation of the transmission and","distribution networks and which are","adopted pursuant to this Regulation;","(b) cooperate with ENTSO for electricity","and adopt best practices on the","coordinated operation and planning of","transmission and distribution systems","including issues such as exchange of data","between operators and coordination of","distributed energy resources;","(c) work on identifying best practices on","the areas identified in paragraph 1 and","for the introduction of energy efficiency","improvements in the distribution network;","(d) adopt an annual work programme and","an annual report;","(e) operate in full compliance with","competition rules."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1403","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1226","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 4"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:40"},"new":["4. Regional security coordinators","shall provide transmission system","operators of the capacity calculation","region with all the information necessary to","implement recommendations proposed by","the regional security coordinators."],"old":["4. Regional operational centres shall","provide transmission system operators of","the system operation region with all the","information necessary to implement the","decisions and recommendations proposed","by the regional operational centres."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1226","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-598","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point a"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:39"},"new":["(a) generating installations using","renewable energy sources shall only be","subject to downward redispatching or","curtailment if no other alternative exists;"],"old":["(a) generating installations using","renewable energy sources shall only be","subject to downward redispatching or","curtailment if no other alternative exists or","if other solutions would result in","disproportionate costs or risks to network","security;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"598","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-284","justification":" There needs to be a level-playing field between EU and third countries\u2019 power producers, in\n order to achieve the objectives of the internal energy market.","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point g a (new)"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["(ga) cross-border electricity flows","between the EU and third countries shall","discourage imports of electricity","generated by high-carbon assets located","in non EU Member States;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"284","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Massimiliano Salini","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-887","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 1"]],"meps":[125670],"meta":{"created":"2019-07-03T06:30:41"},"new":["1. The European resource adequacy","assessment shall evaluate resource","adequacy in the European Union. The","assessment should be based on the","Member States levels of adequacy","and foresee bidding zones at regional","level."],"old":["1. The European resource adequacy","assessment shall cover the overall","adequacy of the electricity system to","supply current and projected demands for","electricity for a ten-year period from the","date of that assessment, in a yearly","resolution."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"887","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1404","location":[["Proposal for a regulation","Article 51"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:34"},"new":["Article 51 deleted"],"old":["Tasks of the EU DSO entity","1. The tasks of the EU DSO entity shall be","the following:","(a) coordinated operation and planning of","transmission and distribution networks;","(b) integration of renewable energy","resources, distributed generation and","other resources embedded in the","distribution network such as energy","storage;","(c) development of demand response;","(d) digitalisation of distribution networks","including deployment of smart grids and","intelligent metering systems;","(e) data management, cyber security and","data protection;","(f) participation in the elaboration of","network codes pursuant to Article 55.","2. In addition the EU DSO entity shall:","(a) cooperate with ENTSO for electricity","on the monitoring of implementation of","the network codes and guidelines which","are relevant to the operation and planning","of distribution grids and the coordinated","operation of the transmission and","distribution networks and which are","adopted pursuant to this Regulation;","(b) cooperate with ENTSO for electricity","and adopt best practices on the","coordinated operation and planning of","transmission and distribution systems","including issues such as exchange of data","between operators and coordination of","distributed energy resources;","(c) work on identifying best practices on","the areas identified in paragraph 1 and","for the introduction of energy efficiency","","improvements in the distribution network;","(d) adopt an annual work programme and","an annual report;","(e) operate in full compliance with","competition rules."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1404","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1227","location":[[" Proposal for a regulation","Article 34 \u2013 paragraph 4 a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:40"},"new":["4 a. Upon request of the Commission,","the regional operational centres shall give","their views to the Commission on the","adoption of the guidelines referred in","Article 54."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1227","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Martina Werner, Peter Kouroumbashev, Flavio Zanonato, Jeppe Kofod, Carlos Zorrinho, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-599","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point a"]],"meps":[124826,124857,124800,124870,124739,125041,125044],"meta":{"created":"2019-07-03T06:30:39"},"new":["(a) generating installations using","renewable energy sources shall only be","subject to downward redispatching or","curtailment in very exceptional cases if no","other alternative exists or if other solutions","would result in significantly","disproportionate costs or significant risks","to network security;"],"old":["(a) generating installations using","renewable energy sources shall only be","subject to downward redispatching or","curtailment if no other alternative exists or","if other solutions would result in","disproportionate costs or risks to network","security;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"599","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Patrizia Toia, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-285","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point h"]],"meps":[124826,124870,124739,124735,28340,124699,125041,125044],"meta":{"created":"2020-11-15T15:52:08"},"new":["(h) market rules shall provide for","strong regional cooperation where","effective;"],"old":["(h) market rules shall provide for","regional cooperation where effective;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"285","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-888","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 1"]],"meps":[124826,124870,124739,124735,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:41"},"new":["1. The European resource adequacy","assessment shall cover the overall","adequacy of the electricity system to","supply current and projected demands for","electricity in the Union, within the","relevant Member States forming a region","and for each Member State one, five and","ten years ahead from the date of that","assessment."],"old":["1. The European resource adequacy","assessment shall cover the overall","adequacy of the electricity system to","supply current and projected demands for","electricity for a ten-year period from the","date of that assessment, in a yearly","resolution."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"888","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Kathleen Van Brempt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1405","location":[[" Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 introductory part"]],"meps":[5729],"meta":{"created":"2019-07-03T06:30:34"},"new":["1. The main task of the EU DSO","entity shall be the participation in the","elaboration of network codes pursuant to","Articles 55 and 56.","Other tasks may include the exchange of","views and best practices on:"],"old":["1. The tasks of the EU DSO entity","shall be the following:"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1405","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1228","justification":"It is our position that Articles 31 to 44 and all reference regarding ROCs in the Clean Energy\nPackage to All Europeans shall be deleted without any substitution.It is of particular concern\nthat establishment of ROCs violates subsidiarity and proportionality principle according to\nart. 194 SFEU","location":[[" Proposal for a regulation","Article 35"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:40"},"new":["Article 35 deleted","centres"],"old":["","Cooperation within regional operational","1. The day-to-day operation of regional","operational centres shall be managed","through cooperative decision-making.","The cooperative-decision making process","shall be based on:","(a) working arrangements to address","planning and operational aspects related","to the functions, in accordance with","Article 36;","(b) a procedure for consulting the","transmission system operators of the","system operation region in the exercise of","its operational duties and tasks, in","accordance with Article 37;","(c) a procedure for the adoption of","decisions and recommendations in","accordance with Article 38;","(d) a procedure for the revision of","decisions and recommendations adopted","by regional operational centres in","accordance with Article 39."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1228","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-600","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point a"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:39"},"new":["(a) generating installations using","renewable energy sources as well as","energy storage facilities shall only be","subject to downward redispatching or","curtailment if no other alternative exists or","if other solutions would result in","disproportionate costs or risks to network","security;"],"old":["(a) generating installations using","renewable energy sources shall only be","subject to downward redispatching or","curtailment if no other alternative exists or","if other solutions would result in","","disproportionate costs or risks to network","security;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"600","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Kathleen Van Brempt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-286","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point i"]],"meps":[5729],"meta":{"created":"2020-11-15T15:52:08"},"new":["(i) all generation, storage and demand","resources shall participate on equal footing","in the market in a way that accounts for","the benefits and costs each provide to the","environment and the system, their","sustainability, and their contributions to","the decarbonisation objectives set in the","2015 Paris Agreement and in Directive","(Renewable Energy Directive);"],"old":["(i) all generation, storage and demand","resources shall participate on equal footing","in the market;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"286","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-889","justification":" Because of the introduction of new term \u201cresource adequacy assessment\u201d it is necessary to\n define relationship of new extent of generation adequacy to primary sources. Misleadingly\n\n\n\nformulated requirements for availability of primary sources can influence final methodology\nand extent of proposed measures in the area of system and resource adequacy.","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 1"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:41"},"new":["1. The European resource adequacy","assessment shall cover the overall","adequacy of the electricity system to","supply current and projected demands for","electricity with respect to the availability","of primary resources for a ten-year period","from the date of that assessment, in a","yearly resolution."],"old":["1. The European resource adequacy","assessment shall cover the overall","adequacy of the electricity system to","supply current and projected demands for","electricity for a ten-year period from the","date of that assessment, in a yearly","resolution."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"889","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Kate\u0159ina Kone\u010dn\u00e1, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1229","location":[["Proposal for a regulation","Article 35"]],"meps":[23699,96713],"meta":{"created":"2019-07-03T06:30:40"},"new":["Article 35 deleted","centres"],"old":["Cooperation within regional operational","1. The day-to-day operation of regional","operational centres shall be managed","through cooperative decision-making.","The cooperative-decision making process","shall be based on:","(a) working arrangements to address","planning and operational aspects related","to the functions, in accordance with","Article 36;","(b) a procedure for consulting the","transmission system operators of the","system operation region in the exercise of","its operational duties and tasks, in","accordance with Article 37;","(c) a procedure for the adoption of","decisions and recommendations in","accordance with Article 38;","(d) a procedure for the revision of","decisions and recommendations adopted","by regional operational centres in","accordance with Article 39."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1229","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1406","location":[[" Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 point a"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:35"},"new":["deleted"],"old":["(a) coordinated operation and","planning of transmission and distribution","networks;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1406","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-601","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point a"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:39"},"new":["(a) generating installations using","renewable energy sources shall only be","subject to downward redispatching or","curtailment if no other alternative exists or","if other solutions would result in","highly disproportionate costs or severe","risks to network security;"],"old":["(a) generating installations using","renewable energy sources shall only be","subject to downward redispatching or","curtailment if no other alternative exists or","if other solutions would result in","disproportionate costs or risks to network","security;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"601","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-287","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point i"]],"meps":[124813,124796],"meta":{"created":"2020-11-15T15:52:08"},"new":["(i) all generation, storage and demand","resources shall participate on equal footing","in the market in a way that accounts for","the benefits and costs each provide to the","environment and the system, their","sustainability, and their contributions to","the decarbonisation objectives set in the","2015 Paris Agreement and Directive","[Renewable Energy Directive]; ;"],"old":["(i) all generation, storage and demand","resources shall participate on equal footing","in the market;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"287","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1407","location":[["Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 point a"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:35"},"new":["(a) adopting recommendations","relating to coordinated operation and","planning of transmission and distribution","networks in cooperation with ENTSO for","Electricity;"],"old":["(a) coordinated operation and planning","of transmission and distribution networks;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1407","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1230","location":[[" Proposal for a regulation","Article 35 \u2013 title"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:40"},"new":["Cooperation within capacity calculation","regions"],"old":["Cooperation within regional operational","centres"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1230","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-890","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 1"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:41"},"new":["1. The European resource adequacy","assessment shall cover the overall","adequacy of the electricity system to","supply current and projected demands for","electricity with respect to the availability","of primary resources for a ten-year period","from the date of that assessment, in a","yearly resolution."],"old":["1. The European resource adequacy","assessment shall cover the overall","adequacy of the electricity system to","supply current and projected demands for","electricity for a ten-year period from the","date of that assessment, in a yearly","resolution."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"890","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1408","location":[["Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 point b"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:35"},"new":["(b) delivering a consultative advice on","efficient integration of renewable energy","resources, distributed generation and other","resources embedded in the distribution","network such as energy storage;"],"old":["(b) integration of renewable energy","resources, distributed generation and other","resources embedded in the distribution","network such as energy storage;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1408","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1231","location":[[" Proposal for a regulation","Article 35 \u2013 paragraph 1 \u2013 introductory part"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:40"},"new":["1. The day-to-day operation of","regional coordination centres shall be","managed through cooperative decision-","making with active involvement of","transmission system operators of the","region. The cooperative-decision making","process shall be based on:"],"old":["1. The day-to-day operation of","regional operational centres shall be","managed through cooperative decision-","making. The cooperative-decision making","process shall be based on:"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1231","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-891","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 1"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:41"},"new":["1. The European resource adequacy","assessment as well as regional adequacy","assessment shall cover the overall","adequacy of the electricity system to","supply current and projected demands for","electricity for a ten-year period from the","date of that assessment, in a yearly","resolution."],"old":["1. The European resource adequacy","assessment shall cover the overall","adequacy of the electricity system to","supply current and projected demands for","electricity for a ten-year period from the","date of that assessment, in a yearly","resolution."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"891","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-288","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point i"]],"meps":[96852],"meta":{"created":"2020-11-15T15:52:08"},"new":["(i) all generation, storage and demand","resources shall participate on equal footing","in the market in a way that accounts for","the benefits and costs each provide to the","environment and the system, their","sustainability, and their contributions to","the decarbonisation objectives set in the","2015 Paris Agreement and the Renewable","Energy Directive;"],"old":["(i) all generation, storage and demand","resources shall participate on equal footing","in the market;","",""],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"288","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1232","location":[["Proposal for a regulation","Article 35 \u2013 paragraph 1 \u2013 introductory part"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:40"},"new":["1. The day-to-day coordination","within capacity calculation region shall be","managed through cooperative decision-","making process between transmission","system operators of such region. The","cooperative-decision making process shall","be based on:"],"old":["1. The day-to-day operation of","regional operational centres shall be","managed through cooperative decision-","making. The cooperative-decision making","process shall be based on:"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1232","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Werner Langen","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1409","justification":" Adding sectoral integration to the regulation will ensure stability and a level playing field\n among all the market-based resources, which will help achieve the objectives of the EU's\n internal energy market.","location":[["Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 point b"]],"meps":[1928],"meta":{"created":"2019-07-03T06:30:35"},"new":["(b) integration of renewable energy","resources, distributed generation and other","resources embedded in the distribution","network such as energy storage and","sectoral integration;"],"old":["(b) integration of renewable energy","resources, distributed generation and other","resources embedded in the distribution","network such as energy storage;"],"orig_lang":"de","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1409","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-602","justification":"Installations used to generate and supply electricity from renewable energy sources that are\nowned by local energy communities are usually smaller, owned by ordinary citizens, have less\nimpact on the grid, and are located close to consumption. Under these business models, the\nprimary aim is that the electricity generated will also be consumed by the members of the\nlocal energy community. In order to ensure confidence and investor certainty for such actors,\nthere is a need to clarify that the circumstances such installations can be curtailed or\nredispatched are limited to situations only where other measures to maintain network security\nhave failed.","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point a a (new)"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:40"},"new":["(a a) electricity generated from","renewable sources by local energy","communities, which is intended for the","consumption of its members, shall not be","subject to downward redispatching or","curtailment unless no other solution","would resolve network security issues;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"602","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Patrizia Toia, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1410","location":[[" Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 point b"]],"meps":[124826,124870,124739,124735,28340,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:35"},"new":["(b) improve and maximise the","integration of renewable energy resources,","distributed generation and other resources","embedded in the distribution network such","as energy storage;"],"old":["(b) integration of renewable energy","resources, distributed generation and other","resources embedded in the distribution","network such as energy storage;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1410","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Pilar del Castillo Vera, Pilar Ayuso, Francesc Gamb\u00fas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-289","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point i"]],"meps":[28390,4319,125006],"meta":{"created":"2020-11-15T15:52:08"},"new":["(i) all generation, storage and demand","resources shall participate on equal footing","in the market taking into account the","technical features of installations;"],"old":["(i) all generation, storage and demand","resources shall participate on equal footing","in the market;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"289","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-892","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 1"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:42"},"new":["1. The European resource adequacy","assessment shall determine resource","adequacy concerns in the Union, within","the relevant Member States in the system","operation region and for each Member","State, and where relevant down to each","bidding zone."],"old":["1. The European resource adequacy","assessment shall cover the overall","adequacy of the electricity system to","supply current and projected demands for","electricity for a ten-year period from the","date of that assessment, in a yearly","resolution."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"892","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1411","location":[[" Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 point b"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:35"},"new":["(b) facilitate the integration of","renewable energy resources, distributed","generation and other resources embedded","in the distribution network such as energy","storage;"],"old":["(b) integration of renewable energy","resources, distributed generation and other","resources embedded in the distribution","network such as energy storage;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1411","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-603","justification":"Concerning non-market based curtailment as well as redispatching, these measures are the\nlast possibilities for TSOs to keep system in balance and secure electricity supply. TSOs shall\nhave all the possibilities to rebalance the grid, therefore it is suggested to delete \u201clast\ncurtailment and redispatching\u201d rule for renewables and high-efficiency cogeneration. This\nrule is also not compliant with the aim of having equal-level playing field.","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point b"]],"meps":[124699],"meta":{"created":"2019-07-03T06:30:40"},"new":["deleted"],"old":["(b) generating installations using","high-efficiency cogeneration shall only be","subject to downward redispatching or","curtailment if, other than curtailment or","downward redispatching of generating","installations using renewable energy","sources, no other alternative exists or if","other solutions would result in","disproportionate costs or risks to network","security;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"603","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Martina Werner, Carlos Zorrinho, Miapetra Kumpula-Natri, Edouard Martin, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1233","location":[["Proposal for a regulation","Article 35 \u2013 paragraph 1 \u2013 introductory part"]],"meps":[124826,124739,124735,124947,124784],"meta":{"created":"2019-07-03T06:30:40"},"new":["1. The day-to-day operation of","regional coordination centres shall be","managed through cooperative decision-","making amongst transmission system","operators. The cooperative-decision","making process shall be based on:"],"old":["1. The day-to-day operation of","regional operational centres shall be","managed through cooperative decision-","making. The cooperative-decision making","process shall be based on:"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1233","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1412","location":[["Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 point c"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:35"},"new":["(c) facilitate the development of","demand response notably via aggregators;"],"old":["(c) development of demand response;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1412","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-290","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point i"]],"meps":[2278],"meta":{"created":"2020-11-15T15:52:08"},"new":["(i) all generation, storage and demand","resources shall participate on equal footing","in the market, while being allowed to bid","towards different services;"],"old":["(i) all generation, storage and demand","resources shall participate on equal footing","in the market;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"290","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-893","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 3"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:42"},"new":["3. Transmission system operators","shall provide the ENTSO for Electricity","with the data it needs to carry out, every","year, the European resource adequacy","assessment. The ENTSO for Electricity","shall carry out the assessment every year.","Market participants shall, based on their","possibilities and data availability, provide","transmission system operators with data","regarding expected future utilisation of","generation sources."],"old":["3. Transmission system operators","shall provide the ENTSO for Electricity","with the data it needs to carry out, every","year, the European resource adequacy","assessment. The ENTSO for Electricity","shall carry out the assessment every year."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"893","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Kate\u0159ina Kone\u010dn\u00e1, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-604","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point b"]],"meps":[23699,96713],"meta":{"created":"2019-07-03T06:30:40"},"new":["deleted"],"old":["(b) generating installations using","high-efficiency cogeneration shall only be","subject to downward redispatching or","curtailment if, other than curtailment or","downward redispatching of generating","installations using renewable energy","sources, no other alternative exists or if","other solutions would result in","disproportionate costs or risks to network","security;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"604","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1413","location":[["Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 point c"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:35"},"new":["(c) adopting recommendations","relating to development of demand","response;"],"old":["(c) development of demand response;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1413","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1234","location":[[" Proposal for a regulation","Article 35 \u2013 paragraph 1 \u2013 point a"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:40"},"new":["(a) working arrangements to address","planning and operational aspects relevant","for the services referred to in Article","34(1), including arrangements for","coordination established between regional","security coordinators, if required;"],"old":["(a) working arrangements to address","planning and operational aspects related to","the functions, in accordance with Article","36;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1234","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-291","justification":"Detailing further the provisions of the related point j), the electricity generated by producers\nmust include relevant components that form part of the costs of the electricity they produce,\nand the responsibility therefore extends beyond a simple selling principle.","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point j a (new)"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["(ja) electricity generation operators","shall bear the full financial and legal","responsibility deriving from the operation","of their assets throughout their life-time,","for their decommissioning, as well as for","the management of waste or reconversion","of sites;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"291","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1414","location":[["Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 point c"]],"meps":[90110],"meta":{"created":"2019-07-03T06:30:35"},"new":["(c) development of demand response","and energy storage ;"],"old":["(c) development of demand response;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1414","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-605","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point b"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:40"},"new":["deleted"],"old":["(b) generating installations using","high-efficiency cogeneration shall only be","subject to downward redispatching or","curtailment if, other than curtailment or","downward redispatching of generating","installations using renewable energy","sources, no other alternative exists or if","other solutions would result in","disproportionate costs or risks to network","security;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"605","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-606","justification":"In line with Article 6.4 of Regulation 2016/631. Concerning non-market based curtailment as\nwell as redispatching, as Regulation and network codes acknowledge, CHP embedded in\nindustrial sites has as main objective to supply thermal energy to associated industrial\nprocesses. As a consequence, curtailing CHP undermines energy supply to the associated\nindustrial processes, which may force it to cease industrial operations, even for safety\nreasons.","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point b"]],"meps":[90110],"meta":{"created":"2019-07-03T06:30:40"},"new":["(b) (b) generating installations using","high-efficiency cogeneration and,","especially, in those cases in which:","i) the primary purpose of those facilities is","to produce heat for production processes","of the industrial site concerned;","ii) heat and power-generating is","inextricably interlinked, in a way that any","change of heat generation results","inadvertently in a change of active power-","generating and vice versa;","shall only be subject to downward","redispatching or curtailment if, other than","curtailment or downward redispatching of","generating installations using renewable","energy sources, no other alternative exists","or if other solutions would result in","disproportionate costs or risks to network","security;"],"old":["(b) generating installations using high-","","","efficiency cogeneration shall only be","subject to downward redispatching or","curtailment if, other than curtailment or","downward redispatching of generating","installations using renewable energy","sources, no other alternative exists or if","other solutions would result in","disproportionate costs or risks to network","security;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"606","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1415","location":[["Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 point c"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:35"},"new":["(c) development of demand response","and energy storage;"],"old":["(c) development of demand response;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1415","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Kaja Kallas, Pavel Teli\u010dka, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar, Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1235","location":[[" Proposal for a regulation","Article 35 \u2013 paragraph 1 \u2013 point b"]],"meps":[124697,124706,124989,124872,125026,90110],"meta":{"created":"2019-07-03T06:30:40"},"new":["(b) a procedure for consulting, in an","efficient and inclusive manner, the","transmission system operators of the","system operation region in the exercise of","its operational duties and tasks, in","accordance with Article 37;"],"old":["(b) a procedure for consulting the","transmission system operators of the","system operation region in the exercise of","its operational duties and tasks, in","accordance with Article 37;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1235","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-607","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point b"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:40"},"new":["(b) generating installations using high-","efficiency cogeneration as well as energy","storage facilities shall only be subject to","downward redispatching or curtailment if,","other than curtailment or downward","redispatching of generating installations","using renewable energy sources, no other","alternative exists or if other solutions","would result in disproportionate costs or","risks to network security;"],"old":["(b) generating installations using high-","efficiency cogeneration shall only be","subject to downward redispatching or","curtailment if, other than curtailment or","downward redispatching of generating","installations using renewable energy","sources, no other alternative exists or if","other solutions would result in","disproportionate costs or risks to network","","security;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"607","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Kathleen Van Brempt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1416","location":[[" Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 point c a (new)"]],"meps":[5729],"meta":{"created":"2019-07-03T06:30:35"},"new":["(c a) development of innovative","financing techniques, including pre-","financing combined with on-bill","repayment via the meter, for investments","in renewable energy and energy efficiency","measures;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1416","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-894","justification":"Commission\u00b4s proposal sets obligation for TSO to provide necessary data to ENTSO-E for\nevaluation of resource adequacy on EU level. It is necessary to clearly set roles and\nresponsibilities of all subjects influenced by providing such data and fact that according to\narticle 18 para 1 Member Stat shall monitor resource adequacy within their territory based\non the European resource adequacy assessment. Commission\u2019s proposal sets obligation to\nTSO to provide necessary data, however it doesn\u2019t establish obligation for generation sources\n(and market participants concerned in regulation of electricity system) to provide these data\nto TSO.","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 3"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:42"},"new":["3. Transmission system operators","shall provide the ENTSO for Electricity","with the data it needs to carry out, every","year, the European resource adequacy","assessment. The ENTSO for Electricity","shall carry out the assessment every year.","Market participants shall, based on their","possibilities and data availability, provide","transmission system operators with data","regarding expected future utilization of","generation sources."],"old":["3. Transmission system operators","","shall provide the ENTSO for Electricity","with the data it needs to carry out, every","year, the European resource adequacy","assessment. The ENTSO for Electricity","shall carry out the assessment every year."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"894","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Martina Werner, Peter Kouroumbashev, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Eugen Freund, Patrizia Toia, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-292","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point k"]],"meps":[124826,124857,124870,124739,124735,125018,28340,124699,125041,125044,124784],"meta":{"created":"2020-11-15T15:52:08"},"new":["(k) market rules shall allow for","progress in research and development into","sustainable, secure and low-carbon","energy sources, technologies or systems to","be realized and used to the benefit of","society;"],"old":["(k) market rules shall allow for","progress in research and development to be","realized and used to the benefit of society;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"292","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-608","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point b"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:40"},"new":["(b) electricity generated in a high-","efficiency cogeneration process shall only","be subject to downward redispatching or","curtailment if, no other alternative exists","except curtailment or downward","redispatching of generating installations","using renewable energy sources, or if other","solutions would result in highly","disproportionate costs or severe risks to","network security"],"old":["(b) generating installations using","high-efficiency cogeneration shall only be","subject to downward redispatching or","curtailment if, other than curtailment or","downward redispatching of generating","installations using renewable energy","sources, no other alternative exists or if","other solutions would result in","disproportionate costs or risks to network","security;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"608","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Martina Werner, Peter Kouroumbashev, Carlos Zorrinho, Miapetra Kumpula-Natri, Edouard Martin, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1236","location":[[" Proposal for a regulation","Article 35 \u2013 paragraph 1 \u2013 point b"]],"meps":[124826,124857,124739,124735,124947,124784],"meta":{"created":"2019-07-03T06:30:40"},"new":["(b) a procedure for consulting the","transmission system operators and relevant","stakeholders of the system operation","region in the exercise of its operational","duties and tasks, in accordance with Article","37;"],"old":["(b) a procedure for consulting the","transmission system operators of the","system operation region in the exercise of","its operational duties and tasks, in","accordance with Article 37;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1236","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Kathleen Van Brempt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1417","location":[[" Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 point c b (new)"]],"meps":[5729],"meta":{"created":"2019-07-03T06:30:36"},"new":["(c b) fulfilment of the tasks as obligated","party in the [Energy Efficiency Directive];"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1417","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-895","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 3"]],"meps":[124826,124870,124739,124735,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:42"},"new":["3. Transmission system operators","shall provide the ENTSO for Electricity","with the data it needs to carry out, every","year, the European resource adequacy","assessment."],"old":["3. Transmission system operators","shall provide the ENTSO for Electricity","with the data it needs to carry out, every","year, the European resource adequacy","assessment. The ENTSO for Electricity","shall carry out the assessment every year."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"895","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-293","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point l"]],"meps":[124813,124796],"meta":{"created":"2020-11-15T15:52:08"},"new":["(l) market rules shall enable the","efficient dispatch of generation assets and","demand response, whilst accounting for","the ability of individual assets to","participate in dispatch mechanisms ;"],"old":["(l) market rules shall enable the","efficient dispatch of generation assets and","demand response;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"293","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1237","location":[["Proposal for a regulation","Article 35 \u2013 paragraph 1 \u2013 point b"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:40"},"new":["(b) a procedure for sharing analysis","and consulting the regional security","coordinator's proposals with transmission","system operators of the capacity","calculation region;"],"old":["(b) a procedure for consulting the","transmission system operators of the","system operation region in the exercise of","its operational duties and tasks, in","accordance with Article 37;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1237","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-609","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point b"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:40"},"new":["(b) generating installations using high-","efficiency cogeneration shall only be","subject to downward redispatching or","curtailment if no other alternative exists","except curtailment or downward","redispatching of generating installations","using renewable energy sources, or if other","solutions would result in","highly disproportionate costs or severe","risks to network security;"],"old":["(b) generating installations using high-","efficiency cogeneration shall only be","subject to downward redispatching or","curtailment if, other than curtailment or","downward redispatching of generating","installations using renewable energy","sources, no other alternative exists or if","other solutions would result in","disproportionate costs or risks to network","security;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"609","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Kathleen Van Brempt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1418","location":[[" Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 point c c (new)"]],"meps":[5729],"meta":{"created":"2019-07-03T06:30:36"},"new":["(c c) introduction of energy efficiency","improvements in the distribution network;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1418","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Pilar del Castillo Vera, Pilar Ayuso, Francesc Gamb\u00fas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-896","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 3 a (new)"]],"meps":[28390,4319,125006],"meta":{"created":"2019-07-03T06:30:42"},"new":["3a. According to national legislation,","the transmission system operators may","have the right to request relevant data not","containing commercial sensitive","information form generators, distribution","system operators and other market","participants."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"896","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Kaja Kallas, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar, Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1238","location":[["Proposal for a regulation","Article 35 \u2013 paragraph 1 \u2013 point c"]],"meps":[124697,124989,124872,125026,90110],"meta":{"created":"2019-07-03T06:30:41"},"new":["(c) a procedure for the adoption of","decisions and recommendations in","accordance with Article 38 that ensures","equitable treatment between members of","the regional operational centre ;"],"old":["(c) a procedure for the adoption of","decisions and recommendations in","accordance with Article 38;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1238","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-294","justification":" This is clarification is necessary, especially in the light of the detailed provisions of Articles\n 10 and 11.","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point l"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["(l) market rules shall enable the","efficient dispatch of generation assets and","demand response, whilst accounting for","the ability of individual assets to","participate in dispatch mechanisms;"],"old":["(l) market rules shall enable the","efficient dispatch of generation assets and","demand response;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"294","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-610","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point b"]],"meps":[124826,124870,124739,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:40"},"new":["(b) electricity generated in a high-","efficiency cogeneration process shall only","be subject to downward redispatching or","curtailment if, other than curtailment or","downward redispatching of generating","installations using renewable energy","sources, no other alternative exists or if","other solutions would result in","disproportionate costs or risks to network","security;"],"old":["(b) generating installations using","high-efficiency cogeneration shall only be","subject to downward redispatching or","curtailment if, other than curtailment or","downward redispatching of generating","installations using renewable energy","sources, no other alternative exists or if","other solutions would result in","disproportionate costs or risks to network","security;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"610","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1419","location":[["Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 point d"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:36"},"new":["(d) adopting recommendations","relating to digitalisation of distribution","networks including deployment of smart","grids and intelligent metering systems;"],"old":["(d) digitalisation of distribution","networks including deployment of smart","grids and intelligent metering systems;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1419","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Bendt Bendtsen","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-897","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 3 a (new)"]],"meps":[96705],"meta":{"created":"2019-07-03T06:30:42"},"new":["3a. The transmission system operators","shall have the right to request relevant","data not containing commercially","sensitive information, and not already","collected by the relevant DSO, from","generators and other market participants."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"897","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1239","location":[["Proposal for a regulation","Article 35 \u2013 paragraph 1 \u2013 point c"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:41"},"new":["(c) a procedure for the adoption of","transmission system operators\u2019 decisions","considering the recommendations from","regional security coordinators;"],"old":["(c) a procedure for the adoption of","decisions and recommendations in","accordance with Article 38;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1239","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-611","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point c"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:40"},"new":["deleted"],"old":["(c) self-generated electricity from","generating installations using renewable","energy sources or high-efficiency","cogeneration which is not fed into the","transmission or distribution network shall","not be curtailed unless no other solution","would resolve network security issues;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"611","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Massimiliano Salini","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-898","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 4 \u2013 introductory part"]],"meps":[125670],"meta":{"created":"2019-07-03T06:30:42"},"new":["4. The European resource adequacy","assessment shall be based on a transparent","methodology which shall ensure that the","assessment:"],"old":["4. The European resource adequacy","assessment shall be based on a","methodology which shall ensure that the","assessment:"],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"898","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-295","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point l"]],"meps":[2278],"meta":{"created":"2020-11-15T15:52:08"},"new":["(l) market rules shall enable the","efficient dispatch of generation assets,","energy storage and demand response;"],"old":["(l) market rules shall enable the","efficient dispatch of generation assets and","demand response;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"295","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1240","location":[[" Proposal for a regulation","Article 35 \u2013 paragraph 1 \u2013 point c"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:41"},"new":["(c) a procedure for the adoption and","revision of recommendations in","accordance with Article 38;"],"old":["(c) a procedure for the adoption of","decisions and recommendations in","accordance with Article 38;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1240","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Martina Werner, Peter Kouroumbashev, Flavio Zanonato, Jeppe Kofod, Carlos Zorrinho, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-612","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point c"]],"meps":[124826,124857,124800,124870,124739,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:40"},"new":["deleted"],"old":["(c) self-generated electricity from","generating installations using renewable","energy sources or high-efficiency","cogeneration which is not fed into the","transmission or distribution network shall","not be curtailed unless no other solution","would resolve network security issues;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"612","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1420","location":[["Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 point d"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:36"},"new":["(d) accelerate the digitalisation of","distribution networks including","deployment of smart grids and intelligent","metering systems;"],"old":["(d) digitalisation of distribution","networks including deployment of smart","grids and intelligent metering systems;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1420","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-899","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 4 \u2013 point a a (new)"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:42"},"new":["(aa) is based on appropriate scenarios","that are consistent with the objectives and","targets agreed in the policy framework for","climate and energy covering the period","from 2020 to 2030 as well as with 2050","EU decarbonisation objectives and the","Paris Agreement."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"899","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1241","location":[[" Proposal for a regulation","Article 35 \u2013 paragraph 1 \u2013 point d"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:41"},"new":["deleted"],"old":["(d) a procedure for the revision of","decisions and recommendations adopted","by regional operational centres in","accordance with Article 39."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1241","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-296","justification":"As storage is listed in para (f) and (i) it should be included in para (l) as well.","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point l"]],"meps":[125024,183793,96993],"meta":{"created":"2020-11-15T15:52:08"},"new":["(l) market rules shall enable the","efficient dispatch of generation assets,","storage and demand response;"],"old":["(l) market rules shall enable the","efficient dispatch of generation assets and","demand response;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"296","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Kate\u0159ina Kone\u010dn\u00e1, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-613","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point c"]],"meps":[23699,96713],"meta":{"created":"2019-07-03T06:30:40"},"new":["deleted"],"old":["(c) self-generated electricity from","generating installations using renewable","energy sources or high-efficiency","cogeneration which is not fed into the","transmission or distribution network shall","not be curtailed unless no other solution","would resolve network security issues;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"613","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-900","justification":"This amendment is intrinsically linked to the amendment on Article 18, paragraph 3.","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 4 \u2013 point a a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:42"},"new":["(aa) is based on appropriate scenarios","that are consistent with the objectives and","targets agreed in the policy framework for","climate and energy covering the period","from 2020 to 2030 as well as with 2050","EU decarbonisation objectives and the","Paris Agreement;"],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"900","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Martina Werner, Carlos Zorrinho, Miapetra Kumpula-Natri, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1242","location":[[" Proposal for a regulation","Article 35 \u2013 paragraph 1 \u2013 point d"]],"meps":[124826,124739,124735,125041,125044,124947],"meta":{"created":"2019-07-03T06:30:41"},"new":["(d) a procedure for the adoption and","revision of decisions and recommendations","adopted by regional cooperation centres in","accordance with Article 39."],"old":["(d) a procedure for the revision of","decisions and recommendations adopted by","regional operational centres in accordance","with Article 39."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1242","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-614","justification":"Concerning non-market based curtailment as well as redispatching, these measures are the\nlast possibilities for TSOs to keep system in balance and secure electricity supply. TSOs shall\nhave all the possibilities to rebalance the grid, therefore it is suggested to delete \u201clast\ncurtailment and redispatching\u201d rule for renewables and high-efficiency cogeneration. This\nrule is also not compliant with the aim of having equal-level playing field.","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point c"]],"meps":[124699],"meta":{"created":"2019-07-03T06:30:40"},"new":["deleted"],"old":["(c) self-generated electricity from","generating installations using renewable","","energy sources or high-efficiency","cogeneration which is not fed into the","transmission or distribution network shall","not be curtailed unless no other solution","would resolve network security issues;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"614","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Martina Werner, Peter Kouroumbashev, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Patrizia Toia, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1421","location":[[" Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 point d"]],"meps":[124826,124857,124870,124739,124735,28340,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:36"},"new":["(d) improve the digitalisation of","distribution networks including","deployment of smart grids and intelligent","metering systems;"],"old":["(d) digitalisation of distribution","networks including deployment of smart","grids and intelligent metering systems;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1421","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-297","justification":"In line with the provisions of Article 2 and Article 23, as well as the enlarged scope of the\nRegulation market rules shall apply to all market participants, but except to assets held\noutside the market.","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point m"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["(m) market rules including those","applying to ancillary services, shall allow","for entry and exit of electricity generation,","demand side response providers, storage","facilities and electricity supply","undertakings based on their assessment of","the economic and financial viability of","their operations, except generation assets","that part of a strategic reserve or capacity","mechanism;"],"old":["(m) market rules shall allow for entry","and exit of electricity generation and","electricity supply undertakings based on","their assessment of the economic and","financial viability of their operations;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"297","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-901","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 4 \u2013 point b"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:42"},"new":["(b) is based on appropriate scenarios of","projected demand and supply including an","economic assessment of the likelihood of","retirement, moth- balling, new-build of","generation assets and measures to reach","energy efficiency and electricity","interconnection targets and appropriate","sensitivities on wholesale prices and","carbon price developments","and appropriately takes account of the","contribution of all resources and their","potential for technological advancement","i.e. via monitoring flexibility available in","the system, including existing and","potential flexibility from generation,","demand-side, interconnections and","storage.;"],"old":["(b) is based on appropriate scenarios of","projected demand and supply including an","economic assessment of the likelihood of","retirement, new-build of generation assets","and measures to reach energy efficiency","targets and appropriate sensitivities on","wholesale prices and carbon price","developments;"],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"901","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1243","location":[["Proposal for a regulation","Article 35 \u2013 paragraph 1 \u2013 point d"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:41"},"new":["(d) a procedure for the revision of","recommendations adopted by regional","security coordinators in accordance with","Article 39."],"old":["(d) a procedure for the revision of","decisions and recommendations adopted","by regional operational centres in","accordance with Article 39."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1243","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-298","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point m"]],"meps":[124813,124796],"meta":{"created":"2020-11-15T15:52:08"},"new":["(m) market rules, including those","applying to ancillary services, shall allow","for entry and exit of electricity generation,","demand side response providers, storage","facilities, and electricity supply","undertakings based on their assessment of","the economic and financial viability of","their operations;"],"old":["(m) market rules shall allow for entry","and exit of electricity generation and","electricity supply undertakings based on","their assessment of the economic and","financial viability of their operations;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"298","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Kaja Kallas, Pavel Teli\u010dka, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar, Carolina Punset, Gerben-Jan Gerbrandy","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1422","location":[[" Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 point d"]],"meps":[124697,124706,124989,124872,125026,90110,96940],"meta":{"created":"2019-07-03T06:30:36"},"new":["(d) digitalisation of distribution","networks including deployment of smart","grids and smart metering systems ;"],"old":["(d) digitalisation of distribution","networks including deployment of smart","grids and intelligent metering systems;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1422","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-615","justification":"To truly enable active customers, encourage their participation and keep citizens engagement\nin being part of the energy transition, self-generated energy should not be curtailed. In\naddition \u201cnetwork security issues\u201d is an unclear concept and thus not adequate for the\npurpose of this Regulation.","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point c"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:40"},"new":["deleted"],"old":["(c) self-generated electricity from","generating installations using renewable","energy sources or high-efficiency","cogeneration which is not fed into the","transmission or distribution network shall","not be curtailed unless no other solution","would resolve network security issues;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"615","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1244","justification":" In order to achieve and further implement the internal energy market, regional operational\n centres have to cooperate.This Article is hence a logical continuation of the previous\n provisions on ROCs.","location":[["Proposal for a regulation","Article 35 a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:41"},"new":["Article 35 a","Cooperation between regional operational","centres","1.Regional operational centres shall","cooperate at Union level in order to","ensure the coordinated operation and","efficient and secure performance of the","electricity systems across the Union.For","this purpose, regional operational centres","shall set up efficient cooperation","structures to:","(a) share existing tools, methods and","procedures.","(b) carry out their coordination functions","alternately or cooperatively;","(c) jointly optimise the execution of","functions and tools for transmission","system operators and develop new ones.","2.By [OP:eighteen months after entry into","force of this Regulation], regional","operational centres shall develop, in close","cooperation with transmission system","operators and the ENTSO for Electricity,","and submit to the Agency, a proposal for","the cooperation and coordination between","regional operational centres in","accordance with the criteria in paragraph","1.","Within three months of receipt, the","Agency shall, after formally consulting","the organisations representing all","stakeholders, either decide to approve the","proposal or propose amendments.","3.The proposal referred to in paragraph 2","shall be submitted to the Agency in case","of significant changes."],"old":[""],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1244","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-902","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 4 \u2013 point b"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:42"},"new":["(b) is based on appropriate scenarios of","projected demand and supply including an","economic assessment of the likelihood of","retirement, moth-balling, new-build of","generation assets, measures to reach energy","efficiency targets, measures to reach","electricity interconnection targets and","appropriate sensitivities on wholesale","prices and carbon price developments;"],"old":["(b) is based on appropriate scenarios of","projected demand and supply including an","economic assessment of the likelihood of","retirement, new-build of generation assets","and measures to reach energy efficiency","targets and appropriate sensitivities on","wholesale prices and carbon price","developments;"],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"902","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-299","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point m"]],"meps":[96852],"meta":{"created":"2020-11-15T15:52:08"},"new":["(m) market rules, including those","applying to ancillary services, shall allow","for entry and exit of electricity generation,","demand side response providers, storage","facilities, and electricity supply","undertakings based on their assessment of","the economic and financial viability of","their operations;"],"old":["(m) market rules shall allow for entry","and exit of electricity generation and","electricity supply undertakings based on","their assessment of the economic and","financial viability of their operations;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"299","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-616","justification":" Renewable energy that is self-produced and consumed without being put on the grid should\n not be subject to any curtailment whatsoever. In order to ensure confidence and investor\n certainty for active customers there is a need to clarify under which circumstances their\n installations can be subject to curtailment or redispatch for excess electricity that is exported\n to the grid. It should be clarified that such instances be limited only to circumstances\n determined by the national energy regulator, and where all other measures have been taken.","meps":[96852],"meta":{"created":"2019-07-03T06:30:40"},"new":["(c) self-generated electricity from","generating installations using renewable","energy sources or high-efficiency","cogeneration, for the amount which is not","fed into the transmission or distribution","network shall not be curtailed unless, based","on conditions pre-determined by the","national energy regulator, all other","measures have been taken and no other","solution would resolve network security","issues;"],"old":["(c) self-generated electricity from","generating installations using renewable","energy sources or high-efficiency","cogeneration which is not fed into the","transmission or distribution network shall","not be curtailed unless no other solution","would resolve network security issues;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"616","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Pilar del Castillo Vera, Pilar Ayuso, Francesc Gamb\u00fas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-300","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point m"]],"meps":[28390,4319,125006],"meta":{"created":"2020-11-15T15:52:08"},"new":["(m) market rules shall allow for entry","and exit of electricity generation and","electricity supply undertakings based on","their assessment of the economic and","financial viability of their operations","without endangering the security of","supply, effective competition and price","formation;"],"old":["(m) market rules shall allow for entry","and exit of electricity generation and","electricity supply undertakings based on","their assessment of the economic and","financial viability of their operations;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"300","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1245","location":[[" Proposal for a regulation","Article 36"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:41"},"new":["Article 36 deleted","Working arrangements"],"old":["1. Regional operational centres shall","develop working arrangements to address","planning and operational aspects related","to the functions to be performed, taking","into account, in particular, the","specificities and requirements of those","functions as specified in Annex I.","2. Regional operational centres shall","ensure that the working arrangements","contain rules for the notification of","parties concerned."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1245","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Kathleen Van Brempt, Ivo Belet","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-903","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 4 \u2013 point b"]],"meps":[5729,28257],"meta":{"created":"2019-07-03T06:30:42"},"new":["(b) is based on appropriate scenarios of","projected demand and supply including an","economic assessment of the likelihood of","retirement, new-build of generation assets","and measures to reach energy efficiency","and interconnection targets and","appropriate sensitivities on wholesale","prices and carbon price developments;"],"old":["(b) is based on appropriate scenarios of","projected demand and supply including an","economic assessment of the likelihood of","retirement, new-build of generation assets","and measures to reach energy efficiency","targets and appropriate sensitivities on","wholesale prices and carbon price","developments;"],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"903","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Kaja Kallas, Pavel Teli\u010dka, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar, Carolina Punset, Gerben-Jan Gerbrandy","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1423","location":[[" Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 point e"]],"meps":[124697,124706,124989,124872,125026,90110,96940],"meta":{"created":"2019-07-03T06:30:36"},"new":["(e) guarantee non-discriminatory and","neutral access to data regardless of the","data management model, and promote","standardization, cross-border data","exchange, in particular with ENTSO for","Electricity where relevant to facilitate data","exchange, cyber security and data","protection;"],"old":["(e) data management, cyber security","and data protection;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1423","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Kate\u0159ina Kone\u010dn\u00e1, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1246","location":[["Proposal for a regulation","Article 36"]],"meps":[23699,96713],"meta":{"created":"2019-07-03T06:30:41"},"new":["Article 36 deleted","Working arrangements"],"old":["1. Regional operational centres shall","develop working arrangements to address","planning and operational aspects related","to the functions to be performed, taking","into account, in particular, the","specificities and requirements of those","functions as specified in Annex I.","2. Regional operational centres shall","ensure that the working arrangements","contain rules for the notification of","parties concerned."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1246","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-617","justification":"Renewable energy that is self-produced and consumed without being put on the grid should\nnot be subject to any curtailment whatsoever. For excess electricity that is exported to the\ngrid by active customers, in order to ensure confidence and investor certainty there is a need\nto clarify the circumstances that would allow their installations to be curtailed or subject to\nredispatch.","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point c"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:41"},"new":["(c) self-generated electricity from","generating installations using renewable","energies or high-efficiency cogeneration,","for the amount which is not fed into the","transmission or distribution network shall","not be curtailed unless, based on","conditions pre-determined by the national","energy regulator through a consultation,","no other solution would resolve network","security issues;"],"old":["(c) self-generated electricity from","generating installations using renewable","energy sources or high-efficiency","cogeneration which is not fed into the","transmission or distribution network shall","not be curtailed unless no other solution","would resolve network security issues;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"617","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-301","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point m"]],"meps":[124826,124870,124739,124735,124699,125041,125044],"meta":{"created":"2020-11-15T15:52:08"},"new":["(m) market rules shall allow for entry","and exit of electricity generation and","electricity supply undertakings based on","the assessment of the economic and","financial viability of their operations","including possible decommissioning costs;"],"old":["(m) market rules shall allow for entry","and exit of electricity generation and","electricity supply undertakings based on","their assessment of the economic and","financial viability of their operations;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"301","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Massimiliano Salini","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-904","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 4 \u2013 point b"]],"meps":[125670],"meta":{"created":"2019-07-03T06:30:42"},"new":["(b) is based on appropriate national","scenarios of projected demand and supply","including an economic assessment of the","likelihood of retirement, new-build of","generation assets and measures to reach","energy efficiency targets and appropriate","sensitivities on wholesale prices and","carbon price developments;"],"old":["(b) is based on appropriate scenarios of","projected demand and supply including an","economic assessment of the likelihood of","retirement, new-build of generation assets","and measures to reach energy efficiency","targets and appropriate sensitivities on","wholesale prices and carbon price","developments;"],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"904","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Pilar del Castillo Vera, Pilar Ayuso, Francesc Gamb\u00fas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1424","location":[["Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 point e"]],"meps":[28390,4319,125006],"meta":{"created":"2019-07-03T06:30:36"},"new":["(e) neutral data management, cyber","security and data protection in cooperation","with relevant authorities and entities;"],"old":["(e) data management, cyber security","and data protection;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1424","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1247","justification":" It is our position that Articles 31 to 44 and all reference regarding ROCs in the Clean Energy\n Package to All Europeans shall be deleted without any substitution.It is of particular concern\n that establishment of ROCs violates subsidiarity and proportionality principle according to\n art. 194 SFEU","location":[["Proposal for a regulation","Article 36"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:41"},"new":["Article 36 deleted","Working arrangements"],"old":["","","1. Regional operational centres shall","develop working arrangements to address","planning and operational aspects related","to the functions to be performed, taking","into account, in particular, the","specificities and requirements of those","functions as specified in Annex I.","2. Regional operational centres shall","ensure that the working arrangements","contain rules for the notification of","parties concerned."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1247","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Kathleen Van Brempt, Ivo Belet","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-618","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point c"]],"meps":[5729,28257],"meta":{"created":"2019-07-03T06:30:41"},"new":["(c) self-generated electricity from","generating installations using renewable","energy sources or high-efficiency","cogeneration which is not fed into the","transmission or distribution network shall","not be curtailed unless no other solution","would resolve network security issues or if","this would result in disproportionately","high costs;"],"old":["(c) self-generated electricity from","generating installations using renewable","energy sources or high-efficiency","cogeneration which is not fed into the","transmission or distribution network shall","not be curtailed unless no other solution","would resolve network security issues;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"618","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1425","location":[["Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 point e"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:36"},"new":["(e) contribute to sound data","management in compliance with the right","to privacy, cyber security and data","protection;"],"old":["(e) data management, cyber security","and data protection;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1425","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-905","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 4 \u2013 point c"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:42"},"new":["(c) appropriately takes account of the","contribution of all resources and their","potential for technological","advancement, including existing and future","generation, energy storage, demand","response, and import and export","possibilities and their contribution to","flexible system operation;"],"old":["(c) appropriately takes account of the","contribution of all resources including","existing and future generation, energy","storage, demand response, and import and","export possibilities and their contribution","to flexible system operation;"],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"905","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-302","justification":" As storage is defined as a separate activity in the electricity system, storage undertakings\n need to be able to make market entry or exit decisions on the same basis as other market\n players.","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point m"]],"meps":[90110],"meta":{"created":"2020-11-15T15:52:08"},"new":["(m) market rules shall allow for entry","and exit of electricity generation, energy","storage, and electricity supply","undertakings based on their assessment of","the economic and financial viability of","their operations;"],"old":["(m) market rules shall allow for entry","and exit of electricity generation and","electricity supply undertakings based on","their assessment of the economic and","financial viability of their operations;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"302","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-619","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point c"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:41"},"new":["(c) self-generated electricity from","generating installations using renewable","energy sources, energy storage, demand-","response or high-efficiency cogeneration","which is not fed into the transmission or","distribution network shall not be curtailed","unless no other solution would resolve","network security issues;"],"old":["(c) self-generated electricity from","generating installations using renewable","energy sources or high-efficiency","cogeneration which is not fed into the","transmission or distribution network shall","not be curtailed unless no other solution","would resolve network security issues;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"619","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Kaja Kallas, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar, Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1248","location":[[" Proposal for a regulation","Article 36 \u2013 paragraph 1"]],"meps":[124697,124989,124872,125026,90110],"meta":{"created":"2019-07-03T06:30:41"},"new":["1. Regional operational centres shall","develop working arrangements that are","efficient, inclusive, and facilitate","consensus, to address planning and","operational aspects related to the functions","to be performed, taking into account, in","particular, the specificities and","requirements of those functions as","specified in Annex I."],"old":["1. Regional operational centres shall","develop working arrangements to address","planning and operational aspects related to","the functions to be performed, taking into","account, in particular, the specificities and","requirements of those functions as","specified in Annex I."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1248","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-906","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 4 \u2013 point c"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:43"},"new":["(c) appropriately takes account of the","contribution of all resources and their","potential for technological advancement","including existing and future generation,","energy storage, demand response, and","import and export possibilities and their","contribution to flexible system operation;"],"old":["(c) appropriately takes account of the","contribution of all resources including","existing and future generation, energy","storage, demand response, and import and","export possibilities and their contribution","to flexible system operation;"],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"906","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1426","location":[["Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 point e"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:36"},"new":["(e) adopting recommendations","relating to data management, cyber","security and data protection;"],"old":["(e) data management, cyber security","and data protection;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1426","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-303","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point m"]],"meps":[2278],"meta":{"created":"2020-11-15T15:52:08"},"new":["(m) market rules shall allow for entry","and exit of electricity generation, energy","storage and electricity supply undertakings","based on their assessment of the economic","and financial viability of their operations;"],"old":["(m) market rules shall allow for entry","and exit of electricity generation and","electricity supply undertakings based on","their assessment of the economic and","financial viability of their operations;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"303","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-620","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point c"]],"meps":[90110],"meta":{"created":"2019-07-03T06:30:41"},"new":["(c) self-generated electricity from","generating installations using renewable","energy sources, energy storage, demand-","response or high-efficiency cogeneration","which is not fed into the transmission or","distribution network shall not be curtailed","unless no other solution would resolve","network security issues;"],"old":["(c) self-generated electricity from","generating installations using renewable","energy sources or high-efficiency","cogeneration which is not fed into the","transmission or distribution network shall","not be curtailed unless no other solution","would resolve network security issues;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"620","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Werner Langen","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-907","justification":"Adding sectoral integration to the regulation will ensure stability and a level playing field\namong all the market-based resources, which will help achieve the objectives of the EU's\ninternal energy market.","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 4 \u2013 point c"]],"meps":[1928],"meta":{"created":"2019-07-03T06:30:43"},"new":["(c) appropriately takes account of the","contribution of all resources including","existing and future generation, energy","storage, sectoral integration, demand","response, and import and export","possibilities and their contribution to","flexible system operation;"],"old":["(c) appropriately takes account of the","contribution of all resources including","existing and future generation, energy","storage, demand response, and import and","export possibilities and their contribution","to flexible system operation;","",""],"orig_lang":"de","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"907","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Martina Werner, Peter Kouroumbashev, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Patrizia Toia, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1427","location":[[" Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 point e"]],"meps":[124826,124857,124870,124739,124735,28340,124699,125041,125044,124784],"meta":{"created":"2019-07-03T06:30:36"},"new":["(e) promotion of neutral data","management, cyber security and data","protection;"],"old":["(e) data management, cyber security","and data protection;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1427","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-621","justification":"For many local energy communities that own their own production, which they supply to their\nmembers, the aim is to have such installations contributing to as much of their consumption\nneeds as possible. Such installations are usually smaller, owned by ordinary citizens, have\nless impact on the grid, and are located close to consumption. In order to ensure confidence\nand investor certainty for such actors, there is a need to clarify under which circumstances\ninstallations owned and operated by local energy communities can be curtailment or\nredispatch","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point c a (new)"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:41"},"new":["(c a) electricity generated from","installations using renewable energy","sources by renewable energy","communities, which is intended for the","consumption of its members, shall not be","subject to downward redispatching or","curtailment unless, based on conditions","pre-determined by the national energy","regulator through a consultation, no","other solution would resolve network","security issues;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"621","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1249","location":[["Proposal for a regulation","Article 36 \u2013 paragraph 1"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:41"},"new":["1. With the support of the Agency,","regional operational centres shall develop","working arrangements to address planning","and operational aspects related to the","functions to be performed, taking into","account, in particular, the specificities and","requirements of those functions as","specified in Annex I."],"old":["1. Regional operational centres shall","develop working arrangements to address","planning and operational aspects related to","the functions to be performed, taking into","account, in particular, the specificities and","requirements of those functions as","specified in Annex I."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1249","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Eugen Freund, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-304","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point m a (new)"]],"meps":[124826,124870,124739,125018,124699],"meta":{"created":"2020-11-15T15:52:08"},"new":["(ma) must-run generation of","conventional generators shall be limited","to the amount that is strictly necessary for","the resource adequacy"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"304","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Massimiliano Salini","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-908","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 4 \u2013 point e"]],"meps":[125670],"meta":{"created":"2019-07-03T06:30:43"},"new":["deleted"],"old":["(e) includes scenarios without existing","or planned capacity mechanisms;"],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"908","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-622","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point d"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:41"},"new":["deleted"],"old":["(d) downward redispatching or","curtailment under letters a to c shall be","duly and transparently justified. The","justification shall be included in the","report under paragraph 3."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"622","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Pervenche Ber\u00e8s, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-305","justification":"The new market design should focus on properly driving all clean energy investments and\nprovide an efficient investment signal.","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point m a (new)"]],"meps":[1985,124947],"meta":{"created":"2020-11-15T15:52:08"},"new":["(ma) Market rules shall allow the","development of long-term instruments","and products that enable investments in","clean energy."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"305","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1250","location":[["Proposal for a regulation","Article 36 \u2013 paragraph 2"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:41"},"new":["2. Regional coordination centres shall","ensure that the working arrangements","contain rules for the notification of parties","concerned."],"old":["2. Regional operational centres shall","ensure that the working arrangements","contain rules for the notification of parties","concerned."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1250","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-909","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 4 \u2013 point h \u2013 indent 2 a (new)"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:43"},"new":["- \"level of reliable capacity needed","to ensure adequacy\""],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"909","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Kathleen Van Brempt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1428","location":[[" Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 point f"]],"meps":[5729],"meta":{"created":"2019-07-03T06:30:36"},"new":["deleted"],"old":["(f) participation in the elaboration of","network codes pursuant to Article 55."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1428","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-623","justification":"Concerning non-market based curtailment as well as redispatching, these measures are the\nlast possibilities for TSOs to keep system in balance and secure electricity supply. TSOs shall\n\n have all the possibilities to rebalance the grid, therefore it is suggested to delete \u201clast\n curtailment and redispatching\u201d rule for renewables and high-efficiency cogeneration. This\n rule is also not compliant with the aim of having equal-level playing field.","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point d"]],"meps":[124699],"meta":{"created":"2019-07-03T06:30:41"},"new":["deleted"],"old":["(d) downward redispatching or","curtailment under letters a to c shall be","duly and transparently justified. The","justification shall be included in the","report under paragraph 3."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"623","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1251","justification":" It is our position that Articles 31 to 44 and all reference regarding ROCs in the Clean Energy\n Package to All Europeans shall be deleted without any substitution.It is of particular concern\n that establishment of ROCs violates subsidiarity and proportionality principle according to\n art. 194 SFEU","location":[["Proposal for a regulation","Article 37"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:42"},"new":["Article 37 deleted","Consultation procedure"],"old":["Regional operational centres shall","develop a procedure to organise, in the","exercise of their daily operational duties","and tasks, the appropriate and regular","","consultation of transmission system","operators and of relevant stakeholders. In","order to ensure that regulatory issues can","be addressed, regulatory authorities shall","be involved when required."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1251","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-306","justification":"The impact of regulatory changes on hedging must be duly considered.","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point n"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["(n) long-term hedging opportunities,","which allow market participants to hedge","against price volatility risks on a market","basis, and mitigate uncertainty on future","returns on investment shall be tradable on","exchanges in a transparent manner subject","to compliance with EU treaty rules on","competition. Regulatory changes shall","take into account effects on both short-","term and long-term forward and futures","markets and products."],"old":["(n) long-term hedging opportunities,","which allow market participants to hedge","against price volatility risks on a market","basis, and eliminate uncertainty on future","returns on investment shall be tradable on","exchanges in a transparent manner subject","to compliance with EU treaty rules on","competition."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"306","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-910","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 4 \u2013 point i"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:43"},"new":["(i) identifies the sources of possible","resource adequacy concerns, in particular","whether it is a network or a resource","constraint, or market failures."],"old":["(i) identifies the sources of possible","resource adequacy concerns, in particular","whether it is a network or a resource","constraint, or both."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"910","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Kate\u0159ina Kone\u010dn\u00e1, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1252","location":[[" Proposal for a regulation","Article 37"]],"meps":[23699,96713],"meta":{"created":"2019-07-03T06:30:42"},"new":["Article 37 deleted","Consultation procedure"],"old":["Regional operational centres shall","develop a procedure to organise, in the","exercise of their daily operational duties","and tasks, the appropriate and regular","consultation of transmission system","operators and of relevant stakeholders. In","order to ensure that regulatory issues can","be addressed, regulatory authorities shall","be involved when required."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1252","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Kate\u0159ina Kone\u010dn\u00e1, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-624","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point d"]],"meps":[23699,96713],"meta":{"created":"2019-07-03T06:30:41"},"new":["deleted"],"old":["(d) downward redispatching or","curtailment under letters a to c shall be","duly and transparently justified. The","justification shall be included in the","report under paragraph 3."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"624","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Pervenche Ber\u00e8s, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1429","justification":"The guidelines are very important, even if they have no legal value: they set out the path to be\nfollowed. It is therefore important that electricity distributors entity be able to participate in\ntheir definition through the future EU-DSO.","location":[[" Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 point f"]],"meps":[1985,124947],"meta":{"created":"2019-07-03T06:30:36"},"new":["(f) participation in the","recommendation, the proposal, the","elaboration of network codes and","guidelines pursuant to Article 55."],"old":["(f) participation in the elaboration of","network codes pursuant to Article 55."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1429","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-625","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point d"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:41"},"new":["(d) shall be duly and transparently","justified. The justification shall be included","in the report under paragraph 3."],"old":["(d) downward redispatching or","curtailment under letters a to c shall be","duly and transparently justified. The","justification shall be included in the report","under paragraph 3."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"625","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-307","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point n"]],"meps":[124826,124870,124739,124735,124699],"meta":{"created":"2020-11-15T15:52:08"},"new":["(n) long-term hedging opportunities,","which allow market participants to hedge","against price volatility risks on a market","basis, and mitigate uncertainty on future","returns on investment shall be tradable on","exchanges in a transparent manner subject","to compliance with EU treaty rules on","competition while current products","offered on exchanges should be further","expanded and promoted at EU level."],"old":["(n) long-term hedging opportunities,","which allow market participants to hedge","against price volatility risks on a market","basis, and eliminate uncertainty on future","returns on investment shall be tradable on","exchanges in a transparent manner subject","to compliance with EU treaty rules on","competition."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"307","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1253","location":[[" Proposal for a regulation","Article 37"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:42"},"new":["Article 37 deleted","Consultation procedure"],"old":["","Regional operational centres shall","develop a procedure to organise, in the","exercise of their daily operational duties","and tasks, the appropriate and regular","consultation of transmission system","operators and of relevant stakeholders. In","order to ensure that regulatory issues can","be addressed, regulatory authorities shall","be involved when required."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1253","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-626","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point d"]],"meps":[124826,124870,124739,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:41"},"new":["(d) downward redispatching or","curtailment under letters a to b shall be","duly and transparently justified. The","justification shall be included in the report","under paragraph 3."],"old":["(d) downward redispatching or","curtailment under letters a to c shall be","duly and transparently justified. The","justification shall be included in the report","under paragraph 3."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"626","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-911","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 4 \u2013 point i a (new)"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:43"},"new":["(ia) Respecting real network","development."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"911","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-308","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point n"]],"meps":[2025],"meta":{"created":"2020-11-15T15:52:08"},"new":["(n) long-term hedging opportunities,","which allow market participants to hedge","against price volatility risks on a market","basis, and eliminate uncertainty on future","returns on investment shall be tradable on","exchanges in a transparent manner;","similarly, long-term supply contracts shall","be negotiated over the counter. Both shall","be compliant with EU treaty rules on","competition."],"old":["(n) long-term hedging opportunities,","which allow market participants to hedge","against price volatility risks on a market","basis, and eliminate uncertainty on future","returns on investment shall be tradable on","exchanges in a transparent manner subject","to compliance with EU treaty rules on","competition."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"308","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1430","location":[["Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 point f"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:36"},"new":["(f) contribute to the elaboration of","network codes via issuing opinions","pursuant to Article 55."],"old":["(f) participation in the elaboration of","network codes pursuant to Article 55."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1430","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-627","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 5 \u2013 point d"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:41"},"new":["(d) downward redispatching or","curtailment shall be duly and transparently","justified. The justification shall be included","in the report under paragraph 3."],"old":["(d) downward redispatching or","curtailment under letters a to c shall be","duly and transparently justified. The","justification shall be included in the report","under paragraph 3."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"627","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1254","location":[["Proposal for a regulation","Article 37 \u2013 paragraph 1"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:42"},"new":["Regional operational centres shall develop","a procedure to organise, in the exercise of","their daily operational duties and tasks, the","appropriate and regular consultation of","transmission system operators and of","relevant stakeholders."],"old":["Regional operational centres shall develop","a procedure to organise, in the exercise of","their daily operational duties and tasks, the","appropriate and regular consultation of","transmission system operators and of","relevant stakeholders. In order to ensure","that regulatory issues can be addressed,","regulatory authorities shall be involved","when required."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1254","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-912","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 4 \u2013 point i a (new)"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:43"},"new":["(ia) Respecting real network","development."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"912","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-309","justification":"This is necessary for pressing reasons relating to the internal logic of the text or because the\namendments are inextricably linked to other admissible amendments.","location":[[" Proposal for a regulation","Article 3 \u2013 paragraph 1 \u2013 point n"]],"meps":[124947,1985],"meta":{"created":"2020-11-15T15:52:08"},"new":["(n) long-term hedging opportunities,","which allow market participants to hedge","against price volatility risks on a market","basis, and mitigate uncertainty on future","returns on investment, shall be tradable on","exchanges in a transparent manner;","similarly, long-term supply contracts shall","be negotiated over the counter; both shall","be compliant with EU rules"],"old":["(n) long-term hedging opportunities,","which allow market participants to hedge","against price volatility risks on a market","basis, and eliminate uncertainty on future","returns on investment shall be tradable on","exchanges in a transparent manner subject","to compliance with EU treaty rules on","competition."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"309","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Kaja Kallas, Carolina Punset, Gerben-Jan Gerbrandy","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1431","location":[["Proposal for a regulation","Article 51 \u2013 paragraph 1 \u2013 point f a (new)"]],"meps":[124697,90110,96940],"meta":{"created":"2019-07-03T06:30:36"},"new":["(f a) definition of standardised market","products, at least for crossborder bidding","zones, in cooperation with all relevant","market participants including","transmission system operators, demand","response providers and other system","users;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1431","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-628","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 6 \u2013 introductory part"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:41"},"new":["6. Where non-market based","curtailment or redispatching is used, it shall","be subject to financial payment by the","system operator requesting the curtailment","or redispatching to the owner of the","curtailed or redispatched generation or","demand facility. A methodology for","determining financial compensation shall","be established by the relevant regulatory","authority and shall consider additional","operating cost caused by the curtailment","or redispatching."],"old":["6. Where non-market based","curtailment or redispatching is used, it shall","be subject to financial compensation by","the system operator requesting the","curtailment or redispatching to the owner","of the curtailed or redispatched generation","or demand facility. Financial compensation","shall at least be equal to the highest of the","following elements:","",""],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"628","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-913","justification":") We propose to add letter (i a ) Respecting real network development. Combination of flow-\nbased methodology together with probabilistic approach and intermittent/variable generation\nmix is difficult to apply. In case of inadequate inclusion of availability of cross border profile\nthe result could cause violation of subsidiarity principle, where regional (even EU) measures\n(e.g. in area of strategic reserves) could be in conflict with national requirement or measure\nto secure required level of resource adequacy. Except of flow based methodology this article\nmust also respect real network development and specific conditions of Member States.","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 4 \u2013 point i a (new)"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:43"},"new":["(ia) Respecting real network","development."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"913","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Martina Werner, Carlos Zorrinho, Miapetra Kumpula-Natri, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1255","location":[["Proposal for a regulation","Article 37 \u2013 paragraph 1"]],"meps":[124826,124739,124735,124784],"meta":{"created":"2019-07-03T06:30:42"},"new":["Regional coordination centres shall","develop a procedure to organise, in the","exercise of their daily duties and tasks, the","appropriate and regular consultation of","transmission system operators and of","relevant stakeholders. In order to ensure","that regulatory issues can be addressed,","regulatory authorities shall be involved","when required."],"old":["Regional operational centres shall develop","a procedure to organise, in the exercise of","their daily operational duties and tasks, the","appropriate and regular consultation of","transmission system operators and of","relevant stakeholders. In order to ensure","that regulatory issues can be addressed,","regulatory authorities shall be involved","when required."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1255","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Eugen Freund, Patrizia Toia, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-310","location":[["Proposal for a regulation","Article 3 \u2013 paragraph 1 a (new)"]],"meps":[124826,124870,124739,124735,125018,28340,124699,125041,125044],"meta":{"created":"2020-11-15T15:52:08"},"new":["1a. Member States shall set out a","roadmap with measures to remove","existing barriers to the principles outlined","in paragraph 1 as part of their 2030","National Energy and Climate Plans."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"310","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Kaja Kallas, Pavel Teli\u010dka, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar, Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1432","location":[[" Proposal for a regulation","Article 51 \u2013 paragraph 2 \u2013 point a"]],"meps":[124697,124706,124989,124872,125026,90110],"meta":{"created":"2019-07-03T06:30:36"},"new":["(a) cooperate effectively with ENTSO","for electricity, the Agency and national","regulators to facilitate the monitoring by","the Agency and where relevant the","national regulatory authorities of","implementation of the network codes and","guidelines which are relevant to the","operation and planning of distribution grids","and the coordinated operation of the","transmission and distribution networks and","which are adopted pursuant to this","Regulation;"],"old":["(a) cooperate with ENTSO for","electricity on the monitoring of","implementation of the network codes and","guidelines which are relevant to the","operation and planning of distribution grids","and the coordinated operation of the","transmission and distribution networks and","which are adopted pursuant to this","Regulation;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1432","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-629","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 6 \u2013 introductory part"]],"meps":[124891,96713],"meta":{"created":"2019-07-03T06:30:41"},"new":["6. Where non-market based","curtailment or redispatching is used, it shall","be subject to financial compensation by the","system operator requesting the curtailment","or redispatching to the owner of the","curtailed or redispatched generation or","demand facility."],"old":["6. Where non-market based","curtailment or redispatching is used, it shall","be subject to financial compensation by the","system operator requesting the curtailment","or redispatching to the owner of the","curtailed or redispatched generation or","demand facility. Financial compensation","shall at least be equal to the highest of the","following elements:"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"629","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1256","justification":" This Article is a logical continuation of the previous provisions on ROCs.","location":[[" Proposal for a regulation","Article 37 a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:42"},"new":["Article 37 a","Transparency","1.Regional operational centres shall","organise a process for stakeholder","involvement and organise regular","meetings with stakeholders to discuss","matters relating to the efficient, secure","and reliable operation of the","interconnected system as well as to","identify shortcomings and propose","improvements;","2.ENTSO for electricity and regional","operational centres shall operate in full","transparency towards stakeholders and","the general public.All relevant","documentation shall be published on the","website of the respective regional","operation centre.This paragraph shall","apply to the proposals, justifications and","decisions adopted pursuant to Articles 32,","33 and 35(a) 38 of this Regulation."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1256","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Jens Geier, Eugen Freund, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Edouard Martin, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-311","location":[["Proposal for a regulation","Article 3 a (new)"]],"meps":[124826,124870,124739,96833,125018,124699,125041,125044,124947,124784],"meta":{"created":"2020-11-15T15:52:08"},"new":["Article 3 a","Just transition","The European Commission shall support","Member States that put in place a","national strategy for the progressive","reduction of installed coal-fired","generating and mining capacity through","all available means, including targeted","financial support to enable a \u201cjust","transition\u201d in regions affected by","structural change.","The Commission shall assist Member","States to address the social, skills and","industrial impacts of the clean energy","transition. The Commission shall work in","close partnership with the actors of coal","and carbon-intensive regions, provide","guidance, in particular for the access to","and use of available funds and","programmes, and encourage exchange of","good practices, including discussions on","industrial roadmaps and re-skilling needs,","through targeted platforms including","through the just transition initiative for","workers and communities established in","the Governance Regulation."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"311","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Massimiliano Salini","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-914","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 5 \u2013 introductory part"]],"meps":[125670],"meta":{"created":"2019-07-03T06:30:43"},"new":["5. By [OP: six months after entry into","force of this Regulation], the ENTSO for","Electricity shall publish and submit to the","Agency a draft methodology for","calculating:"],"old":["5. By [OP: six months after entry into","force of this Regulation], the ENTSO for","Electricity shall submit to the Agency a","draft methodology for calculating:"],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"914","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Kathleen Van Brempt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1433","location":[[" Proposal for a regulation","Article 51 \u2013 paragraph 2 \u2013 point c"]],"meps":[5729],"meta":{"created":"2019-07-03T06:30:36"},"new":["deleted"],"old":["(c) work on identifying best practices","on the areas identified in paragraph 1 and","for the introduction of energy efficiency","improvements in the distribution network;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1433","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-630","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 6 \u2013 introductory part"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:41"},"new":["6. Where non-market based","curtailment or redispatching is used, it shall","be subject to financial compensation by the","system operator requesting the curtailment","or redispatching to the owner of the","curtailed or redispatched generation,","energy storage or demand facility.","Financial compensation shall at least be","equal to the highest of the following","elements:"],"old":["6. Where non-market based","curtailment or redispatching is used, it shall","be subject to financial compensation by the","system operator requesting the curtailment","or redispatching to the owner of the","curtailed or redispatched generation or","demand facility. Financial compensation","shall at least be equal to the highest of the","following elements:"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"630","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Pilar del Castillo Vera, Pilar Ayuso, Francesc Gamb\u00fas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-312","location":[[" Proposal for a regulation","Article 3 a (new)"]],"meps":[28390,4319,125006],"meta":{"created":"2020-11-15T15:52:08"},"new":["Article 3 a","Real time control of renewable energy","sources","From 1 January 2020, all power plants","using renewable energy sources with an","installed electricity capacity of more than","5 MW shall be able to receive in real time","from the relevant transmission system","operator a maximum set point for their","energy production and shall follow it in","accordance with Article 40(1)j a (new) of","[recast of Directive 2009/72/EC as","proposed by COM(2016) 864]."],"old":[""],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"312","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Kate\u0159ina Kone\u010dn\u00e1, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1257","location":[["Proposal for a regulation","Article 38"]],"meps":[23699,96713],"meta":{"created":"2019-07-03T06:30:42"},"new":["Article 38 deleted","Adoption of decisions and","recommendations"],"old":["","1. Regional operational centres shall","develop a procedure for the adoption of","decisions and recommendations.","2. Regional operational centres shall","adopt binding decisions addressed to the","transmission system operators in respect","of the functions referred to in points (a),","(b), (g) and (q) of Article 34(1).","Transmission system operators shall","implement the binding decisions issued by","the regional operational centres except in","cases when the safety of the system will be","negatively affected.","3. Regional operational centres shall","adopt recommendations addressed to the","transmission system operators for the","functions referred to in points (c) to (f)","and (h) to (p) of Article 34(1).","4. The regulatory authorities of a system","operation region may jointly decide to","grant binding decision-making powers to","the regional operational centre for one or","more of the functions provided for in","points (c) to (f) and (h) to (l) of Article","34(1)."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1257","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1434","location":[[" Proposal for a regulation","Article 51 \u2013 paragraph 2 \u2013 point e"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:36"},"new":["deleted"],"old":["(e) operate in full compliance with","competition rules."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1434","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1258","justification":" It is our position that Articles 31 to 44 and all reference regarding ROCs in the Clean Energy\n Package to All Europeans shall be deleted without any substitution.It is of particular concern\n that establishment of ROCs violates subsidiarity and proportionality principle according to\n art. 194 SFEU","location":[["Proposal for a regulation","Article 38"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:42"},"new":["Article 38 deleted","Adoption of decisions and","recommendations"],"old":["","1. Regional operational centres shall","develop a procedure for the adoption of","decisions and recommendations.","2. Regional operational centres shall","adopt binding decisions addressed to the","transmission system operators in respect","of the functions referred to in points (a),","(b), (g) and (q) of Article 34(1).","Transmission system operators shall","implement the binding decisions issued by","the regional operational centres except in","cases when the safety of the system will be","negatively affected.","3. Regional operational centres shall","adopt recommendations addressed to the","transmission system operators for the","functions referred to in points (c) to (f)","and (h) to (p) of Article 34(1).","4. The regulatory authorities of a system","operation region may jointly decide to","grant binding decision-making powers to","the regional operational centre for one or","more of the functions provided for in","points (c) to (f) and (h) to (l) of Article","34(1)."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1258","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Pervenche Ber\u00e8s, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1435","justification":"The Community-wide ten years development plan has an impact on electricity distribution: it\nis therefore normal that the future entity bringing together electricity distributors should be\nable to cooperate with ENTSO-E.","location":[["Proposal for a regulation","Article 51 \u2013 paragraph 2 \u2013 point e a (new)"]],"meps":[1985,124947],"meta":{"created":"2019-07-03T06:30:37"},"new":["(e a) Cooperate with ENTSO for","electricity in the elaboration of the non-","binding community-wide ten-year network","development plan."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1435","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-313","justification":"All market participants must have full and non-discriminatory access to the balancing market.\nOnly when this is the case, should market participants be financially responsible for\nimbalances they cause in the system. Until such arrangements are in place, balancing\nresponsibilities should not be mandatory for all actors, in particular smaller market\nparticipants.","location":[["Proposal for a regulation","Article 4 \u2013 paragraph 1"]],"meps":[124813,124796],"meta":{"created":"2020-11-15T15:52:08"},"new":["1. All market participants shall aim","for system balance and shall be financially","responsible for imbalances they cause in","the system. Balancing responsibility shall","be preconditioned on the ability of all","market participants to have full access to","the balancing market, be it individually or","through an aggregator, in line with","paragraph 1 of Article 5. No later than","one year after this Regulation enters into","force, the Commission shall assess the","level of market access in the balancing","market. After a positive assessment for the","Member State concerned, each market","participant shall either be balance","responsible parties or delegate their","responsibility to a balance responsible","party of their choice"],"old":["1. All market participants shall aim","for system balance and shall be financially","responsible for imbalances they cause in","the system. They shall either be balance","responsible parties or delegate their","responsibility to a balance responsible","party of their choice."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"313","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Adam Gierek, Krystyna \u0141ybacka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-915","justification":" The purpose of the amendment is to enable Member States to take account of their own\n specific circumstances and avoid discrimination between Member States.","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 5 \u2013 point a Regulation (EC) No 714/2009 of the European Parliament and of the Council"]],"meps":[28379,124883],"meta":{"created":"2019-07-03T06:30:43"},"new":["(a) the value of lost load. The","methodology for calculating the value of","lost load shall allow Member States to","take account of local economic","conditions;"],"old":["(a) the value of lost load;"],"orig_lang":"pl","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"915","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-631","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 6 \u2013 introductory part"]],"meps":[90110],"meta":{"created":"2019-07-03T06:30:42"},"new":["6. Where non-market based","curtailment or redispatching is used, it shall","be subject to financial compensation by the","system operator requesting the curtailment","or redispatching to the owner of the","curtailed or redispatched generation,","energy storage or demand facility.","Financial compensation shall at least be","equal to the highest of the following","elements:"],"old":["6. Where non-market based","curtailment or redispatching is used, it shall","be subject to financial compensation by the","system operator requesting the curtailment","or redispatching to the owner of the","curtailed or redispatched generation or","demand facility. Financial compensation","shall at least be equal to the highest of the","following elements:"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"631","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Patrizia Toia, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1436","location":[["Proposal for a regulation","Article 51 a (new)"]],"meps":[124826,124870,124739,124735,28340,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:37"},"new":["Article 51 a","Adoption of decisions","The EU DSO entity shall adopt decisions","with regard to their tasks pursuant to","Article 51 by consensus."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1436","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-314","justification":" The requirement for balancing responsibility must be conditional on the possibility of market\n participants to offset imbalances.","location":[[" Proposal for a regulation","Article 4 \u2013 paragraph 1"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["1. All market participants shall aim","for system balance and shall be financially","responsible for imbalances they cause in","the system. They shall either be balance","responsible parties or delegate their","responsibility to a balance responsible","party of their choice. However, generating","installations using renewable energy","sources shall be responsible for","imbalances they cause in the system only","if a liquid intraday market exists and","barriers to their participation in balancing","markets are removed."],"old":["1. All market participants shall aim","for system balance and shall be financially","responsible for imbalances they cause in","the system. They shall either be balance","responsible parties or delegate their","responsibility to a balance responsible","party of their choice."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"314","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1259","location":[[" Proposal for a regulation","Article 38 \u2013 paragraph 1"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:42"},"new":["1. The transmission system operators","of a system operation region shall develop","a procedure for the adoption and revision","of recommendations put forward by","regional coordination centres in","accordance with the criteria set out in","paragraphs 2 and 3."],"old":["1. Regional operational centres shall","develop a procedure for the adoption of","decisions and recommendations."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1259","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1437","location":[[" Proposal for a regulation","Article 52"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:37"},"new":["Article 52 deleted","Consultations in the network code","development process"],"old":["1. While preparing possible network codes","pursuant to Article 55, the EU DSO entity","shall conduct an extensive consultation","process, at an early stage and in an open","and transparent manner, involving all","relevant stakeholders, and, in particular,","the organisations representing all","stakeholders, in accordance with the rules","of procedure referred to in Article 50.","That consultation shall also involve","national regulatory authorities and other","national authorities, supply and","generation undertakings, system users","including customers, distribution system","operators, including relevant industry","associations, technical bodies and","stakeholder platforms. It shall aim at","identifying the views and proposals of all","relevant parties during the decision-","making process.","2. All documents and minutes of meetings","related to the consultations referred to in","paragraph 1 shall be made public.","3. The EU DSO entity shall take into","consideration the views provided during","the consultations. Before adopting","proposals for network codes referred to in","Article 55 the EU DSO entity shall","indicate how the observations received","during the consultation have been taken","into consideration. It shall provide","reasons where observations have not been","taken into account."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1437","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-315","justification":"The assumption of balancing responsibility by all market actors must be conditioned on the\nability of all market actors to access the balancing market. Otherwise, imposing such\nresponsibility would be discriminatory, particularly against smaller actors that generate\nelectricity from renewable sources. It should also be clarified that this responsibility may be\nassumed personally, or through a third party intermediary.","location":[[" Proposal for a regulation","Article 4 \u2013 paragraph 1"]],"meps":[96852],"meta":{"created":"2020-11-15T15:52:08"},"new":["1. All market participants shall aim","for system balance and shall be financially","responsible for imbalances they cause in","the system.","Balancing responsibility shall be coupled","with full access to the balancing market,","be it individually or through aggregation","in line with paragraph 1 of Article 5. They","may either be balance responsible parties","or delegate their responsibility to a balance","responsible party of their choice."],"old":["1. All market participants shall aim","for system balance and shall be financially","responsible for imbalances they cause in","the system. They shall either be balance","responsible parties or delegate their","responsibility to a balance responsible","party of their choice.",""],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"315","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Cristian-Silviu Bu\u015foi","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-916","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 5 \u2013 point a"]],"meps":[38420],"meta":{"created":"2019-07-03T06:30:43"},"new":["(a) the value of lost load. The","methodology for calculating the value of","lost load shall enable Member States to","take into account local economic","conditions;"],"old":["(a) the value of lost load;"],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"916","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Fulvio Martusciello","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-316","location":[["Proposal for a regulation","Article 4 \u2013 paragraph 1"]],"meps":[124828],"meta":{"created":"2020-11-15T15:52:08"},"new":["1. All market participants shall aim","for system balance and shall be financially","responsible for imbalances they cause in","the system. They shall either be balance","responsible parties or delegate their","responsibility to a balance responsible","party of their choice. Balancing","responsibilities for RES generators should","be made conditional to the existence of","fair market rules."],"old":["1. All market participants shall aim","for system balance and shall be financially","responsible for imbalances they cause in","the system. They shall either be balance","responsible parties or delegate their","responsibility to a balance responsible","party of their choice."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"316","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-632","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 6 \u2013 introductory part"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:42"},"new":["6. Where non-market based","curtailment or redispatching is used, it shall","be subject to payment by the system","operator requesting the curtailment or","redispatching to the owner of the curtailed","or redispatched generation or demand","facility. Payment shall at least be equal to","the highest of the following elements"],"old":["6. Where non-market based","curtailment or redispatching is used, it shall","be subject to financial compensation by","the system operator requesting the","curtailment or redispatching to the owner","of the curtailed or redispatched generation","or demand facility. Financial","compensation shall at least be equal to the","highest of the following elements:"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"632","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1438","location":[["Proposal for a regulation","Article 52"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:37"},"new":["Article 52 deleted","development process"],"old":["Consultations in the network code","1. While preparing possible network codes","pursuant to Article 55, the EU DSO entity","shall conduct an extensive consultation","process, at an early stage and in an open","and transparent manner, involving all","relevant stakeholders, and, in particular,","the organisations representing all","stakeholders, in accordance with the rules","of procedure referred to in Article 50.","That consultation shall also involve","national regulatory authorities and other","national authorities, supply and","generation undertakings, system users","including customers, distribution system","operators, including relevant industry","associations, technical bodies and","stakeholder platforms. It shall aim at","identifying the views and proposals of all","relevant parties during the decision-","making process.","2. All documents and minutes of meetings","related to the consultations referred to in","paragraph 1 shall be made public.","3. The EU DSO entity shall take into","consideration the views provided during","the consultations. Before adopting","proposals for network codes referred to in","Article 55 the EU DSO entity shall","indicate how the observations received","during the consultation have been taken","into consideration. It shall provide","reasons where observations have not been","taken into account."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1438","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Kaja Kallas, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar, Carolina Punset, Gerben-Jan Gerbrandy","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1260","location":[["Proposal for a regulation","Article 38 \u2013 paragraph 1"]],"meps":[124697,124989,124872,125026,90110,96940],"meta":{"created":"2019-07-03T06:30:42"},"new":["1. Regional operational centres shall","develop a procedure for the adoption of","decisions and recommendations, that","ensures geographically balanced","representation and equitable treatment","between members of the Regional","operational centre."],"old":["1. Regional operational centres shall","develop a procedure for the adoption of","decisions and recommendations."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1260","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-317","location":[["Proposal for a regulation","Article 4 \u2013 paragraph 1"]],"meps":[125024,183793,96993],"meta":{"created":"2020-11-15T15:52:08"},"new":["1. All market participants shall aim","for system balance and shall be financially","responsible for imbalances they cause in","the system. They shall either be balance","responsible parties or delegate their","responsibility to a balance responsible","party of their choice. In addition,","principles set out in point (i) of Article","3(1) shall apply to balancing","responsibility."],"old":["1. All market participants shall aim","for system balance and shall be financially","responsible for imbalances they cause in","the system. They shall either be balance","responsible parties or delegate their","","responsibility to a balance responsible","party of their choice."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"317","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1439","justification":"The proposal to create a EU DSO entity should be scrapped to eliminate the risks of conflicts\nof interests. This amendment promotes consistency with other amendments.","location":[[" Proposal for a regulation","Article 52"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:37"},"new":["Article 52 deleted","Consultations in the network code","development process"],"old":["1. While preparing possible network codes","pursuant to Article 55, the EU DSO entity","shall conduct an extensive consultation","process, at an early stage and in an open","and transparent manner, involving all","relevant stakeholders, and, in particular,","the organisations representing all","stakeholders, in accordance with the rules","of procedure referred to in Article 50.","That consultation shall also involve","national regulatory authorities and other","national authorities, supply and","generation undertakings, system users","including customers, distribution system","operators, including relevant industry","associations, technical bodies and","stakeholder platforms. It shall aim at","identifying the views and proposals of all","relevant parties during the decision-","making process.","2. All documents and minutes of meetings","related to the consultations referred to in","paragraph 1 shall be made public.","3. The EU DSO entity shall take into","consideration the views provided during","the consultations. Before adopting","proposals for network codes referred to in","Article 55 the EU DSO entity shall","indicate how the observations received","during the consultation have been taken","into consideration. It shall provide","reasons where observations have not been","","","taken into account."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1439","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-633","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 6 \u2013 point a"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:42"},"new":["deleted"],"old":["(a) additional operating cost caused","by the curtailment or redispatching, such","as additional fuel costs in case of upward","redispatching, or backup heat provision in","case of downward redispatching or","curtailment of generating installations","using high-efficiency cogeneration;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"633","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Rolandas Paksas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-917","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 5 \u2013 point a"]],"meps":[96694],"meta":{"created":"2019-07-03T06:30:43"},"new":["(a) the value of lost load. The","methodology for calculating the value of","lost load shall enable Member States to","take into account local economic","conditions;"],"old":["(a) the value of lost load;"],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"917","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-318","location":[[" Proposal for a regulation","Article 4 \u2013 paragraph 1"]],"meps":[2025],"meta":{"created":"2020-11-15T15:52:08"},"new":["1. All market participants shall aim","for system balance and shall be financially","responsible for imbalances they cause in","the system."],"old":["1. All market participants shall aim","for system balance and shall be financially","responsible for imbalances they cause in","the system. They shall either be balance","responsible parties or delegate their","responsibility to a balance responsible","party of their choice."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"318","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1261","location":[["Proposal for a regulation","Article 38 \u2013 paragraph 1"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:42"},"new":["1. Transmission system operators of","the capacity calculation region shall","establish a procedure for the adoption of","recommendations by regional security","coordinators."],"old":["1. Regional operational centres shall","develop a procedure for the adoption of","decisions and recommendations."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1261","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Eva Kaili","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-319","location":[[" Proposal for a regulation","Article 4 \u2013 paragraph 1"]],"meps":[125109],"meta":{"created":"2020-11-15T15:52:08"},"new":["1. All markets participants shall aim","for system balance and shall be financially","responsible for imbalances they cause in","the system, unless no liquid intraday","market and barriers to balancing markets","participation exist. They shall either be","balance responsible parties or delegate","their responsibility to a balance responsible","party of their choice."],"old":["1. All market participants shall aim","for system balance and shall be financially","responsible for imbalances they cause in","the system. They shall either be balance","responsible parties or delegate their","responsibility to a balance responsible","party of their choice."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"319","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Jerzy Buzek, Janusz Lewandowski, Marian-Jean Marinescu","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-918","justification":"The proposed amendments aim to mitigate those economic differences between Member\nStates and to avoid discrimination against the customers of any Member State.","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 5 \u2013 point a"]],"meps":[23781,33982],"meta":{"created":"2019-07-03T06:30:43"},"new":["(a) the value of lost load. The","methodology for calculating the value of","lost load shall enable Member States to","take into account local economic","conditions;"],"old":["(a) the value of lost load;"],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"918","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1440","justification":"The EU DSO should have good oversight of its activities, and should consult on all proposals,\nnot only those referring to network code development.","location":[["Proposal for a regulation","Article 52 \u2013 title"]],"meps":[124699],"meta":{"created":"2019-07-03T06:30:37"},"new":["EU DSO Entity Consultations"],"old":["Consultations in the network code","development process"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1440","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-634","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 6 \u2013 point a"]],"meps":[124891,96713],"meta":{"created":"2019-07-03T06:30:42"},"new":["deleted"],"old":["(a) additional operating cost caused","by the curtailment or redispatching, such","as additional fuel costs in case of upward","redispatching, or backup heat provision in","case of downward redispatching or","curtailment of generating installations","using high-efficiency cogeneration;"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"634","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-320","justification":"General rules of the proposed Regulation (art. 3) correctly enhance equal and technologically\nneutral approach while stating that exceptions from these rules (dispatch, balancing\nresponsibility) distort the market and are directly in conflict with the efficiency target.\nUnfortunately the Proposal further introduces a list of exceptions for some technologies\n(mainly small RES installations).In this regard such exceptions must be carefully assessed\nand reduced. It is not clear which entity will carry balancing responsibility and incurred costs\nif exceptions are applied as mentioned in Art. 4 para 2, letter (b) and para 3.We propose to\nremove current exception.","location":[["Proposal for a regulation","Article 4 \u2013 paragraph 1"]],"meps":[124706],"meta":{"created":"2020-11-15T15:52:08"},"new":["1. All market participants shall aim","for system balance and shall be financially","responsible for imbalances they cause in","the system. They shall either be balance","responsible parties or delegate their","responsibility to a balance responsible","party of their choice. From 1 January","2025, no exemption to balance","responsibility shall be allowed."],"old":["1. All market participants shall aim","for system balance and shall be financially","responsible for imbalances they cause in","the system. They shall either be balance","responsible parties or delegate their","responsibility to a balance responsible","party of their choice."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"320","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Kathleen Van Brempt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1262","location":[[" Proposal for a regulation","Article 38 \u2013 paragraph 1"]],"meps":[5729],"meta":{"created":"2019-07-03T06:30:42"},"new":["1. Regional operational centres,","together with the Commission and the","Agency, shall develop a procedure for the","adoption of decisions and","recommendations."],"old":["1. Regional operational centres shall","develop a procedure for the adoption of","decisions and recommendations."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1262","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Pilar del Castillo Vera, Pilar Ayuso, Francesc Gamb\u00fas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-919","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 5 \u2013 point a"]],"meps":[28390,4319,125006],"meta":{"created":"2019-07-03T06:30:43"},"new":["(a) the value of lost load, taking into","account the level of interconnection of","each Member State;"],"old":["(a) the value of lost load;"],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"919","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Eugen Freund, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1441","location":[["Proposal for a regulation","Article 52 \u2013 paragraph 1"]],"meps":[124826,124870,124739,124735,125018,124699,125041,125044,124784],"meta":{"created":"2019-07-03T06:30:37"},"new":["1. While preparing new network","codes for technical details of existing","Union acts that set the political","framework pursuant to Article 55,the EU","DSO entity shall conduct an extensive","consultation process, at an early stage and","in an open and transparent manner,","involving all relevant stakeholders, and, in","particular, the organizations representing","all stakeholders, in accordance with the","rules of procedure referred to in Article 50.","That consultation shall also involve","national regulatory authorities and other","national authorities, supply and generation","undertakings, system users including","customers, distribution system operators,","including relevant industry associations,","technical bodies and stakeholder platforms.","It shall aim at identifying the views and","proposals of all relevant parties during the","decision-making process."],"old":["1. While preparing possible network","codes pursuant to Article 55, the EU DSO","entity shall conduct an extensive","consultation process, at an early stage and","in an open and transparent manner,","involving all relevant stakeholders, and, in","particular, the organisations representing","all stakeholders, in accordance with the","rules of procedure referred to in Article 50.","That consultation shall also involve","","national regulatory authorities and other","national authorities, supply and generation","undertakings, system users including","customers, distribution system operators,","including relevant industry associations,","technical bodies and stakeholder platforms.","It shall aim at identifying the views and","proposals of all relevant parties during the","decision-making process."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1441","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-321","location":[["Proposal for a regulation","Article 4 \u2013 paragraph 1"]],"meps":[96713],"meta":{"created":"2020-11-15T15:52:08"},"new":["1. All market participants shall aim","for system balance and shall be financially","responsible for imbalances they cause in","the system. They shall either be balance","responsible parties or delegate their","responsibility to a balance responsible","party of their choice. From 1 January","2025, no exemption to balance","responsibility shall be allowed."],"old":["1. All market participants shall aim","for system balance and shall be financially","responsible for imbalances they cause in","the system. They shall either be balance","responsible parties or delegate their","responsibility to a balance responsible","","party of their choice."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"321","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-635","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 6 \u2013 point b"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:42"},"new":["deleted"],"old":["(b) 90 % of the net revenues from the","sale of electricity on the day-ahead market","that the generating or demand facility","","would have generated without the","curtailment or redispatching request.","Where financial support is granted to","generating or demand facilities based on","the electricity volume generated or","consumed, lost financial support shall be","deemed part of the net revenues."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"635","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-322","justification":" General rules of the proposed Regulation (art. 3) correctly enhance equal and technologically\n neutral approach while stating that exceptions from these rules (dispatch, balancing\n responsibility) distort the market and are directly in conflict with the efficiency target.\n Unfortunately the Proposal further introduces a list of exceptions for some technologies\n (mainly small RES installations).In this regard such exceptions must be carefully assessed\n and reduced. It is not clear which entity will carry balancing responsibility and incurred costs\n if exceptions are applied as mentioned in Art. 4 para 2, letter (b) and para 3.We propose to\n remove current exception.","location":[[" Proposal for a regulation","Article 4 \u2013 paragraph 1"]],"meps":[28331],"meta":{"created":"2020-11-15T15:52:08"},"new":["1. All market participants shall aim","for system balance and shall be financially","responsible for imbalances they cause in","the system. They shall either be balance","responsible parties or delegate their","responsibility to a balance responsible","party of their choice. From 1 January","2025, no exemption to balance","responsibility shall be allowed."],"old":["1. All market participants shall aim","for system balance and shall be financially","responsible for imbalances they cause in","the system. They shall either be balance","responsible parties or delegate their","responsibility to a balance responsible","party of their choice."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"322","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1442","justification":" ACER should be assigned an oversight role for the texts drafted by the EU DSO entity.","location":[[" Proposal for a regulation","Article 52 \u2013 paragraph 1 a (new)"]],"meps":[124699],"meta":{"created":"2019-07-03T06:30:37"},"new":["1 a. While preparing the proposals","pursuant to the tasks referred to in Article","51, the EU DSO entity shall submit to the","Agency the draft texts of the proposals.","Within two months of receipt, the Agency","shall provide an opinion to the EU DSO","on the draft texts and proposed","amendments. If the opinion is positive, the","EU DSO can adopt the texts. If the","opinion is negative, the EU DSO should","redraft the texts. In case of significant","changes, the consultation set in","paragraphs 1, 2 and 3 shall be repeated."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1442","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Patrizia Toia","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-920","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 5 \u2013 point c"]],"meps":[28340],"meta":{"created":"2019-07-03T06:30:43"},"new":["(c) the reliability standard expressed as","\"expected energy not served\" and the \"loss","of load expectation\". Member States shall","set the target value for reliability standard","in compliance with the EU adequacy","methodology developed by Entso-E."],"old":["(c) the reliability standard expressed as","\"expected energy not served\" and the \"loss","of load expectation\"."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"920","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Martina Werner, Carlos Zorrinho, Miapetra Kumpula-Natri, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1263","location":[[" Proposal for a regulation","Article 38 \u2013 paragraph 1"]],"meps":[124826,124739,124735,124947],"meta":{"created":"2019-07-03T06:30:42"},"new":["1. The transmission system operators","of each regional coordination centres shall","develop a procedure for the adoption of","decisions and recommendations."],"old":["1. Regional operational centres shall","develop a procedure for the adoption of","decisions and recommendations."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1263","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1443","justification":"Consultation obligations should not be limited to the development of network codes but\nshould also apply to the work planning processes and the development of network codes, in\nparticular to ensure that consumer delivery is designed in from the outset and that\ninvestments offer the greatest value for consumers. The process should facilitate input from\nnon-technical experts that can provide insight on the functioning of the market place.","location":[["Proposal for a regulation","Article 52 \u2013 paragraph 3"]],"meps":[124699],"meta":{"created":"2019-07-03T06:30:37"},"new":["3. The EU DSO entity shall take into","consideration the views provided during","the consultations. Before adopting","proposals for network codes referred to in","Article 55 or proposals pursuant to the","tasks referred to in Article 51, the EU","DSO entity shall indicate in an accessible","publication how the observations received","during the consultation have been taken","into consideration. In the same","publication, it shall provide reasons where","observations have not been taken into","account."],"old":["3. The EU DSO entity shall take into","consideration the views provided during","the consultations. Before adopting","proposals for network codes referred to in","Article 55 the EU DSO entity shall indicate","how the observations received during the","consultation have been taken into","consideration. It shall provide reasons","where observations have not been taken","into account."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1443","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-636","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 6 \u2013 point b"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:42"},"new":["deleted"],"old":["(b) 90 % of the net revenues from the","sale of electricity on the day-ahead market","that the generating or demand facility","would have generated without the","curtailment or redispatching request.","Where financial support is granted to","generating or demand facilities based on","the electricity volume generated or","consumed, lost financial support shall be","deemed part of the net revenues."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"636","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Patrizia Toia","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-323","justification":"It is important to ensure that, with regard to balancing, energy aggregators, too, should have\nthe same rights and obligations as other participants.","location":[[" Proposal for a regulation","Article 4 \u2013 paragraph 1"]],"meps":[28340],"meta":{"created":"2020-11-15T15:52:08"},"new":["1. All market participants, including","energy aggregators, shall aim for system","balance and shall be financially responsible","for imbalances they cause in the system.","They shall either be balance responsible","parties or delegate their responsibility to a","balance responsible party of their choice."],"old":["1. All market participants shall aim","for system balance and shall be financially","","responsible for imbalances they cause in","the system. They shall either be balance","responsible parties or delegate their","responsibility to a balance responsible","party of their choice."],"orig_lang":"it","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"323","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1264","location":[[" Proposal for a regulation","Article 38 \u2013 paragraph 1"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:42"},"new":["1. With the support of the Agency,","regional operational centres shall develop a","procedure for the adoption of decisions and","recommendations."],"old":["1. Regional operational centres shall","develop a procedure for the adoption of","decisions and recommendations."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1264","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1444","justification":" Consultation obligations should not be limited to the development of network codes but\n should also apply to the work planning processes and the development of network codes, in\n particular to ensure that consumer delivery is designed in from the outset and that\n investments offer the greatest value for consumers. The process should facilitate input from\n non-technical experts that can provide insight on the functioning of the market place.","location":[["Proposal for a regulation","Article 52 \u2013 paragraph 3 a (new)"]],"meps":[124699],"meta":{"created":"2019-07-03T06:30:37"},"new":["3 a. An Independent Advisory Council","of stakeholder representatives, in","particular system users and final","customers, shall be established to provide","independent advice to the EU DSO Entity","on:","(a) work on identifying best practices for","the introduction of energy efficiency","improvements in the distribution network","asset out in Article 51 (2) (c)","(b) the annual work-programme and","annual report as set out in Article 51 (2)","(d), and","(c) preparation of possible network codes","pursuant to Article 56."],"old":[""],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1444","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Cristian-Silviu Bu\u015foi","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-921","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 5 \u2013 point c \u2013 point 1 (new)"]],"meps":[38420],"meta":{"created":"2019-07-03T06:30:43"},"new":["1) (d) technical conditions of","generation and grid operation, including","plant type parameters, maintenance","schedules, power plant, grid outages and","the derating factors for all generation","installations;"],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"921","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-637","justification":" In line with compensation requirements for conventional fuel suppliers in most markets, and\n following the principle of level playing field, full compensation should be granted in case of\n curtailment or redispatching.","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 6 \u2013 point b"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:42"},"new":["(b) 100 % of the net revenues from the","sale of electricity on the day-ahead market","that the generating or demand facility","would have generated without the","curtailment or redispatching request.","Where financial support is granted to","generating or demand facilities based on","the electricity volume generated or","consumed, lost financial support shall be","deemed part of the net revenues and","compensated at 100%. The full","compensation shall be settled within a","reasonable timeframe after the","curtailment has occurred. This paragraph","shall apply to installations using a high-","efficiency cogeneration process within the","limit of the share of renewable energy","sources in the fuel they use."],"old":["(b) 90 % of the net revenues from the","sale of electricity on the day-ahead market","that the generating or demand facility","would have generated without the","curtailment or redispatching request.","","Where financial support is granted to","generating or demand facilities based on","the electricity volume generated or","consumed, lost financial support shall be","deemed part of the net revenues."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"637","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-324","justification":" This amendment further details the provisions of paragraph 2 of this Article. In line with\n enabling active consumer participation, the provisions have to be adapted so that smaller\n players can effectively participate in the market.","location":[["Proposal for a regulation","Article 4 \u2013 paragraph 1 a (new)"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["1a. Member States shall establish","transparent, fair and competitive markets","for the delegation of balancing","responsibility from small-scale generating","installations using renewable energy","sources or high-efficiency cogeneration","referred to in paragraph 2.","Member States shall, in particular, ensure","that:","(a) the owner of a small scale generating","installation using renewable energy","sources or high-efficiency cogeneration","can choose among at least three service","providers for the delegation of its","balancing responsibility;","(b) the contracts offered by the service","providers to the owner of a small-scale","generating installation using renewable","energy sources or high-efficiency","cogeneration clearly indicate how the","pricing of the service will be cost-","reflective and proportionate.","By way of derogation from the first","subparagraph, Member States may","delegate to system operators the task of","acting as default balance responsible","party for small-scale generating","installations using renewable energy","sources or high-efficiency cogeneration.","If they do so, national regulatory","authorities shall permit system operators","to recover their costs in the form of","network tariffs."],"old":[""],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"324","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1265","location":[["Proposal for a regulation","Article 38 \u2013 paragraph 2"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:42"},"new":["deleted"],"old":["2. Regional operational centres shall","adopt binding decisions addressed to the","transmission system operators in respect","of the functions referred to in points (a),","(b), (g) and (q) of Article 34(1).","Transmission system operators shall","implement the binding decisions issued by","the regional operational centres except in","cases when the safety of the system will be","negatively affected."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1265","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1445","location":[[" Proposal for a regulation","Article 53 \u2013 paragraph 1"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:37"},"new":["1. Distribution system operators and","transmission system operators shall","cooperate in planning and operating their","networks. In particular, transmission and","distribution system operators shall","exchange all necessary information and","data regarding, the performance of","generation assets and demand side","response, the daily operation of their","networks and the long-term planning of","network investments, with the view to","ensure the cost-efficient development and","operation and the secure and reliable","operation of their networks."],"old":["1. Distribution system operators shall","cooperate with transmission system","operators in planning and operating their","networks. In particular, transmission and","distribution system operators shall","exchange all necessary information and","data regarding, the performance of","generation assets and demand side","response, the daily operation of their","networks and the long-term planning of","network investments, with the view to","ensure the cost-efficient, secure and","reliable development and operation of","their networks."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1445","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Adam Gierek, Krystyna \u0141ybacka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-922","justification":" ENTSO-E should draw up common methodology for calculating the impact of factors\n reducing the value for all generation units so that the European generation adequacy\n assessment can take into account the actual capacity of generation units to provide power to\n the system.","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 5 \u2013 point c a (new) Regulation (EC) No 714/2009 of the European Parliament and of the Council"]],"meps":[28379,124883],"meta":{"created":"2019-07-03T06:30:44"},"new":["(ca) The technical conditions of","generators and network operators, taking","into account the parameters specific to the","generation unit concerned, the","maintenance of timelines, the specific","characteristics of the generation units,","transmission shutdowns and factors","reducing the value for all generation","units;"],"orig_lang":"pl","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"922","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Eva Kaili","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-638","justification":"Full compensation should be ensured in case of unavoidable curtailment of renewables. This\nnotably ensures that clean generation facilities which are technically able to reduce their\nelectricity output at a lower cost than their competitors are not penalised for being flexible.\nThe full compensation for renewable power plants also counterbalances the fact that the\nconventional and polluting plants which will not be curtailed and keep running simply\nbecause of their cost structure and inflexible technical characteristics receive 100% of the\nmarket revenues during that period of time.\n\nSuch compensation regime is essential to reduce the risk of discrimination, to reduce volume-\nrelated investment risk and to ensure that the financing costs for investing in capital intensive\ntechnologies such as solar power and wind power are minimized.","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 6 \u2013 point b"]],"meps":[125109],"meta":{"created":"2019-07-03T06:30:42"},"new":["(b) 90 % of the net revenues from the","sale of electricity on the day-ahead market","that the generating or demand facility","would have generated without the","curtailment or redispatching request.","Where financial support is granted to","generating or demand facilities based on","the electricity volume generated or","consumed, lost financial support shall be","deemed part of the net revenues be deemed","part of the net revenues and compensated","at 100%. The full compensation should be","settled within a reasonable time after the","curtailment has occurred."],"old":["(b) 90 % of the net revenues from the","sale of electricity on the day-ahead market","that the generating or demand facility","would have generated without the","curtailment or redispatching request.","Where financial support is granted to","generating or demand facilities based on","the electricity volume generated or","consumed, lost financial support shall be","deemed part of the net revenues."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"638","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-325","location":[[" Proposal for a regulation","Article 4 \u2013 paragraph 2 \u2013 introductory part"]],"meps":[124706],"meta":{"created":"2020-11-15T15:52:08"},"new":["2. Member States may provide for","derogation from balance responsibility in","respect of installations benefitting from","support approved by the Commission","under Union State aid rules pursuant to","Articles 107 to 109 TFEU, and","commissioned prior to [OP: entry into","force], against appropriate compensation.","Member States shall, subject to Union","state aid rules, incentivize market","participants which are fully or partly","exempted from balancing responsibility to","accept full balancing responsibility","against appropriate compensation."],"old":["2. Member States may provide for","derogation from balance responsibility in","respect of:"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"325","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1266","location":[["Proposal for a regulation","Article 38 \u2013 paragraph 2"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:43"},"new":["deleted"],"old":["2. Regional operational centres shall","adopt binding decisions addressed to the","transmission system operators in respect","of the functions referred to in points (a),","(b), (g) and (q) of Article 34(1).","Transmission system operators shall","implement the binding decisions issued by","the regional operational centres except in","cases when the safety of the system will be","negatively affected."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1266","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1446","location":[["Proposal for a regulation","Article 53 \u2013 paragraph 2"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:37"},"new":["2. Transmission and distribution","system operators shall cooperate in order to","achieve coordinated access to resources","such as distributed generation, energy","storage or demand response that may","support particular needs of both the","distribution system and the transmission","system. They shall not sign contracts with","providers of these resources that prevent","them from selling their services in other","markets. Standardised products for","flexibility shall be defined per market","zone, with the cooperation of transmission","and distribution system operators ,","demand response service providers, other","system users and with regulatory","oversight pursuant to Article 32 of the","[Electricity Directive]."],"old":["2. Transmission and distribution","system operators shall cooperate in order to","achieve coordinated access to resources","such as distributed generation, energy","storage or demand response that may","support particular needs of both the","distribution system and the transmission","system."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1446","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-639","justification":"Full compensation should be ensured in case of unavoidable solar curtailment, so that clean\ngeneration facilities capable of reducing their electricity output at a lower cost than\ncompetitors are not penalised for being flexible. It also reflects that the plants which keep\nrunning because of their cost structure and inflexible technical characteristics will receive\n100% of the market revenues during that period. This is essential to reduce the risk of\ndiscrimination and volume-related investment and to ensure that financing costs for capital\nintensive technologies are minimized.","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 6 \u2013 point b"]],"meps":[90110],"meta":{"created":"2019-07-03T06:30:42"},"new":["(b) 100 % of the net revenues from the","sale of electricity on the day-ahead market","that the generating, energy storage or","demand facility would have generated","without the curtailment or redispatching","request. Where financial support is granted","to generating or demand facilities based on","the electricity volume generated, stored or","consumed, lost financial support shall be","deemed part of the net revenues. The full","compensation should be settled within","reasonable time after the curtailment has","occurred."],"old":["(b) 90 % of the net revenues from the","sale of electricity on the day-ahead market","that the generating or demand facility","would have generated without the","curtailment or redispatching request.","Where financial support is granted to","generating or demand facilities based on","the electricity volume generated or","consumed, lost financial support shall be","deemed part of the net revenues."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"639","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Jerzy Buzek, Janusz Lewandowski, Marian-Jean Marinescu","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-923","justification":"ENTSO-E should prepare a unified method of calculation of the derating factors for all\ngeneration installations, so that the ERAA may appropriately take into account the actual\ncontribution of all resources.","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 5 \u2013 point c a (new)"]],"meps":[23781,33982],"meta":{"created":"2019-07-03T06:30:44"},"new":["(ca) technical conditions of generation","and grid operation, including plant type","parameters, maintenance schedules,","power plant, grid outages and the derating","factors for all generation installations;"],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"923","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1447","location":[["Proposal for a regulation","Article 53 \u2013 paragraph 2"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:37"},"new":["2. Transmission and distribution","system operators shall cooperate in order to","achieve coordinated access to resources","such as distributed generation, energy","storage or demand response that may","support particular needs of both the","distribution system and the transmission","system. They must not sign contracts with","providers of these resources that prevent","them from selling their services in other","markets."],"old":["2. Transmission and distribution","system operators shall cooperate in order to","achieve coordinated access to resources","such as distributed generation, energy","storage or demand response that may","support particular needs of both the","distribution system and the transmission","system."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1447","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Massimiliano Salini, Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-326","location":[["Proposal for a regulation","Article 4 \u2013 paragraph 2 \u2013 introductory part"]],"meps":[125670,36392],"meta":{"created":"2020-11-15T15:52:08"},"new":["2. If markets are not fit for RES,","Member States may provide for derogation","from balance responsibility in respect of:"],"old":["2. Member States may provide for","derogation from balance responsibility in","respect of:"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"326","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1267","justification":" check final references","location":[["Proposal for a regulation","Article 38 \u2013 paragraph 2"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:43"},"new":["2. Regional operational centres shall","adopt binding decisions addressed to the","transmission system operators in respect of","the functions referred to in the relevant","points of Article 34(1)."],"old":["2. Regional operational centres shall","adopt binding decisions addressed to the","transmission system operators in respect of","the functions referred to in points (a), (b),","(g) and (q) of Article 34(1). Transmission","system operators shall implement the","binding decisions issued by the regional","operational centres except in cases when","the safety of the system will be negatively","affected."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1267","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-640","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 6 \u2013 point b"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:42"},"new":["(b) 90 % of the net revenues from the","sale of electricity on the day-ahead market","that the generating or demand facility","would have generated without the","curtailment or redispatching request.","Where financial support is granted to","generating or demand facilities based on","the electricity volume generated or","consumed, lost financial support shall be","deemed part of the net revenues and","compensated at 100%. The full","compensation should be settled within a","reasonable time after the curtailment has","occurred"],"old":["(b) 90 % of the net revenues from the","sale of electricity on the day-ahead market","that the generating or demand facility","would have generated without the","curtailment or redispatching request.","Where financial support is granted to","generating or demand facilities based on","the electricity volume generated or","consumed, lost financial support shall be","deemed part of the net revenues."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"640","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-924","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 6"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:44"},"new":["6. The proposals under paragraphs 2","and 5, the scenarios and assumptions on","which they are based and the results of the","European resource adequacy assessment","under paragraph 3 shall be subject to prior","consultation of all interested stakeholders","and approval by the Agency under the","procedure set out in Article 22."],"old":["6. The proposals under paragraphs 2","and 5 and the results of the European","resource adequacy assessment under","paragraph 3 shall be subject to prior","consultation and approval by the Agency","under the procedure set out in Article 22."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"924","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1448","location":[[" Proposal for a regulation","Article 53 \u2013 paragraph 2 a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:37"},"new":["2 a. The ENTSO for Electricity and the","EU DSO entity shall make a proposal on","the establishment of a formal cooperation","mechanism between distribution system","operators and transmission system","operators with the objective to maximizing","the contribution of all players (inter alia","market agents, cooperatives, energy","communities) to the achievement of the","EU climate and energy targets and","objectives. The proposal shall identify,","inter alia, the following elements:","- describe the functions of the cooperation","mechanism","- outline the respective responsibilities of","transmission and distribution system","operators in service management","- establish concrete coordination","mechanisms","- identify all necessary changes in existing","EU Network Codes","- analyse functional impacts on the","relationship with other local players"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1448","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Ashley Fox","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1268","location":[[" Proposal for a regulation","Article 38 \u2013 paragraph 2"]],"meps":[96957],"meta":{"created":"2019-07-03T06:30:43"},"new":["2. Regional operational centres shall","adopt decisions addressed to the","transmission system operators in respect of","the functions referred to in points (a), (b),","(g) and (q) of Article 34(1). If a","transmission system operator decides not","to implement any decision issued by a","regional operational centre, the","transmission system operator shall","provide a reasoned justification based on","system security and efficiency in writing","to the regional operational centre and","copied to the Commission, the Agency and","the ENTSO for Electricity."],"old":["2. Regional operational centres shall","adopt binding decisions addressed to the","transmission system operators in respect of","the functions referred to in points (a), (b),","(g) and (q) of Article 34(1). Transmission","system operators shall implement the","binding decisions issued by the regional","operational centres except in cases when","the safety of the system will be negatively","affected."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1268","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-327","justification":"In line with enabling active consumer participation, the provisions have to be adapted so that\nsmaller players can participate to the internal energy market.","location":[["Proposal for a regulation","Article 4 \u2013 paragraph 2 \u2013 introductory part"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["2. Member States shall provide for","derogation from balance responsibility in","respect of:"],"old":["2. Member States may provide for","derogation from balance responsibility in","respect of:"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"327","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-641","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 6 \u2013 point b"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:42"},"new":["(b) 90 % of the net revenues from the","sale of electricity on the day-ahead market","that the generating, energy storage or","demand facility would have generated","without the curtailment or redispatching","request. Where financial support is granted","to generating or demand facilities based on","the electricity volume generated, stored or","consumed, lost financial support shall be","deemed part of the net revenues."],"old":["(b) 90 % of the net revenues from the","sale of electricity on the day-ahead market","that the generating or demand facility","would have generated without the","curtailment or redispatching request.","Where financial support is granted to","generating or demand facilities based on","the electricity volume generated or","consumed, lost financial support shall be","deemed part of the net revenues."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"641","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-925","justification":" The European resource adequacy assessment must be fully transparent, including the\n underlying scenarios and assumptions, to be adequately scrutinised by stakeholders.","meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:44"},"new":["6. The proposals under paragraphs 2","and 5, the scenario and assumptions on","which they are based, and the results of the","European resource adequacy assessment","under paragraph 3 shall be subject to prior","consultation of all relevant stakeholders","and approval by the Agency under the","procedure set out in Article 22."],"old":["6. The proposals under paragraphs 2","and 5 and the results of the European","resource adequacy assessment under","paragraph 3 shall be subject to prior","consultation and approval by the Agency","under the procedure set out in Article 22."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"925","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1269","location":[["Proposal for a regulation","Article 38 \u2013 paragraph 2"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:43"},"new":["2. Regional coordination centres shall","have the competence to adopt decisions","addressed to the transmission system","operators in respect of the functions","referred to in points (a) and (b) of Article","34(1)."],"old":["2. Regional operational centres shall","adopt binding decisions addressed to the","transmission system operators in respect of","the functions referred to in points (a), (b),","(g) and (q) of Article 34(1). Transmission","system operators shall implement the","binding decisions issued by the regional","operational centres except in cases when","the safety of the system will be negatively","affected."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1269","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1449","location":[[" Proposal for a regulation","Article 54 \u2013 paragraph 1"]],"meps":[124826,124870,124739,124735,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:37"},"new":["1. The general political framework","for network codes and guidelines shall be","first adopted by Union law following the","ordinary legislative procedure. The","Commission may, subject to the","empowerments in Articles 55 and 57, adopt","delegated acts for the technical","specifications of network codes and","guidelines where the general political","framework has been adopted by Union","law. Such delegated acts can either be","adopted as network codes on the basis of","text proposals developed by the ENTSO","for Electricity, or, where so decided in the","priority list pursuant to Article 55","paragraph 2, by the EU DSO entity and the","Agency pursuant to the procedure in","Article 55 or as guidelines pursuant to the","procedure in Article 57."],"old":["1. The Commission may, subject to","the empowerments in Articles 55 and 57,","adopt delegated acts. Such delegated acts","can either be adopted as network codes on","the basis of text proposals developed by the","ENTSO for Electricity, or, where so","decided in the priority list pursuant to","Article 55 paragraph 2, by the EU DSO","entity and the Agency pursuant to the","procedure in Article 55 or as guidelines","pursuant to the procedure in Article 57."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1449","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-642","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 6 \u2013 point b"]],"meps":[124826,124870,124739,125041,125044],"meta":{"created":"2019-07-03T06:30:42"},"new":["(b) 90 % of the net revenues from the","sale of electricity on the day-ahead market","that the generating or demand facility","would have generated without the","curtailment or redispatching request.","Where financial support is granted to","generating or demand facilities based on","the electricity volume generated or","consumed, lost financial support shall be","compensated for 100%."],"old":["(b) 90 % of the net revenues from the","sale of electricity on the day-ahead market","that the generating or demand facility","would have generated without the","curtailment or redispatching request.","Where financial support is granted to","generating or demand facilities based on","the electricity volume generated or","consumed, lost financial support shall be","deemed part of the net revenues."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"642","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1270","location":[["Proposal for a regulation","Article 38 \u2013 paragraph 2"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:43"},"new":["2. Regional coordination centres shall","adopt recommendations addressed to the","transmission system operators in respect of","the functions referred to in Article 34(1).","Transmission system operators shall do","their utmost to follow those","recommendations."],"old":["2. Regional operational centres shall","adopt binding decisions addressed to the","transmission system operators in respect of","the functions referred to in points (a), (b),","(g) and (q) of Article 34(1). Transmission","system operators shall implement the","binding decisions issued by the regional","operational centres except in cases when","the safety of the system will be negatively","affected."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1270","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Eva Kaili","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-328","location":[["Proposal for a regulation","Article 4 \u2013 paragraph 2 \u2013 introductory part"]],"meps":[125109],"meta":{"created":"2020-11-15T15:52:08"},"new":["2. Member States shall provide for","derogation from balance responsibility in","respect of:"],"old":["2. Member States may provide for","derogation from balance responsibility in","respect of:"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"328","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1450","location":[["Proposal for a regulation","Article 54 \u2013 paragraph 1"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:38"},"new":["1. The Commission may, subject to","the empowerments in Articles 55 and 57,","adopt delegated acts. Such delegated acts","can either be adopted as network codes on","the basis of text proposals developed by the","ENTSO for Electricity, pursuant to the","procedure in Article 55 or as guidelines","pursuant to the procedure in Article 57."],"old":["1. The Commission may, subject to","the empowerments in Articles 55 and 57,","adopt delegated acts. Such delegated acts","can either be adopted as network codes on","the basis of text proposals developed by the","ENTSO for Electricity, or, where so","decided in the priority list pursuant to","Article 55 paragraph 2, by the EU DSO","entity and the Agency pursuant to the","procedure in Article 55 or as guidelines","pursuant to the procedure in Article 57."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1450","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-926","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 6"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:44"},"new":["6. The proposals under paragraphs 2","and 5, the scenarios and assumptions on","which they are based, and the results of the","European resource adequacy assessment","under paragraph 3 shall be subject to prior","consultation of all relevant stakeholders","and approval by the Agency under the","procedure set out in Article 22."],"old":["6. The proposals under paragraphs 2","and 5 and the results of the European","resource adequacy assessment under","paragraph 3 shall be subject to prior","consultation and approval by the Agency","under the procedure set out in Article 22."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"926","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Martina Werner, Carlos Zorrinho, Miapetra Kumpula-Natri, Dan Nica, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1271","location":[["Proposal for a regulation","Article 38 \u2013 paragraph 2"]],"meps":[124826,124739,124735,124784,124947],"meta":{"created":"2019-07-03T06:30:43"},"new":["2. Regional coordination centres shall","adopt binding decisions addressed to the","transmission system operators only in","respect of the functions referred to in","points (a), (b) and (q) of Article 34(1).","Transmission system operators shall","implement the binding decisions issued by","the regional coordination centres except in","cases when the safety of the system will be","negatively affected. Transmission system","operators shall justify why the safety of","the system is negatively affected."],"old":["2. Regional operational centres shall","adopt binding decisions addressed to the","transmission system operators in respect of","the functions referred to in points (a), (b),","(g) and (q) of Article 34(1). Transmission","system operators shall implement the","binding decisions issued by the regional","operational centres except in cases when","the safety of the system will be negatively","affected."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1271","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-329","location":[[" Proposal for a regulation","Article 4 \u2013 paragraph 2 \u2013 point a"]],"meps":[124891,96713],"meta":{"created":"2020-11-15T15:52:08"},"new":["deleted"],"old":["(a) demonstration projects;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"329","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1451","location":[[" Proposal for a regulation","Article 54 \u2013 paragraph 1"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:38"},"new":["1. The Commission may, subject to","the empowerments in Articles 55 and 57,","adopt delegated acts. Such delegated acts","can either be adopted as network codes on","the basis of text proposals an opinion","developed by the ENTSO for Electricity,","or, where so decided in the priority list","pursuant to Article 55 paragraph 2, by the","EU DSO entity and a proposal developed","by the Agency pursuant to the procedure in","Article 55 or as guidelines pursuant to the","procedure in Article 57."],"old":["1. The Commission may, subject to","the empowerments in Articles 55 and 57,","adopt delegated acts. Such delegated acts","can either be adopted as network codes on","the basis of text proposals developed by the","ENTSO for Electricity, or, where so","decided in the priority list pursuant to","Article 55 paragraph 2, by the EU DSO","entity and the Agency pursuant to the","procedure in Article 55 or as guidelines","pursuant to the procedure in Article 57."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1451","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-643","justification":" In case of involuntary curtailment or redispatching, all associated costs shall be compensated\n to relevant providers. They shall not be held accountable for imbalance which was caused by\n other market players.","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 6 \u2013 point b"]],"meps":[124699],"meta":{"created":"2019-07-03T06:30:42"},"new":["(b) net revenues from the sale of","electricity on the day-ahead market that the","generating or demand facility would have","generated without the curtailment or","redispatching request. Where financial","support is granted to generating or demand","facilities based on the electricity volume","generated or consumed, lost financial","support shall be deemed part of the net","revenues."],"old":["(b) 90 % of the net revenues from the","sale of electricity on the day-ahead market","that the generating or demand facility","would have generated without the","curtailment or redispatching request.","Where financial support is granted to","generating or demand facilities based on","the electricity volume generated or","consumed, lost financial support shall be","deemed part of the net revenues."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"643","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Kathleen Van Brempt, Ivo Belet","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-927","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 6"]],"meps":[5729,28257],"meta":{"created":"2019-07-03T06:30:44"},"new":["6. The proposals under paragraphs 2","and 5, the scenarios and assumptions on","which they are based, and the results of the","European resource adequacy assessment","under paragraph 3 shall be subject to prior","consultation and approval by the Agency","under the procedure set out in Article 22."],"old":["6. The proposals under paragraphs 2","and 5 and the results of the European","resource adequacy assessment under","paragraph 3 shall be subject to prior","consultation and approval by the Agency","under the procedure set out in Article 22."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"927","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1272","justification":"The provisions and decision making procedures have to be laid out in detail as these new\nentities are created under Articles 30-44.","location":[[" Proposal for a regulation","Article 38 \u2013 paragraph 2 a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:43"},"new":["2 a. Transmission system operators","may not implement the binding decisions","issued by the regional operational centres","where the implementation of the decisions","would result in a violation of operational","security limits defined by each TSO in","accordance with Article 25 of Regulation","[The Commission Regulation establishing","a guideline on Electricity Transmission","System Operation].","When a transmission system operator","decides not to implement a decision for","the reason referred to in this paragraph, it","shall notify it to the regional operational","centre within the shortest delay possible,","together with a justification.The regional","operational centre shall assess the impact","of the deviation on the other transmission","system operators of the region and may","propose a different set of decisions.","Regional operational centres shall report","the instances where a transmission system","operator decides not to implement a","decision, together with the justification","provided, to the regulatory authorities of","the system operation region within the","following two days.","Regional operational centres may request","the Agency or one or more national","regulatory authorities of the geographical","area where they are established to assess","whether a justification invoked by a","transmission system operator pursuant to","paragraph 3 qualifies as a violation of","operational security limits"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1272","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1452","location":[[" Proposal for a regulation","Article 54 \u2013 paragraph 1"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:38"},"new":["1. The Commission may, subject to","the empowerments in Articles 55 and 57,","adopt implementing acts. Such","implementing acts can either be adopted as","network codes on the basis of text","proposals developed by the ENTSO for","Electricity, or, where so decided in the","priority list pursuant to Article 55","paragraph 2, by the EU DSO entity and the","Agency pursuant to the procedure in","Article 55 or as guidelines pursuant to the","procedure in Article 57."],"old":["1. The Commission may, subject to","the empowerments in Articles 55 and 57,","adopt delegated acts. Such delegated acts","can either be adopted as network codes on","the basis of text proposals developed by the","ENTSO for Electricity, or, where so","decided in the priority list pursuant to","Article 55 paragraph 2, by the EU DSO","entity and the Agency pursuant to the","procedure in Article 55 or as guidelines","pursuant to the procedure in Article 57."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1452","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Kaja Kallas, Pavel Teli\u010dka, Morten Helveg Petersen, Angelika Mlinar","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-330","location":[[" Proposal for a regulation","Article 4 \u2013 paragraph 2 \u2013 point a"]],"meps":[124697,124706,124872,125026],"meta":{"created":"2020-11-15T15:52:08"},"new":["deleted"],"old":["(a) demonstration projects;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"330","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Pilar del Castillo Vera, Pilar Ayuso, Francesc Gamb\u00fas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-928","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 6"]],"meps":[28390,4319,125006],"meta":{"created":"2019-07-03T06:30:44"},"new":["6. The proposals under paragraphs 2","and 5 shall be subject to prior consultation","and approval by the Agency under the","procedure set out in Article 22."],"old":["6. The proposals under paragraphs 2","and 5 and the results of the European","resource adequacy assessment under","paragraph 3 shall be subject to prior","consultation and approval by the Agency","under the procedure set out in Article 22."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"928","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-644","justification":" In case of involuntary curtailment or redispatching, all associated costs shall be compensated\n to relevant providers. They shall not be held accountable for imbalance which was caused by\n other market players.","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 6 \u2013 point b"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:42"},"new":["(b) net revenues from the sale of","electricity on the day-ahead market that the","generating or demand facility would have","generated without the curtailment or","redispatching request. Where financial","support is granted to generating or demand","facilities based on the electricity volume","generated or consumed, lost financial","support shall be deemed part of the net","revenues."],"old":["(b) 90 % of the net revenues from the","sale of electricity on the day-ahead market","that the generating or demand facility","would have generated without the","curtailment or redispatching request.","Where financial support is granted to","generating or demand facilities based on","the electricity volume generated or","consumed, lost financial support shall be","deemed part of the net revenues."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"644","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1273","location":[["Proposal for a regulation","Article 38 \u2013 paragraph 3"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:43"},"new":["3. Regional operational centres shall","adopt recommendations addressed to the","transmission system operators for the","functions listed in Article 34(1) which are","not referred to in paragraph 2 of this","Article. Every 6 months, regional","operational centres shall publish a","comprehensive report presenting all cases","where decisions and recommendations","where not applied, and detailing proposals","for improving the procedures."],"old":["3. Regional operational centres shall","adopt recommendations addressed to the","transmission system operators for the","functions referred to in points (c) to (f) and","(h) to (p) of Article 34(1)."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1273","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Patrizia Toia","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-929","justification":" The estimate and the proposal of the indicators as in par. 5 shall be set by Member States in\n compliance with the EU Adequacy methodology developed by Entso-E.","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 6"]],"meps":[28340],"meta":{"created":"2019-07-03T06:30:44"},"new":["6. The proposals under paragraphs 2","and 5 shall be subject to prior consultation","and approval by the Agency under the","procedure set out in Article 22."],"old":["6. The proposals under paragraphs 2","and 5 and the results of the European","resource adequacy assessment under","paragraph 3 shall be subject to prior","consultation and approval by the Agency","under the procedure set out in Article 22."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"929","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1453","justification":"It is necessary to evaluate extent and form of use of delegated acts in all cases proposed by\nthe Directive and reflected in the Regulation. From the proposal of the Directive it is not\nclear, what was the rationale behind use of implementing acts (e.g. data format in Article.24\nof the Directive) or in other cases use of delegated (Article 61 on ACER or Article 63 on\nnetwork codes).It is therefore not clear what \u201crule\u201d was used to set which form of act to use\nto specific topics.","location":[["Proposal for a regulation","Article 54 \u2013 paragraph 1"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:38"},"new":["1. The Commission may, subject to","the empowerments in Articles 55 and 57,","adopt implementing acts. Such","implementing acts can either be adopted as","network codes on the basis of text","proposals developed by the ENTSO for","Electricity, or, where so decided in the","priority list pursuant to Article 55","paragraph 2, by the EU DSO entity and the","Agency pursuant to the procedure in","Article 55 or as guidelines pursuant to the","procedure in Article 57."],"old":["1. The Commission may, subject to","the empowerments in Articles 55 and 57,","adopt delegated acts. Such delegated acts","can either be adopted as network codes on","the basis of text proposals developed by the","ENTSO for Electricity, or, where so","decided in the priority list pursuant to","Article 55 paragraph 2, by the EU DSO","entity and the Agency pursuant to the","procedure in Article 55 or as guidelines","pursuant to the procedure in Article 57."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1453","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1274","location":[[" Proposal for a regulation","Article 38 \u2013 paragraph 3"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:43"},"new":["3. Regional security coordinators","shall adopt recommendations addressed to","the transmission system operators with","regard to the services referred to in Article","34(1)."],"old":["3. Regional operational centres shall","adopt recommendations addressed to the","transmission system operators for the","functions referred to in points (c) to (f)","and (h) to (p) of Article 34(1)."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1274","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-331","location":[[" Proposal for a regulation","Article 4 \u2013 paragraph 2 \u2013 point a"]],"meps":[124826,124870,124739,124735,124699],"meta":{"created":"2020-11-15T15:52:08"},"new":["(a) demonstration projects for","innovative technologies with an installed","electricity capacity of less than 500 kW;"],"old":["(a) demonstration projects;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"331","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-645","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 6 \u2013 point b"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:42"},"new":["(b) net revenues from the sale of","electricity on the day-ahead market that the","generating or demand facility would have","generated without the curtailment or","redispatching request. Where financial","support is granted to generating or demand","facilities based on the electricity volume","generated or consumed, lost financial","support shall be deemed part of the net","revenues."],"old":["(b) 90 % of the net revenues from the","sale of electricity on the day-ahead market","that the generating or demand facility","would have generated without the","curtailment or redispatching request.","","Where financial support is granted to","generating or demand facilities based on","the electricity volume generated or","consumed, lost financial support shall be","deemed part of the net revenues."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"645","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Massimiliano Salini","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-930","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 6"]],"meps":[125670],"meta":{"created":"2019-07-03T06:30:44"},"new":["6. The methodology proposals under","paragraphs 2, 4 and 5 and the results of the","European resource adequacy assessment","under paragraph 3 shall be subject to prior","stakeholder consultation and approval by","the Agency under the procedure set out in","Article 22."],"old":["6. The proposals under paragraphs 2","and 5 and the results of the European","resource adequacy assessment under","paragraph 3 shall be subject to prior","consultation and approval by the Agency","under the procedure set out in Article 22."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"930","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1275","location":[[" Proposal for a regulation","Article 38 \u2013 paragraph 3"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:43"},"new":["3. Regional operational centres shall","adopt recommendations addressed to the","transmission system operators for the","functions referred to in points (c) to (q) of","Article 34(1)."],"old":["3. Regional operational centres shall","adopt recommendations addressed to the","transmission system operators for the","functions referred to in points (c) to (f) and","(h) to (p) of Article 34(1)."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1275","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1454","location":[["Proposal for a regulation","Article 54 \u2013 paragraph 1"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:38"},"new":["1. The Commission may, subject to","the empowerments in Articles 55 and 57,","adopt implementing acts. Such","implementing acts can either be adopted as","network codes on the basis of text","proposals developed by the ENTSO for","Electricity, or, where so decided in the","priority list pursuant to Article 55","paragraph 2, by the EU DSO entity and the","Agency pursuant to the procedure in","Article 55 or as guidelines pursuant to the","procedure in Article 57."],"old":["1. The Commission may, subject to","the empowerments in Articles 55 and 57,","adopt delegated acts. Such delegated acts","can either be adopted as network codes on","the basis of text proposals developed by the","ENTSO for Electricity, or, where so","","decided in the priority list pursuant to","Article 55 paragraph 2, by the EU DSO","entity and the Agency pursuant to the","procedure in Article 55 or as guidelines","pursuant to the procedure in Article 57."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1454","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-646","justification":"Reporting procedures should be streamline under the Governance regulation to reduce\nadministrative burden.","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 6 a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:43"},"new":["6 a. Member States shall ensure that","the information reported under paragraph","3 is reflected through the national","reporting process on the internal energy","market, as provided for in Article 21 of","the [Governance Regulation]."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"646","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Kaja Kallas, Pavel Teli\u010dka, Morten Helveg Petersen, Angelika Mlinar","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-332","location":[["Proposal for a regulation","Article 4 \u2013 paragraph 2 \u2013 point b"]],"meps":[124697,124706,124872,125026],"meta":{"created":"2020-11-15T15:52:08"},"new":["deleted"],"old":["(b) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 500 kW;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"332","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1276","location":[[" Proposal for a regulation","Article 38 \u2013 paragraph 4"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:43"},"new":["deleted"],"old":["4. The regulatory authorities of a","system operation region may jointly","decide to grant binding decision-making","powers to the regional operational centre","for one or more of the functions provided","for in points (c) to (f) and (h) to (l) of","Article 34(1)."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1276","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Flavio Zanonato","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-931","location":[[" Proposal for a regulation","Article 19 a (new)"]],"meps":[124800],"meta":{"created":"2019-07-03T06:30:44"},"new":["Article 19 a","Capacity mechanisms","1) To address residual concerns that","cannot be eliminated by the measures","pursuant to Article 18 (3), Member States","may introduce capacity mechanisms as a","last resort, subject to the provisions of this","Article and to Union State aid rules. The","amount of capacity committed in the","mechanism shall not go beyond what is","strictly necessary to address the identified","concern. The parameters determining the","amount of capacity procured in the","capacity mechanism shall be approved by","the national regulatory authority.","2) Capacity mechanisms shall not create","unnecessary market distortions or inhibit","cross-border trade. They shall be open to","all generation technologies, storage and","demand-side response.","3) Prior to introducing capacity","mechanisms under paragraph 2, Member","States shall conduct a comprehensive","study on their possible effects on the","neighbouring Member States by","consulting, at least, its electrically","connected neighbouring Member States","and the stakeholders of those Member","State.","4) Member States shall assess whether a","capacity mechanism in the form of","strategic reserve can address their","adequacy concerns identified in the","European resource adequacy assessment.","If this is the case, Member States shall","introduce a strategic reserve. Only where","this is not the case, Member States may","implement a capacity mechanism other","than a strategic reserve.","5) Member States shall not introduce","capacity mechanisms where:","(a) the European resource adequacy","assessment has not identified a resource","adequacy concern; or","(b) the detailed roadmap as referred to in","Article 18(3) has not received a positive","decision by the Commission as referred to","in Article 18(3b).","6) Where a Member State applies as","capacity mechanism, it shall review that","mechanism and provide that no new","contracts are concluded under that","mechanism where:","(a) the European resource adequacy","assessment has not identified a resource","adequacy concern; and/or","(b) the measures referred to in Article","18(3) have been sufficiently implemented","in accordance with Article 18(3e).","7) Capacity mechanisms shall be","temporary. They shall be approved by the","Commission for no longer than five years.","They shall be phased out or at least","phased down, based on the","implementation plan pursuant to Article","18(3).","8) With the exception of strategic reserves,","generation capacity emitting 450 gr","CO2/kWh or more shall not be committed","in capacity mechanisms after (at the date","of entry into force of this Regulation)."],"old":["","",""],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"931","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1455","justification":" The proposal to create a EU DSO entity should be scrapped to eliminate the risks of conflicts\n of interests. This amendment promotes consistency with other amendments.","location":[[" Proposal for a regulation","Article 54 \u2013 paragraph 1"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:38"},"new":["1. The Commission may, subject to","the empowerments in Articles 55 and 57,","adopt delegated acts. Such delegated acts","can either be adopted as network codes on","the basis of text proposals developed by the","ENTSO for Electricity, or, where so","decided in the priority list pursuant to","Article 55 paragraph 2, by the Agency","pursuant to the procedure in Article 55 or","as guidelines pursuant to the procedure in","Article 57."],"old":["1. The Commission may, subject to","the empowerments in Articles 55 and 57,","adopt delegated acts. Such delegated acts","can either be adopted as network codes on","the basis of text proposals developed by the","ENTSO for Electricity, or, where so","decided in the priority list pursuant to","Article 55 paragraph 2, by the EU DSO","entity and the Agency pursuant to the","procedure in Article 55 or as guidelines","pursuant to the procedure in Article 57."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1455","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1277","location":[["Proposal for a regulation","Article 38 \u2013 paragraph 4"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:44"},"new":["deleted"],"old":["4. The regulatory authorities of a","system operation region may jointly","decide to grant binding decision-making","powers to the regional operational centre","for one or more of the functions provided","for in points (c) to (f) and (h) to (l) of","Article 34(1)."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1277","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Carolina Punset, Gerben-Jan Gerbrandy","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-647","justification":" The evolution of curtailment ratio and practices is a key performance indicator of the energy\n transition. Hence it should be reported by the Member States under the Governance\n Regulation process.","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 6 a (new)"]],"meps":[90110,96940],"meta":{"created":"2019-07-03T06:30:43"},"new":["6 a. Member States shall ensure that","the information reported under paragraph","3 is reflected through the national","reporting process on the internal energy","market, as provided in the Governance","Regulation (art.21)."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"647","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-333","location":[["Proposal for a regulation","Article 4 \u2013 paragraph 2 \u2013 point b"]],"meps":[125024,183793,96993],"meta":{"created":"2020-11-15T15:52:08"},"new":["deleted"],"old":["(b) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 500 kW;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"333","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-932","location":[[" Proposal for a regulation","Article 19 a (new)"]],"meps":[124826,124870,124739,124735,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:44"},"new":["Article 19 a","Capacity mechanisms","1) To address residual concerns that","cannot be eliminated by the measures","pursuant to Article 18 (3), Member States","may introduce capacity mechanisms as a","last resort, subject to the provisions of this","Article and to Union State aid rules. The","amount of capacity committed in the","mechanism shall not go beyond what is","strictly necessary to address the identified","concern. The parameters determining the","amount of capacity procured in the","capacity mechanism shall be approved by","the national regulatory authority.","2) Capacity mechanisms shall not create","unnecessary market distortions or inhibit","cross-border trade. They shall be open to","all generation technologies, storage and","demand-side response","3) Prior to introducing capacity","mechanisms under paragraph 2, Member","State shall conduct a comprehensive study","on their possible effects on the","neighbouring Member States by","consulting, at least, its electrically","connected neighbouring Member States","and the stakeholders of those Member","States.","4) Member States shall assess whether a","capacity mechanism in the form of","strategic reserve can address their","adequacy concerns identified in the","European resource adequacy assessment.","If this is the case, Member States shall","introduce a strategic reserve. Only where","this is not the case, Member States may","implement a capacity mechanism other","than a strategic reserve.","5) Member States shall not introduce","capacity mechanisms where:","(a) the European resource adequacy","assessment has not identified a resource","adequacy concern; or","(b) the detailed roadmap as referred to in","Article 18(3) has not received a positive","decision by the Commission.","6) Where a Member State applies a","capacity mechanism, it shall review that","mechanism and provide that no new","contracts are concluded under that","mechanism where:","(a) the European resource adequacy","assessment has not identified a resource","adequacy concern; and/or","(b) the measures referred to in Article","18(3) have been sufficiently implemented.","7) Capacity mechanisms shall be","temporary. They shall be approved by the","Commission for no longer than five years.","They shall be phased out or at least","phased down, based on the","implementation plan pursuant to Article","18(3).","8) With the exception of strategic reserves,","generation capacity emitting 550 gr","CO2/kWh or more shall not be committed","in capacity mechanisms after [at the date","of entry into force of this Regulation]."],"old":["","","",""],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"932","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1456","location":[[" Proposal for a regulation","Article 54 \u2013 paragraph 2 \u2013 point \u2013a (new)"]],"meps":[124826,124870,124739,124735,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:38"},"new":["(-a) be solely of a technical nature"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1456","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1278","location":[["Proposal for a regulation","Article 38 \u2013 paragraph 4"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:44"},"new":["4. The regulatory authorities of a","system operation region may jointly decide","to grant binding decision-making powers to","the regional operational centre for one or","more of the functions provided for in","points (a) to (q) of Article 34(1). This","decision shall define precisely for such","functions the respective responsibilities of","regional coordination centres and of","transmission system operators, in","particular in cases when the safety of the","system could be negatively affected."],"old":["4. The regulatory authorities of a","system operation region may jointly decide","to grant binding decision-making powers to","the regional operational centre for one or","more of the functions provided for in","points (c) to (f) and (h) to (l) of Article","34(1)."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1278","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-648","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 6 a (new)"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:43"},"new":["6 a. Member States shall ensure that","the information reported under","paragraph3 is reflected through the","national reporting process on the internal","energy market, as provided in the","Governance Regulation (art.21)."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"648","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-334","location":[["Proposal for a regulation","Article 4 \u2013 paragraph 2 \u2013 point b"]],"meps":[124891,96713],"meta":{"created":"2020-11-15T15:52:08"},"new":["deleted"],"old":["(b) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 500 kW;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"334","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1279","location":[[" Proposal for a regulation","Article 38 \u2013 paragraph 4"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:44"},"new":["4. The regulatory authorities of a","system operation region may jointly decide","to grant binding decision-making powers to","the regional operational centre for one or","more of the functions listed in Article","34(1) and which are not referred to in","paragraph 2 of this Article."],"old":["4. The regulatory authorities of a","system operation region may jointly decide","to grant binding decision-making powers to","the regional operational centre for one or","more of the functions provided for in","points (c) to (f) and (h) to (l) of Article","34(1)."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1279","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1457","location":[["Proposal for a regulation","Article 54 \u2013 paragraph 2 \u2013 point a"]],"meps":[124826,124870,124739,124735,124699],"meta":{"created":"2019-07-03T06:30:38"},"new":["(a) ensure that they provide the","minimum degree of technical","harmonisation required to achieve the aims","of this Regulation;"],"old":["(a) ensure that they provide the","minimum degree of harmonisation required","to achieve the aims of this Regulation;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1457","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-933","justification":" The necessary level of security of supply should be established taking into account the value\n that consumers place on electricity (VoLL \u2013 value of lost load), by the match between the\n incremental cost of insuring consumers against blackouts and the cost of incremental\n blackouts to consumers. In relation to achieving such necessary level and since capacity\n remuneration mechanisms distort the market, they should only be adopted after verification of\n both their technical necessity and their economic efficiency, after having evaluated other\n alternative options.","location":[[" Proposal for a regulation","Article 20 \u2013 paragraph 1"]],"meps":[90110],"meta":{"created":"2019-07-03T06:30:44"},"new":["1. When applying capacity","mechanisms Member States shall have a","reliability standard in place indicating the","necessary level of security of supply in a","transparent manner. A thorough cost-","benefit analysis shall be carried out to","justify the necessity of achieving a certain","level of security of supply, as well as to","justify the need to adopt capacity","mechanisms in order to achieve such","necessary level."],"old":["1. When applying capacity","mechanisms Member States shall have a","reliability standard in place indicating their","desired level of security of supply in a","transparent manner."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"933","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Gunnar H\u00f6kmark","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-335","location":[[" Proposal for a regulation","Article 4 \u2013 paragraph 2 \u2013 point b"]],"meps":[28124],"meta":{"created":"2020-11-15T15:52:08"},"new":["deleted"],"old":["(b) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 500 kW;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"335","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-649","justification":"The provisions of this Article shall also include arrangements for cross-border redispatching\nand counter-trading across national borders and this logically follow from earlier\nparagraphs of this Article..","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 6 b (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:43"},"new":["6 b. Where applicable, transmission","system operators of different Member","States shall agree on a fair repartition of","the costs of cross-border redispatching","and counter-trading."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"649","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1458","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 introductory part"]],"meps":[124826,124870,124739,124735,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:38"},"new":["1. The Commission is empowered to","adopt delegated acts for precise and","technically detailed rules with cross-","border relevance in accordance with","Article 63 concerning the establishment of","network codes. Prior to adopting a","delegated act for the establishment of a","new network code or for the modification","of an existing network code, the","Commission shall present a legislative","proposal following the ordinary legislative","procedure to adopt the political","framework."],"old":["1. The Commission is empowered to","adopt delegated acts in accordance with","Article 63 concerning the establishment of","network codes in the following areas:"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1458","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Ashley Fox","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1280","location":[[" Proposal for a regulation","Article 38 \u2013 paragraph 4"]],"meps":[96957],"meta":{"created":"2019-07-03T06:30:44"},"new":["4. The regulatory authorities of a","system operation region may jointly decide","to grant decision-making powers to the","regional operational centre for one or more","of the functions provided for in points (c)","to (f) and (h) to (l) of Article 34(1)."],"old":["4. The regulatory authorities of a","system operation region may jointly decide","to grant binding decision-making powers","to the regional operational centre for one or","more of the functions provided for in","points (c) to (f) and (h) to (l) of Article","34(1)."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1280","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Kaja Kallas, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar, Carolina Punset, Gerben-Jan Gerbrandy","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-934","location":[["Proposal for a regulation","Article 20 \u2013 paragraph 1"]],"meps":[124697,124989,124872,125026,90110,96940],"meta":{"created":"2019-07-03T06:30:44"},"new":["1. When applying capacity","mechanisms Member States shall have a","reliability standard in place indicating their","desired level of security of supply in a","transparent manner. In case of cross-","border bidding zones, such reliability","standards shall be established jointly by","the relevant authorities."],"old":["1. When applying capacity","mechanisms Member States shall have a","reliability standard in place indicating their","desired level of security of supply in a","transparent manner."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"934","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Angelika Niebler, Sven Schulze","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-650","justification":"Decisions on bidding zones definitely do not come within the Commission\u2019s remit.","location":[["Proposal for a regulation","Article 13"]],"meps":[124809],"meta":{"created":"2019-07-03T06:30:43"},"new":["deleted"],"old":["[...]"],"orig_lang":"de","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"650","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-336","justification":" In line with enabling active consumer participation, the provisions have to be adapted so that\n smaller players can participate to the internal energy market.","location":[[" Proposal for a regulation","Article 4 \u2013 paragraph 2 \u2013 point b"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["(b) electricity generated in installations","using renewable energy sources or","generated in a high-efficiency","cogeneration process in installations with","an installed capacity of less than 3 MW (or","3 generation units). As of 1 January 2026,","this threshold shall be reduced to 1 MW","provided that a liquid intraday market","exists, that market barriers are removed","and that installations using renewable","energy sources can access at least three","service providers to outsource the","management of their balancing","responsibilities."],"old":["(b) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 500 kW;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"336","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1459","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 introductory part"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:38"},"new":["1. The Commission is empowered to","establish network codes, by means of","implementing acts adopted in accordance","with the examination procedure referred","to in Article 62(2), in the following areas:"],"old":["1. The Commission is empowered to","adopt delegated acts in accordance with","Article 63 concerning the establishment of","network codes in the following areas:"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1459","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1281","location":[[" Proposal for a regulation","Article 38 \u2013 paragraph 4 a (new)"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:44"},"new":["4 a. Where the transmission system","operator does not implement the binding","decision in accordance with Article 38 (2),","it shall submit a detailed justification to","the regional coordination centre and","other transmission operators in the","region."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1281","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-651","location":[["Proposal for a regulation","Article 13 \u2013 paragraph 1"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:43"},"new":["1. Bidding zone borders shall be based","on long-term, structural congestions in the","transmission network and bidding zones","shall not contain such congestions. The","configuration of bidding zones in the","Union shall be designed in such a way as to","maximise economic efficiency and cross-","border trading opportunities while","maintaining security of supply. Current","bidding zones shall be assessed in","considering their ability to incentivize","sufficient flexible generation and load","capacity which is vital for avoiding grid","bottlenecks, balancing electricity demand","and supply and securing the long-term","security of the grid. If the bidding zone","design does not allow for price peaks in","terms of scarcity prices the redesign of","The bidding zones shall be mandated by","the Agency."],"old":["1. Bidding zone borders shall be based","on long-term, structural congestions in the","transmission network and bidding zones","shall not contain such congestions. The","configuration of bidding zones in the","Union shall be designed in such a way as to","maximise economic efficiency and cross-","border trading opportunities while","maintaining security of supply.",""],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"651","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula\u2013Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-337","location":[["Proposal for a regulation","Article 4 \u2013 paragraph 2 \u2013 point b"]],"meps":[124826,124870,124739,124735,124699,125041,125044],"meta":{"created":"2020-11-15T15:52:08"},"new":["(b) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 500 kW;","except for electricity from wind energy","where an installed capacity of 3MW or 3","generation units applies;"],"old":["(b) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 500 kW;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"337","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-935","justification":"It is possible, that in seeking to justify the use of a capacity mechanism, a Member State could\nset an unnecessarily high and unrealisable reliability standard, which would require the use\nof such a capacity mechanism for it to be met. In the interests of well-functioning markets and\nminimising the cost of electricity to consumers, the reliability standard should be set at the\nmost technically feasible and cost effective level.","location":[["Proposal for a regulation","Article 20 \u2013 paragraph 1"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:44"},"new":["1. When applying capacity","mechanisms Member States shall have a","reliability standard in place indicating the","level of security of supply that they deem","necessary in a transparent and objective","manner. The reliability standard shall be","set at a technically feasible and cost-","effective level."],"old":["1. When applying capacity","mechanisms Member States shall have a","reliability standard in place indicating their","desired level of security of supply in a","transparent manner."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"935","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1460","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 introductory part"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:38"},"new":["1. The Commission is empowered for","five years to adopt delegated acts in","accordance with Article 63 concerning the","establishment of network codes in cover","the following areas:"],"old":["1. The Commission is empowered to","adopt delegated acts in accordance with","Article 63 concerning the establishment of","network codes in the following areas:"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1460","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Hans-Olaf Henkel","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-652","location":[[" Proposal for a regulation","Article 13 \u2013 paragraph 1"]],"meps":[124823],"meta":{"created":"2019-07-03T06:30:43"},"new":["1. Bidding zone borders shall be based","on long-term, structural congestions in the","transmission network and bidding zones","shall not contain such congestions. The","configuration of bidding zones in the","Union shall be designed in such a way as to","maximise economic efficiency and cross-","border trading opportunities while","maintaining security of supply. Current","bidding zones shall be assessed based on","their ability to incentivise sufficient","flexible generation and load capacity","which is crucial for avoiding grid","bottlenecks, balancing electricity demand","and supply securing the long-term","security of the grid."],"old":["1. Bidding zone borders shall be based","on long-term, structural congestions in the","transmission network and bidding zones","shall not contain such congestions. The","configuration of bidding zones in the","Union shall be designed in such a way as to","maximise economic efficiency and cross-","border trading opportunities while","maintaining security of supply."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"652","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1282","location":[["Proposal for a regulation","Article 38 \u2013 paragraph 4 a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:44"},"new":["4 a. Other functions may be assigned","to the regional coordination centres, when","it is deemed efficient and so agreed by all","relevant parties."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1282","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-936","location":[[" Proposal for a regulation","Article 20 \u2013 paragraph 1"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:44"},"new":["1. When applying capacity","mechanisms Member States shall have a","reliability standard in place indicating their","necessary level of security of supply in a","transparent manner. This reliability","standard should be set at a technically","feasible and cost effective level."],"old":["1. When applying capacity","mechanisms Member States shall have a","reliability standard in place indicating their","desired level of security of supply in a","transparent manner."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"936","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1461","justification":"Alternate wording is in line with our comment on delegated acts as it is necessary to evaluate\nextent and form of use of delegated acts in all cases proposed by the Directive and reflected in\nthe Regulation. From the proposal of the Directive it is not clear, what was the rationale\nbehind use of implementing acts (e.g. data format in Article.24 of the Directive) or in other\ncases use of delegated (Article 61 on ACER or Article 63 on network codes).It is therefore not\nclear what \u201crule\u201d was used to set which form of act to use to specific topics.","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 introductory part"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:38"},"new":["1. The Commission is empowered to","adopt implementing acts in accordance","with Article 63 concerning the","establishment of network codes in the","following areas:"],"old":["1. The Commission is empowered to","adopt delegated acts in accordance with","Article 63 concerning the establishment of","","network codes in the following areas:"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1461","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-653","location":[[" Proposal for a regulation","Article 13 \u2013 paragraph 1"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:43"},"new":["1. Bidding zone borders shall be based","on long-term, structural congestions in the","transmission network and bidding zones","shall not contain such congestions. The","configuration of bidding zones in the","Union shall be designed in such a way as to","ensure liquidity of day-ahead and","intraday markets, and thus to maximise","economic efficiency and cross-border","trading opportunities while maintaining","security of supply. They shall not contain","long-term, structural congestions."],"old":["1. Bidding zone borders shall be based","on long-term, structural congestions in the","","transmission network and bidding zones","shall not contain such congestions. The","configuration of bidding zones in the","Union shall be designed in such a way as to","maximise economic efficiency and cross-","border trading opportunities while","maintaining security of supply."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"653","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Jerzy Buzek, Janusz Lewandowski, Marian-Jean Marinescu","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-338","justification":"The proposed amendment aims to clarify that the new generating installations using\nrenewable energy sources or high-efficiency cogeneration with an installed electricity\ncapacity of less than 500 kW, may be exempted from the balancing responsibility by the\nrelevant Member State, provided however that the relevant DSO does not raise any\nobjections.","location":[["Proposal for a regulation","Article 4 \u2013 paragraph 2 \u2013 point b"]],"meps":[28269,23781,33982],"meta":{"created":"2020-11-15T15:52:08"},"new":["(b) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 500 kW if","the relevant DSO raises no objections;"],"old":["(b) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 500 kW;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"338","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-937","justification":" When identifying the necessary level of security of supply, Member States shall consider the\n potentially negative environmental impacts of electricity generation and the need to avoid\n environmentally harmful subsidies.","location":[[" Proposal for a regulation","Article 20 \u2013 paragraph 1"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:44"},"new":["1. When applying capacity","mechanisms Member States shall have a","reliability standard in place to determine","the necessary level of security of supply in","a transparent manner."],"old":["1. When applying capacity","mechanisms Member States shall have a","reliability standard in place indicating","their desired level of security of supply in","a transparent manner."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"937","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1462","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 introductory part"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:38"},"new":["1. The Commission is empowered to","adopt implementing acts in accordance","with Article 63 concerning the","establishment of network codes in the","following areas:"],"old":["1. The Commission is empowered to","adopt delegated acts in accordance with","Article 63 concerning the establishment of","network codes in the following areas:"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1462","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Martina Werner, Peter Kouroumbashev, Carlos Zorrinho, Miapetra Kumpula-Natri, Jens Geier, Eugen Freund, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-654","location":[["Proposal for a regulation","Article 13 \u2013 paragraph 1"]],"meps":[124826,124857,124739,124735,96833,125018,124699],"meta":{"created":"2019-07-03T06:30:43"},"new":["1. Bidding zone shall be as large,","liquid and stable as possible, to foster","efficient integration of energy markets,","ensure security for investors and","maximise economic efficiency and cross-","border trading opportunities while","maintaining security of supply."],"old":["1. Bidding zone borders shall be","based on long-term, structural","congestions in the transmission network","and bidding zones shall not contain such","congestions. The configuration of bidding","zones in the Union shall be designed in","such a way as to maximise economic","efficiency and cross-border trading","opportunities while maintaining security of","supply."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"654","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1283","justification":" It is our position that Articles 31 to 44 and all reference regarding ROCs in the Clean Energy\n Package to All Europeans shall be deleted without any substitution.It is of particular concern\n that establishment of ROCs violates subsidiarity and proportionality principle according to\n art. 194 SFEU","location":[["Proposal for a regulation","Article 39"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:44"},"new":["Article 39 deleted","Revision of decisions and","recommendations"],"old":["1. Regional operational centres shall","develop a procedure for the revision of","decisions and recommendations.","2. The procedure shall be triggered at the","request of one or more of the transmission","system operators of the system operation","region. Following the revision of the","decision or recommendation, regional","operational centres shall confirm or","modify the measure.","3. Where the measure subject to revision","is a binding decision in accordance with","Article 38(2), the request for revision shall","not suspend the decision except in cases","when the safety of the system will be","negatively affected.","4. Where the measure subject to revision","is a recommendation in accordance with","Article 38(3) and following its revision a","transmission system operator decides to","deviate from the recommendation, the","transmission system operator shall submit","a detailed justification to the regional","operational centre and to the other","transmission system operators of the","system operation region."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1283","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Massimiliano Salini, Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-339","meps":[125670,36392],"meta":{"created":"2020-11-15T15:52:08"},"new":["(b) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 10 kW;"],"old":["(b) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 500 kW;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"339","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-938","location":[[" Proposal for a regulation","Article 20 \u2013 paragraph 1"]],"meps":[124826,124870,124739,124735,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:44"},"new":["1. When applying capacity","mechanisms Member States shall have a","reliability standard in place indicating their","required level of security of supply in a","transparent manner."],"old":["1. When applying capacity","mechanisms Member States shall have a","reliability standard in place indicating their","desired level of security of supply in a","transparent manner."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"938","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1463","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 point g"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:38"},"new":["(g) capacity-allocation and congestion-","management rules;"],"old":["(g) capacity-allocation and congestion-","management rules including curtailment","of generation and redispatch of","generation and demand ;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1463","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Lud\u011bk Niedermayer","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-655","justification":" It is crucial to complement this paragraph with a provision on sharing of re-dispatching and\n countertrading costs. This will ensure that TSOs get the right financial incentives and\n economic signals to maximise cross-border capacities and to ensure non-discrimination\n between internal and cross-border trade. The \u201cpolluter pay principle\u201d as mentioned by\n ACER in its Recommendation No 02/2016 shall be used.","location":[["Proposal for a regulation","Article 13 \u2013 paragraph 1 a (new)"]],"meps":[124701],"meta":{"created":"2019-07-03T06:30:43"},"new":["1 a. The costs of remedial actions","should be shared among TSOs based on","the \u2018polluter-pays principle\u2019, where the","\u201cpolluter\u201d should be defined as the","transmission system operators of areas","generating unscheduled flows and the","transmission system operator of the","congested asset in proportion to the","contribution of unscheduled and","scheduled flows, respectively, to the","overload."],"old":[""],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"655","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-340","justification":" The proposed threshold for an exemption from balancing responsibility could add additional\n burdens for smaller generating installations, particularly in markets that are not yet\n developed. Therefore, the threshold for an exemption from balancing responsibility should be\n raised to 1MW, which would help simplify the process for smaller generating installations,\n including renewable energy communities and self-producers","location":[[" Proposal for a regulation","Article 4 \u2013 paragraph 2 \u2013 point b"]],"meps":[124813,124796],"meta":{"created":"2020-11-15T15:52:08"},"new":["(b) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 1 MW;"],"old":["(b) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 500 kW;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"340","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1464","justification":" Removal of the text is in line with our current position as stated in article 20.","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 point g"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:38"},"new":["(g) capacity-allocation and congestion-","management rules;"],"old":["(g) capacity-allocation and congestion-","management rules including curtailment","of generation and redispatch of","generation and demand ;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1464","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1284","location":[[" Proposal for a regulation","Article 39"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:44"},"new":["Article 39 deleted","Revision of decisions and","recommendations"],"old":["1. Regional operational centres shall","develop a procedure for the revision of","decisions and recommendations.","2. The procedure shall be triggered at the","request of one or more of the transmission","system operators of the system operation","region. Following the revision of the","decision or recommendation, regional","operational centres shall confirm or","modify the measure.","3. Where the measure subject to revision","is a binding decision in accordance with","Article 38(2), the request for revision shall","not suspend the decision except in cases","when the safety of the system will be","negatively affected.","4. Where the measure subject to revision","is a recommendation in accordance with","Article 38(3) and following its revision a","transmission system operator decides to","deviate from the recommendation, the","transmission system operator shall submit","a detailed justification to the regional","operational centre and to the other","transmission system operators of the","system operation region."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1284","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-939","location":[["Proposal for a regulation","Article 20 \u2013 paragraph 1"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:45"},"new":["1. Member States shall have a","reliability standard in place indicating their","desired level of security of supply in a","transparent manner."],"old":["1. When applying capacity","mechanisms Member States shall have a","reliability standard in place indicating their","desired level of security of supply in a","transparent manner."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"939","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Martina Werner, Peter Kouroumbashev, Carlos Zorrinho, Miapetra Kumpula-Natri, Jens Geier, Eugen Freund, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-656","location":[[" Proposal for a regulation","Article 13 \u2013 paragraph 1 a (new)"]],"meps":[124826,124857,124739,124735,96833,125018,124699],"meta":{"created":"2019-07-03T06:30:43"},"new":["1 a. Large bidding zones with liquid","and competitive markets ensure the most","efficient allocation of resources, maximise","economic efficiency and cross-border","trading opportunities while maintaining","security of supply. Large bidding zones","are crucial for the integration of the","growing share of renewable energy","sources into the grid."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"656","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-341","location":[[" Proposal for a regulation","Article 4 \u2013 paragraph 2 \u2013 point b"]],"meps":[96852],"meta":{"created":"2020-11-15T15:52:08"},"new":["(b) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","electricity capacity of less than 1 MW;"],"old":["(b) generating installations using","renewable energy sources or high-","efficiency cogeneration with an installed","","","electricity capacity of less than 500 kW;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"341","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Kate\u0159ina Kone\u010dn\u00e1, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1285","location":[["Proposal for a regulation","Article 39"]],"meps":[23699,96713],"meta":{"created":"2019-07-03T06:30:44"},"new":["Article 39 deleted","Revision of decisions and","recommendations"],"old":["1. Regional operational centres shall","develop a procedure for the revision of","decisions and recommendations.","2. The procedure shall be triggered at the","request of one or more of the transmission","system operators of the system operation","region. Following the revision of the","decision or recommendation, regional","operational centres shall confirm or","modify the measure.","3. Where the measure subject to revision","is a binding decision in accordance with","Article 38(2), the request for revision shall","not suspend the decision except in cases","when the safety of the system will be","negatively affected.","4. Where the measure subject to revision","is a recommendation in accordance with","Article 38(3) and following its revision a","transmission system operator decides to","deviate from the recommendation, the","transmission system operator shall submit","a detailed justification to the regional","operational centre and to the other","transmission system operators of the","system operation region."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1285","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-940","location":[["Proposal for a regulation","Article 20 \u2013 paragraph 1"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:45"},"new":["1. Member States shall have a","reliability standard in place indicating their","desired level of security of supply in a","transparent manner."],"old":["1. When applying capacity","mechanisms Member States shall have a","reliability standard in place indicating their","desired level of security of supply in a","transparent manner."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"940","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1465","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 point g"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:38"},"new":["(g) capacity-allocation and congestion-","management rules"],"old":["(g) capacity-allocation and congestion-","management rules including curtailment","of generation and redispatch of","generation and demand ;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1465","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-342","location":[["Proposal for a regulation","Article 4 \u2013 paragraph 2 \u2013 point c"]],"meps":[124706],"meta":{"created":"2020-11-15T15:52:08"},"new":["deleted"],"old":["(c) installations benefitting from","support approved by the Commission","under Union State aid rules pursuant to","Articles 107 to 109 TFEU, and","commissioned prior to [OP: entry into","force]. Member States may, subject to","Union state aid rules, incentivize market","participants which are fully or partly","exempted from balancing responsibility to","accept full balancing responsibility","against appropriate compensation."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"342","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Kathleen Van Brempt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1286","location":[[" Proposal for a regulation","Article 39 \u2013 title"]],"meps":[5729],"meta":{"created":"2019-07-03T06:30:44"},"new":["Appeal against decisions and revision of","decisions and recommendations"],"old":["Revision of decisions and","recommendations"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1286","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-941","justification":" When identifying the necessary level of security of supply, Member States shall consider the\n potentially negative environmental impacts of electricity generation and the need to avoid\n environmentally harmful subsidies.","location":[[" Proposal for a regulation","Article 20 \u2013 paragraph 2"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:45"},"new":["2. The reliability standard shall be set","by the national regulatory authority based","on the methodology pursuant to","Article19(5), taking into account the","principles of necessity and proportionality","and the need to avoid the negative impacts","of environmentally harmful subsidies and","market distortions via the creation of","overcapacity."],"old":["2. The reliability standard shall be set","by the national regulatory authority based","on the methodology pursuant to Article","19(5)."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"941","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-657","location":[["Proposal for a regulation","Article 13 \u2013 paragraph 2"]],"meps":[124826,124870,124739,124735,124699],"meta":{"created":"2019-07-03T06:30:43"},"new":["deleted"],"old":["2. Each bidding zone should be equal","to an imbalance price area."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"657","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Patrizia Toia, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1466","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 point g"]],"meps":[124826,124870,124739,124735,28340,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:38"},"new":["(g) capacity-allocation and congestion-","management rules ;"],"old":["(g) capacity-allocation and congestion-","management rules including curtailment","of generation and redispatch of","","generation and demand ;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1466","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Gunnar H\u00f6kmark","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-343","location":[["Proposal for a regulation","Article 4 \u2013 paragraph 2 \u2013 point c"]],"meps":[28124],"meta":{"created":"2020-11-15T15:52:08"},"new":["deleted"],"old":["(c) installations benefitting from","support approved by the Commission","under Union State aid rules pursuant to","Articles 107 to 109 TFEU, and","commissioned prior to [OP: entry into","force]. Member States may, subject to","Union state aid rules, incentivize market","participants which are fully or partly","exempted from balancing responsibility to","accept full balancing responsibility","against appropriate compensation."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"343","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1287","location":[[" Proposal for a regulation","Article 39 \u2013 title"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:44"},"new":["Revision of recommendations"],"old":["Revision of decisions and","recommendations"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1287","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-942","location":[[" Proposal for a regulation","Article 20 \u2013 paragraph 2"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:45"},"new":["2. The reliability standard shall be set","by the national regulatory authority based","on the methodology pursuant to Article","19(5), taking into account the evolution of","electricity demands, the principles of","necessity and proportionality and the need","to avoid environmentally and","economically harmful subsidies."],"old":["2. The reliability standard shall be set","by the national regulatory authority based","on the methodology pursuant to Article","19(5)."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"942","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-344","location":[[" Proposal for a regulation","Article 4 \u2013 paragraph 2 \u2013 point c"]],"meps":[124826,124870,124739,124735,124699,125041,125044],"meta":{"created":"2020-11-15T15:52:08"},"new":["(c) installations benefitting from","support approved by the Commission","under Union State aid rules pursuant to","Articles 107 to 109 TFEU, and","commissioned prior to [OP: entry into","force]. Member States may incentivize","market participants which are fully or","partly exempted from balancing","responsibility to accept full balancing","responsibility against appropriate","compensation. Member States shall ensure","that balancing responsibility is taken by","other market participants for the","electricity generated from installations","subject to a derogation from balance","responsibility."],"old":["(c) installations benefitting from","support approved by the Commission","under Union State aid rules pursuant to","Articles 107 to 109 TFEU, and","commissioned prior to [OP: entry into","force]. Member States may, subject to","Union state aid rules, incentivize market","participants which are fully or partly","exempted from balancing responsibility to","accept full balancing responsibility against","appropriate compensation."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"344","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Patrizia Toia","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-658","justification":"With reference to this provision, it is fundamental to ensure coherence with the EBGL, where\nthe above mentioned provision makes reference only to \u201cself-dispatch systems\u201d and not to\n\u201ccentral dispatch systems\u201d (such as the Italian one). It is therefore necessary to ensure the\nexceptions related to the Central Dispatch model, in line with what foreseen in art. 54.2 of\nEBGL submitted to the Committee of Member States.\n\nIn fact, in central dispatch systems imbalances are settled unit by unit. Therefore, it is\nnecessary that the imbalance price is also calculated with granularity that is finer than a\nbidding zone in order to send the proper signals to Balance Service Providers (BSPs) and\nBalance Responsible Parties (BRPs). Hence, imbalance price areas shall be different from\nbidding zones, as per the EBGL.","location":[["Proposal for a regulation","Article 13 \u2013 paragraph 2"]],"meps":[28340],"meta":{"created":"2019-07-03T06:30:43"},"new":["2. Each bidding zone should be equal","to an imbalance price area, except in case","where an imbalance price area may","constitute a part of a bidding zone in line","with the European Balancing Guidelines."],"old":["2. Each bidding zone should be equal","to an imbalance price area."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"658","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Claude Turmes","changes":{},"committee":["ITRE"],"compromise":["on behalf of the Verts/ALE Group"],"date":"2017-09-25T00:00:00","id":"PE609.625-943","location":[["Proposal for a regulation","Article 20 \u2013 paragraph 2"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:45"},"new":["2. The reliability standard shall be set","by the national regulatory authority based","on the methodology pursuant to Article","19(5), taking into account the principles","of necessity and proportionality and the","need to avoid the negative impacts of","environmentally harmful subsidies."],"old":["2. The reliability standard shall be set","by the national regulatory authority based","on the methodology pursuant to Article","19(5)."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"943","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Kathleen Van Brempt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1288","location":[[" Proposal for a regulation","Article 39 \u2013 paragraph 1"]],"meps":[5729],"meta":{"created":"2019-07-03T06:30:44"},"new":["1. Regional operational centres,","together with the Commission and","the Agency, shall develop a procedure for","appeal against binding decisions and for","the revision of decisions and","recommendations.","In the case of an appeal, it is the","Commission that will take a final","decision. The Commission shall do so","after consultation of the involved","transmission system operator(s) and the","regional operational center and after","taken advice from the Agency. The","Commission can decide to maintain,","suspend, withdraw or alter the contested","decision."],"old":["1. Regional operational centres shall","develop a procedure for the revision of","decisions and recommendations."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1288","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-345","justification":"The applicable scope must be narrowed to the relevant articles.","location":[[" Proposal for a regulation","Article 4 \u2013 paragraph 2 \u2013 point c"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["(c) installations benefitting from","support approved by the Commission","pursuant to Articles 107 to 109 TFEU, and","commissioned prior to [OP: entry into","force]. Member States may, subject to","Union state aid rules, incentivize market","participants which are fully or partly","exempted from balancing responsibility to","accept full balancing responsibility against","appropriate compensation."],"old":["(c) installations benefitting from","support approved by the Commission","under Union State aid rules pursuant to","Articles 107 to 109 TFEU, and","commissioned prior to [OP: entry into","force]. Member States may, subject to","Union state aid rules, incentivize market","","participants which are fully or partly","exempted from balancing responsibility to","accept full balancing responsibility against","appropriate compensation."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"345","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Angelika Niebler, Sven Schulze","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1467","justification":"Methods of setting tariffs, and network tariffs, are based on national and regional influences.\nHarmonisation of network tariffs would be contrary to the subsidiarity principle. It is\ntherefore not the role of ACER to issue a recommendation on this.","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 point k"]],"meps":[124809],"meta":{"created":"2019-07-03T06:30:38"},"new":["deleted"],"old":["(k) rules regarding harmonised","transmission and distribution tariff","structures and connection charges","including locational signals and inter-","transmission system operator","compensation rules;"],"orig_lang":"de","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1467","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Gunnar H\u00f6kmark","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-659","location":[["Proposal for a regulation","Article 13 \u2013 paragraph 2"]],"meps":[28124],"meta":{"created":"2019-07-03T06:30:43"},"new":["2. The imbalance price area shall be","equal to the bidding zone in case of self-","dispatching model, while it may constitute","a part of the bidding zone in case of","central dispatch model."],"old":["2. Each bidding zone should be equal","to an imbalance price area."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"659","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1289","location":[["Proposal for a regulation","Article 39 \u2013 paragraph 1"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:44"},"new":["1. Regional coordination centres and","transmission system operators shall jointly","develop a procedure for the revision of","recommendations."],"old":["1. Regional operational centres shall","develop a procedure for the revision of","decisions and recommendations."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1289","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-346","location":[["Proposal for a regulation","Article 4 \u2013 paragraph 2 a (new)"]],"meps":[124826,124870,124739,124699,125041,125044],"meta":{"created":"2020-11-15T15:52:08"},"new":["2a. Where Member States do not","provide for a derogation from balancing","responsibility allowed under paragraph 2,","they shall ensure well-functioning","markets are established for the delegation","of balancing responsibility from small-","scale generating installations using","renewable sources or high-efficiency","cogeneration. In particular, they shall","ensure the availability of at least three","providers for the delegation of balancing","responsibility and transparent, cost-","reflective and proportionate pricing."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"346","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-944","location":[["Proposal for a regulation","Article 20 \u2013 paragraph 2"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:45"},"new":["2. The reliability standard shall be set","by the national regulatory authority","Member state or by the Member state","designated authority based on the","methodology pursuant to Article 19 (5)"],"old":["2. The reliability standard shall be set","by the national regulatory authority based","on the methodology pursuant to Article","19(5)."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"944","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski, Edward Czesak","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-660","location":[[" Proposal for a regulation","Article 13 \u2013 paragraph 2"]],"meps":[124891,132925],"meta":{"created":"2019-07-03T06:30:43"},"new":["2. Each bidding zone should be equal","to an imbalance price area, except of","central dispatch systems."],"old":["2. Each bidding zone should be equal","to an imbalance price area."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"660","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1468","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 point k"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:38"},"new":["deleted"],"old":["(k) rules regarding harmonised","transmission and distribution tariff","structures and connection charges","including locational signals and inter-","transmission system operator","compensation rules;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1468","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1290","location":[["Proposal for a regulation","Article 39 \u2013 paragraph 1"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:44"},"new":["1. With the support of the Agency,","regional operational centres shall develop a","procedure for the revision of decisions."],"old":["1. Regional operational centres shall","develop a procedure for the revision of","decisions and recommendations."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1290","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Massimiliano Salini, Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-347","location":[["Proposal for a regulation","Article 4 \u2013 paragraph 3"]],"meps":[125670,36392],"meta":{"created":"2020-11-15T15:52:08"},"new":["deleted"],"old":["3. From 1 January 2026, point (b) of","paragraph 2 shall apply only to","","generating installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","capacity of less than 250 kW."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"347","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Massimiliano Salini, Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-661","location":[[" Proposal for a regulation","Article 13 \u2013 paragraph 2"]],"meps":[125670,36392],"meta":{"created":"2019-07-03T06:30:43"},"new":["2. The imbalance price area shall be","equal or smaller of the bidding zone."],"old":["2. Each bidding zone should be equal","to an imbalance price area."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"661","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Ashley Fox","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-945","location":[["Proposal for a regulation","Article 20 \u2013 paragraph 2"]],"meps":[96957],"meta":{"created":"2019-07-03T06:30:45"},"new":["2. The reliability standard shall be set","by the national regulatory authority based","on an agreed methodology, such as that","pursuant to Article 19(5)."],"old":["2. The reliability standard shall be set","by the national regulatory authority based","on the methodology pursuant to Article","19(5)."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"945","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1469","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 point k"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:39"},"new":["deleted"],"old":["(k) rules regarding harmonised","transmission and distribution tariff","structures and connection charges","including locational signals and inter-","transmission system operator","compensation rules;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1469","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1291","location":[[" Proposal for a regulation","Article 39 \u2013 paragraph 1"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:44"},"new":["1. Regional security coordinators","shall develop a procedure for the revision","of recommendations."],"old":["1. Regional operational centres shall","develop a procedure for the revision of","decisions and recommendations."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1291","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Kathleen Van Brempt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1292","location":[[" Proposal for a regulation","Article 39 \u2013 paragraph 2"]],"meps":[5729],"meta":{"created":"2019-07-03T06:30:44"},"new":["2. These procedures shall be triggered","at the request of one or more of the","transmission system operators of the","system operation region. In the case of a","revision of a decision or recommendation,","regional operational centres shall confirm","or modify the measure."],"old":["2. The procedure shall be triggered at","the request of one or more of the","transmission system operators of the","system operation region. Following the","revision of the decision or","recommendation, regional operational","centres shall confirm or modify the","measure."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1292","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-348","justification":" The proposed threshold under Article 4(3) for an exemption from balancing responsibility\n that would apply from 1 January 2026 could add additional burdens for current smaller\n generating installations, particularly in markets that are not yet developed.","location":[[" Proposal for a regulation","Article 4 \u2013 paragraph 3"]],"meps":[124813,124796],"meta":{"created":"2020-11-15T15:52:08"},"new":["deleted"],"old":["3. From 1 January 2026, point (b) of","paragraph 2 shall apply only to","generating installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","capacity of less than 250 kW."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"348","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1293","location":[[" Proposal for a regulation","Article 39 \u2013 paragraph 2"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:45"},"new":["2. The procedure shall be triggered at","the request of one or more of the","transmission system operators of the","capacity calculation region. Following the","revision of the recommendation, regional","security coordinators shall confirm or","modify the measure."],"old":["2. The procedure shall be triggered at","the request of one or more of the","transmission system operators of the","system operation region. Following the","","revision of the decision or","recommendation, regional operational","centres shall confirm or modify the","measure."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1293","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-946","justification":" We prefer to set reliability standard either directly by Member State or indirectly by Member\n State\u00b4s designated authority","location":[[" Proposal for a regulation","Article 20 \u2013 paragraph 2"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:45"},"new":["2. The reliability standard shall be set","by the Member state or by the Member","state designated authority based on the","methodology pursuant to Article 19(5)."],"old":["2. The reliability standard shall be set","by the national regulatory authority based","on the methodology pursuant to Article","19(5)."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"946","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-349","justification":"A further reduction of the threshold is introduced in the previous paragraph and a derogation\nshould always be kept for de minimis installations.","location":[[" Proposal for a regulation","Article 4 \u2013 paragraph 3"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["deleted"],"old":["3. From 1 January 2026, point (b) of","paragraph 2 shall apply only to","generating installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","capacity of less than 250 kW."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"349","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-662","location":[[" Proposal for a regulation","Article 13 \u2013 paragraph 2"]],"meps":[96993],"meta":{"created":"2019-07-03T06:30:44"},"new":["2. The imbalance price area shall be","equal or smaller of the bidding zone."],"old":["2. Each bidding zone should be equal","to an imbalance price area."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"662","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Jos\u00e9 Blanco L\u00f3pez, Soledad Cabez\u00f3n Ruiz","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1470","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 point k"]],"meps":[124826,124870,124739,124735,124699,125044,125041],"meta":{"created":"2019-07-03T06:30:39"},"new":["(k) rules regarding harmonised","transmission tariff structures including","locational signals and inter-transmission","system operator compensation rules;"],"old":["(k) rules regarding harmonised","transmission and distribution tariff","structures and connection charges","including locational signals and inter-","transmission system operator compensation","rules;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1470","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1294","location":[["Proposal for a regulation","Article 39 \u2013 paragraph 2"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:45"},"new":["2. The procedure shall be triggered at","the request of one or more of the","transmission system operators of the","system operation region. Following the","revision of the decision, regional","operational centres shall confirm or modify","the measure."],"old":["2. The procedure shall be triggered at","the request of one or more of the","transmission system operators of the","system operation region. Following the","revision of the decision or","recommendation, regional operational","centres shall confirm or modify the","measure."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1294","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-947","location":[[" Proposal for a regulation","Article 20 \u2013 paragraph 3"]],"meps":[124826,124870,124739,124735,124699,125041,125044,124947],"meta":{"created":"2019-07-03T06:30:45"},"new":["3. The reliability standard shall be","calculated using the cost of new entry over","a given timeframe."],"old":["3. The reliability standard shall be","calculated using the value of lost load and","the cost of new entry over a given","timeframe."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"947","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Gunnar H\u00f6kmark","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-350","location":[["Proposal for a regulation","Article 4 \u2013 paragraph 3"]],"meps":[28124],"meta":{"created":"2020-11-15T15:52:08"},"new":["deleted"],"old":["3. From 1 January 2026, point (b) of","paragraph 2 shall apply only to","generating installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","capacity of less than 250 kW."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"350","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1295","location":[["Proposal for a regulation","Article 39 \u2013 paragraph 3"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:45"},"new":["deleted"],"old":["3. Where the measure subject to","revision is a binding decision in","accordance with Article 38(2), the request","for revision shall not suspend the decision","except in cases when the safety of the","system will be negatively affected."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1295","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-663","location":[["Proposal for a regulation","Article 13 \u2013 paragraph 3"]],"meps":[124826,124870,124739,124735,124699],"meta":{"created":"2019-07-03T06:30:44"},"new":["deleted"],"old":["3. In order to ensure an optimal","bidding zone definition in closely","interconnected areas, a bidding zone","review shall be carried out. That review","shall include analysis of the configuration","of bidding zones in a coordinated manner","with the involvement of affected","stakeholders from all affected Member","States, following the process in","accordance with Articles 32 to 34 of","Regulation (EU) 2015/1222. The Agency","shall approve and may request","amendments to the methodology and","assumptions that will be used in the","bidding zone review process as well as the","alternative bidding zone configurations","considered."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"663","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1296","location":[[" Proposal for a regulation","Article 39 \u2013 paragraph 3"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:45"},"new":["3. The request for revision shall not","suspend the decision except in cases when","the implementation of the binding","decision will result in a violation of","operational security limits defined by each","TSO in accordance with Article 25 of","Regulation [The Commission Regulation","establishing a guideline on Electricity","Transmission System Operation] at the","time of implementing the decision."],"old":["3. Where the measure subject to","revision is a binding decision in","accordance with Article 38(2), the request","for revision shall not suspend the decision","except in cases when the safety of the","system will be negatively affected."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1296","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Ashley Fox","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-948","location":[[" Proposal for a regulation","Article 20 \u2013 paragraph 4"]],"meps":[96957],"meta":{"created":"2019-07-03T06:30:45"},"new":["4. The parameters determining the","amount of capacity procured in the","capacity mechanism shall be approved by","the competent authority."],"old":["4. The parameters determining the","amount of capacity procured in the","capacity mechanism shall be approved by","the national regulatory authority."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"948","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1471","justification":"Due to the regional differences and variations, it does not seem opportune to allow for EU\nwide harmonisation of distribution tariff structures.","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 point k"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:39"},"new":["(k) rules regarding harmonised","transmission tariff structures including","locational signals and inter-transmission","system operator compensation rules;"],"old":["(k) rules regarding harmonised","transmission and distribution tariff","","structures and connection charges","including locational signals and inter-","transmission system operator compensation","rules;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1471","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Kaja Kallas, Pavel Teli\u010dka, Morten Helveg Petersen, Angelika Mlinar","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-351","location":[["Proposal for a regulation","Article 4 \u2013 paragraph 3"]],"meps":[124697,124706,124872,125026],"meta":{"created":"2020-11-15T15:52:08"},"new":["deleted"],"old":["3. From 1 January 2026, point (b) of","paragraph 2 shall apply only to","generating installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","capacity of less than 250 kW."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"351","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1297","location":[[" Proposal for a regulation","Article 39 \u2013 paragraph 3"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:45"},"new":["3. Where, following","recommendation, a transmission system","operator decides to deviate from such","recommendation, the transmission system","operator shall submit a detailed","justification to the regional security","coordinator and to the other transmission","system operators of the capacity","calculation region."],"old":["3. Where the measure subject to","revision is a binding decision in","accordance with Article 38(2), the request","for revision shall not suspend the decision","except in cases when the safety of the","system will be negatively affected."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1297","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Pilar del Castillo Vera, Pilar Ayuso, Francesc Gamb\u00fas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1472","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 point k"]],"meps":[28390,4319,125006],"meta":{"created":"2019-07-03T06:30:39"},"new":["(k) rules regarding harmonised","transmission tariff structures including","locational signals and inter-transmission","system operator compensation rules;"],"old":["(k) rules regarding harmonised","transmission and distribution tariff","structures and connection charges","including locational signals and inter-","transmission system operator compensation","rules;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1472","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski, Edward Czesak, Nikolay Barekov","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-664","location":[["Proposal for a regulation","Article 13 \u2013 paragraph 3"]],"meps":[124891,132925,124871],"meta":{"created":"2019-07-03T06:30:44"},"new":["In order to ensure an optimal","bidding zone definition in closely","interconnected areas and prevent cross-","border flows causing internal congestion,","a bidding zone review shall be carried out.","That review shall include analysis of the","configuration of bidding zones in a","coordinated manner with the involvement","of affected stakeholders from all affected","Member States, following the process in","accordance with Articles 32 to 34 of","Regulation (EU) 2015/1222. According to","the above-mentioned Regulation, the","review should result in a joint proposal to","maintain or amend the bidding zone","configuration to the participating Member","States and the participating regulatory","authorities. The Agency shall approve and","may request amendments to the","methodology and assumptions that will be","used in the bidding zone review process as","well as the alternative bidding zone","configurations considered."],"old":["3. In order to ensure an optimal 3.","","","bidding zone definition in closely","interconnected areas, a bidding zone","review shall be carried out. That review","shall include analysis of the configuration","of bidding zones in a coordinated manner","with the involvement of affected","stakeholders from all affected Member","States, following the process in accordance","with Articles 32 to 34 of Regulation (EU)","2015/1222. The Agency shall approve and","may request amendments to the","methodology and assumptions that will be","used in the bidding zone review process as","well as the alternative bidding zone","configurations considered."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"664","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1298","location":[[" Proposal for a regulation","Article 39 \u2013 paragraph 4"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:45"},"new":["deleted"],"old":["4. Where the measure subject to","revision is a recommendation in","accordance with Article 38(3) and","following its revision a transmission","system operator decides to deviate from","the recommendation, the transmission","system operator shall submit a detailed","justification to the regional operational","centre and to the other transmission","system operators of the system operation","region."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1298","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-949","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 1"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:45"},"new":["1. Where it is technically possible,","capacity mechanisms shall be open to","direct cross-border participation with","other Member States, provided there is a","direct network connection between those","Member States and the bidding zone","applying the mechanism. In such","cases, direct cross-border participation","shall be open to capacity providers located","in the Member States concerned and,","where this is not possible, to","interconnections with the Member State","implementing the capacity mechanism."],"old":["1. Mechanisms other than strategic","reserves shall be open to direct","participation of capacity providers located","in another Member State provided there is","a network connection between that","Member State and the bidding zone","applying the mechanism."],"orig_lang":"fr","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"949","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-352","location":[[" Proposal for a regulation","Article 4 \u2013 paragraph 3"]],"meps":[125024,183793,96993],"meta":{"created":"2020-11-15T15:52:08"},"new":["deleted"],"old":["3. From 1 January 2026, point (b) of","paragraph 2 shall apply only to","generating installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","capacity of less than 250 kW."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"352","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1299","location":[["Proposal for a regulation","Article 39 \u2013 paragraph 4"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:45"},"new":["deleted"],"old":["4. Where the measure subject to","revision is a recommendation in","accordance with Article 38(3) and","following its revision a transmission","system operator decides to deviate from","the recommendation, the transmission","system operator shall submit a detailed","justification to the regional operational","centre and to the other transmission","system operators of the system operation","region."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1299","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1300","location":[["Proposal for a regulation","Article 39 \u2013 paragraph 4"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:45"},"new":["4. Where a transmission system","operator decides to deviate from the","recommendation, the transmission system","operator shall submit a detailed","justification to the regional coordination","centre and to the other transmission system","operators of the system operation region.","This justification shall be publicly","disclosed soon after declining the","recommendation."],"old":["4. Where the measure subject to","revision is a recommendation in","accordance with Article 38(3) and","following its revision a transmission","system operator decides to deviate from the","recommendation, the transmission system","operator shall submit a detailed","justification to the regional operational","centre and to the other transmission system","operators of the system operation region."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1300","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1473","justification":" Considering various natural aspects and characteristics of distribution grid among Member\n State, it won\u00b4t be possible to implement harmonization of distribution tariffs on EU level. The\n same argument applies in letter (n) of this article.","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 point k"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:39"},"new":["(k) rules regarding harmonised","transmission tariff structures and","connection charges including locational","signals and inter-transmission system","operator compensation rules;"],"old":["(k) rules regarding harmonised","transmission and distribution tariff","structures and connection charges","including locational signals and inter-","transmission system operator compensation","rules;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1473","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-665","location":[[" Proposal for a regulation","Article 13 \u2013 paragraph 3"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:44"},"new":["3. In order to ensure an optimal","bidding zone definition with liquid day-","ahead and intraday markets in closely","interconnected areas, a bidding zone","review shall be carried outwith the","objective to broaden the geographical","scope of existing bidding zones and to","propose arrangements for a fair cost-","allocation of cross-border redispatch and","counter-trading. That review shall include","analysis of the configuration of bidding","zones in a coordinated manner with the","involvement of regional operational","centers, macro-regional partnerships,","affected stakeholders from all affected","Member States, following the process in","accordance with Articles 32 to 34 of","Regulation (EU) 2015/1222. The Agency","shall approve and may request amendments","to the methodology and assumptions that","will be used in the bidding zone review","process as well as the alternative bidding","zone configurations considered."],"old":["3. In order to ensure an optimal","bidding zone definition in closely","interconnected areas, a bidding zone","review shall be carried out. That review","shall include analysis of the configuration","of bidding zones in a coordinated manner","with the involvement of affected","stakeholders from all affected Member","States, following the process in accordance","with Articles 32 to 34 of Regulation (EU)","2015/1222. The Agency shall approve and","may request amendments to the","methodology and assumptions that will be","","used in the bidding zone review process as","well as the alternative bidding zone","configurations considered."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"665","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Kate\u0159ina Kone\u010dn\u00e1, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1301","location":[[" Proposal for a regulation","Article 40"]],"meps":[23699,96713],"meta":{"created":"2019-07-03T06:30:45"},"new":["Article 40 deleted","Management board of regional","operational centres"],"old":["1. In order to adopt measures related to","their governance and to monitor their","performance, the regional operational","centres shall establish a management","board.","2. The management board shall be","composed of members representing the","transmission system operators and of","observers representing the regulatory","authorities of the system operation region.","The representatives of the regulatory","authorities shall have no voting rights.","3. The management board shall be","responsible for:","(a) drafting and endorsing the statutes","and rules of procedure of the regional","operational centre;","(b) deciding upon and implementing the","organisational structure;","(c) preparing and endorsing the annual","budget;","","(d) developing and endorsing the","cooperative decision-making processes in","accordance with Article 35.","4. The competences of the management","board shall exclude those that are related","to the day-to-day activities of regional","operational centres and the performance","of its functions."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1301","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-353","location":[[" Proposal for a regulation","Article 4 \u2013 paragraph 3"]],"meps":[96852],"meta":{"created":"2020-11-15T15:52:08"},"new":["deleted"],"old":["3. From 1 January 2026, point (b) of","paragraph 2 shall apply only to","generating installations using renewable","energy sources or high-efficiency","cogeneration with an installed electricity","capacity of less than 250 kW."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"353","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1302","justification":" It is our position that Articles 31 to 44 and all reference regarding ROCs in the Clean Energy\n Package to All Europeans shall be deleted without any substitution.It is of particular concern\n that establishment of ROCs violates subsidiarity and proportionality principle according to\n art. 194 SFEU","location":[["Proposal for a regulation","Article 40"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:45"},"new":["Article 40 deleted","operational centres"],"old":["Management board of regional","1. In order to adopt measures related to","their governance and to monitor their","performance, the regional operational","centres shall establish a management","board.","2. The management board shall be","composed of members representing the","transmission system operators and of","observers representing the regulatory","authorities of the system operation region.","The representatives of the regulatory","authorities shall have no voting rights.","3. The management board shall be","responsible for:","(a) drafting and endorsing the statutes","and rules of procedure of the regional","operational centre;","(b) deciding upon and implementing the","organisational structure;","(c) preparing and endorsing the annual","budget;","(d) developing and endorsing the","cooperative decision-making processes in","accordance with Article 35.","4. The competences of the management","board shall exclude those that are related","to the day-to-day activities of regional","operational centres and the performance","of its functions."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1302","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Jerzy Buzek, Janusz Lewandowski, Marian-Jean Marinescu","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-950","justification":" Member States should be enabled to determine the rules of cross-border participation in their\n capacity mechanism with a necessary degree of flexibility.","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 1"]],"meps":[23781,33982],"meta":{"created":"2019-07-03T06:30:45"},"new":["1. Mechanisms other than strategic","reserves shall be open to direct cross-","border participation, by which capacities","located in another Member State provided","there is a network connection between that","Member State or interconnectors can be","certified in the capacity mechanism and","remunerated for their participation,","subject to limitations mentioned in","paragraphs 2 and 2a."],"old":["1. Mechanisms other than strategic","reserves shall be open to direct","participation of capacity providers located","in another Member State provided there is","","","a network connection between that","Member State and the bidding zone","applying the mechanism."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"950","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Miapetra Kumpula-Natri","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1474","justification":" Given the fast paced evolution of energy systems, NC on distribution tariff structure is not\n justified given their low cross-border impact and their strong interlink with local specificities.","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 point k"]],"meps":[124735],"meta":{"created":"2019-07-03T06:30:39"},"new":["(k) rules regarding harmonised","transmission tariff structures and","connection charges including locational","signals and inter-transmission system","operator compensation rules;"],"old":["(k) rules regarding harmonised","transmission and distribution tariff","structures and connection charges","including locational signals and inter-","transmission system operator compensation","rules;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1474","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Martina Werner, Carlos Zorrinho, Miapetra Kumpula-Natri, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1303","location":[[" Proposal for a regulation","Article 40 \u2013 paragraph 2"]],"meps":[124826,124739,124735,124784],"meta":{"created":"2019-07-03T06:30:45"},"new":["2. The management board shall be","composed of members representing the","transmission system operators."],"old":["2. The management board shall be","composed of members representing the","transmission system operators and of","observers representing the regulatory","authorities of the system operation region.","The representatives of the regulatory","authorities shall have no voting rights."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1303","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Pilar del Castillo Vera, Pilar Ayuso, Francesc Gamb\u00fas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-666","location":[["Proposal for a regulation","Article 13 \u2013 paragraph 3"]],"meps":[28390,4319,125006],"meta":{"created":"2019-07-03T06:30:44"},"new":["3. In order to ensure an optimal","bidding zone definition in closely","interconnected areas, a bidding zone","review shall be carried out. That review","shall include analysis of the configuration","of bidding zones in a coordinated manner","with the involvement of affected","stakeholders from all affected Member","States, following the process in accordance","with Articles 32 to 34 of Regulation (EU)","2015/1222."],"old":["3. In order to ensure an optimal","bidding zone definition in closely","interconnected areas, a bidding zone","review shall be carried out. That review","shall include analysis of the configuration","of bidding zones in a coordinated manner","with the involvement of affected","stakeholders from all affected Member","States, following the process in accordance","with Articles 32 to 34 of Regulation (EU)","2015/1222. The Agency shall approve and","may request amendments to the","methodology and assumptions that will be","used in the bidding zone review process as","well as the alternative bidding zone","configurations considered."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"666","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Cristian-Silviu Bu\u015foi","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-951","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 1"]],"meps":[38420],"meta":{"created":"2019-07-03T06:30:45"},"new":["1. Mechanisms other than strategic","reserves shall be open to direct cross-","border participation, by which capacities","located in another Member State or","interconnectors can be certified in the","capacity mechanism and remunerated for","their participation, subject to limitations","mentioned in paragraphs 2 and 2a."],"old":["1. Mechanisms other than strategic","reserves shall be open to direct","participation of capacity providers located","in another Member State provided there is","a network connection between that","Member State and the bidding zone","applying the mechanism."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"951","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1304","location":[[" Proposal for a regulation","Article 40 \u2013 paragraph 2"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:45"},"new":["2. The management board shall be","composed of members representing the","transmission system operators."],"old":["2. The management board shall be","composed of members representing the","transmission system operators and of","observers representing the regulatory","authorities of the system operation region.","The representatives of the regulatory","authorities shall have no voting rights."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1304","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-354","location":[[" Proposal for a regulation","Article 4 \u2013 paragraph 3"]],"meps":[124826,124870,124739,124735,124699,125041,125044],"meta":{"created":"2020-11-15T15:52:08"},"new":["3. From 1 January 2026, point (b) of","paragraph 2 shall apply only to generating","installations using high-efficiency","cogeneration with an installed electricity","capacity of less than 400 kW."],"old":["3. From 1 January 2026, point (b) of","paragraph 2 shall apply only to generating","installations using renewable energy","sources or high-efficiency cogeneration","with an installed electricity capacity of less","","","than 250 kW."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"354","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1475","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 point k"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:39"},"new":["(k) rules regarding harmonised","transmission tariff structures and","connection charges including locational","signals and inter-transmission system","operator compensation rules;"],"old":["(k) rules regarding harmonised","transmission and distribution tariff","structures and connection charges","including locational signals and inter-","transmission system operator compensation","rules;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1475","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1305","location":[["Proposal for a regulation","Article 40 \u2013 paragraph 2"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:45"},"new":["2. The management board shall be","composed of members representing the","transmission system operators and of","observers representing the regulatory","authorities of the capacity calculation","region. The representatives of the","regulatory authorities shall have no voting","rights."],"old":["2. The management board shall be","composed of members representing the","transmission system operators and of","observers representing the regulatory","authorities of the system operation region.","The representatives of the regulatory","authorities shall have no voting rights."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1305","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-952","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 1"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:46"},"new":["1. Mechanisms other than strategic","reserves shall be open to direct cross-","border participation, by which","capacities located in another Member State","and/or interconnectors can be certified in","the capacity mechanism and remunerated","for their participation, subject to","limitations mentioned in paragraph 2a."],"old":["1. Mechanisms other than strategic","reserves shall be open to direct","participation of capacity providers located","in another Member State provided there is","a network connection between that","","Member State and the bidding zone","applying the mechanism."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"952","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Kaja Kallas, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar, Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-355","location":[["Proposal for a regulation","Article 4 \u2013 paragraph 3 a (new)"]],"meps":[124697,124989,124872,125026,90110],"meta":{"created":"2020-11-15T15:52:08"},"new":["3a. For the purpose of paragraph 1,","Member states shall ensure that all","market participants have access to","competitive balancing markets and","services for the delegation of their","balancing responsibility and other","flexibility services that are cost-reflective,","and provide fair value for balancing."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"355","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Werner Langen, Markus Pieper, Kri\u0161j\u0101nis Kari\u0146\u0161","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-199","justification":"This amendment aims to ensure consistency with the other texts of the 'Clean Energy for All\nEuropeans' package.","location":[["Proposal for a regulation","Article 8 \u2013 title"]],"meps":[1928,28224,96901],"meta":{"created":"2019-07-03T06:30:40"},"new":["Tasks of the Agency as regards regional","coordination centres"],"old":["Tasks of the Agency as regards regional","operational centres"],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"199","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1306","location":[["Proposal for a regulation","Article 40 \u2013 paragraph 2"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:45"},"new":["2. The management board shall be","composed of members representing the","transmission system operators and of","observers representing the regulatory","authorities of the system operation region.","Composition of the management board","shall be geographically balanced."],"old":["2. The management board shall be","composed of members representing the","transmission system operators and of","observers representing the regulatory","authorities of the system operation region.","The representatives of the regulatory","authorities shall have no voting rights."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1306","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1476","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 point m"]],"meps":[124826,124870,124739,124735,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:39"},"new":["deleted"],"old":["(m) rules for non-discriminatory,","transparent provision of non-frequency","ancillary services, including steady state","voltage control, inertia, fast reactive","current injection, black-start capability;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1476","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Werner Langen","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-667","justification":" In this connection, ACER\u2019s remit should be confined to methodology and assumptions.","location":[["Proposal for a regulation","Article 13 \u2013 paragraph 3"]],"meps":[1928],"meta":{"created":"2019-07-03T06:30:44"},"new":["(3) In order to ensure an optimal","bidding zone definition in closely","interconnected areas, a bidding zone","review shall be carried out. That review","shall include analysis of the configuration","of bidding zones in a coordinated manner","with the involvement of affected","stakeholders from all affected Member","States, following the process in accordance","with Articles 32 to 34 of Regulation (EU)","2015/1222. The Agency shall approve and","may request amendments to the","methodology and assumptions that will be","used in the bidding zone review process."],"old":["(3) In order to ensure an optimal","bidding zone definition in closely","interconnected areas, a bidding zone","review shall be carried out. That review","shall include analysis of the configuration","of bidding zones in a coordinated manner","with the involvement of affected","stakeholders from all affected Member","States, following the process in accordance","with Articles 32 to 34 of Regulation (EU)","2015/1222. The Agency shall approve and","may request amendments to the","methodology and assumptions that will be","used in the bidding zone review process as","well as the alternative bidding zone","configurations considered."],"orig_lang":"de","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"667","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Adam Gierek, Krystyna \u0141ybacka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-953","justification":"Member States should be able to specify the rules on the participation of cross-border\ncapacity in capacity mechanisms, while retaining some flexibility in the application of the\nadopted criteria.","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 1 Regulation (EC) No 714/2009 of the European Parliament and of the Council"]],"meps":[28379,124883],"meta":{"created":"2019-07-03T06:30:46"},"new":["1. Mechanisms other than strategic","reserves shall be open to direct","participation of capacity providers located","in another Member State to the extent that","the capacity located in another Member","State can be certified in the capacity","mechanism concerned, taking into","account the limits set out in paragraphs 2","and 2a."],"old":["1. Mechanisms other than strategic","reserves shall be open to direct","participation of capacity providers located","in another Member State provided there is","a network connection between that","Member State and the bidding zone","applying the mechanism."],"orig_lang":"pl","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"953","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-356","justification":" Currently the magnitude visible to the TSO is the net of consumption and energy production\n of the generation units, not the actual demand or energy delivery of these production units,\n making demand forecasts and generation less reliable and the system less secure and more\n necessitated of reserves and flexibility resources.","location":[["Proposal for a regulation","Article 4 \u2013 paragraph 3 a (new)"]],"meps":[90110],"meta":{"created":"2020-11-15T15:52:08"},"new":["3a. From 1 January 2020, all power","plants, using renewable energy sources,","with an installed electricity capacity of","more than 5 MW shall be able to receive","in real time from the relevant TSO a","maximum set point for their energy","production."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"356","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Barbara Kappel, Lorenzo Fontana, Angelo Ciocca","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-200","location":[["Proposal for a regulation","Article 8 \u2013 paragraph 1"]],"meps":[125024,96993,183793],"meta":{"created":"2019-07-03T06:30:40"},"new":["deleted"],"old":["1. The Agency, in close cooperation","with the national regulatory authorities","and the ENTSO for Electricity, shall","monitor and analyse the performance of","regional operational centres, taking into","account the reports provided for in","[Article 43 paragraph 4 recast Electricity","Regulation as proposed by COM(2016)","861/2]."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"200","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1477","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 point m"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:39"},"new":["deleted"],"old":["(m) rules for non-discriminatory,","transparent provision of non-frequency","ancillary services, including steady state","voltage control, inertia, fast reactive","current injection, black-start capability;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1477","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Kaja Kallas, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar, Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1307","location":[[" Proposal for a regulation","Article 40 \u2013 paragraph 2 a (new)"]],"meps":[124697,124989,124872,125026,90110],"meta":{"created":"2019-07-03T06:30:45"},"new":["2 a. The Management board shall","ensure that the functioning of the","Regional operational centre is inclusive,","ensures geographically- balanced","representation and equitable treatment in","the procedures and decision-making","processes between members of Regional","operational centre."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1307","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-954","justification":" There should not be an exception for strategic reserves.","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 1"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:46"},"new":["1. All capacity mechanisms other than","strategic reserves shall be open to direct","participation of capacity providers located","in another Member State provided there is","a network connection between that","Member State and the bidding zone","applying the mechanism."],"old":["1. Mechanisms other than strategic","reserves shall be open to direct","participation of capacity providers located","in another Member State provided there is","a network connection between that","","Member State and the bidding zone","applying the mechanism."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"954","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-357","justification":" Reporting processes should be streamlined through the Governance Regulation to avoid\n additional administrative burden.","location":[[" Proposal for a regulation","Article 4 \u2013 paragraph 3 a (new)"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["3a. Member States shall comply with","the provisions of the above paragraphs","through the reporting process on the","internal energy market as provided in","Article 21 of the Governance regulation","[add reference]."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"357","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Davor \u0160krlec on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-201","justification":" As market coupling increases, ACER should be empowered to exercise stronger oversight of\n cross-border market activity, including tasks of ROCs. ACER is better placed than ENTSOs to\n oversee ROCs because ENTSO-E consist of TSOs, that act as natural monopolies and should\n themselves be subject to regulatory oversight. Therefore, ACER should have adequate\n mandate, including issuing binding decisions in cases of non-compliance.","location":[["Proposal for a regulation","Article 8 \u2013 paragraph 1"]],"meps":[124756],"meta":{"created":"2019-07-03T06:30:40"},"new":["1. The Agency, in close cooperation","with the national regulatory authorities","shall monitor and analyse the performance","of regional operational centres, taking into","account the reports provided for in [Article","43 paragraph 4 recast Electricity","Regulation as proposed by COM(2016)","861/2]. The Agency or the subset of the","Board of Regulators as referred to in","Article 7 shall issue recommendations or,","where appropriate, decisions to ensure","that the regional operational centres","comply with their obligations under this","Regulation and other relevant Union","legislation, notably as regards their effect","on the market integration as well as on","non-discrimination, effective competition","and the efficient functioning of the","market."],"old":["1. The Agency, in close cooperation","with the national regulatory authorities and","the ENTSO for Electricity, shall monitor","and analyse the performance of regional","operational centres, taking into account the","reports provided for in [Article 43","paragraph 4 recast Electricity Regulation as","proposed by COM(2016) 861/2]."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"201","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-955","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 1"]],"meps":[124826,124870,124739,124735,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:46"},"new":["1. Mechanisms other than strategic","reserves shall be open to direct","participation of capacity providers located","in another Member State provided there is","a physical network connection between","that Member State and the bidding zone","applying the mechanism."],"old":["1. Mechanisms other than strategic","reserves shall be open to direct","participation of capacity providers located","in another Member State provided there is","a network connection between that","Member State and the bidding zone","applying the mechanism."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"955","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1478","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 point n"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:39"},"new":["deleted"],"old":["(n) demand response, including","aggregation, energy storage, and demand","curtailment rules;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1478","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1308","location":[[" Proposal for a regulation","Article 40 \u2013 paragraph 3 \u2013 point a"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:45"},"new":["(a) drafting and endorsing the statutes","and rules of procedure of the regional","security coordinator;"],"old":["(a) drafting and endorsing the statutes","and rules of procedure of the regional","operational centre;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1308","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Martina Werner, Peter Kouroumbashev, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-668","location":[[" Proposal for a regulation","Article 13 \u2013 paragraph 4"]],"meps":[124826,124857,124870,124739,124735,124699],"meta":{"created":"2019-07-03T06:30:44"},"new":["deleted"],"old":["4. The transmission system operators","participating in the bidding zone review","shall submit a proposal to the","Commission regarding whether to amend","or maintain the bidding zone","configuration. Based on that proposal, the","Commission shall adopt a decision","whether to amend or maintain the bidding","zone configuration, [no later than 6","months after entry into force of this","Regulation, specific date to be inserted by","OP] or by six months after the conclusion","of the bidding zone configuration","","launched in accordance with points (a),","(b) or (c) of Article 32(1) of Regulation","(EU) 2015/1222, whichever comes later."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"668","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Kathleen Van Brempt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-358","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 1"]],"meps":[5729],"meta":{"created":"2020-11-15T15:52:08"},"new":["1. All market participants, including","those offering electricity production from","variable renewable energy sources,","storage and demand side management","services, shall have access to the balancing","market, be it individually or through","aggregation. Balancing market rules and","products shall respect the need to","accommodate increasing shares of variable","generation as well as increased demand","responsiveness and the advent of new","technologies."],"old":["1. All market participants shall have","access to the balancing market, be it","individually or through aggregation.","Balancing market rules and products shall","respect the need to accommodate","increasing shares of variable generation as","well as increased demand responsiveness","and the advent of new technologies.",""],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"358","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Hans-Olaf Henkel","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-202","location":[[" Proposal for a regulation","Article 8 \u2013 paragraph 1"]],"meps":[124823],"meta":{"created":"2019-07-03T06:30:40"},"new":["1. The Agency, in close cooperation","with the national regulatory authorities and","the ENTSO for Electricity, shall monitor","and analyse the performance of regional","operational centres, taking into account the","reports provided for in Art. 43 (4) of","Regulation (EU) .../... [proposed recast","Electricity Regulation, COD (2016) 0379].","The Agency shall ensure that the regional","operational centres comply with their","obligations under Regulation (EU) .../...","[proposed recast Electricity Regulation,","COD (2016) 0379], the network codes","adopted pursuant to Art. 54 and 55","thereof and the guidelines adopted."],"old":["1. The Agency, in close cooperation","with the national regulatory authorities and","the ENTSO for Electricity, shall monitor","and analyse the performance of regional","operational centres, taking into account the","","","reports provided for in [Article 43","paragraph 4 recast Electricity Regulation","as proposed by COM(2016) 861/2]."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"202","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Massimiliano Salini","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-956","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 1"]],"meps":[125670],"meta":{"created":"2019-07-03T06:30:46"},"new":["1. Capacity mechanisms and strategic","reserves shall be open to direct","participation of capacity providers located","in another Member State provided there is","a network connection between that","Member State and the bidding zone","applying the mechanism."],"old":["1. Mechanisms other than strategic","reserves shall be open to direct","participation of capacity providers located","in another Member State provided there is","a network connection between that","Member State and the bidding zone","applying the mechanism."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"956","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1479","justification":" In this Regulation it is clearly mentioned that rules concerning regional operational centres\n should be set by TSOs. For this reason, it is not clear why it is necessary to have additional\n legal decree for ROCs.It is also our opinion that all of such important provisions should be\n explicitly mentioned in the text of this Regulation.","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 point n"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:39"},"new":["deleted"],"old":["(n) demand response, including","aggregation, energy storage, and demand","curtailment rules;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1479","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1309","location":[[" Proposal for a regulation","Article 40 \u2013 paragraph 3 \u2013 point b"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:45"},"new":["(b) implementing the organisational","structure;"],"old":["(b) deciding upon and implementing","the organisational structure;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1309","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Andr\u00e1s Gy\u00fcrk, Gy\u00f6rgy H\u00f6lv\u00e9nyi","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-957","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 1"]],"meps":[23816,124715],"meta":{"created":"2019-07-03T06:30:46"},"new":["1. Mechanisms other than strategic","reserves may be open to direct","participation of capacity providers located","in another Member State provided there is","a network connection between that","Member State and the bidding zone","applying the mechanism."],"old":["1. Mechanisms other than strategic","reserves shall be open to direct","participation of capacity providers located","in another Member State provided there is","a network connection between that","Member State and the bidding zone","applying the mechanism."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"957","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Eugen Freund, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-359","location":[["Proposal for a regulation","Article 5 \u2013 paragraph 1"]],"meps":[124826,124870,124739,124735,125018,124699,125041,125044,124784],"meta":{"created":"2020-11-15T15:52:08"},"new":["1. All market participants, including","those providing electricity generated from","variable renewable sources and demand","side response and storage services shall","have full access to the balancing market,","be it individually or through aggregation.","Balancing market rules and products shall","respect the need to accommodate","increasing shares of variable generation as","well as increased demand responsiveness","and the advent of new technologies."],"old":["1. All market participants shall have","access to the balancing market, be it","individually or through aggregation.","Balancing market rules and products shall","respect the need to accommodate","increasing shares of variable generation as","well as increased demand responsiveness","and the advent of new technologies."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"359","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Werner Langen, Markus Pieper, Kri\u0161j\u0101nis Kari\u0146\u0161","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-203","justification":"This amendment aims to ensure consistency with the other texts of the 'Clean Energy for All\nEuropeans' package.","location":[["Proposal for a regulation","Article 8 \u2013 paragraph 1"]],"meps":[1928,28224,96901],"meta":{"created":"2019-07-03T06:30:40"},"new":["1. The Agency, in close cooperation","with the national regulatory authorities and","the ENTSO for Electricity, shall monitor","and analyse the performance of regional","coordination centres, taking into account","the reports provided for in [Article 43","paragraph 4 recast Electricity Regulation as","proposed by COM(2016) 861/2]."],"old":["1. The Agency, in close cooperation","with the national regulatory authorities and","the ENTSO for Electricity, shall monitor","and analyse the performance of regional","operational centres, taking into account the","reports provided for in [Article 43","paragraph 4 recast Electricity Regulation as","proposed by COM(2016) 861/2]."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"203","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-958","justification":"Commission\u00b4s proposal in Article 21 para 1 excludes cross border participation in capacity\nmechanism for strategic reserve. This exception is not justified anywhere in the proposal and\nin our opinion there is neither any theoretical reason for such exception. Strategic reserve is\nstandard form of capacity mechanism, where cross border participation can bring increased\neffectivity. With regard to strategic reserve, this topic is of particular interest and brings new\npossibility to effectively share generation adequacy surplus of neighbouring countries.","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 1"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:46"},"new":["1. Mechanisms shall be open to direct","participation of capacity providers located","in another Member State provided there is","a network connection between that","Member State and the bidding zone","applying the mechanism."],"old":["1. Mechanisms other than strategic","reserves shall be open to direct","participation of capacity providers located","in another Member State provided there is","a network connection between that","Member State and the bidding zone","applying the mechanism."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"958","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1310","location":[["Proposal for a regulation","Article 40 \u2013 paragraph 3 \u2013 point d"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:46"},"new":["deleted"],"old":["(d) developing and endorsing the","cooperative decision-making processes in","accordance with Article 35."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1310","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1480","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 point n"]],"meps":[124826,124870,124739,124735,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:39"},"new":["deleted"],"old":["(n) demand response, including","aggregation, energy storage, and demand","curtailment rules;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1480","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-204","location":[["Proposal for a regulation","Article 8 \u2013 paragraph 1"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:40"},"new":["1. The Agency, in close cooperation","with the national regulatory authorities and","the ENTSO for Electricity, shall monitor","and analyse the performance of regional","coordination centres, taking into account","the reports provided for in [Article 43","paragraph 4 recast Electricity Regulation as","proposed by COM(2016) 861/2]."],"old":["1. The Agency, in close cooperation","with the national regulatory authorities and","the ENTSO for Electricity, shall monitor","and analyse the performance of regional","operational centres, taking into account the","reports provided for in [Article 43","paragraph 4 recast Electricity Regulation as","proposed by COM(2016) 861/2]."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"204","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-669","location":[["Proposal for a regulation","Article 13 \u2013 paragraph 4"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:44"},"new":["4. The transmission system operators","participating in the bidding zone review","shall submit a proposal to the relevant","Member States whether to amend or","maintain the bidding zone configuration.","The relevant Member States are those","participating in the review pursuant to","Article 32(2) of Regulation","(EU)2015/1222 and those in the same","Capacity Calculation Region(s) pursuant","to Regulation (EU) 2015/1222. Based on","the proposal, the relevant Member States","shall come to a unanimous decision within","six months on whether to amend or","maintain the bidding zone configuration.","Other Member States or third countries","may submit comments. The decision shall","be reasoned, in accordance with relevant","Union law and shall take account of the","observations of other Member States and","third countries, as well as of commitments","on addressing existing congestion made","by the relevant Member States. The","relevant Member States shall notify the","Commission and the Agency of their","decision and any cross-border agreements","entered into by the Member States, the","national regulatory authorities or the","transmission system operators for the","purpose of achieving consensus.","Agreements entered into by the relevant","Member States shall not deviate from","coordinated capacity calculation","processes as set out in Article14 nor from","the relevant provisions of Regulation (EU)","2015/1222"],"old":["4. The transmission system operators","participating in the bidding zone review","shall submit a proposal to the Commission","regarding whether to amend or maintain","the bidding zone configuration. Based on","that proposal, the Commission shall adopt","a decision whether to amend or maintain","the bidding zone configuration, [no later","than 6 months after entry into force of","this Regulation, specific date to be","inserted by OP] or by six months after the","conclusion of the bidding zone","configuration launched in accordance","with points (a), (b) or (c) of Article 32(1)","of Regulation (EU) 2015/1222, whichever","comes later.",""],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"669","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Pilar del Castillo Vera, Francesc Gamb\u00fas, Pilar Ayuso","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-360","location":[["Proposal for a regulation","Article 5 \u2013 paragraph 1"]],"meps":[28390,125006,4319],"meta":{"created":"2020-11-15T15:52:08"},"new":["1. All market participants shall have","successfully completed a qualification","process in order to become a balancing","service provider, be it individually or","through aggregation. Balancing market","rules and products shall respect the need to","accommodate increasing shares of variable","generation as well as increased demand","responsiveness and the advent of new","technologies."],"old":["1. All market participants shall have","access to the balancing market, be it","individually or through aggregation.","Balancing market rules and products shall","respect the need to accommodate","increasing shares of variable generation as","well as increased demand responsiveness","","and the advent of new technologies."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"360","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-959","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 1"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:46"},"new":["1. Mechanisms shall be open to direct","participation of capacity providers located","in another Member State provided there is","a network connection between that","Member State and the bidding zone","applying the mechanism."],"old":["1. Mechanisms other than strategic","reserves shall be open to direct","participation of capacity providers located","in another Member State provided there is","a network connection between that","Member State and the bidding zone","applying the mechanism."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"959","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Kaja Kallas, Pavel Teli\u010dka, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar, Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1311","location":[["Proposal for a regulation","Article 40 \u2013 paragraph 3 \u2013 point d"]],"meps":[124697,124706,124989,124872,125026,90110],"meta":{"created":"2019-07-03T06:30:46"},"new":["(d) developing and endorsing the","cooperative and inclusive decision-making","processes in accordance with Article 35."],"old":["(d) developing and endorsing the","cooperative decision-making processes in","accordance with Article 35."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1311","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Kaja Kallas, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1481","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 point n"]],"meps":[124697,124989,124872,125026],"meta":{"created":"2019-07-03T06:30:40"},"new":["(n) demand response, including","aggregation, and demand curtailment rules;"],"old":["(n) demand response, including","aggregation, energy storage, and demand","curtailment rules;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1481","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Davor \u0160krlec on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-205","justification":" ACER should be empowered to exercise stronger oversight of cross-border market activity,\n including tasks of ROCs.","location":[[" Proposal for a regulation","Article 8 \u2013 paragraph 1 a (new)"]],"meps":[124756],"meta":{"created":"2019-07-03T06:30:40"},"new":["1a. The Agency shall report annually","to the Commission the results of the","monitoring provided in paragraph 1."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"205","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-361","justification":" The proposal requires that all market participants should have access to the balancing\n market. However, renewable energy communities and active customers, as a category of\n market participants, face diverse regulatory and market barriers that are not well understood\n or acknowledged by national authorities and that are effectively preventing them from\n participating in the balancing market. The proposed amendment would provide a stronger\n obligation for national authorities to ensure that these barriers are removed and that active\n customers and local energy communities do not only have partial access to the balancing\n market.","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 1"]],"meps":[96852],"meta":{"created":"2020-11-15T15:52:08"},"new":["1. All market participants shall have","full access to the balancing market, be it","individually or through aggregation.","Balancing market rules and products shall","respect the need to accommodate","increasing shares of variable generation,","including small decentralized or","distributed generation, as well as","increased demand responsiveness and the","advent of new technologies."],"old":["1. All market participants shall have","access to the balancing market, be it","individually or through aggregation.","Balancing market rules and products shall","respect the need to accommodate","increasing shares of variable generation as","well as increased demand responsiveness","and the advent of new technologies."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"361","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-960","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 1"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:46"},"new":["1. Mechanisms shall be open to direct","participation of capacity providers located","in another Member State provided there is","a network connection between that","Member State and the bidding zone","applying the mechanism."],"old":["1. Mechanisms other than strategic","reserves shall be open to direct","participation of capacity providers located","in another Member State provided there is","a network connection between that","Member State and the bidding zone","applying the mechanism."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"960","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1312","location":[["Proposal for a regulation","Article 40 \u2013 paragraph 4"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:46"},"new":["4. The competences of the","management board shall exclude those that","are related to the day-to-day activities of","regional security coordinators and the","performance of its services."],"old":["4. The competences of the","management board shall exclude those that","are related to the day-to-day activities of","regional operational centres and the","performance of its functions."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1312","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-362","justification":"Decentralised and distributed generation require an access to balancing markets to be able to\neffectively participate and be integrated in the electricity market.","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 1"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["1. All market participants shall have","access to the balancing market, be it","individually or through aggregation.","Balancing market rules and products shall","respect the need to accommodate","increasing shares of variable generation","including small decentralised or","distributed generation, as well as","increased demand responsiveness and the","advent of new technologies."],"old":["1. All market participants shall have","access to the balancing market, be it","individually or through aggregation.","Balancing market rules and products shall","respect the need to accommodate","increasing shares of variable generation as","well as increased demand responsiveness","and the advent of new technologies."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"362","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Kaja Kallas, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1482","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 point n a (new)"]],"meps":[124697,124989,124872,125026],"meta":{"created":"2019-07-03T06:30:40"},"new":["(n a) energy storage ;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1482","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Massimiliano Salini, Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-670","location":[[" Proposal for a regulation","Article 13 \u2013 paragraph 4"]],"meps":[125670,36392],"meta":{"created":"2019-07-03T06:30:44"},"new":["4. The transmission system operators","participating in the bidding zone review","shall submit a proposal to the concerned","national regulatory authorities regarding","whether to amend or maintain the bidding","zone configuration. Based on that proposal,","the national regulatory authorities of the","concerned member states shall adopt a","decision whether to amend or maintain the","bidding zone configuration, [no later than 6","months after entry into force of this","Regulation, specific date to be inserted by","OP] or by six months after the conclusion","of the bidding zone configuration launched","in accordance with points (a), (b) or (c) of","Article 32(1) of Regulation (EU)","2015/1222, whichever comes later.","Where the national regulatory authorities","have not been able to reach agreement","within 6months following the receipt of","the proposal regarding the bidding zone","review, or upon their joint request, the","Agency shall adopt a decision concerning","the submitted proposal within six months,","in accordance with Article xx of [ACER","Regulation]"],"old":["4. The transmission system operators","participating in the bidding zone review","shall submit a proposal to the Commission","regarding whether to amend or maintain","the bidding zone configuration. Based on","that proposal, the Commission shall adopt","a decision whether to amend or maintain","the bidding zone configuration, [no later","than 6 months after entry into force of this","Regulation, specific date to be inserted by","OP] or by six months after the conclusion","of the bidding zone configuration launched","in accordance with points (a), (b) or (c) of","Article 32(1) of Regulation (EU)","2015/1222, whichever comes later."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"670","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Lud\u011bk Niedermayer","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-961","justification":"Cross-border participation should apply to all types of mechanisms aimed at ensuring\nsecurity of supply, including strategic reserves.","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 1"]],"meps":[124701],"meta":{"created":"2019-07-03T06:30:46"},"new":["1. Capacity mechanisms shall be","open to direct participation of capacity","providers located in another Member State","provided there is a network connection","between that Member State and the bidding","zone applying the mechanism."],"old":["1. Mechanisms other than strategic","reserves shall be open to direct","","participation of capacity providers located","in another Member State provided there is","a network connection between that","Member State and the bidding zone","applying the mechanism."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"961","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1483","justification":"Already several European bodies dealing with the issue (such as ENISA) and a network code\nwould most likely overlap with other regulations and public information should be restricted\nto what is necessary.","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 point o"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:40"},"new":["deleted"],"old":["(o) cyber security rules; and"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1483","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1313","justification":" It is our position that Articles 31 to 44 and all reference regarding ROCs in the Clean Energy\n Package to All Europeans shall be deleted without any substitution.It is of particular concern\n that establishment of ROCs violates subsidiarity and proportionality principle according to\n art. 194 SFEU","location":[[" Proposal for a regulation","Article 41"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:46"},"new":["Article 41 deleted","Organisational structure"],"old":["1. Regional operational centres shall set","up and manage their organisation","according to a structure that supports the","safety of their functions. Their","organisational structure shall specify:","(a) the authority, duties and","responsibilities of the management","personnel;","(b) the relationship and reporting lines","between different parts and processes of","the organisation.","2. Regional operational centres may set","up regional desks to address local","specificities or back-up operational","centres for the efficient and reliable","exercise of their functions."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1313","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Davor \u0160krlec on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-206","justification":"In consistence with the amendments proposed in Art 7.","location":[[" Proposal for a regulation","Article 8 \u2013 paragraph 2 \u2013 introductory part"]],"meps":[124756],"meta":{"created":"2019-07-03T06:30:40"},"new":["2. The Agency or the subset of the","Board of Regulators as referred to in","Article 7 shall in particular:"],"old":["2. To carry out the tasks referred to","in paragraph 1 in an efficient and","","expeditious manner, the Agency shall in","particular:"],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"206","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-363","justification":"Proposal requires access of all market participants to the balancing markets, mainly with\nfocus on new technologies (RES, storages, aggregators).Nevertheless certification\nrequirements for these new technologies are omitted together with not existent definition. We\ntherefore propose to include specification of certification requirements for balancing market\nparticipants.","location":[["Proposal for a regulation","Article 5 \u2013 paragraph 1"]],"meps":[28331],"meta":{"created":"2020-11-15T15:52:08"},"new":["1. All prequalified market participants","shall have access to the balancing market,","be it individually or through aggregation.","Balancing market rules and products shall","respect the need to accommodate","increasing shares of variable generation as","well as increased demand responsiveness","and the advent of new technologies."],"old":["1. All market participants shall have","access to the balancing market, be it","individually or through aggregation.","Balancing market rules and products shall","respect the need to accommodate","increasing shares of variable generation as","well as increased demand responsiveness","and the advent of new technologies."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"363","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-962","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 1"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:46"},"new":["1. Capacity mechanisms shall be","open to direct participation of capacity","providers located in another Member State","provided there is a network connection","between that Member State and the bidding","zone applying the mechanism."],"old":["1. Mechanisms other than strategic","reserves shall be open to direct","participation of capacity providers located","in another Member State provided there is","a network connection between that","Member State and the bidding zone","applying the mechanism."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"962","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1484","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 point o"]],"meps":[124826,124870,124739,124735,124699],"meta":{"created":"2019-07-03T06:30:40"},"new":["deleted"],"old":["(o) cyber security rules; and"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1484","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Kate\u0159ina Kone\u010dn\u00e1, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1314","location":[[" Proposal for a regulation","Article 41"]],"meps":[23699,96713],"meta":{"created":"2019-07-03T06:30:46"},"new":["Article 41 deleted","Organisational structure"],"old":["","1. Regional operational centres shall set","up and manage their organisation","according to a structure that supports the","safety of their functions. Their","organisational structure shall specify:","(a) the authority, duties and","responsibilities of the management","personnel;","(b) the relationship and reporting lines","between different parts and processes of","the organisation.","2. Regional operational centres may set","up regional desks to address local","specificities or back-up operational","centres for the efficient and reliable","exercise of their functions."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1314","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Pilar del Castillo Vera","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-207","location":[["Proposal for a regulation","Article 8 \u2013 paragraph 2 \u2013 point a"]],"meps":[28390],"meta":{"created":"2019-07-03T06:30:40"},"new":["deleted"],"old":["(a) decide on the configuration of","system operation regions pursuant to","Article 33(1) of [recast Electricity","Regulation as proposed by COM(2016)","861/2]"],"orig_lang":"es","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"207","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-364","justification":" Proposal requires access of all market participants to the balancing markets, mainly with\n focus on new technologies such as renewables, energy storage or aggregators).Nevertheless\n certification requirements for these new technologies are omitted.","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 1"]],"meps":[124706],"meta":{"created":"2020-11-15T15:52:08"},"new":["1. All prequalified market participants","shall have access to the balancing market,","be it individually or through aggregation.","Balancing market rules and products shall","respect the need to accommodate","increasing shares of variable generation as","well as increased demand responsiveness","and the advent of new technologies."],"old":["1. All market participants shall have","access to the balancing market, be it","individually or through aggregation.","Balancing market rules and products shall","respect the need to accommodate","increasing shares of variable generation as","well as increased demand responsiveness","and the advent of new technologies."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"364","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Kaja Kallas, Fredrick Federley, Angelika Mlinar, Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-671","location":[["Proposal for a regulation","Article 13 \u2013 paragraph 4"]],"meps":[124697,124989,125026,90110],"meta":{"created":"2019-07-03T06:30:44"},"new":["4. The transmission system operators","participating in the bidding zone review","shall submit a proposal to the relevant","Member States whether to amend or","maintain the bidding zone configuration.","Based on that proposal, the relevant","Member States shall come to a unanimous","decision on whether to amend or maintain","the bidding zone configuration [no later","than 6 months after entry into force of this","Regulation, specific date to be inserted by","OP] or by six months after the conclusion","of the bidding zone configuration launched","in accordance with points (a), (b) or (c) of","Article 32(1) of Regulation (EU)","2015/1222, whichever comes later. The","relevant Member States shall notify the","Commission and the Agency of their","decision and any cross-border agreements","entered into by the Member States, the","national regulatory authorities or the","transmission system operators for the","purpose of achieving consensus.","Agreements entered into by the relevant","Member States shall not deviate from","coordinated capacity calculation","processes as set out in Article 14 nor from","the relevant provisions of Regulation","(EU) 2015/1222."],"old":["4. The transmission system operators","participating in the bidding zone review","shall submit a proposal to the Commission","regarding whether to amend or maintain","the bidding zone configuration. Based on","that proposal, the Commission shall adopt","a decision whether to amend or maintain","the bidding zone configuration, [no later","than 6 months after entry into force of this","Regulation, specific date to be inserted by","OP] or by six months after the conclusion","of the bidding zone configuration launched","in accordance with points (a), (b) or (c) of","Article 32(1) of Regulation (EU)","2015/1222, whichever comes later."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"671","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1485","justification":" Rules for regional coordination centres naturally fall under System Operation Guidelines as\n they would provide additional level of detail on how in practice the coordination should be\n executed.","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 point p"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:40"},"new":["deleted"],"old":["(p) rules concerning regional","operational centres."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1485","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Pilar del Castillo Vera, Pilar Ayuso, Francesc Gamb\u00fas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-963","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 1"]],"meps":[28390,4319,125006],"meta":{"created":"2019-07-03T06:30:46"},"new":["1. Mechanisms shall be open to direct","cross-border participation of capacity","providers located in another Member State","according to the level of interconnection","between that Member State and the bidding","zone applying the mechanism."],"old":["1. Mechanisms other than strategic","reserves shall be open to direct","participation of capacity providers located","in another Member State provided there is","a network connection between that","Member State and the bidding zone","","","applying the mechanism."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"963","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-365","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 1"]],"meps":[96713],"meta":{"created":"2020-11-15T15:52:08"},"new":["1. All prequalified market participants","shall have access to the balancing market,","be it individually or through aggregation.","Balancing market rules and products shall","respect the need to accommodate","increasing shares of variable generation as","well as increased demand responsiveness","and the advent of new technologies."],"old":["1. All market participants shall have","access to the balancing market, be it","individually or through aggregation.","Balancing market rules and products shall","respect the need to accommodate","increasing shares of variable generation as","well as increased demand responsiveness","and the advent of new technologies."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"365","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Werner Langen","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-208","location":[["Proposal for a regulation","Article 8 \u2013 paragraph 2 \u2013 point a"]],"meps":[1928],"meta":{"created":"2019-07-03T06:30:40"},"new":["deleted"],"old":["(a) decide on the configuration of","system operation regions pursuant to","Article 33(1) of [recast Electricity","Regulation as proposed by COM(2016)","861/2]"],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"208","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1315","location":[["Proposal for a regulation","Article 41 \u2013 paragraph 1 \u2013 introductory part"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:46"},"new":["1. Regional operational centres shall","set up and manage their organisation","according to a structure that supports the","safety of their functions and that they","exercise their powers independent from","any market players. Regional operational","centres shall ensure that their staff and","the persons responsible for their","management act independently from any","market interest and do not seek or take","direct instructions from any government","or other public or private entity when","carrying out their tasks. Their","organisational structure shall specify:"],"old":["1. Regional operational centres shall","set up and manage their organisation","according to a structure that supports the","safety of their functions.","Their organisational structure shall specify:"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1315","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1486","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 1 \u2013 point p"]],"meps":[124826,124870,124739,124735,124699],"meta":{"created":"2019-07-03T06:30:40"},"new":["deleted"],"old":["(p) rules concerning regional","operational centres."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1486","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Kaja Kallas, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar, Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-366","location":[["Proposal for a regulation","Article 5 \u2013 paragraph 1"]],"meps":[124697,124989,124872,125026,90110],"meta":{"created":"2020-11-15T15:52:08"},"new":["1. All market participants shall have","full access to the balancing market, be it","individually or through aggregation.","Balancing market rules and products shall","respect the need to accommodate","increasing shares of variable generation as","well as increased demand responsiveness","and the advent of new technologies."],"old":["1. All market participants shall have","access to the balancing market, be it","individually or through aggregation.","Balancing market rules and products shall","respect the need to accommodate","increasing shares of variable generation as","well as increased demand responsiveness","and the advent of new technologies."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"366","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-209","justification":" Member States should be able to express a binding opinion, so that the Commission is not\n granted sole decision-making power on this matter.","location":[[" Proposal for a regulation","Article 8 \u2013 paragraph 2 \u2013 point a"]],"meps":[96993],"meta":{"created":"2019-07-03T06:30:40"},"new":["(a) having heard the binding opinion","of the Member States, decide on the","configuration of system operation regions","pursuant to Article 33(1) of [recast","Electricity Regulation as proposed by","COM(2016) 861/2];"],"old":["(a) decide on the configuration of","system operation regions pursuant to","Article 33(1) of [recast Electricity","Regulation as proposed by COM(2016)","861/2]"],"orig_lang":"it","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"209","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Jerzy Buzek, Janusz Lewandowski, Marian-Jean Marinescu","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-964","justification":" Member States should be enabled to determine the rules of cross-border participation in their\n capacity mechanism with a necessary degree of flexibility.","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 2"]],"meps":[23781,33982],"meta":{"created":"2019-07-03T06:30:46"},"new":["2. Member States shall ensure that","eligible foreign capacity capable of","providing equivalent contribution to their","system adequacy as domestic capacities","has the opportunity to participate in the","same competitive process as domestic","capacity."],"old":["2. Member States shall ensure that","foreign capacity capable of providing","equivalent technical performance to","domestic capacities has the opportunity to","participate in the same competitive process","as domestic capacity."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"964","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-672","location":[["Proposal for a regulation","Article 13 \u2013 paragraph 4"]],"meps":[96993],"meta":{"created":"2019-07-03T06:30:44"},"new":["4. The transmission system operators","participating in the bidding zone review","shall submit a proposal to the concerned","national regulatory authorities regarding","whether to amend or maintain the bidding","zone configuration. Based on that proposal,","the national regulatory authorities of the","concerned member states shall adopt a","decision whether to amend or maintain the","bidding zone configuration, [no later than 6","months after entry into force of this","Regulation, specific date to be inserted by","OP] or by six months after the conclusion","of the bidding zone configuration launched","in accordance with points (a), (b) or (c) of","Article 32(1) of Regulation (EU)","2015/1222, whichever comes later.","Where the national regulatory authorities","have not been able to reach an agreement","within 6 months following the receipt of","the proposal regarding the bidding zone","review, or upon their joint request, the","Agency shall adopt a decision concerning","the submitted proposal within six months"],"old":["4. The transmission system operators","participating in the bidding zone review","shall submit a proposal to the Commission","regarding whether to amend or maintain","the bidding zone configuration. Based on","that proposal, the Commission shall adopt","a decision whether to amend or maintain","the bidding zone configuration, [no later","than 6 months after entry into force of this","Regulation, specific date to be inserted by","OP] or by six months after the conclusion","of the bidding zone configuration launched","in accordance with points (a), (b) or (c) of","Article 32(1) of Regulation (EU)","2015/1222, whichever comes later."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"672","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1487","meps":[2278],"meta":{"created":"2019-07-03T06:30:40"},"new":["(p a) Energy storage"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1487","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Davor \u0160krlec on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-210","justification":" Because the ROCs\u2019 reach largely surpasses the national reach of the NRAs, ACER should be\n responsible for issuing the guidelines for statutes and rules of procedure, approving statutes\n\nand rules of procedure, the cooperative decision-making procedure, and the framework for\nthe cooperation and coordination between regional operational centres since they will have a\ntangible impact for the consistency and interoperability between ROCs and significant\nrelevance beyond the concerned region.","location":[[" Proposal for a regulation","Article 8 \u2013 paragraph 2 \u2013 point a a (new)"]],"meps":[124756],"meta":{"created":"2019-07-03T06:30:41"},"new":["(aa) issue guidelines and","recommendations for the elaboration of","the statutes and rules of procedure","referred to in [Article 32(2) of recast","Electricity Regulation as proposed by","COM(2016) 861/2] with a view to","promoting their soundness and","convergence;"],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"210","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1316","location":[[" Proposal for a regulation","Article 41 \u2013 paragraph 1 \u2013 introductory part"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:46"},"new":["1. Transmission system operators of","the capacity calculation region shall","establish the necessary arrangements for","regional security coordinators to manage","their organisation according to a structure","that supports the safety of their services."],"old":["1. Regional operational centres shall","set up and manage their organisation","according to a structure that supports the","safety of their functions.","Their organisational structure shall","specify:"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1316","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-367","justification":" Balancing markets must cater for the new needs that are required to allow market\n participation of new, innovative and more distributed actors.","location":[["Proposal for a regulation","Article 5 \u2013 paragraph 2"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["2. Balancing markets shall be","organised in such a way, in particular","through product definition, bid size,","duration and gate closure, as to ensure","effective non-discrimination between","market participants taking account of the","different technical capability of generation","from variable renewable sources, including","small decentralised or distributed","generation, and individual and","aggregated demand side response and","storage and taking account of the","different ownership of the generation.","Balancing markets shall allow","prequalification for a pool of","decentralised resources, rather than","individual units."],"old":["2. Balancing markets shall be","organised in such a way as to ensure","effective non-discrimination between","market participants taking account of the","different technical capability of generation","from variable renewable sources and","demand side response and storage."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"367","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Cristian-Silviu Bu\u015foi","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-965","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 2"]],"meps":[38420],"meta":{"created":"2019-07-03T06:30:46"},"new":["2. Member States shall ensure that","eligible foreign capacity capable of","providing equivalent contribution to their","system adequacy as domestic capacities","has the opportunity to participate in the","same competitive process as domestic","capacity."],"old":["2. Member States shall ensure that","foreign capacity capable of providing","equivalent technical performance to","domestic capacities has the opportunity to","participate in the same competitive process","as domestic capacity."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"965","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-673","location":[[" Proposal for a regulation","Article 13 \u2013 paragraph 4"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:44"},"new":["4. The transmission system operators","participating in the bidding zone review","shall submit a proposal to the","Commission and Member States of the","capacity calculation region regarding","whether to amend or maintain the bidding","zone configuration. Based on that","proposal, in case there is no agreement","between Member States in the capacity","calculation region, the Commission shall","adopt a decision whether to amend or","maintain the bidding zone configuration,","by clearly highlighting the issue at stake","combined with an assessment of all","available solutions on an equal basis, [no","later than 6 months after entry into force of","this Regulation, specific date to be inserted","by OP] or by six months after the","conclusion of the bidding zone","configuration launched in accordance with","points (a), (b) or (c) of Article 32(1) of","Regulation (EU) 2015/1222, whichever","comes later."],"old":["4. The transmission system operators","participating in the bidding zone review","shall submit a proposal to the Commission","regarding whether to amend or maintain","the bidding zone configuration. Based on","that proposal, the Commission shall adopt","a decision whether to amend or maintain","the bidding zone configuration, [no later","than 6 months after entry into force of this","Regulation, specific date to be inserted by","OP] or by six months after the conclusion","of the bidding zone configuration launched","","in accordance with points (a), (b) or (c) of","Article 32(1) of Regulation (EU)","2015/1222, whichever comes later."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"673","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Davor \u0160krlec on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-211","justification":"Because the ROCs\u2019 reach largely surpasses the national reach of the NRAs, ACER should be\nresponsible for issuing the guidelines for statutes and rules of procedure, approving statutes\nand rules of procedure, the cooperative decision-making procedure, and the framework for\nthe cooperation and coordination between regional operational centres since they will have a\ntangible impact for the consistency and interoperability between ROCs and significant\nrelevance beyond the concerned region.","location":[["Proposal for a regulation","Article 8 \u2013 paragraph 2 \u2013 point a b (new)"]],"meps":[124756],"meta":{"created":"2019-07-03T06:30:41"},"new":["(ab) approve the statutes and rules of","procedure referred to in Article 32(2) of","recast Electricity Regulation as proposed","by COM(2016) 861/2;"],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"211","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1488","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 2"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:40"},"new":["2. The Commission shall, after","consulting the Agency, the ENTSO for","Electricity and the other relevant","stakeholders, establish a priority list every","three years, identifying the areas set out","in paragraph 1 to be included in the","development of network codes."],"old":["2. The Commission shall, after","consulting the Agency, the ENTSO for","Electricity and the other relevant","stakeholders, establish a priority list every","three years, identifying the areas set out in","paragraph 1 to be included in the","development of network codes. If the","subject-matter of the network code is","directly related to the operation of the","distribution system and less relevant for","the transmission system, the Commission","may require the EU DSO entity for","electricity instead of the ENTSO for","Electricity to convene a drafting","committee and submit a proposal for a","network code to the agency."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1488","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Martina Werner, Peter Kouroumbashev, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1317","location":[[" Proposal for a regulation","Article 41 \u2013 paragraph 1 \u2013 introductory part"]],"meps":[124826,124857,124739,124735,124699],"meta":{"created":"2019-07-03T06:30:46"},"new":["1. The transmission system operators","of a system operation region shall set up","and manage their organisation according to","a structure that supports the safety of their","functions. Their organisational structure","shall specify:"],"old":["1. Regional operational centres shall","set up and manage their organisation","according to a structure that supports the","safety of their functions.","Their organisational structure shall specify:"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1317","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-368","justification":" The principle of non-discrimination in balancing markets should be directly enforceable and\n fully effective. In addition, balancing market rules should take into account the necessity of\n creating a level playing field to enable the development of distributed renewable energy\n resources, including by renewable active customers energy communities.","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 2"]],"meps":[124813,124796],"meta":{"created":"2020-11-15T15:52:08"},"new":["2. Balancing markets shall ensure","effective non-discrimination between","market participants taking account of the","different technical capability of generation","from variable renewable sources, including","small decentralised or distributed","generation and generation from active","customers and renewable energy","communities, and demand side response","and storage. Market operators shall","ensure that energy communities have a","proportionate and simple access to the","market."],"old":["2. Balancing markets shall be","organised in such a way as to ensure","effective non-discrimination between","market participants taking account of the","different technical capability of generation","from variable renewable sources and","demand side response and storage."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"368","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-674","location":[["Proposal for a regulation","Article 13 \u2013 paragraph 4"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:44"},"new":["4. The transmission system operators","participating in the bidding zone review","shall submit a proposal to the Commission","and Member States of the Capacity","Calculation Region regarding whether to","amend or maintain the bidding zone","configuration. Based on that proposal,","where there is no agreement between","Member States in the Capacity","Calculation Region, the Commission shall","adopt a decision whether to amend or","maintain the bidding zone configuration,","by clearly showing the issues at stake","together with an assessment of all","available solutions on an equal basis, [no","later than 6 months after entry into force of","this Regulation, specific date to be inserted","by OP] or by six months after the","conclusion of the bidding zone","configuration launched in accordance with","points (a), (b) or (c) of Article 32(1) of","Regulation (EU) 2015/1222, whichever","comes later."],"old":["4. The transmission system operators","participating in the bidding zone review","shall submit a proposal to the Commission","regarding whether to amend or maintain","the bidding zone configuration. Based on","that proposal, the Commission shall adopt","a decision whether to amend or maintain","the bidding zone configuration, [no later","than 6 months after entry into force of this","Regulation, specific date to be inserted by","OP] or by six months after the conclusion","of the bidding zone configuration launched","in accordance with points (a), (b) or (c) of","Article 32(1) of Regulation (EU)","2015/1222, whichever comes later."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"674","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Andr\u00e1s Gy\u00fcrk, Gy\u00f6rgy H\u00f6lv\u00e9nyi","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-966","justification":"Mandatory opening towards foreign capacity might interfere with domestic energy policy\ngoals. Incentives to construct new domestic power plants may dramatically decrease.","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 2"]],"meps":[23816,124715],"meta":{"created":"2019-07-03T06:30:46"},"new":["2. Member States may ensure that","eligible foreign capacity capable of","providing equivalent contribution to their","system adequacy to domestic capacities","has the opportunity to participate in the","same competitive process as domestic","capacity."],"old":["2. Member States shall ensure that","foreign capacity capable of providing","equivalent technical performance to","domestic capacities has the opportunity to","participate in the same competitive process","as domestic capacity."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"966","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Davor \u0160krlec on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-212","justification":" Because the ROCs\u2019 reach largely surpasses the national reach of the NRAs, ACER should be\n responsible for issuing the guidelines for statutes and rules of procedure, approving statutes\n and rules of procedure, the cooperative decision-making procedure, and the framework for\n the cooperation and coordination between regional operational centres since they will have a\n tangible impact for the consistency and interoperability between ROCs and significant\n relevance beyond the concerned region.","location":[["Proposal for a regulation","Article 8 \u2013 paragraph 2 \u2013 point a c (new)"]],"meps":[124756],"meta":{"created":"2019-07-03T06:30:41"},"new":["(ac) approve the cooperative decision-","making procedure referred to in Article","35 of recast Electricity Regulation as","proposed by COM(2016) 861/2;"],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"212","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1489","justification":" This regulation introduces a European entity for distribution system operators in Articles 49-\n 51.Tasks related to this entity must therefore be aligned to the provision of this Article and\n especially regarding the cooperation between TSOs and DSOs also to Article 53.","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 2"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:40"},"new":["2. The Commission shall, after","consulting the Agency, the ENTSO for","Electricity, the EU DSO entity and the","other relevant stakeholders, establish an","annual priority list every three years,","identifying the areas set out in paragraph 1","Article 8(6) to be included in the","development of network codes."],"old":["2. The Commission shall, after","consulting the Agency, the ENTSO for","","Electricity and the other relevant","stakeholders, establish a priority list every","three years, identifying the areas set out in","paragraph 1 to be included in the","development of network codes. If the","subject-matter of the network code is","directly related to the operation of the","distribution system and less relevant for","the transmission system, the Commission","may require the EU DSO entity for","electricity instead of the ENTSO for","Electricity to convene a drafting","committee and submit a proposal for a","network code to the agency."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1489","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-369","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 2"]],"meps":[2278],"meta":{"created":"2020-11-15T15:52:08"},"new":["2. Balancing markets shall be","organised in such a way as to ensure","effective non-discrimination between","market participants taking account of the","different technical capability of generation","from variable renewable sources and","demand side response and storage. All","generation, storage and demand resources","shall participate on equal footing in the","market."],"old":["2. Balancing markets shall be","organised in such a way as to ensure","","effective non-discrimination between","market participants taking account of the","different technical capability of generation","from variable renewable sources and","demand side response and storage."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"369","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1318","location":[[" Proposal for a regulation","Article 41 \u2013 paragraph 1 \u2013 point a"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:46"},"new":["deleted"],"old":["(a) the authority, duties and","responsibilities of the management","personnel;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1318","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski, Edward Czesak, Nikolay Barekov","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-675","justification":" As a general rule, according to the amendment to paragraph 3, the decision making power\n regarding the bidding zone configuration should remain Member States\u2019 competence. In\n exceptional circumstances however, the decision to amend the configuration should be taken\n by the Commission, if the bidding zone review reveals that the existent configuration has\n damaging cross-border impact, by overloading the neighbouring TSO\u2019s areas and\n threatening their systems stability.","location":[[" Proposal for a regulation","Article 13 \u2013 paragraph 4"]],"meps":[124891,132925,124871],"meta":{"created":"2019-07-03T06:30:44"},"new":["4. If the review reveals that the","bidding zone configuration has important","impact on neighbouring TSO\u2019s control","areas by causing flows overloading the","network and creating internal congestion,","thus threating the system stability, the","transmission system operators participating","in the bidding zone review shall submit","such a case to the Commission with a","proposal regarding an amendment of the","bidding zone configuration. Based on that","proposal, the Commission shall adopt a","decision amending the bidding zone","configuration, [no later than 6 months after","entry into force of this Regulation, specific","date to be inserted by OP] or by six months","after the conclusion of the bidding zone","configuration launched in accordance with","points (a), (b) or (c) of Article 32(1) of","Regulation (EU) 2015/1222, whichever","comes later."],"old":["4. The transmission system operators","participating in the bidding zone review","shall submit a proposal to the Commission","regarding whether to amend or maintain","the bidding zone configuration. Based on","that proposal, the Commission shall adopt","a decision whether to amend or maintain","the bidding zone configuration, [no later","than 6 months after entry into force of this","Regulation, specific date to be inserted by","OP] or by six months after the conclusion","of the bidding zone configuration launched","in accordance with points (a), (b) or (c) of","Article 32(1) of Regulation (EU)","2015/1222, whichever comes later."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"675","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Adam Gierek, Krystyna \u0141ybacka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-967","justification":"Member States should be able to specify the rules on the participation of cross-border\ncapacity in capacity mechanisms, while retaining some flexibility in the application of the\nadopted criteria.","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 2 Regulation (EC) No 714/2009 of the European Parliament and of the Council"]],"meps":[28379,124883],"meta":{"created":"2019-07-03T06:30:46"},"new":["2. Member States shall ensure that","authorised foreign capacity capable of","providing an equivalent contribution to","the system to domestic capacities has the","opportunity to participate in the same","competitive process as domestic capacity."],"old":["2. Member States shall ensure that","foreign capacity capable of providing","equivalent technical performance to","domestic capacities has the opportunity to","participate in the same competitive process","as domestic capacity."],"orig_lang":"pl","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"967","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Davor \u0160krlec on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-213","justification":" Because the ROCs\u2019 reach largely surpasses the national reach of the NRAs, ACER should be\n responsible for issuing the guidelines for statutes and rules of procedure, approving statutes\n and rules of procedure, the cooperative decision-making procedure, and the framework for\n the cooperation and coordination between regional operational centres since they will have a\n tangible impact for the consistency and interoperability between ROCs and significant\n relevance beyond the concerned region.","location":[[" Proposal for a regulation","Article 8 \u2013 paragraph 2 \u2013 point a d (new)"]],"meps":[124756],"meta":{"created":"2019-07-03T06:30:41"},"new":["(ad) approve the framework for the","cooperation and coordination between","regional operational centres pursuant to","Article 35a NEW of [recast Electricity","Regulation as proposed by COM(2016)","861/2;"],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"213","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Kaja Kallas, Pavel Teli\u010dka, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar, Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1490","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 2"]],"meps":[124697,124706,124989,124872,125026,90110],"meta":{"created":"2019-07-03T06:30:40"},"new":["2. The Commission shall, after","consulting the Agency, the ENTSO for","Electricity and the other relevant","stakeholders, establish a priority list every","three years, identifying the areas set out in","paragraph 1 to be included in the","development of network codes. If the","subject-matter of the network code is","directly related to the operation of the","distribution system and less relevant for the","transmission system, the Commission may","require the EU DSO entity for electricity","instead of the ENTSO for Electricity to","convene a drafting committee and submit a","proposal for a network code to the agency.","The EU DSO entity shall ensure that the","drafting committee convened has a","geographically-balanced representation,","including small or independent","distribution system operators and is","subject to rules related to independence","and the prevention of conflict of interests."],"old":["2. The Commission shall, after","consulting the Agency, the ENTSO for","Electricity and the other relevant","stakeholders, establish a priority list every","three years, identifying the areas set out in","paragraph 1 to be included in the","development of network codes. If the","subject-matter of the network code is","directly related to the operation of the","distribution system and less relevant for the","transmission system, the Commission may","require the EU DSO entity for electricity","instead of the ENTSO for Electricity to","convene a drafting committee and submit a","proposal for a network code to the agency.",""],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1490","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Eugen Freund, Patrizia Toia, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-370","location":[["Proposal for a regulation","Article 5 \u2013 paragraph 2"]],"meps":[124826,124870,124739,124735,125018,28340,124699,125041,125044],"meta":{"created":"2020-11-15T15:52:08"},"new":["2. Balancing markets shall be","organised in such a way as to ensure","effective non-discrimination between","market participants taking account of the","different technical capability of generation","from variable renewable sources and","demand side response and storage with","particular attention paid to small-scale","producers of renewable energy."],"old":["2. Balancing markets shall be","organised in such a way as to ensure","effective non-discrimination between","market participants taking account of the","different technical capability of generation","from variable renewable sources and","demand side response and storage."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"370","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Markus Pieper","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-676","justification":"A change in bidding zones is a drastic change that can jeopardize investment security for\nmarket participants. It shall therefore be carefully considered by the Member States, and not\nby the Commission.","meps":[28224],"meta":{"created":"2019-07-03T06:30:44"},"new":["4. The transmission system operators","participating in the bidding zone review","shall submit a proposal to the Member","States whether to amend or maintain the","bidding zone configuration. Based on that","proposal, the Member States shall decide","within six months whether to amend or","maintain the bidding zone configuration.","The decision shall be reasoned and taking","into account comments made by other","Member States or third countries."],"old":["4. The transmission system operators","participating in the bidding zone review","shall submit a proposal to the Commission","regarding whether to amend or maintain","the bidding zone configuration. Based on","that proposal, the Commission shall adopt","a decision whether to amend or maintain","the bidding zone configuration, [no later","than 6 months after entry into force of","this Regulation, specific date to be","inserted by OP] or by six months after the","conclusion of the bidding zone","configuration launched in accordance","with points (a), (b) or (c) of Article 32(1)","of Regulation (EU) 2015/1222, whichever","comes later."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"676","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-214","location":[[" Proposal for a regulation","Article 8 \u2013 paragraph 2 \u2013 point b"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:41"},"new":["(b) request information from regional","coordination centres where appropriate","pursuant to Article 43 of [recast Electricity","Regulation as proposed by COM(2016)","861/2];"],"old":["(b) request information from regional","operational centres where appropriate","pursuant to Article 43 of [recast Electricity","Regulation as proposed by COM(2016)","861/2];"],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"214","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-677","location":[["Proposal for a regulation","Article 13 \u2013 paragraph 4 a (new)"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:44"},"new":["4 a. Where the relevant Member States","fail to come to a unanimous decision","within the permitted timeframe, or where","the Member States become aware of the","fact that commitments on which a","previous unanimous decision was based","were not complied with, they shall","immediately notify the Commission,","which shall amend or maintain the","bidding zone configuration within six","months of that notification, after a","thorough evaluation of all the issues at","stake, together with an assessment of all","available solutions on an equal basis ."],"old":[""],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"677","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-371","justification":" The principle of non-discrimination in balancing markets should be directly enforceable and\n fully effective. In addition, balancing market rules should take into account the necessity of\n enabling the development of distributed renewable energy resources, not just individually but\n also through aggregation, including by active customers and renewable energy communities.","location":[["Proposal for a regulation","Article 5 \u2013 paragraph 2"]],"meps":[96852],"meta":{"created":"2020-11-15T15:52:08"},"new":["2. Balancing markets shall ensure","effective non-discrimination between","market participants taking account of the","different technical capability of generation","from variable renewable sources, including","small decentralized or distributed","generation, and demand side response and","storage."],"old":["2. Balancing markets shall be","organised in such a way as to ensure","effective non-discrimination between","market participants taking account of the","different technical capability of generation","","from variable renewable sources and","demand side response and storage."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"371","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-968","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 2"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:46"},"new":["2. Member States shall ensure that","eligible foreign capacity capable of","providing equivalent technical performance","to domestic capacities has the opportunity","to participate in the same competitive","process as domestic capacity."],"old":["2. Member States shall ensure that","foreign capacity capable of providing","equivalent technical performance to","domestic capacities has the opportunity to","participate in the same competitive process","as domestic capacity."],"orig_lang":"fr","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"968","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1319","location":[["Proposal for a regulation","Article 41 \u2013 paragraph 1 \u2013 point b"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:46"},"new":["deleted"],"old":["(b) the relationship and reporting","lines between different parts and","processes of the organisation."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1319","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Pervenche Ber\u00e8s, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1491","justification":"There should be a parity between ENTSO-E and EU-DSO. Cost-benefit analysis is important\nso that consumers can be informed of the rationale for a decision.","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 2"]],"meps":[1985,124947],"meta":{"created":"2019-07-03T06:30:40"},"new":["2. The Commission shall, after","consulting the Agency, the ENTSO for","Electricity , the EU DSO entity for","electricity as well as the other relevant","stakeholders, establish a priority list every","three years, identifying the areas set out in","paragraph 1 to be included in the","development of network codes following a","thorough cost-benefit analysis. If the","subject-matter of the network code is","directly related to the operation of the","distribution system and less relevant for the","transmission system, the Commission may","require the EU DSO entity for electricity","instead of the ENTSO for Electricity to","convene a drafting committee and submit a","proposal for a network code to the agency."],"old":["2. The Commission shall, after","consulting the Agency, the ENTSO for","Electricity and the other relevant","stakeholders, establish a priority list every","three years, identifying the areas set out in","paragraph 1 to be included in the","development of network codes. If the","subject-matter of the network code is","directly related to the operation of the","distribution system and less relevant for the","transmission system, the Commission may","require the EU DSO entity for electricity","instead of the ENTSO for Electricity to","convene a drafting committee and submit a","proposal for a network code to the agency."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1491","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Werner Langen, Markus Pieper, Kri\u0161j\u0101nis Kari\u0146\u0161","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-215","justification":"This amendment aims to ensure consistency with the other texts of the 'Clean Energy for All\nEuropeans' package.","location":[["Proposal for a regulation","Article 8 \u2013 paragraph 2 \u2013 point b"]],"meps":[1928,28224,96901],"meta":{"created":"2019-07-03T06:30:41"},"new":["(b) request information from regional","coordination centres where appropriate","pursuant to Article 43 of [recast Electricity","Regulation as proposed by COM(2016)","861/2];"],"old":["(b) request information from regional","operational centres where appropriate","pursuant to Article 43 of [recast Electricity","Regulation as proposed by COM(2016)","861/2];"],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"215","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-678","location":[[" Proposal for a regulation","Article 13 \u2013 paragraph 4 a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:44"},"new":["4 a. Where the relevant Member States","fail to come to a unanimous decision","within the set timeframe, or where the","Member States become aware of the fact","that commitments on which a previous","unanimous decision was based were not","complied with, they shall immediately","notify the Commission, which shall adopt","a legislative proposal to be adopted under","the ordinary legislative procedure to","amend or maintain the bidding zone","configuration within six months of that","notification."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"678","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Werner Langen","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-372","justification":" Adding sectoral integration to the regulation will ensure stability and a level playing field\n among all the market-based resources, which will help achieve the objectives of the EU's\n internal energy market.","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 2"]],"meps":[1928],"meta":{"created":"2020-11-15T15:52:08"},"new":["2. Balancing markets shall be","organised in such a way as to ensure","effective non-discrimination between","market participants taking account of the","different technical capability of generation","from variable renewable sources, sectoral","integration and demand side response and","storage."],"old":["2. Balancing markets shall be","organised in such a way as to ensure","effective non-discrimination between","market participants taking account of the","different technical capability of generation","from variable renewable sources and","demand side response and storage."],"orig_lang":"de","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"372","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Jerzy Buzek, Janusz Lewandowski, Marian-Jean Marinescu","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-969","justification":"Member State should be entitled to limit the cross-border participation of capacity providers\nfrom a bidding zone that applies a strategic reserve.","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 2 \u2013 point 1 (new)"]],"meps":[23781,33982],"meta":{"created":"2019-07-03T06:30:47"},"new":["(1) The Member State applying the","mechanism may limit direct cross-border","participation to only:","a. bidding zones with a direct network","connection between that bidding zone and","the bidding zone applying the mechanism;","b. bidding zones not applying a strategic","reserve;","c. capacity providers that are not already","participating in another capacity","mechanism for the same delivery period.","In the specific cases where those","limitations are applied, Member States","shall however take into account, in their","capacity requirements, the contribution to","their system adequacy of those ineligible","capacities."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"969","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-216","location":[["Proposal for a regulation","Article 8 \u2013 paragraph 2 \u2013 point d"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:41"},"new":["(d) issue opinions and","recommendations to regional coordination","centres."],"old":["(d) issue opinions and","recommendations to regional operational","centres."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"216","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Fulvio Martusciello","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1492","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 2"]],"meps":[124828],"meta":{"created":"2019-07-03T06:30:40"},"new":["2. The Commission shall, after","consulting the Agency, the ENTSO for","Electricity, the distribution system","operators and the other relevant","stakeholders, establish an annual priority","list every three years, identifying the areas","set out in paragraph 1 to be included in the","development of network codes. If the","subject-matter of the network code is","directly related to the operation of the","distribution system and less relevant for the","transmission system, the Commission may","require the EU DSO entity for electricity","instead of the ENTSO for Electricity to","convene a drafting committee and submit a","proposal for a network code to the agency."],"old":["2. The Commission shall, after","consulting the Agency, the ENTSO for","Electricity and the other relevant","stakeholders, establish a priority list every","three years, identifying the areas set out in","paragraph 1 to be included in the","development of network codes. If the","subject-matter of the network code is","directly related to the operation of the","distribution system and less relevant for the","transmission system, the Commission may","require the EU DSO entity for electricity","instead of the ENTSO for Electricity to","convene a drafting committee and submit a","proposal for a network code to the agency."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1492","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Adam Gierek, Krystyna \u0141ybacka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-970","justification":"Member States should be able to specify the rules on the participation of cross-border\ncapacity in capacity mechanisms, while retaining some flexibility in the application of the\nadopted criteria.","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 2 a (new) Regulation (EC) No 714/2009 of the European Parliament and of the Council"]],"meps":[28379,124883],"meta":{"created":"2019-07-03T06:30:47"},"new":["2a. A Member State applying a","capacity mechanism may limit the direct","participation of cross-border capacity:","a. only to those price zones which are","directly connected with the price zone in","which the capacity mechanism is applied;","b. only to those price zones which do not","apply a strategic reserve mechanism;","c. only to those capacity providers who do","not participate in any other capacity","mechanism in the same supply period.","In specific cases where the above-","mentioned limits are applied, Member","States shall take into account the","contribution to generation adequacy of","those capacities which could have","participated had the limits not been","applied."],"orig_lang":"pl","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"970","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Martina Werner, Carlos Zorrinho, Miapetra Kumpula-Natri, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1320","location":[["Proposal for a regulation","Article 41 \u2013 paragraph 2"]],"meps":[124826,124739,124735,124947],"meta":{"created":"2019-07-03T06:30:46"},"new":["2. Regional coordination centers may","set up regional desks to address local","specificities or back-up coordination","centres only where this is needed for the","efficient and reliable exercise of their","functions and only if this does not lead to","an increase of network tariffs."],"old":["2. Regional operational centres may","set up regional desks to address local","specificities or back-up operational centres","for the efficient and reliable exercise of","their functions."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1320","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-679","justification":"as for 13(4a).","location":[[" Proposal for a regulation","Article 13 \u2013 paragraph 5"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:45"},"new":["deleted"],"old":["5. The decision referred to in","paragraph 4 shall be based on the result","of the bidding zone review and the","transmission system operators\u2019 proposal","concerning its maintenance or","amendment. The decision shall be","","justified, in particular as regards possible","deviations from the result of the bidding","zone review."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"679","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-373","justification":"It is necessary to redesign the balancing products in order to fully harness the potential of\nrenewables for providing the system with flexibility. Market entry barriers should be removed\nand efforts should focus on increasing the harmonisation of the different balancing markets\non the basis of a model maximizing the participation of renewable energy generators.","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 2"]],"meps":[90110],"meta":{"created":"2020-11-15T15:52:08"},"new":["2. Balancing markets shall be","organised in such a way as to ensure","effective non-discrimination between","market participants. Balancing markets","shall be designed to maximize the","participation of renewables sources."],"old":["2. Balancing markets shall be","organised in such a way as to ensure","effective non-discrimination between","market participants taking account of the","different technical capability of","generation from variable renewable","sources and demand side response and","storage."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"373","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1493","justification":"In the absence of a EU DSO, ACER should be drafting and monitoring the implementation of\nnetwork codes related to distribution networks. ACER should also have the authority to\nconvene the network codes \u201cdrafting committees\u201d. These \u201cdrafting committees\u201d should be\nrenamed \u201cstakeholder committees\u201d to prevent any misinterpretation regarding their role: the\ncommittees should have a consultative, supporting role but should not \u201chold the pen\u201d in the\ndrafting of network codes.","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 2"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:40"},"new":["2. The Commission shall, after","consulting the Agency, the ENTSO for","Electricity and the other relevant","stakeholders, establish a priority list every","three years, identifying the areas set out","in paragraph 1 to be included in the","development of network codes. If the","subject-matter of the network code is","directly related to the operation of the","distribution system and less relevant for the","transmission system, the Commission may","require the Agency instead of the ENTSO","for Electricity to convene a stakeholder","committee and submit a proposal for a","network code."],"old":["2. The Commission shall, after","consulting the Agency, the ENTSO for","Electricity and the other relevant","stakeholders, establish a priority list every","three years, identifying the areas set out in","paragraph 1 to be included in the","development of network codes. If the","subject-matter of the network code is","directly related to the operation of the","distribution system and less relevant for the","transmission system, the Commission may","require the EU DSO entity for electricity","instead of the ENTSO for Electricity to","convene a drafting committee and submit a","","proposal for a network code to the agency."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1493","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Cristian-Silviu Bu\u015foi","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-971","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 2 a (new)"]],"meps":[38420],"meta":{"created":"2019-07-03T06:30:47"},"new":["2a. The Member State applying the","mechanism may limit direct cross-border","participation:","a. to only bidding zones with a direct","network connection between that bidding","zone and the bidding zone applying the","mechanism;","b. the only bidding zones not applying a","strategic reserve;","c. to only capacity providers that are not","already participating in another capacity","mechanism for the same delivery","period. In the specific cases where those","limitations are applied, Member States","shall however take into account, in their","capacity requirements, the contribution to","their system adequacy of those ineligible","capacities."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"971","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Werner Langen, Markus Pieper, Kri\u0161j\u0101nis Kari\u0146\u0161","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-217","justification":" This amendment aims to ensure consistency with the other texts of the 'Clean Energy for All\n Europeans' package.","location":[[" Proposal for a regulation","Article 8 \u2013 paragraph 2 \u2013 point d"]],"meps":[1928,28224,96901],"meta":{"created":"2019-07-03T06:30:41"},"new":["(d) issue opinions and","recommendations to regional coordination","centres."],"old":["(d) issue opinions and","recommendations to regional operational","centres."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"217","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Jerzy Buzek, Janusz Lewandowski, Marian-Jean Marinescu","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-374","justification":"Member States should be given a certain degree of competence, which would i.e. enable them\nto adjust the procurement processes for balancing energy and balancing capacity to the\nspecificity of the national market (e.g. whether the system is centrally dispatched, or not) with\na view of ensuring economic efficiency.","location":[["Proposal for a regulation","Article 5 \u2013 paragraph 3"]],"meps":[28269,23781,33982],"meta":{"created":"2020-11-15T15:52:08"},"new":["3. Balancing energy shall be procured","separately from balancing capacity. When","economically efficient and subject to","approval by the national regulatory","authority, procurement of balancing","energy and balancing capacity may be","performed under an integrated process.","Procurement processes shall be transparent","while at the same time respecting","confidentiality."],"old":["3. Balancing energy shall be procured","separately from balancing capacity.","Procurement processes shall be transparent","while at the same time respecting","confidentiality."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"374","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Martina Werner, Peter Kouroumbashev, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-680","location":[["Proposal for a regulation","Article 13 \u2013 paragraph 5"]],"meps":[124826,124857,124870,124739,124735,124699],"meta":{"created":"2019-07-03T06:30:45"},"new":["deleted"],"old":["5. The decision referred to in","paragraph 4 shall be based on the result","of the bidding zone review and the","transmission system operators\u2019 proposal","concerning its maintenance or","amendment. The decision shall be","justified, in particular as regards possible","deviations from the result of the bidding","zone review."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"680","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1321","location":[["Proposal for a regulation","Article 41 \u2013 paragraph 2"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:46"},"new":["2. Regional security coordinators","may set up regional desks to address local","specificities for the efficient and reliable","exercise of their services."],"old":["2. Regional operational centres may","set up regional desks to address local","specificities or back-up operational","centres for the efficient and reliable","exercise of their functions."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1321","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-972","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 2 a (new)"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:47"},"new":["2a. The Member State applying the","mechanism may limit direct cross-border","participation to only:","(a) bidding zones with a direct network","connection between that bidding zone and","the bidding zone applying the mechanism;","(b) bidding zones not applying strategic","reserve;","(c) capacity providers that are not already","participating in another capacity","mechanism for the same delivery period."],"old":["",""],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"972","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1494","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 2"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:40"},"new":["2. The Commission shall, after","consulting the Agency, the ENTSO for","Electricity, the EU DSO entity and the","other relevant stakeholders, establish a","priority list every three years, identifying","the areas set out in paragraph 1 to be","included in the development of network","codes. If the subject-matter of the network","code is directly related to the operation of","the distribution system and less relevant for","the transmission system, the Commission","shall require the EU DSO entity for","electricity instead of the ENTSO for","Electricity to convene a drafting committee","and submit a proposal for a network code","to the agency."],"old":["2. The Commission shall, after","consulting the Agency, the ENTSO for","Electricity and the other relevant","stakeholders, establish a priority list every","three years, identifying the areas set out in","paragraph 1 to be included in the","development of network codes. If the","subject-matter of the network code is","directly related to the operation of the","distribution system and less relevant for the","transmission system, the Commission may","require the EU DSO entity for electricity","instead of the ENTSO for Electricity to","convene a drafting committee and submit a","proposal for a network code to the agency."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1494","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-375","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 3"]],"meps":[124891],"meta":{"created":"2020-11-15T15:52:08"},"new":["3. Balancing energy shall be procured","separately from balancing capacity. When","economically efficient and subject to","approval by the national regulatory","authority, procurement of balancing","energy and balancing capacity may be","performed under an integrated","process. Procurement processes shall be","transparent while at the same time","respecting confidentiality."],"old":["3. Balancing energy shall be procured","separately from balancing capacity.","Procurement processes shall be transparent","while at the same time respecting","confidentiality."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"375","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Andr\u00e1s Gy\u00fcrk","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-218","location":[[" Proposal for a regulation","Article 10 \u2013 paragraph 1 \u2013 introductory part"]],"meps":[23816],"meta":{"created":"2019-07-03T06:30:41"},"new":["1. The Agency shall approve and ask","for amendment where necessary"],"old":["1. The Agency shall approve and","amend where necessary"],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"218","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Angelika Niebler, Sven Schulze","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-973","justification":"If particular pressure arises, national capacity should be used primarily in the Member State\nconcerned.","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 3"]],"meps":[124809],"meta":{"created":"2019-07-03T06:30:47"},"new":["3. Member States shall not restrict","capacity which is located in their territory","from participating in capacity mechanisms","of other Member States. It should however","be borne in mind that, by preference,","national capacity meets its needs from","domestic sources at times of particular","pressure."],"old":["3. Member States shall not restrict","capacity which is located in their territory","from participating in capacity mechanisms","of other Member States."],"orig_lang":"de","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"973","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-376","justification":" In order to achieve system efficiency, capacity reservation shall be minimised.","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 4"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["4. Balancing markets shall ensure","operational security whilst allowing for","maximum use and efficient allocation of","cross-zonal capacity across timeframes in","accordance with Article 15. To this effect,","there shall be no reservation of cross-","zonal capacity for balancing purposes,","with the exception of the calculated","capacity as defined by the regional","operation centres."],"old":["4. Balancing markets shall ensure","operational security whilst allowing for","maximum use and efficient allocation of","cross-zonal capacity across timeframes in","accordance with Article 15."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"376","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Kate\u0159ina Kone\u010dn\u00e1, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1322","location":[[" Proposal for a regulation","Article 42"]],"meps":[23699,96713],"meta":{"created":"2019-07-03T06:30:46"},"new":["Article 42 deleted","Equipment and staff"],"old":["Regional operational centres shall be","equipped with all the human, technical,","physical and financial resources","necessary for fulfilling their obligations","under this Regulation and carrying out","their functions."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1322","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Kaja Kallas, Fredrick Federley, Angelika Mlinar, Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-681","location":[["Proposal for a regulation","Article 13 \u2013 paragraph 5"]],"meps":[124697,124989,125026,90110],"meta":{"created":"2019-07-03T06:30:45"},"new":["5. Where the relevant Member States","fail to come to a unanimous decision","within the permitted timeframe, or where","the Member States become aware of the","fact that commitments on which a","previous unanimous decision was based","were not complied with, they shall","immediately notify the Commission,","which shall amend or maintain the","bidding zone configuration within six","months of that notification. The deadline","for the Commission decision shall be final","and not be further extended."],"old":["5. The decision referred to in","paragraph 4 shall be based on the result","of the bidding zone review and the","transmission system operators\u2019 proposal","concerning its maintenance or","amendment. The decision shall be","justified, in particular as regards possible","","deviations from the result of the bidding","zone review."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"681","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1495","meps":[124826,124870,124739,124735,124699],"meta":{"created":"2019-07-03T06:30:40"},"new":["2. The Commission shall, after","consulting the Agency, the ENTSO for","Electricity and the other relevant","stakeholders, establish a priority list every","three years identifying areas to be included","in the legislative planning and the","development of network codes. If the","subject-matter of the network code is","directly related to the operation of the","distribution system and less relevant for the","transmission system, the Commission may","require the EU DSO entity for electricity","instead of the ENTSO for Electricity to","convene a drafting committee and submit a","proposal for a network code to the agency."],"old":["2. The Commission shall, after","consulting the Agency, the ENTSO for","Electricity and the other relevant","stakeholders, establish a priority list every","three years, identifying the areas set out in","paragraph 1 to be included in the","development of network codes. If the","subject-matter of the network code is","directly related to the operation of the","distribution system and less relevant for the","transmission system, the Commission may","require the EU DSO entity for electricity","instead of the ENTSO for Electricity to","convene a drafting committee and submit a","proposal for a network code to the agency."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1495","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Jerzy Buzek, Janusz Lewandowski, Marian-Jean Marinescu","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-974","justification":" Member States should be enabled to determine the rules of cross-border participation in their\n capacity mechanism with a necessary degree of flexibility.","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 3"]],"meps":[23781,33982],"meta":{"created":"2019-07-03T06:30:47"},"new":["3. Member States shall not restrict","eligible capacity providers which are","located in their territory from participating","in capacity mechanisms of other Member","States."],"old":["3. Member States shall not restrict","capacity which is located in their territory","from participating in capacity mechanisms","of other Member States."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"974","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-377","justification":"These provisions are necessary for a flexible and efficient market, that can integrate high\nshares of variable renewable energy.","location":[["Proposal for a regulation","Article 5 \u2013 paragraph 5"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["5. Marginal pricing shall be used for","the settlement of balancing energy. On","balancing markets, market participants","shall be allowed to bid as close to real time","as possible after the intraday cross-zonal","gate closure time."],"old":["5. Marginal pricing shall be used for","the settlement of balancing energy. Market","participants shall be allowed to bid as close","to real time as possible, and at least after","the intraday cross-zonal gate closure time","determined in accordance with Article 59","of Commission Regulation (EU)","2015/122234.","_________________","34","Commission Regulation (EU)","2015/1222 of 24 July 2015 establishing a","guideline on capacity allocation and","congestion management (OJ L 197,","25.7.2015, p. 24)."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"377","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Davor \u0160krlec on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-219","justification":"Article19(6) of [recast Electricity Regulation] stipulates that the Agency shall also approve\nthe results of the European resource adequacy assessment. This provision should be\nreiterated in this Regulation.","location":[[" Proposal for a regulation","Article 10 \u2013 paragraph 1 \u2013 point a"]],"meps":[124756],"meta":{"created":"2019-07-03T06:30:41"},"new":["(a) the proposals for methodologies","and calculations related to the European","resource adequacy assessment pursuant to","Article 19(2), (3) and (5) of [recast","Electricity Regulation as proposed by","COM(2016) 861/2] as well as the results","of the European resource adequacy","assessment pursuant to Article19(6) of","[recast Electricity Regulation."],"old":["(a) the proposals for methodologies","and calculations related to the European","resource adequacy assessment pursuant to","Article 19(2), (3) and (5) of [recast","Electricity Regulation as proposed by","COM(2016) 861/2]."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"219","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1323","justification":" It is our position that Articles 31 to 44 and all reference regarding ROCs in the Clean Energy\n Package to All Europeans shall be deleted without any substitution.It is of particular concern\n that establishment of ROCs violates subsidiarity and proportionality principle according to\n art. 194 SFEU","location":[[" Proposal for a regulation","Article 42 \u2013 paragraph 1"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:46"},"new":["deleted"],"old":["Regional operational centres shall be","equipped with all the human, technical,","physical and financial resources","necessary for fulfilling their obligations","under this Regulation and carrying out","their functions."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1323","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski, Edward Czesak, Nikolay Barekov","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-682","location":[[" Proposal for a regulation","Article 13 \u2013 paragraph 5"]],"meps":[124891,132925,124871],"meta":{"created":"2019-07-03T06:30:45"},"new":["5. The decision referred to in","paragraph 4 shall be based on the result of","the bidding zone review and the","transmission system operators\u2019 proposal","concerning its amendment. The decision","shall be justified, in particular as regards","possible deviations from the result of the","bidding zone review."],"old":["5. The decision referred to in","paragraph 4 shall be based on the result of","the bidding zone review and the","transmission system operators\u2019 proposal","concerning its maintenance or","amendment. The decision shall be justified,","in particular as regards possible deviations","from the result of the bidding zone review."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"682","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Pilar del Castillo Vera, Pilar Ayuso, Francesc Gamb\u00fas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-378","location":[["Proposal for a regulation","Article 5 \u2013 paragraph 5"]],"meps":[28390,4319,125006],"meta":{"created":"2020-11-15T15:52:08"},"new":["5. The settlement of balancing","energy shall be based on marginal","pricing. Market participants shall be","allowed to bid as close to real time as","possible, and at least until the relevant","intraday cross-zonal gate closure time","determined in accordance with Article 59","of Commission Regulation (EU)","2015/122234 .","_________________","34","Commission Regulation (EU) 2015/1222","of 24 July 2015 establishing a guideline on","capacity allocation and congestion","management (OJ L 197, 25.7.2015, p. 24)."],"old":["5. Marginal pricing shall be used for","the settlement of balancing energy.","Market participants shall be allowed to bid","as close to real time as possible, and at","least after the intraday cross-zonal gate","closure time determined in accordance with","","Article 59 of Commission Regulation (EU)","2015/122234 .","_________________","34","Commission Regulation (EU) 2015/1222","of 24 July 2015 establishing a guideline on","capacity allocation and congestion","management (OJ L 197, 25.7.2015, p. 24)."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"378","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Adam Gierek, Krystyna \u0141ybacka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-975","justification":" Member States should be able to specify the rules on the participation of cross-border\n capacity in capacity mechanisms, while retaining some flexibility in the application of the\n adopted criteria.","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 3 Regulation (EC) No 714/2009 of the European Parliament and of the Council"]],"meps":[28379,124883],"meta":{"created":"2019-07-03T06:30:47"},"new":["3. Member States shall not restrict","authorised capacity which is located in","their territory from participating in capacity","mechanisms of other Member States."],"old":["3. Member States shall not restrict","capacity which is located in their territory","from participating in capacity mechanisms","of other Member States."],"orig_lang":"pl","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"975","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1496","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 3"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:41"},"new":["3. The Commission shall request the","Agency to submit to it within a reasonable","period of time not exceeding six months a","non-binding framework guideline","(framework guideline) setting out clear and","objective principles for the development of","network codes relating to the areas","identified in the priority list. The request of","the Commission may include conditions","which the framework guideline shall","address. Each framework guideline shall","contribute to a better market integration of","high levels of electricity generated from","variable renewable energy sources, non-","discrimination, effective competition, and","the efficient functioning of the market.","Upon a reasoned request from the Agency,","the Commission may extend that period."],"old":["3. The Commission shall request the","Agency to submit to it within a reasonable","period of time not exceeding six months a","non-binding framework guideline","(framework guideline) setting out clear and","objective principles for the development of","network codes relating to the areas","identified in the priority list. The request of","the Commission may include conditions","which the framework guideline shall","address. Each framework guideline shall","contribute to market integration, non-","discrimination, effective competition, and","the efficient functioning of the market.","Upon a reasoned request from the Agency,","the Commission may extend that period.",""],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1496","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Massimiliano Salini, Lara Comi, Fulvio Martusciello, Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-220","location":[["Proposal for a regulation","Article 10 \u2013 paragraph 1 \u2013 point a"]],"meps":[125670,96775,124828,36392],"meta":{"created":"2019-07-03T06:30:41"},"new":["(a) the proposals for methodologies","related to the resource adequacy","assessment pursuant to Article 19(2) and","(5) of [recast Electricity Regulation as","proposed by COM(2016) 861/2]."],"old":["(a) the proposals for methodologies","and calculations related to the European","resource adequacy assessment pursuant to","Article 19(2), (3) and (5) of [recast","Electricity Regulation as proposed by","COM(2016) 861/2]."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"220","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Martina Werner, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1324","location":[["Proposal for a regulation","Article 42 \u2013 paragraph 1"]],"meps":[124826,124739,124735,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:46"},"new":["Regional coordination centres shall be","equipped with all the human, technical,","physical and financial resources necessary","for fulfilling their obligations under this","Regulation and carrying out their","functions. The human, technical, physical","and financial resources for regional","coordination centres shall not go beyond","what is strictly necessary for the","fulfilment of its tasks."],"old":["Regional operational centres shall be","equipped with all the human, technical,","physical and financial resources necessary","for fulfilling their obligations under this","Regulation and carrying out their","functions."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1324","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Cristian-Silviu Bu\u015foi","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-976","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 3"]],"meps":[38420],"meta":{"created":"2019-07-03T06:30:47"},"new":["3. Member States shall not restrict","eligible capacity providers that are located","in their territory from participating in","capacity mechanisms of other Member","States."],"old":["3. Member States shall not restrict","capacity which is located in their territory","from participating in capacity mechanisms","of other Member States."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"976","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1497","justification":"This amendment promotes consistency with other amendments. In addition, in order to\nprovide clarification around the distinct roles and responsibilities to elaborate network codes,\nprovisions on network codes related to the distribution grid should be dealt with in another\nsub-paragraph. Hence, the content of this paragraph is limited to network codes falling\nwithin the scope of ENTSO-E\u2019s remit","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 4"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:41"},"new":["4. The Agency shall formally consult","the ENTSO for Electricity and the other","relevant stakeholders in regard to the","framework guideline, during a period of no","less than two months, in an open and","transparent manner."],"old":["4. The Agency shall formally consult","the ENTSO for Electricity , the EU DSO","entity, and the other relevant stakeholders","in regard to the framework guideline,","during a period of no less than two months,","in an open and transparent manner."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1497","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-683","location":[[" Proposal for a regulation","Article 13 \u2013 paragraph 5 a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:45"},"new":["5 a. The deadline for the Commission","decision referred to in paragraph 4a shall","be extended by up to a further 12 months","where the relevant Member State agrees","to a binding, detailed roadmap with","concrete milestones on how the","congestion issues will be resolved. The","relevant Member State shall regularly","report to the Commission and to other","relevant Member States on the progress","made."],"old":[""],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"683","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-379","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 5"]],"meps":[125024,183793,96993],"meta":{"created":"2020-11-15T15:52:08"},"new":["5. Marginal Pricing or pay-as bid","shall be used for the settlement of","balancing energy. Market participants shall","be allowed to bid as close to real time as","possible, and at least after the intraday","cross-zonal gate closure time determined in","accordance with Article 29 of Commission","Regulation (EU) 2015/1222."],"old":["5. Marginal pricing shall be used for","the settlement of balancing energy. Market","participants shall be allowed to bid as close","to real time as possible, and at least after","the intraday cross-zonal gate closure time","determined in accordance with Article 59","of Commission Regulation (EU)","2015/122234.","_________________","34","Commission Regulation (EU) 2015/1222","of 24 July 2015 establishing a guideline on","capacity allocation and congestion","management (OJ L 197, 25.7.2015, p. 24)."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"379","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Hans-Olaf Henkel","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-221","location":[["Proposal for a regulation","Article 10 \u2013 paragraph 2 \u2013 introductory part"]],"meps":[124823],"meta":{"created":"2019-07-03T06:30:41"},"new":["2. The Agency shall, after consulting","with the relevant stakeholders, approve","and amend where necessary the","methodologies"],"old":["2. The Agency shall approve and","amend where necessary the methodologies"],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"221","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Kaja Kallas, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar, Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1325","location":[["Proposal for a regulation","Article 42 \u2013 paragraph 1"]],"meps":[124697,124989,124872,125026,90110],"meta":{"created":"2019-07-03T06:30:46"},"new":["Regional operational centres shall be","equipped with all the human, technical,","physical and financial resources necessary","for fulfilling their obligations under this","Regulation and carrying out their","functions, ensuring in particular","geographically balanced representation","and equitable treatment between members","of Regional operational centre."],"old":["Regional operational centres shall be","equipped with all the human, technical,","physical and financial resources necessary","for fulfilling their obligations under this","Regulation and carrying out their","functions."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1325","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-977","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 4"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:47"},"new":["4. Cross-border participation","in capacity mechanisms shall not change,","alter or otherwise impact cross-zonal","schedules and physical flows between","Member States which shall be determined","solely by the outcome of capacity","allocation pursuant to Article 14."],"old":["4. Cross-border participation in","market-wide capacity mechanisms shall","not change, alter or otherwise impact cross-","zonal schedules and physical flows","between Member States which shall be","determined solely by the outcome of","capacity allocation pursuant to Article 14."],"orig_lang":"fr","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"977","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1498","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 4"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:41"},"new":["4. The Agency shall formally consult","the ENTSO for Electricity , and the other","relevant stakeholders in regard to the","framework guideline, during a period of no","less than two months, in an open and","transparent manner."],"old":["4. The Agency shall formally consult","the ENTSO for Electricity , the EU DSO","entity, and the other relevant stakeholders","in regard to the framework guideline,","during a period of no less than two months,","in an open and transparent manner."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1498","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski, Edward Czesak, Nikolay Barekov","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-684","location":[["Proposal for a regulation","Article 13 \u2013 paragraph 6"]],"meps":[124891,132925,124871],"meta":{"created":"2019-07-03T06:30:45"},"new":["deleted"],"old":["6. Where further bidding zone","reviews are launched under Article","32(1)(a), (b) or (c) of Regulation (EU)","2015/1222, the Commission may adopt a","decision within six months of the","conclusion of that bidding zone review."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"684","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-380","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 6"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["6. The imbalances shall be settled at a","price that reflects the real time value of","energy as observed on the activity on the","commercial markets close to real time."],"old":["6. The imbalances shall be settled at a","price that reflects the real time value of","energy."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"380","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Andr\u00e1s Gy\u00fcrk","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-222","location":[[" Proposal for a regulation","Article 10 \u2013 paragraph 2 \u2013 introductory part"]],"meps":[23816],"meta":{"created":"2019-07-03T06:30:41"},"new":["2. The Agency shall approve and ask","for amendment where necessary the","methodologies"],"old":["2. The Agency shall approve and","amend where necessary the methodologies"],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"222","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1326","location":[[" Proposal for a regulation","Article 42 \u2013 paragraph 1"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:47"},"new":["Regional coordination centres shall be","equipped with all the human, technical,","physical and financial resources necessary","for fulfilling their obligations under this","Regulation and carrying out their","functions, ensuring in particular","geographically balanced representation","and equitable treatment between","members."],"old":["Regional operational centres shall be","equipped with all the human, technical,","physical and financial resources necessary","for fulfilling their obligations under this","Regulation and carrying out their","functions."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1326","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-978","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 4"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:47"},"new":["4. Cross-border participation in","capacity mechanisms shall not change,","alter or otherwise impact cross-zonal","schedules and physical flows between","Member States which shall be determined","solely by the outcome of capacity","allocation pursuant to Article 14."],"old":["4. Cross-border participation in","market-wide capacity mechanisms shall","not change, alter or otherwise impact cross-","zonal schedules and physical flows","between Member States which shall be","determined solely by the outcome of","capacity allocation pursuant to Article 14."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"978","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Kaja Kallas, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar, Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-685","location":[["Proposal for a regulation","Article 13 \u2013 paragraph 6"]],"meps":[124697,124989,124872,125026,90110],"meta":{"created":"2019-07-03T06:30:45"},"new":["deleted"],"old":["6. Where further bidding zone","reviews are launched under Article","32(1)(a), (b) or (c) of Regulation (EU)","2015/1222, the Commission may adopt a","decision within six months of the","conclusion of that bidding zone review."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"685","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1499","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 6"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:41"},"new":["6. If the Commission considers that","the framework guideline does not","contribute to a better market integration of","high levels of electricity generated from","variable renewable energy sources, non-","discrimination, effective competition and","the efficient functioning of the market, it","may request the Agency to review the","framework guideline within a reasonable","period of time and re-submit it to the","Commission."],"old":["6. If the Commission considers that","the framework guideline does not","contribute to market integration , non-","discrimination, effective competition and","the efficient functioning of the market, it","may request the Agency to review the","framework guideline within a reasonable","period of time and re-submit it to the","Commission."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1499","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1327","location":[[" Proposal for a regulation","Article 42 \u2013 paragraph 1"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:47"},"new":["Regional operational centres shall be","equipped with all the human, technical,","physical and financial resources necessary","for fulfilling their obligations under this","Regulation and carrying out their functions","independently and impartially."],"old":["Regional operational centres shall be","equipped with all the human, technical,","physical and financial resources necessary","for fulfilling their obligations under this","Regulation and carrying out their","functions."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1327","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-979","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 4"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:48"},"new":["4. Cross-border participation in","capacity mechanisms shall not change,","alter or otherwise impact cross-zonal","schedules and physical flows between","Member States which shall be determined","solely by the outcome of capacity","allocation pursuant to Article 14."],"old":["4. Cross-border participation in","market-wide capacity mechanisms shall","not change, alter or otherwise impact cross-","","zonal schedules and physical flows","between Member States which shall be","determined solely by the outcome of","capacity allocation pursuant to Article 14."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"979","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Davor \u0160krlec on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-223","justification":"This is in line with the Greens\u2019 amendments to the risk-preparedness Regulation. The\ncommon solutions on how to handle crises should be helpful when drafting national plans.\nThey would ensure coherence among the plans and facilitate agreements among member\nstates negotiating regional part of their plans.","location":[[" Proposal for a regulation","Article 10 \u2013 paragraph 2 a (new)"]],"meps":[124756],"meta":{"created":"2019-07-03T06:30:41"},"new":["2a. Taking into account the results of","the European resource adequacy","assessment as well as other relevant","regulations, the Agency shall draft the","EU-wide guidelines for the solutions on","how to prevent and handle crises","situations, identifying both market and","non-market measures as well as the","principles of compensation schemes and","principles for identifying protected","customers. Competent authorities of","Member States shall take full account of","these guidelines when drafting their risk-","preparedness plans. The Agency shall","review and, if necessary, update these","solutions every three years, unless","circumstances warrant more frequent","updates."],"old":[""],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"223","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-381","location":[["Proposal for a regulation","Article 5 \u2013 paragraph 6"]],"meps":[96713],"meta":{"created":"2020-11-15T15:52:08"},"new":["6. The imbalances shall be settled at a","price that reflects the real time value of","energy calculated according to EB GL."],"old":["6. The imbalances shall be settled at a","price that reflects the real time value of","energy."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"381","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Martina Werner, Peter Kouroumbashev, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-686","location":[[" Proposal for a regulation","Article 13 \u2013 paragraph 6"]],"meps":[124826,124857,124870,124739,124735,124699],"meta":{"created":"2019-07-03T06:30:45"},"new":["deleted"],"old":["6. Where further bidding zone","reviews are launched under Article","32(1)(a), (b) or (c) of Regulation (EU)","2015/1222, the Commission may adopt a","decision within six months of the","conclusion of that bidding zone review."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"686","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1500","justification":"This amendment promotes consistency with other amendments. In addition, in order to\nprovide clarification around the distinct roles and responsibilities to elaborate network codes,\nprovisions on network codes related to the distribution grid should be dealt with in another\nsub-paragraph. Hence, the content of this paragraph is limited to network codes falling\nwithin the scope of ENTSO-E\u2019s remit.","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 8"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:41"},"new":["8. The Commission shall request the","ENTSO for Electricity to submit a proposal","for a network code which is in line with the","relevant framework guideline, to the","Agency within a reasonable period of time","not exceeding 12 months."],"old":["8. The Commission shall request the","ENTSO for Electricity or, where so","decided in the priority list pursuant to","paragraph 2, the EU DSO entity for","Electricity , to submit a proposal for a","network code which is in line with the","relevant framework guideline, to the","Agency within a reasonable period of time","not exceeding 12 months."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1500","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1328","location":[[" Proposal for a regulation","Article 42 \u2013 paragraph 1"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:47"},"new":["Regional security coordinators shall be","equipped with all the human, technical,","physical and financial resources necessary","for performance of their services."],"old":["Regional operational centres shall be","equipped with all the human, technical,","physical and financial resources necessary","for fulfilling their obligations under this","Regulation and carrying out their","functions."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1328","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-980","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 5"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:48"},"new":["deleted"],"old":["5. Capacity providers shall be able to","participate in more than one mechanism","for the same delivery period. They shall be","subject to non-availability payments in","case of non-availability, and subject to","two or more non-availability payments","where there is concurrent scarcity in two","or more bidding zones where the capacity","provider is contracted."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"980","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Hans-Olaf Henkel","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-224","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 1 \u2013 point c"]],"meps":[124823],"meta":{"created":"2019-07-03T06:30:41"},"new":["(c) carry out the obligations laid out in","Article 3, 5, 11, 12 and 13 of Regulation","(EU) No 347/2013."],"old":["(c) carry out the obligations laid out in","Article 5, 11, 12 and 13 of Regulation (EU)","No 347/2013."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"224","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-382","justification":"Par.6 includes unclear definition of \u201cthe real time value of energy\u201d, which could cause issues\nin future implementation in real operation. Link to Commission regulation establishing a\nguideline on electricity balancing (EB GL) clarifies process of calculation of real time value\nof energy.","location":[["Proposal for a regulation","Article 5 \u2013 paragraph 6"]],"meps":[28331],"meta":{"created":"2020-11-15T15:52:08"},"new":["6. The imbalances shall be settled at a","price that reflects the real time value of","energy calculated according to EB GL"],"old":["6. The imbalances shall be settled at a","price that reflects the real time value of","energy."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"382","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-687","location":[[" Proposal for a regulation","Article 13 \u2013 paragraph 6"]],"meps":[96993],"meta":{"created":"2019-07-03T06:30:45"},"new":["6. Where further bidding zone reviews","are launched under Article 32(1)(a), (b) or","(c) of Regulation (EU) 2015/1222,","the concerned national regulatory","authorities may adopt a decision within six","months of the conclusion of that bidding","zone review according to the adoption","terms referred to in paragraph 4."],"old":["6. Where further bidding zone reviews","are launched under Article 32(1)(a), (b) or","(c) of Regulation (EU) 2015/1222, the","Commission may adopt a decision within","six months of the conclusion of that","bidding zone review."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"687","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1329","justification":" It is our position that Articles 31 to 44 and all reference regarding ROCs in the Clean Energy\n Package to All Europeans shall be deleted without any substitution.It is of particular concern\n that establishment of ROCs violates subsidiarity and proportionality principle according to\n art. 194 SFEU","location":[["Proposal for a regulation","Article 43"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:47"},"new":["Article 43 deleted","Monitoring and reporting"],"old":["","1. Regional operational centres shall","establish a process for the continuous","monitoring of at least:","(a) their operational performance;","(b) the decisions and recommendations","issued and the outcome achieved;","(c) the effectiveness and efficiency of each","of the functions for which they are","responsible.","2. Regional operational centres shall","submit to the Agency and to the","regulatory authorities of the system","operation region the data resulting from","their continuous monitoring at least","annually.","3. Regional operational centres shall","establish their costs in a transparent","manner and report them to the Agency","and to the regulatory authorities of the","system operation region.","4. Regional operational centres shall","submit an annual report concerning their","performance to ENTSO for Electricity,","the Agency, the regulatory authorities of","the system operation region and the","Electricity Coordination Group","established pursuant to Article 1 of","Commission Decision 2012/C 353/0237 .","","","5. Regional operational centres shall","report shortcomings identified in the","monitoring process under paragraph 1 to","ENTSO for electricity, the regulatory","authorities of the system operation region,","the Agency and the competent authorities","of Member States responsible for the","prevention and management of crisis","situations.","_________________","37","Commission Decision of 15 November","2012 setting up the Electricity","Coordination Group (OJ C 353,","17.11.2012, p.2)."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1329","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1501","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 8"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:41"},"new":["8. The Commission shall request the","ENTSO for Electricity to submit a proposal","for a network code which is in line with the","relevant framework guideline, to the","Agency within a reasonable period of time","not exceeding 12 months."],"old":["8. The Commission shall request the","ENTSO for Electricity or, where so","decided in the priority list pursuant to","paragraph 2, the EU DSO entity for","Electricity , to submit a proposal for a","network code which is in line with the","relevant framework guideline, to the","Agency within a reasonable period of time","not exceeding 12 months."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1501","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Massimiliano Salini","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-981","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 5"]],"meps":[125670],"meta":{"created":"2019-07-03T06:30:48"},"new":["5. Capacity providers shall not be able","to participate in more than one mechanism","for the same delivery period."],"old":["5. Capacity providers shall be able to","participate in more than one mechanism for","the same delivery period. They shall be","subject to non-availability payments in","case of non-availability, and subject to","two or more non-availability payments","where there is concurrent scarcity in two","or more bidding zones where the capacity","provider is contracted."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"981","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Kate\u0159ina Kone\u010dn\u00e1, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1330","location":[[" Proposal for a regulation","Article 43"]],"meps":[23699,96713],"meta":{"created":"2019-07-03T06:30:47"},"new":["Article 43 deleted","Monitoring and reporting"],"old":["1. Regional operational centres shall","establish a process for the continuous","monitoring of at least:","(a) their operational performance;","(b) the decisions and recommendations","issued and the outcome achieved;","(c) the effectiveness and efficiency of each","of the functions for which they are","responsible.","2. Regional operational centres shall","submit to the Agency and to the","regulatory authorities of the system","operation region the data resulting from","their continuous monitoring at least","annually.","3. Regional operational centres shall","establish their costs in a transparent","manner and report them to the Agency","and to the regulatory authorities of the","system operation region.","4. Regional operational centres shall","submit an annual report concerning their","performance to ENTSO for Electricity,","the Agency, the regulatory authorities of","the system operation region and the","Electricity Coordination Group","established pursuant to Article 1 of","Commission Decision 2012/C 353/0237 .","5. Regional operational centres shall","report shortcomings identified in the","monitoring process under paragraph 1 to","ENTSO for electricity, the regulatory","authorities of the system operation region,","the Agency and the competent authorities","of Member States responsible for the","prevention and management of crisis","situations.","_________________","37","Commission Decision of 15 November","2012 setting up the Electricity","Coordination Group (OJ C 353,","17.11.2012, p.2)."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1330","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-383","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 7"]],"meps":[124891],"meta":{"created":"2020-11-15T15:52:08"},"new":["deleted"],"old":["7. The sizing of reserve capacity shall","be performed at regional level in","accordance with point 7 of Annex I.","Regional operational centres shall","support transmission system operators in","determining the amount of balancing","capacity that needs to be procured in","accordance with point 8 of Annex I."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"383","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-225","justification":" All proposals, opinions and recommendations taken by the Agency in accordance with the\n provisions of the Regulation 347/2013 on guidelines for trans-European energy infrastructure\n should be adopted according to ACER's ordinary decision-making process. This amendment\n is necessary for pressing reasons relating to the internal logic of the text.","location":[["Proposal for a regulation","Article 12 \u2013 paragraph 1 \u2013 subparagraph 1 a (new)"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:42"},"new":["All opinions and recommendations","adopted by the Agency in application of","the Regulation 347/2013 on guidelines for","trans-European energy infrastructure","shall be adopted in accordance with the","procedure referred to in Article 23(5)."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"225","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Massimiliano Salini, Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-688","location":[[" Proposal for a regulation","Article 13 \u2013 paragraph 6"]],"meps":[125670,36392],"meta":{"created":"2019-07-03T06:30:45"},"new":["6. Where further bidding zone reviews","are launched under Article 32(1)(a), (b) or","(c) of Regulation (EU) 2015/1222, the","concerned national regulation authorities","may adopt a decision within six months of","the conclusion of that bidding zone review","according to the adoption terms referred","to in paragraph 4."],"old":["6. Where further bidding zone reviews","are launched under Article 32(1)(a), (b) or","","(c) of Regulation (EU) 2015/1222, the","Commission may adopt a decision within","six months of the conclusion of that","bidding zone review."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"688","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Angelika Niebler, Sven Schulze","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-982","justification":"Capacity providers should be able to participate in only one mechanism outside the domestic\nmarket for the same delivery period. If capacity providers were to participate in several\nmechanisms outside the domestic market for the same delivery period, there would be a risk\nthat the necessary capacity might not be available.","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 5"]],"meps":[124809],"meta":{"created":"2019-07-03T06:30:48"},"new":["5. Capacity providers shall be able to","participate in only one mechanism outside","the domestic market for the same delivery","period. They shall be subject to non-","availability payments in case of non-","availability."],"old":["5. Capacity providers shall be able to","participate in more than one mechanism","for the same delivery period. They shall be","subject to non-availability payments in","case of non-availability, and subject to two","or more non-availability payments where","there is concurrent scarcity in two or","more bidding zones where the capacity","provider is contracted."],"orig_lang":"de","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"982","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1331","location":[["Proposal for a regulation","Article 43 \u2013 title"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:47"},"new":["Reporting"],"old":["Monitoring and reporting"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1331","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-384","justification":" Member States should have a possibility to procure balancing services year-ahead while TSO\n would be obliged to procure part of the balancing services on the short term markets.","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 7"]],"meps":[124706],"meta":{"created":"2020-11-15T15:52:08"},"new":["deleted"],"old":["7. The sizing of reserve capacity shall","be performed at regional level in","accordance with point 7 of Annex I.","Regional operational centres shall","support transmission system operators in","determining the amount of balancing","capacity that needs to be procured in","accordance with point 8 of Annex I."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"384","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-226","justification":" This is necessary for pressing reasons relating to the internal logic of the text or because the\n amendments are inextricably linked to other admissible amendments","location":[[" Proposal for a regulation","Article 12 \u2013 paragraph 1 \u2013 subparagraph 1 a (new)"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:42"},"new":["All opinions and recommendations","adopted by the Agency in application of","the Regulation 347/2013 on guidelines for","trans-European energy infrastructure","shall be adopted in accordance with the","procedure referred to in Article 23(5)."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"226","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1502","justification":" This regulation introduces a European entity for distribution system operators in Articles 49-\n 51.Tasks related to this entity must therefore be aligned to the provision of this Article and\n especially regarding the cooperation between TSOs and DSOs also to Article 53.","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 8"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:41"},"new":["8. The Commission shall request the","ENTSO for Electricity or, where so","decided in the priority list pursuant to","paragraph 2, the EU DSO entity for","Electricity, to submit an opinion for on a","network code which is in line with the","relevant framework guideline, to the","Agency within a reasonable period of time","not exceeding 12 months"],"old":["8. The Commission shall request the","ENTSO for Electricity or, where so","decided in the priority list pursuant to","paragraph 2, the EU DSO entity for","Electricity , to submit a proposal for a","network code which is in line with the","relevant framework guideline, to the","Agency within a reasonable period of time","","","not exceeding 12 months."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1502","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1332","location":[[" Proposal for a regulation","Article 43 \u2013 paragraph 1 \u2013 introductory part"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:47"},"new":["1. Regional operational centres shall","submit to the Agency and to the","regulatory authorities of the system","operation region the data underlying the","task they perform and an activity report at","least annually. The data and report shall","cover at least:"],"old":["1. Regional operational centres shall","establish a process for the continuous","monitoring of at least:"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1332","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Adam Gierek, Krystyna \u0141ybacka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-983","justification":" Member States should be able to specify the rules on the participation of cross-border\n capacity in capacity mechanisms, while retaining some flexibility in the application of the\n adopted criteria.","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 5 Regulation (EC) No 714/2009 of the European Parliament and of the Council"]],"meps":[28379,124883],"meta":{"created":"2019-07-03T06:30:48"},"new":["5. Notwithstanding the limits set out","in paragraph 2, capacity providers shall be","able to participate in more than one","mechanism for the same delivery period.","They shall be subject to non-availability","payments in case of non-availability.","."],"old":["5. Capacity providers shall be able to","participate in more than one mechanism for","the same delivery period. They shall be","subject to non-availability payments in","case of non-availability, and subject to two","or more non-availability payments where","there is concurrent scarcity in two or","more bidding zones where the capacity","","provider is contracted."],"orig_lang":"pl","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"983","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Martina Werner, Peter Kouroumbashev, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-689","location":[["Proposal for a regulation","Article 13 \u2013 paragraph 7"]],"meps":[124826,124857,124870,124739,124735,124699],"meta":{"created":"2019-07-03T06:30:45"},"new":["deleted"],"old":["7. The Commission shall consult","relevant stakeholders on its decisions","under this Article before they are adopted."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"689","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-385","meps":[28331],"meta":{"created":"2020-11-15T15:52:08"},"new":["deleted"],"old":["7. The sizing of reserve capacity shall","be performed at regional level in","accordance with point 7 of Annex I.","Regional operational centres shall","support transmission system operators in","determining the amount of balancing","capacity that needs to be procured in","accordance with point 8 of Annex I."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"385","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1333","location":[[" Proposal for a regulation","Article 43 \u2013 paragraph 1 \u2013 point b"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:47"},"new":["(b) the recommendations issued and","the outcome achieved;"],"old":["(b) the decisions and recommendations","issued and the outcome achieved;"],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1333","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Miroslav Poche, Zigmantas Bal\u010dytis, Patrizia Toia, Jeppe Kofod, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-227","justification":"The proposed amendment aims to replicate more precisely the specific tasks of the Agency\nunder Regulation (EU) 1227/2011 in order to ensure consistency and clarity.","location":[[" Proposal for a regulation","Article 13 \u2013 paragraph 1 \u2013 introductory part"]],"meps":[124699,96680,28340,124870,124784],"meta":{"created":"2019-07-03T06:30:42"},"new":["In order to effectively monitor wholesale","market integrity and transparency, the","Agency, in close cooperation with national","regulatory authorities and other authorities,","shall:"],"old":["In order to effectively monitor wholesale","market integrity and transparency, the","Agency, in close cooperation with the","regulatory authorities and other national","authorities, shall"],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"227","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1503","justification":" This regulation introduces a European entity for distribution system operators in Articles 49-\n 51.Tasks related to this entity must therefore be aligned to the provision of this Article and\n especially regarding the cooperation between TSOs and DSOs also to Article 53.","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 9"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:41"},"new":["9. The Agency, shall convene a","drafting committee to support it in the","network code development process. The","drafting committee shall consist of","representatives of the ENTSO for","Electricity, the Agency, the EU DSO","entity, where appropriate of nominated","electricity market operators, the main","affected stakeholders, including third","party market operators, and any other","external source of expertise from the","academic world or civil society","organisations. The Agency shall elaborate","proposals for network codes in the areas","referred to in paragraph 6 Article","paragraph 1 upon a request addressed to it","by the Commission in accordance with","paragraph 8;"],"old":["9. The ENTSO for Electricity, or","where so decided in the priority list","pursuant to paragraph 2, the EU DSO","entity, shall convene a drafting committee","to support it in the network code","development process. The drafting","committee shall consist of representatives","of the ENTSO for Electricity, the Agency,","the EU DSO entity, where appropriate of","nominated electricity market operators and","a limited number of the main affected","stakeholders. The ENTSO for Electricity","or where so decided in the priority list","pursuant to paragraph 2 the EU DSO","entity, shall elaborate proposals for","network codes in the areas referred to in","paragraph 1 upon a request addressed to it","by the Commission in accordance with","paragraph 8."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1503","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-386","location":[["Proposal for a regulation","Article 5 \u2013 paragraph 7"]],"meps":[96713],"meta":{"created":"2020-11-15T15:52:08"},"new":["deleted"],"old":["7. The sizing of reserve capacity shall","be performed at regional level in","accordance with point 7 of Annex I.","Regional operational centres shall","support transmission system operators in","determining the amount of balancing","capacity that needs to be procured in","accordance with point 8 of Annex I."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"386","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1334","location":[[" Proposal for a regulation","Article 43 \u2013 paragraph 1 \u2013 point c"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:47"},"new":["(c) the effectiveness and efficiency of","each of their services."],"old":["(c) the effectiveness and efficiency of","each of the functions for which they are","responsible."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1334","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Pilar del Castillo Vera, Pilar Ayuso, Francesc Gamb\u00fas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-984","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 5"]],"meps":[28390,4319,125006],"meta":{"created":"2019-07-03T06:30:48"},"new":["5. Capacity providers shall not be able","to participate in more than one mechanism","for the same delivery period. They shall be","subject to non-availability payments in","case of non-availability."],"old":["5. Capacity providers shall be able to","participate in more than one mechanism for","the same delivery period. They shall be","subject to non-availability payments in","case of non-availability, and subject to two","or more non-availability payments where","there is concurrent scarcity in two or","more bidding zones where the capacity","provider is contracted."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"984","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski, Edward Czesak, Nikolay Barekov","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-690","justification":"As a general rule, according to the amendment to paragraph 3, decisions regarding the\nbidding zone configuration would be taken and consulted by Member States. In exceptional\n\n circumstances, according to the amendment to paragraph 4, this is the Commission who\n would take decisions and consult relevant stakeholders.","location":[["Proposal for a regulation","Article 13 \u2013 paragraph 7"]],"meps":[124891,132925,124871],"meta":{"created":"2019-07-03T06:30:45"},"new":["7. Member States or the Commission","shall consult relevant stakeholders,","including Member States not participating","in the bidding zone review on their","decisions under this Article before they are","adopted."],"old":["7. The Commission shall consult","relevant stakeholders on its decisions under","this Article before they are adopted."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"690","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-387","location":[["Proposal for a regulation","Article 5 \u2013 paragraph 7"]],"meps":[2025],"meta":{"created":"2020-11-15T15:52:08"},"new":["7. The sizing of reserve capacity may","be facilitated, when appropriate and based","on national specificities, at regional level","in accordance with point 7 of Annex I."],"old":["7. The sizing of reserve capacity shall","be performed at regional level in","accordance with point 7 of Annex I.","Regional operational centres shall support","","transmission system operators in","determining the amount of balancing","capacity that needs to be procured in","accordance with point 8 of Annex I."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"387","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1504","justification":"Existing language on the \u201cdrafting committee\u201d (renamed \u201cstakeholder committee\u201d) including\n\"a limited number of the main affected stakeholders\" is too vague and could limit\nparticipation. In order to ensure that the process is not captured by large industry\nassociations, the Electricity Regulation should ensure that all relevant stakeholders who are\nlikely to have an interest in the network code, particularly smaller less-resourced ones, can\nsupport the network code development process and are adequately represented. Furthermore,\nin order to provide clarification around the distinct roles and responsibilities to elaborate\nnetwork codes, provisions on network codes related to the distribution grid should be moved\nto another sub-paragraph. Hence, the content of this paragraph is limited to network codes\nfalling within the scope of ENTSO-E\u2019s remit.","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 9"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:41"},"new":["9. The ENTSO for Electricity shall","convene a stakeholder committee to","support it in the network code development","process. The stakeholder committee shall","consist of representatives of the ENTSO","for Electricity, the Agency, and of other","affected stakeholders who are likely to","have an interest in the network code,","including distribution system operators,","nominated electricity market operators","system users, relevant industry","associations, technical bodies and","consumer associations. The ENTSO for","Electricity shall elaborate proposals for","network codes in the areas referred to in","paragraph 1 upon a request addressed to it","by the Commission in accordance with","paragraph 8."],"old":["9. The ENTSO for Electricity, or","where so decided in the priority list","pursuant to paragraph 2, the EU DSO","entity, shall convene a drafting committee","to support it in the network code","development process. The drafting","committee shall consist of representatives","of the ENTSO for Electricity, the Agency,","the EU DSO entity, where appropriate of","nominated electricity market operators and","a limited number of the main affected","stakeholders. The ENTSO for Electricity","or where so decided in the priority list","pursuant to paragraph 2 the EU DSO","entity, shall elaborate proposals for","network codes in the areas referred to in","paragraph 1 upon a request addressed to it","by the Commission in accordance with","paragraph 8."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1504","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Martina Werner, Carlos Zorrinho, Miapetra Kumpula-Natri, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1335","location":[["Proposal for a regulation","Article 43 \u2013 paragraph 2"]],"meps":[124826,124739,124735,124784],"meta":{"created":"2019-07-03T06:30:47"},"new":["deleted"],"old":["2. Regional operational centres shall","submit to the Agency and to the","regulatory authorities of the system","operation region the data resulting from","their continuous monitoring at least","annually."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1335","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Davor \u0160krlec on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-228","justification":"Given the trend towards market coupling and regionalisation, there is a strong case for\nenhancing ACER\u2019s authority in monitoring regional markets under REMIT. Expanding\nACER\u2019s remit to cover real-time regional market functioning would not significantly modify\nits current authority, but rather make it more effective and credible.","location":[["Proposal for a regulation","Article 13 \u2013 paragraph 1 \u2013 point a"]],"meps":[124756],"meta":{"created":"2019-07-03T06:30:42"},"new":["(a) monitor wholesale markets,","including regional markets in real time,","collect data and register market participants","in accordance with Article 7 to 9 of","Regulation (EU) 1227/201137;","__________________","37","Regulation (EU) No 1227/2011 of the","European Parliament and of the Council of","25 October 2011 on wholesale energy","market integrity and transparency OJ L","326, 8.12.2011, p. 1\u201316."],"old":["(a) monitor wholesale markets, collect","data and register market participants in","accordance with Article 7 to 9 of","Regulation (EU) 1227/201137 ;","__________________","37","Regulation (EU) No 1227/2011 of the","European Parliament and of the Council of","25 October 2011 on wholesale energy","market integrity and transparency OJ L","326, 8.12.2011, p. 1\u201316."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"228","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-388","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 7"]],"meps":[2278],"meta":{"created":"2020-11-15T15:52:08"},"new":["7. The sizing of reserve capacity shall","be performed at regional level in","accordance with point 7 of Annex I.","Regional operational centres shall support","transmission system operators in","determining the amount of balancing","capacity including energy storage that","needs to be procured in accordance with","point 8 of Annex I."],"old":["7. The sizing of reserve capacity shall","be performed at regional level in","accordance with point 7 of Annex I.","Regional operational centres shall support","transmission system operators in","determining the amount of balancing","capacity that needs to be procured in","accordance with point 8 of Annex I."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"388","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1505","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 9"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:41"},"new":["9. The ENTSO for Electricity shall","convene a stakeholder committee to","support it in the network code development","process. The stakeholder committee shall","consist of representatives of the ENTSO","for Electricity, the Agency, and of other","affected stakeholders who are likely to","have an interest in the network code,","including distribution system operators,","nominated electricity market operators","system users, relevant industry","associations, technical bodies and","consumer associations. The ENTSO for","Electricity shall elaborate proposals for","network codes in the areas referred to in","paragraph 1 upon a request addressed to it","by the Commission in accordance with","paragraph 8."],"old":["9. The ENTSO for Electricity, or","where so decided in the priority list","pursuant to paragraph 2, the EU DSO","entity, shall convene a drafting committee","to support it in the network code","development process. The drafting","committee shall consist of representatives","of the ENTSO for Electricity, the Agency,","the EU DSO entity, where appropriate of","nominated electricity market operators","and a limited number of the main affected","stakeholders. The ENTSO for Electricity","or where so decided in the priority list","pursuant to paragraph 2 the EU DSO","entity, shall elaborate proposals for","network codes in the areas referred to in","paragraph 1 upon a request addressed to it","by the Commission in accordance with","paragraph 8."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1505","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-985","justification":"While a capacity provider shall be able to participate in more than one mechanism for the\nsame delivery period, capacity providers shall not be allowed to participate with more than\ntheir available maximum capacity in order not to endanger security of supply.","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 5"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:48"},"new":["5. Capacity providers shall be able to","participate in more than one mechanism for","the same delivery period. They shall be","subject to non-availability payments in","case of non-availability, and subject to two","or more non-availability payments where","there is concurrent scarcity in two or more","bidding zones where the capacity provider","is contracted. Capacity providers are","allowed to participate with no more than","their available maximum capacity."],"old":["5. Capacity providers shall be able to","participate in more than one mechanism for","the same delivery period. They shall be","subject to non-availability payments in","case of non-availability, and subject to two","or more non-availability payments where","there is concurrent scarcity in two or more","bidding zones where the capacity provider","","is contracted."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"985","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1336","location":[["Proposal for a regulation","Article 43 \u2013 paragraph 2"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:47"},"new":["2. Regional security coordinators","shall submit to the Agency and to the","regulatory authorities of the capacity","calculation region the data resulting from","their continuous monitoring at least","annually."],"old":["2. Regional operational centres shall","submit to the Agency and to the regulatory","authorities of the system operation region","the data resulting from their continuous","monitoring at least annually."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1336","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-691","location":[[" Proposal for a regulation","Article 13 \u2013 paragraph 7"]],"meps":[96993],"meta":{"created":"2019-07-03T06:30:45"},"new":["7. National regulatory authorities","shall consult relevant stakeholders on its","decisions under this Article before they are","adopted."],"old":["7. The Commission shall consult","relevant stakeholders on its decisions under","this Article before they are adopted."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"691","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-389","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 8"]],"meps":[96713],"meta":{"created":"2020-11-15T15:52:08"},"new":["deleted"],"old":["8. The procurement of balancing","capacity shall be facilitated on a regional","level in accordance with point 8 of Annex","I. The procurement shall be based on a","primary market and organised in such a","way as to be non-discriminatory between","market participants in the","prequalification process individually or","through aggregation."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"389","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1506","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 10"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:41"},"new":["10. The Agency shall revise the","network code and ensure that the network","code is in line with the relevant framework","guideline and contributes to market","integration, non-discrimination, effective","competition, and the efficient functioning","of the market. Within four months of","receiving, the Agency shall provide the","revised network code to the ENTSO for","Electricity or the EU DSO entity. If the","ENTSO for Electricity or the EU DSO","entity disagrees with the revised network","code, it shall convene the drafting","committee referred to in paragraph 9 to","support it in the revised network code","development process. The ENTSO for","Electricity or the EU DSO entity shall","provide its views on the revised network","code and resubmit it to the Agency within","two months of receiving the revised","network code. The Agency submit the","revised network code to the Commission","within one month of the day of the receipt","of the revised proposal . In the proposal","submitted to the Commission, the Agency","shall take into account the views provided","by all involved parties during the drafting","of the proposal led by the ENTSO for","Electricity or the EU DSO entity and shall","formally consult the relevant stakeholders","on the version to be submitted to the","Commission."],"old":["10. The Agency shall revise the","network code and ensure that the network","code is in line with the relevant framework","guideline and contributes to market","integration, non-discrimination, effective","competition, and the efficient functioning","of the market and , submit the revised","network code to the Commission within six","months of the day of the receipt of the","proposal . In the proposal submitted to the","Commission, the Agency shall take into","","account the views provided by all involved","parties during the drafting of the proposal","led by the ENTSO for Electricity or the EU","DSO entity and shall formally consult the","relevant stakeholders on the version to be","submitted to the Commission."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1506","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Miroslav Poche, Zigmantas Bal\u010dytis, Patrizia Toia, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Jeppe Kofod, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-229","justification":" The proposed amendment aims to replicate more precisely the specific tasks of the Agency\n under Regulation (EU) 1227/2011 in order to ensure consistency and clarity.","location":[["Proposal for a regulation","Article 13 \u2013 paragraph 1 \u2013 point a"]],"meps":[124699,96680,28340,125041,125044,124870,124784],"meta":{"created":"2019-07-03T06:30:42"},"new":["(a) monitor wholesale markets, collect","and share data and establish a European","register of market participants in","accordance with Article 7 to 12 of","Regulation (EU)1227/201137;","__________________","37","Regulation (EU) No 1227/2011 of the","European Parliament and of the Council of","25 October 2011 on wholesale energy","market integrity and transparency OJ L","326, 8.12.2011, p. 1\u201316."],"old":["(a) monitor wholesale markets, collect","data and register market participants in","accordance with Article 7 to 9 of","Regulation (EU) 1227/201137 ;","__________________","37","Regulation (EU) No 1227/2011 of the","European Parliament and of the Council of","25 October 2011 on wholesale energy","market integrity and transparency OJ L","326, 8.12.2011, p. 1\u201316."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"229","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-390","location":[["Proposal for a regulation","Article 5 \u2013 paragraph 8"]],"meps":[28331],"meta":{"created":"2020-11-15T15:52:08"},"new":["deleted"],"old":["8. The procurement of balancing","capacity shall be facilitated on a regional","level in accordance with point 8 of Annex","I. The procurement shall be based on a","primary market and organised in such a","way as to be non-discriminatory between","market participants in the","prequalification process individually or","through aggregation."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"390","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1337","location":[["Proposal for a regulation","Article 43 \u2013 paragraph 3"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:47"},"new":["3. Regional operational centres shall","establish their costs in a transparent","manner and report them to the Agency and","to the regulatory authorities of the system","operation region at least annually."],"old":["3. Regional operational centres shall","establish their costs in a transparent","","manner and report them to the Agency and","to the regulatory authorities of the system","operation region."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1337","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1507","justification":" This amendment promotes consistency with other amendments. In addition, in order to\n provide clarify around the distinct roles and responsibilities to elaborate network codes,\n provisions on network codes related to the distribution grid should be moved to another sub-\n paragraph. Hence, the content of this paragraph is limited to network codes falling within the\n scope of ENTSO-E\u2019s remit.","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 10"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:41"},"new":["10. The Agency shall revise the","network code and ensure that the network","code elaborated by the ENTSO for","Electricity is in line with the relevant","framework guideline and contributes to","market integration, non-discrimination,","effective competition, and the efficient","functioning of the market and , submit the","revised network code to the Commission","within six months of the day of the receipt","of the proposal . In the proposal submitted","to the Commission, the Agency shall take","into account the views provided by all","involved parties during the drafting of the","proposal led by the ENTSO for Electricity","shall formally consult the relevant","stakeholders on the version to be submitted","to the Commission."],"old":["10. The Agency shall revise the","network code and ensure that the network","code is in line with the relevant framework","guideline and contributes to market","integration, non-discrimination, effective","competition, and the efficient functioning","of the market and , submit the revised","network code to the Commission within six","months of the day of the receipt of the","proposal . In the proposal submitted to the","Commission, the Agency shall take into","account the views provided by all involved","parties during the drafting of the proposal","led by the ENTSO for Electricity or the","EU DSO entity and shall formally consult","","the relevant stakeholders on the version to","be submitted to the Commission."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1507","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-986","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 5"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:48"},"new":["5. Capacity providers shall be able to","participate in more than one mechanism for","the same delivery period. They shall be","subject to non-availability payments in","case of non-availability, or if they are","unable to fulfil their commitments overall."],"old":["5. Capacity providers shall be able to","participate in more than one mechanism for","the same delivery period. They shall be","subject to non-availability payments in","case of non-availability, and subject to two","or more non-availability payments where","there is concurrent scarcity in two or","more bidding zones where the capacity","provider is contracted."],"orig_lang":"fr","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"986","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Massimiliano Salini, Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-692","location":[[" Proposal for a regulation","Article 13 \u2013 paragraph 7"]],"meps":[125670,36392],"meta":{"created":"2019-07-03T06:30:45"},"new":["7. National regulatory authorities","shall consult relevant stakeholders on its","decisions under this Article before they are","adopted."],"old":["7. The Commission shall consult","relevant stakeholders on its decisions under","this Article before they are adopted."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"692","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Martina Werner, Flavio Zanonato, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-391","location":[["Proposal for a regulation","Article 5 \u2013 paragraph 8"]],"meps":[124826,124800,124739,124735,124699,125041,125044],"meta":{"created":"2020-11-15T15:52:08"},"new":["8. The procurement of balancing","capacity shall be performed by the","transmission system operators. The","procurement shall be based on a primary","market and be non-discriminatory between","market participants in the prequalification","process individually or through","aggregation. The reservation of cross-","zonal capacity for the exchange of","balancing capacity shall be limited to 5%","of the available capacity for the exchange","of energy of the previous relevant","calendar year between the respective","bidding zones."],"old":["8. The procurement of balancing","capacity shall be facilitated on a regional","level in accordance with point 8 of Annex","I. The procurement shall be based on a","primary market and organised in such a","way as to be non-discriminatory between","market participants in the prequalification","process individually or through","aggregation."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"391","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1338","location":[[" Proposal for a regulation","Article 43 \u2013 paragraph 3"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:47"},"new":["3. Regional security coordinators","shall establish their costs in a transparent","manner and report them to the Agency and","to the regulatory authorities of the capacity","calculation region."],"old":["3. Regional operational centres shall","establish their costs in a transparent","manner and report them to the Agency and","to the regulatory authorities of the system","operation region."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1338","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1508","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 10"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:41"},"new":["10. The Agency shall revise the","network code elaborated by the ENTSO","for Electricity and ensure that the network","code is in line with the relevant framework","guideline and contributes to market","integration, non-discrimination, effective","competition, and the efficient functioning","of the market and , submit the","revised network code to the Commission","within six months of the day of the receipt","of the proposal . In the proposal submitted","to the Commission, the Agency shall take","into account the views provided by all","involved parties during the drafting of the","proposal led by the ENTSO for Electricity","and shall formally consult the relevant","stakeholders on the version to be submitted","to the Commission."],"old":["10. The Agency shall revise the","network code and ensure that the network","code is in line with the relevant framework","guideline and contributes to market","integration, non-discrimination, effective","competition, and the efficient functioning","of the market and , submit the revised","network code to the Commission within six","months of the day of the receipt of the","proposal . In the proposal submitted to the","Commission, the Agency shall take into","account the views provided by all involved","parties during the drafting of the proposal","led by the ENTSO for Electricity or the","EU DSO entity and shall formally consult","the relevant stakeholders on the version to","be submitted to the Commission."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1508","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Hans-Olaf Henkel","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-230","justification":"As stated in Article 13 of Regulation 1227/2011, the implementation of prohibitions of market\nabuse are entrusted with the national regulatory authorities with whom the Agency shares the\ndata as set out in Article 10 of Regulation 1227/2011.","location":[[" Proposal for a regulation","Article 13 \u2013 paragraph 1 \u2013 point a"]],"meps":[124823],"meta":{"created":"2019-07-03T06:30:42"},"new":["(a) monitor wholesale markets, collect","and share data and register market","participants in accordance with Article 7 to","12 of Regulation (EU) 1227/201137 ;","__________________","37","Regulation (EU) No 1227/2011 of the","European Parliament and of the Council of","25 October 2011 on wholesale energy","market integrity and transparency OJ L","326, 8.12.2011, p. 1\u201316."],"old":["(a) monitor wholesale markets, collect","data and register market participants in","accordance with Article 7 to 9 of","Regulation (EU) 1227/201137 ;","__________________","37","Regulation (EU) No 1227/2011 of the","European Parliament and of the Council of","25 October 2011 on wholesale energy","market integrity and transparency OJ L","326, 8.12.2011, p. 1\u201316."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"230","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Claude Turmes","changes":{},"committee":["ITRE"],"compromise":["on behalf of the Verts/ALE Group"],"date":"2017-09-25T00:00:00","id":"PE610.751-1509","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 10"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:41"},"new":["10. The Agency shall ensure that the","network code is in line with the relevant","framework guideline and contributes to","better market integration of high levels of","electricity generated from variable","renewable energy sources, non-","discrimination, effective competition, and","the efficient functioning of the market","and submit the draft network code to the","Commission within six months of the day","of the receipt of the opinion In the","proposal submitted to the Commission, the","Agency shall take into account the views","provided by all involved parties during the","drafting of the proposal."],"old":["10. The Agency shall revise the","network code and ensure that the network","code is in line with the relevant framework","guideline and contributes to market","integration, non-discrimination, effective","competition, and the efficient functioning","of the market and , submit the revised","network code to the Commission within six","months of the day of the receipt of the","proposal . In the proposal submitted to the","Commission, the Agency shall take into","account the views provided by all involved","parties during the drafting of the proposal","led by the ENTSO for Electricity or the","EU DSO entity and shall formally consult","the relevant stakeholders on the version to","be submitted to the Commission."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1509","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Cristian-Silviu Bu\u015foi","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-987","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 5"]],"meps":[38420],"meta":{"created":"2019-07-03T06:30:48"},"new":["5. Without prejudice to the","limitations set out in paragraph","2, capacity providers shall be able to","participate in more than one mechanism for","the same delivery period. They shall be","subject to non-availability payments","pursuant to the common rules referred","to in paragraph 10(d) in case of non-","availability."],"old":["5. Capacity providers shall be able to","participate in more than one mechanism for","the same delivery period. They shall be","subject to non-availability payments in","case of non-availability, and subject to","two or more non-availability payments","","where there is concurrent scarcity in two","or more bidding zones where the capacity","provider is contracted."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"987","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-693","location":[[" Proposal for a regulation","Article 13 \u2013 paragraph 7"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:45"},"new":["7. Member States and the","Commission shall consult relevant","stakeholders before adopting a decision","under this Article."],"old":["7. The Commission shall consult","relevant stakeholders on its decisions","","under this Article before they are adopted."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"693","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-392","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 8"]],"meps":[2025],"meta":{"created":"2020-11-15T15:52:08"},"new":["8. The procurement of balancing","capacity may be facilitated on a cross-","border level on a voluntary basis and","grounded on the Electricity Balancing","Guideline provisions. The procurement","shall be based on a primary market and","organised in such a way as to be non-","discriminatory between market participants","in the prequalification process individually","or through aggregation subject to technical","constraints inherent in managing","networks."],"old":["8. The procurement of balancing","capacity shall be facilitated on a regional","level in accordance with point 8 of Annex","I. The procurement shall be based on a","primary market and organised in such a","way as to be non-discriminatory between","market participants in the prequalification","process individually or through","aggregation."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"392","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Martina Werner, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1339","location":[[" Proposal for a regulation","Article 43 \u2013 paragraph 4"]],"meps":[124826,124739,124735,124699],"meta":{"created":"2019-07-03T06:30:48"},"new":["4. Regional coordination centres shall","submit an annual report with the data","resulting from their continuous","monitoring pursuant to paragraph 1 and","on their performance to ENTSO for","Electricity, the Agency, the regulatory","authorities of the system operation region","and the Electricity Coordination Group","established pursuant to Article 1 of","Commission Decision 2012/C 353/02."],"old":["4. Regional operational centres shall","submit an annual report concerning their","performance to ENTSO for Electricity, the","Agency, the regulatory authorities of the","system operation region and the Electricity","Coordination Group established pursuant","to Article 1 of Commission Decision","2012/C 353/0237 .","_________________","37","Commission Decision of 15 November","2012 setting up the Electricity","Coordination Group (OJ C 353,","17.11.2012, p.2)."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1339","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1510","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 11"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:41"},"new":["11. Where the ENTSO for Electricity","have failed to develop an opinion within","the period of time set by the Commission","under paragraph 8, the Commission may","request the Agency to prepare a draft","network code on the basis of the relevant","framework guideline without the opinion","from the ENTSO for Electricity. The","Agency may launch a further consultation","in the course of preparing a draft network","code under this paragraph. The Agency","shall submit a draft network code prepared","under this paragraph to the Commission","and may recommend that it be adopted."],"old":["11. Where the ENTSO for Electricity","or the EU DSO entity have failed to","develop a network code within the period","of time set by the Commission under","paragraph 8, the Commission may request","the Agency to prepare a draft network code","on the basis of the relevant framework","guideline. The Agency may launch a","further consultation in the course of","preparing a draft network code under this","paragraph. The Agency shall submit a draft","","network code prepared under this","paragraph to the Commission and may","recommend that it be adopted."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1510","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Jerzy Buzek, Janusz Lewandowski, Marian-Jean Marinescu","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-988","justification":" Member States should be enabled to determine the rules of cross-border participation in their\n capacity mechanism with a necessary degree of flexibility.","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 5"]],"meps":[23781,33982],"meta":{"created":"2019-07-03T06:30:48"},"new":["5. Without prejudice to the","limitations set out in paragraph 2,","capacity providers shall be able to","participate in more than one mechanism for","the same delivery period. They shall be","subject to non-availability payments","pursuant to the common rules referred to","in paragraph 10(d) in case of non-","availability."],"old":["5. Capacity providers shall be able to","participate in more than one mechanism for","the same delivery period. They shall be","subject to non-availability payments in","case of non-availability, and subject to","two or more non-availability payments","where there is concurrent scarcity in two","or more bidding zones where the capacity","provider is contracted."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"988","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-231","justification":"The commissioning of additional tasks to the Agency is considered to overstep the principle of\nsubsidiarity.","location":[["Proposal for a regulation","Article 14 \u2013 paragraph 1"]],"meps":[96993],"meta":{"created":"2019-07-03T06:30:42"},"new":["deleted"],"old":["The Agency may, in circumstances clearly","defined by the Commission in guidelines","adopted pursuant to Article 57 of [recast","Electricity Regulation as proposed by","COM(2016) 861/2] or Article 23 of","Regulation (EC) No 715/2009 and on","issues related to the purpose for which it","has been established, be commissioned","with additional tasks respecting the limits","of transfer of executive powers to Union","agencies ."],"orig_lang":"it","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"231","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1511","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 11"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:41"},"new":["11. Where the ENTSO for Electricity","has failed to develop a network code","within the period of time set by the","Commission under paragraph 8, the","Commission may request the Agency to","prepare a draft network code on the basis","of the relevant framework guideline. The","Agency may launch a further consultation","in the course of preparing a draft network","code under this paragraph. The Agency","shall submit a draft network code prepared","under this paragraph to the Commission","and may recommend that it be adopted."],"old":["11. Where the ENTSO for Electricity","or the EU DSO entity have failed to","develop a network code within the period","of time set by the Commission under","paragraph 8, the Commission may request","the Agency to prepare a draft network code","on the basis of the relevant framework","guideline. The Agency may launch a","further consultation in the course of","preparing a draft network code under this","paragraph. The Agency shall submit a draft","network code prepared under this","paragraph to the Commission and may","recommend that it be adopted."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1511","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-393","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 8"]],"meps":[124891],"meta":{"created":"2020-11-15T15:52:08"},"new":["8. The procurement of balancing","capacity shall be based on a primary","market and organised in such a way as to","be non-discriminatory between market","participants in the prequalification process","individually or through aggregation."],"old":["8. The procurement of balancing","capacity shall be facilitated on a regional","level in accordance with point 8 of Annex","I. The procurement shall be based on a","primary market and organised in such a","way as to be non-discriminatory between","market participants in the prequalification","process individually or through","aggregation."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"393","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Angelika Niebler, Sven Schulze","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-989","justification":"It is not at all clear how much value would be added by creating regional operational centres.\nThe ENTSO for electricity is an existing grouping of transmission system operators at EU\nlevel. An additional body would result in a disproportionately high administrative and\nbureaucratic burden. Duplicate structures must be avoided.","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 6"]],"meps":[124809],"meta":{"created":"2019-07-03T06:30:48"},"new":["deleted"],"old":["6. Regional operational centres","established pursuant to Article 32 shall","annually calculate the maximum entry","capacity available for the participation of","foreign capacity taking into account the","expected availability of interconnection","and the likely concurrence of system","","stress between the system where the","mechanism is applied and the system in","which the foreign capacity is located. A","calculation is required for each bidding","zone border."],"orig_lang":"de","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"989","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1340","location":[["Proposal for a regulation","Article 43 \u2013 paragraph 4"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:48"},"new":["4. Regional security coordinators","shall submit an annual report concerning","their performance to ENTSO for","Electricity, the Agency, the regulatory","authorities of the capacity calculation","region and the Electricity Coordination","Group established pursuant to Article 1 of","Commission Decision 2012/C 353/0237 .","_________________","37","Commission Decision of 15 November","2012 setting up the Electricity","Coordination Group (OJ C 353,","17.11.2012, p.2)."],"old":["4. Regional operational centres shall","submit an annual report concerning their","performance to ENTSO for Electricity, the","Agency, the regulatory authorities of the","system operation region and the Electricity","Coordination Group established pursuant","to Article 1 of Commission Decision","2012/C 353/0237 .","_________________","37","Commission Decision of 15 November","2012 setting up the Electricity","Coordination Group (OJ C 353,","17.11.2012, p.2)."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1340","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Hans-Olaf Henkel","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-232","justification":" This amendment is necessary for pressing reasons relating to the internal logic of the text or\n inextricably linked to other admissible amendments.","location":[["Proposal for a regulation","Article 14 \u2013 paragraph 1"]],"meps":[124823],"meta":{"created":"2019-07-03T06:30:42"},"new":["The Agency may, in circumstances clearly","defined by the Commission in Guidelines","adopted pursuant to Article 57 of [recast","Electricity Regulation as proposed by","COM(2016) 861/2] or Article 23 of","Regulation (EC) No 715/2009 and on","issues related to the purpose for which it","has been established, be commissioned","with additional tasks respecting the limits","of transfer of executive powers to Union","agencies. The Commission may provide","an explanation as to whether the foreseen","new competences are in line with the","Meroni doctrine and existing rulings of","the European Court of Justice."],"old":["The Agency may, in circumstances clearly","defined by the Commission in Guidelines","adopted pursuant to Article 57 of [recast","Electricity Regulation as proposed by","COM(2016) 861/2] or Article 23 of","","Regulation (EC) No 715/2009 and on","issues related to the purpose for which it","has been established, be commissioned","with additional tasks respecting the limits","of transfer of executive powers to Union","agencies ."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"232","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Martina Werner, Peter Kouroumbashev, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-694","location":[["Proposal for a regulation","Article 13 \u2013 paragraph 8"]],"meps":[124826,124857,124870,124739,124735,124699],"meta":{"created":"2019-07-03T06:30:45"},"new":["deleted"],"old":["8. The Commission decision shall","specify the date of implementation of a","change. That implementation date shall","balance the need for expediency with","practical considerations, including","forward trade of electricity. The","Commission may define appropriate","transitional arrangements as part of its","decision."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"694","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1512","justification":"This amendment promotes consistency with other amendments. In addition, in order to\nprovide clarify around the distinct roles and responsibilities to elaborate network codes,\nprovisions on network codes related to the distribution grid should be moved to another sub-\nparagraph. Hence, the content of this paragraph is limited to network codes falling within the\nscope of ENTSO-E\u2019s remit.","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 11"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:41"},"new":["11. Where the ENTSO for Electricity","or has failed to develop a network code","within the period of time set by the","Commission under paragraph 8, the","Commission may request the Agency to","prepare a draft network code on the basis","of the relevant framework guideline. The","Agency may launch a further consultation","in the course of preparing a draft network","code under this paragraph. The Agency","shall submit a draft network code prepared","under this paragraph to the Commission","and may recommend that it be adopted."],"old":["11. Where the ENTSO for Electricity","or the EU DSO entity have failed to","develop a network code within the period","of time set by the Commission under","paragraph 8, the Commission may request","the Agency to prepare a draft network code","","on the basis of the relevant framework","guideline. The Agency may launch a","further consultation in the course of","preparing a draft network code under this","paragraph. The Agency shall submit a draft","network code prepared under this","paragraph to the Commission and may","recommend that it be adopted."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1512","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-394","justification":"Especially smaller market participants should be enabled to participate via aggregation.","location":[["Proposal for a regulation","Article 5 \u2013 paragraph 8"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["8. The procurement of balancing","capacity shall be facilitated on a regional","level in accordance with point 8 of Annex","I. The procurement shall be based on a","primary market and organised in such a","way as to be non-discriminatory between","market participants in the prequalification","process, whether market participants","participate individually or through","aggregation."],"old":["8. The procurement of balancing","capacity shall be facilitated on a regional","level in accordance with point 8 of Annex","I. The procurement shall be based on a","primary market and organised in such a","way as to be non-discriminatory between","market participants in the prequalification","process individually or through","aggregation."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"394","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-990","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 6"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:48"},"new":["6. Where capacity mechanisms are","implemented, transmission system","managers shall help the regulatory","authorities concerned to calculate the","maximum entry capacity available for the","participation of foreign capacity taking into","account the expected availability of","interconnection and the likely concurrence","of system stress between the system where","the mechanism is applied and the system in","which the foreign capacity is located. A","calculation is required for each bidding","zone border."],"old":["6. Regional operational centres","established pursuant to Article 32 shall","annually calculate the maximum entry","capacity available for the participation of","foreign capacity taking into account the","expected availability of interconnection","and the likely concurrence of system stress","between the system where the mechanism","is applied and the system in which the","foreign capacity is located. A calculation is","required for each bidding zone border."],"orig_lang":"fr","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"990","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1513","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 12"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:41"},"new":["12. The Commission may adopt, on its","own initiative, where the Agency has failed","to develop a draft network code as referred","to in paragraph 11 of this Article, or upon","recommendation of the Agency under","paragraph 10 of this Article, one or more","network codes in the areas listed in","paragraph 1."],"old":["12. The Commission may adopt, on its","own initiative, where the ENTSO for","Electricity or the EU DSO entity have","failed to develop a network code, or the","Agency has failed to develop a draft","network code as referred to in paragraph 11","of this Article, or upon recommendation of","the Agency under paragraph 10 of this","Article, one or more network codes in the","areas listed in paragraph 1."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1513","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1341","location":[["Proposal for a regulation","Article 43 \u2013 paragraph 5"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:48"},"new":["5. Regional operational centres shall","report annually shortcomings identified in","the monitoring process under paragraph 1","to ENTSO for electricity, the regulatory","authorities of the system operation region,","the Agency and the competent authorities","of Member States responsible for the","prevention and management of crisis","situations."],"old":["5. Regional operational centres shall","report shortcomings identified in the","monitoring process under paragraph 1 to","ENTSO for electricity, the regulatory","authorities of the system operation region,","the Agency and the competent authorities","of Member States responsible for the","prevention and management of crisis","situations."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1341","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-395","location":[["Proposal for a regulation","Article 5 \u2013 paragraph 8"]],"meps":[2278],"meta":{"created":"2020-11-15T15:52:08"},"new":["8. The procurement of balancing","capacity including energy storage shall be","facilitated on a regional level in accordance","with point 8 of Annex I. The procurement","shall be based on a primary market and","organised in such a way as to be non-","discriminatory between market participants","in the prequalification process individually","or through aggregation."],"old":["8. The procurement of balancing","capacity shall be facilitated on a regional","level in accordance with point 8 of Annex","I. The procurement shall be based on a","primary market and organised in such a","way as to be non-discriminatory between","market participants in the prequalification","process individually or through","aggregation."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"395","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Werner Langen, Markus Pieper","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-233","justification":" This provision extends the Commission\u2019s competences in this field and could lead to\n significant transfer of competences from the national regulatory authorities to ACER. New\n\n\ndecision-making powers should only be transferred to ACER if agreed by the European\nParliament and the Council in an ordinary legislative procedure.","location":[[" Proposal for a regulation","Article 14 \u2013 paragraph 1"]],"meps":[1928,28224],"meta":{"created":"2019-07-03T06:30:42"},"new":["The Agency may, in circumstances clearly","defined by the Commission in Guidelines","adopted pursuant to Article 57 of [recast","Electricity Regulation as proposed by","COM(2016) 861/2] or Article 23 of","Regulation (EC) No 715/2009 and on","issues related to the purpose for which it","has been established, be commissioned","with additional tasks respecting the limits","of transfer of executive powers to Union","agencies, which do not involve decision-","making powers."],"old":["The Agency may, in circumstances clearly","defined by the Commission in Guidelines","adopted pursuant to Article 57 of [recast","Electricity Regulation as proposed by","COM(2016) 861/2] or Article 23 of","Regulation (EC) No 715/2009 and on","issues related to the purpose for which it","has been established, be commissioned","with additional tasks respecting the limits","of transfer of executive powers to Union","agencies ."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"233","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Massimiliano Salini, Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-695","location":[["Proposal for a regulation","Article 13 \u2013 paragraph 8"]],"meps":[125670,36392],"meta":{"created":"2019-07-03T06:30:45"},"new":["8. The decision of the national","regulatory authorities shall specify the","date of implementation of a change. That","implementation date shall balance the need","for expediency with practical","considerations, including forward trade of","electricity. The national regulatory","authorities may define appropriate","transitional arrangements as part of its","decision."],"old":["8. The Commission decision shall","specify the date of implementation of a","change. That implementation date shall","balance the need for expediency with","practical considerations, including forward","trade of electricity. The Commission may","define appropriate transitional","arrangements as part of its decision."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"695","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1514","meps":[96852],"meta":{"created":"2019-07-03T06:30:42"},"new":["12. The Commission may adopt, on its","own initiative, where the ENTSO for","Electricity has failed to develop a network","code, or the Agency has failed to develop a","draft network code as referred to in","paragraph 11 of this Article, or upon","recommendation of the Agency under","paragraph 10 of this Article, one or more","network codes in the areas listed in","paragraph 1."],"old":["12. The Commission may adopt, on its","own initiative, where the ENTSO for","Electricity or the EU DSO entity have","failed to develop a network code, or the","Agency has failed to develop a draft","network code as referred to in paragraph 11","of this Article, or upon recommendation of","the Agency under paragraph 10 of this","Article, one or more network codes in the","areas listed in paragraph 1."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1514","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-396","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 8"]],"meps":[96852],"meta":{"created":"2020-11-15T15:52:08"},"new":["8. The procurement of balancing","capacity shall be facilitated on a regional","level in accordance with point 8 of Annex","I. The procurement shall be based on a","primary market and be non-discriminatory","between market participants in the","prequalification process, whether market","participants participate individually or","through aggregation."],"old":["8. The procurement of balancing","capacity shall be facilitated on a regional","level in accordance with point 8 of Annex","I. The procurement shall be based on a","primary market and organised in such a","way as to be non-discriminatory between","market participants in the prequalification","process individually or through","aggregation."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"396","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Massimiliano Salini","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-991","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 6"]],"meps":[125670],"meta":{"created":"2019-07-03T06:30:48"},"new":["6. Transmission System Operators","shall annually calculate, in coordination","with the TSOs concerned, the maximum","entry capacity available for the","participation of foreign capacity taking into","account the expected availability of","interconnection and the likely concurrence","of system stress between the system where","the mechanism is applied and the system in","which the foreign capacity is located. A","calculation is required for each bidding","zone border."],"old":["6. Regional operational centres","established pursuant to Article 32 shall","annually calculate the maximum entry","capacity available for the participation of","foreign capacity taking into account the","expected availability of interconnection","and the likely concurrence of system stress","between the system where the mechanism","is applied and the system in which the","foreign capacity is located. A calculation is","required for each bidding zone border."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"991","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1342","location":[[" Proposal for a regulation","Article 43 \u2013 paragraph 5"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:48"},"new":["5. Regional security coordinators","shall report shortcomings identified in the","monitoring process under paragraph 1 to","ENTSO for electricity, the regulatory","authorities of the capacity calculation","region, the Agency and the competent","authorities of Member States responsible","for the prevention and management of","crisis situations."],"old":["5. Regional operational centres shall","report shortcomings identified in the","monitoring process under paragraph 1 to","ENTSO for electricity, the regulatory","authorities of the system operation region,","the Agency and the competent authorities","of Member States responsible for the","prevention and management of crisis","situations."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1342","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1515","justification":" This amendment promotes consistency with other amendments","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 12"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:42"},"new":["12. The Commission may adopt, on its","own initiative, where the ENTSO for","Electricity or Agency have failed to","develop a network code, or the Agency has","failed to develop a draft network code as","referred to in paragraph 11 of this Article,","or upon recommendation of the Agency","under paragraph 10 of this Article, one or","more network codes in the areas listed in","paragraph 1."],"old":["12. The Commission may adopt, on its","own initiative, where the ENTSO for","Electricity or the EU DSO entity have","failed to develop a network code, or the","Agency has failed to develop a draft","network code as referred to in paragraph 11","of this Article, or upon recommendation of","the Agency under paragraph 10 of this","Article, one or more network codes in the","areas listed in paragraph 1."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1515","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-397","justification":" The principle of non-discriminatory procurement of balancing capacity should have legal\n effect without any additional action from Member States. Balancing markets should also\n ensure participation either through aggregation or on an individual basis.","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 8"]],"meps":[124813,124796],"meta":{"created":"2020-11-15T15:52:08"},"new":["8. The procurement of balancing","capacity shall be facilitated on a regional","level in accordance with point 8 of Annex","I. The procurement shall be based on a","primary market and be non-discriminatory","between market participants in the","prequalification process to ensure","participation can take place individually","or through aggregation"],"old":["8. The procurement of balancing","capacity shall be facilitated on a regional","level in accordance with point 8 of Annex","I. The procurement shall be based on a","primary market and organised in such a","way as to be non-discriminatory between","market participants in the prequalification","process individually or through","aggregation."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"397","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-696","location":[[" Proposal for a regulation","Article 13 \u2013 paragraph 8"]],"meps":[96993],"meta":{"created":"2019-07-03T06:30:45"},"new":["8. The decision of the national","regulatory authorities shall specify the","date of implementation of a change. That","implementation date shall balance the need","for expediency with practical","considerations, including forward trade of","electricity. National regulatory authorities","may define appropriate transitional","arrangements as part of its decision."],"old":["8. The Commission decision shall","specify the date of implementation of a","change. That implementation date shall","balance the need for expediency with","practical considerations, including forward","trade of electricity. The Commission may","define appropriate transitional","arrangements as part of its decision."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"696","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Pilar del Castillo Vera","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-234","location":[["Proposal for a regulation","Article 14 \u2013 paragraph 1"]],"meps":[28390],"meta":{"created":"2019-07-03T06:30:42"},"new":["The Agency may, in circumstances clearly","defined by the Commission in guidelines","adopted pursuant to Article 57 of [recast","Electricity Regulation as proposed by","COM(2016) 861/2] or Article 23 of","Regulation (EC) No 715/2009 and on","issues related to the purpose for which it","has been established, be commissioned","with additional tasks that do not require","decision-making powers."],"old":["The Agency may, in circumstances clearly","defined by the Commission in guidelines","adopted pursuant to Article 57 of [recast","Electricity Regulation as proposed by","COM(2016) 861/2] or Article 23 of","Regulation (EC) No 715/2009 and on","issues related to the purpose for which it","has been established, be commissioned","with additional tasks respecting the limits","of transfer of executive powers to Union","agencies."],"orig_lang":"es","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"234","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-992","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 6"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:48"},"new":["6. Transmission system operators","shall annually calculate the maximum entry","capacity available for the participation of","foreign capacity taking into account the","expected availability of interconnection","and the likely concurrence of system stress","between the system where the mechanism","is applied and the system in which the","foreign capacity is located. A calculation is","required for each bidding zone border."],"old":["6. Regional operational centres","established pursuant to Article 32 shall","annually calculate the maximum entry","capacity available for the participation of","foreign capacity taking into account the","expected availability of interconnection","and the likely concurrence of system stress","between the system where the mechanism","is applied and the system in which the","foreign capacity is located. A calculation is","required for each bidding zone border."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"992","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1343","justification":"It is our position that Articles 31 to 44 and all reference regarding ROCs in the Clean Energy\nPackage to All Europeans shall be deleted without any substitution.It is of particular concern\nthat establishment of ROCs violates subsidiarity and proportionality principle according to\nart. 194 SFEU","location":[[" Proposal for a regulation","Article 44"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:48"},"new":["Article 44 deleted","Liability"],"old":["Regional operational centres shall take","the necessary steps to cover liability","related to the execution of their tasks, in","particular, where they adopt decisions","binding on transmission system operators.","The method employed to provide the cover","shall take into account the legal status of","the regional operational centre and the","level of commercial insurance cover","available."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1343","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Kaja Kallas, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar, Carolina Punset, Gerben-Jan Gerbrandy","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-398","location":[["Proposal for a regulation","Article 5 \u2013 paragraph 8"]],"meps":[124697,124989,124872,125026,90110,96940],"meta":{"created":"2020-11-15T15:52:08"},"new":["8. The procurement of balancing","capacity shall be facilitated cross-border","and on a regional level in accordance with","point 8 of Annex I. The procurement shall","be based on a primary market and be non-","discriminatory between market participants","in the prequalification process individually","or through aggregation."],"old":["8. The procurement of balancing","capacity shall be facilitated on a regional","level in accordance with point 8 of Annex","I. The procurement shall be based on a","primary market and organised in such a","way as to be non-discriminatory between","market participants in the prequalification","process individually or through","aggregation."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"398","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1516","meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:42"},"new":["13. Where the Commission proposes to","adopt a network code on its own initiative,","the Commission shall consult the Agency,","the ENTSO for Electricity, the EU DSO","entity and all relevant stakeholders in","regard to the draft network code during a","period of no less than two months."],"old":["13. Where the Commission proposes to","adopt a network code on its own initiative,","the Commission shall consult the Agency,","the ENTSO for Electricity and all relevant","stakeholders in regard to the draft network","code during a period of no less than two","months."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1516","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-697","location":[[" Proposal for a regulation","Article 13 \u2013 paragraph 8"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:45"},"new":["8. The decision adopted under this","Article shall specify the date of","implementation of a change. That","implementation date shall balance the need","for expediency with practical","considerations, including forward trade of","electricity. Appropriate transitional","arrangements may be defined as part of","the decision"],"old":["8. The Commission decision shall","specify the date of implementation of a","change. That implementation date shall","balance the need for expediency with","practical considerations, including forward","trade of electricity. The Commission may","define appropriate transitional","arrangements as part of its decision."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"697","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Davor \u0160krlec on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-235","justification":" ACER has acknowledged itself that customer and stakeholder engagement indecision-making\n on energy market rules needs to be enhanced.","location":[["Proposal for a regulation","Article 15 \u2013 paragraph 1"]],"meps":[124756],"meta":{"created":"2019-07-03T06:30:42"},"new":["1. In carrying out its tasks, in","particular in the process of developing","framework guidelines in accordance with","Article 55 of [recast Electricity Regulation","as proposed by COM(2016) 861/2] or","Article 6 of Regulation (EC) No 715/2009,","and in the process of proposing","amendments of network codes under","Article 56 of [recast Electricity Regulation","as proposed by COM(2016) 861/2] or","Article 7 of Regulation (EC) No 715/2009","the Agency shall consult extensively and at","an early stage with market participants,","transmission system operators, consumers,","end-users and, where relevant, competition","authorities, without prejudice to their","respective competence, in an open and","transparent manner, in particular when its","tasks concern transmission system","operators. The Agency shall ensure that","small market actors have an equal footing","with other stakeholders in the","development \u2013 and scrutiny over","implementation \u2013 of rules that impact","their ability to participate in the market."],"old":["1. In carrying out its tasks, in","particular in the process of developing","framework guidelines in accordance with","Article 55 of [recast Electricity Regulation","as proposed by COM(2016) 861/2] or","Article 6 of Regulation (EC) No 715/2009,","and in the process of proposing","amendments of network codes under","Article 56 of [recast Electricity Regulation","as proposed by COM(2016) 861/2] or","Article 7 of Regulation (EC) No 715/2009","","the Agency shall consult extensively and at","an early stage with market participants,","transmission system operators, consumers,","end-users and, where relevant, competition","authorities, without prejudice to their","respective competence, in an open and","transparent manner, in particular when its","tasks concern transmission system","operators."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"235","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Kate\u0159ina Kone\u010dn\u00e1, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1344","location":[["Proposal for a regulation","Article 44"]],"meps":[23699,96713],"meta":{"created":"2019-07-03T06:30:48"},"new":["Article 44 deleted","Liability"],"old":["Regional operational centres shall take","the necessary steps to cover liability","related to the execution of their tasks, in","particular, where they adopt decisions","binding on transmission system operators.","The method employed to provide the cover","shall take into account the legal status of","the regional operational centre and the","level of commercial insurance cover","available."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1344","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-399","justification":" It aims at introducing a necessary flexibility in the rules on the procurement of balancing\n capacities.","location":[["Proposal for a regulation","Article 5 \u2013 paragraph 9"]],"meps":[2025],"meta":{"created":"2020-11-15T15:52:08"},"new":["9. The procurement of upward","balancing capacity and downward","balancing capacity shall be carried out","separately. The contracting shall be","performed for not longer than one day","before the provision of the balancing","capacity and the contracting period shall","have a maximum of one day.","Each TSO may submit a proposal to the","competent regulatory authority requesting","the exemption to the procurement rules","according to this paragraph. The request","for exemption shall include:","(a) specification of the time period during","which the exemption would apply;","(b) specification of the volume of","balancing capacity for which the","exemption would apply;","(c) analysis of the impact of such an","exemption on the participation of","balancing resources;","(d) and justification for the exemption","demonstrating that such an exemption","would lead to higher economic efficiency."],"old":["9. The procurement of upward","balancing capacity and downward","balancing capacity shall be carried out","separately. The contracting shall be","performed for not longer than one day","before the provision of the balancing","capacity and the contracting period shall","have a maximum of one day.","",""],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"399","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1517","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 13"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:42"},"new":["13. Where the Commission proposes to","adopt a network code on its own initiative,","the Commission shall consult the Agency,","the ENTSO for Electricity, the EU DSO","entity and all relevant stakeholders in","regard to the draft network code during a","period of no less than two months."],"old":["13. Where the Commission proposes to","adopt a network code on its own initiative,","the Commission shall consult the Agency,","the ENTSO for Electricity and all relevant","stakeholders in regard to the draft network","code during a period of no less than two","months."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1517","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski, Edward Czesak, Nikolay Barekov","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-698","location":[["Proposal for a regulation","Article 13 \u2013 paragraph 8"]],"meps":[124891,132925,124871],"meta":{"created":"2019-07-03T06:30:46"},"new":["8. The decisions adopted under this","Article shall specify the date of","implementation of a change. That","implementation date shall balance the need","for expediency with practical","considerations, including forward trade of","electricity. The decisions may define","appropriate transitional arrangements."],"old":["8. The Commission decision shall","specify the date of implementation of a","change. That implementation date shall","balance the need for expediency with","practical considerations, including forward","trade of electricity. The Commission may","define appropriate transitional","arrangements as part of its decision."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"698","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Marian-Jean Marinescu","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-993","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 6"]],"meps":[33982],"meta":{"created":"2019-07-03T06:30:49"},"new":["6. Transmission system operators","shall annually calculate the maximum entry","capacity available for the participation of","foreign capacity taking into account the","expected availability of interconnection","and the likely concurrence of system stress","between the system where the mechanism","is applied and the system in which the","foreign capacity is located. A calculation is","required for each bidding zone border."],"old":["6. Regional operational centres","established pursuant to Article 32 shall","annually calculate the maximum entry","capacity available for the participation of","foreign capacity taking into account the","expected availability of interconnection","and the likely concurrence of system stress","between the system where the mechanism","is applied and the system in which the","foreign capacity is located. A calculation is","required for each bidding zone border."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"993","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Martina Werner, Carlos Zorrinho, Miapetra Kumpula-Natri","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1345","location":[["Proposal for a regulation","Article 44 \u2013 paragraph 1"]],"meps":[124826,124739,124735],"meta":{"created":"2019-07-03T06:30:48"},"new":["Regional coordination centers shall","establish an arrangement to cover liability","related to the execution of their tasks, in","particular, where they adopt decisions","binding on transmission system operators","and include this arrangement in the","proposal for the establishment of regional","coordination centres in accordance with","Article 32. The method employed to","provide the cover shall take into account","the legal status of the regional","coordination centre and the level of","commercial insurance cover available."],"old":["Regional operational centres shall take the","necessary steps to cover liability related to","the execution of their tasks, in particular,","where they adopt decisions binding on","transmission system operators. The method","employed to provide the cover shall take","into account the legal status of the regional","operational centre and the level of","commercial insurance cover available."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1345","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Barbara Kappel, Lorenzo Fontana, Angelo Ciocca","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-236","justification":"This amendment introduces provisions on the Agency\u2019s decision-making process similar to\nthose stipulated in the ESMA, EBA and EIOPA funding regulations. They intend to ensure\nthat decisions are justified and open to judicial review. They should be fully detailed in\nextensive rules of procedure and the amendment is necessary for pressing reasons relating to\nthe internal logic of the text.","location":[[" Proposal for a regulation","Article 15 \u2013 paragraph 2 \u2013 subparagraph 1"]],"meps":[125024,96993,183793],"meta":{"created":"2019-07-03T06:30:42"},"new":["Before taking the decisions provided for","in this Regulation, the Agency shall","inform the parties to the decision and","shall set a time limit for submission of the","parties\u2019 observations, taking full account","of the urgency, complexity and potential","consequences of the matter. The Agency","shall ensure that the public and any","interested parties are, where appropriate,","given objective, reliable and easily","accessible information, in particular with","regard to the results of its work. Decisions","taken by the Agency shall be fully","reasoned for the purpose of allowing an","appeal on the merits."],"old":["The Agency shall ensure that the public","and any interested parties are, where","appropriate, given objective, reliable and","easily accessible information, in particular","with regard to the results of its work."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"236","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-400","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 9"]],"meps":[96713],"meta":{"created":"2020-11-15T15:52:08"},"new":["9. The procurement of upward","balancing capacity and downward","balancing capacity shall be carried out","separately, except in cases described in","Article 32 (3) of Commission Regulation","(EU).../...establishing a guideline on","electricity balancing (EBGL). The","contracting should be performed on short-","term basis for not longer than one day","before the provision of the balancing","capacity and the contracting period shall","have a maximum period of one day. When","cost efficient, the contracting may be","partially performed on a longer term basis","with a longer contracting period."],"old":["9. The procurement of upward","balancing capacity and downward","balancing capacity shall be carried out","separately. The contracting shall be","performed for not longer than one day","before the provision of the balancing","capacity and the contracting period shall","have a maximum of one day."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"400","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-699","location":[["Proposal for a regulation","Article 13 a (new)"]],"meps":[124826,124870,124739,124735,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:46"},"new":["Article 13 a","Management of structural congestion","within a bidding zone","ENTSO for Electricity shall provide a","technical report on the bidding zone","configuration to the Member States in","accordance with Article 34(2) of","Regulation (EU) 2015/1222 every 5 years.","In case the technical report reveals a","long-term structural congestion within","one or more bidding zones, the respective","Member States shall take all efforts to","reduce this congestion to an appropriate","level in due time.","Where a bidding zone features structural","congestion, the affected Member State(s)","shall including :","(a) accelerate the implementation of","network development plans while","prioritising congested areas;","(b) urge TSOs to accelerate the extension","of the grid as much as possible while","putting in place appropriate planning and","implementation conditions;","(c) urge TSOs to maximise the use of","existing grids and to upgrade them as","much as possible while ensuring system","stability;","(d) consider technological alternatives,","including direct current lines and","underground cabling;","(e) make full use of joint TSO planning of","networks and interconnections across","borders and align them; allowing for","efficient integration of renewable energy","in the internal market;","(f) conduct a detailed analysis of the","economic effects of a bidding zone split,","in particular focusing on market power,","liquidity on spot and derivatives markets,","and transaction costs."],"old":[""],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"699","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1518","justification":" The suggested amendment lays out the process for elaborating network codes related to the\n distribution grid. In the absence of a EU DSO, ACER should be drafting and monitoring the\n implementation of network codes related to distribution networks. ACER should also have the\n authority to convene the \u201cdrafting committees\u201d (renamed \u201cstakeholder committees\u201d) to\n support it in the network code development process.","location":[["Proposal for a regulation","Article 55 \u2013 paragraph 13 a (new)"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:42"},"new":["13 a. Where the subject-matter of the","network code is directly related to the","operation of the distribution system and","less relevant for the transmission system,","and where so decided in the priority list","pursuant to paragraph 2, the Agency shall","submit a proposal for a network code to","the Commission within a reasonable","period of time not exceeding 12 months.","The Agency shall convene a stakeholder","committee to support it in the network","code development process. The","stakeholder committee shall consist of","representatives of the Agency, the ENTSO","for Electricity, and other affected","stakeholders who are likely to have an","interest in the network code, including","distribution system operators, nominated","electricity market operators, system users,","relevant industry associations, technical","bodies and consumer platforms. The","Agency shall ensure that the network code","is in line with the relevant framework","guideline and contributes to market","integration, non-discrimination, effective","competition, and the efficient functioning","of the market and, submit the network","code to the Commission. In the proposal","submitted to the Commission, the Agency","shall take into account the views provided","by all involved parties during the drafting","of the proposal and shall formally consult","the relevant stakeholders on the version to","be submitted to the Commission."],"old":[""],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1518","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1346","location":[[" Proposal for a regulation","Article 44 \u2013 paragraph 1"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:48"},"new":["Regional security coordinators shall take","the necessary steps to cover liability related","to the execution of their services, in","particular, where they issue","recommendations addressed to the","transmission system operators. The method","employed to provide the cover shall take","into account the legal status of the regional","security coordinator and the level of","commercial insurance cover available."],"old":["Regional operational centres shall take the","necessary steps to cover liability related to","the execution of their tasks, in particular,","where they adopt decisions binding on","transmission system operators. The method","employed to provide the cover shall take","into account the legal status of the regional","operational centre and the level of","commercial insurance cover available."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1346","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-401","justification":"We prefer to have a possibility to procure balancing services year-ahead while TSO would be\nobliged to procure part of the balancing services on the short term markets. Market\nparticipant not able to deliver balancing services for the whole year would be hereby enabled\nto participate on the balancing markets without compromising secure system operation.\nSetting of upward and downward balancing capacity (in our understanding includes\nbalancing and also ancillary services) and its day-ahead procurement on regional level is in\nour opinion directly linked with secure system operation and real system operation. Smaller\ncountries with relatively small amount of power blocks compared to their capacity and with\nrelatively limited cross-border capacity may be significantly negatively affected by\nprocurement on day-ahead market. Moreover reservation of cross-border capacity for\nbalancing also threatens the most liquid cross-border trades and is in conflict with art. 6,\nwhere markets (DA, ID) should maximize ability of market participants to contribute to avoid\nsystem imbalances; even before balancing markets.","location":[["Proposal for a regulation","Article 5 \u2013 paragraph 9"]],"meps":[28331],"meta":{"created":"2020-11-15T15:52:08"},"new":["9. The procurement of upward","balancing capacity and downward","balancing capacity shall be carried out","separately, except in cases described in","Article 32 (3) of Commission Regulation","(EU).../...establishing a guideline on","electricity balancing (EBGL). The","contracting shall be performed on short-","term basis for not longer than one day","before the provision of the balancing","capacity and the contracting period shall","have a maximum of one day. When cost","efficient, the contracting may be partially","performed on a longer term basis with a","longer contacting period."],"old":["9. The procurement of upward","balancing capacity and downward","balancing capacity shall be carried out","separately. The contracting shall be","performed for not longer than one day","before the provision of the balancing","capacity and the contracting period shall","have a maximum of one day."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"401","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Jens Geier, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-700","location":[[" Proposal for a regulation","Article 13 b (new)"]],"meps":[124826,124870,124739,124735,96833,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:46"},"new":["Article 13 b","Bidding zone review","1. In case that a long-term structural","congestion has not been reduced to an","appropriate level within due time, a","bidding zone review shall be carried out.","That review shall include analysis of the","configuration of bidding zones in a","coordinated manner with the involvement","of affected stakeholders from all affected","Member States, following the process in","accordance with Articles 32 to 34 of","Regulation (EU) 2015/1222.","2. The transmission system operators","participating in the bidding zone review","shall submit a proposal to the concerned","Member States regarding whether to","amend or maintain the bidding zone","configuration.","Based on the proposal, the concerned","Member States shall come to a","unanimous decision within twelve months","on whether to amend or maintain the","bidding zone configuration. The decision","shall be reasoned, in accordance with","relevant Union law and shall take account","of any observations from other Member","States and third countries, as well as any","commitments to address existing","congestion made by the relevant Member","States.","The concerned Member States shall","inform the Commission and the Agency of","their decision and any cross-border","agreements entered into by the Member","States, the national regulatory authorities","or the transmission system operators for","the purpose of achieving consensus.","3. Where the concerned Member States","fail to come to a unanimous decision","within the permitted timeframe, or where","the Member States become aware of the","fact that commitments on which a","previous unanimous decision was based","were not complied with, they shall","immediately inform the Commission.","Where the concerned Member States fail","to adopt a decision whether to amend or","maintain the bidding zone configuration a","conciliation committee shall be set up by","the Commission. The Commission shall","act as an arbitrator between the","concerned Member States. The","conciliation committee shall adopt a","decision whether or not to amend or","maintain the bidding zone configuration","within twelve months.","4. Where the conciliation committee fails","to adopt a decision whether to amend or","maintain the bidding zone configuration,","the Commission shall adopt a decision","whether to amend or maintain the bidding","zone configuration on the national","borders of at least two Member States.","The Commission shall not have the right","to adopt a decision whether to amend or","maintain the bidding zone configuration","within the territory of a Member State.","5. The Member States and the","Commission shall consult relevant","stakeholders before adopting decisions","under this Article.","6. The decisions adopted under this","Article shall specify the date of","implementation of a change. That","implementation date shall balance the","need for expediency with practical","considerations, including forward trade of","electricity. Appropriate transitional","arrangements may be defined as part of","the decision."],"old":["","",""],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"700","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Rolandas Paksas","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-237","justification":"This amendment introduces provisions for the Agency\u2019s decision-making process similar to\nthose stipulated in the ESMA, EBA and EIOPA founding regulations. They intend to ensure\nthat decisions are justified and open to judicial review. They should be more fully detailed in\nextensive rules of procedure.","location":[["Proposal for a regulation","Article 15 \u2013 paragraph 4 a (new)"]],"meps":[96694],"meta":{"created":"2019-07-03T06:30:42"},"new":["4a. The Agency shall adopt and","publish adequate and proportionate rules","of procedure for all Agency tasks under","Chapter I. For all Agency decisions, the","rules of procedure shall at least set the","standards specified in paragraphs 1 to 4","and ensure a transparent and reasonable","decision-making process guaranteeing","fundamental procedural rights based on","the rule of law, in particular the right to","be heard, the right to access files and the","duty to give reasons. For all other Agency","tasks under Chapter I, the rules of","procedure shall at least ensure that","fundamental procedural rights are","guaranteed."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"237","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Cristian-Silviu Bu\u015foi","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-994","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 6"]],"meps":[38420],"meta":{"created":"2019-07-03T06:30:49"},"new":["6. Transmission system operators","shall annually calculate the maximum entry","capacity available for the participation of","foreign capacity taking into account the","expected availability of interconnection","and the likely concurrence of system stress","between the system where the mechanism","is applied and the system in which the","foreign capacity is located. A calculation is","required for each bidding zone border."],"old":["6. Regional operational centres","established pursuant to Article 32 shall","annually calculate the maximum entry","capacity available for the participation of","foreign capacity taking into account the","expected availability of interconnection","and the likely concurrence of system stress","between the system where the mechanism","is applied and the system in which the","foreign capacity is located. A calculation is","required for each bidding zone border."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"994","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Miapetra Kumpula-Natri","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1347","justification":"As of today the TYNDPs remain merely a collection of national plans and miss European\naspect.There\u2019s a lot of potential in the TYNDP process, starting from common European\nscenarios and European investments\u2019 needs.However, today the content of investment plans\nrelies too much on already existing plans.","location":[[" Proposal for a regulation","Article 45 \u2013 paragraph 1 \u2013 subparagraph 2 \u2013 point a"]],"meps":[124735],"meta":{"created":"2019-07-03T06:30:48"},"new":["(a) set basis for national investment","plans and regional investment plans as","referred to in Article 12(1), and, if","appropriate, Union aspects of network","planning as set out in Regulation (EU) No","347/2013 of the European Parliament and","of the Council38 ; it shall be subject to a","cost-benefit analysis using the","methodology established as set out in","Article 11 of that Regulation;","_________________","38","Regulation (EU) No 347/2013 of the","European Parliament and of the Council of","17 April 2013 on guidelines for trans-","European energy infrastructure (OJ L 115,","25.4.2013, p. 39)."],"old":["(a) build on national investment plans,","taking into account regional investment","plans as referred to in Article 12(1), and, if","appropriate, Union aspects of network","planning as set out in Regulation (EU) No","347/2013 of the European Parliament and","of the Council38 ; it shall be subject to a","cost-benefit analysis using the","methodology established as set out in","Article 11 of that Regulation;","","_________________","38","Regulation (EU) No 347/2013 of the","European Parliament and of the Council of","17 April 2013 on guidelines for trans-","European energy infrastructure (OJ L 115,","25.4.2013, p. 39)."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1347","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-701","justification":"In line with the provisions on energy efficiency and demand response of Articles 3 (1 e,f), 16\n(2,8), 18 (3), 19 (4b), 25 (2) and 55 (1,l), the logic of the regulation has to be also applied on\ncongestion management.","location":[[" Proposal for a regulation","Article 14 \u2013 paragraph 1"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:46"},"new":["1. Network congestion problems shall","be addressed with non-discriminatory","market-based solutions including energy","efficiency/ demand-side management","solutions which give efficient economic","signals to the market participants and","transmission system operators involved.","Network congestion problems shall be","solved with non-transaction based","methods, i.e. methods that do not involve a","selection between the contracts of","individual market participants. When","taking operational measures to ensure that","its transmission system remains in the","normal state, the transmission system","operator shall take into account the effect","of those measures on neighbouring control","areas and coordinate such measures with","other affected transmission system","operators as provided for in Regulation","(EU) 1222/2015."],"old":["1. Network congestion problems shall","be addressed with non-discriminatory","market-based solutions which give","efficient economic signals to the market","participants and transmission system","operators involved. Network congestion","problems shall be solved with non-","transaction based methods, i.e. methods","that do not involve a selection between the","","contracts of individual market participants.","When taking operational measures to","ensure that its transmission system remains","in the normal state, the transmission system","operator shall take into account the effect","of those measures on neighbouring control","areas and coordinate such measures with","other affected transmission system","operators as provided for in Regulation","(EU) 1222/2015."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"701","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1348","justification":"The amendment is necessary for pressing reasons relating to the internal logic of the text","location":[["Proposal for a regulation","Article 45 \u2013 paragraph 1 \u2013 subparagraph 2 \u2013 point c"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:48"},"new":["(c) identify investment gaps, notably","with respect to cross-border capacities by","analysing target values in MW for","transfer capacity at bidding zone","boundaries."],"old":["(c) identify investment gaps, notably","with respect to cross-border capacities."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1348","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1519","justification":"This regulation introduces a European entity for distribution system operators in Articles 49-\n51.Tasks related to this entity must therefore be aligned to the provision of this Article and\nespecially regarding the cooperation between TSOs and DSOs also to Article 53.","location":[[" Proposal for a regulation","Article 55 \u2013 paragraph 14"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:42"},"new":["14. This Article shall be without","prejudice to the Commission's right to","adopt and amend the guidelines as laid","down in Article 57. It shall be without","prejudice to the possibility for the ENTSO","for Electricity and the EU DSO entity to","develop non-binding guidance in the areas","set out in paragraph 1 where this does not","relate to areas covered by a request","addressed to it by the Commission. This","guidance shall be submitted to the Agency","for an opinion. This opinion shall be taken","duly into account by the ENTSO for","Electricity and by the EU DSO entity."],"old":["14. This Article shall be without","prejudice to the Commission's right to","adopt and amend the guidelines as laid","down in Article 57. It shall be without","prejudice to the possibility for the ENTSO","for Electricity to develop non-binding","guidance in the areas set out in paragraph 1","where this does not relate to areas covered","by a request addressed to it by the","Commission. This guidance shall be","submitted to the Agency for an opinion.","This opinion shall be taken duly into","account by the ENTSO for Electricity."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1519","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-402","justification":" It is also crucial that TSOs may decide themselves which time period is the most appropriate\n for balancing capacity procurement (for a given service) \u2013 whether it is one year, several\n weeks or hours in advance of delivery.","location":[["Proposal for a regulation","Article 5 \u2013 paragraph 9"]],"meps":[124699],"meta":{"created":"2020-11-15T15:52:08"},"new":["9. The procurement of upward","balancing capacity and downward","balancing capacity shall be carried out","separately."],"old":["9. The procurement of upward","","balancing capacity and downward","balancing capacity shall be carried out","separately. The contracting shall be","performed for not longer than one day","before the provision of the balancing","capacity and the contracting period shall","have a maximum of one day."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"402","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski, Edward Czesak, Nikolay Barekov","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-702","justification":" The crossborder redispatch costs shall be shared based on the polluter-pays principle,\n recognized by ACER, where the internal exchanges from bidding zones causing flows over the\n overloaded neighbouring network elements, should be identified as polluters. They should\n contribute to the costs in proportion to their contribution to the overload. This will be an\n economic incentive to avoid such distortions for example by development of transmission\n grid.","location":[["Proposal for a regulation","Article 14 \u2013 paragraph 3"]],"meps":[124891,132925,124871],"meta":{"created":"2019-07-03T06:30:46"},"new":["3. The maximum capacity of the","interconnections and/or the transmission","networks affecting cross-border flows shall","be made available to market participants,","complying with safety standards of secure","network operation. Counter-trading and","redispatch, including cross-border","redispatch, shall be used to optimise","available capacities as long as it is","demonstrated that the foreseen related","costs are not expected to be higher than","social welfare benefits. The costs of","counter-trading and redispatch, including","cross-border redispatch shall be shared","based on the \u201cpolluter-pays principle\u201d,","where the unscheduled flows over the","overloaded network elements, should be","identified as polluters and they should","contribute to the costs in proportion to","their contribution to the overload."],"old":["3. The maximum capacity of the","interconnections and/or the transmission","networks affecting cross-border flows shall","be made available to market participants,","complying with safety standards of secure","network operation. Counter-trading and","redispatch, including cross-border","redispatch, shall be used to maximise","available capacities unless it is","demonstrated that it is not beneficial to","economic efficiency at Union level.",""],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"702","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Werner Langen, Markus Pieper","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-238","justification":" This modification introduces provisions on the Agency\u2019s decision-making process comparable\n to those stipulated in the ESMA, EBA and EIOPA funding regulations. They aim to guarantee\n that decisions are justified and open to judicial review.","location":[[" Proposal for a regulation","Article 15 a (new)"]],"meps":[1928,28224],"meta":{"created":"2019-07-03T06:30:42"},"new":["Article 15a","Decision-making","1. Before taking the decisions","provided for in this Regulation, the","Agency shall inform the parties about the","decision and shall set a time limit for","submission of the parties\u2019 observations,","taking full account of the urgency,","complexity and potential consequences of","the matter.","2. Decisions taken by the Agency","shall be fully reasoned for the purpose of","allowing an appeal on the merits.","3. The parties shall be informed of","the legal remedies available pursuant to","this Regulation.","4. The Agency shall adopt and","publish adequate and proportionate rules","of procedure for all Agency tasks under","Chapter I. For all Agency decisions, the","rules of procedure shall at least set the","standards specified in paragraphs 1 to 3","and ensure a transparent and reasonable","decision-making process, guaranteeing","fundamental procedural rights based on","the rule of law. For all other Agency tasks","under Chapter I, the rules of procedure","shall at least ensure that fundamental","procedural rights are guaranteed."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"238","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Jerzy Buzek, Janusz Lewandowski, Marian-Jean Marinescu","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-995","justification":" Considering the fact that Regional Security Coordinators would not be entrusted with the\n competence to calculate the maximum entry capacity available for the participation of foreign\n capacity in the capacity mechanism, this provision should be amended accordingly.","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 6"]],"meps":[23781,33982],"meta":{"created":"2019-07-03T06:30:49"},"new":["6. Transmission system operators","shall annually calculate the maximum entry","capacity available for the participation of","foreign capacity taking into account the","expected availability of interconnection","and the likely concurrence of system stress","between the system where the mechanism","is applied and the system in which the","foreign capacity is located. A calculation is","required for each bidding zone border."],"old":["6. Regional operational centres","established pursuant to Article 32 shall","annually calculate the maximum entry","capacity available for the participation of","foreign capacity taking into account the","expected availability of interconnection","and the likely concurrence of system stress","between the system where the mechanism","is applied and the system in which the","foreign capacity is located. A calculation is","required for each bidding zone border."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"995","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1520","location":[["Proposal for a regulation","Article 56 \u2013 paragraph 1"]],"meps":[124826,124870,124739,124735,124699],"meta":{"created":"2019-07-03T06:30:42"},"new":["1. The Commission shall present a","legislative proposal for the general","political framework prior to adopting","delegated acts in accordance with Article","63 concerning the amendment of network","codes following the procedure under","Article 55. Amendments can also be","proposed by the Agency under the","procedure set out in paragraphs 2 to 4 of","this Article."],"old":["1. The Commission is empowered to","adopt delegated acts in accordance with","Article 63 concerning the amendment of","network codes following the procedure","under Article 55. Amendments can also be","proposed by the Agency under the","procedure set out in paragraphs 2 to 4 of","this Article."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1520","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Flavio Zanonato","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-703","justification":" Provisions should take notice of the physical flows that are an inherent part of the effective\n capacity. Failing to do so, these norms would ultimately lead to higher re-dispatch costs as\n well as risks related to possible unavailability or inexistence of necessary remedial actions in\n coping with congestion.","location":[[" Proposal for a regulation","Article 14 \u2013 paragraph 3"]],"meps":[124800],"meta":{"created":"2019-07-03T06:30:46"},"new":["3. The maximum capacity of the","interconnections and/or the transmission","networks affecting cross-border flows shall","be made available to market participants,","complying with safety standards of secure","network operation. Counter-trading and","redispatch, including cross-border","redispatch, shall be used to ensure security","of supply and to optimize available","capacities as long as it is demonstrated that","the foreseen related costs are not expected","to be higher than social welfare benefits","and if it can be demonstrated that a","sufficient level of remedial actions is","available to ensure operational security."],"old":["3. The maximum capacity of the","interconnections and/or the transmission","networks affecting cross-border flows shall","be made available to market participants,","complying with safety standards of secure","network operation. Counter-trading and","redispatch, including cross-border","redispatch, shall be used to maximise","available capacities unless it is","demonstrated that it is not beneficial to","economic efficiency at Union level."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"703","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Ashley Fox","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-403","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 9"]],"meps":[96957],"meta":{"created":"2020-11-15T15:52:08"},"new":["9. The procurement of upward","balancing capacity and downward","balancing capacity shall be carried out","separately."],"old":["9. The procurement of upward","balancing capacity and downward","balancing capacity shall be carried out","separately. The contracting shall be","performed for not longer than one day","before the provision of the balancing","capacity and the contracting period shall","have a maximum of one day."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"403","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Neoklis Sylikiotis, Sofia Sakorafa, Xabier Benito Ziluaga","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-239","justification":"This amendment introduces provisions on the Agency\u2019s decision-making process. It intends to\nensure that decisions are justified and open to judicial review. They should be more fully\ndetailed in extensive rules of procedure.","location":[["Proposal for a regulation","Article 15 a (new)"]],"meps":[124689,125091,135490],"meta":{"created":"2019-07-03T06:30:42"},"new":["Article 15a","Decision-making","The Agency shall adopt and publish","adequate and proportionate rules of","procedure for all Agency tasks under","Chapter I. For all Agency decisions, the","rules of procedure shall ensure a","transparent and reasonable decision-","making process guaranteeing","fundamental procedural rights based on","the rule of law, in particular the right to","be heard, the right to access file and the","duty to give reasons. For all other Agency","tasks under Chapter I, the rules of","procedure shall at least ensure that","fundamental procedural rights are","guaranteed."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"239","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1349","justification":" This amendment is intrinsically linked to other amendments tabled to provisions which have\n been modified by the Commission","location":[["Proposal for a regulation","Article 45 \u2013 paragraph 1 \u2013 subparagraph 2 \u2013 point c a (new)"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:48"},"new":["(c a) identify any inconsistencies in the","TSOs\u2019 approach to calculating future","system flexibility requirements and","demand response capacity.It should also","identify any cross-border implications","created from potential deficiencies in","system flexibility and provide advice to","National Regulatory Authorities on best","practices to develop additional flexibility","resources."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1349","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-704","justification":"General principles of capacity allocation and congestion management should consider\nliquidity of individual market segments (forward, day-ahead, Intra-day) and proceed from the\nmost liquid to the least liquid. Commission\u00b4s proposal omits fact that majority of transactions\nof the most liquid markets is traded in forwards / futures. It would be also useful to clearly\nspecify in definitions terms used in individual articles as e.g. \u201ccountertrading\u201d. Current\nwording of the proposed Regulation explicitly requires use of cost-associated reparatory\nmeasures as e.g. countertrading and redispatching to maximize available transmission\ncapacity. Such requirement is in conflict with Commission\u2019s Regulation (EU) 2015/1222\n(CACM) according to which are TSO obligated to consider only non-costly reparatory\nmeasures for capacity calculation. Regarding uncertainty level of capacity calculation\nprocess, the cost-associated reparatory measures should only be used in cases when ensuring\nsecure system operation in real time or closely before real time.","location":[["Proposal for a regulation","Article 14 \u2013 paragraph 3"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:46"},"new":["3. The maximum capacity of the","interconnections and/or the transmission","networks affecting cross-border flows shall","be made available to market participants,","complying with safety standards of secure","network operation."],"old":["3. The maximum capacity of the","interconnections and/or the transmission","networks affecting cross-border flows shall","be made available to market participants,","complying with safety standards of secure","network operation. Counter-trading and","redispatch, including cross-border","redispatch, shall be used to maximise","available capacities unless it is","demonstrated that it is not beneficial to","economic efficiency at Union level."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"704","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1521","location":[[" Proposal for a regulation","Article 56 \u2013 paragraph 1"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:42"},"new":["1. The Commission is empowered to","adopt implementing acts in accordance","with the regulatory procedure referred to","in Article 62(2 )concerning the amendment","of network codes following the procedure","under Article 55. Amendments can also be","proposed by the Agency under the","procedure set out in paragraphs 2 to 4 of","this Article."],"old":["1. The Commission is empowered to","adopt delegated acts in accordance with","Article 63 concerning the amendment of","network codes following the procedure","under Article 55. Amendments can also be","proposed by the Agency under the","procedure set out in paragraphs 2 to 4 of","this Article."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1521","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Patrizia Toia","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-705","justification":" Art. 14.3 imposes an obligation to TSOs to use preventive re-dispatch and countertrading to\n maximize available cross-border capacity while remaining unclear about the principles on\n which the costs of remedial actions should be shared.\n\n These provisions would oblige TSOs to ignore the physical flows that are an inherent part of\n the effective capacity calculation, increase the differences between the system reality on one\n side and the commercial exchanges on the other. They would lead to higher re-dispatch costs\n and risks related to possible unavailability or inexistence of necessary remedial actions to\n cope with congestions.\n\n Costly remedial measures, such as redispatching, should be primarily reserved for securing\n safe operations in real time (or in intra-day/close to real time stage). The use of redispatching\n can help to optimize capacities. Despite that, forcing TSOs to make use of redispatch\n resources for optimizing capacities not only increases costs for end-consumers, but may also\n endanger system operation based on insufficient or premature utilization of the limited\n available redispatch resources necessary to ensure security of supply (SoS) and grid stability.\n\n Moreover, the costs of performing a redispatch may be higher than the welfare gain\n associated with the trade.","location":[["Proposal for a regulation","Article 14 \u2013 paragraph 3"]],"meps":[28340],"meta":{"created":"2019-07-03T06:30:46"},"new":["3. The maximum capacity of the","interconnections and/or the transmission","networks affecting cross-border flows shall","be made available to market participants,","complying with safety standards of secure","network operation. Counter-trading and","redispatch, including cross-border","redispatch, shall be used to ensure security","of supply and to optimise available","capacities as long as it is demonstrated that","the foreseen related costs are not expected","to be higher than social welfare benefits","and if it can be demonstrated that a","sufficient level of remedial actions is","available to ensure operational security."],"old":["3. The maximum capacity of the","","interconnections and/or the transmission","networks affecting cross-border flows shall","be made available to market participants,","complying with safety standards of secure","network operation. Counter-trading and","redispatch, including cross-border","redispatch, shall be used to maximise","available capacities unless it is","demonstrated that it is not beneficial to","economic efficiency at Union level."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"705","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1522","justification":" It is necessary to evaluate extent and form of use of delegated acts in all cases proposed by\n the Directive and reflected in the Regulation. From the proposal of the Directive it is not\n clear, what was the rationale behind use of implementing acts (e.g. data format in Article.24\n of the Directive) or in other cases use of delegated (Article 61 on ACER or Article 63 on\n\n\nnetwork codes).It is therefore not clear what \u201crule\u201d was used to set which form of act to use\nto specific topics.","location":[[" Proposal for a regulation","Article 56 \u2013 paragraph 1"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:42"},"new":["1. The Commission is empowered to","adopt implementing acts in accordance","with Article 63 concerning the amendment","of network codes following the procedure","under Article 55. Amendments can also be","proposed by the Agency under the","procedure set out in paragraphs 2 to 4 of","this Article."],"old":["1. The Commission is empowered to","adopt delegated acts in accordance with","Article 63 concerning the amendment of","network codes following the procedure","under Article 55. Amendments can also be","proposed by the Agency under the","procedure set out in paragraphs 2 to 4 of","this Article."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1522","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Adam Gierek, Krystyna \u0141ybacka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-996","justification":"This competence should remain with the Member States.","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 6 Regulation (EC) No 714/2009 of the European Parliament and of the Council"]],"meps":[28379,124883],"meta":{"created":"2019-07-03T06:30:49"},"new":["6. Transmission system operators","shall annually calculate the maximum entry","capacity available for the participation of","foreign capacity taking into account the","expected availability of interconnection","and the likely concurrence of system stress","between the system where the mechanism","is applied and the system in which the","foreign capacity is located. A calculation is","required for each bidding zone border."],"old":["6. Regional operational centres","established pursuant to Article 32 shall","annually calculate the maximum entry","capacity available for the participation of","foreign capacity taking into account the","expected availability of interconnection","and the likely concurrence of system stress","between the system where the mechanism","is applied and the system in which the","foreign capacity is located. A calculation is","required for each bidding zone border."],"orig_lang":"pl","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"996","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Davor \u0160krlec on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-240","justification":" There is little EU oversight of resource adequacy/security of supply. Currently, Member\n States are free to take unilateral approaches to assessing and developing measures to address\n resource adequacy issues, including the introduction of CRMs that take poor account of\n energy efficiency in demand forecasts, and the capacity value of demand-side resources,\n variable renewable and interconnections. ACER should have a stronger role in monitoring\n adequacy assessments.","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 1"]],"meps":[124756],"meta":{"created":"2019-07-03T06:30:42"},"new":["The Agency, in close cooperation","with the Commission, the Member States","and the relevant national authorities","including the national regulatory","authorities and without prejudice to the","competences of competition authorities,","shall monitor the wholesale and retail","markets in electricity and natural gas, in","particular the retail prices of electricity and","natural gas, compliance with the consumer","rights laid down in [recast Electricity","Directive as proposed by COM(2016)","864/2], Directive 2009/73/EC, and EC and","[recast Directive 2009/28/EC as proposed","by COM (2016) 767, access to the","networks including access of electricity","produced from renewable energy sources,","potential barriers to cross-border trade,","regulatory barriers for new market","entrants and small actors, including","energy communities, state interventions","preventing prices from reflecting actual","scarcity, the performance of the Member","States in the area of electricity security of","supply based on the results of the European","resource adequacy assessment as referred","to in Article 19 of [recast Electricity","Regulation], in particular taking into","account the ex-post evaluation referred to","in Article 16 of [Risk Preparedness","Regulation as proposed by COM(2016)","862] and the consistency of national","approaches to assessing and developing","measures to address resource adequacy","issues, including the introduction of","capacity remuneration mechanisms."],"old":["1. The Agency, in close cooperation 1.","","with the Commission, the Member States","and the relevant national authorities","including the national regulatory","authorities and without prejudice to the","competences of competition authorities,","shall monitor the wholesale and retail","markets in electricity and natural gas, in","particular the retail prices of electricity and","natural gas, compliance with the consumer","rights laid down in [recast Electricity","Directive as proposed by COM(2016)","864/2] and Directive 2009/73/EC, access","to the networks including access of","electricity produced from renewable","energy sources, potential barriers to cross-","border trade, state interventions preventing","prices from reflecting actual scarcity, the","performance of the Member States in the","area of electricity security of supply based","on the results of the European resource","adequacy assessment as referred to in","Article 19 of [recast Electricity","Regulation], in particular taking into","account the ex-post evaluation referred to","in Article 16 of [Risk Preparedness","Regulation as proposed by COM(2016)","862] ."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"240","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-404","justification":"This clarification is intended to underline the duration of balancing capacity contracting\nperiod.","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 9"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["9. The procurement of upward","balancing capacity and downward","balancing capacity shall be carried out","separately. Procurement of balancing","capacity shall be performed for not longer","than one day before the provision of the","balancing capacity and the contracting","period shall have a maximum duration of","one day."],"old":["9. The procurement of upward","balancing capacity and downward","","balancing capacity shall be carried out","separately. The contracting shall be","performed for not longer than one day","before the provision of the balancing","capacity and the contracting period shall","have a maximum of one day."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"404","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1350","justification":" This amendment is linked to the provisions on integrating increasing shares of renewable\n energy, that has an impact for example in Article 51 (1 a) and 55 (3).","location":[[" Proposal for a regulation","Article 45 \u2013 paragraph 1 \u2013 subparagraph 2 \u2013 point c a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:48"},"new":["(c a) include a scenario where the","penetration of renewable energy sources","exceeds EU targets by a significant","magnitude."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1350","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-706","location":[[" Proposal for a regulation","Article 14 \u2013 paragraph 3"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:46"},"new":["3. The maximum capacity of the","interconnections, contracted energy","storage capacity and levels, and/or the","transmission networks affecting cross-","border flows shall be made available to","market participants, complying with safety","standards of secure network operation."],"old":["3. The maximum capacity of the","","interconnections and/or the transmission","networks affecting cross-border flows shall","be made available to market participants,","complying with safety standards of secure","network operation. Counter-trading and","redispatch, including cross-border","redispatch, shall be used to maximise","available capacities unless it is","demonstrated that it is not beneficial to","economic efficiency at Union level."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"706","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1523","location":[["Proposal for a regulation","Article 56 \u2013 paragraph 1"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:42"},"new":["1. The Commission is empowered to","adopt implementing acts in accordance","with Article 63 concerning the amendment","of network codes following the procedure","under Article 55. Amendments can also be","proposed by the Agency under the","procedure set out in paragraphs 2 to 4 of","this Article."],"old":["1. The Commission is empowered to","adopt delegated acts in accordance with","Article 63 concerning the amendment of","network codes following the procedure","under Article 55. Amendments can also be","proposed by the Agency under the","procedure set out in paragraphs 2 to 4 of","this Article."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1523","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-997","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 6"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:49"},"new":["6. Relevant transmission system","operator shall annually calculate the","maximum entry capacity available for the","participation of foreign capacity taking into","account the expected availability of","interconnection and the likely concurrence","of system stress between the system where","the mechanism is applied and the system in","which the foreign capacity is located. A","calculation is required for each bidding","zone border."],"old":["6. Regional operational centres","established pursuant to Article 32 shall","annually calculate the maximum entry","capacity available for the participation of","foreign capacity taking into account the","expected availability of interconnection","and the likely concurrence of system stress","between the system where the mechanism","is applied and the system in which the","foreign capacity is located. A calculation is","required for each bidding zone border."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"997","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Miroslav Poche, Peter Kouroumbashev, Zigmantas Bal\u010dytis, Patrizia Toia, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-241","justification":"In order to \u201cput consumers at the centre of a thriving and functioning energy system\u201d, the\nactual impact on consumers both big and small needs to be properly monitored and report on.","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 1"]],"meps":[124699,124857,96680,28340,125041,125044,124784],"meta":{"created":"2019-07-03T06:30:42"},"new":["1. The Agency, in close cooperation","with the Commission, the Member States","and the relevant national authorities","including the national regulatory","authorities and without prejudice to the","competences of competition authorities,","shall monitor the wholesale and retail","markets in electricity and natural gas, in","particular the retail prices of electricity and","natural gas, compliance with the consumer","rights and protections laid down in [recast","Electricity Directive as proposed by","COM(2016) 864/2] and Directive","2009/73/EC, the impact of market","developments on household customers,","access to the networks including access of","electricity produced from renewable","energy sources, potential barriers to cross-","border trade, state interventions preventing","prices from reflecting actual scarcity, the","performance of the Member States in the","area of electricity security of supply based","on the results of the European resource","adequacy assessment as referred to in","Article 19 of [recast Electricity","Regulation], in particular taking into","account the ex-post evaluation referred to","in Article 16 of [Risk Preparedness","Regulation as proposed by COM(2016)","862]."],"old":["1. The Agency, in close cooperation","with the Commission, the Member States","and the relevant national authorities","including the national regulatory","authorities and without prejudice to the","competences of competition authorities,","shall monitor the wholesale and retail","markets in electricity and natural gas, in","particular the retail prices of electricity and","natural gas, compliance with the consumer","rights laid down in [recast Electricity","Directive as proposed by COM(2016)","864/2] and Directive 2009/73/EC, access to","the networks including access of electricity","produced from renewable energy sources,","potential barriers to cross-border trade,","state interventions preventing prices from","reflecting actual scarcity, the performance","of the Member States in the area of","electricity security of supply based on the","results of the European resource adequacy","assessment as referred to in Article 19 of","[recast Electricity Regulation], in particular","taking into account the ex-post evaluation","referred to in Article 16 of [Risk","Preparedness Regulation as proposed by","COM(2016) 862] ."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"241","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Lud\u011bk Niedermayer","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-405","location":[["Proposal for a regulation","Article 5 \u2013 paragraph 9"]],"meps":[124701],"meta":{"created":"2020-11-15T15:52:08"},"new":["9. The procurement of upward","balancing capacity and downward","balancing capacity shall be carried out","separately. At least 50% of the contracting","shall be performed for not longer than one","day before the provision of the balancing","capacity and the remaining part shall be","contracted up to 3 months."],"old":["9. The procurement of upward","balancing capacity and downward","balancing capacity shall be carried out","separately. The contracting shall be","performed for not longer than one day","before the provision of the balancing","capacity and the contracting period shall","have a maximum of one day."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"405","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Fulvio Martusciello","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1524","location":[["Proposal for a regulation","Article 56 \u2013 paragraph 2"]],"meps":[124828],"meta":{"created":"2019-07-03T06:30:42"},"new":["2. Draft amendments to any network","code adopted under Article 55 may be","proposed to the Agency by persons who","are likely to have an interest in that","network code, including the ENTSO for","Electricity, the EU DSO entity,","transmission system operators, distribution","system operators, system users and","consumers. The Agency may also propose","amendments on its own initiative."],"old":["2. Draft amendments to any network","code adopted under Article 55 may be","proposed to the Agency by persons who","are likely to have an interest in that","network code, including the ENTSO for","Electricity, the EU DSO entity,","transmission system operators, system","users and consumers. The Agency may","also propose amendments on its own","initiative."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1524","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-707","location":[["Proposal for a regulation","Article 14 \u2013 paragraph 3"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:46"},"new":["3. The maximum capacity of the","interconnections and/or the transmission","networks affecting cross-border flows shall","be made available to market participants,","complying with safety standards of secure","network operation. Counter-trading and","redispatch, including cross-border","redispatch, shall be used to guarantee the","firmness of the exchange scheduled in","case of reductions of the available net","transfer capacity due to system security","reasons."],"old":["3. The maximum capacity of the","interconnections and/or the transmission","networks affecting cross-border flows shall","be made available to market participants,","complying with safety standards of secure","network operation. Counter-trading and","redispatch, including cross-border","redispatch, shall be used to maximise","available capacities unless it is","demonstrated that it is not beneficial to","economic efficiency at Union level."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"707","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1351","justification":"This Amendment is intrinsically linked to the provisions on flexibility requirements related to\nArticle 3 (1 e, f), Article 16 (2, 8), Article 18 (3), 19 (4 b), 25 (2) and 55 (1,l) and ensures an\nimplementation of the concerned provisions through the TYNDP.","location":[[" Proposal for a regulation","Article 45 \u2013 paragraph 1 \u2013 subparagraph 2 \u2013 point c b (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:48"},"new":["(c b) identify any inconsistencies in the","TSOs approach to calculating future","system flexibility requirements and","demand response capacity.It should also","identify any cross-border implications","created from potential deficiencies in the","system flexibility and provide to National","Regulatory Authorities best practices to","develop additional flexibility resources."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1351","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-998","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 6"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:49"},"new":["6. Relevant transmission system","operator shall annually calculate the","maximum entry capacity available for the","participation of foreign capacity taking into","account the expected availability of","interconnection and the likely concurrence","of system stress between the system where","the mechanism is applied and the system in","which the foreign capacity is located. A","calculation is required for each bidding","zone border."],"old":["6. Regional operational centres","established pursuant to Article 32 shall","annually calculate the maximum entry","capacity available for the participation of","foreign capacity taking into account the","expected availability of interconnection","and the likely concurrence of system stress","between the system where the mechanism","is applied and the system in which the","foreign capacity is located. A calculation is","required for each bidding zone border."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"998","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Andr\u00e1s Gy\u00fcrk, Gy\u00f6rgy H\u00f6lv\u00e9nyi","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-406","location":[["Proposal for a regulation","Article 5 \u2013 paragraph 9"]],"meps":[23816,124715],"meta":{"created":"2020-11-15T15:52:08"},"new":["9. The procurement of upward","balancing capacity and downward","balancing capacity shall be carried out","separately. Contracting and the provision","of balancing capacity shall be performed","in the shortest timeframe allowed by the","characteristics of the Member State's","infrastructure."],"old":["9. The procurement of upward","balancing capacity and downward","balancing capacity shall be carried out","separately. The contracting shall be","","performed for not longer than one day","before the provision of the balancing","capacity and the contracting period shall","have a maximum of one day."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"406","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Pilar del Castillo Vera, Pilar Ayuso, Francesc Gamb\u00fas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-708","location":[["Proposal for a regulation","Article 14 \u2013 paragraph 3"]],"meps":[28390,4319,125006],"meta":{"created":"2019-07-03T06:30:46"},"new":["3. The optimum capacity of the","interconnections and/or the transmission","networks affecting cross-border flows shall","be made available to market participants,","complying with safety standards of secure","network operation. Counter-trading and","redispatch, including cross-border","redispatch, shall be used to optimize","available capacities unless it is","demonstrated that it is not beneficial to the","Member States sharing the","interconnection."],"old":["3. The maximum capacity of the","interconnections and/or the transmission","networks affecting cross-border flows shall","be made available to market participants,","complying with safety standards of secure","network operation. Counter-trading and","redispatch, including cross-border","redispatch, shall be used to maximise","available capacities unless it is","demonstrated that it is not beneficial to","economic efficiency at Union level."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"708","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Pilar del Castillo Vera","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-242","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 1"]],"meps":[28390],"meta":{"created":"2019-07-03T06:30:42"},"new":["1. The Agency, in close cooperation","with the Commission, the Member States","and the relevant national authorities","including the national regulatory","authorities and without prejudice to the","competences of competition authorities,","shall monitor the wholesale and retail","markets in electricity and natural gas, in","particular the retail prices of electricity and","natural gas, compliance with the consumer","rights laid down in [recast Electricity","Directive as proposed by COM(2016)","864/2] and Directive 2009/73/EC, access to","the networks including access of electricity","produced from renewable energy","sources, the stage reached with regard to","interconnections, potential barriers to","cross-border trade, state interventions","preventing prices from reflecting actual","scarcity, the performance of the Member","States in the area of electricity security of","supply based on the results of the European","resource adequacy assessment as referred","to in Article 19 of [recast Electricity","Regulation], in particular taking into","account the ex-post evaluation referred to","in Article 16 of [Risk Preparedness","Regulation as proposed by COM(2016)","862]."],"old":["1. The Agency, in close cooperation","with the Commission, the Member States","and the relevant national authorities","including the national regulatory","authorities and without prejudice to the","competences of competition authorities,","shall monitor the wholesale and retail","markets in electricity and natural gas, in","particular the retail prices of electricity and","natural gas, compliance with the consumer","rights laid down in [recast Electricity","Directive as proposed by COM(2016)","864/2] and Directive 2009/73/EC, access to","the networks including access of electricity","produced from renewable energy","sources, potential barriers to cross-border","trade, state interventions preventing prices","from reflecting actual scarcity, the","performance of the Member States in the","area of electricity security of supply based","on the results of the European resource","adequacy assessment as referred to in","Article 19 of [recast Electricity","Regulation], in particular taking into","account the ex-post evaluation referred to","in Article 16 of [Risk Preparedness","Regulation as proposed by COM(2016)","862]."],"orig_lang":"es","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"242","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1352","justification":"The amendment is necessary for pressing reasons relating to the internal logic of the text","location":[["Proposal for a regulation","Article 45 \u2013 paragraph 1 \u2013 point 1 (new)"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:48"},"new":["(1) The draft Union-wide network","plan shall be submitted to the Agency for","an opinion.The ENTSO-E shall amend","the Union-wide network development plan","in accordance with this opinion and","resubmit the amended plan to the","Agency.The agency shall recommend the","Union-wide network development plan to","the Commission, if deemed adequate."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1352","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1525","justification":" In line with the addition of the new DSO entity, distribution system operators should also be\n mentioned here.","location":[[" Proposal for a regulation","Article 56 \u2013 paragraph 2"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:42"},"new":["2. Draft amendments to any network","code adopted under Article 55 may be","proposed to the Agency by persons who","are likely to have an interest in that","network code, including the ENTSO for","Electricity, the EU DSO entity,","transmission and distribution system","operators, system users and consumers.","The Agency may also propose amendments","on its own initiative."],"old":["2. Draft amendments to any network","code adopted under Article 55 may be","proposed to the Agency by persons who","are likely to have an interest in that","network code, including the ENTSO for","Electricity, the EU DSO entity,","transmission system operators, system","users and consumers. The Agency may","also propose amendments on its own","initiative."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1525","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Pilar del Castillo Vera, Pilar Ayuso, Francesc Gamb\u00fas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-999","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 6"]],"meps":[28390,4319,125006],"meta":{"created":"2019-07-03T06:30:49"},"new":["6. Where capacity systems are","applied, transport system operators shall","calculate the maximum entry capacity","available for the participation of foreign","capacity taking into account the expected","availability of interconnection and the","likely concurrence of system stress","between the system where the mechanism","is applied and the system in which the","foreign capacity is located. A calculation is","required for each bidding zone border."],"old":["6. Regional operational centres","established pursuant to Article 32 shall","annually calculate the maximum entry","capacity available for the participation of","foreign capacity taking into account the","expected availability of interconnection","and the likely concurrence of system stress","between the system where the mechanism","is applied and the system in which the","foreign capacity is located. A calculation is","required for each bidding zone border."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"999","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Davor \u0160krlec on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-243","justification":"Greater powers delegated to the Agency by this Regulation should be accompanied by\nadditional measures of parliamentary oversight.","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 3"]],"meps":[124756],"meta":{"created":"2019-07-03T06:30:43"},"new":["3. When publishing its annual report,","the Agency may submit to the European","Parliament and to the Commission an","opinion on the possible measures to","remove the barriers referred to in","paragraph 2. The Parliament and the","Commission may request the Agency to","provide a follow-up to this opinion and to","focus on specific issues in the next annual","report. A hearing of the Director may be","requested by the competent committee of","the European Parliament on the issues","raised in the opinion."],"old":["3. When publishing its annual report,","the Agency may submit to the European","Parliament and to the Commission an","opinion on the possible measures to","remove the barriers referred to in","paragraph 2."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"243","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-709","location":[[" Proposal for a regulation","Article 14 \u2013 paragraph 4"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:46"},"new":["4. Capacity shall be allocated only by","means of explicit capacity auctions or","implicit auctions including both capacity","and energy in accordance with Regulation","(EU) 2015/1222. By 2024 implicit","auctions shall be used for intra-day time","frame."],"old":["4. Capacity shall be allocated only by","means of explicit capacity auctions or","implicit auctions including both capacity","and energy. Both methods may coexist on","the same interconnection. For intra-day","trade continuous trading shall be used,","which may be complemented by auctions."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"709","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-407","justification":" Information is required by all participants to the balancing market.","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 10"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["10. Transmission system operators or","third parties to whom these","responsibilities have either been delegated","by the relevant TSO, Member State or","regulatory authority shall publish close to","real-time information on the current","balancing state of their control areas, the","imbalance price and the balancing energy","price."],"old":["10. Transmission system operators","shall publish close to real-time information","on the current balancing state of their","control areas, the imbalance price and the","balancing energy price."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"407","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1353","justification":" The amendment is necessary for pressing reasons relating to the internal logic of the text","location":[["Proposal for a regulation","Article 45 \u2013 paragraph 2"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:48"},"new":["2. The Agency shall provide an","opinion on the national ten-year network","development plans to assess their","consistency with the draft Union -wide","network development plan. If the Agency,","in consultation with the concerned","national regulatory authority, identifies","inconsistencies between a national ten-year","network development plan and the Union -","wide network development plan, it shall, in","close cooperation with all concerned","regulatory authorities, recommend","amending the national ten-year network","development plan or the draft Union -wide","network development plan as appropriate.","If such national ten-year network","development plan is elaborated in","accordance with Article 51 of [recast of","Directive 2009/72/EC as proposed by","COM(2016) 864/2], the Agency shall","recommend that the competent national","regulatory authority amend the national","ten-year network development plan in","accordance with Article 51(7) of that","Directive and inform the Commission","thereof. An investment which is objected","by the Agency, after having consulted the","concerned national regulatory authorities,","shall not be part of the Union-wide","network development plan."],"old":["2. The Agency shall provide an","opinion on the national ten-year network","development plans to assess their","consistency with the Union -wide network","development plan. If the Agency identifies","inconsistencies between a national ten-year","network development plan and the Union -","wide network development plan, it shall","recommend amending the national ten-year","network development plan or the Union -","wide network development plan as","appropriate. If such national ten-year","network development plan is elaborated in","accordance with Article 51 of [recast of","Directive 2009/72/EC as proposed by","COM(2016) 864/2], the Agency shall","recommend that the competent national","regulatory authority amend the national","ten-year network development plan in","accordance with Article 51(7) of that","Directive and inform the Commission","thereof."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1353","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Pervenche Ber\u00e8s, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1526","justification":"Distributors system operators must participate in the elaboration.","location":[[" Proposal for a regulation","Article 56 \u2013 paragraph 2"]],"meps":[1985,124947],"meta":{"created":"2019-07-03T06:30:42"},"new":["2. Draft amendments to any network","code adopted under Article 55 may be","proposed to the Agency by persons who","are likely to have an interest in that","network code, including the ENTSO for","Electricity, the EU DSO entity,","transmission and distribution system","operators, system users and consumers.","The Agency may also propose amendments","on its own initiative."],"old":["2. Draft amendments to any network","code adopted under Article 55 may be","proposed to the Agency by persons who","are likely to have an interest in that","network code, including the ENTSO for","Electricity, the EU DSO entity,","transmission system operators, system","users and consumers. The Agency may","also propose amendments on its own","initiative."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1526","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Rolandas Paksas","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-244","justification":" To avoid double reporting, the information collected by ACER should be made available to\n the relevant NRAs (to avoid that they have to collect it a second time where it is needed at\n national level).","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 3 a (new)"]],"meps":[96694],"meta":{"created":"2019-07-03T06:30:43"},"new":["3a. The Agency may request national","regulatory authorities, the ENTSO for","Electricity, the ENTSO for Gas, the","regional operational centres, the EU","entity of Distribution System Operators","(EU DSO) and the Nominated Electricity","Market Operators to provide any","information necessary for the purpose of","carrying out of monitoring pursuant to","this Article. For that purpose the Agency","shall have the power to issue decisions. At","the request of the Agency, the competent","national regulatory authorities shall assist","the Agency in collecting the information.","The Agency shall make the information","collected equally available to the","competent national regulatory authorities","to avoid double reporting."],"old":["",""],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"244","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Ashley Fox","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1000","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 8"]],"meps":[96957],"meta":{"created":"2019-07-03T06:30:49"},"new":["deleted"],"old":["8. Any difference in the cost of","foreign capacity and domestic capacity","arising through the allocation referred to","in paragraph 7 shall accrue to","transmission system operators and be","shared between them according to the","methodology referred in point (b) of","paragraph 10. Transmission system","operators shall use such revenues for the","purposes set out in Article 17(2)."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1000","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Pilar del Castillo Vera, Pilar Ayuso, Francesc Gamb\u00fas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-710","location":[[" Proposal for a regulation","Article 14 \u2013 paragraph 7 \u2013 subparagraph 1"]],"meps":[28390,4319,125006],"meta":{"created":"2019-07-03T06:30:46"},"new":["deleted"],"old":["Transmission system operators shall not","limit the volume of interconnection","capacity to be made available to other","market participants in order to solve","","congestion inside their own control area","or as a means of managing flows on a","border between two control areas","observed even without any transaction,","that is to say flows over control areas","caused by origin and destination within","one control area."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"710","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Davor \u0160krlec on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-245","justification":" In order to carry out its monitoring and reporting obligations effectively, the Agency should\n have the right to request and obtain all necessary information.","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 3 a (new)"]],"meps":[124756],"meta":{"created":"2019-07-03T06:30:43"},"new":["3a. The Agency may request national","regulatory authorities, the ENTSO for","Electricity, the ENTSO for Gas, the","regional operational centres, the EU","entity of Distribution System Operators","(EU DSO) and the Nominated Electricity","Market Operators to provide any","information necessary for the purpose of","carrying out of monitoring pursuant to","this Article. For that purpose the Agency","shall have the power to issue decisions.","The Agency may use confidential","information received pursuant to this","Article only for the purposes of carrying","out the tasks assigned to it in this","Regulation."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"245","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1527","location":[["Proposal for a regulation","Article 56 \u2013 paragraph 2"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:43"},"new":["2. Draft amendments to any network","code adopted under Article 55 may be","proposed to the Agency by persons who","are likely to have an interest in that","network code, including the ENTSO for","Electricity, transmission system operators,","distribution system operators, system users","and consumers. The Agency may also","propose amendments on its own initiative."],"old":["2. Draft amendments to any network","code adopted under Article 55 may be","proposed to the Agency by persons who","are likely to have an interest in that","network code, including the ENTSO for","Electricity, the EU DSO entity,","transmission system operators, system","users and consumers. The Agency may","also propose amendments on its own","initiative."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1527","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1354","justification":"This Amendment details information provisions to all relevant flexibility possibilities,\nincluding those mentioned in Article 58 of the [Electricity Directive].","location":[[" Proposal for a regulation","Article 47 \u2013 paragraph 4"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:49"},"new":["4. Transmission system operators","shall publish relevant data on aggregated","forecast and actual demand, on availability","and actual use of generation and load","assets, on availability and use of the","networks and interconnections, and on","balancing power and reserve capacity.","They shall collaborate with national","regulatory authorities around the","monitoring of demand-side flexibility","available in the system, including existing","and potential flexibility from generation,","demand-side, interconnections, and","storage, pursuant to Article 58 of","[Electricity Directive]. For availability and","actual use of small generation and load","units, aggregated estimate data may be","used."],"old":["4. Transmission system operators","shall publish relevant data on aggregated","forecast and actual demand, on availability","and actual use of generation and load","assets, on availability and use of the","networks and interconnections, and on","balancing power and reserve capacity. For","availability and actual use of small","generation and load units, aggregated","estimate data may be used."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1354","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Pilar del Castillo Vera, Pilar Ayuso, Francesc Gamb\u00fas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-408","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 10"]],"meps":[28390,4319,125006],"meta":{"created":"2020-11-15T15:52:08"},"new":["10. Transmission system operators","shall publish close to real-time information","on the current balancing state of their","control areas, the estimated imbalance","price and the estimated balancing energy","price."],"old":["10. Transmission system operators","shall publish close to real-time information","on the current balancing state of their","control areas, the imbalance price and the","balancing energy price.","",""],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"408","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski, Edward Czesak, Nikolay Barekov","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-711","location":[["Proposal for a regulation","Article 14 \u2013 paragraph 7 \u2013 subparagraph 1"]],"meps":[124891,132925,124871],"meta":{"created":"2019-07-03T06:30:46"},"new":["Transmission system operators shall not","limit the volume of interconnection","capacity to be made available to other","market participants in order to solve","congestion inside their own control area,","except for congestion on internal network","elements with cross-border relevance.","Transmission system operators may limit","the volume of interconnection capacity to","be made available to market participants","as a means of managing flows on a border","between two control areas observed even","without any transaction, that is to say flows","over control areas caused by origin and","destination within one control area, which","are below the level of threshold","established within capacity calculation","region."],"old":["Transmission system operators shall not","limit the volume of interconnection","capacity to be made available to other","market participants in order to solve","congestion inside their own control area or","as a means of managing flows on a border","between two control areas observed even","without any transaction, that is to say flows","over control areas caused by origin and","destination within one control area."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"711","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Franc Bogovi\u010d, Werner Langen, Milan Zver, Alojz Peterle, Romana Tomc, Patricija \u0160ulin, Tanja Fajon, Igor \u0160oltes, Davor \u0160krlec, Ivo Vajgl","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-246","justification":"Decisions on the seats of agencies are taken by common agreement between representatives\nof the governments of Member States, as it stems from Article 341 of the Treaty on the\nFunctioning of the EU and Protocol No 6 of the Treaties. This is based on the political will of\nMember States to build a polycentric European Union in which institutions are\ngeographically spread across its territory with the objective of decentralising EU governance,\nin accordance with the conclusions of the Representatives of Member States, meeting at head\nof state or government level, in Brussels on 13 December 2003, and recalled in the European\nCouncil conclusions of June 2008.","location":[["Proposal for a regulation","Article 17 \u2013 paragraph 4 \u2013 subparagraph 1"]],"meps":[125004,1928,96933,23693,125104,125103,96911,125003,124756,97019],"meta":{"created":"2019-07-03T06:30:43"},"new":["The seat of the Agency is in Ljubljana,","Slovenia."],"old":["The seat of the Agency shall be Ljubljana,","Slovenia."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"246","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1528","justification":" This amendment promotes consistency with other amendments.","location":[["Proposal for a regulation","Article 56 \u2013 paragraph 2"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:43"},"new":["2. Draft amendments to any network","code adopted under Article 55 may be","proposed to the Agency by persons who","are likely to have an interest in that","network code, including the ENTSO for","Electricity, transmission system operators,","distribution system operators, system users","and consumers. The Agency may also","propose amendments on its own initiative."],"old":["2. Draft amendments to any network","code adopted under Article 55 may be","proposed to the Agency by persons who","are likely to have an interest in that","network code, including the ENTSO for","Electricity, the EU DSO entity,","transmission system operators, system","users and consumers. The Agency may","also propose amendments on its own","initiative."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1528","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Flavio Zanonato","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-712","justification":" When assessing the capacity calculation process, both internal congestion and loop flows\n should be duly taken into consideration. Indeed, as the utilization of interconnections depends\n on the supply/demand situation on each side of the border, and capacity is influences by the\n physical and intermingled realities of the power system, these provisions should address the\n increasing complexity of power flows in the context of the energy transition.","location":[["Proposal for a regulation","Article 14 \u2013 paragraph 7 \u2013 subparagraph 1"]],"meps":[124800],"meta":{"created":"2019-07-03T06:30:46"},"new":["Transmission system operators shall not","limit the volume of interconnection","capacity to be made available to market","participants in order to solve congestion","inside their own control area, except for","congestion on internal network elements","having cross-border relevance.","Transmission system operators may limit","the volume of interconnection capacity to","be made available to market participants","as a means of managing flows on a border","between two control areas observed even","without any transaction, that is to say flows","over control areas caused by origin and","destination within one control area which","are below the level of threshold","established within the capacity calculation","region."],"old":["Transmission system operators shall not","limit the volume of interconnection","capacity to be made available to other","market participants in order to solve","congestion inside their own control area or","as a means of managing flows on a border","between two control areas observed even","without any transaction, that is to say flows","over control areas caused by origin and","destination within one control area."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"712","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Andr\u00e1s Gy\u00fcrk","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-247","location":[["Proposal for a regulation","Article 17 \u2013 paragraph 4 \u2013 subparagraph 2"]],"meps":[23816],"meta":{"created":"2019-07-03T06:30:43"},"new":["deleted"],"old":["The Agency may establish local offices in","the Member States, subject to their","consent and in accordance with Article","25(j)."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"247","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Patrizia Toia","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-713","justification":"Art. 14, par. 7 requires TSOs not to consider neither internal congestions nor loop flows\nwithin the capacity calculation process. A number of factors need to be taken into account\nwhen assessing capacities supplied to the market:- Utilization of interconnections depends on\nthe supply/demand situation on each side of the border.- Capacity is influenced by the\nphysical realities of the power systems that are connected with one another. The European\ncontinental system is a highly meshed network with complex internal and cross-border power\nflows.- Increasing complexity of power flows with the energy transition, i.e., growing number\nof variable generation, affects the forecast of transfer capacities.\u2500 Network infrastructure has\nnot kept pace with renewables development. While grid expansions will ensure sufficient\ntransmission capacity for the market over the long-term, during the investment phase,\ntransmission capacity may be insufficient for market needs at certain moments in time. This is\npartially because of temporary capacity reductions as a result of ongoing investment.","location":[[" Proposal for a regulation","Article 14 \u2013 paragraph 7 \u2013 subparagraph 1"]],"meps":[28340],"meta":{"created":"2019-07-03T06:30:47"},"new":["Transmission system operators shall not","limit the volume of interconnection","capacity to be made available to market","participants in order to solve congestion","inside their own control area, except for","congestion on internal network elements","having cross-border relevance.","Transmission system operators may limit","the volume of interconnection capacity to","be made available to market participants","or as a means of managing flows on a","border between two control areas observed","even without any transaction, i.e. flows","over control areas caused by origin and","destination within one control area which","are below the level of threshold","established within the capacity calculation","region."],"old":["Transmission system operators shall not","limit the volume of interconnection","capacity to be made available to other","market participants in order to solve","congestion inside their own control area or","as a means of managing flows on a border","between two control areas observed even","without any transaction, that is to say","","","flows over control areas caused by origin","and destination within one control area."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"713","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1001","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 8"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:49"},"new":["8. Any revenue arising for","transmission system managers from the","allocation referred to in paragraph 7 shall","be shared among them according to a","methodology approved by the regulatory","authority of the Member State in which","the capacity mechanism is implemented","after it has considered the opinions of the","regulatory authorities of the neighbouring","Member States. Transmission system","operators shall use such revenues for the","purposes set out in Article 17(2)."],"old":["8. Any difference in the cost of","foreign capacity and domestic capacity","arising through the allocation referred to","in paragraph 7 shall accrue to","transmission system operators and be","shared between them according to the","methodology referred in point (b) of","paragraph 10. Transmission system","operators shall use such revenues for the","purposes set out in Article 17(2)."],"orig_lang":"fr","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1001","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Kaja Kallas, Pavel Teli\u010dka, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar, Carolina Punset, Gerben-Jan Gerbrandy","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1355","justification":"This amendment is intrinsically linked to other amendments tabled to provisions which have\nbeen modified by the Commission","location":[["Proposal for a regulation","Article 47 \u2013 paragraph 4"]],"meps":[124697,124706,124989,124872,125026,90110,96940],"meta":{"created":"2019-07-03T06:30:49"},"new":["4. Transmission system operators","shall publish relevant data on aggregated","forecast and actual demand, on availability","and actual use of generation and load","assets, on availability and use of the","networks and interconnections, on","balancing power and reserve capacity and","on the availability of flexibility. For","availability and actual use of small","generation and load units, aggregated","estimate data may be used."],"old":["4. Transmission system operators","shall publish relevant data on aggregated","forecast and actual demand, on availability","and actual use of generation and load","assets, on availability and use of the","networks and interconnections, and on","balancing power and reserve capacity. For","availability and actual use of small","generation and load units, aggregated","estimate data may be used."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1355","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1529","location":[[" Proposal for a regulation","Article 57 \u2013 paragraph 2"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:43"},"new":["2. The Commission may adopt a","delegated act as guidelines in the areas","where such acts could also be developed","under the network code procedure pursuant","to Article 55 (1). Those guidelines shall be","adopted as implementing acts in","accordance with the examination","procedure referred to in Article 62(2)."],"old":["2. The Commission may adopt a","delegated act as a Guideline in the areas","where such acts could also be developed","under the network code procedure pursuant","to Article 55 (1)."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1529","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-409","location":[["Proposal for a regulation","Article 5 \u2013 paragraph 10"]],"meps":[124706],"meta":{"created":"2020-11-15T15:52:08"},"new":["10. Transmission system operators","shall publish close to real-time information","on the current balancing state of their","control areas and the estimate of the","balancing energy price."],"old":["10. Transmission system operators","shall publish close to real-time information","on the current balancing state of their","control areas, the imbalance price and the","balancing energy price."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"409","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-714","justification":" A derogation from the general principle established in Article 14, paragraph 7 shall not be\n granted.","location":[["Proposal for a regulation","Article 14 \u2013 paragraph 7 \u2013 subparagraph 2"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:47"},"new":["deleted"],"old":["Upon request by a transmission system","operator, the relevant regulatory authority","may grant a derogation from the first","subparagraph where it is necessary for","maintaining operational security or where","it is beneficial to economic efficiency at","Union level. Such a derogation, which","may not relate to curtailment of already","allocated capacities pursuant to","paragraph 5, shall be limited in time,","","strictly limited to what is necessary, and","avoid discrimination between internal and","cross-zonal exchanges. Before granting a","derogation, the relevant regulatory","authority shall consult the regulatory","authorities of other Member States","forming part of an affected capacity","calculation region. In case a regulatory","authority disagrees with the proposed","derogation, the Agency shall decide on the","derogation pursuant to Article 6(8)(a)","[recast of Regulation (EC) No 713/2009","as proposed by COM(2016) 863/2]. The","justification and reasons for the","derogation shall be published. Where a","derogation is granted, the relevant","transmission system operators shall","develop and publish a methodology and","projects that shall provide a long-term","solution to the issue that the derogation","seeks to address. The derogation shall","expire when the time limit is reached or,","once the solution is applied, whichever is","earlier."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"714","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Barbara Kappel, Lorenzo Fontana, Angelo Ciocca","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-248","justification":" As the national regulatory authorities have their offices in the Member States, it is not\n necessary to establish local offices for the Agency.","location":[[" Proposal for a regulation","Article 17 \u2013 paragraph 4 \u2013 subparagraph 2"]],"meps":[125024,96993,183793],"meta":{"created":"2019-07-03T06:30:43"},"new":["deleted"],"old":["The Agency may establish local offices in","the Member States, subject to their","consent and in accordance with Article","25(j)."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"248","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1530","justification":" It is necessary to evaluate extent and form of use of delegated acts in all cases proposed by\n the Directive and reflected in the Regulation. From the proposal of the Directive it is not\n clear, what was the rationale behind use of implementing acts (e.g. data format in Article.24\n of the Directive) or in other cases use of delegated (Article 61 on ACER or Article 63 on\n\n\nnetwork codes).It is therefore not clear what \u201crule\u201d was used to set which form of act to use\nto specific topics.","location":[[" Proposal for a regulation","Article 57 \u2013 paragraph 2"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:43"},"new":["2. The Commission may adopt a","implementing act as a Guideline in the","areas where such acts could also be","developed under the network code","procedure pursuant to Article 55 (1)."],"old":["2. The Commission may adopt a","delegated act as a Guideline in the areas","where such acts could also be developed","under the network code procedure pursuant","to Article 55 (1)."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1530","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1356","justification":" This obligation for market participant is very wide ranging.Any disproportionate\n administrative and financial effort should be avoided.","location":[[" Proposal for a regulation","Article 47 \u2013 paragraph 5"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:49"},"new":["deleted"],"old":["5. The market participants concerned","shall provide the transmission system","operators with the relevant data."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1356","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1002","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 9 \u2013 introductory part"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:49"},"new":["9. Transmission system operators","where the foreign capacity is located shall:"],"old":["9. The transmission system operator","where the foreign capacity is located shall:"],"orig_lang":"fr","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1002","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-410","justification":"We propose to delete imbalance price from the list of public information by TSO. The\nimbalance price is calculated according to data received from TSO/DSO with a delay of at\nleast day after (ex post).Moreover this issue is already included in more detail in Commission\nregulation establishing a guideline on electricity balancing (EB GL).","location":[["Proposal for a regulation","Article 5 \u2013 paragraph 10"]],"meps":[28331],"meta":{"created":"2020-11-15T15:52:08"},"new":["10. Transmission system operators","shall publish close to real-time information","on the current balancing state of their","control areas, and the estimate of balancing","energy price."],"old":["10. Transmission system operators","shall publish close to real-time information","on the current balancing state of their","control areas, the imbalance price and the","balancing energy price."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"410","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski, Edward Czesak","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-715","location":[[" Proposal for a regulation","Article 14 \u2013 paragraph 7 \u2013 subparagraph 2"]],"meps":[124891,132925],"meta":{"created":"2019-07-03T06:30:47"},"new":["Upon request by a transmission system","operator, the relevant regulatory authority","may grant a derogation from the above","subparagraph where it is necessary for","maintaining operational security or where","it is beneficial to economic efficiency at","Union level. Such a derogation, which may","not relate to curtailment of already","allocated capacities pursuant to paragraph","5, shall be limited in time, strictly limited","to what is necessary, and avoid","discrimination between internal and cross-","zonal exchanges. The relevant regulatory","authority shall inform the regulatory","authorities of other Member States forming","part of an affected capacity calculation","region about granted derogation. The","justification and reasons for the derogation","shall be published. Where a derogation is","granted, the relevant transmission system","operators shall develop and publish a","methodology and projects that shall","provide a long-term solution to the issue","that the derogation seeks to address. The","derogation shall expire when the time limit","is reached or, once the solution is applied,","whichever is earlier."],"old":["Upon request by a transmission system","operator, the relevant regulatory authority","may grant a derogation from the first","subparagraph where it is necessary for","maintaining operational security or where","it is beneficial to economic efficiency at","Union level. Such a derogation, which may","","not relate to curtailment of already","allocated capacities pursuant to paragraph","5, shall be limited in time, strictly limited","to what is necessary, and avoid","discrimination between internal and cross-","zonal exchanges. Before granting a","derogation, the relevant regulatory","authority shall consult the regulatory","authorities of other Member States forming","part of an affected capacity calculation","region. In case a regulatory authority","disagrees with the proposed derogation,","the Agency shall decide on the derogation","pursuant to Article 6(8)(a) [recast of","Regulation (EC) No 713/2009 as proposed","by COM(2016) 863/2]. The justification","and reasons for the derogation shall be","published. Where a derogation is granted,","the relevant transmission system operators","shall develop and publish a methodology","and projects that shall provide a long-term","solution to the issue that the derogation","seeks to address. The derogation shall","expire when the time limit is reached or,","once the solution is applied, whichever is","earlier."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"715","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Neoklis Sylikiotis, Sofia Sakorafa","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-249","justification":" The decision on the set of an Agency is a political decision and can't be underlined through\n the revision of the legislation","location":[[" Proposal for a regulation","Article 17 \u2013 paragraph 4 \u2013 subparagraph 2"]],"meps":[124689,125091],"meta":{"created":"2019-07-03T06:30:43"},"new":["deleted"],"old":["The Agency may establish local offices in","the Member States, subject to their","consent and in accordance with Article","25(j)."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"249","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1357","justification":" When TSO are required to comply with their obligations under Article 40, which are\n intrinsically linked to this provisions, they have to receive the relevant consumption\n information from the power plant operators, including from renewable energy sources.","location":[[" Proposal for a regulation","Article 47 \u2013 paragraph 5"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:49"},"new":["5. The market participants concerned","shall provide the transmission system","operators with the relevant data. All power","plants using renewable energy sources,","with an installed electricity capacity of","more than 1 MW shall provide the","transmission system operators with real","time information at least of their net","production so as to allow TSOs to comply","with their obligations under Article 40 (1)","(i), and (k)."],"old":["5. The market participants concerned","shall provide the transmission system","operators with the relevant data."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1357","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1531","location":[["Proposal for a regulation","Article 57 \u2013 paragraph 2"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:43"},"new":["2. The Commission may adopt a","implementing act as a Guideline in the","areas where such acts could also be","developed under the network code","procedure pursuant to Article 55 (1)."],"old":["2. The Commission may adopt a","delegated act as a Guideline in the areas","where such acts could also be developed","under the network code procedure pursuant","to Article 55 (1)."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1531","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-411","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 10"]],"meps":[96713],"meta":{"created":"2020-11-15T15:52:08"},"new":["10. Transmission system operators","shall publish close to real-time information","on the current balancing state of their","control areas, and the estimate of balancing","energy price."],"old":["10. Transmission system operators","shall publish close to real-time information","on the current balancing state of their","control areas, the imbalance price and the","balancing energy price."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"411","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1003","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 9 \u2013 point a"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:50"},"new":["(Does not affect the English version.)"],"old":["(a) establish whether interested","capacity providers can provide the","technical performance as required by the","capacity mechanism in which the capacity","provider intends to participate and register","the capacity provider in the registry as","eligible capacity providers."],"orig_lang":"fr","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1003","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Miroslav Poche, Zigmantas Bal\u010dytis, Patrizia Toia, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Jeppe Kofod, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-250","justification":"Retaining the EC text in Article 17(4) is inconsistent with AM 28 of Article 25 (k) of the draft\nITRE report.","location":[[" Proposal for a regulation","Article 17 \u2013 paragraph 4 \u2013 subparagraph 2"]],"meps":[124699,96680,28340,125041,125044,124870,124784],"meta":{"created":"2019-07-03T06:30:43"},"new":["The Agency may establish local offices in","the Member States, in accordance with","Article 25(j)."],"old":["The Agency may establish local offices in","the Member States, subject to their","consent and in accordance with Article","25(j)."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"250","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-716","location":[["Proposal for a regulation","Article 14 \u2013 paragraph 7 \u2013 subparagraph 2"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:47"},"new":["Upon request by a transmission system","operator, the relevant regulatory authority","may grant a derogation from the first","subparagraph where it is necessary for","maintaining operational security or where","it is beneficial to economic efficiency at","Union level. Such a derogation, which may","not relate to curtailment of already","allocated capacities pursuant to paragraph","5, shall be limited in time, strictly limited","to what is necessary, and avoid","discrimination between internal and cross-","zonal exchanges. Before granting a","derogation, the relevant regulatory","authority shall consult the regulatory","authorities of other Member States forming","part of an affected capacity calculation","region. In case a regulatory authority","disagrees with the proposed derogation, the","Agency shall decide on the derogation","pursuant to Article 6(8)(a) [recast of","Regulation (EC) No 713/2009 as proposed","by COM(2016) 863/2]. The justification","and reasons for the derogation shall be","published. Where a derogation is granted,","the relevant transmission system operators","shall develop and publish a methodology","and projects that shall provide a long-term","solution to the issue that the derogation","seeks to address. The derogation shall","expire when the time limit is reached or,","once the solution is applied, whichever is","earlier. In case a derogation is not","granted, it should be considered as a","reason to start a bidding zone review","process in accordance with Articles 32 to","34 of Regulation (EU) 2015/1222."],"old":["Upon request by a transmission system","operator, the relevant regulatory authority","may grant a derogation from the first","subparagraph where it is necessary for","maintaining operational security or where","it is beneficial to economic efficiency at","Union level. Such a derogation, which may","not relate to curtailment of already","allocated capacities pursuant to paragraph","5, shall be limited in time, strictly limited","","to what is necessary, and avoid","discrimination between internal and cross-","zonal exchanges. Before granting a","derogation, the relevant regulatory","authority shall consult the regulatory","authorities of other Member States forming","part of an affected capacity calculation","region. In case a regulatory authority","disagrees with the proposed derogation, the","Agency shall decide on the derogation","pursuant to Article 6(8)(a) [recast of","Regulation (EC) No 713/2009 as proposed","by COM(2016) 863/2]. The justification","and reasons for the derogation shall be","published. Where a derogation is granted,","the relevant transmission system operators","shall develop and publish a methodology","and projects that shall provide a long-term","solution to the issue that the derogation","seeks to address. The derogation shall","expire when the time limit is reached or,","once the solution is applied, whichever is","earlier."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"716","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1532","justification":" This Amendment is inextricably linked to the provisions and amendments of Article 16.","location":[["Proposal for a regulation","Article 57 \u2013 paragraph 4 \u2013 subparagraph 1"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:43"},"new":["Guidelines may also determine appropriate","rules relating to charges applied to","producers, energy storage and customers","(load) under national distribution and","transmission tariff systems and connection","regimes , including the reflection of the","inter-transmission system operator","compensation mechanism in national","network charges, the avoidance of charges","that do not reflect costs and benefits of","active consumers and the provision of","appropriate and efficient locational signals,","with the exception of active consumers, in","accordance with the principles set out in","Article 16."],"old":["Guidelines may also determine appropriate","rules relating to charges applied to","producers, energy storage and customers","(load) under national distribution and","transmission tariff systems and connection","regimes , including the reflection of the","inter-transmission system operator","compensation mechanism in national","network charges and the provision of","appropriate and efficient locational signals,","in accordance with the principles set out in","Article 16."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1532","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Kaja Kallas, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar, Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-412","location":[[" Proposal for a regulation","Article 5 \u2013 paragraph 10 a (new)"]],"meps":[124697,124989,124872,125026,90110],"meta":{"created":"2020-11-15T15:52:08"},"new":["10a. Member States shall report on the","functioning and transparency of, and","access, in particular by small providers,","to, the balancing markets, in particular","for the purpose of Article 4, through the","reporting procedure on the internal","energy market laid down in Article 21 of","Regulation .../... [Governance of the","Energy Union]."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"412","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Pilar del Castillo Vera, Pilar Ayuso, Francesc Gamb\u00fas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1358","justification":"This amendment is intrinsically linked to other amendments tabled to provisions which have\nbeen modified by the Commission","location":[["Proposal for a regulation","Article 47 \u2013 paragraph 5 a (new)"]],"meps":[28390,4319,125006],"meta":{"created":"2019-07-03T06:30:49"},"new":["5 a. All power plants using renewable","energy sources with an installed electricity","capacity of more than 1 MW shall provide","the transmission system operators with","real time information at least of their net","production so as to allow transmission","system operators to comply with their","obligations under Article 40 of [recast of","Directive 2009/72/EC as proposed by","COM(2016) 864]."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1358","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1004","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 9 \u2013 point b"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:50"},"new":["(Does not affect the English version.)"],"old":["(b) carry out availability checks as","appropriate."],"orig_lang":"fr","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1004","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Hans-Olaf Henkel","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-251","location":[["Proposal for a regulation","Article 17 \u2013 paragraph 4 \u2013 subparagraph 2"]],"meps":[124823],"meta":{"created":"2019-07-03T06:30:43"},"new":["The Agency may establish local offices in","the Member States, in accordance with","Article 25(j)."],"old":["The Agency may establish local offices in","the Member States, subject to their","consent and in accordance with Article","25(j)."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"251","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1359","justification":" This obligation for market participant is very wide ranging.Any disproportionate\n administrative and financial effort should be avoided.","location":[["Proposal for a regulation","Article 47 \u2013 paragraph 6"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:49"},"new":["deleted"],"old":["6. Generation undertakings which","own or operate generation assets, where","at least one generation asset has an","installed capacity of at least 250 MW, or","which have a portfolio comprising at least","400 MW of generation assets, shall keep","at the disposal of the national regulatory","authority, the national competition","authority and the Commission, for five","years all hourly data per plant that is","necessary to verify all operational","dispatching decisions and the bidding","behaviour at power exchanges,","","interconnection auctions, reserve markets","and over-the-counter-markets. The per-","plant and per hour information to be","stored shall include, but shall not be","limited to, data on available generation","capacity and committed reserves,","including allocation of those committed","reserves on a per-plant level, at the times","the bidding is carried out and when","production takes place."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1359","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":" Miapetra Kumpula-Natri","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1533","justification":" Given the fast paced evolution of energy systems, NC on distribution tariff structure is not\n justified given their low cross-border impact and their strong interlink with local specificities.","location":[[" Proposal for a regulation","Article 57 \u2013 paragraph 4 \u2013 subparagraph 1"]],"meps":[124735],"meta":{"created":"2019-07-03T06:30:43"},"new":["Guidelines may also determine appropriate","rules relating to charges applied to","producers, energy storage and customers","(load) under national transmission tariff","systems and connection regimes , including","the reflection of the inter-transmission","system operator compensation mechanism","in national network charges and the","provision of appropriate and efficient","locational signals, in accordance with the","principles set out in Article 16."],"old":["Guidelines may also determine appropriate","rules relating to charges applied to","producers, energy storage and customers","(load) under national distribution and","transmission tariff systems and connection","regimes , including the reflection of the","inter-transmission system operator","compensation mechanism in national","network charges and the provision of","appropriate and efficient locational signals,","in accordance with the principles set out in","Article 16."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1533","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Flavio Zanonato","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-717","justification":"The European continental system is a highly meshed network, with complex internal and\ncross-border power flows. For this reason, it is important to assess the social welfare benefits\nbefore derogating from Art.14, par.7, first part.","location":[[" Proposal for a regulation","Article 14 \u2013 paragraph 7 \u2013 subparagraph 2"]],"meps":[124800],"meta":{"created":"2019-07-03T06:30:47"},"new":["Upon request by a transmission system","operator, the relevant regulatory authority","may grant a derogation from the above","subparagraph where it is necessary for","maintaining operational security or where","the foreseen related costs are not expected","to be higher than social welfare benefits.","Such a derogation, which may not relate to","curtailment of already allocated capacities","pursuant to paragraph 5, shall be limited in","time, strictly limited to what is necessary,","and avoid discrimination between internal","and cross-zonal exchanges. Before granting","a derogation, the relevant regulatory","authority shall consult the regulatory","authorities of other Member States forming","part of an affected capacity calculation","region. In case a regulatory authority","disagrees with the proposed derogation, the","Agency shall decide on the derogation","pursuant to Article 6(8)(a) [recast of","Regulation (EC) No 713/2009 as proposed","by COM(2016) 863/2]. The justification","and reasons for the derogation shall be","published. Where a derogation is granted,","the relevant transmission system operators","shall develop and publish a methodology","and projects that shall provide a long-term","solution to the issue that the derogation","seeks to address. The derogation shall","expire when the time limit is reached or,","once the solution is applied, whichever is","earlier."],"old":["Upon request by a transmission system","operator, the relevant regulatory authority","may grant a derogation from the first","subparagraph where it is necessary for","maintaining operational security or where","it is beneficial to economic efficiency at","Union level. Such a derogation, which may","not relate to curtailment of already","allocated capacities pursuant to paragraph","","5, shall be limited in time, strictly limited","to what is necessary, and avoid","discrimination between internal and cross-","zonal exchanges. Before granting a","derogation, the relevant regulatory","authority shall consult the regulatory","authorities of other Member States forming","part of an affected capacity calculation","region. In case a regulatory authority","disagrees with the proposed derogation, the","Agency shall decide on the derogation","pursuant to Article 6(8)(a) [recast of","Regulation (EC) No 713/2009 as proposed","by COM(2016) 863/2]. The justification","and reasons for the derogation shall be","published. Where a derogation is granted,","the relevant transmission system operators","shall develop and publish a methodology","and projects that shall provide a long-term","solution to the issue that the derogation","seeks to address. The derogation shall","expire when the time limit is reached or,","once the solution is applied, whichever is","earlier."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"717","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-413","location":[[" Proposal for a regulation","Article 6 \u2013 paragraph 1"]],"meps":[28331],"meta":{"created":"2020-11-15T15:52:08"},"new":["1. Transmission system operators and","nominated electricity market operators","shall jointly organise the management of","the integrated day-ahead and intraday","markets based on market coupling as set","out in Regulation (EU) 2015/1222.","Transmission system operators and","nominated electricity market operators","shall cooperate at Union level or, where","more appropriate, on a regional basis in","order to maximise the efficiency and","effectiveness of Union electricity day-","ahead and intraday trading. The obligation","to cooperate shall be without prejudice to","the application of the provisions of Union","competition law. In their functions relating","to electricity trading, transmission system","operators and nominated electricity market","operators shall be subject to regulatory","oversight by regulators and the Agency","pursuant to Article 59 of [recast of","Directive 2009/72/EC as proposed by","COM(2016) 864/2] and Articles 4 and 9 of","[recast of Regulation (EC) No 713/2009 as","proposed by COM(2016) 863/2]."],"old":["1. Transmission system operators and","","nominated electricity market operators","shall jointly organise the management of","the integrated day-ahead and intraday","markets based on market coupling as set","out in Regulation (EU) 2015/1222.","Transmission system operators and","nominated electricity market operators","shall cooperate at Union level or, where","more appropriate, on a regional basis in","order to maximise the efficiency and","effectiveness of Union electricity day-","ahead and intraday trading. The obligation","to cooperate shall be without prejudice to","the application of the provisions of Union","competition law. In their functions relating","to electricity trading, transmission system","operators and nominated market operators","shall be subject to regulatory oversight by","regulators and the Agency pursuant to","Article 59 of [recast of Directive","2009/72/EC as proposed by COM(2016)","864/2] and Articles 4 and 9 of [recast of","Regulation (EC) No 713/2009 as proposed","by COM(2016) 863/2]."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"413","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1005","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 10 \u2013 subparagraph 1 \u2013 point a"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:50"},"new":["(a) principles for assessing the","maximum entry capacity for cross-border","participation as referred to in paragraph 6;"],"old":["(a) a methodology for calculating the","maximum entry capacity for cross-border","participation as referred to in paragraph 6;"],"orig_lang":"fr","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1005","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.740-1360","justification":"The creation of a new EU DSO entity contains significant risks of obstructing competition and\ndiscrimination on sensitive issues (in particular on issues relating to consumers and treatment\nof distributed energy resources, such as solar PV and demand response).In addition, EU\nunbundling rules for DSOs are not very stringent, which would allow large DSOs connected\nto parent utilities to exert undue influence via the DSO entity.In order to eliminate any risks of\nconflicts of interests and obstruction of competition, the proposed EU DSO entity should be\nrejected.","location":[[" Proposal for a regulation","Article 49"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:49"},"new":["Article 49 deleted","operators"],"old":["European entity for distribution system","Distribution system operators which are","not part of a vertically integrated","undertaking or which are unbundled","according to the provisions of Article 35","[recast of Directive 2009/72/EC as","proposed by COM(2016) 864/2], shall","cooperate at Union level through a","European Entity for Distribution system","operators (\"EU DSO entity\"), in order to","promote the completion and functioning","of the internal market in electricity, and to","promote optimal management and a","coordinated operation of distribution and","transmission systems. Distribution system","operators who wish to participate in the","EU DSO entity shall become registered","members of the entity."],"orig_lang":"en","peid":"PE610.740v01-00","reference":"2016/0379(COD)","seq":"1360","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610740_EN.pdf"},{"authors":"Patrizia Toia","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-252","justification":" These AMs are necessary for pressing reasons relating to the internal logic of the text or\n inextricably linked to other admissible amendments.","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 1"]],"meps":[28340],"meta":{"created":"2019-07-03T06:30:43"},"new":["1. The Administrative Board shall be","composed of eleven members. Each","member shall have an alternate. Two","members and their alternates shall be","appointed by the Commission, two","members and their alternates shall be","appointed by the European Parliament, two","members and their alternates shall be","appointed by the Board of Regulators and","five members and their alternates shall be","appointed by the Council. No Member of","the European Parliament shall be a member","of the Administrative Board."],"old":["1. The Administrative Board shall be","composed of nine members. Each member","shall have an alternate. Two members and","their alternates shall be appointed by the","Commission, two members and their","alternates shall be appointed by the","European Parliament and five members","","and their alternates shall be appointed by","the Council. No Member of the European","Parliament shall be a member of the","Administrative Board."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"252","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Patrizia Toia","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-718","justification":" Art. 14, par. 7 requires TSOs not to consider neither internal congestions nor loop flows\n within the capacity calculation process. A number of factors need to be taken into account\n when assessing capacities supplied to the market:\n\n \u2500 Utilization of interconnections depends on the supply/demand situation on each side of the\n border.\n\n \u2500 Capacity is influenced by the physical realities of the power systems that are connected\n with one another. The European continental system is a highly meshed network with complex\n internal and cross-border power flows.\n\n \u2500 Increasing complexity of power flows with the energy transition, i.e., growing number of\n variable generation, affects the forecast of transfer capacities.\n\n \u2500 Network infrastructure has not kept pace with renewables development. While grid\n expansions will ensure sufficient transmission capacity for the market over the long-term,\n during the investment phase, transmission capacity may be insufficient for market needs at\n\ncertain moments in time. This is partially because of temporary capacity reductions as a\nresult of ongoing investment.","location":[["Proposal for a regulation","Article 14 \u2013 paragraph 7 \u2013 subparagraph 2"]],"meps":[28340],"meta":{"created":"2019-07-03T06:30:47"},"new":["Upon request by a transmission system","operator, the relevant regulatory authority","may grant a derogation from the above","subparagraph where it is necessary for","maintaining operational security or where","the foreseen related costs are not expected","to be higher than social welfare benefits.","Such a derogation, which may not relate to","curtailment of already allocated capacities","pursuant to paragraph 5, shall be limited in","time, strictly limited to what is necessary,","and avoid discrimination between internal","and cross-zonal exchanges. Before granting","a derogation, the relevant regulatory","authority shall consult the regulatory","authorities of other Member States forming","part of an affected capacity calculation","region. In case a regulatory authority","disagrees with the proposed derogation, the","Agency shall decide on the derogation","pursuant to Article 6(8)(a) [recast of","Regulation (EC) No 713/2009as proposed","by COM(2016) 863/2]. The justification","and reasons for the derogation shall be","published. Where a derogation is granted,","the relevant transmission system operators","shall develop and publish a methodology","and projects that shall provide a long-term","solution to the issue that the derogation","seeks to address. The derogation shall","expire when the time limit is reached or,","once the solution is applied, whichever is","earlier."],"old":["Upon request by a transmission system","operator, the relevant regulatory authority","may grant a derogation from the first","subparagraph where it is necessary for","maintaining operational security or where","it is beneficial to economic efficiency at","","Union level. Such a derogation, which may","not relate to curtailment of already","allocated capacities pursuant to paragraph","5, shall be limited in time, strictly limited","to what is necessary, and avoid","discrimination between internal and cross-","zonal exchanges. Before granting a","derogation, the relevant regulatory","authority shall consult the regulatory","authorities of other Member States forming","part of an affected capacity calculation","region. In case a regulatory authority","disagrees with the proposed derogation, the","Agency shall decide on the derogation","pursuant to Article 6(8)(a) [recast of","Regulation (EC) No 713/2009 as proposed","by COM(2016) 863/2]. The justification","and reasons for the derogation shall be","published. Where a derogation is granted,","the relevant transmission system operators","shall develop and publish a methodology","and projects that shall provide a long-term","solution to the issue that the derogation","seeks to address. The derogation shall","expire when the time limit is reached or,","once the solution is applied, whichever is","earlier."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"718","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1534","justification":"Proposed alternate wording is in line with our position on harmonization of distribution\ntariffs as specified in article 55 of the Regulation.","location":[[" Proposal for a regulation","Article 57 \u2013 paragraph 4 \u2013 subparagraph 1"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:43"},"new":["Guidelines may also determine appropriate","rules relating to charges applied to","producers, energy storage and customers","(load) under national transmission tariff","systems and connection regimes , including","the reflection of the inter-transmission","system operator compensation mechanism","in national network charges and the","provision of appropriate and efficient","locational signals, in accordance with the","principles set out in Article 16."],"old":["Guidelines may also determine appropriate","rules relating to charges applied to","producers, energy storage and customers","(load) under national distribution and","transmission tariff systems and connection","regimes , including the reflection of the","","inter-transmission system operator","compensation mechanism in national","network charges and the provision of","appropriate and efficient locational signals,","in accordance with the principles set out in","Article 16."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1534","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-414","location":[["Proposal for a regulation","Article 6 \u2013 paragraph 1"]],"meps":[96713],"meta":{"created":"2020-11-15T15:52:08"},"new":["1. Transmission system operators and","nominated electricity market operators","shall jointly organise the management of","the integrated day-ahead and intraday","markets based on market coupling as set","out in Regulation (EU) 2015/1222.","Transmission system operators and","nominated electricity market operators","shall cooperate at Union level or, where","more appropriate, on a regional basis in","order to maximise the efficiency and","effectiveness of Union electricity day-","ahead and intraday trading. The obligation","to cooperate shall be without prejudice to","the application of the provisions of Union","competition law. In their functions relating","to electricity trading, transmission system","operators and nominated electricity market","operators shall be subject to regulatory","oversight by regulators and the Agency","pursuant to Article 59 of [recast of","Directive 2009/72/EC as proposed by","COM(2016) 864/2] and Articles 4 and 9 of","[recast of Regulation (EC) No 713/2009 as","proposed by COM(2016) 863/2]."],"old":["1. Transmission system operators and","nominated electricity market operators","shall jointly organise the management of","the integrated day-ahead and intraday","markets based on market coupling as set","out in Regulation (EU) 2015/1222.","Transmission system operators and","nominated electricity market operators","shall cooperate at Union level or, where","more appropriate, on a regional basis in","order to maximise the efficiency and","effectiveness of Union electricity day-","","ahead and intraday trading. The obligation","to cooperate shall be without prejudice to","the application of the provisions of Union","competition law. In their functions relating","to electricity trading, transmission system","operators and nominated market operators","shall be subject to regulatory oversight by","regulators and the Agency pursuant to","Article 59 of [recast of Directive","2009/72/EC as proposed by COM(2016)","864/2] and Articles 4 and 9 of [recast of","Regulation (EC) No 713/2009 as proposed","by COM(2016) 863/2]."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"414","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1535","location":[["Proposal for a regulation","Article 57 \u2013 paragraph 4 \u2013 subparagraph 1"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:43"},"new":["Guidelines may also determine appropriate","rules relating to charges applied to","producers, energy storage and","customers (load) under","national transmission tariff systems and","connection regimes , including the","reflection of the inter-transmission system","operator compensation mechanism in","national network charges and the provision","of appropriate and efficient locational","signals, in accordance with the principles","set out in Article 16."],"old":["Guidelines may also determine appropriate","rules relating to charges applied to","producers, energy storage and customers","(load) under national distribution and","transmission tariff systems and connection","regimes , including the reflection of the","inter-transmission system operator","compensation mechanism in national","network charges and the provision of","appropriate and efficient locational signals,","in accordance with the principles set out in","Article 16."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1535","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Massimiliano Salini, Lara Comi, Fulvio Martusciello, Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-253","justification":" Representatives from the Board of Regulators should be present in the Administrative Board\n to increase the consistency of the decisions taken by both the Administrative Board and the\n Board of Regulators in terms of human resources and budget allocated to specific tasks.","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 1"]],"meps":[125670,96775,124828,36392],"meta":{"created":"2019-07-03T06:30:43"},"new":["1. The Administrative Board shall be","composed of eleven members. Each","member shall have an alternate. Two","members and their alternates shall be","appointed by the Commission, two","members and their alternates shall be","appointed by the European Parliament, two","members and their alternates shall be","appointed by the Board of Regulators and","five members and their alternates shall be","appointed by the Council. No Member of","the European Parliament shall be a member","of the Administrative Board."],"old":["1. The Administrative Board shall be","composed of nine members. Each member","shall have an alternate. Two members and","their alternates shall be appointed by the","Commission, two members and their","alternates shall be appointed by the","European Parliament and five members","and their alternates shall be appointed by","the Council. No Member of the European","Parliament shall be a member of the","Administrative Board."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"253","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1006","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 10 \u2013 subparagraph 1 \u2013 point b"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:50"},"new":["deleted"],"old":["(b) a methodology for sharing the","revenues referred to in paragraph 8;"],"orig_lang":"fr","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1006","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-719","justification":"This amendment is intrinsically linked to other amendments tabled to provisions which have\nbeen modified by the Commission","location":[["Proposal for a regulation","Article 14 \u2013 paragraph 9"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:47"},"new":["9. Transmission system operators","shall, as far as technically possible, net the","capacity requirements of any power flows","in opposite direction over the congested","interconnection line in order to use that line","to its maximum capacity. In so doing,","available capacity and level from energy","storage at interconnection end-points","shall be included in the calculation for the","netting. Having full regard to network","security, transactions that relieve the","congestion shall never be denied."],"old":["9. Transmission system operators","shall, as far as technically possible, net the","capacity requirements of any power flows","in opposite direction over the congested","interconnection line in order to use that line","to its maximum capacity. Having full","regard to network security, transactions","that relieve the congestion shall never be","denied."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"719","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-415","justification":" The principle of non-discrimination in day-ahead and intraday markets should have legal\n effect without any additional action from Member States.","location":[[" Proposal for a regulation","Article 6 \u2013 paragraph 2 \u2013 point a"]],"meps":[124813,124796],"meta":{"created":"2020-11-15T15:52:08"},"new":["(a) be non-discriminatory;"],"old":["(a) be organised in such a way as to","be non-discriminatory;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"415","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-254","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 1"]],"meps":[36392],"meta":{"created":"2019-07-03T06:30:43"},"new":["1. The Administrative Board shall be","composed of eleven members. Each","member shall have an alternate. Two","members and their alternates shall be","appointed by the Commission, two","members and their alternates shall be","appointed by the European Parliament, two","members and their alternates shall be","appointed by the Board of Regulators and","five members and their alternates shall be","appointed by the Council. No Member of","the European Parliament shall be a member","of the Administrative Board."],"old":["1. The Administrative Board shall be","composed of nine members. Each member","shall have an alternate. Two members and","their alternates shall be appointed by the","Commission, two members and their","alternates shall be appointed by the","European Parliament and five members","and their alternates shall be appointed by","the Council. No Member of the European","Parliament shall be a member of the","Administrative Board."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"254","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1536","location":[["Proposal for a regulation","Article 57 \u2013 paragraph 5 \u2013 point b"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:43"},"new":["(b) details of investment incentive rules","for interconnector capacity including","energy storage capacity, including","locational signals;"],"old":["(b) details of investment incentive rules","","for interconnector capacity including","locational signals;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1536","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-720","location":[["Proposal for a regulation","Article 15 \u2013 paragraph 2"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:47"},"new":["2. When cross-zonal capacity is","available after the intraday cross-zonal gate","closure time, where appropriate and","possible, transmission system operators","shall use the cross-zonal capacity for the","exchange of balancing energy or for","operating the imbalance netting process."],"old":["2. When cross-zonal capacity is","available after the intraday cross-zonal gate","closure time, transmission system operators","shall use the cross-zonal capacity for the","exchange of balancing energy or for","operating the imbalance netting process.","",""],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"720","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1007","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 10 \u2013 subparagraph 1 \u2013 point c"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:50"},"new":["(c) common principles for carrying","out the availability checks referred to in","point (b) of paragraph 9;"],"old":["(c) common rules to carry out","availability checks referred to in point (b)","of paragraph 9;"],"orig_lang":"fr","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1007","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-416","justification":"The principle of non-discrimination in day-ahead and intraday markets should have legal\neffect without any additional action from Member States.","location":[[" Proposal for a regulation","Article 6 \u2013 paragraph 2 \u2013 point a"]],"meps":[96852],"meta":{"created":"2020-11-15T15:52:08"},"new":["(a) be non-discriminatory;"],"old":["(a) be organised in such a way as to","be non-discriminatory;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"416","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1537","location":[[" Proposal for a regulation","Article 57 \u2013 paragraph 7"]],"meps":[124826,124870,124739,124735,124699],"meta":{"created":"2019-07-03T06:30:43"},"new":["7. When adopting or amending","guidelines, the Commission shall consult","the Agency, the ENTSO for Electricity, the","EU DSO Entity and other stakeholders","where relevant."],"old":["7. When adopting or amending","guidelines, the Commission shall consult","the Agency, the ENTSO for Electricity and","other stakeholders where relevant."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1537","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-255","justification":" In order to improve the consistency of the decisions taken by both the Administrative Board\n and the Board of Regulators in terms of human resources and budget allocated to specific\n tasks, it is preferable that representatives from regulatory authorities be present, on behalf of\n their Member State and on a rotating principle, in the Administrative Board. This proposal\n would also propose a governance scheme closer to the \u201ccommon approach\u201d on the\n decentralised Agencies.","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 1"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:43"},"new":["1. The Administrative Board shall be","composed of nine members. Each member","shall have an alternate. One member and","its alternate shall be appointed by the","Commission, two members and their","alternate shall be appointed by the","European Parliament and six members and","their alternates shall be members from the","Board of Regulators."],"old":["1. The Administrative Board shall be","composed of nine members. Each member","shall have an alternate. Two members and","their alternates shall be appointed by the","Commission, two members and their","alternates shall be appointed by the","European Parliament and five members and","their alternates shall be appointed by the","Council. No Member of the European","Parliament shall be a member of the","Administrative Board."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"255","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-721","location":[[" Proposal for a regulation","Article 15 \u2013 paragraph 2"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:47"},"new":["2. Only if cross-zonal capacity is","available after the intraday cross-zonal gate","closure time, transmission system operators","shall use the cross-zonal capacity for the","exchange of balancing energy or for","operating the imbalance netting process."],"old":["2. When cross-zonal capacity is","available after the intraday cross-zonal gate","closure time, transmission system operators","shall use the cross-zonal capacity for the","exchange of balancing energy or for","operating the imbalance netting process."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"721","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1538","justification":" This regulation introduces a European entity for distribution system operators in Articles 49-\n 51.Tasks related to this entity must therefore be aligned to the provision of this Article and\n especially regarding the cooperation between TSOs and DSOs also to Article 53.","location":[[" Proposal for a regulation","Article 57 \u2013 paragraph 7"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:43"},"new":["7. When adopting or amending","guidelines, the Commission shall consult","the Agency, the ENTSO for Electricity, the","EU DSO entity and other stakeholders","where relevant."],"old":["7. When adopting or amending","guidelines, the Commission shall consult","the Agency, the ENTSO for Electricity and","other stakeholders where relevant."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1538","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Pervenche Ber\u00e8s, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-722","justification":" The terminology \u201cnetwork access\u201d should be retained, \u201cuse\u201d and \u201creinforcement\u201d added for\n more clarity.","location":[[" Proposal for a regulation","Article 16 \u2013 title"]],"meps":[1985,124947],"meta":{"created":"2019-07-03T06:30:47"},"new":["Charges for access to networks, use of","networks and reinforcement"],"old":["Charges for access to networks"],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"722","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-417","location":[["Proposal for a regulation","Article 6 \u2013 paragraph 2 \u2013 point c"]],"meps":[96713],"meta":{"created":"2020-11-15T15:52:08"},"new":["(c) maximise the opportunities for","market participants to participate in cross-","zonal trade as close as possible to real time","across all bidding zones;"],"old":["(c) maximise the opportunities for","market participants to participate in cross-","border trade as close as possible to real","time across all bidding zones;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"417","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-256","justification":" The independence of the Agency is essential for it to perform its function properly and ensure\n market confidence. This amendment is linked to an amendment on Recital 34.","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 1"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:43"},"new":["1. The Administrative Board shall be","composed of nine members. Each member","shall have an alternate. Two members and","their alternates shall be appointed by the","Commission, two members and their","alternates shall be appointed by the","European Parliament and five members","and their alternates shall be members from","the Board of Regulators."],"old":["1. The Administrative Board shall be","composed of nine members. Each member","shall have an alternate. Two members and","their alternates shall be appointed by the","Commission, two members and their","alternates shall be appointed by the","European Parliament and five members","and their alternates shall be appointed by","the Council. No Member of the European","Parliament shall be a member of the","Administrative Board."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"256","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1008","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 10 \u2013 subparagraph 1 \u2013 point d"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:50"},"new":["(d) common principles for","determining when a non-availability","payment is due;"],"old":["(d) common rules to determine when a","non-availability payment is due;"],"orig_lang":"fr","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1008","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1539","location":[["Proposal for a regulation","Article 57 \u2013 paragraph 7"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:43"},"new":["7. When adopting or amending","Guidelines, the Commission shall consult","the Agency, the ENTSO for Electricity, the","EU DSO entity and other stakeholders","where relevant"],"old":["7. When adopting or amending","guidelines, the Commission shall consult","the Agency, the ENTSO for Electricity and","other stakeholders where relevant."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1539","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-723","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 1"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:47"},"new":["1. Charges applied by network","operators for access to networks, including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual costs","incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner.","Those charges shall not be distance-","related."],"old":["1. Charges applied by network","operators for access to networks, including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual costs","incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner. In","particular, they shall be applied in a way","which does not discriminate between","production connected at the distribution","level and production connected at the","transmission level, either positively or","negatively. They shall not discriminate","against energy storage and shall not","create disincentives for participation in","demand response. Without prejudice to","paragraph 3, those charges shall not be","distance-related."],"orig_lang":"fr","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"723","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1009","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 10 \u2013 subparagraph 1 \u2013 point f"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:50"},"new":["(f) common principles for identifying","capacity eligible to participate as referred","to in point (a) of paragraph 9."],"old":["(f) common rules to identify capacity","","eligible to participate as referred to in","point (a) of paragraph 9."],"orig_lang":"fr","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1009","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-418","justification":"New definition according to \u201cnominated electricity market operator\u201d. \u201cCross-border trade\u201d\nis not defined correctly. We propose to use more specific term \u201ecross-zonal\u201c, already used in\nthe Commission\u2019s Regulation (EU) 2015/1222. It is also appropriate to change use of all\nterms \u201ccross-border trade\u201d to \u201ccross-zonal\u201d. We propose to remove par. 3 as this topic is\nalready used in more detail in Commission\u2019s Regulation (EU) 2015/1222 (CACM).","location":[["Proposal for a regulation","Article 6 \u2013 paragraph 2 \u2013 point c"]],"meps":[28331],"meta":{"created":"2020-11-15T15:52:08"},"new":["(c) maximise the opportunities for","market participants to participate in cross-","zonal trade as close as possible to real time","across all bidding zones;"],"old":["(c) maximise the opportunities for","market participants to participate in cross-","border trade as close as possible to real","time across all bidding zones;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"418","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-257","justification":"In order to improve the consistency of the decisions taken by both the Administrative Board\nand the Board of Regulators in terms of human resources and budget allocated to specific\ntasks, it is preferable that representatives from regulatory authorities be present, on behalf of\ntheir Member State and on a rotating principle, in the Administrative Board. This proposal\nwould also propose a governance scheme closer to the \u201ccommon approach\u201d on the\ndecentralised Agencies.","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 2"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:43"},"new":["2. The term of office of the members","of the Administrative Board and their","alternates shall be two years and a half,","renewable once."],"old":["2. The term of office of the members","","of the Administrative Board and their","alternates shall be four years, renewable","once. For the first mandate, the term of","office of half of the members of the","Administrative Board and their alternates","shall be six years."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"257","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1540","location":[["Proposal for a regulation","Article 58 \u2013 title"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:43"},"new":["Right of Member States to provide for","more detailed measures or more efficient","market solutions"],"old":["Right of Member States to provide for","more detailed measures"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1540","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1010","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 11"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:50"},"new":["11. The Agency shall verify whether","the capacities have been calculated in line","with the principles referred to in point (a)","of paragraph 10."],"old":["11. The Agency shall verify whether","the capacities have been calculated in line","with the methodology as referred to in","point (a) of paragraph 10."],"orig_lang":"fr","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1010","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-724","justification":" The current heterogeneity of tariffs at the level of each Member State, which is competent to\n define the methodology for calculating tariffs, reflects local specificities and complies with the\n principle of subsidiarity..","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 1"]],"meps":[1985],"meta":{"created":"2019-07-03T06:30:47"},"new":["1. Charges applied by network","operators for access to networks , including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual costs","incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner. In","particular, they shall be applied in a way","which does not discriminate between","production connected at the distribution","level and production connected at the","transmission level."],"old":["1. Charges applied by network","operators for access to networks , including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual costs","","incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner. In","particular, they shall be applied in a way","which does not discriminate between","production connected at the distribution","level and production connected at the","transmission level, either positively or","negatively. They shall not discriminate","against energy storage and shall not","create disincentives for participation in","demand response. Without prejudice to","paragraph 3, those charges shall not be","distance-related."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"724","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Pilar del Castillo Vera, Francesc Gamb\u00fas, Pilar Ayuso","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-419","location":[[" Proposal for a regulation","Article 6 \u2013 paragraph 2 \u2013 point e"]],"meps":[28390,125006,4319],"meta":{"created":"2020-11-15T15:52:08"},"new":["(e) ensure operational security whilst","allowing for optimal use of transmission","capacity;"],"old":["(e) ensure operational security whilst","allowing for maximum use of transmission","capacity;"],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"419","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Neoklis Sylikiotis, Sofia Sakorafa","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-258","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 3"]],"meps":[124689,125091],"meta":{"created":"2019-07-03T06:30:43"},"new":["3. The Administrative Board shall","appoint its Chairman and its Vice-","Chairman from among its members,","striving for a balanced geographical","representation of Member States over","time. The Vice-Chairman shall","automatically replace the Chairman if the","latter is not in a position to perform his","duties. The term of office of the Chairman","and of the Vice-Chairman shall be two","years, renewable once. The term of office","of the Chairman and that of the Vice-","Chairman shall expire when they cease to","be members of the Administrative Board."],"old":["3. The Administrative Board shall","elect by a two-thirds majority its Chairman","and its Vice-Chairman from among its","members. The Vice-Chairman shall","automatically replace the Chairman if the","latter is not in a position to perform his","duties. The term of office of the Chairman","and of the Vice-Chairman shall be two","years, renewable once. The term of office","of the Chairman and that of the Vice-","Chairman shall expire when they cease to","be members of the Administrative Board."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"258","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1541","location":[["Proposal for a regulation","Article 58 \u2013 paragraph 1"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:43"},"new":["This Regulation shall be without prejudice","to the rights of Member States to maintain","or introduce measures that contain more","detailed provisions and/or measures that","contain market solutions more efficient in","terms of reaching the overall aims of this","Regulation determined in Article 1 than","those set out in this Regulation, in the","guidelines referred to in Article 57 or in the","network codes referred to in Article 55,","provided those measures do not endanger","the effectiveness of Union legislation."],"old":["This Regulation shall be without prejudice","to the rights of Member States to maintain","or introduce measures that contain more","detailed provisions than those set out in","this Regulation, , in the guidelines referred","to in Article 57 or in the network codes","","referred to in Article 55, provided those","measures do not endanger the effectiveness","of Union legislation."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1541","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Patrizia Toia","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-725","justification":"Art. 16 sets the rules for charges applied by network operators for the access to the network.\nThe scope of the provision is enlarged in respect to the Third Electricity Package and it\nincludes also charges for connection to the networks, charges for the use of the network and,\nwhere applicable, charges for network reinforcement. Having a broader scope than in the\nThird Electricity Package, the proposed amendment is aimed to avoid misunderstanding in its\nimplementation.","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 1"]],"meps":[28340],"meta":{"created":"2019-07-03T06:30:47"},"new":["1. Charges applied by network","operators for access to networks , including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual","costs incurred and are applied in a non-","discriminatory manner. In particular, they","shall be applied in a way which does not","discriminate between production connected","at the distribution level and production","connected at the transmission level, either","positively or negatively. They shall not","discriminate against energy storage and","shall not create disincentives for","participation in demand response. Without","prejudice to paragraph 3, those charges","shall not be distance-related."],"old":["1. Charges applied by network","operators for access to networks , including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual costs","incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner. In","particular, they shall be applied in a way","which does not discriminate between","production connected at the distribution","","level and production connected at the","transmission level, either positively or","negatively. They shall not discriminate","against energy storage and shall not create","disincentives for participation in demand","response. Without prejudice to paragraph","3, those charges shall not be distance-","related."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"725","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Flavio Zanonato","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1011","justification":"(b) Member States shall carry out their own adequacy assessments and studies upon which\nthey base their decisions on whether or not introduce capacity mechanisms in their system.\nCommon rules and EYU methodologies for generation adequacy assessment are strongly\nneeded. (l) The establishment of an emissions performance standard goes hand in hand with\nthe set in place of realistically ambitious thresholds.","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 1"]],"meps":[124800],"meta":{"created":"2019-07-03T06:30:50"},"new":["1. Capacity mechanisms other than","strategic reserve shall:","(a) not create unnecessary market","distortions and not limit cross-border","trade;","(b) not go beyond what is necessary to","address the adequacy concern in the","Member States, and perform in","compliance with the EU adequacy","methodology developed by ENTSO-E;","(c) select capacity providers by means of a","transparent, non-discriminatory and","market-based process;","(d) be technology neutral;","(e) be temporary and approved by the","Commission for no longer than five years;","(f) apply capacity products which are","issued for not longer than two years;","(g) provide incentives for capacity","providers to be available in times of","expected system stress;","(h) ensure that the remuneration is","determined through a market-based","process;","(i) set out the required technical","conditions for the participation of","capacity providers in advance of the","selection process;","(j) be open to participation of all","resources, including renewable energy,","storage and demand side management","that are capable of providing the required","technical performance;","(k) apply appropriate penalties to capacity","providers when not available in the event","of system stress;","(l) not be open for generation capacity","emitting 450 gr CO2/kWh or more at the","entry into force of this Regulation;","(m) be phased-out or at least phased down","to a strategic reserve after a pre-defined","period of time, based on the full","implementation of the measures outlined","in the roadmap pursuant to Article 18(3)."],"old":["1. To address residual concerns that","cannot be eliminated by the measures","pursuant to Article 18(3), Member States","may introduce capacity mechanisms,","subject to the provisions of this Article","and to the Union State aid rules.","",""],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1011","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Martina Werner, Peter Kouroumbashev, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Jens Geier, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-420","location":[[" Proposal for a regulation","Article 6 \u2013 paragraph 2 \u2013 point h"]],"meps":[124826,124857,124870,124739,124735,96833,124699],"meta":{"created":"2020-11-15T15:52:08"},"new":["(h) be based on bidding zones that are","as large, stable and liquid as possible","across different Member States."],"old":["(h) make no distinction between trades","made within a bidding zone and across","bidding zones."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"420","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Massimiliano Salini, Lara Comi, Fulvio Martusciello, Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-259","justification":" The attendance of the Director at the meetings of the Administrative Board is satisfactory.\n The governance scheme proposed in the art. 19 is also closer to the \u201ccommon approach\u201d on\n the decentralised Agencies.","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 4"]],"meps":[125670,96775,124828,36392],"meta":{"created":"2019-07-03T06:30:43"},"new":["4. The meetings of the Administrative","Board shall be convened by its Chairman.","The Director shall participate, without the","right to vote, in the deliberations unless the","Administrative Board decides otherwise as","regards the Director. The Administrative","Board shall meet at least twice a year in","ordinary session. It shall also meet at the","initiative of its Chairman, at the request of","the Commission or at the request of at least","a third of its members. The Administrative","Board may invite any person who may","have a relevant opinion to attend its","meetings in the capacity of an observer.","The members of the Administrative Board","may, subject to its rules of procedure, be","assisted by advisers or experts. The","Administrative Board\u2019s secretarial services","shall be provided by the Agency."],"old":["4. The meetings of the Administrative","Board shall be convened by its Chairman.","The Chairman of the Board of Regulators","or the nominee of the Board of","Regulators, and the Director shall","participate, without the right to vote, in the","deliberations unless the Administrative","Board decides otherwise as regards the","Director. The Administrative Board shall","meet at least twice a year in ordinary","session. It shall also meet at the initiative","of its Chairman, at the request of the","Commission or at the request of at least a","third of its members. The Administrative","Board may invite any person who may","have a relevant opinion to attend its","meetings in the capacity of an observer.","The members of the Administrative Board","may, subject to its rules of procedure, be","assisted by advisers or experts. The","Administrative Board\u2019s secretarial services","shall be provided by the Agency."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"259","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1542","justification":" This amendment is intrinsically linked to other amendments tabled to provisions which have\n been modified by the Commission","location":[[" Proposal for a regulation","Article 59 \u2013 paragraph 1 \u2013 point a"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:43"},"new":["(a) the investment must enhance","competition in electricity supply and, for","projects commissioned after 1 Jan 2019,","must specifically have included energy","storage at one or both interconnector ends","in case energy storage provides a lower","cost alternative to interconnection","capacity investments;"],"old":["(a) the investment must enhance","competition in electricity supply;"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1542","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-421","location":[[" Proposal for a regulation","Article 6 \u2013 paragraph 3"]],"meps":[28331],"meta":{"created":"2020-11-15T15:52:08"},"new":["deleted"],"old":["3. Market operators shall be free to","develop products and trading","opportunities that suit market","participants' demand and needs and","ensure that all market participants are","able to access the market individually or","through aggregation. They shall respect","the need to accommodate increasing","shares of variable generation as well as","","increased demand responsiveness and the","advent of new technologies."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"421","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-726","justification":" Charges applied by network operators for access to networks should take into account the\n necessity of enabling the development of renewables self-consumption, not just demand\n response. While these charges should be applied in a way which does not discriminate\n between production connected at the distribution level and production connected at the\n transmission level, the language prohibiting positive or negative discrimination does not add\n anything substantial in terms of preventing discriminatory treatment and should be deleted to\n prevent any misinterpretations. In particular, this provision should not prevent network\n operators from treating certain generation assets differently under the principle of equality or\n non-discrimination in order to remedy a market failure. In this context, the CJEU has ruled\n that the general principle of equality prohibits \u201ctreating similar situations differently and\n treating different situations in the same way, unless there are objective reasons to do so.\u201d It is\n intended to make sure groups or companies cannot block market entrance through indirect\n discrimination. Therefore, it would appear that under the general principle of equality,\n certain generation assets could be treated differently, regardless of the voltage levels at which\n they are embedded, if similar treatment would prevent them from effectively competing on an\n equal playing field with other generation assets.","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 1"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:48"},"new":["1. Charges applied by network","operators for access to networks, including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual costs","incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner.","They shall not be set at a level that hinders","the development of production connected","at the distribution level. They shall not","discriminate against energy storage and","shall not create disincentives for","participation in demand response or","renewables self-consumption. Without","prejudice to paragraph 3, those charges","shall not be distance-related."],"old":["1. Charges applied by network","operators for access to networks , including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual costs","incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner. In","particular, they shall be applied in a way","which does not discriminate between","production connected at the distribution","level and production connected at the","transmission level, either positively or","negatively. They shall not discriminate","against energy storage and shall not create","","disincentives for participation in demand","response. Without prejudice to paragraph","3, those charges shall not be distance-","related."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"726","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Martina Werner, Flavio Zanonato, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula- Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1012","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 1"]],"meps":[124826,124800,124870,124739,124735,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:50"},"new":["1. Capacity mechanisms other than","strategic reserves shall:","(a) not create unnecessary market","distortions and not limit cross-border","trade","(b) not go beyond what is necessary to","address the adequacy concern","(c) select capacity providers by means of a","transparent, non-discriminatory and","market-based process;","(d) be market based and technology","neutral","(e) be temporary and approved by the","Commission for no longer than five years","(f) apply capacity products which are","issued for not longer than two years","(g) provide incentives for capacity","providers to be available in times of","expected system stress;","(h) ensure that the remuneration is","determined through a market-based","process;","(i) set out the required technical","conditions for the participation of capacity","providers in advance of the selection","process;","(j) be open to participation of all","resources, including renewable energy,","storage and demand side management","that are capable of providing the required","technical performance;","(k) apply appropriate penalties to capacity","providers when not available in the event","of system stress.","(l) not be open for generation capacity","emitting 550 grCO2/kWh or more at the","entry into force of this Regulation.","(m) be phased-out or at least phased down","to a strategic reserve after a pre-defined","period of time, based on the full","implementation of the measures outlined","in the roadmap pursuant to Article 18 (3)"],"old":["1. To address residual concerns that","cannot be eliminated by the measures","pursuant to Article 18(3), Member States","may introduce capacity mechanisms,","subject to the provisions of this Article","and to the Union State aid rules.",""],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1012","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-422","location":[["Proposal for a regulation","Article 6 \u2013 paragraph 3"]],"meps":[96713],"meta":{"created":"2020-11-15T15:52:08"},"new":["deleted"],"old":["3. Market operators shall be free to","develop products and trading","opportunities that suit market","participants' demand and needs and","ensure that all market participants are","able to access the market individually or","through aggregation. They shall respect","the need to accommodate increasing","shares of variable generation as well as","increased demand responsiveness and the","advent of new technologies."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"422","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1543","justification":"This amendment is intrinsically linked to other amendments tabled to provisions which have\nbeen modified by the Commission","location":[[" Proposal for a regulation","Article 59 \u2013 paragraph 4 \u2013 subparagraph 1"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:43"},"new":["The decision on the exemption under","paragraphs 1, 2 and 3 shall be taken on a","case-by-case basis by the regulatory","authorities of the Member States","concerned. An exemption may cover all or","part of the capacity or contracted energy","storage capacity of the new interconnector,","or of the existing interconnector with","significantly increased capacity."],"old":["The decision on the exemption under","paragraphs 1, 2 and 3 shall be taken on a","case-by-case basis by the regulatory","authorities of the Member States","concerned. An exemption may cover all or","","part of the capacity of the new","interconnector, or of the existing","interconnector with significantly increased","capacity."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1543","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-727","justification":"Paragraph needs to be brought in accord with article 15 of Directive 20212/27/EU which\nprovides for binding conditions for network tariffs and stipulates that Member States may\nrequire transmission system operators and distribution system operators to encourage high-\nefficiency cogeneration to be sited close to areas of demand by reducing the connection and\nuse-of- system charges. In order to preserve level playing field network tariffs should not be\nused in order to provide incentive for energy storage.","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 1"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:48"},"new":["1. Charges applied by network","operators for access to networks , including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual costs","incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner.","Without prejudice to Article 15 (1) and (6)","and the criteria in Annex XI of Directive","2012/27/EU, they shall, in particular, be","applied in a way which does not","discriminate between production connected","at the distribution level and production","connected at the transmission level, either","positively or negatively. They shall neither","discriminate against nor provide incentives","for energy storage and shall not create","disincentives for participation in demand","response. Without prejudice to paragraph","3, those charges shall not be distance-","related."],"old":["1. Charges applied by network","operators for access to networks , including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual costs","incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner. In","particular, they shall be applied in a way","","which does not discriminate between","production connected at the distribution","level and production connected at the","transmission level, either positively or","negatively. They shall not discriminate","against energy storage and shall not create","disincentives for participation in demand","response. Without prejudice to paragraph","3, those charges shall not be distance-","related."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"727","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-260","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 4"]],"meps":[36392],"meta":{"created":"2019-07-03T06:30:44"},"new":["4. The meetings of the Administrative","Board shall be convened by its Chairman.","The Director shall participate, without the","right to vote, in the deliberations unless the","Administrative Board decides otherwise as","regards the Director. The Administrative","Board shall meet at least twice a year in","ordinary session. It shall also meet at the","initiative of its Chairman, at the request of","the Commission or at the request of at least","a third of its members. The Administrative","Board may invite any person who may","have a relevant opinion to attend its","meetings in the capacity of an observer.","The members of the Administrative Board","may, subject to its rules of procedure, be","assisted by advisers or experts. The","Administrative Board\u2019s secretarial services","shall be provided by the Agency."],"old":["4. The meetings of the Administrative","Board shall be convened by its Chairman.","The Chairman of the Board of Regulators","or the nominee of the Board of","Regulators, and the Director shall","participate, without the right to vote, in the","deliberations unless the Administrative","Board decides otherwise as regards the","Director. The Administrative Board shall","meet at least twice a year in ordinary","session. It shall also meet at the initiative","of its Chairman, at the request of the","Commission or at the request of at least a","third of its members. The Administrative","Board may invite any person who may","have a relevant opinion to attend its","meetings in the capacity of an observer.","The members of the Administrative Board","may, subject to its rules of procedure, be","assisted by advisers or experts. The","Administrative Board\u2019s secretarial services","shall be provided by the Agency."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"260","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1544","justification":"This amendment is intrinsically linked to other amendments tabled to provisions which have\nbeen modified by the Commission","location":[["Proposal for a regulation","Article 59 \u2013 paragraph 4 \u2013 subparagraph 3"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:43"},"new":["In deciding to grant an exemption,","consideration shall be given, on a case-by-","case basis, to the need to impose conditions","regarding the duration of the exemption","and non-discriminatory access to the","interconnector. When deciding those","conditions, account shall, in particular, be","taken of additional capacity or contracted","energy storage capacity to be built or the","modification of existing capacity, the time-","frame of the project and national","circumstances."],"old":["In deciding to grant an exemption,","consideration shall be given, on a case-by-","case basis, to the need to impose conditions","regarding the duration of the exemption","and non-discriminatory access to the","interconnector. When deciding those","conditions, account shall, in particular, be","taken of additional capacity to be built or","the modification of existing capacity, the","time-frame of the project and national","circumstances."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1544","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1013","justification":" Capacity mechanisms can, if not well designed and temporary in nature, create important\n market distortions. They shall not be used as a life-line for conventional generation capacity\n and only be introduced as a last resort.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 1"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:50"},"new":["1. To address residual concerns that","cannot be eliminated by the measures","pursuant to Article 18(3), Member States","may temporarily introduce capacity","mechanisms as a last resort. The","Commission may adopt a decision","allowing for the requested capacity","mechanism to be granted, subject to the","provisions of this Article and to the Union","State aid rules. The Commission shall","inform all Member States of those","applications before taking a decision,","taking into account confidentiality. That","decision shall be published in the Official","Journal of the European Union. The","Commission may include in its decision","conditions to the implementation of the","capacity mechanism. Remedies that build","on the curtailment of renewable energy","generation, forced disconnections of","household customers or limited feed-","in/dispatch of small-scale self-generators","shall be excluded. The decision shall be","limited in time and contain a detailed","timeline with measures to phase out the","capacity mechanism as well as the","foreseen date of expiration of the capacity","mechanism."],"old":["1. To address residual concerns that","cannot be eliminated by the measures","pursuant to Article 18(3), Member States","may introduce capacity mechanisms,","subject to the provisions of this Article and","to the Union State aid rules."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1013","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-423","justification":" Market rules shall enable involvement of consumers, local communities or cooperatives and\n must be adapted to their characteristics and capabilities.","location":[["Proposal for a regulation","Article 6 \u2013 paragraph 3"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["3. Market operators shall be free to","develop products and trading opportunities","that suit market participants' demand and","needs and ensure that all market","participants are able to access the market","individually or through aggregation. They","shall accommodate increasing shares of","variable renewable generation as well as","increased demand responsiveness and the","advent of new technologies. Market","operators shall ensure that local","communities have a proportionate and","simple access to the market."],"old":["3. Market operators shall be free to","develop products and trading opportunities","that suit market participants' demand and","needs and ensure that all market","participants are able to access the market","individually or through aggregation. They","shall respect the need to accommodate","increasing shares of variable generation as","well as increased demand responsiveness","","and the advent of new technologies."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"423","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Carolina Punset, Gerben-Jan Gerbrandy","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-728","justification":" As demand response, self-generation and self-consumption play a fundamental role in the\n development of active contribution of consumers in the electricity system. It is essential to\n guarantee that network charges do not create disincentives for persons willing to use their\n right to self-generate and self-consume and do not discriminate against energy storage.","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 1"]],"meps":[90110,96940],"meta":{"created":"2019-07-03T06:30:48"},"new":["1. Charges applied by network","operators for access to networks, including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual costs","incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner. In","particular, they shall be applied in a way","which does not discriminate between","production or energy storage connected at","the distribution level and production","connected at the transmission level, either","positively or negatively. They shall not","discriminate against energy storage,","specifically not double charging energy","storage, and aggregation and shall not","create disincentives for self-generation,","self-consumption, and for participation in","demand response. Without prejudice to","paragraph 3, those charges shall not be","distance-related."],"old":["1. Charges applied by network","operators for access to networks , including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual costs","incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner. In","particular, they shall be applied in a way","which does not discriminate between","","production connected at the distribution","level and production connected at the","transmission level, either positively or","negatively. They shall not discriminate","against energy storage and shall not create","disincentives for participation in demand","response. Without prejudice to paragraph","3, those charges shall not be distance-","related."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"728","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1545","location":[["Proposal for a regulation","Article 59 \u2013 paragraph 11"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:44"},"new":["11. The Commission may adopt","guidelines for the application of the","conditions laid down in paragraph 1 of this","Article and to set out the procedure to be","followed for the application of paragraphs","4, 7 8 , 9 and 10 of this Article."],"old":["11. The Commission is empowered to","adopt delegated acts in accordance with","Article 63 concerning the adoption of","guidelines for the application of the","conditions laid down in paragraph 1 of this","Article and to set out the procedure to be","followed for the application of paragraphs","4, 7 8 , 9 and 10 of this Article."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1545","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-261","justification":" In order to improve the consistency of the decisions taken by both the Administrative Board\n and the Board of Regulators in terms of human resources and budget allocated to specific\n tasks, it is preferable that representatives from regulatory authorities be present, on behalf of\n their Member State and on a rotating principle, in the Administrative Board. This proposal\n would also propose a governance scheme closer to the \u201ccommon approach\u201d on the\n decentralised Agencies.","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 4"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:44"},"new":["4. The meetings of the Administrative","Board shall be convened by its Chairman.","The Director shall participate, without the","right to vote, in the deliberations unless the","Administrative Board decides otherwise as","regards the Director. The Administrative","Board shall meet at least twice a year in","ordinary session. It shall also meet at the","initiative of its Chairman, at the request of","the Commission or at the request of at least","a third of its members. The Administrative","Board may invite any person who may","have a relevant opinion to attend its","meetings in the capacity of an observer.","The members of the Administrative Board","may, subject to its rules of procedure, be","assisted by advisers or experts. The","Administrative Board\u2019s secretarial services","shall be provided by the Agency."],"old":["4. The meetings of the Administrative","Board shall be convened by its Chairman.","The Chairman of the Board of Regulators","or the nominee of the Board of","Regulators, and the Director shall","participate, without the right to vote, in the","deliberations unless the Administrative","Board decides otherwise as regards the","Director. The Administrative Board shall","meet at least twice a year in ordinary","session. It shall also meet at the initiative","","of its Chairman, at the request of the","Commission or at the request of at least a","third of its members. The Administrative","Board may invite any person who may","have a relevant opinion to attend its","meetings in the capacity of an observer.","The members of the Administrative Board","may, subject to its rules of procedure, be","assisted by advisers or experts. The","Administrative Board\u2019s secretarial services","shall be provided by the Agency."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"261","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-424","location":[[" Proposal for a regulation","Article 6 \u2013 paragraph 3"]],"meps":[2278],"meta":{"created":"2020-11-15T15:52:08"},"new":["3. Market operators shall be free to","develop products and trading opportunities","that suit market participants' demand and","needs and ensure that all market","participants are able to access the market","individually or through aggregation. They","shall respect the need to accommodate","increasing shares of variable generation","including energy storage as well as","increased demand and energy storage","responsiveness and the advent of new","technologies."],"old":["3. Market operators shall be free to","develop products and trading opportunities","that suit market participants' demand and","needs and ensure that all market","participants are able to access the market","individually or through aggregation. They","shall respect the need to accommodate","increasing shares of variable generation as","well as increased demand responsiveness","and the advent of new technologies."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"424","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Andr\u00e1s Gy\u00fcrk, Gy\u00f6rgy H\u00f6lv\u00e9nyi","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1014","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 1"]],"meps":[23816,124715],"meta":{"created":"2019-07-03T06:30:50"},"new":["1. Member States may introduce","capacity mechanisms, subject to the","provisions of this Article and to the Union","State aid rules."],"old":["1. To address residual concerns that","cannot be eliminated by the measures","pursuant to Article 18(3), Member States","may introduce capacity mechanisms,","subject to the provisions of this Article and","to the Union State aid rules."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1014","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-729","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 1"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:48"},"new":["1. Charges applied by network","operators for access to networks , including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual costs","incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner. In","particular, they shall be applied in a way","which does not discriminate between new","and existing production connected at the","distribution level and new and existing","production connected at the transmission","level, either positively or negatively. They","shall not discriminate against energy","storage and aggregation and shall not","create disincentives for self- generation","and self-consumption using renewable","energy sources and participation in","demand response. Without prejudice to","paragraph 3, those charges shall not be","distance-related."],"old":["1. Charges applied by network","operators for access to networks , including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual costs","incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner. In","particular, they shall be applied in a way","which does not discriminate between","production connected at the distribution","level and production connected at the","","transmission level, either positively or","negatively. They shall not discriminate","against energy storage and shall not create","disincentives for participation in demand","response. Without prejudice to paragraph","3, those charges shall not be distance-","related."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"729","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Theresa Griffin, Jude Kirton-Darling, Clare Moody","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1546","justification":" To achieve the goals and ambitions of the Energy Union, cooperation should be sought with\n appropriate third countries which are physically connected to the EU electricity market. This\n is beneficial for all parties and can help with the Union's security of supply, energy efficiency\n and the transition to a low-carbon energy future.","location":[[" Proposal for a regulation","Article 60 a (new)"]],"meps":[124961,124953,124944],"meta":{"created":"2019-07-03T06:30:44"},"new":["Article 60 a","Cooperation with third countries","In conjunction with this Regulation, the","Commission shall develop mechanisms to","foster cooperation and market integration","with third countries which are physically","connected to the EU electricity market."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1546","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Patrizia Toia","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-262","justification":"19(1) and 19(4) - In order to improve the consistency of the decisions taken by both the\nAdministrative Board and the Board of Regulators in terms of human resources and budget\nallocated to specific tasks, it is preferable that representatives from the BoR be present in the\nAdministrative Board. This proposal would also propose a governance scheme closer to the\n\u201ccommon approach\u201d on the decentralised Agencies.","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 4"]],"meps":[28340],"meta":{"created":"2019-07-03T06:30:44"},"new":["4. The meetings of the Administrative","Board shall be convened by its Chairman.","The Director shall participate, without the","right to vote, in the deliberations unless the","Administrative Board decides otherwise as","regards the Director. The Administrative","Board shall meet at least twice a year in","ordinary session. It shall also meet at the","initiative of its Chairman, at the request of","the Commission or at the request of at least","a third of its members. The Administrative","Board may invite any person who may","have a relevant opinion to attend its","meetings in the capacity of an observer.","The members of the Administrative Board","may, subject to its rules of procedure, be","assisted by advisers or experts. The","Administrative Board\u2019s secretarial services","shall be provided by the Agency."],"old":["4. The meetings of the Administrative","Board shall be convened by its Chairman.","The Chairman of the Board of Regulators","or the nominee of the Board of","Regulators, and the Director shall","participate, without the right to vote, in the","deliberations unless the Administrative","Board decides otherwise as regards the","Director. The Administrative Board shall","meet at least twice a year in ordinary","session. It shall also meet at the initiative","of its Chairman, at the request of the","Commission or at the request of at least a","third of its members. The Administrative","Board may invite any person who may","","have a relevant opinion to attend its","meetings in the capacity of an observer.","The members of the Administrative Board","may, subject to its rules of procedure, be","assisted by advisers or experts. The","Administrative Board\u2019s secretarial services","shall be provided by the Agency."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"262","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Cristian-Silviu Bu\u015foi","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1015","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 1"]],"meps":[38420],"meta":{"created":"2019-07-03T06:30:50"},"new":["1. To address residual concerns that","cannot be eliminated by the measures","pursuant to Article 18(3), Member States","may introduce capacity mechanisms."],"old":["1. To address residual concerns that","cannot be eliminated by the measures","pursuant to Article 18(3), Member States","may introduce capacity mechanisms,","subject to the provisions of this Article","and to the Union State aid rules."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1015","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Pilar del Castillo Vera, Pilar Ayuso, Francesc Gamb\u00fas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-425","location":[[" Proposal for a regulation","Article 6 \u2013 paragraph 3"]],"meps":[28390,4319,125006],"meta":{"created":"2020-11-15T15:52:08"},"new":["3. Market operators shall be free to","propose to the national competent","authority products and trading","opportunities that suit market participants'","demand and needs and ensure that all","market participants are able to access the","market individually or through","aggregation. They shall respect the need to","accommodate increasing shares of variable","generation as well as increased demand","responsiveness and the advent of new","technologies."],"old":["3. Market operators shall be free to","develop products and trading opportunities","that suit market participants' demand and","","needs and ensure that all market","participants are able to access the market","individually or through aggregation. They","shall respect the need to accommodate","increasing shares of variable generation as","well as increased demand responsiveness","and the advent of new technologies."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"425","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Algirdas Saudargas, Jerzy Buzek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1547","justification":" This amendment is needed to ensure the coherence and completeness of the internal logic of\n the regulation and particularly to achieve is main aim: to ensure \u201cwell-functioning,\n integrated electricity markets, which allow non-discriminatory market access for all resource\n providers\u201d as stated in the article 1.\n\n Well-functioning of EU\u2018s internal electricity market can be significantly influenced by import\n of electricity from third countries that compete in the EU\u2018s market on equal basis with\n electricity produced in the EU but is produced in third country under different requirements\n than at the EU (state aid, competition, environment etc.).Commission's proposals address\n only the internal side of the market and do not ensure that there is a level playing field for EU\n power producers vis-a-vis third country power producers. Moreover, there is no reciprocity\n on market access (EU companies cannot trade in third countries while they can do that in the\n EU).\n\n Such situation negatively affects EU electricity internal market, producers\u2019 competitiveness\n and creates difficulties for them to develop competitive electricity generation in the EU.\n Taking this into account there is a need to clarify how third countries access to European\n market is regulated. This would improve predictability for market players and give security\n for EU power producers that equal competitive conditions will be established in the EU\n market.","location":[[" Proposal for a regulation","Article 61 a (new)"]],"meps":[96696],"meta":{"created":"2019-07-03T06:30:44"},"new":["Article 61 a","Third Country participation","1.Third countries may only participate in","the internal electricity market provided","that they have concluded agreements with","the Union whereby they have adopted and","are applying at least:","(a) the main rights and obligations set out","in [Regulation on the internal market for","electricity and the delegated and","implementing acts adopted pursuant to it];","(b) the main rights and obligations set out","in the [Directive on the internal market","for electricity];","(c) the rules on energy state aid control","pursuant to Article 107 to 109 TFEU;","(d) the rules on coordinated supervision","of market integrity and transparency as","set out in Regulation 1227/2001 of the","European Parliament and of the Council","of 25 October 2011 on wholesale energy","market integrity and transparency,","including market implementing acts","adopted pursuant to it;","(e) requirements of Council directive","2009/71/EURATOM of 25 June 2009","establishing a Community framework for","the nuclear safety of nuclear installations","(including Council directive","2014/87/EURATOM of 8 July 2014","amending Directive","2009/71/Euratom);and Council directive","2011/70/EURATOM of 19 July 2011","establishing a Community framework for","the responsible and safe management of","spent fuel and radioactive waste;","(f) environmental rules with relevance for","the power sector; and","(g) rules on administrative enforcement","and judicial oversight over the internal","market cooperation with the EU,","conferring enforcement and judicial","control of the rules of this Regulation and","the delegated and implementing acts","adopted under it either to the Commission","and the European Court of Justice or to a","specific non-domestic enforcement body","and a neutral non-domestic Court or","arbitration body which is independent","from the respective third country.","2.Where no agreement between the Union","and a third country has been concluded","pursuant to paragraph 1 and where","system operation is endangered, Member","States may take necessary actions such as","but not limited to the restriction of","electricity flows from the respective third","country."],"old":[""],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1547","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Morten Helveg Petersen","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-730","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 1"]],"meps":[124872],"meta":{"created":"2019-07-03T06:30:48"},"new":["1. Charges applied by network","operators for access to networks , including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be fair, cost-","reflective, transparent, take into account","the need for network security and","flexibility, recover allowed total cost of","providing the regulated services, and are","applied in a non-discriminatory manner. In","particular, they shall neutrally support","overall system efficiency in the long run","through price signals to consumers and","producers and they shall as far as possible","be applied in a way which does not","discriminate between production connected","at the distribution level and production","connected at the transmission level, either","positively or negatively. They shall not","discriminate against energy storage and","shall not create disincentives for","participation in demand response. Without","prejudice to paragraph 3, those charges","shall not be distance-related."],"old":["1. Charges applied by network","operators for access to networks , including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual costs","incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner. In","particular, they shall be applied in a way","which does not discriminate between","production connected at the distribution","level and production connected at the","transmission level, either positively or","negatively. They shall not discriminate","against energy storage and shall not create","disincentives for participation in demand","response. Without prejudice to paragraph","3, those charges shall not be distance-","related."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"730","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Patrizia Toia","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-263","justification":"In order to improve the consistency of the decisions taken by both the Administrative Board\nand the Board of Regulators in terms of human resources and budget allocated to specific\ntasks, it is preferable that representatives from the BoR be present in the Administrative\nBoard. This proposal would also propose a governance scheme closer to the \u201ccommon\napproach\u201d on the decentralised Agencies.","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 5"]],"meps":[28340],"meta":{"created":"2019-07-03T06:30:44"},"new":["5. Decisions of the Administrative","Board shall be adopted on the basis of a","two thirds majority of the members","present, unless provided otherwise in this","Regulation. Each member of the","Administrative Board or alternate shall","have one vote."],"old":["5. Decisions of the Administrative","Board shall be adopted on the basis of a","simple majority of the members present,","unless provided otherwise in this","Regulation. Each member of the","Administrative Board or alternate shall","have one vote."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"263","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Adam Gierek, Krystyna \u0141ybacka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1016","justification":"Energy supply is also a market mechanism.","meps":[28379,124883],"meta":{"created":"2019-07-03T06:30:51"},"new":["1. To address residual concerns that","cannot be eliminated by the measures","pursuant to Article 18(3), Member States","may introduce capacity mechanisms."],"old":["1. To address residual concerns that","cannot be eliminated by the measures","pursuant to Article 18(3), Member States","may introduce capacity mechanisms,","subject to the provisions of this Article","and to the Union State aid rules."],"orig_lang":"pl","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1016","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Dan Nica, Jos\u00e9 Blanco L\u00f3pez, Peter Kouroumbashev, Zigmantas Bal\u010dytis, Soledad Cabez\u00f3n Ruiz, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-426","location":[["Proposal for a regulation","Article 6 \u2013 paragraph 3"]],"meps":[124784,125044,124857,96680,125041,124699],"meta":{"created":"2020-11-15T15:52:08"},"new":["3. Market operators shall be free to","develop products and trading opportunities","that suit market participants' demand and","needs and ensure that all market","participants are able to access the market","individually or through aggregation. They","shall respect the need to accommodate","increasing shares of variable generation","and storage as well as increased demand","responsiveness and the advent of new","technologies."],"old":["3. Market operators shall be free to","develop products and trading opportunities","that suit market participants' demand and","needs and ensure that all market","participants are able to access the market","individually or through aggregation. They","shall respect the need to accommodate","increasing shares of variable generation as","well as increased demand responsiveness","and the advent of new technologies."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"426","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Barbara Kappel, Lorenzo Fontana, Angelo Ciocca","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-731","justification":" In the Member States charges for generators differ remarkably between member states and\n deteriorate competition between generators. Therefore, the G-Components shall be analysed\n as for their impact on competition and subsequently reduced where necessary.","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 1"]],"meps":[125024,96993,183793],"meta":{"created":"2019-07-03T06:30:48"},"new":["1. Charges applied by network","operators for access to networks, including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual costs","incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner. In","particular, they shall be applied in a way","which does not discriminate between","production connected at the distribution","level and production connected at the","transmission level, either positively or","negatively. Charges for generators (G-","component) shall not differ between","member states. They shall not discriminate","against energy storage and shall not create","disincentives for participation in demand","response. Without prejudice to paragraph","3, those charges shall not be distance-","related."],"old":["1. Charges applied by network","operators for access to networks , including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual costs","incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner. In","particular, they shall be applied in a way","which does not discriminate between","production connected at the distribution","level and production connected at the","transmission level, either positively or","negatively. They shall not discriminate","against energy storage and shall not create","disincentives for participation in demand","response. Without prejudice to paragraph","3, those charges shall not be distance-","related."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"731","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1548","location":[[" Proposal for a regulation","Article 63 \u2013 paragraph 1"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:44"},"new":["1. The power to adopt implementing","acts is conferred on the Commission","subject to the conditions laid down in this","Article."],"old":["1. The power to adopt delegated acts","is conferred on the Commission subject to","the conditions laid down in this Article."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1548","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-264","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 5"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:44"},"new":["5. Decisions of the Administrative","Board shall be adopted on the basis of a","two-thirds majority of the members","present, unless provided otherwise in this","Regulation. Each member of the","Administrative Board or, in his absence an","alternate shall have one vote."],"old":["5. Decisions of the Administrative","Board shall be adopted on the basis of a","simple majority of the members present,","unless provided otherwise in this","Regulation. Each member of the","Administrative Board or alternate shall","have one vote."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"264","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Martina Werner, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-427","location":[["Proposal for a regulation","Article 7 \u2013 paragraph 1"]],"meps":[124826,124739,124735,124699],"meta":{"created":"2020-11-15T15:52:08"},"new":["1. Market operators shall allow","market participants to trade energy as close","to real time as possible and at least up to 15","minutes before real time across all","bidding zones."],"old":["1. Market operators shall allow","market participants to trade energy as close","","to real time as possible and at least up to","the intraday cross-zonal gate closure time","determined in accordance with Article 59","of Regulation (EU) 2015/1222."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"427","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Eva Kaili","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-732","justification":"As demand response, self-generation and self-consumption play a fundamental role in the\ndevelopment of active contribution of consumers in the electricity system. The proposition\nfrom the European Commission sets (in the Renewable Energy Directive) a right for\nEuropean citizens to self-consume and sell their excess production of renewable electricity. In\norder to make this right enforceable, it is essential to guarantee that network charges do not\ncreate disincentives for persons willing to use their right to self-generate and self-consume,\nwhich would in practice exclude the substance of this right.","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 1"]],"meps":[125109],"meta":{"created":"2019-07-03T06:30:48"},"new":["1. Charges applied by network","operators for access to networks , including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual","costs incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner. In","particular, they shall be applied in a way","which does not discriminate between","production connected at the distribution","level and production connected at the","transmission level, either positively or","negatively. They shall not discriminate","against energy storage and aggregation","and shall not create disincentives for self-","generation, self-consumption and for","participation in demand response. Without","prejudice to paragraph 3, those charges","shall not be distance-related."],"old":["1. Charges applied by network","operators for access to networks , including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual costs","incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner. In","particular, they shall be applied in a way","which does not discriminate between","production connected at the distribution","level and production connected at the","transmission level, either positively or","negatively. They shall not discriminate","against energy storage and shall not create","disincentives for participation in demand","response. Without prejudice to paragraph","3, those charges shall not be distance-","related."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"732","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Jerzy Buzek, Janusz Lewandowski, Marian-Jean Marinescu","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1017","justification":"The definition of state aid should be applied in line with the dynamic market-based approach,\nreflecting the fact that capacity-based payments would not create economic advantage,\nbecause they are constituting a remuneration for contributing to the security of supply. In this\nrespect, a capacity mechanism would not constitute a subsidy for generators and demand\nresponse resources, but a fair tool designed to share the responsibility for security of supply\nbetween capacity providers and the TSOs.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 1"]],"meps":[23781,33982],"meta":{"created":"2019-07-03T06:30:51"},"new":["1. To address residual concerns that","cannot be eliminated by the measures","pursuant to Article 18(3), Member States","may introduce capacity mechanisms."],"old":["1. To address residual concerns that","cannot be eliminated by the measures","pursuant to Article 18(3), Member States","may introduce capacity mechanisms,","subject to the provisions of this Article","and to the Union State aid rules."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1017","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1549","justification":"Proposed alternate wording is In line with our arguments on delegated and implementing\nacts. It is necessary to evaluate extent and form of use of delegated acts in all cases proposed\nby the Directive and reflected in the Regulation. From the proposal of the Directive it is not\nclear, what was the rationale behind use of implementing acts (e.g. data format in Article.24\nof the Directive) or in other cases use of delegated (Article 61 on ACER or Article 63 on\nnetwork codes).It is therefore not clear what \u201crule\u201d was used to set which form of act to use\nto specific topics.","location":[["Proposal for a regulation","Article 63 \u2013 paragraph 1"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:44"},"new":["1. The power to adopt implementing","acts is conferred on the Commission","subject to the conditions laid down in this","Article."],"old":["1. The power to adopt delegated acts","is conferred on the Commission subject to","the conditions laid down in this Article."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1549","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-428","justification":" These provisions are necessary for a flexible and efficient market, that can integrate high\n shares of variable renewable energy.","location":[[" Proposal for a regulation","Article 7 \u2013 paragraph 1"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["1. Market operators shall allow","market participants to trade energy as close","to real time as possible and at least up to","the 5 minutes before real time across all","bidding zones"],"old":["1. Market operators shall allow","market participants to trade energy as close","to real time as possible and at least up to","the intraday cross-zonal gate closure time","determined in accordance with Article 59","of Regulation (EU) 2015/1222."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"428","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-265","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 5"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:44"},"new":["5. Decisions of the Administrative","Board shall be adopted on the basis of a","two third simple majority of the members","present, unless provided otherwise in this","Regulation. Each member of the","Administrative Board or alternate shall","have one vote."],"old":["5. Decisions of the Administrative","Board shall be adopted on the basis of a","simple majority of the members present,","unless provided otherwise in this","Regulation. Each member of the","Administrative Board or alternate shall","have one vote."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"265","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-733","meps":[96852],"meta":{"created":"2019-07-03T06:30:48"},"new":["1. Charges applied by network","operators for access to networks , including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual costs","incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner. In","particular, they shall be applied in a way","which does not negatively discriminate","between production connected at the","distribution level and production connected","at the transmission level. They shall not","discriminate against energy storage and","shall not create disincentives for","participation in demand response or","renewables self-consumption. Without","prejudice to paragraph 3, those charges","shall not be distance-related."],"old":["1. Charges applied by network","operators for access to networks , including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual costs","incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner. In","particular, they shall be applied in a way","which does not discriminate between","production connected at the distribution","level and production connected at the","transmission level, either positively or","negatively. They shall not discriminate","against energy storage and shall not create","disincentives for participation in demand","response. Without prejudice to paragraph","3, those charges shall not be distance-","related."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"733","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Marian-Jean Marinescu","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-734","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 1"]],"meps":[33982],"meta":{"created":"2019-07-03T06:30:48"},"new":["1. Charges applied by network","operators for access to networks , including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual","costs incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner. In","particular, they shall be applied in a way","which does not discriminate between","production connected at the distribution","level and production connected at the","transmission level, either positively or","negatively. They shall not discriminate","against energy storage and shall not create","disincentives for participation in demand","response or for self-generation","production. Without prejudice to","paragraph 3, those charges shall not be","distance-related."],"old":["1. Charges applied by network","operators for access to networks , including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual costs","incurred insofar as they correspond to","","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner. In","particular, they shall be applied in a way","which does not discriminate between","production connected at the distribution","level and production connected at the","transmission level, either positively or","negatively. They shall not discriminate","against energy storage and shall not create","disincentives for participation in demand","response. Without prejudice to paragraph","3, those charges shall not be distance-","related."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"734","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1018","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 1"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:51"},"new":["1. To address residual concerns that","cannot be eliminated by the measures","pursuant to Article 18(3), Member States","shall prepare a plan providing for","appropriate measures to address these","concerns, to be implemented within a","maximum period of five years."],"old":["1. To address residual concerns that","cannot be eliminated by the measures","pursuant to Article 18(3), Member States","may introduce capacity mechanisms,","subject to the provisions of this Article","and to the Union State aid rules."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1018","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Pilar del Castillo Vera, Pilar Ayuso, Francesc Gamb\u00fas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-429","location":[[" Proposal for a regulation","Article 7 \u2013 paragraph 1"]],"meps":[28390,4319,125006],"meta":{"created":"2020-11-15T15:52:08"},"new":["1. Market operators shall allow","market participants to trade energy as close","to real time as possible and at least up to","the relevant intraday cross-zonal gate","closure time determined in accordance with","Article 59 of Regulation (EU) 2015/1222."],"old":["1. Market operators shall allow","market participants to trade energy as close","to real time as possible and at least up to","the intraday cross-zonal gate closure time","determined in accordance with Article 59","of Regulation (EU) 2015/1222."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"429","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1550","location":[["Proposal for a regulation","Article 63 \u2013 paragraph 2"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:44"},"new":["2. The power to adopt delegated acts","referred to in Article 31(3), Article 46(4)","and Article 59(11) shall be conferred on","the Commission for an undetermined","period of time from the [OP: please insert","the date of entry into force]."],"old":["2. The power to adopt delegated acts","referred to in Article 31(3), Article 46(4),","Article 55(1), Article 56(1) and (4), and","Article 59(11) shall be conferred on the","","Commission for an undetermined period of","time from the [OP: please insert the date of","entry into force]."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1550","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Pilar del Castillo Vera","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-266","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 5"]],"meps":[28390],"meta":{"created":"2019-07-03T06:30:44"},"new":["5. Decisions of the Administrative","Board shall be adopted on the basis of a","two-thirds majority of the members","present, unless provided otherwise in this","Regulation. Each member of the","Administrative Board or alternate shall","have one vote."],"old":["5. Decisions of the Administrative","","Board shall be adopted on the basis of","a simple majority of the members present,","unless provided otherwise in this","Regulation. Each member of the","Administrative Board or alternate shall","have one vote."],"orig_lang":"es","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"266","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-735","justification":" Grid tariffs have to reflect structural and regional circumstances consumption-dependent.","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 1"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:48"},"new":["1. Charges applied by network","operators for access to networks , including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual costs","incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner.","Grid tariffs should not include unrelated","costs supporting other policy objectives,","such as taxes and levies, as this would","cause distortions in decision on","production, consumption and investment.","They shall not discriminate against energy","storage, particularly not double charging","energy storage and shall not create","disincentives for participation in demand","response. Without prejudice to paragraph","3, those charges shall not be distance-","related."],"old":["1. Charges applied by network","operators for access to networks , including","charges for connection to the networks,","charges for use of networks, and, where","applicable, charges for related network","reinforcements, shall be transparent, take","into account the need for network security","and flexibility and reflect actual costs","incurred insofar as they correspond to","those of an efficient and structurally","comparable network operator and are","applied in a non-discriminatory manner. In","particular, they shall be applied in a way","which does not discriminate between","production connected at the distribution","level and production connected at the","transmission level, either positively or","negatively. They shall not discriminate","against energy storage and shall not create","disincentives for participation in demand","response. Without prejudice to paragraph","","3, those charges shall not be distance-","related."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"735","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-430","location":[["Proposal for a regulation","Article 7 \u2013 paragraph 3"]],"meps":[124813,124796],"meta":{"created":"2020-11-15T15:52:08"},"new":["3. Market operators shall provide","products for trading in day-ahead and","intraday markets which are sufficiently","small in size, with minimum bid sizes of 1","Megawatt or less, to allow for the effective","participation of demand-side response,","energy storage and small-scale renewables.","Market operators shall ensure that energy","communities have a proportionate and","simple access to the market."],"old":["3. Market operators shall provide","products for trading in day-ahead and","intraday markets which are sufficiently","small in size, with minimum bid sizes of 1","Megawatt or less, to allow for the effective","participation of demand-side response,","energy storage and small-scale renewables."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"430","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1551","justification":" Proposed alternate wording is In line with our arguments on delegated and implementing\n acts. It is necessary to evaluate extent and form of use of delegated acts in all cases proposed\n by the Directive and reflected in the Regulation. From the proposal of the Directive it is not\n clear, what was the rationale behind use of implementing acts (e.g. data format in Article.24\n of the Directive) or in other cases use of delegated (Article 61 on ACER or Article 63 on\n network codes).It is therefore not clear what \u201crule\u201d was used to set which form of act to use\n to specific topics.","location":[[" Proposal for a regulation","Article 63 \u2013 paragraph 2"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:44"},"new":["2. The power to adopt implementing","acts referred to in Article 31(3), Article","46(4), Article 55(1), Article 56(1) and (4),","and Article 59(11) shall be conferred on","the Commission for an undetermined","period of time from the [OP: please insert","the date of entry into force]."],"old":["2. The power to adopt delegated acts","referred to in Article 31(3), Article 46(4),","Article 55(1), Article 56(1) and (4), and","Article 59(11) shall be conferred on the","Commission for an undetermined period of","time from the [OP: please insert the date of","entry into force]."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1551","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1019","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 1"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:51"},"new":["1. To address residual concerns that","cannot be eliminated by the measures","pursuant to Article 18(3), Member States","shall prepare a plan providing for","appropriate measures to address these","concerns, to be implemented within a","maximum period of five years."],"old":["1. To address residual concerns that","cannot be eliminated by the measures","pursuant to Article 18(3), Member States","may introduce capacity mechanisms,","subject to the provisions of this Article","and to the Union State aid rules."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1019","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-431","justification":" Market rules shall enable involvement of consumers, local communities or cooperatives and\n must be adapted to their characteristics and capabilities.","location":[["Proposal for a regulation","Article 7 \u2013 paragraph 3"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["3. Market operators shall provide","products for trading in day-ahead and","intraday markets which are sufficiently","small in size, with minimum bid sizes of 1","Megawatt or less, to allow for the effective","participation of demand-side response,","energy storage and small-scale renewables.","Market operators shall ensure that local","communities have a proportionate and","simple access to the market."],"old":["3. Market operators shall provide","products for trading in day-ahead and","intraday markets which are sufficiently","small in size, with minimum bid sizes of 1","Megawatt or less, to allow for the effective","participation of demand-side response,","energy storage and small-scale renewables."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"431","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-736","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 2"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:48"},"new":["2. Tariffs shall grant appropriate","incentives to transmission and distribution","system operators, over both the short and","long term, to increase efficiencies,","including energy efficiency, foster market","integration, security of supply and global","competitiveness, and support investments","and the related research activities. Tariffs","should avoid directly or indirectly","punishing energy storage, demand-side","response or self-generation."],"old":["2. Tariffs shall grant appropriate","incentives to transmission and distribution","system operators, over both the short and","long term, to increase efficiencies,","including energy efficiency, foster market","integration and security of supply, and","support investments and the related","research activities."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"736","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-267","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 5"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:44"},"new":["5. Decisions of the Administrative","Board shall be adopted on the basis of a","two thirds majority of the members","present, unless provided otherwise in this","Regulation. Each member of the","Administrative Board or alternate shall","have one vote."],"old":["5. Decisions of the Administrative","Board shall be adopted on the basis of a","simple majority of the members present,","unless provided otherwise in this","Regulation. Each member of the","Administrative Board or alternate shall","have one vote."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"267","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1552","location":[[" Proposal for a regulation","Article 63 \u2013 paragraph 2"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:44"},"new":["2. The power to adopt implementing","acts referred to in Article 31(3), Article","46(4), Article 55(1), Article 56(1) and (4),","and Article 59(11) shall be conferred on","the Commission for an undetermined","period of time from the [OP: please insert","the date of entry into force]."],"old":["2. The power to adopt delegated acts","referred to in Article 31(3), Article 46(4),","Article 55(1), Article 56(1) and (4), and","Article 59(11) shall be conferred on the","","Commission for an undetermined period of","time from the [OP: please insert the date of","entry into force]."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1552","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1020","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 1"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:51"},"new":["1. To address residual concerns that","cannot be eliminated economically by the","measures pursuant to Article 18(3),","Member States may introduce capacity","mechanisms, subject to the provisions of","this article and to Union State aid rules."],"old":["1. To address residual concerns that","cannot be eliminated by the measures","pursuant to Article 18(3), Member States","may introduce capacity mechanisms,","","subject to the provisions of this Article and","to the Union State aid rules."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1020","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-432","justification":" The emergence of new transaction technologies, such as blockchain, will make bid sizes\n increasingly small. Keeping the threshold as low as possible will ensure that new players\n bidding small loads are able to participate in the market.","location":[[" Proposal for a regulation","Article 7 \u2013 paragraph 3"]],"meps":[90110],"meta":{"created":"2020-11-15T15:52:08"},"new":["3. Market operators shall provide","products for trading in day-ahead and","intraday markets which are sufficiently","small in size, with minimum bid sizes of 1","Kilowatt or more, to allow for the effective","participation of demand-side response,","energy storage and small-scale renewables,","including directly by customers."],"old":["3. Market operators shall provide","products for trading in day-ahead and","intraday markets which are sufficiently","small in size, with minimum bid sizes of 1","Megawatt or less, to allow for the effective","participation of demand-side response,","energy storage and small-scale renewables."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"432","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Barbara Kappel, Lorenzo Fontana, Angelo Ciocca","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-268","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 5"]],"meps":[125024,96993,183793],"meta":{"created":"2019-07-03T06:30:44"},"new":["5. Decisions of the Administrative","Board shall be adopted on the basis of a","two thirds majority of the members","present, unless provided otherwise in this","Regulation. Each member of the","Administrative Board or alternate shall","have one vote."],"old":["5. Decisions of the Administrative","Board shall be adopted on the basis of a","simple majority of the members present,","unless provided otherwise in this","Regulation. Each member of the","Administrative Board or alternate shall","have one vote."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"268","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1553","location":[["Proposal for a regulation","Article 63 \u2013 paragraph 3"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:44"},"new":["3. The delegation of power referred to","in Article 31(3), Article 46(4), Article","55(1), Article 56(1) and (4), and Article","59(11) shall be conferred on the","Commission for a period of five years","from [the date of entry into force of this","Regulation]. The Commission shall draw","up a report in respect of the delegation of","power not later than nine months before","the end of the five-year period. The","delegation of power shall be tacitly","extended for periods of an identical","duration, unless the European Parliament","or the Council opposes such extension not","later than three months before the end of","each period."],"old":["3. The delegation of power referred to","in Article 31(3), Article 46(4), Article","55(1), Article 56(1) and (4), and Article","59(11) may be revoked at any time by the","European Parliament or by the Council.","A decision to revoke shall put an end to","the delegation of power specified in that","decision. It shall take effect on the day","following the publication of the decision","in the Official Journal of the European","Union or at a later date specified therein.","It shall not affect the validity of any","delegated act already in force."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1553","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Marian-Jean Marinescu","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-737","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 2"]],"meps":[33982],"meta":{"created":"2019-07-03T06:30:48"},"new":["2. Tariffs shall grant appropriate","incentives to transmission and distribution","system operators, over both the short and","long term, to increase efficiencies,","including energy efficiency, foster market","integration and security of supply, and","support investments and the related","research activities. Tariffs shall not create","disincentives for energy storage, demand","response or self-generation production."],"old":["2. Tariffs shall grant appropriate","incentives to transmission and distribution","system operators, over both the short and","long term, to increase efficiencies,","including energy efficiency, foster market","integration and security of supply, and","","support investments and the related","research activities."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"737","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Patrizia Toia","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-433","justification":"The emergence of new transaction technologies, such as blockchain, will make bid sizes\nincreasingly small. Keeping the threshold as low as possible will ensure that new players\nbidding small loads are to participate in the market","location":[[" Proposal for a regulation","Article 7 \u2013 paragraph 3"]],"meps":[28340],"meta":{"created":"2020-11-15T15:52:08"},"new":["3. Market operators shall provide","products for trading in day-ahead and","intraday markets which are sufficiently","small in size, with minimum bid sizes of 1","Megawatt or less, to allow for the effective","participation of demand-side response,","energy storage and small-scale renewables","including directly by customers."],"old":["3. Market operators shall provide","products for trading in day-ahead and","intraday markets which are sufficiently","small in size, with minimum bid sizes of 1","Megawatt or less, to allow for the effective","participation of demand-side response,","energy storage and small-scale renewables."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"433","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1554","location":[["Proposal for a regulation","Article 63 \u2013 paragraph 3"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:44"},"new":["The delegation of power referred to","in Article 31(3), Article 46(4) and Article","59(11) may be revoked at any time by the","European Parliament or by the Council. A","decision to revoke shall put an end to the","delegation of power specified in that","decision. It shall take effect on the day","following the publication of the decision in","the Official Journal of the European Union","or at a later date specified therein. It shall","not affect the validity of any delegated act","already in force."],"old":["3. The delegation of power referred to 3.","in Article 31(3), Article 46(4), Article","55(1), Article 56(1) and (4), and Article","59(11) may be revoked at any time by the","","European Parliament or by the Council. A","decision to revoke shall put an end to the","delegation of power specified in that","decision. It shall take effect on the day","following the publication of the decision in","the Official Journal of the European Union","or at a later date specified therein. It shall","not affect the validity of any delegated act","already in force."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1554","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Eugen Freund","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-269","justification":" The Administrative Board and the Board of Regulators should continue to act by a two-thirds\n majority, as is the case under the currently applicable Agency Regulation.","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 5"]],"meps":[125018],"meta":{"created":"2019-07-03T06:30:44"},"new":["5. Decisions of the Administrative","Board shall be adopted on the basis of a","two-thirds majority of the members","present, unless provided otherwise in this","Regulation. Each member of the","Administrative Board or alternate shall","have one vote."],"old":["5. Decisions of the Administrative","Board shall be adopted on the basis of a","simple majority of the members present,","unless provided otherwise in this","Regulation. Each member of the","Administrative Board or alternate shall","have one vote."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"269","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Kaja Kallas, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar, Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-738","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 2"]],"meps":[124697,124989,124872,125026,90110],"meta":{"created":"2019-07-03T06:30:48"},"new":["2. Tariffs shall grant appropriate","incentives to transmission and distribution","system operators, over both the short and","long term, to increase efficiencies,","including energy efficiency, foster market","integration and security of supply, and","support efficient investments, in particular","in digitalisation, flexibility services and","interconnections, and the related research","activities ."],"old":["2. Tariffs shall grant appropriate","incentives to transmission and distribution","system operators, over both the short and","long term, to increase efficiencies,","including energy efficiency, foster market","integration and security of supply, and","support investments and the related","research activities."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"738","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1021","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 1 \u2013 subparagraph 1 (new)"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:51"},"new":["The plan under paragraph 1 shall aim at","structurally and permanently addressing a","resource adequacy concern via one or","more of the following:","a) additional renewable energy generation","capacity","b) energy efficiency","c) demand side response","d) storage","e) interconnection"],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1021","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Martina Werner, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-434","location":[["Proposal for a regulation","Article 7 \u2013 paragraph 3"]],"meps":[124826,124739,124735,124699],"meta":{"created":"2020-11-15T15:52:08"},"new":["3. Market operators shall provide","products for trading in day-ahead and","intraday markets which are sufficiently","small in size, with minimum bid sizes of","100 Kilowatt or less, to allow for the","effective participation of demand-side","response, energy storage and small-scale","renewables."],"old":["3. Market operators shall provide","products for trading in day-ahead and","intraday markets which are sufficiently","small in size, with minimum bid sizes of 1","Megawatt or less, to allow for the effective","participation of demand-side response,","energy storage and small-scale renewables."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"434","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1555","justification":" Proposed alternate wording is In line with our arguments on delegated and implementing\n acts. It is necessary to evaluate extent and form of use of delegated acts in all cases proposed\n by the Directive and reflected in the Regulation. From the proposal of the Directive it is not\n clear, what was the rationale behind use of implementing acts (e.g. data format in Article.24\n of the Directive) or in other cases use of delegated (Article 61 on ACER or Article 63 on\n network codes).It is therefore not clear what \u201crule\u201d was used to set which form of act to use\n to specific topics.","location":[[" Proposal for a regulation","Article 63 \u2013 paragraph 4"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:44"},"new":["4. Before adopting an implementing","act, the Commission shall consult experts","designated by each Member State in","accordance with the principles laid down in","the Interinstitutional Agreement on Better","Law-Making of 13 April 2016."],"old":["4. Before adopting a delegated act,","the Commission shall consult experts","designated by each Member State in","accordance with the principles laid down in","the Interinstitutional Agreement on Better","Law-Making of 13 April 2016."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1555","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Werner Langen, Markus Pieper, Kri\u0161j\u0101nis Kari\u0146\u0161","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-270","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 5"]],"meps":[1928,28224,96901],"meta":{"created":"2019-07-03T06:30:44"},"new":["5. Decisions of the Administrative","Board shall be adopted on the basis of a","two-thirds majority of the members","present, unless provided otherwise in this","Regulation. Each member of the","Administrative Board or alternate shall","have one vote."],"old":["5. Decisions of the Administrative","Board shall be adopted on the basis of a","simple majority of the members present,","unless provided otherwise in this","Regulation. Each member of the","Administrative Board or alternate shall","have one vote."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"270","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1022","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 1 \u2013 point 1 (new)"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:51"},"new":["(1) When designing capacity","mechanisms, Member States shall include","an exit clause, a provision allowing for","efficient phase-out of a capacity","mechanism in case the resource adequacy","assessment proves that the adequacy","concern is not present anymore."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1022","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-739","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 2"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:48"},"new":["2. Tariffs shall grant appropriate","incentives to transmission and distribution","system operators, over both the short and","long term, to increase efficiencies,","including energy efficiency, foster market","integration, including from renewable","sources, and security of supply, and","support investments and the related","research activities."],"old":["2. Tariffs shall grant appropriate","incentives to transmission and distribution","system operators, over both the short and","long term, to increase efficiencies,","including energy efficiency, foster market","integration and security of supply, and","support investments and the related","research activities.",""],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"739","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Ashley Fox","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-435","location":[["Proposal for a regulation","Article 7 \u2013 paragraph 4"]],"meps":[96957],"meta":{"created":"2020-11-15T15:52:08"},"new":["deleted"],"old":["4. By 1 January 2025, the imbalance","settlement period shall be 15 minutes in","all control areas."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"435","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1556","location":[[" Proposal for a regulation","Article 63 \u2013 paragraph 4"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:44"},"new":["4. Before adopting a implementing","act, the Commission shall consult experts","designated by each Member State in","accordance with the principles laid down in","the Interinstitutional Agreement on Better","Law-Making of 13 April 2016."],"old":["4. Before adopting a delegated act, the","Commission shall consult experts","designated by each Member State in","accordance with the principles laid down in","the Interinstitutional Agreement on Better","Law-Making of 13 April 2016."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1556","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski, Edward Czesak, Hans-Olaf Henkel","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-271","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 5"]],"meps":[124891,132925,124823],"meta":{"created":"2019-07-03T06:30:44"},"new":["5. Decisions of the Administrative","Board shall be adopted on the basis of a","two-thirds majority of the members","present, unless provided otherwise in this","Regulation. Each member of the","Administrative Board or alternate shall","have one vote."],"old":["5. Decisions of the Administrative","Board shall be adopted on the basis of a","simple majority of the members present,","unless provided otherwise in this","Regulation. Each member of the","Administrative Board or alternate shall","have one vote."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"271","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-740","justification":" In order to promote the development of an internal energy market that fully achieves its\n renewable energy potential, tariffs should incentivise transmission and distribution system\n operators to foster the integration of energy from renewable sources more explicitly.","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 2"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:48"},"new":["2. Tariffs shall grant appropriate","incentives to transmission and distribution","system operators, over both the short and","long term, to increase efficiencies,","including energy efficiency, foster market","integration, including from renewable","sources, and security of supply, and","support investments and the related","research activities."],"old":["2. Tariffs shall grant appropriate","incentives to transmission and distribution","system operators, over both the short and","long term, to increase efficiencies,","including energy efficiency, foster market","integration and security of supply, and","support investments and the related","research activities."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"740","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1023","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 1 \u2013 point 2 (new)"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:51"},"new":["(2) Pending the implementation of the","plan under paragraph 1, Member States","may introduce capacity mechanisms,","subject to the provisions of this Article","and to the Union state aid rules."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1023","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Miapetra Kumpula-Natri","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-436","justification":" The forced change to a 15 minute settlement period would penalise early adopters of smart\n meters such as Finland. A majority of Finnish smart meters were adopted in 2011-2013 with\n a one hour settlement period and their renewal before the end of their projected life cycle of\n 15 years is not justifiable.","location":[[" Proposal for a regulation","Article 7 \u2013 paragraph 4"]],"meps":[124735],"meta":{"created":"2020-11-15T15:52:08"},"new":["4. By 1 January 2025, the imbalance","settlement period shall be 15 minutes in all","control areas.","The relevant regulatory authority may","issue a derogation granted at its own","initiative. Where the relevant regulatory","authority grants a derogation, it shall","specify its duration. The derogation may","be granted only once and for a maximum","period of four years."],"old":["4. By 1 January 2025, the imbalance","settlement period shall be 15 minutes in all","control areas."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"436","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1557","location":[["Proposal for a regulation","Article 63 \u2013 paragraph 5"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:44"},"new":["5. As soon as it adopts a delegated act,","the Commission shall notify it","simultaneously to the European Parliament,","to the Council and the Official Journal of","the European Union."],"old":["5. As soon as it adopts a delegated act,","the Commission shall notify it","simultaneously to the European Parliament","and to the Council."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1557","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Massimiliano Salini, Lara Comi, Fulvio Martusciello, Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-272","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 5"]],"meps":[125670,96775,124828,36392],"meta":{"created":"2019-07-03T06:30:45"},"new":["5. Decisions of the Administrative","Board shall be adopted on the basis of a","two-thirds majority of the members","present, unless provided otherwise in this","Regulation. Each member of the","Administrative Board or alternate shall","have one vote."],"old":["5. Decisions of the Administrative","Board shall be adopted on the basis of a","simple majority of the members present,","unless provided otherwise in this","Regulation. Each member of the","Administrative Board or alternate shall","have one vote."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"272","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Eugen Freund, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-741","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 2"]],"meps":[124826,124870,124739,124735,125018,124699,125041,125044,124784],"meta":{"created":"2019-07-03T06:30:48"},"new":["2. Tariffs shall grant appropriate","incentives to transmission and distribution","system operators, over both the short and","long term, to increase efficiencies,","including energy efficiency and","strengthening digitalisation, foster market","integration and security of supply, and","support investments and the related","research activities."],"old":["2. Tariffs shall grant appropriate","incentives to transmission and distribution","system operators, over both the short and","long term, to increase efficiencies,","including energy efficiency, foster market","integration and security of supply, and","support investments and the related","","research activities."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"741","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1024","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 1 \u2013 point 3 (new)"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:51"},"new":["(3) When designing capacity","mechanisms, Member States shall","prioritise resources in accordance with","the social, economic and environmental","benefits they provide."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1024","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-437","location":[[" Proposal for a regulation","Article 7 \u2013 paragraph 4"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["4. By 1 January 2022, the imbalance","settlement period shall be 15 minutes in all","control areas while ensuring that all","boundaries of market time unit shall","coincide with boundaries of the imbalance","settlement period."],"old":["4. By 1 January 2025, the imbalance","settlement period shall be 15 minutes in all","control areas."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"437","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1558","justification":" Proposed alternate wording is In line with our arguments on delegated and implementing\n acts. It is necessary to evaluate extent and form of use of delegated acts in all cases proposed\n by the Directive and reflected in the Regulation. From the proposal of the Directive it is not\n clear, what was the rationale behind use of implementing acts (e.g. data format in Article.24\n of the Directive) or in other cases use of delegated (Article 61 on ACER or Article 63 on\n network codes).It is therefore not clear what \u201crule\u201d was used to set which form of act to use\n to specific topics.","location":[["Proposal for a regulation","Article 63 \u2013 paragraph 5"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:44"},"new":["5. As soon as it adopts an","implementing act, the Commission shall","notify it simultaneously to the European","Parliament and to the Council."],"old":["5. As soon as it adopts a delegated","act, the Commission shall notify it","simultaneously to the European Parliament","and to the Council."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1558","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-273","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 5"]],"meps":[36392],"meta":{"created":"2019-07-03T06:30:45"},"new":["5. Decisions of the Administrative","Board shall be adopted on the basis of a","two thirds majority of the members","present, unless provided otherwise in this","Regulation. Each member of the","Administrative Board or alternate shall","have one vote"],"old":["5. Decisions of the Administrative","Board shall be adopted on the basis of a","simple majority of the members present,","","unless provided otherwise in this","Regulation. Each member of the","Administrative Board or alternate shall","have one vote."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"273","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-742","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 2"]],"meps":[90110],"meta":{"created":"2019-07-03T06:30:49"},"new":["2. Tariffs shall grant appropriate","incentives to transmission and distribution","system operators, over both the short and","long-term, to increase efficiencies,","including energy efficiency and energy","storage , foster market integration and","security of supply, and support investments","and the related research activities."],"old":["2. Tariffs shall grant appropriate","incentives to transmission and distribution","system operators, over both the short and","long term, to increase efficiencies,","including energy efficiency, foster market","integration and security of supply, and","support investments and the related","research activities."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"742","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1025","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 1 a (new)"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:51"},"new":["1a. The plan under paragraph 1 shall","aim at structurally and permanently","addressing a resource adequacy concern,","in particular by planning support for, and","investments in:","a) additional renewable energy generation","capacity;","b) Energy efficiency;","c) Demand side response;","d) Storage;","e) Interconnection."],"old":[""],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1025","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Henna Virkkunen","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-438","justification":"The proposal is welcomed, but there might be adaptation costs for some Member States. A\ntransition will be needed for e.g. Member States where smart metering is systematically rolled\nout.","location":[["Proposal for a regulation","Article 7 \u2013 paragraph 4"]],"meps":[124726],"meta":{"created":"2020-11-15T15:52:08"},"new":["4. By 1 January 2025, the imbalance","settlement period shall be 15 minutes in all","control areas. The relevant regulatory","authority may issue a derogation. The","derogation may be for a maximum of 4","years."],"old":["4. By 1 January 2025, the imbalance","settlement period shall be 15 minutes in all","control areas."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"438","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1559","location":[[" Proposal for a regulation","Article 63 \u2013 paragraph 5"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:45"},"new":["5. As soon as it adopts a","implementing act, the Commission shall","notify it simultaneously to the European","Parliament and to the Council."],"old":["5. As soon as it adopts a delegated","act, the Commission shall notify it","simultaneously to the European Parliament","and to the Council."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1559","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Neoklis Sylikiotis, Sofia Sakorafa","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-274","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 5"]],"meps":[124689,125091],"meta":{"created":"2019-07-03T06:30:45"},"new":["5. Decisions of the Administrative","Board shall be adopted on the basis of two-","thirds majority of the members present,","unless provided otherwise in this","Regulation. Each member of the","Administrative Board or alternate shall","have one vote."],"old":["5. Decisions of the Administrative","Board shall be adopted on the basis of a","simple majority of the members present,","unless provided otherwise in this","Regulation. Each member of the","Administrative Board or alternate shall","have one vote."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"274","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Werner Langen","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1026","justification":"This regulation should set the design principles for capacity mechanisms in order to ensure a\ncoordinated and European approach.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 1 a (new)"]],"meps":[1928],"meta":{"created":"2019-07-03T06:30:51"},"new":["-1 a. Capacity mechanisms may be","introduced only where they are designed","to be: market-based, transparent,","technologically neutral and open."],"orig_lang":"de","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1026","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Pilar del Castillo Vera, Pilar Ayuso, Francesc Gamb\u00fas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-743","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 2"]],"meps":[28390,4319,125006],"meta":{"created":"2019-07-03T06:30:49"},"new":["2. Tariffs shall cover investment costs","of transmission and distribution networks","as well as their operation and","maintenance carried out by an efficient","and well-managed company. These costs","will include incentives to increase","efficiencies, including energy efficiency,","and quality and reduce losses."],"old":["2. Tariffs shall grant appropriate","incentives to transmission and distribution","system operators, over both the short and","long term, to increase efficiencies,","including energy efficiency, foster market","integration and security of supply, and","support investments and the related","research activities."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"743","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Pilar del Castillo Vera, Pilar Ayuso, Francesc Gamb\u00fas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-439","location":[["Proposal for a regulation","Article 7 \u2013 paragraph 4"]],"meps":[28390,4319,125006],"meta":{"created":"2020-11-15T15:52:08"},"new":["4. By 1 January 2025, the imbalance","settlement period shall be 15 minutes in all","control areas for Member States that have","reached a 10% level of interconnection."],"old":["4. By 1 January 2025, the imbalance","settlement period shall be 15 minutes in all","control areas."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"439","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-275","justification":"In order to improve the consistency of the decisions taken by both the Administrative Board\nand the Board of Regulators in terms of human resources and budget allocated to specific\ntasks, it is preferable that representatives from regulatory authorities be present, on behalf of\ntheir Member State and on a rotating principle, in the Administrative Board. This proposal\nwould also propose a governance scheme closer to the \u201ccommon approach\u201d on the\ndecentralised Agencies.","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 6 \u2013 point b"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:45"},"new":["(b) the arrangements governing the","rotation applicable to the renewal of the","members of the Administrative Board who","are appointed by the Board of Regulators","and the Council so as to ensure a balanced","participation of regulatory authorities and","Member States over time."],"old":["(b) the arrangements governing the","rotation applicable to the renewal of the","members of the Administrative Board who","are appointed by the Council so as to","ensure a balanced participation of Member","States over time."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"275","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1560","location":[[" Proposal for a regulation","Article 63 \u2013 paragraph 6"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:45"},"new":["6. A delegated act adopted pursuant to","Article 31(3), Article 46(4) and Article","59(11) shall enter into force only if no","objection has been expressed either by the","European Parliament or by the Council","within a period of two months of","notification of that act to the European","Parliament and the Council or if, before the","expiry of that period, the European","Parliament and the Council have both","informed the Commission that they will","not object. That period shall be extended","by two months at the initiative of the","European Parliament or of the Council."],"old":["6. A delegated act adopted pursuant to","Article 31(3), Article 46(4), Article 55(1),","Article 56(1) and (4), and Article 59(11)","shall enter into force only if no objection","has been expressed either by the European","Parliament or by the Council within a","period of two months of notification of that","act to the European Parliament and the","Council or if, before the expiry of that","period, the European Parliament and the","Council have both informed the","Commission that they will not object. That","period shall be extended by two months at","","the initiative of the European Parliament or","of the Council."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1560","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1027","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 1 b (new)"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:51"},"new":["1b. Pending the implementation of the","plan under paragraph 1, Member States","may introduce capacity mechanisms,","subject to the provisions of this Article","and to the Union State aid rules."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1027","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-276","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 7"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:45"},"new":["deleted"],"old":["7. A member of the Administrative","Board shall not be a member of the Board","of Regulators."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"276","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-440","justification":" The date of 1 January 2015 must be maintained as proposed by the European Commission in\n order to ensure a real cost-efficient harmonization.","location":[["Proposal for a regulation","Article 7 \u2013 paragraph 4"]],"meps":[1985],"meta":{"created":"2020-11-15T15:52:08"},"new":["4. By 1 January 2025, the imbalance","settlement period shall be 15 minutes in all","control areas, in order to ensure a cost","efficient harmonization."],"old":["4. By 1 January 2025, the imbalance","settlement period shall be 15 minutes in all","","control areas."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"440","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Flavio Zanonato","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1028","justification":" The establishment of an emissions performance standard goes hand in hand with the set in\n place of realistically ambitious thresholds.","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 2"]],"meps":[124800],"meta":{"created":"2019-07-03T06:30:51"},"new":["2. Capacity mechanisms in the form","of strategic reserves with capacities held","outside the market shall:","(a) be only dispatched in case day-ahead","and intraday markets have failed to clear","and transmission system operators have","exhausted their balancing resources to","establish an equilibrium between demand","and supply;","(b) ensure that during periods where","strategic reserves were dispatched,","imbalances are settled at least at the","technical price limit applied by the market","operators pursuant to Article 9.","(c) be open also for generation capacity","emitting 450 gr CO2/kWh or more to","allow for a fair transition;","(d) not allow capacity providers that go in","the strategic reserve to return to the","market."],"old":["2. Where a Member State wishes to","implement a capacity mechanism, it shall","consult on the proposed mechanism at","least with its electrically connected","neighbouring Member States."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1028","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-277","justification":"In order to improve the consistency of the decisions taken by both the Administrative Board\nand the Board of Regulators in terms of human resources and budget allocated to specific\ntasks, it is preferable that representatives from regulatory authorities be present, on behalf of\ntheir Member State and on a rotating principle, in the Administrative Board. This proposal\nwould also propose a governance scheme closer to the \u201ccommon approach\u201d on the\ndecentralised Agencies.","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 7"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:45"},"new":["deleted"],"old":["7. A member of the Administrative","Board shall not be a member of the Board","of Regulators."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"277","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-744","justification":" This amendment is intrinsically linked to other amendments tabled to provisions which have\n been modified by the Commission","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 3"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:49"},"new":["3. Where appropriate, the level of the","tariffs applied to producers and/or","consumers shall provide locational signals","at Union level, and take into account the","amount of network losses and congestion","caused, and investment costs and benefits","for infrastructure and the system. It is not","appropriate to apply locational signals for","active consumers who cannot vary the","location of their households."],"old":["3. Where appropriate, the level of the","tariffs applied to producers and/or","consumers shall provide locational signals","at Union level, and take into account the","amount of network losses and congestion","caused, and investment costs for","infrastructure."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"744","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1561","justification":" This amendment is indispensable in order to achieve the objectives of the internal energy\n market by having a level-playing field with third countries\u2019 power producers that produce\n electricity under different requirements than those of the EU (environmental protection,\n internal market, competition, state aid etc.) and/or where there is no reciprocity on market\n access (EU companies cannot trade in third countries while they can do that in the EU).Such\n situation negatively affects EU electricity producers\u2019 competitiveness and creates difficulties\n for them to develop competitive renewable electricity generation in the EU. This Amendment\n sets thus out provisions for third country participation to the internal electricity market that\n are linked to provisions stemming from this Regulation, the Electricity Directive and different\n relevant provisions of Union law to which EU internal market participants are bound.","location":[["Proposal for a regulation","Article 63 a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:45"},"new":["Article 63 a","Third Country participation","Third countries may only participate in","the internal electricity market provided","that they have concluded agreements with","the Union whereby they have adopted and","are applying at least:","(a) the main rights and obligations set out","in [Regulation on the internal market for","electricity and the delegated and","implementing acts adopted pursuant to it];","(b) the main rights and obligations set out","in the [Directive on the internal market","for electricity];","(c) the rules on energy state aid control","pursuant to Article 107 to 109 TFEU;","(d) the rules on coordinated supervision","of market integrity and transparency as","set out in Regulation 1227/2001 of the","European Parliament and of the Council","of 25 October 2011 on wholesale energy","market integrity and transparency,","including market implementing acts","adopted pursuant to it;","(e) requirements of Council directive","2009/71/EURATOM of 25 June 2009","establishing a Community framework for","the nuclear safety of nuclear installations","(including Council","directive2014/87/EURATOM of 8 July","2014 amending Directive","2009/71/Euratom);and Council directive","2011/70/EURATOM of 19 July","2011establishing a Community","framework for the responsible and safe","management of spent fuel and radioactive","waste;","(f) environmental rules with relevance for","the power sector; and","(g) rules on administrative enforcement","and judicial oversight over the internal","market cooperation with the EU,","conferring enforcement and judicial","control of the rules of this Regulation and","the delegated and implementing acts","adopted under it either to the Commission","and the European Court of Justice or to a","specific non-domestic enforcement body","and a neutral non-domestic Court or","arbitration body which is independent","from the respective third country.2.Where","no agreement between the Union and a","third country has been concluded","pursuant to paragraph 1 and where","system operation is endangered, Member","States may take necessary actions such as","but not limited to the restriction of","electricity flows from the respective third","country."],"old":[""],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1561","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Martina Werner, Flavio Zanonato, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula- Natri","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1029","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 2"]],"meps":[124826,124800,124870,124739,124735],"meta":{"created":"2019-07-03T06:30:52"},"new":["2. Capacity mechanisms in the form","of strategic reserves with capacities held","outside the market shall:","(a) be only dispatched in case day-ahead","and intraday markets have failed to clear","and transmission system operators have","exhausted their balancing resources to","establish an equilibrium between demand","and supply;","(b) ensure that during periods where","strategic reserves were dispatched,","imbalances are settled at least at the","technical price limit applied by the market","operators pursuant to Article 9 .","(c) be open also for generation capacity","emitting 550 gr CO2/kWh or more to","allow for a fair transition","(d) not allow capacity providers that go in","the strategic reserve to return to the","market"],"old":["2. Where a Member State wishes to","implement a capacity mechanism, it shall","consult on the proposed mechanism at","least with its electrically connected","neighbouring Member States."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1029","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Davor \u0160krlec on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-278","justification":" There is a need to highlight the need for AB members to be fully independent and actin the\n interest of the Union as a whole.","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 8"]],"meps":[124756],"meta":{"created":"2019-07-03T06:30:45"},"new":["8. The members of the Administrative","Board shall undertake to act independently","and objectively in the sole interest of the","Union as a whole and shall neither seek","nor take instructions from the Union","institutions or bodies, from any","government of a Member State or from","any other public or private body. For that","purpose, each member shall make a written","declaration of commitments and a written","declaration of interests indicating either the","absence of any interest which may be","considered prejudicial to his independence","or any direct or indirect interest which","might be considered prejudicial to his","independence. Those declarations shall be","made public annually."],"old":["8. The members of the Administrative","Board shall undertake to act independently","and objectively in the public interest For","that purpose, each member shall make a","written declaration of commitments and a","written declaration of interests indicating","either the absence of any interest which","may be considered prejudicial to his","independence or any direct or indirect","interest which might be considered","prejudicial to his independence. Those","declarations shall be made public annually."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"278","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Kaja Kallas, Fredrick Federley, Morten Helveg Petersen, Angelika Mlinar, Gerben-Jan Gerbrandy","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-441","location":[[" Proposal for a regulation","Article 7 \u2013 paragraph 4"]],"meps":[124697,124989,124872,125026,96940],"meta":{"created":"2020-11-15T15:52:08"},"new":["4. By 1 January 2025, the imbalance","settlement period shall be 15 minutes or","less in all control areas."],"old":["4. By 1 January 2025, the imbalance","settlement period shall be 15 minutes in all","control areas."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"441","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1562","justification":"With regard to new provisions, thresholds and implementation deadlines introduced in a\nrelevant number of Articles of this regulation, as well as the monitoring tasks conferred to the\ndifferent actors, it is necessary to provide a review date of the Regulation to allow for\npossible adaptations and to adequately integrate future developments.","location":[["Proposal for a regulation","Article 64 a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:45"},"new":["Article 64 a","Review","By 1 June 2025, the Commission shall","review and submit a report on the","implementation of this Regulation,","together with a legislative proposal if","appropriate, to the European Parliament","and to the Council."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1562","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1030","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 2"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:52"},"new":["2. Where a Member State wishes to","implement a capacity mechanism, it shall","consult on the proposed mechanism at least","with its electrically connected","neighbouring Member States, the Agency","as well as with all relevant stakeholders,","including with consumer organisations.","Prior to submitting a proposal for a","capacity mechanism to public","consultation, the national regulatory","authority shall assess the impact of the","capacity mechanism on energy prices in","particular to energy prices for household","customers. The impact assessment shall","be published."],"old":["2. Where a Member State wishes to","implement a capacity mechanism, it shall","consult on the proposed mechanism at least","with its electrically connected","neighbouring Member States.",""],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1030","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Dan Nica, Peter Kouroumbashev, Zigmantas Bal\u010dytis, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-745","justification":"This amendment is intrinsically linked to other amendments tabled to provisions which have\nbeen modified by the Commission","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 3"]],"meps":[124784,124857,96680,124699],"meta":{"created":"2019-07-03T06:30:49"},"new":["3. Where appropriate, the level of the","tariffs applied to producers and/or","consumers shall provide locational signals","at Union level, and take into account","investment costs for infrastructure. The","amount of network losses and congestion","caused that exceed the Union average","shall not be recognized as eligible costs","and shall not be included in the","distribution tariffs applied to consumers."],"old":["3. Where appropriate, the level of the","tariffs applied to producers and/or","consumers shall provide locational signals","at Union level, and take into account the","amount of network losses and congestion","caused, and investment costs for","infrastructure."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"745","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Patrizia Toia","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-279","justification":"19(8)The Administrative Board should act independently and objectively in the public interest\nand should not seek or follow political instructions. The independence of the Agency from\npolitical interference is essential for it to perform its function properly and ensure market\nconfidence.","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 8"]],"meps":[28340],"meta":{"created":"2019-07-03T06:30:45"},"new":["8. The members of the Administrative","Board shall undertake to act independently","and objectively in the public interest","without following or seeking any political","instruction. For that purpose, each member","shall make a written declaration of","commitments and a written declaration of","interests indicating either the absence of","any interest which may be considered","prejudicial to his independence or any","direct or indirect interest which might be","considered prejudicial to his independence.","Those declarations shall be made public","annually."],"old":["8. The members of the Administrative","Board shall undertake to act independently","and objectively in the public interest For","","that purpose, each member shall make a","written declaration of commitments and a","written declaration of interests indicating","either the absence of any interest which","may be considered prejudicial to his","independence or any direct or indirect","interest which might be considered","prejudicial to his independence. Those","declarations shall be made public annually."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"279","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Gunnar H\u00f6kmark","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1031","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 2"]],"meps":[28124],"meta":{"created":"2019-07-03T06:30:52"},"new":["2. Where a Member State wishes to","implement a capacity mechanism, it shall","consult on the proposed mechanism at least","with its electrically connected","neighbouring Member States, in particular","with regards to increasing regional","participation and cross-border trade on","market-based terms."],"old":["2. Where a Member State wishes to","implement a capacity mechanism, it shall","consult on the proposed mechanism at least","with its electrically connected","neighbouring Member States."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1031","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-442","location":[[" Proposal for a regulation","Article 7 \u2013 paragraph 4"]],"meps":[124826,124870,124739,124699],"meta":{"created":"2020-11-15T15:52:08"},"new":["4. By 1 January 2021, the imbalance","settlement period shall be 15 minutes in all","control areas."],"old":["4. By 1 January 2025, the imbalance","settlement period shall be 15 minutes in all","control areas."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"442","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1563","location":[["Proposal for a regulation","Article 64 a (new)"]],"meps":[124826,124870,124739,124735,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:45"},"new":["Article 64 a","Revision","The Regulation shall be subject to a","general revision no later than by the end","of 2024."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1563","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Miroslav Poche, Zigmantas Bal\u010dytis, Patrizia Toia, Jeppe Kofod, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-280","justification":" The Administrative Board should act independently and objectively in the public interest and\n should not seek or follow political instructions. The independence of the Agency from political\n interference is vital to perform its main tasks. For this reason, this provision should be\n maintained.","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 8"]],"meps":[124699,96680,28340,124870,124784],"meta":{"created":"2019-07-03T06:30:45"},"new":["8. The members of the Administrative","Board shall undertake to act independently","and objectively in the public interest,","without seeking or following any political","instructions. For that purpose, each","member shall make a written declaration of","commitments and a written declaration of","interests indicating either the absence of","any interest which may be considered","prejudicial to his independence or any","direct or indirect interest which might be","considered prejudicial to his independence.","Those declarations shall be made public","annually."],"old":["8. The members of the Administrative","Board shall undertake to act independently","and objectively in the public interest For","that purpose, each member shall make a","written declaration of commitments and a","written declaration of interests indicating","either the absence of any interest which","may be considered prejudicial to his","independence or any direct or indirect","interest which might be considered","prejudicial to his independence. Those","declarations shall be made public annually."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"280","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1032","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 2"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:52"},"new":["2. Where a Member State wishes to","implement a capacity mechanism, it shall","consult on the proposed mechanism at least","with all interested parties, including","consumer organisations, and its","electrically connected neighbouring","Member States."],"old":["2. Where a Member State wishes to","implement a capacity mechanism, it shall","consult on the proposed mechanism at least","with its electrically connected","neighbouring Member States."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1032","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-746","justification":"This Amendment is intrinsically linked to paragraph 1 of this Article, establishing the\nprinciple that charges shall not be distance related. For system efficiency, locational signals\ncan provide incentives to invest in areas where additional capacity is truly needed. However,\nas active consumers cannot vary the location of their households, locational signals should\nnot be applied to them.","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 3"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:49"},"new":["3. Where appropriate, the level of the","tariffs applied to producers and/or","consumers may provide locational signals,","and take into account the amount of","network losses and congestion caused, and","investment costs and benefits for","infrastructure and the system. It is not","appropriate to apply locational signals for","active consumers."],"old":["3. Where appropriate, the level of the","tariffs applied to producers and/or","consumers shall provide locational signals","at Union level, and take into account the","amount of network losses and congestion","caused, and investment costs for","infrastructure."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"746","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Theresa Griffin, Jude Kirton-Darling, Clare Moody","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-443","justification":"The 15 minute imbalance settlement period has been proposed irrespective of the economic\nimpact within individual Member States and irrespective of the fact that such harmonisation\nis not necessary to allow cross-border trade of electricity. National Regulatory Authorities\nand other parties across Europe invest considerable time and resources in developing\nNetwork Code and Guidelines, and it is important that they are not immediately undermined,\nor adjusted without an informed and structured discussion of the change in question. This\namendment is in line with the agreement reached within Article 53 of the \u2018Guidelines on\nElectricity Balancing\u2019. That Article requires 15 minute harmonisation, but allows exemptions\nwhere cost benefit analyses (undertaken with ACER involvement) are performed.","location":[[" Proposal for a regulation","Article 7 \u2013 paragraph 4 \u2013 point 1 (new)"]],"meps":[124961,124953,124944],"meta":{"created":"2020-11-15T15:52:08"},"new":["(1) The TSOs of a synchronous area","may jointly request an exemption from the","requirement laid down in paragraph 1."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"443","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Patrizia Toia","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1033","justification":"Member States, being the ultimate subjects responsible for Security of Electricity Supply shall\nmonitor resource adequacy within their territory and shall carry out their own adequacy\nassessments and studies upon which they base their decisions whether or not to introduce\ncapacity mechanism in their System. Common rules and EU methodologies for generation\nadequacy assessment are needed.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 2"]],"meps":[28340],"meta":{"created":"2019-07-03T06:30:52"},"new":["2. The decision of a Member State to","implement a capacity mechanism shall be","based on the adequacy assessment","performed by the concerned Member","State in compliance with the EU adequacy","methodology developed by ENTSO-E."],"old":["2. Where a Member State wishes to","implement a capacity mechanism, it shall","consult on the proposed mechanism at","least with its electrically connected","neighbouring Member States."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1033","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Neoklis Sylikiotis, Sofia Sakorafa","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-281","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 8"]],"meps":[124689,125091],"meta":{"created":"2019-07-03T06:30:45"},"new":["8. The members of the Administrative","Board shall undertake to act independently","and objectively in the public interest","without seeking or following any political","instructions. For that purpose, each","member shall make a written declaration of","commitments and a written declaration of","interests indicating either the absence of","any interest which may be considered","prejudicial to his independence or any","direct or indirect interest which might be","considered prejudicial to his independence.","Those declarations shall be made public","annually."],"old":["8. The members of the Administrative","Board shall undertake to act independently","and objectively in the public interest For","that purpose, each member shall make a","written declaration of commitments and a","written declaration of interests indicating","either the absence of any interest which","may be considered prejudicial to his","independence or any direct or indirect","interest which might be considered","prejudicial to his independence. Those","declarations shall be made public annually."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"281","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1564","location":[[" Proposal for a regulation","Annex I"]],"meps":[124891],"meta":{"created":"2019-07-03T06:30:45"},"new":["deleted"],"old":["[...]"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1564","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1034","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 2"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:52"},"new":["2. Where a Member State wishes to","implement a capacity mechanism, it shall","consult on the proposed mechanism with","all interested parties, including with its","electrically connected neighbouring","Member States."],"old":["2. Where a Member State wishes to","implement a capacity mechanism, it shall","consult on the proposed mechanism at","least with its electrically connected","neighbouring Member States."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1034","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-282","location":[[" Proposal for a regulation","Article 19 \u2013 paragraph 8"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:45"},"new":["8. The members of the Administrative","Board shall undertake to act independently","and objectively in the public interest","without seeking or following any political","instruction. For that purpose, each member","shall make a written declaration of","commitments and a written declaration of","interests indicating either the absence of","any interest which may be considered","prejudicial to his independence or any","direct or indirect interest which might be","considered prejudicial to his independence.","Those declarations shall be made public","annually."],"old":["8. The members of the Administrative","Board shall undertake to act independently","and objectively in the public interest For","that purpose, each member shall make a","written declaration of commitments and a","","","written declaration of interests indicating","either the absence of any interest which","may be considered prejudicial to his","independence or any direct or indirect","interest which might be considered","prejudicial to his independence. Those","declarations shall be made public annually."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"282","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Ashley Fox","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-444","location":[["Proposal for a regulation","Article 7 \u2013 paragraph 4 \u2013 point 1 (new)"]],"meps":[96957],"meta":{"created":"2020-11-15T15:52:08"},"new":["(1) By 1 January 2025, the imbalance","settlement period shall be 15 minutes in","all control areas."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"444","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-747","justification":" The concept of locational signal must be based on the principle of subsidiarity. This\n locational signal has an impact on regional development policy. The cost of the network must\n not be a barrier to the installation of consumers and producers.","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 3"]],"meps":[1985],"meta":{"created":"2019-07-03T06:30:49"},"new":["3. Where appropriate, the level of the","tariffs applied to producers and/or","consumers may provide locational signal,","and take into account the amount of","network losses and congestion caused, and","investment costs for infrastructure."],"old":["3. Where appropriate, the level of the","tariffs applied to producers and/or","consumers shall provide locational signals","at Union level, and take into account the","","amount of network losses and congestion","caused, and investment costs for","infrastructure."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"747","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1565","location":[[" Proposal for a regulation","Annex I \u2013 part 2 \u2013 point 2.4 a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:45"},"new":["2.4 a. Coordinated security analysis shall","be performed based on a common system","model in accordance with point 2 and on","a methodology to design coordinated","remedial actions developed by the","transmission system operators of the","relevant system operation region."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1565","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-283","location":[["Proposal for a regulation","Article 19 \u2013 paragraph 8"]],"meps":[36392],"meta":{"created":"2019-07-03T06:30:45"},"new":["8. The members of the Administrative","Board shall undertake to act independently","and objectively in the public interest","without seeking or following any political","instruction. For that purpose, each member","shall make a written declaration of","commitments and a written declaration of","interests indicating either the absence of","any interest which may be considered","prejudicial to his independence or any","direct or indirect interest which might be","considered prejudicial to his independence.","Those declarations shall be made public","annually."],"old":["8. The members of the Administrative","Board shall undertake to act independently","and objectively in the public interest For","that purpose, each member shall make a","written declaration of commitments and a","written declaration of interests indicating","either the absence of any interest which","may be considered prejudicial to his","independence or any direct or indirect","interest which might be considered","prejudicial to his independence. Those","declarations shall be made public annually."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"283","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1035","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 3"]],"meps":[124826,124870,124739,124735,124699,125041,125044],"meta":{"created":"2019-07-03T06:30:52"},"new":["deleted"],"old":["3. Capacity mechanisms shall not","create unnecessary market distortions and","not limit cross-border trade. The amount","of capacity committed in the mechanism","shall not go beyond what is necessary to","address the concern."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1035","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Theresa Griffin, Jude Kirton-Darling, Clare Moody","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-445","justification":" National Regulatory Authorities and other parties across Europe invest considerable time\n and resources in developing Network Code and Guidelines, and it is important that they are\n not immediately undermined, or adjusted without an informed and structured discussion of\n the change in question. The agreement reached within Article 53 of the \u2018Guidelines on\n Electricity Balancing\u2019 allows exemptions where cost benefit analyses (undertaken with ACER\n involvement) are performed.","location":[["Proposal for a regulation","Article 7 \u2013 paragraph 4 \u2013 point 2 (new)"]],"meps":[124961,124953,124944],"meta":{"created":"2020-11-15T15:52:08"},"new":["(2) Where the relevant regulatory","authorities of a synchronous area grant","an exemption from the requirement laid","down in paragraph 4 upon a joint request","of the TSOs in the concerned","synchronous area or at their own","initiative, they shall perform, in","cooperation with the Agency and at least","every three years, a cost-benefit analysis","concerning the harmonisation of the","imbalance settlement period within and","between synchronous areas."],"old":[""],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"445","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-284","justification":" This proposal aims at defining a governance scheme closer to the \u201ccommon approach\u201d on\n the decentralised Agencies with an administrative board composed of a subset of the Board of\n regulators focusing on human resources and budget issues. The proposal is moreover aligned\n with similar pro-visions in ESMA Regulation.","location":[["Proposal for a regulation","Article 20 \u2013 paragraph 1 \u2013 point a"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:45"},"new":["deleted"],"old":["(a) after having consulted the Board","of Regulators and obtained its favourable","opinion in accordance with Article 23(b),","appoint the Director in accordance with","Article 24(2) and where relevant extend","their term of office or remove them from","office."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"284","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Kathleen Van Brempt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1036","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 3"]],"meps":[5729],"meta":{"created":"2019-07-03T06:30:52"},"new":["3. Capacity mechanisms shall not","create unnecessary market distortions,","further distortions that would increase the","costs of the decarbonisation, hinder the","objectives set in the Renewable Energy","Directive, not limit cross-border trade and","shall be non-discriminatory and open to","all generation technologies,","interconnection capacities, demand-side","response resources, storage and energy","efficiency. The amount of capacity","committed in the mechanism shall not go","beyond what is necessary to address the","concern. Capacity mechanisms shall be","designed in the least intrusive way","possible, the costs shall be fairly","distributed and shall not create","unnecessary burden especially to","consumers in fuel poverty.","Generation capacity providers shall be","selected on the basis of transparent","criteria, including flexibility criteria and","least costs to society."],"old":["3. Capacity mechanisms shall not","create unnecessary market distortions and","not limit cross-border trade. The amount of","capacity committed in the mechanism shall","not go beyond what is necessary to address","the concern.",""],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1036","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-748","justification":" In line with the provisions of paragraph 1 of this Article, as well as Art 46 intrinsically linked\n to this addition, network operators shall be able to recuperate costs related to the network\n access and also shall be able to collect specific levies for cross-border trade, which shall be\n used by the Union as own resources. This option was recommended by the High Level Group\n on Own Resources chaired by Mario Monti.","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 6"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:49"},"new":["6. There shall be no specific network","charge on individual transactions for cross-","border trade of electricity, with the","exception of specific levies collected by","network operators on behalf of the Union","contributing to the Union\u2019s own resources","within the Multiannual Financial","Framework."],"old":["6. There shall be no specific network","charge on individual transactions for cross-","border trade of electricity."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"748","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Ashley Fox","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-446","location":[[" Proposal for a regulation","Article 7 \u2013 paragraph 4 \u2013 point 2 (new)"]],"meps":[96957],"meta":{"created":"2020-11-15T15:52:08"},"new":["(2) The TSOs of a synchronous area","may jointly request an exemption from the","requirement laid down in paragraph 1."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"446","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Martina Werner, Carlos Zorrinho, Miapetra Kumpula-Natri","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1566","location":[[" Proposal for a regulation","Annex I \u2013 part 5 \u2013 point 5.1"]],"meps":[124826,124739,124735],"meta":{"created":"2019-07-03T06:30:45"},"new":["deleted"],"old":["5.1. Regional operational centres shall","be equipped with the close to real time","supervisory control and data acquisition","systems with the observability defined by","applying the threshold defined in","accordance with point 4.1."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1566","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-285","justification":" This amendment aims at defining a modern governance scheme and is linked to an\n amendment on Article 21(1).","location":[[" Proposal for a regulation","Article 20 \u2013 paragraph 1 \u2013 point a"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:45"},"new":["deleted"],"old":["(a) after having consulted the Board","of Regulators and obtained its favourable","opinion in accordance with Article 23(b),","appoint the Director in accordance with","Article 24(2) and where relevant extend","their term of office or remove them from","office."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"285","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1037","justification":"Capacity mechanisms can, if not well designed and temporary in nature, create important\nmarket distortions. They shall not be used as a life-line for conventional generation capacity.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 3"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:52"},"new":["3. Capacity mechanisms shall not","create unnecessary market distortions and","not limit cross-border trade. The amount of","capacity committed in the mechanism shall","not go beyond what is necessary to address","the concern. Where the European","adequacy assessment has not identified a","resource adequacy concern, Member","State shall apply capacity mechanisms.","Capacity mechanisms shall be applied for","a maximum period of four years.","Every four years, Member States shall","assess their capacity mechanism and in","particular:","(a) the level of support received by","capacity providers","(b) the amount of capacity committed in","the mechanism","(c) the design criteria of the mechanism,","including the sustainability criterion."],"old":["3. Capacity mechanisms shall not","create unnecessary market distortions and","not limit cross-border trade. The amount of","capacity committed in the mechanism shall","not go beyond what is necessary to address","the concern."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1037","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-749","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 6"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:49"},"new":["6. There shall be no specific network","charge on individual transactions for","transits of electricity."],"old":["6. There shall be no specific network","charge on individual transactions for cross-","border trade of electricity."],"orig_lang":"fr","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"749","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Ashley Fox","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-447","location":[[" Proposal for a regulation","Article 7 \u2013 paragraph 4 \u2013 point 3 (new)"]],"meps":[96957],"meta":{"created":"2020-11-15T15:52:08"},"new":["(3) Where the relevant regulatory","authorities of a synchronous area grant","an exemption from the requirement laid","down in paragraph 1 upon a joint request","of the TSOs in the concerned","synchronous area or at their own","initiative, they shall perform, in","cooperation with the Agency and at least","every three years, a cost-benefit analysis","concerning the harmonisation of the","imbalance settlement period within and","between synchronous areas."],"old":[""],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"447","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Martina Werner, Carlos Zorrinho, Miapetra Kumpula-Natri","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1567","location":[["Proposal for a regulation","Annex I \u2013 part 8 \u2013 title"]],"meps":[124826,124739,124735],"meta":{"created":"2019-07-03T06:30:45"},"new":["8. Calculation of the regional","balancing capacity"],"old":["8."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1567","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-286","justification":"This proposal aims at defining a governance scheme closer to the \u201ccommon approach\u201d on\nthe decentralised Agencies with an administrative board composed of a subset of the Board of\nregulators focusing on human resources and budget issues. The proposal is moreover aligned\nwith similar pro-visions in ESMA Regulation.","location":[["Proposal for a regulation","Article 20 \u2013 paragraph 1 \u2013 point b"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:45"},"new":["deleted"],"old":["(b) formally appoint the members of","the Board of Regulators in accordance","with Article 22(1)."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"286","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1038","meps":[96852],"meta":{"created":"2019-07-03T06:30:52"},"new":["3. Capacity mechanisms shall be open","to all generation technologies, storage","and demand response, including","operators located in other Member States","unless technically not feasible. They shall","not create unnecessary market distortions","and not limit cross-border trade. The","amount of capacity committed in the","mechanism shall not go beyond what is","necessary to address the concern."],"old":["3. Capacity mechanisms shall not","create unnecessary market distortions and","not limit cross-border trade. The amount of","capacity committed in the mechanism shall","not go beyond what is necessary to address","the concern."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1038","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Se\u00e1n Kelly","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-448","location":[["Proposal for a regulation","Article 7 \u2013 paragraph 4 a (new)"]],"meps":[96668],"meta":{"created":"2020-11-15T15:52:08"},"new":["4a. Where Member States can","demonstrate that the introduction of an","imbalance settlement period of 15 minutes","would adversely impact their consumers,","the TSOs of a synchronous area may","jointly request an exemption from the","requirement laid down in paragraph 4."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"448","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-750","justification":" In line with the provisions of the Electricity Directive, Member States may allow subsidies\n and exemptions to energy poor consumers.","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 7"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:49"},"new":["7. Distribution tariffs shall reflect the","cost and benefits related to the use of the","distribution network by system users and","the benefits of those users including lower","transmission losses and load reduction","including active customers and may be","differentiated based on system users\u2019","consumption or generation profiles and","grid connection capacities, whilst","avoiding disincentives for energy","efficiency. Where Member States have","implemented the deployment of smart","metering systems, regulatory authorities","may introduce time differentiated network","tariffs, reflecting the use of the network, in","a transparent and foreseeable way for the","consumer. The tariffs shall be set in a","manner that incentivises investment in","demand response flexibility systems and","energy savings; subsequently they shall","not include additional capacity-based","elements. Member states shall ensure that","tariffs are not discriminatory, and that","there are no subsidies to specific groups","of users, including exemptions to pay.","Member States may allow subsidies and","exemptions for measures aiming at","preventing fuel poverty as set in Article 28","and Article 29 of the [Electricity","Directive]."],"old":["7. Distribution tariffs shall reflect the","cost of use of the distribution network by","system users including active customers,","and may be differentiated based on system","users\u2019 consumption or generation profiles.","Where Member States have implemented","the deployment of smart metering systems,","regulatory authorities may introduce time","differentiated network tariffs, reflecting the","use of the network, in a transparent and","foreseeable way for the consumer."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"750","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Martina Werner, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1568","location":[["Proposal for a regulation","Annex I \u2013 part 8 \u2013 point 8.1 \u2013 point c a (new)"]],"meps":[124826,124739,124735,124699],"meta":{"created":"2019-07-03T06:30:46"},"new":["(c a) take into account possible","substitutions between different types of","reserve capacity with the aim to minimise","the costs of procurement."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1568","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-287","justification":" This proposal aims at defining a governance scheme closer to the \u201ccommon approach\u201d on\n the decentralised Agencies with an administrative board composed of a subset of the Board of\n regulators focusing on human resources and budget issues. The proposal is moreover aligned\n with similar pro-visions in ESMA Regulation.","location":[["Proposal for a regulation","Article 20 \u2013 paragraph 1 \u2013 point e"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:45"},"new":["deleted"],"old":["(e) adopt, each year the draft","programming document referred to in","Article 21 before its submission to the","Commission for its opinion, and shall,","following the opinion of the Commission","and after having received approval by the","Board of Regulators in accordance with","Article 23(5)(c), adopt the programming","document of the Agency by a two thirds","majority its members and shall transmit it","to the European Parliament, the Council","and the Commission. The work","programme shall be adopted without","prejudice to the annual budgetary","procedure and shall be made public."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"287","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Gunnar H\u00f6kmark","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1039","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 3"]],"meps":[28124],"meta":{"created":"2019-07-03T06:30:52"},"new":["3. Capacity mechanisms shall be","market-based and not create any","unjustified market distortions and not limit","cross-border trade. The amount of capacity","committed in the mechanism shall not go","beyond what is strictly necessary to","address the concern."],"old":["3. Capacity mechanisms shall not","create unnecessary market distortions and","not limit cross-border trade. The amount of","capacity committed in the mechanism shall","not go beyond what is necessary to address","the concern."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1039","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Se\u00e1n Kelly","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-449","location":[["Proposal for a regulation","Article 7 \u2013 paragraph 4 b (new)"]],"meps":[96668],"meta":{"created":"2020-11-15T15:52:08"},"new":["4b. Where the relevant regulatory","authorities of a synchronous area grant","an exemption from the requirement laid","down in paragraph 4 upon a joint request","of the TSOs in the concerned area or at","their own initiative, they shall perform, in","cooperation with the Agency and at least","every three years, a cost-benefit analysis","concerning the harmonisation of the","imbalance settlement period within and","between synchronous areas."],"old":[""],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"449","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Hans-Olaf Henkel, Edward Czesak, Ev\u017een To\u0161enovsk\u00fd, Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-288","justification":" The wording of Articles 20(1)(e), 21(1), 23(5)(c) and 25(f) must be harmonised so as to\n provide a comprehensive, consistent and realistic framework for the adoption procedure of\n the Agency\u2019s programming document - an integral component of which is the annual Work\n Programme - clearly specifying which actors are involved in the various stages and their\n specific role. The proposed AM provides clarity on the adoption date of the draft\n programming document by 31st January and the final programming document by 31st\n October in order to ensure the process is workable. It specifies that the requirement on the\n annual consultation with the EP on the multiannual component of the PD and the\n Commission\u2019s formal opinion on the draft programming document, is foreseen after 31st\n\n\nJanuary and before the final adoption of the PD by the AB envisaged for 31st October. The\nprogramming document is thus adopted by the AB by 31st October of each year, following the\nCommission\u2019s opinion, following consultation of the EP on the multiannual programming,\nand after having received the approval of the BoR.","location":[[" Proposal for a regulation","Article 20 \u2013 paragraph 1 \u2013 point e"]],"meps":[124823,132925,96713,124891],"meta":{"created":"2019-07-03T06:30:45"},"new":["(e) adopt, each year by 31 January the","draft programming document referred to in","Article 21 and submit it to the","Commission, the European Parliament","and the Council. It shall, following the","advice of the Commission, and in relation","to the multiannual programming after","consulting the European Parliament, and","after having received approval by the","Board of Regulators in accordance with","Article23(5)(c), adopt the programming","document of the Agency by a two thirds","majority of its members and shall transmit","it to the European Parliament, the Council","and the Commission by 31 October. The","programming document shall be made","public."],"old":["(e) adopt, each year the draft","programming document referred to in","Article 21 before its submission to the","Commission for its opinion, and shall,","following the opinion of the Commission","and after having received approval by the","Board of Regulators in accordance with","Article 23(5)(c), adopt the programming","document of the Agency by a two thirds","majority its members and shall transmit it","to the European Parliament, the Council","and the Commission. The work","programme shall be adopted without","prejudice to the annual budgetary","procedure and shall be made public."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"288","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1040","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 3"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:52"},"new":["3. Capacity mechanisms shall be","designed in a way which does not create","unnecessary market distortions and not","limit cross-border trade. The amount of","capacity committed in the mechanism shall","not go beyond what is necessary to address","the concern."],"old":["3. Capacity mechanisms shall not","create unnecessary market distortions and","not limit cross-border trade. The amount of","","capacity committed in the mechanism shall","not go beyond what is necessary to address","the concern."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1040","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Martina Werner, Flavio Zanonato, Carlos Zorrinho, Miapetra Kumpula-Natri","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1569","location":[["Proposal for a regulation","Annex I \u2013 part 8 \u2013 point 8.2"]],"meps":[124826,124800,124739,124735],"meta":{"created":"2019-07-03T06:30:46"},"new":["deleted"],"old":["8.2. Regional operational centres shall","support the transmission system operators","of the system operation region in","procuring the required amount of","balancing capacity determined in","accordance with point 8.1. The","","procurement of balancing capacity shall:","(a) be performed at the day-ahead and/or","intraday timeframe;","(b) take into account possible","substitutions between different types of","reserve capacity with the aim to minimise","the costs of procurement."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1569","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-751","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 7"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:49"},"new":["7. Distribution tariffs shall reflect the","cost of use of the distribution network by","system users including active customers,","and may be differentiated based on system","users\u2019 consumption or generation profiles.","Where Member States have implemented","the deployment of smart metering systems,","regulatory authorities may introduce time","differentiated network tariffs, reflecting the","use of the network, in a transparent and","foreseeable way for the consumer.","Industrial consumers should be exempt","from charges when preventing grid","congestion or providing balancing energy","through flexibility and services via","storage, green hydrogen, and other load","shifting measures irrespective of end use","of electricity. This exemption applies to all","sorts of industrial customers that are able","to shift their load in a system-friendly","fashion either by a flexible production","profile or by the help of (backup) energy","storage."],"old":["7. Distribution tariffs shall reflect the","cost of use of the distribution network by","system users including active customers,","and may be differentiated based on system","users\u2019 consumption or generation profiles.","Where Member States have implemented","the deployment of smart metering systems,","regulatory authorities may introduce time","differentiated network tariffs, reflecting the","use of the network, in a transparent and","foreseeable way for the consumer."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"751","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Se\u00e1n Kelly","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-450","location":[[" Proposal for a regulation","Article 7 \u2013 paragraph 4 c (new)"]],"meps":[96668],"meta":{"created":"2020-11-15T15:52:08"},"new":["4c. The exemption must not be to the","detriment of competition or the effective","functioning of the internal market in","electricity."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"450","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Barbara Kappel, Lorenzo Fontana, Angelo Ciocca","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-289","location":[["Proposal for a regulation","Article 20 \u2013 paragraph 1 \u2013 point e"]],"meps":[125024,96993,183793],"meta":{"created":"2019-07-03T06:30:46"},"new":["(e) adopt, each year the draft","programming document referred to in","Article 21 before its submission to the","Commission for its opinion, and shall,","after having received the opinion of the","Commission and after having received","approval by the Board of Regulators in","accordance with Article 23(5)(c), adopt the","programming document of the Agency by","a two thirds majority its members and shall","transmit it to the European Parliament, the","Council and the Commission. The","programming document shall be adopted","without prejudice to the annual budgetary","procedure and shall be made public;"],"old":["(e) adopt, each year the draft","programming document referred to in","Article 21 before its submission to the","Commission for its opinion, and shall,","following the opinion of the Commission","and after having received approval by the","Board of Regulators in accordance with","Article 23(5)(c), adopt the programming","document of the Agency by a two thirds","majority its members and shall transmit it","to the European Parliament, the Council","and the Commission. The work","programme shall be adopted without","prejudice to the annual budgetary","procedure and shall be made public."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"289","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1041","justification":"We support design principles for capacity mechanisms (CRM) to include also obligation to\nhave clear rules and procedures for CRM phase-out as soon as reasons for their introduction\nperish. It is also necessary to set clear deadline for harmonization of existing CRM with this\nProposal to avoid any misunderstandings between existing and new CRMs. New wording\nspecifies design requirements for CRM to limit their impact on the market.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 3"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:53"},"new":["3. Capacity mechanisms shall be","designed in a way which does not create","unnecessary market distortions and limit","cross-border trade. The amount of capacity","committed in the mechanism shall not go","beyond what is necessary to address the","concern."],"old":["3. Capacity mechanisms shall not","create unnecessary market distortions and","not limit cross-border trade. The amount of","capacity committed in the mechanism shall","not go beyond what is necessary to address","the concern."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1041","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-451","justification":" In case transmission rights are not used, they shall be put back to the allocation platform to\n maximise market efficiency.","location":[[" Proposal for a regulation","Article 8 \u2013 paragraph 2"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["2. Long-term transmission rights shall","be allocated in a transparent, market based","and non-discriminatory manner through a","single allocation platform. Long-term","transmission rights shall be firm and follow","the \u201cuse it or lose it\u201d principle."],"old":["2. Long-term transmission rights shall","be allocated in a transparent, market based","and non-discriminatory manner through a","single allocation platform. Long-term","transmission rights shall be firm and be","transferable between market participants."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"451","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1570","location":[[" Proposal for a regulation","Annex I \u2013 part 13 \u2013 point 13.1"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:46"},"new":["13.1. Regional operational centres shall","identify regional crisis scenarios for their","respective regions in accordance with the","criteria laid down in Article 6(1) of","Regulation (../...) [Risk Preparedness","Regulation].The scenarios shall be","identified on the basis of risks for each","region, such as extreme weather","conditions, natural disasters, fuel","shortages or malicious attacks. The","scenarios shall provide the basis for the","regional parts of the national risk-","preparedness plans."],"old":["13.1. If ENTSO for Electricity delegates","this function, regional operational centres","shall identify regional crisis scenarios in","accordance with the criteria set out in","Article 6(1) of [Risk Preparedness","Regulation as proposed by COM(2016)","862]"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1570","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Hans-Olaf Henkel","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-290","justification":" This amendment is necessary for pressing reasons relating to the internal logic of the text or\n inextricably linked to other admissible amendments.","location":[["Proposal for a regulation","Article 20 \u2013 paragraph 1 \u2013 point s a (new)"]],"meps":[124823],"meta":{"created":"2019-07-03T06:30:46"},"new":["(sa) after having considered the","Director's opinion and after having","consulted the Board of Regulators, adopt","and publish detailed rules of procedure","for all agency tasks under Chapter I,","which are not covered by the rules of","procedure under Art. 20, 23, 26, 30. Rules","of procedure shall ensure a transparent","and comprehensive decision-making","process guaranteeing openness to scrutiny","and fundamental procedural rights","including the right to be heard, access to","file and duty to give justification."],"old":[""],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"290","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Kate\u0159ina Kone\u010dn\u00e1, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1042","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 3"]],"meps":[23699,96713],"meta":{"created":"2019-07-03T06:30:53"},"new":["3. Capacity mechanisms shall be","designed in a way which does not create","unnecessary market distortions and limit","cross-border trade. The amount of capacity","committed in the mechanism shall not go","beyond what is necessary to address the","concern."],"old":["3. Capacity mechanisms shall not","create unnecessary market distortions and","not limit cross-border trade. The amount of","capacity committed in the mechanism shall","not go beyond what is necessary to address","","the concern."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1042","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Massimiliano Salini, Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-452","location":[["Proposal for a regulation","Article 8 \u2013 paragraph 3"]],"meps":[125670,36392],"meta":{"created":"2020-11-15T15:52:08"},"new":["3. Subject to compliance with treaty","rules on competition, market operators","shall be free to develop forward hedging","products including for the long-term to","provide market participants, in particular","owners of generation facilities using","renewable energy sources, with appropriate","possibilities to hedge financial risks from","price fluctuations. Member States shall not","restrict such hedging activity to trades","within a Member State or bidding zone. In","case of scarce liquidity in forward","markets, in order to achieve","decarbonisation and security of supply,","Member State may introduce specific","measures for developing long-term","contracts."],"old":["3. Subject to compliance with treaty","rules on competition, market operators","shall be free to develop forward hedging","products including for the long-term to","provide market participants, in particular","owners of generation facilities using","renewable energy sources, with appropriate","possibilities to hedge financial risks from","price fluctuations. Member States shall not","restrict such hedging activity to trades","within a Member State or bidding zone."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"452","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Hans-Olaf Henkel","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-752","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 7"]],"meps":[124823],"meta":{"created":"2019-07-03T06:30:49"},"new":["7. Distribution tariffs shall reflect the","cost of use of the distribution network by","system users including active customers,","and may be differentiated based on system","users\u2019 consumption or generation profiles.","Where Member States have implemented","the deployment of smart metering systems,","regulatory authorities may introduce time","differentiated network tariffs, reflecting the","use of the network, in a transparent and","foreseeable way for the consumer.","Industrial consumers should be exempt","from charges when preventing grid","congestion or providing balancing energy","through flexibility and services based on","storage, green hydrogen, and other load","shifting measures. This exemption shall","apply to industrial customers that are able","to shift their load in support of the system","by a flexible production or by backup","support through energy storage."],"old":["7. Distribution tariffs shall reflect the","cost of use of the distribution network by","system users including active customers,","and may be differentiated based on system","users\u2019 consumption or generation profiles.","Where Member States have implemented","the deployment of smart metering systems,","regulatory authorities may introduce time","differentiated network tariffs, reflecting the","use of the network, in a transparent and","foreseeable way for the consumer."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"752","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Lud\u011bk Niedermayer","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1571","location":[[" Proposal for a regulation","Annex I \u2013 part 13 \u2013 point 13.1"]],"meps":[124701],"meta":{"created":"2019-07-03T06:30:46"},"new":["13.1. If ENTSO-E delegates this","function, regional operational centres shall","identify regional crisis scenarios in","accordance with the criteria set out in","Article 6(1) of [Risk Preparedness","Regulation as proposed by COM(2016)","862]"],"old":["13.1. If ENTSO for Electricity delegates","","","this function, regional operational centres","shall identify regional crisis scenarios in","accordance with the criteria set out in","Article 6(1) of [Risk Preparedness","Regulation as proposed by COM(2016)","862]"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1571","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1043","justification":" Design of CMs should also include an obligation to have clear rules and procedures for CMs\n phase-out as soon as reasons for their introduction perish. It is also necessary to set clear\n deadline for harmonisation of existing CMs with proposed Regulation.","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 3"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:53"},"new":["3. Capacity mechanisms shall be","designed in a way which does not create","market distortions and not limit cross-","border trade. The amount of capacity","committed in the mechanism shall not go","beyond what is necessary to address the","concern."],"old":["3. Capacity mechanisms shall not","create unnecessary market distortions and","not limit cross-border trade. The amount of","capacity committed in the mechanism shall","not go beyond what is necessary to address","the concern."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1043","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Barbara Kappel, Lorenzo Fontana, Angelo Ciocca","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-291","justification":" Three of the four bodies of the Agency currently have procedural rules. However, no such\n rules are foreseen for the fourth body (the Director) or for any cross-body processes. The\n Regulation should foresee that the Administrative Board put in place adequate and\n proportionate procedural rules for all processes, respecting and detailing further the\n principles proposed in amendment in Article 20 \u2013 paragraph 1 \u2013 point e.","location":[[" Proposal for a regulation","Article 20 \u2013 paragraph 1 \u2013 point s a (new)"]],"meps":[125024,96993,183793],"meta":{"created":"2019-07-03T06:30:46"},"new":["(sa) after having considered the","Director\u2019s opinion in accordance with","Article 25(k) and after having consulted","the Board of Regulators and obtained its","favourable opinion in accordance with","Article 23(5)(e), adopt and publish","adequate and proportionate rules of","procedure in accordance with Article","15a(5) for all Agency tasks under Chapter","I which are not covered by the rules of","procedure under Article 20(1)(l), Article","23(2), Article 26(3) or Article 30(3)."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"291","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Cristian-Silviu Bu\u015foi","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-453","location":[["Proposal for a regulation","Article 8 \u2013 paragraph 3"]],"meps":[38420],"meta":{"created":"2020-11-15T15:52:08"},"new":["Subject to compliance with treaty","rules on competition, market operators","shall be free to develop forward hedging","products including for the long-term to","provide market participants, in particular","owners of generation facilities using","renewable energy sources, with appropriate","possibilities to hedge financial risks from","price fluctuations. Member States shall not","restrict such hedging activity to trades","within a Member State or bidding zone. In","case of scarce liquidity in forward","markets, in order to achieve","decarbonisation and security of supply,","Member State may introduce specific","measures for developing long-term","contracts."],"old":["3. Subject to compliance with treaty 3.","rules on competition, market operators","shall be free to develop forward hedging","products including for the long-term to","provide market participants, in particular","owners of generation facilities using","renewable energy sources, with appropriate","possibilities to hedge financial risks from","price fluctuations. Member States shall not","restrict such hedging activity to trades","within a Member State or bidding zone.",""],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"453","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Kathleen Van Brempt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-753","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 7"]],"meps":[5729],"meta":{"created":"2019-07-03T06:30:49"},"new":["7. Distribution tariffs shall reflect the","cost of use of the distribution network by","system users including active customers,","and may be differentiated based on system","users\u2019 consumption or generation profiles","and grid connection capacities. Where","Member States have implemented the","deployment of smart metering systems,","regulatory authorities may introduce time","differentiated network tariffs, reflecting the","use of the network, in a transparent and","foreseeable way for the consumer. Where","possible, the tariffs shall be set in a","manner that incentivises investment in","demand side response and flexibility","systems. Member states shall ensure that","tariffs are not discriminatory and are not","forms of illegitimate state aid to specific","groups of users via exemptions from (part","of) the tariffs."],"old":["7. Distribution tariffs shall reflect the","cost of use of the distribution network by","system users including active customers,","and may be differentiated based on system","users\u2019 consumption or generation profiles.","Where Member States have implemented","the deployment of smart metering systems,","regulatory authorities may introduce time","differentiated network tariffs, reflecting the","use of the network, in a transparent and","foreseeable way for the consumer.",""],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"753","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1044","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 3"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:53"},"new":["3. Capacity mechanisms shall not","create undue market distortions and not","limit cross-border trade. The amount of","capacity committed in the mechanism shall","not go beyond what is necessary to address","the concern."],"old":["3. Capacity mechanisms shall not","create unnecessary market distortions and","not limit cross-border trade. The amount of","capacity committed in the mechanism shall","not go beyond what is necessary to address","the concern."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1044","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-754","justification":" A more stable network tariff is required.","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 7"]],"meps":[1985],"meta":{"created":"2019-07-03T06:30:49"},"new":["7. Distribution tariffs shall reflect the","cost of use of the distribution network by","system users including active customers,","and may be differentiated based on system","users\u2019 consumption or generation profiles.","Where Member States have implemented","the deployment of smart metering systems,","regulatory authorities may introduce time","differentiated network tariffs, reflecting the","use of the network, in a transparent and","foreseeable and cost efficient way for the","consumer. Regulatory authorities should","also assess the need to introduce more","capacity-based network tariffs where","these can provide for a more efficient","system use."],"old":["7. Distribution tariffs shall reflect the","cost of use of the distribution network by","system users including active customers,","and may be differentiated based on system","users\u2019 consumption or generation profiles.","Where Member States have implemented","the deployment of smart metering systems,","regulatory authorities may introduce time","differentiated network tariffs, reflecting the","use of the network, in a transparent and","foreseeable way for the consumer."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"754","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-454","location":[[" Proposal for a regulation","Article 8 \u2013 paragraph 3"]],"meps":[124826,124870,124739,124735,124699,125041,125044],"meta":{"created":"2020-11-15T15:52:08"},"new":["3. Market operators shall be free to","develop forward hedging products","including for the long-term to provide","market participants, in particular owners of","generation facilities using renewable","energy sources, with appropriate","possibilities to hedge financial risks from","price fluctuations. Member States shall","support liquidity of such products, in","particular already developed exchange-","based products, and allow them to be","traded on large, cross-border bidding","zones."],"old":["3. Subject to compliance with treaty","rules on competition, market operators","shall be free to develop forward hedging","products including for the long-term to","provide market participants, in particular","owners of generation facilities using","renewable energy sources, with appropriate","possibilities to hedge financial risks from","price fluctuations. Member States shall not","restrict such hedging activity to trades","within a Member State or bidding zone."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"454","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1572","location":[["Proposal for a regulation","Annex I \u2013 part 13 \u2013 point 13.1 a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:46"},"new":["13.1 a. Regional operational centres shall","contribute to the harmonisation of","regional measures to be included in the","national risk-preparedness plans of","Member States by:","(a) issuing recommendations regarding","draft national risk-preparedness plans of","Member States concerned pursuant to","Article 10 of [Risk Preparedness","Regulation];","(b) by serving as the co-ordinating body in","order to facilitate agreements among","competent authorities of Member States","concerned on regional measures to be","included in their national plans pursuant","to Article 12 (2) of [Risk Preparedness","Regulation]."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1572","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Esther de Lange","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1045","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 3"]],"meps":[38398],"meta":{"created":"2019-07-03T06:30:53"},"new":["3. Capacity mechanisms shall not","create market distortions and not limit","cross-border trade. The amount of capacity","committed in the mechanism shall not go","beyond what is necessary to address the","concern."],"old":["3. Capacity mechanisms shall not","create unnecessary market distortions and","not limit cross-border trade. The amount of","capacity committed in the mechanism shall","not go beyond what is necessary to address","the concern."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1045","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Davor \u0160krlec on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-292","justification":"To be consistent with the new Article 2a.","location":[["Proposal for a regulation","Article 20 \u2013 paragraph 1 \u2013 point s a (new)"]],"meps":[124756],"meta":{"created":"2019-07-03T06:30:46"},"new":["(sa) appoint the members of the","Stakeholder Group referred to in Article","2a."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"292","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Kri\u0161j\u0101nis Kari\u0146\u0161","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-755","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 7"]],"meps":[96901],"meta":{"created":"2019-07-03T06:30:49"},"new":["7. Distribution tariffs shall reflect the","cost of use of the distribution network by","system users including active customers,","may contain grid connection capacity","elements and may be differentiated based","on system users\u2019 consumption or","generation profiles. Where Member States","have implemented the deployment of smart","metering systems, regulatory authorities","may introduce time differentiated network","tariffs, reflecting the use of the network, in","a transparent and foreseeable way for the","consumer."],"old":["7. Distribution tariffs shall reflect the","cost of use of the distribution network by","system users including active customers,","and may be differentiated based on system","users\u2019 consumption or generation profiles.","Where Member States have implemented","the deployment of smart metering systems,","regulatory authorities may introduce time","differentiated network tariffs, reflecting the","use of the network, in a transparent and","foreseeable way for the consumer."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"755","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Peter Kouroumbashev","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-455","justification":"In order to ensure security of supply in the EU, we need to make sure that investors see\nsecurity in the EU regulatory framework. Long-term visibility is important to attract investors\nin both, new and/or refurbished generation capacities, and in particular for decarbonised\npower plants. This amendment aims ensuring flexibility, at the same time the content of the\ncontract, such as terms, conditions, duration etc. remains to be defined at national level by\nboth parties of the contract.","location":[[" Proposal for a regulation","Article 8 \u2013 paragraph 3 a (new)"]],"meps":[124857],"meta":{"created":"2020-11-15T15:52:08"},"new":["3a. Considering electricity market","participants\u2018 liberty to develop forward","hedging products, the investors shall be","permitted to conclude contracts whose","maturity takes into account the lifetime of","the installation in question, regardless of","the type of generation and of the type of","facility. This shall be applicable to new","and refurbished generations as well as","storage and demand facilities."],"old":[""],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"455","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1046","justification":"It is paramount that capacity mechanism are open to all market participants, including across\nborders, and that they include flexibility criteria to effectively being able to provide capacity\nat short notice and with flexible volumes.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 3 a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:53"},"new":["3a. Decentralised resources and","demand response must have non-","discriminatory access to capacity","mechanisms and their structural","advantages shall be reflected in any","mechanism;"],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1046","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1573","location":[["Proposal for a regulation","Annex I \u2013 part 13 \u2013 point 13.1 a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:46"},"new":["13.1 a. Regional operational centres shall","carry out short-term adequacy","assessments, namely, seasonal adequacy","outlooks as well as week-ahead to","intraday adequacy assessments for their","respective regions pursuant to Article 9 of","[Risk Preparedness Regulation].The","short-term adequacy assessment shall","complement the long-term resource","adequacy assessment, which ensures a","coordinated European adequacy","assessment to assess the need for capacity","mechanisms"],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1573","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Pilar del Castillo Vera, Pilar Ayuso, Francesc Gamb\u00fas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-756","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 7"]],"meps":[28390,4319,125006],"meta":{"created":"2019-07-03T06:30:49"},"new":["7. Transmission and distribution","tariffs shall reflect the investment cost and","use of the transmission and distribution","network by system users including active","customers, and may be differentiated based","on system users\u2019 consumption or","generation profiles. Where Member States","have implemented the deployment of smart","metering systems, competent authorities","may introduce time differentiated network","tariffs, reflecting the use of the network, in","a transparent and foreseeable way for the","consumer."],"old":["7. Distribution tariffs shall reflect the","cost of use of the distribution network by","system users including active customers,","and may be differentiated based on system","users\u2019 consumption or generation profiles.","Where Member States have implemented","the deployment of smart metering systems,","regulatory authorities may introduce time","differentiated network tariffs, reflecting the","use of the network, in a transparent and","foreseeable way for the consumer."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"756","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-293","location":[["Proposal for a regulation","Article 20 \u2013 paragraph 2"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:46"},"new":["deleted"],"old":["2. The Administrative Board shall","adopt, in accordance with Article 110 of","the Staff Regulations, a decision based on","Article 2(1) of the Staff Regulations and","on Article 6 of the Conditions of","Employment of Other Servants,","delegating relevant appointing authority","powers to the Director and defining the","conditions under which that delegation of","powers can be suspended. The Director","shall be authorised to sub-delegate those","powers."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"293","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1047","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 3 b (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:53"},"new":["3b. When certifying capacities, the","specific characteristics of demand-side","flexibility and energy storage shall be","taken into account, including in product","definitions and prequalification","requirements."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1047","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-456","location":[["Proposal for a regulation","Article 8 a (new)"]],"meps":[2025],"meta":{"created":"2020-11-15T15:52:08"},"new":["Article 8 a","Forward instruments hedging generation","investments","In the framework of the freedom given to","the electricity market participants to","develop forward hedging products","pursuant to Article 8(3), investors in new","or refurbished generation, storage or","demand response facilities shall be","allowed to conclude contracts whose","maturity is related to the lifetime of the","installations concerned."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"456","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-757","justification":" Distribution tariffs shall take into account the real economic, technical and social impacts of\n active customers. The consideration of costs shall therefore be complemented by the\n consideration of benefits provided by the development of active customers, notably through\n self-consumption, self-generation, storage and demand response. Those benefits shall notably\n take into account avoided CO2 emissions, reduced feed-in tariffs, and reduced network\n upgrade needs.","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 7"]],"meps":[90110],"meta":{"created":"2019-07-03T06:30:49"},"new":["7. Distribution tariffs shall reflect the","cost and benefits related to the use of the","distribution network by system users","including active customers, and may be","differentiated based on system users\u2019","consumption, energy storage or generation","profiles. Where Member States have","implemented the deployment of smart","metering systems, regulatory authorities","may introduce time differentiated network","tariffs, reflecting these of the network, in a","transparent and foreseeable way for the","consumer."],"old":["7. Distribution tariffs shall reflect the","cost of use of the distribution network by","system users including active customers,","and may be differentiated based on system","users\u2019 consumption or generation profiles.","Where Member States have implemented","the deployment of smart metering systems,","regulatory authorities may introduce time","differentiated network tariffs, reflecting the","use of the network, in a transparent and","foreseeable way for the consumer."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"757","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-294","location":[[" Proposal for a regulation","Article 20 \u2013 paragraph 3"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:46"},"new":["deleted"],"old":["3. Where exceptional circumstances","so require, the Administrative Board may","by way of a decision temporarily suspend","the delegation of the appointing authority","powers to the Director and those sub-","delegated by the latter and in favour of","itself or delegate them to one of its","members or to a staff member other than","the Director."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"294","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Sven Schulze, Hermann Winkler, Christian Ehler","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1048","justification":" Indigenous energy resources reduce export dependency.","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[124809,96764,28226],"meta":{"created":"2019-07-03T06:30:53"},"new":["deleted"],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity","emitting 550 gr CO2/kWh or more shall","not be committed in capacity mechanisms","5 years after the entry into force of this","Regulation."],"orig_lang":"de","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1048","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Lud\u011bk Niedermayer","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1574","location":[[" Proposal for a regulation","Annex I \u2013 part 13 \u2013 point 13.2"]],"meps":[124701],"meta":{"created":"2019-07-03T06:30:46"},"new":["13.2. If ENTSO-E delegates this","function, regional operational centres shall","prepare and carry out yearly crisis","simulation in cooperation with competent","authorities according to Article 12(3) of","[Risk Preparedness Regulation as proposed","by COM(2016) 862]."],"old":["13.2. Regional operational centres shall","prepare and carry out yearly crisis","simulation in cooperation with competent","authorities according to Article 12(3) of","[Risk Preparedness Regulation as proposed","by COM(2016) 862]."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1574","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":" Angelika Niebler, Sven Schulze","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1049","justification":"Capacity mechanisms guarantee security of supply. It is therefore not at all clear why a\nclimate-policy criterion is being introduced in this connection. Setting a CO2 limit of this\nnature will create huge additional costs. The European emissions trading scheme regulates\nthe reduction of greenhouse gas emissions.","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[124809],"meta":{"created":"2019-07-03T06:30:53"},"new":["deleted"],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity","emitting 550 gr CO2/kWh or more shall","not be committed in capacity mechanisms","5 years after the entry into force of this","Regulation."],"orig_lang":"de","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1049","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-758","justification":"Existing language only reflects the cost of use of the distribution network by system users. In\norder to incentivise smarter renewables integration technologies and motivate consumers to\nmake investment decisions that mutually benefit the customer and the grid, distribution tariffs\nneed to acknowledge the benefits that active consumers provide for the grid and allow self-\nconsumption activities to be valued more broadly (e.g. their contribution to avoided costs\nrelated to grid upgrades for the DSO, reduced transmission losses, avoided CO2 emissions,\npublic health, etc.). Furthermore, consumers should be enabled to participate in all forms of\ndemand response, including implicit demand response through time-differentiated network\ntariffs.","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 7"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:50"},"new":["7. Distribution tariffs shall reflect the","cost and benefits of use of the distribution","network by system users including active","customers, and may be differentiated based","on system users\u2019 consumption or","generation profiles. Where Member States","have implemented the deployment of smart","metering systems, regulatory authorities","shall endeavour to may introduce time","differentiated network tariffs, reflecting the","use of the network, in a transparent and","foreseeable way for the consumer."],"old":["7. Distribution tariffs shall reflect the","cost of use of the distribution network by","system users including active customers,","and may be differentiated based on system","users\u2019 consumption or generation profiles.","Where Member States have implemented","the deployment of smart metering systems,","","regulatory authorities may introduce time","differentiated network tariffs, reflecting the","use of the network, in a transparent and","foreseeable way for the consumer."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"758","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":" Hans-Olaf Henkel","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-295","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 1 \u2013 subparagraph 1"]],"meps":[124823],"meta":{"created":"2019-07-03T06:30:46"},"new":["Each year, the Administrative Board shall","adopt a draft programming document","containing annual and multi-annual","programming in line with Article 32 of","Commission Delegation Regulation (EU)","No 1271/2013, based on a draft put","forward by the Director. The","Administrative Board shall adopt the","programming document taking into","account the opinion of the Commission,","after having received the approval of the","Board of Regulators for the annual work","programme of the Agency and in relation","to multiannual programming after","consulting the European Parliament. It","shall forward it to the European","Parliament, the Council and the","Commission no later than 31 October each","year."],"old":["Each year, the Administrative Board shall","adopt a programming document containing","multi-annual and annual programming,","based on a draft put forward by the","Director, taking into account the opinion of","the Commission and in relation to","multiannual programming after consulting","the European Parliament. It shall forward it","to the European Parliament, the Council","and the Commission no later than 31","January each year."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"295","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-457","location":[[" Proposal for a regulation","Article 9 \u2013 paragraph 1"]],"meps":[2025],"meta":{"created":"2020-11-15T15:52:08"},"new":["deleted"],"old":["1. There shall be no maximum limit","of the wholesale electricity price unless it","is set at the value of lost load as","determined in accordance with Article 10.","There shall be no minimum limit of the","wholesale electricity price unless it is set","at a value of minus 2000 \u20ac or less and, in","the event that it is or anticipated to be","reached, set at a lower value for the","following day. This provision shall apply,","inter alia, to bidding and clearing in all","timeframes and include balancing energy","and imbalance prices."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"457","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1575","location":[[" Proposal for a regulation","Annex I \u2013 part 13 \u2013 point 13.2 a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:46"},"new":["13.2 a. Regional operational centres shall","be consulted when developing a","methodology for short-term adequacy","assessments as well as methodology for","identifying the most relevant electricity","crisis scenarios in a regional context","pursuant to Articles 8(2) and 5(4) of [Risk","Preparedness Regulation]."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1575","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Janusz Korwin-Mikke","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1050","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[124879],"meta":{"created":"2019-07-03T06:30:53"},"new":["deleted"],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity","emitting 550 gr CO2/kWh or more shall","not be committed in capacity mechanisms","5 years after the entry into force of this","Regulation."],"orig_lang":"pl","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1050","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-759","justification":"Existing language only reflects the cost of use of the distribution network by system users. In\norder to incentivise smarter renewables integration technologies and motivate consumers to\n\n make investment decisions that mutually benefit the customer and the grid, distribution tariffs\n need to acknowledge the benefits that active consumers provide for the grid and allow self-\n consumption activities to be valued more broadly (e.g. their contribution to avoided costs\n related to grid upgrades for the DSO, reduced transmission losses, avoided CO2 emissions,\n public health, etc.). Furthermore, consumers should be enabled to participate in all forms of\n demand response, including implicit demand response through time-differentiated network\n tariffs.","location":[["Proposal for a regulation","Article 16 \u2013 paragraph 7"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:50"},"new":["7. Distribution tariffs shall reflect the","cost and benefits of use of the distribution","network by system users including active","customers, and may be differentiated based","on system users\u2019 consumption or","generation profiles. Where Member States","have implemented the deployment of smart","metering systems, regulatory authorities","shall endeavour to introduce time","differentiated network tariffs, reflecting the","use of the network, in a transparent and","foreseeable way for the consumer."],"old":["7. Distribution tariffs shall reflect the","cost of use of the distribution network by","system users including active customers,","and may be differentiated based on system","users\u2019 consumption or generation profiles.","Where Member States have implemented","the deployment of smart metering systems,","regulatory authorities may introduce time","differentiated network tariffs, reflecting the","use of the network, in a transparent and","foreseeable way for the consumer."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"759","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Patrizia Toia","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-296","justification":"The annual work programme of the Agency is approved by the Board of Regulators under\nArticle 23(5)(c). Given that the annual work programme needs to be in line with the multi-\nannual work programme, the Board of Regulators should also approve the latter.","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 1 \u2013 subparagraph 1"]],"meps":[28340],"meta":{"created":"2019-07-03T06:30:46"},"new":["Each year, the Administrative Board shall","adopt a programming document containing","multi-annual and annual programming,","based on a draft put forward by the","Director and approved by the Board of","Regulators, taking into account the opinion","of the Commission and in relation to","multiannual programming after consulting","the European Parliament. It shall forward it","to the European Parliament, the Council","and the Commission no later than 31","January each year. The programming","document shall become definitive after","final adoption of the general budget and if","necessary shall be adjusted accordingly."],"old":["Each year, the Administrative Board shall","adopt a programming document containing","multi-annual and annual programming,","based on a draft put forward by the","Director, taking into account the opinion of","the Commission and in relation to","multiannual programming after consulting","the European Parliament. It shall forward it","to the European Parliament, the Council","and the Commission no later than 31","January each year."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"296","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-458","justification":"In line with the market principles established through this regulation, price spikes and\nnegative prices shall be possible to fully reflect market signals.","location":[[" Proposal for a regulation","Article 9 \u2013 paragraph 1"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:08"},"new":["1. There shall be no maximum nor","minimum limit of the wholesale electricity","price. This provision shall apply, inter alia,","to bidding and clearing in all time frames","and include balancing energy and","imbalance prices."],"old":["1. There shall be no maximum limit of","the wholesale electricity price unless it is","set at the value of lost load as determined","in accordance with Article 10. There shall","be no minimum limit of the wholesale","electricity price unless it is set at a value","of minus 2000 \u20ac or less and, in the event","that it is or anticipated to be reached, set","at a lower value for the following day.","This provision shall apply, inter alia, to","bidding and clearing in all timeframes and","include balancing energy and imbalance","prices."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"458","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-760","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 7"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:50"},"new":["7. Distribution tariffs shall reflect the","cost of use of the distribution network by","system users including active customers,","and may be differentiated based on system","users\u2019 consumption, energy storage or","generation profiles. Where Member States","have implemented the deployment of smart","metering systems, regulatory authorities","may introduce time differentiated network","tariffs, reflecting the use of the network, in","a transparent and foreseeable way for the","consumer."],"old":["7. Distribution tariffs shall reflect the","cost of use of the distribution network by","system users including active customers,","and may be differentiated based on system","users\u2019 consumption or generation profiles.","Where Member States have implemented","the deployment of smart metering systems,","regulatory authorities may introduce time","differentiated network tariffs, reflecting the","use of the network, in a transparent and","foreseeable way for the consumer."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"760","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE610.751-1576","location":[["Proposal for a regulation","Annex I \u2013 part 13 a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:46"},"new":["13 a. Identification of transmission","capacity needs.","13a (new) 1. Regional coordination","centres shall provide support to the TSOs","of the system operation region regarding","the identification of transmission capacity","needs.","13a (new) 2. Regional coordination","centres shall propose priorities for","network investments to the TSOs of the","system operation region on the basis of at","least the following criteria:","(a) long-term system adequacy","assessments;","(b) the situation of the interconnected","system;","(c) identified structural congestions."],"orig_lang":"en","peid":"PE610.751v01-00","reference":"2016/0379(COD)","seq":"1576","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610751_EN.pdf"},{"authors":"Adam Gierek, Krystyna \u0141ybacka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1051","justification":" ENP 550 weakens the EU ETS price signal, which is the main instrument of decarbonisation\n policy, and introduces rules which are not technologically neutral. ENP 550 introduces a\n preference for gas units, which will weaken EU energy independence.","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 4 Regulation (EC) No 714/2009 of the European Parliament and of the Council"]],"meps":[28379,124883],"meta":{"created":"2019-07-03T06:30:53"},"new":["deleted"],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity","emitting 550 gr CO2/kWh or more shall","not be committed in capacity mechanisms","5 years after the entry into force of this","Regulation."],"orig_lang":"pl","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1051","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Kaja Kallas, Fredrick Federley, Morten Helveg Petersen, Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.624-761","location":[[" Proposal for a regulation","Article 16 \u2013 paragraph 7"]],"meps":[124697,124989,124872,90110],"meta":{"created":"2019-07-03T06:30:50"},"new":["7. Distribution tariffs shall reflect the","cost and benefits of use of the distribution","network by system users including active","customers, and may be differentiated based","on system users\u2019 consumption or","generation profiles. Where Member States","have implemented the deployment of smart","metering systems, regulatory authorities","shall introduce time differentiated network","tariffs, reflecting the use of the network, in","a transparent and foreseeable way for the","consumer."],"old":["7. Distribution tariffs shall reflect the","cost of use of the distribution network by","system users including active customers,","and may be differentiated based on system","users\u2019 consumption or generation profiles.","Where Member States have implemented","the deployment of smart metering systems,","","regulatory authorities may introduce time","differentiated network tariffs, reflecting the","use of the network, in a transparent and","foreseeable way for the consumer."],"orig_lang":"en","peid":"PE609.624v01-00","reference":"2016/0379(COD)","seq":"761","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609624_EN.pdf"},{"authors":"Barbara Kappel, Lorenzo Fontana, Angelo Ciocca","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-297","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 1 \u2013 subparagraph 1"]],"meps":[125024,96993,183793],"meta":{"created":"2019-07-03T06:30:46"},"new":["Each year, the Administrative Board shall","adopt a programming document containing","multi-annual and annual programming,","based on a draft put forward by the","Director and approved by the Board of","Regulators, taking into account the opinion","of the Commission and in relation to","multiannual programming after consulting","the European Parliament. It shall forward it","to the European Parliament, the Council","and the Commission no later than 31","January each year."],"old":["Each year, the Administrative Board shall","adopt a programming document containing","multi-annual and annual programming,","","based on a draft put forward by the","Director, taking into account the opinion of","the Commission and in relation to","multiannual programming after consulting","the European Parliament. It shall forward it","to the European Parliament, the Council","and the Commission no later than 31","January each year."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"297","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-459","location":[["Proposal for a regulation","Article 9 \u2013 paragraph 1"]],"meps":[124826,124870,124739,124699],"meta":{"created":"2020-11-15T15:52:08"},"new":["1. There shall be no maximum and no","minimum limit of the wholesale electricity","price This provision shall apply, inter alia,","to bidding and clearing in all timeframes","and include balancing energy and","imbalance prices."],"old":["1. There shall be no maximum limit of","the wholesale electricity price unless it is","set at the value of lost load as determined","in accordance with Article 10. There shall","be no minimum limit of the wholesale","electricity price unless it is set at a value","of minus 2000 \u20ac or less and, in the event","that it is or anticipated to be reached, set","at a lower value for the following day.","This provision shall apply, inter alia, to","bidding and clearing in all timeframes and","include balancing energy and imbalance","prices."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"459","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Janusz Lewandowski, Jerzy Buzek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1052","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[23781],"meta":{"created":"2019-07-03T06:30:53"},"new":["deleted"],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity","emitting 550 gr CO2/kWh or more shall","not be committed in capacity mechanisms","5 years after the entry into force of this","Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1052","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-460","location":[["Proposal for a regulation","Article 9 \u2013 paragraph 1"]],"meps":[96713],"meta":{"created":"2020-11-15T15:52:08"},"new":["1. There shall be no limit of the","wholesale electricity price unless it is set at","the value of lost load as determined in","accordance with Article 10. This provision","shall apply, inter alia, to bidding and","clearing in all timeframes and include","balancing energy and imbalance prices."],"old":["1. There shall be no maximum limit","of the wholesale electricity price unless it","is set at the value of lost load as determined","in accordance with Article 10. There shall","be no minimum limit of the wholesale","electricity price unless it is set at a value","of minus 2000 \u20ac or less and, in the event","that it is or anticipated to be reached, set","at a lower value for the following day.","","This provision shall apply, inter alia, to","bidding and clearing in all timeframes and","include balancing energy and imbalance","prices."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"460","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Massimiliano Salini, Lara Comi, Fulvio Martusciello, Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-298","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 1 \u2013 subparagraph 1"]],"meps":[125670,96775,124828,36392],"meta":{"created":"2019-07-03T06:30:46"},"new":["Each year, the Administrative Board shall","adopt a programming document containing","multi-annual and annual programming,","based on a draft put forward by the","Director and approved by the Board of","Regulators, taking into account the opinion","of the Commission and in relation to","multiannual programming after consulting","the European Parliament. It shall forward it","to the European Parliament, the Council","and the Commission no later than 31","January each year."],"old":["Each year, the Administrative Board shall","adopt a programming document containing","multi-annual and annual programming,","based on a draft put forward by the","Director, taking into account the opinion of","the Commission and in relation to","multiannual programming after consulting","the European Parliament. It shall forward it","to the European Parliament, the Council","and the Commission no later than 31","January each year."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"298","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Andr\u00e1s Gy\u00fcrk, Gy\u00f6rgy H\u00f6lv\u00e9nyi","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1053","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[23816,124715],"meta":{"created":"2019-07-03T06:30:53"},"new":["deleted"],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity","emitting 550 gr CO2/kWh or more shall","not be committed in capacity mechanisms","5 years after the entry into force of this","Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1053","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Kate\u0159ina Kone\u010dn\u00e1, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1054","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[23699,96713],"meta":{"created":"2019-07-03T06:30:53"},"new":["deleted"],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity","emitting 550 gr CO2/kWh or more shall","not be committed in capacity mechanisms","5 years after the entry into force of this","Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1054","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-461","location":[[" Proposal for a regulation","Article 9 \u2013 paragraph 1"]],"meps":[28331],"meta":{"created":"2020-11-15T15:52:08"},"new":["1. There shall be no limit of the","wholesale electricity price unless it is set at","the value of lost load as determined in","accordance with Article 10. This provision","shall apply, inter alia, to bidding and","clearing in all timeframes and include","balancing energy and imbalance prices."],"old":["1. There shall be no maximum limit","of the wholesale electricity price unless it","is set at the value of lost load as determined","in accordance with Article 10. There shall","be no minimum limit of the wholesale","electricity price unless it is set at a value","of minus 2000 \u20ac or less and, in the event","that it is or anticipated to be reached, set","at a lower value for the following day.","This provision shall apply, inter alia, to","bidding and clearing in all timeframes and","include balancing energy and imbalance","prices."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"461","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Eugen Freund","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-299","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 1 \u2013 subparagraph 1"]],"meps":[125018],"meta":{"created":"2019-07-03T06:30:46"},"new":["Each year, the Administrative Board shall","adopt a programming document containing","multi-annual and annual programming,","based on a draft put forward by the","Director and approved by the Board of","Regulators, taking into account the opinion","of the Commission and in relation to","multiannual programming after consulting","the European Parliament. It shall forward it","to the European Parliament, the Council","and the Commission no later than 31","January each year."],"old":["Each year, the Administrative Board shall","adopt a programming document containing","","multi-annual and annual programming,","based on a draft put forward by the","Director, taking into account the opinion of","the Commission and in relation to","multiannual programming after consulting","the European Parliament. It shall forward it","to the European Parliament, the Council","and the Commission no later than 31","January each year."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"299","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Cristian-Silviu Bu\u015foi","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1055","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[38420],"meta":{"created":"2019-07-03T06:30:53"},"new":["deleted"],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity","emitting 550 gr CO2/kWh or more shall","not be committed in capacity mechanisms","5 years after the entry into force of this","Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1055","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-462","location":[[" Proposal for a regulation","Article 9 \u2013 paragraph 1"]],"meps":[28331],"meta":{"created":"2020-11-15T15:52:08"},"new":["1. There shall be no maximum limit of","the electricity balancing market price","unless it is set reflecting the value of lost","load as determined in accordance with","Article 10. This provision shall apply, inter","alia, to bidding and clearing in all","timeframes and include balancing energy","and imbalance prices."],"old":["1. There shall be no maximum limit of","the wholesale electricity price unless it is","set at the value of lost load as determined","in accordance with Article 10. There shall","be no minimum limit of the wholesale","electricity price unless it is set at a value","","of minus 2000 \u20ac or less and, in the event","that it is or anticipated to be reached, set","at a lower value for the following day.","This provision shall apply, inter alia, to","bidding and clearing in all timeframes and","include balancing energy and imbalance","prices."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"462","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-300","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 1 \u2013 subparagraph 1"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:46"},"new":["Each year, the Administrative Board shall","adopt a programming document containing","multi-annual and annual programming,","based on a draft put forward by the","Director and approved by the Board of","Regulators, taking into account the opinion","of the Commission and in relation to","multiannual programming after consulting","the European Parliament. It shall forward it","to the European Parliament, the Council","and the Commission no later than 31","January each year."],"old":["Each year, the Administrative Board shall","adopt a programming document containing","multi-annual and annual programming,","based on a draft put forward by the","Director, taking into account the opinion of","the Commission and in relation to","multiannual programming after consulting","the European Parliament. It shall forward it","to the European Parliament, the Council","and the Commission no later than 31","January each year."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"300","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1056","justification":" Introduction of CMs aims at tackling issue of generation adequacy, and should be based on\n technology-neutral approach. Clear rules for effective phase-out of CMs should be set as\n well.","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:53"},"new":["deleted"],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity","emitting 550 gr CO2/kWh or more shall","not be committed in capacity mechanisms","5 years after the entry into force of this","Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1056","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-463","location":[["Proposal for a regulation","Article 9 \u2013 paragraph 1"]],"meps":[125024,183793,96993],"meta":{"created":"2020-11-15T15:52:09"},"new":["1. There shall be no maximum limit of","the wholesale electricity price unless it is","set at the value of lost load as determined","in accordance with Article 10. In strongly","interconnected markets, the level of","technical price limits should be the same","among all bidding zones and markets to","avoid market distortions. There shall be","no minimum limit of the wholesale","electricity price."],"old":["1. There shall be no maximum limit of","the wholesale electricity price unless it is","set at the value of lost load as determined","in accordance with Article 10. There shall","be no minimum limit of the wholesale","electricity price unless it is set at a value","of minus 2000 \u20ac or less and, in the event","that it is or anticipated to be reached, set","at a lower value for the following day.","This provision shall apply, inter alia, to","bidding and clearing in all timeframes","and include balancing energy and","imbalance prices."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"463","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1057","justification":"We are not in favour of introduction of this para 4 of this article. We respect existing EEAG\nand highlight principle of free choice for domestic energy mix. In our opinion, introduction of\nCRMs aims at tackling issue of generation adequacy, including necessary technical /\nqualitative characteristics of supported source. In our opinion is the current proposal in\nconflict with EEAG and DG COMP report on capacity mechanisms. We therefore propose to\nremove the whole para 4.It is also in the recital 30 of the Commission\u00b4s proposal that \u201eMain\nprinciples of capacity mechanisms should be laid down, building on the environmental and\nenergy State aid principles and the findings of DG competitions Sector Inquiry on capacity\nmechanisms.\u201c To ensure temporary status of Capacity mechanisms we propose to include\nnew para (6) specifying provision for CRMs phase-out.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:53"},"new":["deleted"],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity","emitting 550 gr CO2/kWh or more shall","not be committed in capacity mechanisms","5 years after the entry into force of this","Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1057","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Henna Virkkunen","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-464","justification":" Balancing market are priced at a momentary power shortages or power surplus: the price\n may rise to higher levels. Financing market will price any day ahead market risks into the\n financial products.","location":[["Proposal for a regulation","Article 9 \u2013 paragraph 1"]],"meps":[124726],"meta":{"created":"2020-11-15T15:52:09"},"new":["There shall be no maximum limit of","the balancing market electricity price","unless it is set at the value of lost load as","determined in accordance with Article 10.","There shall be no minimum limit of the","balancing market electricity price unless it","is set at a value of minus 2000 \u20ac or less","and, in the event that it is or anticipated to","be reached, set at a lower value for the","following day. This provision shall apply,","inter alia, to bidding and clearing in all","timeframes and include balancing energy","and imbalance prices. The price limits","shall be the same for the common market","area."],"old":["1. There shall be no maximum limit of 1.","the wholesale electricity price unless it is","set at the value of lost load as determined","","in accordance with Article 10. There shall","be no minimum limit of the wholesale","electricity price unless it is set at a value of","minus 2000 \u20ac or less and, in the event that","it is or anticipated to be reached, set at a","lower value for the following day. This","provision shall apply, inter alia, to bidding","and clearing in all timeframes and include","balancing energy and imbalance prices."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"464","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-301","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 1 \u2013 subparagraph 1"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:46"},"new":["Each year, the Administrative Board shall","adopt a programming document containing","multi-annual and annual programming,","based on a draft put forward by the","Director and approved by the Board of","Regulators, taking into account the opinion","of the Commission and in relation to","multiannual programming after consulting","the European Parliament. It shall forward it","to the European Parliament, the Council","and the Commission no later than 31","January each year."],"old":["Each year, the Administrative Board shall","","adopt a programming document containing","multi-annual and annual programming,","based on a draft put forward by the","Director, taking into account the opinion of","the Commission and in relation to","multiannual programming after consulting","the European Parliament. It shall forward it","to the European Parliament, the Council","and the Commission no later than 31","January each year."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"301","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Gunnar H\u00f6kmark","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1058","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[28124],"meta":{"created":"2019-07-03T06:30:53"},"new":["deleted"],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity","emitting 550 gr CO2/kWh or more shall","not be committed in capacity mechanisms","5 years after the entry into force of this","Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1058","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-465","justification":"Barriers to free price formation including caps and floors should be removed, in particular\nwhen markets are coupled as different technical price limits may result in unintended effects.","location":[[" Proposal for a regulation","Article 9 \u2013 paragraph 1"]],"meps":[2278],"meta":{"created":"2020-11-15T15:52:09"},"new":["1. There shall be no maximum limit of","the wholesale electricity price unless it is","set at the value of lost load as determined","in accordance with Article 10. In case of","markets being strongly interconnected,","the level of technical price limits should","be the same across all markets and","bidding zones in order to avoid market","distortions. There shall be no minimum","limit of the wholesale electricity price.","This provision shall apply, inter alia, to","bidding and clearing in all timeframes and","include balancing energy and imbalance","prices."],"old":["1. There shall be no maximum limit of","the wholesale electricity price unless it is","set at the value of lost load as determined","in accordance with Article 10. There shall","be no minimum limit of the wholesale","electricity price unless it is set at a value","of minus 2000 \u20ac or less and, in the event","that it is or anticipated to be reached, set","at a lower value for the following day.","This provision shall apply, inter alia, to","bidding and clearing in all timeframes and","include balancing energy and imbalance","prices."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"465","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-302","justification":" The annual work programme of the Agency is approved by the Board of Regulators under\n Article 23(5)(c). Given that the annual work programme needs to be in line with the multi-\n annual work programme, the Board of Regulators should also approve the latter.","location":[[" Proposal for a regulation","Article 21 \u2013 paragraph 1 \u2013 subparagraph 1"]],"meps":[36392],"meta":{"created":"2019-07-03T06:30:46"},"new":["Each year, the Administrative Board shall","adopt a programming document containing","multi-annual and annual programming,","based on a draft put forward by the","Director and approved by the Board of","Regulators, taking into account the opinion","of the Commission and in relation to multi-","annual programming after consulting the","European Parliament. It shall forward it to","the European Parliament, the Council and","the Commission no later than 31 January","each year"],"old":["Each year, the Administrative Board shall","adopt a programming document containing","multi-annual and annual programming,","based on a draft put forward by the","Director, taking into account the opinion of","the Commission and in relation to","multiannual programming after consulting","the European Parliament. It shall forward it","to the European Parliament, the Council","and the Commission no later than 31","January each year."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"302","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Markus Pieper","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1059","justification":" The design of capacity mechanisms should be technologically neutral and not discriminate\n against specific conventional power plants. From an economic point of view, this would be\n inefficient. Furthermore, capacity mechanisms have the purpose of security of supply.\n Involving criteria of climate protection in the design of capacity mechanisms is an\n unnecessary mixture of two different topics, since the reduction of CO2 emissions is already\n dealt with in the European Emissions Trading System (ETS).","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[28224],"meta":{"created":"2019-07-03T06:30:54"},"new":["deleted"],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity","emitting 550 gr CO2/kWh or more shall","not be committed in capacity mechanisms","5 years after the entry into force of this","Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1059","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Peter Kouroumbashev, Miapetra Kumpula-Natri","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-466","justification":"Considering the difference between the long-term market and the day-ahead market, in the\nbalancing market, it is important to allow the TSOs to ensure balancing power in the grid as\nwell as flexible renewable production. If not, we risk producing additional costs, which will\naffect consumers.","location":[["Proposal for a regulation","Article 9 \u2013 paragraph 1"]],"meps":[124857,124735],"meta":{"created":"2020-11-15T15:52:09"},"new":["1. There shall be no maximum limit of","the electricity balancing market price","unless it is set reflecting the value of lost","load as determined in accordance with","Article 10. There shall be no minimum","limit of the electricity balancing market","price unless it is set at a value of minus","2000 \u20ac or less and, in the event that it is or","anticipated to be reached, set at a lower","value for the following day. This provision","shall apply, inter alia, to bidding and","clearing in all timeframes and include","balancing energy and imbalance prices."],"old":["1. There shall be no maximum limit of","the wholesale electricity price unless it is","set at the value of lost load as determined","in accordance with Article 10. There shall","be no minimum limit of the wholesale","electricity price unless it is set at a value of","minus 2000 \u20ac or less and, in the event that","it is or anticipated to be reached, set at a","lower value for the following day. This","provision shall apply, inter alia, to bidding","and clearing in all timeframes and include","balancing energy and imbalance prices."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"466","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Marian-Jean Marinescu","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1060","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[33982],"meta":{"created":"2019-07-03T06:30:54"},"new":["deleted"],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity","emitting 550 gr CO2/kWh or more shall","not be committed in capacity mechanisms","5 years after the entry into force of this","Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1060","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Neoklis Sylikiotis, Sofia Sakorafa","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-303","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 2"]],"meps":[124689,125091],"meta":{"created":"2019-07-03T06:30:46"},"new":["2. The annual work programme shall","comprise detailed objectives and expected","results including performance indicators. It","shall also contain a description of the","actions to be financed and an indication of","the financial and human resources","allocated to each action, in accordance with","the principles of activity-based budgeting","and management. The annual work","programme shall be coherent with the","multi-annual work programme referred to","in paragraph 4. It shall clearly indicate","tasks that have been added, changed or","deleted in comparison with the previous","financial year."],"old":["2. The annual work programme shall","comprise detailed objectives and expected","results including performance indicators. It","shall also contain a description of the","actions to be financed and an indication of","the financial and human resources","allocated to each action, in accordance with","the principles of activity-based budgeting","and management. The annual work","programme shall be coherent with the","multi-annual work programme referred to","in paragraph 4. It shall clearly indicate","tasks that have been added, changed or","deleted in comparison with the previous","financial year. Annual and multi- annual","programming shall include the strategy","for relations with third countries or","international organisations referred to in","Article 43 and the actions linked to that","strategy."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"303","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Kaja Kallas, Morten Helveg Petersen, Angelika Mlinar","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-467","location":[["Proposal for a regulation","Article 9 \u2013 paragraph 1"]],"meps":[124697,124872,125026],"meta":{"created":"2020-11-15T15:52:09"},"new":["1. There shall be no maximum limit of","the electricity balancing market price","unless it is set at the value of lost load as","determined in accordance with Article 10.","There shall be no minimum limit of the","electricity balancing market price unless it","is set at a value of minus 2000 \u20ac or less","and, in the event that it is or anticipated to","be reached, set at a lower value for the","following day. This provision shall apply,","inter alia, to bidding and clearing in all","timeframes and include balancing energy","and imbalance prices."],"old":["1. There shall be no maximum limit of","the wholesale electricity price unless it is","","set at the value of lost load as determined","in accordance with Article 10. There shall","be no minimum limit of the wholesale","electricity price unless it is set at a value of","minus 2000 \u20ac or less and, in the event that","it is or anticipated to be reached, set at a","lower value for the following day. This","provision shall apply, inter alia, to bidding","and clearing in all timeframes and include","balancing energy and imbalance prices."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"467","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Jens Geier, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1061","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[124826,124870,124739,124735,96833,124699],"meta":{"created":"2019-07-03T06:30:54"},"new":["deleted"],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity","emitting 550 gr CO2/kWh or more shall","not be committed in capacity mechanisms","5 years after the entry into force of this","Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1061","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski, Edward Czesak, Nikolay Barekov","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1062","justification":" The EU ETS system is the key tool to achieve greenhouse gas emissions reduction in the\n framework of climate policy .The introduction of the emission performance standard (EPS) to\n the Electricity Regulation is unjustified as it is based on the Art. 194 of TFEU referring only\n to energy policy. In particular, the discriminatory EPS is contrary to the Art. 194 (2), which\n confers to Member States the right to determine their energy mix. As it stands, the EPS would\n exclude a large share of conventional energy sources from any capacity market.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[124891,132925,124871],"meta":{"created":"2019-07-03T06:30:54"},"new":["deleted"],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity","emitting 550 gr CO2/kWh or more shall","not be committed in capacity mechanisms","5 years after the entry into force of this","Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1062","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-468","location":[[" Proposal for a regulation","Article 9 \u2013 paragraph 2"]],"meps":[96713],"meta":{"created":"2020-11-15T15:52:09"},"new":["2. By way of derogation from","paragraph 1, nominated electricity market","operators may apply harmonized limits on","maximum clearing prices for single day-","ahead coupling and single intra-day","coupling time frames in accordance with","Articles 41 and 54 of Regulation (EU)","2015/1222. Such harmonized limits shall","be set at the value close to the value of lost","load. In the event that limits are, or are","anticipated to be, reached, they shall be","raised for the following day."],"old":["2. By way of derogation from","paragraph 1, until [OP: two years after","entry into force] market operators may","apply limits on maximum clearing prices","for day-ahead and intraday timeframes in","accordance with Articles 41 and 54 of","Regulation (EU) 2015/1222. In the event","that limits are, or are anticipated to be,","reached, they shall be raised for the","following day."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"468","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Barbara Kappel, Lorenzo Fontana, Angelo Ciocca","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-304","location":[["Proposal for a regulation","Article 21 \u2013 paragraph 2"]],"meps":[125024,96993,183793],"meta":{"created":"2019-07-03T06:30:47"},"new":["2. The annual work programme shall","comprise detailed objectives and expected","results including performance indicators. It","shall also contain a description of the","actions to be financed and an indication of","the financial and human resources","allocated to each action, including","reference to the Agency working group","tasked with drawing up the respective","documents, in accordance with the","principles of activity-based budgeting and","management. The annual work programme","shall be coherent with the multi-annual","work programme referred to in paragraph","4. It shall clearly indicate tasks that have","been added, changed or deleted in","comparison with the previous financial","year. Annual and multi- annual","programming shall include the strategy for","relations with third countries or","international organisations referred to in","Article 43 and the actions linked to that","strategy."],"old":["2. The annual work programme shall","comprise detailed objectives and expected","results including performance indicators. It","shall also contain a description of the","actions to be financed and an indication of","the financial and human resources","allocated to each action, in accordance with","the principles of activity-based budgeting","","and management. The annual work","programme shall be coherent with the","multi-annual work programme referred to","in paragraph 4. It shall clearly indicate","tasks that have been added, changed or","deleted in comparison with the previous","financial year. Annual and multi- annual","programming shall include the strategy for","relations with third countries or","international organisations referred to in","Article 43 and the actions linked to that","strategy."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"304","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Rolandas Paksas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1063","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[96694],"meta":{"created":"2019-07-03T06:30:54"},"new":["deleted"],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity","emitting 550 gr CO2/kWh or more shall","not be committed in capacity mechanisms","5 years after the entry into force of this","Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1063","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Davor \u0160krlec on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-305","justification":" In line with the proposal he Board of Regulators to be chaired by the Director of the Agency.","location":[[" Proposal for a regulation","Article 22 \u2013 paragraph 1 \u2013 subparagraph 1 \u2013 point a a (new)"]],"meps":[124756],"meta":{"created":"2019-07-03T06:30:47"},"new":["(aa) the Director of the Agency without","the right to vote;"],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"305","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-469","justification":"Generally we support removal of price caps on the wholesale markets. We however don\u00b4t\nsupport price restrictions in regard to technical price caps for market clearing. It is unclear\nhow to set harmonised min/max clearing prices according to article 10 (Value of lost load \u2013\nVoLL), if VoLLs will be different in each Member State. Some provisions are already included\nin Commission\u2019s Regulation (EU) 2015/1222 (CACM) .Implementation of article 9 in the\noriginal wording (possibility of different minimal and maximal price among Member States\n(MS), according to VoLL) could in its effect limit cross border trade - MS with higher VoLL\nwill in scarcity situations always import all missing electricity from the MS with lower VoLL.\nWe suggest removal of whole para 1 of this article as it can cause problems with\nimplementation of single electricity market as required by Commission\u2019s Regulation (EU)\n2015/1222 (CACM) art. 41 and 54.To avoid problems with non-harmonized price caps (in\neach MS different VoLL = different price cap) we propose to introduce exception allowing to\nset harmonized price cap, however sufficiently high (close to some average VoLL), to avoid\npossible reduction of trade while avoiding cause of unequal conditions on the electricity\nmarkets of Member states.","location":[[" Proposal for a regulation","Article 9 \u2013 paragraph 2"]],"meps":[28331],"meta":{"created":"2020-11-15T15:52:09"},"new":["2. By way of derogation from","paragraph 1, nominated electricity market","operators may apply harmonized limits on","maximum clearing prices for single day-","ahead coupling and single intra-day","coupling in accordance with Articles 41","and 54 of Regulation (EU) 2015/1222.","Such harmonized limits shall be set at the","value close to the value of lost load. In the","event that limits are, or are anticipated to","be, reached, they shall be raised for the","following day."],"old":["2. By way of derogation from","paragraph 1, until [OP: two years after","entry into force] market operators may","apply limits on maximum clearing prices","for day-ahead and intraday timeframes in","accordance with Articles 41 and 54 of","Regulation (EU) 2015/1222. In the event","that limits are, or are anticipated to be,","reached, they shall be raised for the","following day."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"469","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1064","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:54"},"new":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh.","Existing generation capacity emitting 650","gr CO/kWh or more shall not be","committed in capacity mechanisms 5 years","after entry into force of this Regulation.","Existing generation capacity emitting 600","gr CO2/kWh or more shall not be","committed in capacity mechanisms 10","years after the entry into force of this","Regulation.","Existing generation capacity emitting 550","gr CO/kWh or more shall not be","committed in capacity mechanisms 15","years after the entry into force of this","Regulation.","Installations burning waste gases,","including blast furnace gases, shall not be","subject to the CO2 emission limit, taking","into account the efficient energy recovery","of waste gases and its environmental","benefit, and the fact that the high CO2","content of the waste gases is transferred","from the industrial process, for example","steel making process (\"inherent CO2\"","according to the Monitoring and","Reporting Regulation).","The CO2 emission factor of an electricity","generation installation shall be based on","the net efficiency at nominal capacity","under ISO conditions."],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity emitting","550 gr CO2/kWh or more shall not be","committed in capacity mechanisms 5 years","after the entry into force of this Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1064","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-306","justification":"This is necessary for pressing reasons relating to the internal logic of the text or because the\namendments are inextricably linked to other admissible amendments","location":[[" Proposal for a regulation","Article 22 \u2013 paragraph 1 \u2013 subparagraph 1 \u2013 point b a (new)"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:47"},"new":["(ba) one non-voting representative of","the European Parliament."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"306","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Martina Werner, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-470","location":[["Proposal for a regulation","Article 9 \u2013 paragraph 2"]],"meps":[124826,124870,124739,124735,124699],"meta":{"created":"2020-11-15T15:52:09"},"new":["By way of derogation from","paragraph 1, market operators may apply","technical limits on maximum and","minimum bidding limits for day-ahead and","intraday timeframes in accordance with","Articles 41 and 54 of Regulation","(EU)2015/1222. In the event that these","limits are, or are anticipated to be, reached,","they shall be adjusted for the following","day. Technical price limits shall be","harmonised for the common market area."],"old":["2. By way of derogation from 2.","paragraph 1, until [OP: two years after","entry into force] market operators may","apply limits on maximum clearing prices","for day-ahead and intraday timeframes in","","accordance with Articles 41 and 54 of","Regulation (EU) 2015/1222. In the event","that limits are, or are anticipated to be,","reached, they shall be raised for the","following day."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"470","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Kathleen Van Brempt","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1065","justification":" Lager units can make use of more efficient technologies (such as CCGT) capable to keep the\n CO2/kWh emissions below 450 gr/kWh. If capacity mechanisms might support such large\n units, we must be sure that the most energy efficient technologies are used. For smaller units\n such as open gas turbines that are often more flexible and closer located to the needs created\n by decentralized intermittent renewable generation, more stringent CO2/kWh limits are more\n difficult to reach. The reference to ISO conditions and nameplate capacity) is to clarify the\n method of calculating the CO2/kWh in an unambiguous way.","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[5729],"meta":{"created":"2019-07-03T06:30:54"},"new":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh for installations with a","nominal capacity smaller than 200 MW","and below 450 gr CO2/kWh for","installations with larger capacity.","Generation capacity emitting 550 gr","CO2/kWh or more shall not be committed","in capacity mechanisms 5 years after the","entry into force of this Regulation.","The calculation of the CO2/kWh in the","first subparagraph shall be based on the","net efficiency at nominal capacity under","ISO conditions."],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity emitting","550 gr CO2/kWh or more shall not be","committed in capacity mechanisms 5 years","after the entry into force of this Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1065","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-307","justification":"This amendment aims at defining a modern governance scheme and is linked to an\namendment to Recital 34.","location":[["Proposal for a regulation","Article 22 \u2013 paragraph 1 \u2013 subparagraph 1 a \u2013 point (c) (new)"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:47"},"new":["(c) one non-voting representative of","the European Parliament."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"307","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Davor \u0160krlec on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-308","justification":" This amendment stems from the concern that CEER, an organisation dedicated to promoting\n the interests of NRAs, has direct influence on ACER and participates in the Agency\u2019s\n decision-making process.","location":[["Proposal for a regulation","Article 22 \u2013 paragraph 1 \u2013 subparagraph 2"]],"meps":[124756],"meta":{"created":"2019-07-03T06:30:47"},"new":["Only one representative per Member State","from the national regulatory authority may","be admitted to the Board of Regulators.","Members of board or executive structures","of organisations representing the interests","of national regulatory authorities shall","not be admitted to the Board of","Regulators."],"old":["Only one representative per Member State","from the national regulatory authority may","be admitted to the Board of Regulators.",""],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"308","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1066","justification":"The proposed sustainability criteria will directly puts the EU climate commitments in\njeopardy by leaving the option open to subsidise some relatively high efficient coal (and\npotentially lignite) electricity production with heat recovery (i.e. combined heat and power)\nand/or biomass co-firing plants. It is crucial to tighten the level to 350 gCO2/kWh and make\nsure that this level decreases over time. Capacity remuneration should only be warranted\nwhere it contributes towards system stability, and flexibility is a key way to ensure this.","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:54"},"new":["4. Generation capacity shall only be","eligible to participate in a capacity","mechanism if:","(a) its total greenhouse gas emissions per","kilowatt hour of electricity produced in","the installation do not exceed 350gof CO2","equivalent from [OP: date of entry into","force of this Regulation]; and","(b) it is capable of ramping up and down","on-load at least at the level 5% of their","capacity per minute.","Capacity providers must comply with EU","Environmental Quality Standards and","Best Available Techniques (BATs) to","participate in capacity mechanisms."],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","","gr CO2/kWh. Generation capacity","emitting 550 gr CO2/kWh or more shall","not be committed in capacity mechanisms","5 years after the entry into force of this","Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1066","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-471","location":[[" Proposal for a regulation","Article 9 \u2013 paragraph 2"]],"meps":[2025],"meta":{"created":"2020-11-15T15:52:09"},"new":["2. Market operators may apply limits","on maximum clearing prices for day-ahead","and intraday timeframes in accordance","with Articles 41 and 54 of Regulation (EU)","2015/1222. In the event that limits are, or","are anticipated to be, reached, they shall be","raised following an automatic procedure","developed by the Nominated Electricity","Market Operators and approved by the","competent authority."],"old":["2. By way of derogation from","paragraph 1, until [OP: two years after","entry into force] market operators may","apply limits on maximum clearing prices","for day-ahead and intraday timeframes in","accordance with Articles 41 and 54 of","Regulation (EU) 2015/1222. In the event","that limits are, or are anticipated to be,","reached, they shall be raised for the","following day."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"471","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":" Davor \u0160krlec on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-309","justification":" The Director as an impartial official would provide greater objectivity and EU-centric\n approach to the chairmanship.","location":[[" Proposal for a regulation","Article 22 \u2013 paragraph 1 a (new)"]],"meps":[124756],"meta":{"created":"2019-07-03T06:30:47"},"new":["1a. The Board of Regulators shall be","chaired by the Director of the Agency."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"309","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-472","justification":"Technical price limits shall be designed in a way not to distort the market.","location":[[" Proposal for a regulation","Article 9 \u2013 paragraph 2"]],"meps":[4432],"meta":{"created":"2020-11-15T15:52:09"},"new":["2. Market operators may apply","technical limits on maximum and","minimum clearing prices for day-ahead","and intraday timeframes in accordance","with Articles 41 and 54 of Regulation (EU)","2015/1222. In the event that limits are, or","are anticipated to be, reached, they shall be","raised for the following day in accordance","with Articles 41 and 54 of Regulation","(EU) 2015/1222."],"old":["2. By way of derogation from","paragraph 1, until [OP: two years after","entry into force] market operators may","apply limits on maximum clearing prices","for day-ahead and intraday timeframes in","accordance with Articles 41 and 54 of","","Regulation (EU) 2015/1222. In the event","that limits are, or are anticipated to be,","reached, they shall be raised for the","following day."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"472","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Pilar del Castillo Vera, Pilar Ayuso, Francesc Gamb\u00fas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1067","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[28390,4319,125006],"meta":{"created":"2019-07-03T06:30:54"},"new":["4. Member States applying capacity","mechanisms may limit cross-border","participation of generation capacity","emitting 550 gr CO2/kWh or more."],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity emitting","550 gr CO2/kWh or more shall not be","committed in capacity mechanisms 5","years after the entry into force of this","Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1067","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Davor \u0160krlec on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-310","justification":"In line with the proposal he Board of Regulators to be chaired by the Director of the Agency.","location":[[" Proposal for a regulation","Article 22 \u2013 paragraph 2"]],"meps":[124756],"meta":{"created":"2019-07-03T06:30:47"},"new":["2. The Board of Regulators shall elect","a Vice-Chairman from among its members.","The Vice-Chairman shall replace the","Chairman if the latter is not in a position to","perform his duties. The term of office of","the Chairman and of the Vice-Chairman","shall be two-and-a-half years and shall be","renewable. In any event, however, the term","of office of the Vice-Chairman shall expire","when they cease to be members of the","Board of Regulators."],"old":["2. The Board of Regulators shall elect","a Chairman and a Vice-Chairman from","among its members. The Vice-Chairman","","shall replace the Chairman if the latter is","not in a position to perform his duties. The","term of office of the Chairman and of the","Vice-Chairman shall be two-and-a-half","years and shall be renewable. In any event,","however, the term of office of the","Chairman and that of the Vice-Chairman","shall expire when they cease to be","members of the Board of Regulators."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"310","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Martina Werner, Carlos Zorrinho, Miapetra Kumpula-Natri, Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.623-473","location":[["Proposal for a regulation","Article 9 \u2013 paragraph 4"]],"meps":[124826,124739,124735,124699],"meta":{"created":"2020-11-15T15:52:09"},"new":["4. Member States shall identify","policies and measures applied within their","territory that could contribute to indirectly","restrict price formation, including limiting","bids relating to the activation of balancing","energy, capacity mechanisms, measures by","the transmission system operators,","measures intended to challenge market","results or to prevent abuse of dominant","positions."],"old":["4. Member States shall identify","policies and measures applied within their","territory that could contribute to indirectly","restrict price formation, including limiting","bids relating to the activation of balancing","energy, capacity mechanisms, measures by","the transmission system operators,","measures intended to challenge market","results or to prevent abuse of dominant","positions or inefficiently defined bidding","zones."],"orig_lang":"en","peid":"PE609.623v01-00","reference":"2016/0379(COD)","seq":"473","src":"http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//NONSGML+COMPARL+PE-609.623+01+DOC+PDF+V0//EN&language=EN"},{"authors":"Cornelia Ernst","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1068","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[96852],"meta":{"created":"2019-07-03T06:30:54"},"new":["4. Generation capacity shall only be","eligible to participate in a capacity","mechanism if its emissions are below 350","gr CO2/kWh. Participating power","plants shall be required to comply with","European air quality standards including","the best available technique reference","documents in the Directive 2010/75/EU","on industrial emissions. Nuclear","generation shall only be eligible if all costs","for waste handling, decommissioning and","liability are entirely covered by the","operator."],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity","emitting 550 gr CO2/kWh or more shall","not be committed in capacity mechanisms","5 years after the entry into force of this","Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1068","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Pilar del Castillo Vera","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-311","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 1"]],"meps":[28390],"meta":{"created":"2019-07-03T06:30:47"},"new":["1. The Board of Regulators and sub-","committees pursuant to Article 7 shall act","by a two-thirds majority of the members","present, with one vote for each member."],"old":["1. The Board of Regulators and sub-","committees pursuant to Article 7 shall act","by a simple majority of the members","present, with one vote for each member,","except for the opinion pursuant to","paragraph 5(b) which shall be taken on","the basis of a two-thirds majority of its","members present."],"orig_lang":"es","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"311","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Werner Langen","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1069","justification":" Most of the disadvantages posed by the limit value could be averted by applying the 550 gr\n threshold only to new plants. Past investment would not be devalued and capacity markets\n\nwould remain manageable, since all existing plants in the market would be available to the\ncapacity market.","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[1928],"meta":{"created":"2019-07-03T06:30:54"},"new":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh."],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity","emitting 550 gr CO2/kWh or more shall","not be committed in capacity mechanisms","5 years after the entry into force of this","Regulation."],"orig_lang":"de","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1069","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-312","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 1"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:47"},"new":["1. The Board of Regulators shall act","by a two-thirds majority of the members","present, with one vote for each member."],"old":["1. The Board of Regulators and sub-","committees pursuant to Article 7 shall act","","","by a simple majority of the members","present, with one vote for each member,","except for the opinion pursuant to","paragraph 5(b) which shall be taken on","the basis of a two-thirds majority of its","members present ."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"312","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Paul R\u00fcbig","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1070","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[2278],"meta":{"created":"2019-07-03T06:30:54"},"new":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. If combined heat and power","is used, both, the heat and power","output have to be considered in the","calculation of the specific","emissions. Generation capacity emitting","550 gr CO2/kWh or more shall not be","committed in capacity mechanisms 5 years","after the entry into force of this Regulation."],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity emitting","550 gr CO2/kWh or more shall not be","committed in capacity mechanisms 5 years","after the entry into force of this Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1070","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-313","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 1"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:47"},"new":["1. The Board of Regulators shall act","by a two-thirds majority of the members","present, with one vote for each member."],"old":["1. The Board of Regulators and sub-","committees pursuant to Article 7 shall act","by a simple majority of the members","present, with one vote for each member,","except for the opinion pursuant to","paragraph 5(b) which shall be taken on","the basis of a two-thirds majority of its","members present."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"313","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Patrizia Toia","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1071","justification":" To support decarbonisation of the sector, priority should be given to dispatchable renewable\n generation. This will provide an incentive to invest in dispatchable renewable generation and\n drive major modernisation in the generation fleet","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[28340],"meta":{"created":"2019-07-03T06:30:54"},"new":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. In addition, priority is given","to renewable generation capacity coupled","with energy storage. Generation capacity","emitting 550 gr CO2/kWh or more shall","not be committed in capacity mechanisms","5 years after the entry into force of this","Regulation."],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity emitting","550 gr CO2/kWh or more shall not be","committed in capacity mechanisms 5 years","after the entry into force of this Regulation.",""],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1071","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Rolandas Paksas","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-314","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 1"]],"meps":[96694],"meta":{"created":"2019-07-03T06:30:47"},"new":["1. The Board of Regulators and its","sub-committees pursuant to Article 7 shall","act by a two-thirds majority of the","members present, with one vote for each","member."],"old":["1. The Board of Regulators and sub-","committees pursuant to Article 7 shall act","by a simple majority of the members","present, with one vote for each member,","except for the opinion pursuant to","paragraph 5(b) which shall be taken on","the basis of a two-thirds majority of its","members present."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"314","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Esther de Lange","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1072","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[38398],"meta":{"created":"2019-07-03T06:30:55"},"new":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. In addition, priority should","be given to cost-efficient renewable","generation capacity coupled with energy","storage. Generation capacity emitting 550","gr CO2/kWh or more shall not be","committed in capacity mechanisms 5 years","after the entry into force of this Regulation."],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity emitting","550 gr CO2/kWh or more shall not be","committed in capacity mechanisms 5 years","after the entry into force of this Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1072","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Neoklis Sylikiotis, Sofia Sakorafa","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-315","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 1"]],"meps":[124689,125091],"meta":{"created":"2019-07-03T06:30:47"},"new":["1. The Board of Regulators and sub-","committees pursuant to Article 7 shall act","by a two-thirds majority of the members","present, with one vote for each member."],"old":["1. The Board of Regulators and sub-","committees pursuant to Article 7 shall act","by a simple majority of the members","present, with one vote for each member,","except for the opinion pursuant to","paragraph 5(b) which shall be taken on","the basis of a two-thirds majority of its","members present."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"315","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1073","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:55"},"new":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. If CHP is used, both, power","and heat output have to be considered in","the calculation of the specific emissions.","Generation capacity emitting 550 gr","CO2/kWh or more shall not be committed","in capacity mechanisms 5 years after the","entry into force of this Regulation."],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","","gr CO2/kWh. Generation capacity emitting","550 gr CO2/kWh or more shall not be","committed in capacity mechanisms 5 years","after the entry into force of this Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1073","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Eugen Freund","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-316","justification":"The Administrative Board or the Board of Regulators should continue to act by a two-thirds\nmajority, as is the case under the currently applicable Agency Regulation.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 1"]],"meps":[125018],"meta":{"created":"2019-07-03T06:30:47"},"new":["1. The Board of Regulators and sub-","committees pursuant to Article 7 shall act","by a two-thirds majority of the members","present, with one vote for each member."],"old":["1. The Board of Regulators and sub-","committees pursuant to Article 7 shall act","by a simple majority of the members","present, with one vote for each member,","except for the opinion pursuant to","paragraph 5(b) which shall be taken on","the basis of a two-thirds majority of its","members present."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"316","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1074","justification":"Capacity mechanisms shall include flexibility criteria to effectively being able to provide\ncapacity at short notice and with flexible volumes.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:55"},"new":["4. Generation capacity shall only be","eligible to participate in a capacity","mechanism if its emissions are below 350","gr CO2/kWh and if it is capable of","ramping up and down on-load at least at","the level of 5% of their capacity per","minute."],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity","emitting 550 gr CO2/kWh or more shall","not be committed in capacity mechanisms","5 years after the entry into force of this","Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1074","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Massimiliano Salini, Lara Comi, Fulvio Martusciello, Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-317","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 1"]],"meps":[125670,96775,124828,36392],"meta":{"created":"2019-07-03T06:30:47"},"new":["1. The Board of Regulators and sub-","committees pursuant to Article 7 shall act","by a two-thirds majority of the members","present, with one vote for each member."],"old":["1. The Board of Regulators and sub-","committees pursuant to Article 7 shall act","by a simple majority of the members","present, with one vote for each member,","except for the opinion pursuant to","paragraph 5(b) which shall be taken on","the basis of a two-thirds majority of its","members present."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"317","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Massimiliano Salini","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1075","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[125670],"meta":{"created":"2019-07-03T06:30:55"},"new":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh when calculated with","reference to the nameplate basis."],"old":["4. Generation capacity for which a","","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity","emitting 550 gr CO2/kWh or more shall","not be committed in capacity mechanisms","5 years after the entry into force of this","Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1075","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-318","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 1"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:47"},"new":["1. The Board of Regulators and sub-","committees pursuant to Article 7 shall act","by a two-thirds majority of the members","present, with one vote for each member."],"old":["1. The Board of Regulators and sub-","committees pursuant to Article 7 shall act","by a simple majority of the members","present, with one vote for each member,","except for the opinion pursuant to","paragraph 5(b) which shall be taken on","the basis of a two-thirds majority of its","members present."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"318","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1076","justification":" Phasing out most polluting plants is essential to achieve European emissions target, so the\n introduction of the Emission Performance Standard for existing generation capacity should\n be brought forward, with a 5 years long exception for plants that are part of strategic\n reserves, as it is a much less distortive mechanism.","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[90110],"meta":{"created":"2019-07-03T06:30:55"},"new":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity emitting","550 gr CO2/kWh or more shall not be","committed incapacity mechanisms 2 years","after the entry into force of this Regulation,","or5 years for those plants that are part of","strategic reserves."],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity emitting","550 gr CO2/kWh or more shall not be","committed in capacity mechanisms 5 years","after the entry into force of this Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1076","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Se\u00e1n Kelly","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-319","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 1"]],"meps":[96668],"meta":{"created":"2019-07-03T06:30:47"},"new":["1. The Board of Regulators and sub-","committees pursuant to Article 7 shall act","by a two-thirds majority of the members","present, with one vote for each member."],"old":["1. The Board of Regulators and sub-","committees pursuant to Article 7 shall act","by a simple majority of the members","present, with one vote for each member,","except for the opinion pursuant to","paragraph 5(b) which shall be taken on","the basis of a two-thirds majority of its","members present."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"319","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Lud\u011bk Niedermayer","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1077","meps":[124701],"meta":{"created":"2019-07-03T06:30:55"},"new":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism other than strategic reserve if","its emissions are below 550 gr CO2/kWh.","Generation capacity emitting 550 gr","CO2/kWh or more shall not be committed","in capacity mechanisms other than","strategic reserves 5 years after the entry","into force of this Regulation."],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity emitting","550 gr CO2/kWh or more shall not be","committed in capacity mechanisms 5 years","after the entry into force of this Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1077","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Werner Langen, Markus Pieper, Kri\u0161j\u0101nis Kari\u0146\u0161, Andr\u00e1s Gy\u00fcrk","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-320","justification":"Given the EU-wide impact of ACER initiatives, a two-thirds majority is needed to ensure a\nbroad support of national energy regulators from across the Union. A two-thirds majority\nalso promotes cooperation among NRAs more effectively than a simple majority.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 1"]],"meps":[1928,28224,96901,23816],"meta":{"created":"2019-07-03T06:30:48"},"new":["1. The Board of Regulators and its","sub-committees pursuant to Article 7 shall","act by a two-thirds majority of the","members present, with one vote for each","member."],"old":["1. The Board of Regulators and sub-","committees pursuant to Article 7 shall act","by a simple majority of the members","present, with one vote for each member,","except for the opinion pursuant to","paragraph 5(b) which shall be taken on","the basis of a two-thirds majority of its","members present."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"320","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Henna Virkkunen","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1078","justification":"Strategic reserves are out of the market and operate in only in exceptional circumstances. The\nactivation of these reserves is a rare situation and the emissions that it will cause are\ninsignificant. Strategic reserves are used for ensuring that the day-ahead market can clear.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[124726],"meta":{"created":"2019-07-03T06:30:55"},"new":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism other than strategic reserves if","its emissions are below 550 gr CO2/kWh.","Generation capacity emitting 550 gr","CO2/kWh or more shall not be committed","in capacity mechanisms 5 years after the","entry into force of this Regulation."],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity emitting","550 gr CO2/kWh or more shall not be","committed in capacity mechanisms 5 years","after the entry into force of this Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1078","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Barbara Kappel, Lorenzo Fontana, Angelo Ciocca","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-321","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 1"]],"meps":[125024,96993,183793],"meta":{"created":"2019-07-03T06:30:48"},"new":["1. The Board of Regulators and its","sub-committees pursuant to Article 7 shall","act by a two-thirds majority of the","members present, with one vote for each","member."],"old":["1. The Board of Regulators and sub-","committees pursuant to Article 7 shall act","by a simple majority of the members","present, with one vote for each member,","except for the opinion pursuant to","paragraph 5(b) which shall be taken on","the basis of a two-thirds majority of its","members present."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"321","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1079","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 4"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:55"},"new":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 600","gr CO2/kWh. Generation capacity","emitting 600 gr CO2/kWh or more shall","not be committed in capacity","mechanisms 10 years after the entry into","force of this Regulation."],"old":["4. Generation capacity for which a","final investment decision has been made","after [OP: entry into force] shall only be","eligible to participate in a capacity","mechanism if its emissions are below 550","gr CO2/kWh. Generation capacity emitting","550 gr CO2/kWh or more shall not be","committed in capacity mechanisms 5 years","after the entry into force of this Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1079","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Jerzy Buzek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1080","justification":"The new emissions performance standard at the level of below 550 gr CO2/kWh (EPS 550)\ndoes not reflect different energy mix situation within the EU and therefore should be amended\nto ensure security of supply in all Member States. Capacity mechanisms in specific MS are\nnecessary to incentivize investment in new capacity and keep existing conventional assets\noperational.","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 4 a (new)"]],"meta":{"created":"2019-07-03T06:30:55"},"new":["4a. By derogation from the previous","paragraph, in Member States where in","[2015], more than [20%] of electricity was","produced from solid fossil fuels, and the","GDP per capita at market price did not","exceed 60% of the average GDP per","capita at market price of the European","Union1a, existing generation capacity and","new generation capacity for which a final","investment decision has been made no","later than [one year] after [OP:entry into","force] shall be eligible to participate in","capacity mechanisms if its emissions are","above 550 gr CO2/kWh, provided that","security of supply is at risk according to","the assessment of the national competent","authority.","In Member States concerned, generation","capacity emitting 550 gr CO2/kWh or","more shall not be committed in capacity","mechanisms [15 years] after entry into","force of this Regulation.","After five years from [15 years from the","entry into force of this Regulation],","Member States concerned may commit in","capacity mechanisms generation capacity","emitting 550 gr CO2/kWh or more","provided that the security of supply risk","persists according to the assessment of the","national competent authority.","_________________","1a","The following Member States should","meet these criteria: Bulgaria, Czech","Republic, Estonia, Greece, Hungary,","Poland, Portugal, Romania."],"old":[""],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1080","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Hans-Olaf Henkel, Edward Czesak, Ev\u017een To\u0161enovsk\u00fd, Zdzis\u0142aw Krasnod\u0119bski","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-322","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 1"]],"meps":[124823,132925,96713,124891],"meta":{"created":"2019-07-03T06:30:48"},"new":["1. The Board of Regulators and sub-","committees pursuant to Article 7 shall act","by a two thirds majority of the members","present, with one vote for each member,","except for the opinion pursuant to","paragraph 5(b) which shall be taken on the","basis of a two-thirds majority of its","members present."],"old":["1. The Board of Regulators and sub-","committees pursuant to Article 7 shall act","by a simple majority of the members","present, with one vote for each member,","except for the opinion pursuant to","paragraph 5(b) which shall be taken on the","basis of a two-thirds majority of its","members present."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"322","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1081","justification":" Capacity mechanisms can, if not well designed and temporary in nature, create important\n market distortions. They shall not be used as a life line for conventional generation capacity.\n It is paramount that such mechanism are open to all market participants, including across\n borders, and that they include flexibility criteria to effectively being able to provide capacity\n at short notice and with flexible volumes.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 4 a (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:55"},"new":["4a. Where a Member State wishes to","implement a capacity mechanism, it shall","organize a competitive bidding process for","capacity providers. This competitive","bidding process shall include set of clear","and transparent environmental criteria in","order to prioritise the most sustainable","and energy efficient capacity sources","including demand side response. The","competitive bidding process criteria must","also include flexibility criteria. Eligible","capacities should be capable of ramping","up and down on-load at least at the level","5% of their capacity per minute. Capacity","providers must comply with EU","Environmental Quality Standards and","performance shall not exceed the stricter","emission levels associated with BAT and","higher range of BAT-associated energy","efficiency levels of all relevant BAT","Conclusions set for new plants to","participate in capacity mechanisms in","order to be eligible to bid."],"old":[""],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1081","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Hans-Olaf Henkel","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-323","justification":"This amendment is necessary for pressing reasons relating to the internal logic of the text or\ninextricably linked to other admissible amendments.","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 2"]],"meps":[124823],"meta":{"created":"2019-07-03T06:30:48"},"new":["2. The Board of Regulators shall","adopt and publish its rules of procedure,","which shall set out in greater detail the","arrangements governing voting, in","particular the conditions on the basis of","which one member may act on behalf of","another and also, where appropriate, the","rules governing quorums. The rules of","procedure may include arrangements on","accessing files, protecting the rights of","parties, ensuring deadlines and laying","down representation rights and provide","for additional specific working methods","for the consideration of further issues","arising in the context of regional","cooperation initiatives."],"old":["2. The Board of Regulators shall","adopt and publish its rules of procedure,","which shall set out in greater detail the","arrangements governing voting, in","","particular the conditions on the basis of","which one member may act on behalf of","another and also, where appropriate, the","rules governing quorums. The rules of","procedure may provide for specific","working methods for the consideration of","issues arising in the context of regional","cooperation initiatives."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"323","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Carolina Punset","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1082","justification":"Including flexibility criteria in the selection process of capacity providers will ensure that aid\nis primarily granted to the most efficient back-up capacity. Criteria related to maximising\nramping ability of available capacity, and reducing the level of lower bound of adjustability\nof capacity providers will contribute to addressing the issue of overcapacity of inflexible\nenergy sources.","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 4 a (new)"]],"meps":[90110],"meta":{"created":"2019-07-03T06:30:55"},"new":["4a. Capacity mechanisms, if deemed","necessary on the basis of an impact","assessment, shall include flexibility","criteria in the selection process of","generation capacity providers. Such","criteria shall aim at maximising the","ramping ability, and minimising the","necessary level of stable output of power","plants benefitting from capacity","mechanisms."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1082","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Massimiliano Salini","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1083","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 4 a (new)"]],"meps":[125670],"meta":{"created":"2019-07-03T06:30:55"},"new":["4a. Generation capacity emitting 550","gr CO2/kWh for which a final investment","decision has been made before (OP-entry","into force) shall not be retroactively","affected."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1083","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Barbara Kappel, Lorenzo Fontana, Angelo Ciocca","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-324","justification":" The Regulation foresees that a favourable opinion by the Board of Regulators is required for\n the Director to be able to issue opinions, recommendations or decisions under Article 25(c).\n In line with European Court of Justice jurisprudence, the Regulation should clarify that this\n requirement applies depending on the substance of a document, not its form.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 5 \u2013 point a"]],"meps":[125024,96993,183793],"meta":{"created":"2019-07-03T06:30:48"},"new":["(a) review, revise and provide opinions","to the Director on all documents","containing opinions, recommendations and","decisions referred to in Articles 3 to 14 and","16, which are considered for adoption. In","its opinions, the Board of Regulators shall","give utmost account to the","recommendations of the Director","pursuant to Article 25(c) or give a","statement of grounds as to why it does not.","In addition, the Board of Regulators,","within its field of competence, shall","provide guidance to the Director and the","Agency working groups in the execution","of their tasks, with the exception of tasks","pursuant to Regulation 1227/201138.","__________________","38","Regulation (EU) 1227/2011 of the","European Parliament and of the Council of","25 October on wholesale energy market","integrity and transparency, OJ L 326,","8.12.2011, p. 1."],"old":["(a) provide opinions to the Director on","the opinions, recommendations and","decisions referred to in Articles 4 to 14,","which are considered for adoption. In","addition, the Board of Regulators, within","its field of competence, shall provide","guidance to the Director in the execution of","his tasks, with the exception of decisions","pursuant to Article 16(6) of Regulation","1227/200138.","__________________","","","38","Regulation (EU) 1227/2011 of the","European Parliament and of the Council of","25 October on wholesale energy market","integrity and transparency, OJ L 326,","8.12.2011, p. 1."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"324","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1084","justification":" It is paramount that such mechanism are open to all market participants, including across\n borders, and that they include flexibility criteria to effectively being able to provide capacity\n at short notice and with flexible volumes.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 4 b (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:55"},"new":["4b. Capacity mechanisms shall reward","the contribution of all resources in the","same manner, including demand-side","flexibility and aggregated resources. They","shall establish clear provisions on non-","discriminatory product definitions and","include prequalification requirements.","Capacity mechanisms shall reflect the","structural advantage provided by","distributed and demand-side resources."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1084","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Hans-Olaf Henkel","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-325","justification":"This amendment is necessary for pressing reasons relating to the internal logic of the text or\ninextricably linked to other admissible amendments.","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 5 \u2013 point a"]],"meps":[124823],"meta":{"created":"2019-07-03T06:30:48"},"new":["(a) amend and provide opinions to the","Director on opinions, recommendations","and decisions referred to in Articles 3 to","14, which are considered for adoption. In","its opinions, the Board of Regulators shall","give utmost account to the","recommendations of the Director","pursuant to Art. 25c or give a statement of","grounds as to why it does not. The Board","of Regulators, within its field of","competence, shall provide guidance to the","Director in the execution of his tasks, with","the exception of decisions pursuant to","Article 16(6) of Regulation 1227/201138.","__________________","38","Regulation (EU) 1227/2011 of the","European Parliament and of the Council of","25 October on wholesale energy market","integrity and transparency, OJ L 326,","8.12.2011, p. 1."],"old":["(a) provide opinions to the Director on","the opinions, recommendations and","decisions referred to in Articles 4 to 14,","which are considered for adoption. In","addition, the Board of Regulators, within","its field of competence, shall provide","guidance to the Director in the execution of","his tasks, with the exception of decisions","pursuant to Article 16(6) of Regulation","1227/200138.","__________________","38","Regulation (EU) 1227/2011 of the","European Parliament and of the Council of","25 October on wholesale energy market","integrity and transparency, OJ L 326,","8.12.2011, p. 1."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"325","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Massimiliano Salini","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1085","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 4 b (new)"]],"meps":[125670],"meta":{"created":"2019-07-03T06:30:55"},"new":["4b. If the generation adequacy","assessment for a Member State","undertaken in accordance with the","principles laid down in Article 19 shows","serious and persistent security of supply","concerns, the Member State may look for","a temporary exemption from the","application 23.4 for existing generation","capacity."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1085","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-326","justification":"The current governance structure of the Agency has worked very well and demonstrates the\nAgency\u2019s effectiveness and its regulatory independence, as defined in its founding Regulation.\nIt does not need to be changed in the recast ACER Regulation. The Board of Regulators\nshould continue to act by a two-thirds majority, with one vote per national energy regulatory\nauthority, as is the case under the current Agency Regulation. This will provide for broad\nnational support by regulators in European energy regulatory decisions which are grounded\non national know-how and regulatory expertise from across the Union so as to deliver net\nbenefit for Europe\u2019s energy consumers.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 5 \u2013 point a"]],"meps":[36392],"meta":{"created":"2019-07-03T06:30:48"},"new":["(a) provide opinions to the Director on","the all documents containing opinions,","recommendations and decisions referred to","in Articles 3 to 11 and 14, 16 and 30,","which are considered for adoption. The","Board of Regulators may amend the","opinions, recommendations and decisions","drafted by the Director pursuant to Article","25. In addition, the Board of Regulators,","within its field of competence, shall","provide guidance to the Director and the","Agency working groups in the execution","of his their tasks, with the exception of","tasks pursuant to Regulation 1227/201138.","__________________","38","Regulation (EU) 1227/2011 of the","European Parliament and of the Council of","25 October on wholesale energy market","integrity and transparency, OJ L 326,","8.12.2011, p. 1."],"old":["(a) provide opinions to the Director on","the opinions, recommendations and","decisions referred to in Articles 4 to 14,","which are considered for adoption. In","addition, the Board of Regulators, within","its field of competence, shall provide","guidance to the Director in the execution of","his tasks, with the exception of decisions","pursuant to Article 16(6) of Regulation","1227/200138.","__________________","38","Regulation (EU) 1227/2011 of the","European Parliament and of the Council of","25 October on wholesale energy market","integrity and transparency, OJ L 326,","8.12.2011, p. 1."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"326","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1086","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 4 c (new)"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:55"},"new":["4c. Capacity products should be","defined with a time-horizon of no more","than 4 years. The same contract lengths","should be available to all resources."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1086","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Patrizia Toia","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-327","justification":" These AMs are necessary for pressing reasons relating to the internal logic of the text and\n inextricably linked to other admissible amendments.","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 5 \u2013 point a"]],"meps":[28340],"meta":{"created":"2019-07-03T06:30:48"},"new":["(a) provide opinions to the Director on","the all documents containing opinions,","recommendations and decisions referred to","in Articles 3 to 11 and 14, 16 and","30,which are considered for adoption. The","Board of Regulators may amend the","decisions, recommendations and opinions","drafted by the Director pursuant to Article","25. In addition, the Board of Regulators,","within its field of competence, shall","provide guidance to the Director and the","Agency working groups in the execution","of his their tasks, with the exception of","tasks pursuant to Regulation 1227/201138.","__________________","38","Regulation (EU) 1227/2011 of the","European Parliament and of the Council of","25 October on wholesale energy market","integrity and transparency, OJ L 326,","8.12.2011, p. 1."],"old":["(a) provide opinions to the Director on","the opinions, recommendations and","decisions referred to in Articles 4 to 14,","which are considered for adoption. In","addition, the Board of Regulators, within","its field of competence, shall provide","guidance to the Director in the execution of","his tasks, with the exception of decisions","pursuant to Article 16(6) of Regulation","1227/200138.","__________________","38","Regulation (EU) 1227/2011 of the","European Parliament and of the Council of","25 October on wholesale energy market","integrity and transparency, OJ L 326,","8.12.2011, p. 1."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"327","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Barbara Kappel, Angelo Ciocca, Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1087","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 5"]],"meps":[125024,183793,96993],"meta":{"created":"2019-07-03T06:30:55"},"new":["deleted"],"old":["5. Where the European resource","adequacy assessment has not identified a","resource adequacy concern, Member","States shall not apply capacity","mechanisms."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1087","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Massimiliano Salini, Lara Comi, Fulvio Martusciello, Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-328","justification":"National regulatory authorities should be represented by the Board of Regulators in the\nAgency\u2019s decision-making process for all its regulatory tasks. Specifically, the right of\ninitiative in drafting the opinions, recommendations and decisions should be ensured to\nfacilitate an efficient and clear management of the Agency.","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 5 \u2013 point a"]],"meps":[125670,96775,124828,36392],"meta":{"created":"2019-07-03T06:30:48"},"new":["(a) provide opinions to the Director on","the all documents containing opinions,","recommendations and decisions referred to","in Articles 3 to 14, 16 and 30, which are","considered for adoption. The Board of","Regulators may have the right of initiative","on the basis of a two-thirds majority of the","members present in drafting the","mentioned opinions, recommendations","and decisions. In addition, the Board of","Regulators, within its field of competence,","shall provide guidance to the Director and","the Agency working groups in the","execution of his their tasks."],"old":["(a) provide opinions to the Director on","the opinions, recommendations and","decisions referred to in Articles 4 to 14,","which are considered for adoption. In","addition, the Board of Regulators, within","its field of competence, shall provide","guidance to the Director in the execution of","his tasks, with the exception of decisions","pursuant to Article 16(6) of Regulation","1227/200138.","__________________","38","Regulation (EU) 1227/2011 of the","European Parliament and of the Council","of 25 October on wholesale energy market","integrity and transparency, OJ L 326,","8.12.2011, p. 1."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"328","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Martina Werner, Flavio Zanonato, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula- Natri, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1088","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 5"]],"meps":[124826,124800,124870,124739,124735,125041,125044],"meta":{"created":"2019-07-03T06:30:55"},"new":["deleted"],"old":["5. Where the European resource","adequacy assessment has not identified a","resource adequacy concern, Member","States shall not apply capacity","mechanisms."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1088","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1089","justification":" Capacity mechanisms should not be introduced in markets that have not yet been fully opened\n and where interconnection capacity is missing.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 5"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:56"},"new":["Where the European resource","adequacy assessment has not identified a","resource adequacy concern, Member States","shall not apply capacity mechanisms.","Member States shall also not apply","capacity mechanisms in markets with","regulated prices or price caps, in case they","have not reached their interconnection","targets or where network codes and","guidelines are not fully implemented and","applied."],"old":["5. Where the European resource 5.","adequacy assessment has not identified a","resource adequacy concern, Member States","shall not apply capacity mechanisms.",""],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1089","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Miroslav Poche, Zigmantas Bal\u010dytis, Patrizia Toia, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Jeppe Kofod, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-329","justification":" National regulatory authorities, through the Board of Regulators (BoR), should be part of the\n Agency\u2019s decision-making process for all regulatory tasks of the Agency, where these result in\n the Agency voicing opinions, recommendations or decisions. This organic growth will keep\n ensure the complementarity of the Agency\u2019s task and the tasks of the national regulatory\n authorities at national level.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 5 \u2013 point a"]],"meps":[124699,96680,28340,125041,125044,124870,124784],"meta":{"created":"2019-07-03T06:30:48"},"new":["(a) provide opinions to the Director on","all documents containing opinions,","recommendations and decisions referred to","in Articles 4 to 14, which are considered","for adoption. The Board of Regulators","may revise and amend the opinions,","recommendations and decisions drafted","by the Director pursuant to Article 25. In","addition, the Board of Regulators, within","its field of competence, shall provide","guidance to the Director in the execution of","his tasks, with the exception of tasks","pursuant to Regulation 1227/201138.","__________________","38","Regulation (EU) 1227/2011 of the","European Parliament and of the Council of","25 October on wholesale energy market","integrity and transparency, OJ L 326,","8.12.2011, p. 1."],"old":["(a) provide opinions to the Director on","the opinions, recommendations and","decisions referred to in Articles 4 to 14,","which are considered for adoption. In","","addition, the Board of Regulators, within","its field of competence, shall provide","guidance to the Director in the execution of","his tasks, with the exception of decisions","pursuant to Article 16(6) of Regulation","1227/200138.","__________________","38","Regulation (EU) 1227/2011 of the","European Parliament and of the Council of","25 October on wholesale energy market","integrity and transparency, OJ L 326,","8.12.2011, p. 1."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"329","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Andr\u00e1s Gy\u00fcrk, Gy\u00f6rgy H\u00f6lv\u00e9nyi","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1090","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 5"]],"meps":[23816,124715],"meta":{"created":"2019-07-03T06:30:56"},"new":["5. Where a Member State wishes to","implement capacity mechanism, it must","explain its consistency with the European","resource adequacy assessment, especially","regarding the justification, scope, start","and termination, and multi-year","implementation."],"old":["5. Where the European resource","adequacy assessment has not identified a","resource adequacy concern, Member","States shall not apply capacity","mechanisms."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1090","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Marian-Jean Marinescu","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1091","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 5"]],"meps":[33982],"meta":{"created":"2019-07-03T06:30:56"},"new":["5. Where the national resource","adequacy assessment has not identified a","resource adequacy concern, Member States","shall not apply capacity mechanisms."],"old":["5. Where the European resource","adequacy assessment has not identified a","resource adequacy concern, Member States","shall not apply capacity mechanisms."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1091","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-330","justification":"This proposal aims at defining a governance framework closer to the Agencies \u201ccommon\napproach\u201d with a Board of Regulators supervising the administrative, operational and\nbudgetary management of the Agency, supported by an administrative board which would be\ncomposed of at least a subset of the Board of Regulators.","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 5 \u2013 point a"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:48"},"new":["(a) provide opinions to the Director on","all documents containing opinions,","recommendations and decisions referred to","in Articles 3 to 14, 16 and 30, which are","considered for adoption. The Board of","Regulators may revise and amend the","opinions, recommendations and decisions","drafted by the Director pursuant to Article","25. In addition, the Board of Regulators,","within its field of competence, shall","provide guidance to the Director and the","Agency working groups in the execution","of their tasks."],"old":["(a) provide opinions to the Director on","the opinions, recommendations and","decisions referred to in Articles 4 to 14,","which are considered for adoption. In","addition, the Board of Regulators, within","its field of competence, shall provide","guidance to the Director in the execution of","his tasks, with the exception of decisions","pursuant to Article 16(6) of Regulation","1227/200138.","","","__________________","38","Regulation (EU) 1227/2011 of the","European Parliament and of the Council","of 25 October on wholesale energy market","integrity and transparency, OJ L 326,","8.12.2011, p. 1."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"330","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Jerzy Buzek, Janusz Lewandowski, Marian-Jean Marinescu","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1092","justification":"Commission\u2019s proposal does not consider the principle of subsidiarity. While the monitoring\nand assessing of resource adequacy at the European level is needed and could prove helpful,\nthe ERAA should only complement and support the national resource adequacy assessment.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 5"]],"meps":[23781,33982],"meta":{"created":"2019-07-03T06:30:56"},"new":["5. Where a national resource","adequacy assessment has not identified a","resource adequacy concern, Member States","shall not apply capacity mechanisms."],"old":["5. Where the European resource","adequacy assessment has not identified a","resource adequacy concern, Member States","shall not apply capacity mechanisms."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1092","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Cristian-Silviu Bu\u015foi","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1093","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 5"]],"meps":[38420],"meta":{"created":"2019-07-03T06:30:56"},"new":["5. Where a national resource","adequacy assessment has not identified a","resource adequacy concern, Member States","shall not apply capacity mechanisms."],"old":["5. Where the European resource","adequacy assessment has not identified a","resource adequacy concern, Member States","shall not apply capacity mechanisms."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1093","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Rolandas Paksas","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-331","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 5 \u2013 point a"]],"meps":[96694],"meta":{"created":"2019-07-03T06:30:48"},"new":["(a) provide opinions to the Director on","all documents containing opinions,","recommendations and decisions referred to","in Articles 3 to 14, 16 and 30, which are","considered for adoption. The Board of","Regulators may amend the opinions,","recommendations and decisions drafted","by the Director pursuant to Article 25. In","addition, the Board of Regulators, within","its field of competence, shall provide","guidance to the Director and the Agency","working groups in the execution of their","tasks."],"old":["(a) provide opinions to the Director on","the opinions, recommendations and","decisions referred to in Articles 4 to 14,","which are considered for adoption. In","addition, the Board of Regulators, within","its field of competence, shall provide","guidance to the Director in the execution","of his tasks, with the exception of","decisions pursuant to Article 16(6) of","Regulation 1227/200138.","__________________","38","Regulation (EU) 1227/2011 of the","European Parliament and of the Council","of 25 October on wholesale energy market","integrity and transparency, OJ L 326,","","","8.12.2011, p. 1."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"331","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Zdzis\u0142aw Krasnod\u0119bski, Edward Czesak","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1094","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 5"]],"meps":[124891,132925],"meta":{"created":"2019-07-03T06:30:56"},"new":["5. Where a national resource","adequacy assessment has not identified a","resource adequacy concern, Member States","shall not apply capacity mechanisms."],"old":["5. Where the European resource","adequacy assessment has not identified a","resource adequacy concern, Member States","shall not apply capacity mechanisms."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1094","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Neoklis Sylikiotis, Sofia Sakorafa","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-332","justification":" The Regulation foresees that a favourable opinion by the Board of Regulators is required for\n the Director to be able to issue opinions, recommendations or decisions under Article 25(c).\n In line with European Court of Justice jurisprudence, the Regulation should clarify that this\n requirement applies depending on the substance of a document, not its form. The scope of\n involvement of the Board of Regulators in the Agency\u2019s tasks should be extended to cover all\n regulatory tasks of the Agency, where these result in the Agency voicing opinions,\n recommendations or decisions.","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 5 \u2013 point a"]],"meps":[124689,125091],"meta":{"created":"2019-07-03T06:30:48"},"new":["(a) provide opinions to the Director on","all documents containing opinions,","recommendations and decisions referred to","in Articles 4 to 14, 16, 30, which are","considered for adoption. The Board of","Regulators may amend the opinions,","recommendations and decisions drafted","by the Director pursuant to Article 25. In","addition, the Board of Regulators, within","its field of competence, shall provide","guidance to the Director and the Agency","working groups in the execution of their","tasks."],"old":["(a) provide opinions to the Director on","the opinions, recommendations and","decisions referred to in Articles 4 to 14,","which are considered for adoption. In","addition, the Board of Regulators, within","its field of competence, shall provide","guidance to the Director in the execution","of his tasks, with the exception of","decisions pursuant to Article 16(6) of","Regulation 1227/200138.","__________________","38","Regulation (EU) 1227/2011 of the","European Parliament and of the Council","of 25 October on wholesale energy market","integrity and transparency, OJ L 326,","8.12.2011, p. 1."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"332","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Adam Gierek, Krystyna \u0141ybacka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1095","justification":" The main reference for the introduction of capacity mechanisms should be the national\n resource adequacy assessment.","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 5 Regulation (EC) No 714/2009 of the European Parliament and of the Council"]],"meps":[28379,124883],"meta":{"created":"2019-07-03T06:30:56"},"new":["5. Where the national resource","adequacy assessment has not identified a","resource adequacy concern, Member States","shall not apply capacity mechanisms."],"old":["5. Where the European resource","adequacy assessment has not identified a","resource adequacy concern, Member States","shall not apply capacity mechanisms."],"orig_lang":"pl","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1095","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Hans-Olaf Henkel","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-333","justification":"This amendment is necessary for pressing reasons relating to the internal logic of the text or\ninextricably linked to other admissible amendments.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 5 \u2013 point a"]],"meps":[124823],"meta":{"created":"2019-07-03T06:30:48"},"new":["(a) provide opinions to the Director on","the opinions, recommendations and","decisions referred to in Articles 4 to 14,","which are considered for adoption. In","addition, the Board of Regulators, within","its field of competence, shall provide","guidance to the Director in the execution of","his or her tasks, with the exception of","decisions pursuant to Article 16(6) of","Regulation 1227/201138.","__________________","38","Regulation (EU) 1227/2011 of the","European Parliament and of the Council of","25 October on wholesale energy market","integrity and transparency, OJ L 326,","8.12.2011, p. 1."],"old":["(a) provide opinions to the Director on","the opinions, recommendations and","decisions referred to in Articles 4 to 14,","which are considered for adoption. In","addition, the Board of Regulators, within","its field of competence, shall provide","guidance to the Director in the execution of","his tasks, with the exception of decisions","pursuant to Article 16(6) of Regulation","1227/200138.","__________________","38","Regulation (EU) 1227/2011 of the","European Parliament and of the Council of","25 October on wholesale energy market","integrity and transparency, OJ L 326,","8.12.2011, p. 1."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"333","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Lorenzo Fontana","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1096","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 5"]],"meps":[96993],"meta":{"created":"2019-07-03T06:30:56"},"new":["5. Member States may apply capacity","mechanisms if compliant with the EC","Guidelines on State aid for environmental","protection and energy 2014-2020."],"old":["5. Where the European resource","adequacy assessment has not identified a","resource adequacy concern, Member","States shall not apply capacity","mechanisms."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1096","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-334","justification":" This is necessary for pressing reasons relating to the internal logic of the text or because the\n amendments are inextricably linked to other admissible amendments","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 5 \u2013 point a a (new)"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:48"},"new":["(aa) appoint the Director in accordance","with Article 24(2) and where relevant","extend their term of office or remove them","from office."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"334","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1097","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 5"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:56"},"new":["5. Member States shall take into","consideration the result of the European","resource adequacy assessment when","deciding to apply capacity mechanisms."],"old":["5. Where the European resource","adequacy assessment has not identified a","resource adequacy concern, Member","States shall not apply capacity","mechanisms."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1097","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1098","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 5"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:56"},"new":["5. Where a Member States wishes to","establish a capacity mechanism, it must","show that it is consistent with the resource","adequacy assessments, especially as","regards the justification for this."],"old":["5. Where the European resource","adequacy assessment has not identified a","resource adequacy concern, Member","States shall not apply capacity","mechanisms."],"orig_lang":"fr","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1098","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-335","justification":" This is necessary for pressing reasons relating to the internal logic of the text or because the\n amendments are inextricably linked to other admissible amendments","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 5 \u2013 point a b (new)"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:49"},"new":["(ab) adopt, each year the draft","programming document referred to in","Article 21 before its submission to the","Commission for its opinion, and shall,","following the opinion of the Commission,","adopt the programming document of the","Agency by a two thirds majority its","members and shall transmit it to the","European Parliament, the Council and","the Commission. The work programme","shall be adopted without prejudice to the","annual budgetary procedure and shall be","made public."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"335","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Rolandas Paksas","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1099","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 5"]],"meps":[96694],"meta":{"created":"2019-07-03T06:30:56"},"new":["5. Where a national resource","adequacy assessment has not identified a","resource adequacy concern, Member States","shall not apply capacity mechanisms."],"old":["5. Where the European resource","adequacy assessment has not identified a","resource adequacy concern, Member States","shall not apply capacity mechanisms."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1099","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-336","justification":"This amendment aims at defining a modern governance scheme and is linked to an\namendment on Article 21(1).","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 5 \u2013 point b"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:49"},"new":["deleted"],"old":["(b) deliver an opinion to the","Administrative Board on the candidate to","be appointed as Director in accordance","with Article 20(1)(a) and Article 24(2)."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"336","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Kate\u0159ina Kone\u010dn\u00e1, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1100","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 5 a (new)"]],"meps":[23699,96713],"meta":{"created":"2019-07-03T06:30:56"},"new":["5a. When designing capacity","mechanism, Member States shall include","an exit clause, a provision allowing for","efficient phase-out of a capacity","mechanism in case the resource adequacy","assessment proves that the adequacy","concern is not present anymore."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1100","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-337","justification":"This proposal aims at defining a governance framework closer to the Agencies \u201ccommon\napproach\u201d with a Board of Regulators supervising the administrative, operational and\nbudgetary management of the Agency, supported by an administrative board which would be\ncomposed of at least a subset of the Board of Regulators.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 5 \u2013 point b"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:49"},"new":["deleted"],"old":["(b) deliver an opinion to the","Administrative Board on the candidate to","be appointed as Director in accordance","with Article 20(1)(a) and Article 24(2)."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"337","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Pilar del Castillo Vera, Francesc Gamb\u00fas, Pilar Ayuso","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1101","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 5 a (new)"]],"meps":[28390,125006,4319],"meta":{"created":"2019-07-03T06:30:56"},"new":["5a. Member States may apply capacity","mechanisms if a sufficient level of","interconnection has not been reached and","if they are justified by the results of the","national adequacy assessment."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1101","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Barbara Kappel, Lorenzo Fontana, Angelo Ciocca","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-338","justification":" When the term of office of the Director is extended, the Board of Regulators should be\n involved in the same way as when appointing the Director in the first place and the\n amendment is necessary for pressing reasons relating to the internal logic of the text.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 5 \u2013 point b"]],"meps":[125024,96993,183793],"meta":{"created":"2019-07-03T06:30:49"},"new":["(b) deliver an opinion to the","Administrative Board on the candidate to","be appointed as Director and on the","extension of the Director\u2019s term of office","in accordance with Article 20(1)(a), Article","24(2) and Article 24(4)."],"old":["(b) deliver an opinion to the","Administrative Board on the candidate to","be appointed as Director in accordance","with Article 20(1)(a) and Article 24(2)."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"338","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Miroslav Poche, Zigmantas Bal\u010dytis, Patrizia Toia, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Jeppe Kofod, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-339","justification":" The requirement on the BoR approval of the Work Programme of the Agency (forming an\n integral part of the programming document) is foreseen for 30 September in order to be\n submitted for final adoption by the AB envisaged for 31st October.","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 5 \u2013 point c"]],"meps":[124699,96680,28340,125041,125044,124870,124784],"meta":{"created":"2019-07-03T06:30:49"},"new":["(c) in accordance with Article 20(1)(e)","and Article25(f) and in line with the","preliminary draft budget established in","accordance with Article 33 (1) to (3),","approve the annual work programme of","the Agency (which forms part of the","programming document of the Agency in","accordance with Article 21(1)) for the","coming year and present it by 30","September of each year for adoption by the","Administrative Board."],"old":["(c) in accordance with Article 20(1)(e)","and Article 25(f) and in line with the","preliminary draft budget established in","accordance with Article 33(3)(1), approve","the work programme of the Agency for the","coming year and present it by 1 September","of each year for adoption by the","Administrative Board."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"339","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1102","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 5 a (new)"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:57"},"new":["5a. Capacity mechanisms shall be","designed in a way which allows for their","effective phase-out once the adequacy","concern is not present anymore. To this","aim, capacity mechanisms shall contain a","specific exit clause."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1102","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Barbara Kappel, Lorenzo Fontana, Angelo Ciocca","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-340","justification":"The annual work programme of the Agency is approved by the Board of Regulators under this\narticle. Given that the annual work programme needs to be in line with the multi-annual work\nprogramme, the Board of Regulators should also approve the latter and the amendment is\nnecessary for pressing reasons relating to the internal logic of the text.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 5 \u2013 point c"]],"meps":[125024,96993,183793],"meta":{"created":"2019-07-03T06:30:49"},"new":["(c) in accordance with Article 20(1)(e)","and Article 25(f) and in line with the","provisional draft estimate established in","accordance with Article 33(1) to 33(3)(1),","approve the draft multi-annual and","annual programming put forward by the","Director and the work programme of the","Agency for the coming year and present it","by 1 September of each year for adoption","by the Administrative Board."],"old":["(c) in accordance with Article 20(1)(e)","and Article 25(f) and in line with the","preliminary draft budget established in","accordance with Article 33(3)(1), approve","the work programme of the Agency for the","coming year and present it by 1 September","of each year for adoption by the","Administrative Board."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"340","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Hans-Olaf Henkel","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-341","justification":" This amendment is necessary for pressing reasons relating to the internal logic of the text or\n inextricably linked to other admissible amendments.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 5 \u2013 point c"]],"meps":[124823],"meta":{"created":"2019-07-03T06:30:49"},"new":["(c) in accordance with Article 20(1)(e)","and Article 25(f) and in line with the","provisional draft estimate established in","accordance with Article 33(1) to 33(3),","approve the annual work programme of","the Agency for the coming year and","present it by 30 September of each year for","adoption by the Administrative Board."],"old":["(c) in accordance with Article 20(1)(e)","and Article 25(f) and in line with the","preliminary draft budget established in","accordance with Article 33(3)(1), approve","the work programme of the Agency for the","coming year and present it by 1 September","of each year for adoption by the","Administrative Board."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"341","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Lud\u011bk Niedermayer","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1103","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 5 a (new)"]],"meps":[124701],"meta":{"created":"2019-07-03T06:30:57"},"new":["5a. Where implemented, capacity","mechanisms shall be well designed:","market-based, technology-neutral, open to","existing and new assets, open to cross-","border participation"],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1103","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-342","justification":" This amendment aims at defining a modern governance scheme and is linked to an\n amendment on Article 21(1).","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 5 \u2013 point d a (new)"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:49"},"new":["(da) appoint the Director in accordance","with Article 24(2) and where relevant","extend their term of office or remove them","from office."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"342","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Barbara Kappel, Lorenzo Fontana, Angelo Ciocca","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-343","justification":"The Agency\u2019s overall rules of procedure should be drawn up by the Administrative Board, but\nthe Board of Regulators (and the Director) should be involved and the amendment is\nnecessary for pressing reasons relating to the internal logic of the text.","location":[[" Proposal for a regulation","Article 23 \u2013 paragraph 5 \u2013 point d a (new)"]],"meps":[125024,96993,183793],"meta":{"created":"2019-07-03T06:30:49"},"new":["(da) provide an opinion to the","Administrative Board on the rules of","procedure under Article 20(1)(t)."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"343","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Dario Tamburrano, David Borrelli","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1104","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 5 a (new)"]],"meps":[124813,124796],"meta":{"created":"2019-07-03T06:30:57"},"new":["5a. When designing capacity","mechanisms, Member States shall have","regard to the environmental objective of","phasing out environmentally or","economically harmful subsidies."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1104","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1105","location":[[" Proposal for a regulation","Article 23 a (new)"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:57"},"new":["Article 23 a","When designing capacity mechanisms","Member States shall include an exit","clause, a provision allowing for efficient","phase-out of a capacity mechanism in","case the resource adequacy assessment","proves that the adequacy concern is not","present anymore."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1105","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Massimiliano Salini","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1106","location":[[" Proposal for a regulation","Article 24"]],"meps":[125670],"meta":{"created":"2019-07-03T06:30:57"},"new":["Article 24 deleted","Existing mechanisms"],"old":["Member States applying capacity","mechanisms on [OP: entry into force of","this Regulation] shall adapt their","mechanisms to comply with Articles 18,","21 and 23 of this Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1106","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Claude Turmes on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1107","justification":"To create a level playing field, existing capacity market mechanisms have to be aligned with\nthe general provisions as soon as possible.","location":[[" Proposal for a regulation","Article 24 \u2013 paragraph 1"]],"meps":[4432],"meta":{"created":"2019-07-03T06:30:57"},"new":["Member States applying capacity","mechanisms on [OP: entry into force of","this Regulation] shall adapt their","mechanisms to comply with Articles 18,","18a, 21 and 23 of this Regulation. Without","prejudice to the immediate application of","the emission limits and flexibility","requirements set out in Article 23, by [two","years from the entry into force of this","Regulation], Member States shall","complete the review of existing capacity","mechanisms, and of the related","contractual or administrative","arrangement, and bring them in","compliance with the provisions of this","Regulation. They shall submit to the","Commission a detailed report on the","results of the review and of the measures","taken."],"old":["Member States applying capacity","mechanisms on [OP: entry into force of","this Regulation] shall adapt their","mechanisms to comply with Articles 18, 21","and 23 of this Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1107","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Hans-Olaf Henkel","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-344","justification":"This amendment is necessary for pressing reasons relating to the internal logic of the text or\ninextricably linked to other admissible amendments.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 5 \u2013 point d a (new)"]],"meps":[124823],"meta":{"created":"2019-07-03T06:30:49"},"new":["(da) provide an opinion to the","Administrative Board on the rules of","procedures under Art. 20 t."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"344","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1108","justification":" It is appropriate to set clear deadline for adaptation of existing capacity mechanisms to\n comply with proposed Regulation.","location":[["Proposal for a regulation","Article 24 \u2013 paragraph 1"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:57"},"new":["Member States applying capacity","mechanisms on [OP: entry into force of","this Regulation] shall adapt their","mechanisms to comply with Articles 18, 21","and 23 of this Regulation within [two]","years after entry into force of this","Regulation."],"old":["Member States applying capacity","mechanisms on [OP: entry into force of","this Regulation] shall adapt their","mechanisms to comply with Articles 18, 21","and 23 of this Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1108","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Jarom\u00edr Kohl\u00ed\u010dek","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1109","justification":" It is only appropriate to set clear deadline for adaptation of existing capacity mechanisms to\n comply with proposed Regulation.","location":[[" Proposal for a regulation","Article 24 \u2013 paragraph 1"]],"meps":[28331],"meta":{"created":"2019-07-03T06:30:57"},"new":["Member States applying capacity","mechanisms on [OP: entry into force of","this Regulation] shall adapt their","mechanisms to comply with Articles 18, 21","and 23 of this Regulation within [two]","years after entry into force of this","Regulation."],"old":["Member States applying capacity","mechanisms on [OP: entry into force of","this Regulation] shall adapt their","mechanisms to comply with Articles 18, 21","and 23 of this Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1109","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Hans-Olaf Henkel","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-345","justification":" This amendment is necessary for pressing reasons relating to the internal logic of the text or\n inextricably linked to other admissible amendments.","location":[["Proposal for a regulation","Article 23 \u2013 paragraph 5 \u2013 point d b (new)"]],"meps":[124823],"meta":{"created":"2019-07-03T06:30:49"},"new":["(db) provide an opinion to the","Administrative Board on the","communication and dissemination plans","referred to in Art. 41 and on the strategy","for relations with third countries or","international organisations referred to in","Art. 43."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"345","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Miroslav Poche","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1110","justification":"For the sake of legislative clarity, there is a need to specify the deadline for compliance of\nexisting mechanisms with the rules proposed in the regulation.","location":[[" Proposal for a regulation","Article 24 \u2013 paragraph 1"]],"meps":[124699],"meta":{"created":"2019-07-03T06:30:57"},"new":["Member States applying capacity","mechanisms on [OP: entry into force of","this Regulation] shall adapt their","mechanisms to comply with Articles 18, 21","and 23 of this Regulation within two years","after entry into force of this Regulation."],"old":["Member States applying capacity","mechanisms on [OP: entry into force of","this Regulation] shall adapt their","mechanisms to comply with Articles 18, 21","and 23 of this Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1110","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Miroslav Poche, Zigmantas Bal\u010dytis, Patrizia Toia, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Jeppe Kofod, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-346","justification":" Without prejudice to the respective roles of the Administrative Board and the Board of\n Regulators, the Director should be accountable to the Administrative Board in order fully to\n ensure the independence of the Agency\u2019s regulatory action.","location":[[" Proposal for a regulation","Article 24 \u2013 paragraph 1"]],"meps":[124699,96680,28340,125041,125044,124870,124784],"meta":{"created":"2019-07-03T06:30:49"},"new":["1. The Agency shall be managed by","its Director, who shall act in accordance","with the guidance referred to in the second","sentence of Article 23(5)(a) and, where","provided for in this Regulation, the","opinions of the Board of Regulators.","Without prejudice to the respective roles of","the Administrative Board and the Board of","Regulators in relation to the tasks of the","Director, the Director shall neither seek nor","follow any instruction from any","government, from the Union institutions, or","from any other public or private entity or","person. The Director may attend the","meetings of the Board of Regulators as an","observer."],"old":["1. The Agency shall be managed by","its Director, who shall act in accordance","with the guidance referred to in Article","23(5)(a) (1) and, where provided for in this","Regulation, the opinions of the Board of","Regulators. Without prejudice to the","respective roles of the Administrative","Board and the Board of Regulators in","relation to the tasks of the Director, the","Director shall neither seek nor follow any","instruction from any government, from the","Union institutions, or from any other public","or private entity or person. The Director","shall be accountable to the Administrative","Board. The Director may attend the","meetings of the Board of Regulators as an","observer."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"346","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1111","location":[["Proposal for a regulation","Article 24 \u2013 paragraph 1"]],"meps":[96713],"meta":{"created":"2019-07-03T06:30:57"},"new":["Member States applying capacity","mechanisms on [OP: entry into force of","this Regulation] shall adapt their","mechanisms to comply with Articles 18, 21","and 23 of this Regulation within two years","after entry into force of this Regulation."],"old":["Member States applying capacity","mechanisms on [OP: entry into force of","this Regulation] shall adapt their","mechanisms to comply with Articles 18, 21","and 23 of this Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1111","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Davor \u0160krlec on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-347","justification":"The Director as an impartial official would provide greater objectivity and EU-centric\napproach to the chairmanship.","location":[["Proposal for a regulation","Article 24 \u2013 paragraph 1"]],"meps":[124756],"meta":{"created":"2019-07-03T06:30:50"},"new":["1. The Agency shall be managed by","its Director, who shall act in accordance","with the guidance referred to in Article","23(5)(a) (1) and, where provided for in this","Regulation, the opinions of the Board of","Regulators. Without prejudice to the","respective roles of the Administrative","Board and the Board of Regulators in","relation to the tasks of the Director, the","Director shall neither seek nor follow any","instruction from any government, from the","Union institutions, or from any other public","or private entity or person. The Director","shall be accountable to the Administrative","Board. The Director shall chair the","meetings of the Board of Regulators."],"old":["1. The Agency shall be managed by","its Director, who shall act in accordance","with the guidance referred to in Article","23(5)(a) (1) and, where provided for in this","Regulation, the opinions of the Board of","Regulators. Without prejudice to the","respective roles of the Administrative","Board and the Board of Regulators in","relation to the tasks of the Director, the","Director shall neither seek nor follow any","instruction from any government, from the","Union institutions, or from any other public","or private entity or person. The Director","shall be accountable to the Administrative","Board. The Director may attend the","meetings of the Board of Regulators as an","observer."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"347","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Adam Gierek, Krystyna \u0141ybacka","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1112","justification":"The aim of this proposed amendment is to comply with the principle of legitimate\nexpectations, which would necessitate an adjustment period to allow Member States to bring\ncapacity mechanisms into line with requirements arising from the Regulation.","location":[["Proposal for a regulation","Article 24 \u2013 paragraph 1 Regulation (EC) No 714/2009 of the European Parliament and of the Council"]],"meps":[28379,124883],"meta":{"created":"2019-07-03T06:30:57"},"new":["Member States applying capacity","mechanisms on [OP: entry into force of","this Regulation] shall adapt their","mechanisms to comply with Articles 18, 21","and 23 of this Regulation by 31 December","2030."],"old":["Member States applying capacity","mechanisms on [OP: entry into force of","this Regulation] shall adapt their","mechanisms to comply with Articles 18, 21","and 23 of this Regulation."],"orig_lang":"pl","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1112","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-348","justification":" According to the Agencies \u201ccommon approach\u201d the Board of regulators should appoint the\n director of ACER. In particular the procedure in 24 (2) involving the confirmation of the\n European Parliament and granting a fully transparent selection procedure without a\n selection by the Commission, is in line with the appointment procedures of the Executive\n Director of ESMA.","location":[["Proposal for a regulation","Article 24 \u2013 paragraph 2"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:50"},"new":["2. The Director shall be appointed by","the Board of Regulators, after","confirmation by the European Parliament","on the basis of merit as well as skills and","experience relevant to the energy sector,","following an open and transparent selection","procedure. Before appointment, the","candidate selected by the Board of","Regulators may be invited to make a","statement before the competent committee","of the European Parliament and to answer","questions put by its members. For the","purpose of concluding the contract with the","Director, the Agency shall be represented","by the Chairman of the Board of","Regulators"],"old":["2. The Director shall be appointed by","the Administrative Board following a","favourable opinion of the Board of","Regulators, on the basis of merit as well as","skills and experience relevant to the energy","sector, from a list of at least three","candidates proposed by the Commission,","following an open and transparent selection","","","procedure. Before appointment, the","candidate selected by the Administrative","Board may be invited to make a statement","before the competent committee of the","European Parliament and to answer","questions put by its members. For the","purpose of concluding the contract with the","Director, the Agency shall be represented","by the Chairman of the Administrative","Board"],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"348","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Cristian-Silviu Bu\u015foi","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1113","location":[[" Proposal for a regulation","Article 24 \u2013 paragraph 1"]],"meps":[38420],"meta":{"created":"2019-07-03T06:30:57"},"new":["Member States applying capacity","mechanisms on [OP: entry into force of","this Regulation] shall adapt their","mechanisms to comply with Articles 18, 21","and 23 of this Regulation by 31 December","2030."],"old":["Member States applying capacity","mechanisms on [OP: entry into force of","this Regulation] shall adapt their","mechanisms to comply with Articles 18, 21","and 23 of this Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1113","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Davor \u0160krlec on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-349","justification":"The increase of importance and number of new duties and responsibilities appointed to\nACER, thus exceeding its advisory role, in order to enable the establishment and well-\nfunctioning of the Energy Union, requires greater control by the European Parliament.\nMoreover, the confirmation of the Director by the European Parliament is already in practice\nin some European Agencies. Therefore, the Director of ACER should as well be approved by\nthe European Parliament before taking on his duties.","location":[[" Proposal for a regulation","Article 24 \u2013 paragraph 2"]],"meps":[124756],"meta":{"created":"2019-07-03T06:30:50"},"new":["2. The Director shall be appointed by","the Administrative Board following a","favourable opinion of the Board of","Regulators and after confirmation by the","European Parliament, on the basis of","merit as well as skills and experience","relevant to the energy sector, from a list of","at least three candidates proposed by the","Commission, following an open and","transparent selection procedure. Before","appointment, the candidate selected by the","Administrative Board shall be invited to","make a statement before the competent","committee of the European Parliament and","to answer questions put by its members.","For the purpose of concluding the contract","with the Director, the Agency shall be","represented by the Chairman of the","Administrative Board"],"old":["2. The Director shall be appointed by","the Administrative Board following a","favourable opinion of the Board of","Regulators, on the basis of merit as well as","skills and experience relevant to the energy","sector, from a list of at least three","candidates proposed by the Commission,","following an open and transparent selection","procedure. Before appointment, the","candidate selected by the Administrative","Board may be invited to make a statement","before the competent committee of the","European Parliament and to answer","questions put by its members. For the","purpose of concluding the contract with the","Director, the Agency shall be represented","","by the Chairman of the Administrative","Board"],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"349","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Jerzy Buzek, Janusz Lewandowski, Marian-Jean Marinescu","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1114","justification":" A reasonable transitional period should be established for Member States which shall apply a\n capacity mechanism on the date the Electricity Regulation comes into force.","location":[[" Proposal for a regulation","Article 24 \u2013 paragraph 1"]],"meps":[23781,33982],"meta":{"created":"2019-07-03T06:30:57"},"new":["Member States applying capacity","mechanisms on [OP: entry into force of","this Regulation] shall adapt their","mechanisms to comply with Articles 18, 21","and 23 of this Regulation by 31 December","2030."],"old":["Member States applying capacity","mechanisms on [OP: entry into force of","this Regulation] shall adapt their","mechanisms to comply with Articles 18, 21","and 23 of this Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1114","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":"Fran\u00e7oise Grosset\u00eate","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-350","justification":" This amendment aims at defining a modern governance scheme and is linked to amendments\n on Recital 34 and Article 21(1), respectively.","location":[["Proposal for a regulation","Article 24 \u2013 paragraph 2"]],"meps":[2025],"meta":{"created":"2019-07-03T06:30:50"},"new":["2. The Director shall be appointed by","the Board of Regulators, after","confirmation by the European","Parliament, on the basis of merit as well as","skills and experience relevant to the energy","sector, from a list of at least three","candidates proposed by the Commission,","following an open and transparent selection","procedure. Before appointment, the","candidate selected by the Board of","Regulators may be invited to make a","statement before the competent committee","of the European Parliament and to answer","questions put by its members. For the","purpose of concluding the contract with the","Director, the Agency shall be represented","by the Chairman of the Board of","Regulators;"],"old":["2. The Director shall be appointed by","the Administrative Board following a","favourable opinion of the Board of","Regulators, on the basis of merit as well as","skills and experience relevant to the energy","sector, from a list of at least three","candidates proposed by the Commission,","following an open and transparent selection","procedure. Before appointment, the","candidate selected by the Administrative","Board may be invited to make a statement","before the competent committee of the","European Parliament and to answer","questions put by its members. For the","purpose of concluding the contract with the","Director, the Agency shall be represented","by the Chairman of the Administrative","Board"],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"350","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Martina Werner, Flavio Zanonato, Jeppe Kofod, Carlos Zorrinho, Miapetra Kumpula- Natri, Miroslav Poche, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Dan Nica, Edouard Martin","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1115","location":[["Proposal for a regulation","Article 24 \u2013 paragraph 1"]],"meps":[124826,124800,124870,124739,124735,124699,125041,125044,124784,124947],"meta":{"created":"2019-07-03T06:30:57"},"new":["Member States applying capacity","mechanisms shall adapt their mechanisms","to comply with Articles 18, 21 and 23 of","this Regulation."],"old":["Member States applying capacity","mechanisms on [OP: entry into force of","this Regulation] shall adapt their","mechanisms to comply with Articles 18, 21","and 23 of this Regulation."],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1115","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Andr\u00e1s Gy\u00fcrk","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-351","location":[[" Proposal for a regulation","Article 24 \u2013 paragraph 4"]],"meps":[23816],"meta":{"created":"2019-07-03T06:30:50"},"new":["deleted"],"old":["4. The Administrative Board, acting","on a proposal from the Commission, after","having consulted and given the utmost","consideration to the assessment and the","opinion of the Board of Regulators on","that assessment and only in those cases","where it can be justified by the duties and","requirements of the Agency, may extend","once the term of office of the Director by","no more than five years. A Director whose","term of office has been extended may not","participate in another selection procedure","for the same post at the end of the","extended period."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"351","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Esther de Lange, Se\u00e1n Kelly, Ivo Belet","changes":{},"committee":["ITRE"],"date":"2017-09-25T00:00:00","id":"PE609.625-1116","location":[["Proposal for a regulation","Article 24 a (new)"]],"meps":[38398,96668,28257],"meta":{"created":"2019-07-03T06:30:57"},"new":["Article 24 a","Within 12 months after the entry into","force of this Regulation an Electricity","Market Design Advisory Board shall be","established. The Advisory Board shall be","consisting of high-level experts of EU","Member States and a relevant and","balanced group of experts from the","energy sector, including utilities,","investors, technology providers, network","operators, climate protection groups,","consumer representatives and","representatives of local energy","communities.","The Advisory Board will provide the","Commission with expertise and insight,","and thus advice and assist the","Commission in the assessment of the","challenges related to the current energy","market design and preparation of future","policy initiatives in this respect. It will do","so by formulating opinions,","recommendations or reports, where","appropriate.","Within 24 months after the establishment","of the Advisory Board, the European","Commission should draw its conclusions","from the discussion by means of a","Communication laying out the strategic","priorities for a European electricity","market capable of driving the investments","needed for a sustainable, secure and","affordable energy transition."],"old":[""],"orig_lang":"en","peid":"PE609.625v01-00","reference":"2016/0379(COD)","seq":"1116","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-609625_EN.pdf"},{"authors":" Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-352","justification":"According to the Agencies \u201ccommon approach\u201d the Board of regulators should appoint the\ndirector of ACER. In particular the procedure in 24 (2) involving the confirmation of the\nEuropean Parliament and granting a fully transparent selection procedure without a\nselection by the Commission, is in line with the appointment procedures of the Executive\nDirector of ESMA.","location":[[" Proposal for a regulation","Article 24 \u2013 paragraph 4"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:50"},"new":["4. The Board of Regulators, acting on","a proposal from the Commission, after","having consulted and only in those cases","where it can be justified by the duties and","requirements of the Agency, may extend","once the term of office of the Director by","no more than five years. A Director whose","term of office has been extended may not","participate in another selection procedure","for the same post at the end of the extended","period."],"old":["4. The Administrative Board, acting","on a proposal from the Commission, after","having consulted and given the utmost","consideration to the assessment and the","opinion of the Board of Regulators on","that assessment and only in those cases","where it can be justified by the duties and","","","requirements of the Agency, may extend","once the term of office of the Director by","no more than five years. A Director whose","term of office has been extended may not","participate in another selection procedure","for the same post at the end of the extended","period."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"352","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-353","justification":"According to the Agencies \u201ccommon approach\u201d the Board of regulators should appoint the\ndirector of ACER. In particular the procedure in 24 (2) involving the confirmation of the\nEuropean Parliament and granting a fully transparent selection procedure without a\nselection by the Commission, is in line with the appointment procedures of the Executive\nDirector of ESMA.","location":[["Proposal for a regulation","Article 24 \u2013 paragraph 5"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:50"},"new":["5. The Board of Regulators shall","inform the European Parliament of its","intention to extend the Director\u2019s term of","office. Within one month before the","extension of his term of office, the Director","may be invited to make a statement before","the competent committee of the Parliament","and to answer questions put by the","members of that committee."],"old":["5. The Administrative Board shall","inform the European Parliament of its","intention to extend the Director\u2019s term of","office. Within one month before the","extension of his term of office, the Director","may be invited to make a statement before","the competent committee of the Parliament","and to answer questions put by the","members of that committee."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"353","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-354","justification":" According to the Agencies \u201ccommon approach\u201d the Board of regulators should appoint the\n director of ACER. In particular the procedure in 24 (2) involving the confirmation of the\n European Parliament and granting a fully transparent selection procedure without a\n selection by the Commission, is in line with the appointment procedures of the Executive\n Director of ESMA.","location":[[" Proposal for a regulation","Article 24 \u2013 paragraph 7"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:50"},"new":["7. The Director may be removed from","office only upon a decision of the Board of","Regulators. The Board of Regulators shall","reach that decision on the basis of a two-","thirds majority of its members."],"old":["7. The Director may be removed from","office only upon a decision of the","Administrative Board, after having","obtained a favourable opinion of the","Board of Regulators. The Administrative","Board shall reach that decision on the basis","of a two-thirds majority of its members."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"354","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Barbara Kappel, Lorenzo Fontana, Angelo Ciocca","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-355","justification":"In revising and reviewing the documents, the Board of Regulators should give utmost account\nto the Director\u2019s opinion, before passing them to the Director for formal adoption. The\nregional decision-making process should be the same, with the only difference that the\ndocuments tabled to the BoR are prepared by a regional sub-committee of the BoR instead of\na WG.","location":[[" Proposal for a regulation","Article 25 \u2013 paragraph 1 \u2013 point c"]],"meps":[125024,96993,183793],"meta":{"created":"2019-07-03T06:30:50"},"new":["(c) adopt and publish opinions,","recommendations and decisions.","Documents containing opinions,","recommendations and decisions referred to","in Articles 3 to 14 and 16 shall only be","adopted if they have received a favourable","opinion of the Board of Regulators. When","passing draft documents prepared by the","working groups pursuant to Article 30(4)","or a sub-group of the BoR pursuant to","Article 7(2) to the BoR for its opinion, the","Director may assess these documents with","a view to their contribution to the internal","energy market and make corresponding","recommendations to the BoR;"],"old":["(c) draft , adopt and publish opinions,","recommendations and decisions. Opinions,","recommendations and decisions referred to","in Articles 3 to 11 and 14 , shall only be","adopted if they have received a favourable","opinion of the Board of Regulators;",""],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"355","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Davor \u0160krlec on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-356","justification":"In consistence with amendments proposed in Art 7.","location":[["Proposal for a regulation","Article 25 \u2013 paragraph 1 \u2013 point c"]],"meps":[124756],"meta":{"created":"2019-07-03T06:30:50"},"new":["(c) draft, adopt and publish opinions,","recommendations and decisions. Opinions,","recommendations and decisions referred to","in Articles 3 to 11 and 14 , shall only be","adopted if they have received a favourable","opinion of the Board of Regulators or,","where relevant, its subset of the Board of","Regulators pursuant to Article 7;"],"old":["(c) draft , adopt and publish opinions,","recommendations and decisions. Opinions,","recommendations and decisions referred to","in Articles 3 to 11 and 14 , shall only be","adopted if they have received a favourable","opinion of the Board of Regulators;"],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"356","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Patrizia Toia","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-357","justification":" Opinions, recommendations and decisions of the Agency should be drafted under the aegis of\n the Agency\u2019s working groups, with the exception of coordinated regional decisions referred to\n in Article 7 of the regulation. In addition, national regulatory authorities, through the Board\n of Regulators (BoR), should be part of the Agency\u2019s decision-making process for all\n regulatory tasks of the Agency. Hence, a BoR favourable opinion is needed for all regulatory\n competencies attributed to ACER. This should be ensured regard-less of a task\u2019s concrete\n legal basis or format (e.g. REMIT and TEN-E act). It should include within the scope of\n mandatory involvement of the BoR issues such as infrastructure (Article 12).","location":[["Proposal for a regulation","Article 25 \u2013 paragraph 1 \u2013 point c"]],"meps":[28340],"meta":{"created":"2019-07-03T06:30:50"},"new":["(c) draft, adopt and publish the","opinions, recommendations and decisions.","Documents containing opinions,","recommendations and decisions referred to","in Articles 3 to 14, 16 and 30 shall only be","adopted if they have received a favourable","opinion of the Board of Regulators."],"old":["(c) draft , adopt and publish opinions,","recommendations and decisions. Opinions,","recommendations and decisions referred to","in Articles 3 to 11 and 14 , shall only be","adopted if they have received a favourable","opinion of the Board of Regulators;"],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"357","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Hans-Olaf Henkel","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-358","location":[[" Proposal for a regulation","Article 25 \u2013 paragraph 1 \u2013 point c"]],"meps":[124823],"meta":{"created":"2019-07-03T06:30:50"},"new":["(c) draft, adopt and publish opinions,","recommendations and decisions. Opinions,","recommendations and decisions referred to","in Articles 3 to 6, 7(2)a, and 7(4), Articles","8 to 11 and Article 14 shall only be","adopted if they have received a favourable","opinion of the Board of Regulators;"],"old":["(c) draft , adopt and publish opinions,","recommendations and decisions. Opinions,","recommendations and decisions referred to","in Articles 3 to 11 and 14 , shall only be","adopted if they have received a favourable","opinion of the Board of Regulators;"],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"358","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Werner Langen, Markus Pieper","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-359","justification":"The Commission\u2019s proposal gives the Director the right to draft own decisions without\nincluding the national regulatory authorities in this process. Decisions should be drafted by\nthe working groups and amended, if necessary, by the BoR. This ensures the transparency of\nthe drafting procedure.","location":[["Proposal for a regulation","Article 25 \u2013 paragraph 1 \u2013 point c"]],"meps":[1928,28224],"meta":{"created":"2019-07-03T06:30:51"},"new":["(c) adopt and publish opinions,","recommendations and decisions. Opinions,","recommendations and decisions referred to","in Articles 3 to 14, shall only be adopted if","they have received a favourable opinion of","the Board of Regulators;"],"old":["(c) draft , adopt and publish opinions,","recommendations and decisions. Opinions,","recommendations and decisions referred to","in Articles 3 to 11 and 14 , shall only be","adopted if they have received a favourable","opinion of the Board of Regulators;"],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"359","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-360","justification":"Opinions, recommendations and decisions of the Agency should be drafted under the aegis of\nthe Agency\u2019s working groups, with the exception of coordinated regional decisions referred to\nin Article 7 of the regulation. In addition, national regulatory authorities, through the Board\nof Regulators (BoR), should be part of the Agency\u2019s decision-making process for all\n\n regulatory tasks of the Agency. Hence, a BoR favourable opinion is needed for all regulatory\n competencies attributed to ACER. This should be ensured regard-less of a task\u2019s concrete\n legal basis or format (e.g. REMIT and TEN-E act). It should include within the scope of\n mandatory involvement of the BoR issues such as infrastructure (Article 12).","location":[["Proposal for a regulation","Article 25 \u2013 paragraph 1 \u2013 point c"]],"meps":[36392],"meta":{"created":"2019-07-03T06:30:51"},"new":["(c) draft, adopt and publish the","opinions, recommendations and decisions.","Documents containing opinions,","recommendations and decisions referred to","in Articles 3 to 14, 16 and 30 shall only be","adopted if they have received a favourable","opinion of the Board of Regulators."],"old":["(c) draft, adopt and publish opinions,","recommendations and decisions. Opinions,","recommendations and decisions referred to","in Articles 3 to 11 and 14 , shall only be","adopted if they have received a favourable","opinion of the Board of Regulators;"],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"360","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Massimiliano Salini, Lara Comi, Fulvio Martusciello, Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-361","location":[[" Proposal for a regulation","Article 25 \u2013 paragraph 1 \u2013 point c"]],"meps":[125670,96775,124828,36392],"meta":{"created":"2019-07-03T06:30:51"},"new":["(c) adopt and publish opinions,","recommendations and decisions. Opinions,","recommendations and decisions referred to","in Articles 3 to 11 and 14 , 16 and 30 shall","only be adopted if they have received a","favourable opinion of the Board of","Regulators;"],"old":["(c) draft , adopt and publish opinions,","recommendations and decisions. Opinions,","recommendations and decisions referred to","in Articles 3 to 11 and 14 , shall only be","adopted if they have received a favourable","opinion of the Board of Regulators;"],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"361","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-362","location":[[" Proposal for a regulation","Article 25 \u2013 paragraph 1 \u2013 point c"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:51"},"new":["(c) draft, adopt and publish opinions,","recommendations and decisions. Opinions,","recommendations and decisions referred to","in Articles 3 to 14 , 16 and 30 shall only be","adopted if they have received a favourable","opinion of the Board of Regulators;"],"old":["(c) draft , adopt and publish opinions,","recommendations and decisions. Opinions,","recommendations and decisions referred to","in Articles 3 to 11 and 14 , shall only be","adopted if they have received a favourable","opinion of the Board of Regulators;"],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"362","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Hans-Olaf Henkel","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-363","justification":"This amendment is necessary for pressing reasons relating to the internal logic of the text or\ninextricably linked to other admissible amendments.","location":[["Proposal for a regulation","Article 25 \u2013 paragraph 1 \u2013 point f"]],"meps":[124823],"meta":{"created":"2019-07-03T06:30:51"},"new":["(f) each year prepare a draft","programming document of the Agency,","containing multi-annual programming","and the work programme for the following","year in accordance with Article 21. The","Director shall be responsible for","implementing the programming document","and reporting to the Administrative Board","of its implementation;"],"old":["(f) each year prepare a draft work","programme of the Agency for the","following year, and shall , after the","adoption of the draft by the","Administrative Board submit it to the","Board of Regulators, to the European","Parliament and to the Commission by 31","January every year. The Director shall be","responsible for implementing the","programming document and reporting to","the Administrative Board of its","implementation;"],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"363","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Neoklis Sylikiotis, Sofia Sakorafa","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-364","location":[["Proposal for a regulation","Article 25 \u2013 paragraph 1 \u2013 point k"]],"meps":[124689,125091],"meta":{"created":"2019-07-03T06:30:51"},"new":["deleted"],"old":["(k) be responsible for deciding","whether it is necessary for the purpose of","carrying out the Agency's tasks in an","efficient and effective manner to locate","one or more staff in one or more Member","States for the purpose of carrying out the","Agency's tasks in an efficient and","effective manner. The decision to","establish a local office requires the prior","consent of the Commission, the","Administrative Board and the Member","State or Member States concerned. The","decision shall specify the scope of the","","","activities to be carried out at that local","office in a manner that avoids","unnecessary costs and duplication of","administrative functions of the Agency."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"364","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Andr\u00e1s Gy\u00fcrk","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-365","location":[[" Proposal for a regulation","Article 25 \u2013 paragraph 1 \u2013 point k"]],"meps":[23816],"meta":{"created":"2019-07-03T06:30:51"},"new":["deleted"],"old":["(k) be responsible for deciding","whether it is necessary for the purpose of","carrying out the Agency's tasks in an","efficient and effective manner to locate","one or more staff in one or more Member","States for the purpose of carrying out the","Agency's tasks in an efficient and","effective manner. The decision to","establish a local office requires the prior","consent of the Commission, the","Administrative Board and the Member","State or Member States concerned. The","decision shall specify the scope of the","activities to be carried out at that local","office in a manner that avoids","unnecessary costs and duplication of","administrative functions of the Agency."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"365","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Hans-Olaf Henkel","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-366","location":[[" Proposal for a regulation","Article 25 \u2013 paragraph 1 \u2013 point k"]],"meps":[124823],"meta":{"created":"2019-07-03T06:30:51"},"new":["(k) be responsible for deciding whether","it is necessary for the purpose of carrying","out the Agency's tasks in an efficient and","effective manner to locate one or more","staff in one or more Member States for the","purpose of carrying out the Agency's tasks","in an efficient and effective manner. The","decision shall specify the scope of the","activities to be carried out at that local","office in a manner that avoids unnecessary","costs and duplication of administrative","functions of the Agency."],"old":["(k) be responsible for deciding whether","it is necessary for the purpose of carrying","","out the Agency's tasks in an efficient and","effective manner to locate one or more","staff in one or more Member States for the","purpose of carrying out the Agency's tasks","in an efficient and effective manner. The","decision to establish a local office requires","the prior consent of the Commission, the","Administrative Board and the Member","State or Member States concerned. The","decision shall specify the scope of the","activities to be carried out at that local","office in a manner that avoids unnecessary","costs and duplication of administrative","functions of the Agency."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"366","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Franc Bogovi\u010d, Milan Zver, Alojz Peterle, Romana Tomc, Patricija \u0160ulin, Tanja Fajon, Igor \u0160oltes, Ivo Vajgl","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-367","justification":" Proposed amendment to article 25 (j) complements the proposals for a new recital in the\n preamble and the proposal concerning article 17, paragraph 4, for which the same general\n justification is valid (see above under point iii). Relocation of staff to locations outside the\n Seat can only be exceptional and limited in nature for the purpose of carrying tasks in an\n efficient manner, making a real contribution to the working process. Avoiding costs related to\n the geographical spread of agencies outside Brussels cannot be a reason for creating a local\n extension. The duplication of the Agency\u2019s administrative functions is also a reason which\n speaks in favour of keeping the staff at its Seat.","location":[["Proposal for a regulation","Article 25 \u2013 paragraph 1 \u2013 point k"]],"meps":[125004,96933,23693,125104,125103,96911,125003,97019],"meta":{"created":"2019-07-03T06:30:51"},"new":["(k) be responsible for deciding whether","it is exceptionally necessary for the","purpose of carrying out the Agency's tasks","in an efficient and effective manner to","locate one or more staff in one or more","Member States for the purpose of carrying","out the Agency's tasks in an efficient and","effective manner. The decision to establish","a local office requires the prior consent of","the Commission, the Administrative Board,","the Member State of the Seat and the","Member State or Member States","concerned. The decision shall specify the","scope of the activities to be carried out at","that local office in a manner that avoids","unnecessary costs and duplication of","administrative functions of the Agency and","that fully respects Decision 2009/913/EU."],"old":["(k) be responsible for deciding whether","it is necessary for the purpose of carrying","out the Agency's tasks in an efficient and","effective manner to locate one or more","staff in one or more Member States for the","purpose of carrying out the Agency's tasks","in an efficient and effective manner. The","decision to establish a local office requires","the prior consent of the Commission, the","Administrative Board and the Member","State or Member States concerned. The","decision shall specify the scope of the","activities to be carried out at that local","office in a manner that avoids unnecessary","costs and duplication of administrative","functions of the Agency."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"367","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Barbara Kappel, Lorenzo Fontana, Angelo Ciocca","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-368","justification":" The Agency\u2019s overall rules of procedure should be drawn up by the Administrative Board, but\n the Director (and the Board of Regulators) should be involved and the amendment is\n necessary for pressing reasons relating to the internal logic of the text.","location":[[" Proposal for a regulation","Article 25 \u2013 paragraph 1 \u2013 point k a (new)"]],"meps":[125024,96993,183793],"meta":{"created":"2019-07-03T06:30:51"},"new":["(ka) provide an opinion to the","Administrative Board on the rules of","procedure under Article 20(1)(t)."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"368","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Hans-Olaf Henkel","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-369","justification":"Making the rules of procedure of the Board of Appeal dependent on the Commission's opinion\nmight jeopardise the independence of the Board of Appeal.","location":[[" Proposal for a regulation","Article 26 \u2013 paragraph 3 \u2013 subparagraph 1"]],"meps":[124823],"meta":{"created":"2019-07-03T06:30:52"},"new":["The Board of Appeal shall adopt and","publish its rules of procedure. Those rules","shall set out in detail the arrangements","governing the organisation and functioning","of the Board of Appeal and the rules","applicable to appeals before the Board,","pursuant to Art. 29."],"old":["The Board of Appeal shall adopt and","publish its rules of procedure. Those rules","shall set out in detail the arrangements","governing the organisation and functioning","of the Board of Appeal and the rules of","procedures applicable to appeals before the","","Board, pursuant to this Article. The Board","of Appeal shall submit to the Commission","its draft rules of procedure. The","Commission shall deliver an opinion on","the draft rules of procedure within three","months from the date of receipt of the","rules. The Board of Appeal shall adopt","and publish its rules of procedure within","two months after receipt of the","Commission's opinion. Any subsequent","substantial changes to the rules of","procedure shall be notified to the","Commission. The Commission shall","subsequently deliver an opinion on those","changes."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"369","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Barbara Kappel, Lorenzo Fontana, Angelo Ciocca","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-370","location":[["Proposal for a regulation","Article 26 \u2013 paragraph 3 \u2013 subparagraph 1"]],"meps":[125024,96993,183793],"meta":{"created":"2019-07-03T06:30:52"},"new":["The Board of Appeal shall adopt and","publish its rules of procedure. Those rules","shall set out in detail the arrangements","governing the organisation and functioning","of the Board of Appeal and the rules","applicable to appeals before the Board,","pursuant to Article 29. The budget of the","Agency shall comprise a separate budget","line for the financing of the functioning","of the registry for the Board of Appeal and","of an appropriate number of staff to","prepare its decisions."],"old":["The Board of Appeal shall adopt and","publish its rules of procedure. Those rules","shall set out in detail the arrangements","governing the organisation and functioning","of the Board of Appeal and the rules of","procedures applicable to appeals before the","Board, pursuant to this Article. The Board","of Appeal shall submit to the Commission","its draft rules of procedure. The","Commission shall deliver an opinion on","the draft rules of procedure within three","months from the date of receipt of the","rules. The Board of Appeal shall adopt","and publish its rules of procedure within","two months after receipt of the","","Commission's opinion. Any subsequent","substantial changes to the rules of","procedure shall be notified to the","Commission. The Commission shall","subsequently deliver an opinion on those","changes."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"370","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Hans-Olaf Henkel","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-371","location":[[" Proposal for a regulation","Article 26 \u2013 paragraph 3 \u2013 subparagraph 2"]],"meps":[124823],"meta":{"created":"2019-07-03T06:30:52"},"new":["The budget of the Agency shall comprise a","separate budget line for the financing of the","functioning of the registry for the Board of","Appeal and of an appropriate number of","staff to prepare its decisions."],"old":["The budget of the Agency shall comprise a","separate budget line for the financing of the","functioning of the registry for the Board of","Appeal."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"371","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Patrizia Toia","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-372","justification":"Given that the Agency Working Groups, consisting primarily of staff from national energy\nregulators, play a key role in developing energy regulatory proposals, it is appropriate that\nthe ACER Director (responsible for management) and the Board of Regulators (responsible\nfor approving proposed energy regulatory policy) guides their work and development\n(including their internal rules of procedure) - rather than the Administrative Board which is\nnot the relevant Agency body in this area. The proposed amendment will again promote\ngreater co-operation among NRAs and increase the efficiency of the Agency.","location":[[" Proposal for a regulation","Article 30 \u2013 paragraph 1"]],"meps":[28340],"meta":{"created":"2019-07-03T06:30:52"},"new":["1. Where justified and in particular to","support the regulatory work of the Director","and of the Board of Regulators on","regulatory issues, the Director shall,","following a favourable opinion of the","Board of Regulators, establish working","groups."],"old":["1. Where justified and in particular to","support the regulatory work of the Director","and of the Board of Regulators on","regulatory issues, the Administrative Board","may establish working groups."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"372","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Hans-Olaf Henkel, Zdzis\u0142aw Krasnod\u0119bski, Edward Czesak, Ev\u017een To\u0161enovsk\u00fd","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-373","location":[["Proposal for a regulation","Article 30 \u2013 paragraph 1"]],"meps":[124823,124891,132925,96713],"meta":{"created":"2019-07-03T06:30:52"},"new":["1. Where justified and in particular to","support the regulatory work of the Director","and of the Board of Regulators on","regulatory issues, the Director and Board","of Regulators may jointly establish","working groups. The Board of Regulators","shall appoint the working group chairs."],"old":["1. Where justified and in particular to","support the regulatory work of the Director","and of the Board of Regulators on","regulatory issues, the Administrative Board","may establish working groups."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"373","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-374","location":[["Proposal for a regulation","Article 30 \u2013 paragraph 1"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:52"},"new":["1. Where justified and in particular to","support the regulatory work of the Director","and of the Board of Regulators on","regulatory issues, the Director shall,","following a favourable opinion of the","Board of Regulators, establish working","groups."],"old":["1. Where justified and in particular to","support the regulatory work of the Director","and of the Board of Regulators on","regulatory issues, the Administrative Board","may establish working groups."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"374","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-375","location":[[" Proposal for a regulation","Article 30 \u2013 paragraph 1"]],"meps":[36392],"meta":{"created":"2019-07-03T06:30:52"},"new":["1. Where justified and in particular to","support the regulatory work of the Director","and of the Board of Regulators on","regulatory issues, the Director shall,","following a favourable opinion of the","Board of Regulators, establish working","groups."],"old":["1. Where justified and in particular to","support the regulatory work of the Director","and of the Board of Regulators on","regulatory issues, the Administrative Board","may establish working groups."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"375","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Massimiliano Salini, Lara Comi, Fulvio Martusciello, Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-376","location":[[" Proposal for a regulation","Article 30 \u2013 paragraph 1"]],"meps":[125670,96775,124828,36392],"meta":{"created":"2019-07-03T06:30:52"},"new":["1. Where justified and in particular to","support the regulatory work of the Director","and of the Board of Regulators on","regulatory issues, the Director shall,","following a favourable opinion of the","Board of Regulators, establish working","groups."],"old":["1. Where justified and in particular to","support the regulatory work of the Director","and of the Board of Regulators on","regulatory issues, the Administrative Board","may establish working groups."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"376","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Rolandas Paksas","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-377","location":[[" Proposal for a regulation","Article 30 \u2013 paragraph 1"]],"meps":[96694],"meta":{"created":"2019-07-03T06:30:52"},"new":["1. Where justified and in particular to","support the regulatory work of the Director","and of the Board of Regulators on","regulatory issues, the Director shall,","following a favourable opinion of the","Board of Regulators, establish working","groups."],"old":["1. Where justified and in particular to","support the regulatory work of the Director","and of the Board of Regulators on","regulatory issues, the Administrative Board","may establish working groups."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"377","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Barbara Kappel, Lorenzo Fontana, Angelo Ciocca","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-378","location":[["Proposal for a regulation","Article 30 \u2013 paragraph 1"]],"meps":[125024,96993,183793],"meta":{"created":"2019-07-03T06:30:52"},"new":["1. Where justified and in particular to","support the regulatory work of the Director","and of the Board of Regulators on","regulatory issues, the Board of Regulators","and the Director jointly may establish","working groups."],"old":["1. Where justified and in particular to","support the regulatory work of the Director","and of the Board of Regulators on","regulatory issues, the Administrative","Board may establish working groups."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"378","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Werner Langen, Markus Pieper","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-379","justification":" Taking into account that the Director is the Agency\u2019s manager and that the overwhelming\n majority of resources in the Agency working groups are provided by national regulatory\n authorities, it should be the Director and the BoR together who are responsible for\n establishing the groups and setting up their rules of procedure.","location":[["Proposal for a regulation","Article 30 \u2013 paragraph 1"]],"meps":[1928,28224],"meta":{"created":"2019-07-03T06:30:52"},"new":["1. Where justified and in particular to","support the regulatory work of the Director","and of the Board of Regulators on","regulatory issues, the Board of Regulators","and the Director jointly may establish","working groups."],"old":["1. Where justified and in particular to","support the regulatory work of the Director","and of the Board of Regulators on","regulatory issues, the Administrative","Board may establish working groups."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"379","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Barbara Kappel, Lorenzo Fontana, Angelo Ciocca","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-380","location":[[" Proposal for a regulation","Article 30 \u2013 paragraph 1 a (new)"]],"meps":[125024,96993,183793],"meta":{"created":"2019-07-03T06:30:53"},"new":["1a. The Agency Working Groups,","under the guidance of the Board of","Regulators, shall carry out the activities","assigned to them in the programming","document adopted pursuant to Article","20(1)(e) and any activities assigned to","them by the Board of Regulators and the","Director."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"380","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Patrizia Toia","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-381","justification":"Given that the Agency Working Groups, consisting primarily of staff from national energy\nregulators, play a key role in developing energy regulatory proposals, it is appropriate that\nthe ACER Director (responsible for management) and the Board of Regulators (responsible\nfor approving proposed energy regulatory policy) guides their work and development\n(including their internal rules of procedure) - rather than the Administrative Board which is\nnot the relevant Agency body in this area. The proposed amendment will again promote\ngreater co-operation among NRAs and increase the efficiency of the Agency.","location":[[" Proposal for a regulation","Article 30 \u2013 paragraph 2"]],"meps":[28340],"meta":{"created":"2019-07-03T06:30:53"},"new":["2. The working groups shall be","composed of experts from the staff of the","Agency and, from national regulatory","authorities. Experts from the Commission","shall participate as observers. The Agency","shall not be responsible for the costs of the","participation of experts from the staff of","national regulatory authorities in the","Agency working groups."],"old":["2. The working groups shall be","composed of experts from the staff of the","Agency, from national regulatory","authorities and from the Commission, as","necessary. The Agency shall not be","responsible for the costs of the","participation of experts from the staff of","national regulatory authorities in the","","","Agency working groups."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"381","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-382","location":[["Proposal for a regulation","Article 30 \u2013 paragraph 2"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:53"},"new":["2. The working groups shall be","composed of experts from the staff of the","Agency and, from national regulatory","authorities. Experts from the Commission","shall, as necessary, participate as","observers, as necessary. The Agency shall","not be responsible for the costs of the","participation of experts from the staff of","national regulatory authorities in the","Agency working groups."],"old":["2. The working groups shall be","composed of experts from the staff of the","Agency, from national regulatory","authorities and from the Commission, as","necessary. The Agency shall not be","responsible for the costs of the","participation of experts from the staff of","national regulatory authorities in the","Agency working groups."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"382","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-383","location":[["Proposal for a regulation","Article 30 \u2013 paragraph 2"]],"meps":[36392],"meta":{"created":"2019-07-03T06:30:53"},"new":["2. The working groups shall be","composed of experts from the staff of the","Agency and, from national regulatory","authorities. Experts from the Commission","shall, participate as observers, as","necessary. The Agency shall not be","responsible for the costs of the","participation of experts from the staff of","national regulatory authorities in the","Agency working groups."],"old":["2. The working groups shall be","","","composed of experts from the staff of the","Agency, from national regulatory","authorities and from the Commission, as","necessary. The Agency shall not be","responsible for the costs of the","participation of experts from the staff of","national regulatory authorities in the","Agency working groups."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"383","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Massimiliano Salini, Lara Comi, Fulvio Martusciello, Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-384","location":[[" Proposal for a regulation","Article 30 \u2013 paragraph 2"]],"meps":[125670,96775,124828,36392],"meta":{"created":"2019-07-03T06:30:53"},"new":["2. The working groups shall be","composed of experts from the staff of the","Agency and from national regulatory","authorities. Experts from the Commission","shall, participate as observers, as","necessary. The Agency shall not be","responsible for the costs of the","participation of experts from the staff of","national regulatory authorities in the","Agency working groups."],"old":["2. The working groups shall be","composed of experts from the staff of the","Agency, from national regulatory","authorities and from the Commission, as","necessary. The Agency shall not be","responsible for the costs of the","participation of experts from the staff of","national regulatory authorities in the","Agency working groups."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"384","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Rolandas Paksas","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-385","location":[[" Proposal for a regulation","Article 30 \u2013 paragraph 2"]],"meps":[96694],"meta":{"created":"2019-07-03T06:30:53"},"new":["2. The working groups shall be","composed of experts from the staff of the","Agency and from national regulatory","authorities. Experts from the Commission","shall, as necessary, participate as","observers. The Agency shall not be","responsible for the costs of the","participation of experts from the staff of","national regulatory authorities in the","Agency working groups."],"old":["2. The working groups shall be","composed of experts from the staff of the","Agency, from national regulatory","authorities and from the Commission, as","","necessary. The Agency shall not be","responsible for the costs of the","participation of experts from the staff of","national regulatory authorities in the","Agency working groups."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"385","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Massimiliano Salini, Lara Comi, Fulvio Martusciello, Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-386","location":[["Proposal for a regulation","Article 30 \u2013 paragraph 3"]],"meps":[125670,96775,124828,36392],"meta":{"created":"2019-07-03T06:30:53"},"new":["3. The Director, following a","favourable opinion of the Board of","Regulators, shall adopt and publish","internal rules of procedure for the","functioning of the working groups. The","Director, following a favourable opinion","of the Board of Regulators, shall appoint","working group chairs."],"old":["3. The Administrative Board shall","adopt and publish internal rules of","procedure for the functioning of the","working groups."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"386","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Patrizia Toia","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-387","justification":" Given that the Agency Working Groups, consisting primarily of staff from national energy\n regulators, play a key role in developing energy regulatory proposals, it is appropriate that\n the ACER Director (responsible for management) and the Board of Regulators (responsible\n for approving proposed energy regulatory policy) guides their work and development\n (including their internal rules of procedure) - rather than the Administrative Board which is\n not the relevant Agency body in this area. The proposed amendment will again promote\n greater co-operation among NRAs and increase the efficiency of the Agency.","location":[["Proposal for a regulation","Article 30 \u2013 paragraph 3"]],"meps":[28340],"meta":{"created":"2019-07-03T06:30:53"},"new":["3. The Director, following a","favourable opinion of the Board of","Regulators, shall adopt and publish","internal rules of procedure for the","functioning of the working groups. The","Director, following a favourable opinion","of the Board of Regulators, shall appoint","working group chairs."],"old":["3. The Administrative Board shall","adopt and publish internal rules of","procedure for the functioning of the","working groups."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"387","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-388","justification":" Given that the Agency Working Groups, consisting primarily of staff from national energy\n regulators, play a key role in developing energy regulatory proposals, it is appropriate that\n the ACER Director (responsible for management) and the Board of Regulators (responsible\n for approving proposed energy regulatory policy) guides their work and development\n (including their internal rules of procedure) - rather than the Administrative Board which is\n not the relevant Agency body in this area. The proposed amendment will again promote\n greater co-operation among NRAs and increase the efficiency of the Agency.","location":[[" Proposal for a regulation","Article 30 \u2013 paragraph 3"]],"meps":[36392],"meta":{"created":"2019-07-03T06:30:53"},"new":["3. The Director, following a","favourable opinion of the Board of","Regulators, shall adopt and publish","internal rules of procedure for the","functioning of the working groups. The","Director, following a favourable opinion","of the Board of Regulators, shall appoint","working group chairs."],"old":["3. The Administrative Board shall","adopt and publish internal rules of","procedure for the functioning of the","working groups."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"388","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-389","location":[["Proposal for a regulation","Article 30 \u2013 paragraph 3"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:53"},"new":["3. The Director, following a","favourable opinion of the Board of","Regulators, shall adopt and publish","internal rules of procedure for the","functioning of the working groups. The","Director, following a favourable opinion","of the Board of Regulators, shall appoint","working group chairs."],"old":["3. The Administrative Board shall","adopt and publish internal rules of","procedure for the functioning of the","working groups."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"389","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Rolandas Paksas","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-390","location":[["Proposal for a regulation","Article 30 \u2013 paragraph 3"]],"meps":[96694],"meta":{"created":"2019-07-03T06:30:53"},"new":["3. The Director, following a","favourable opinion of the Board of","Regulators, shall adopt and publish","internal rules of procedure for the","functioning of the working groups. The","Director, following a favourable opinion","of the Board of Regulators, shall appoint","working group chairs."],"old":["3. The Administrative Board shall","adopt and publish internal rules of","procedure for the functioning of the","working groups."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"390","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Barbara Kappel, Lorenzo Fontana, Angelo Ciocca","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-391","location":[["Proposal for a regulation","Article 30 \u2013 paragraph 3"]],"meps":[125024,96993,183793],"meta":{"created":"2019-07-03T06:30:53"},"new":["3. The Director and the Board of","Regulators jointly shall adopt and publish","internal rules of procedure for the","functioning of the working groups. The","Board of Regulators shall appoint","working groups chairs."],"old":["3. The Administrative Board shall","adopt and publish internal rules of","","procedure for the functioning of the","working groups."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"391","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Hans-Olaf Henkel","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-392","location":[[" Proposal for a regulation","Article 30 \u2013 paragraph 3"]],"meps":[124823],"meta":{"created":"2019-07-03T06:30:54"},"new":["3. The Director, after consulting the","Board of Regulators, shall adopt and","publish internal rules of procedure for the","functioning of the working groups."],"old":["3. The Administrative Board shall","adopt and publish internal rules of","procedure for the functioning of the","working groups."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"392","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Massimiliano Salini, Lara Comi, Fulvio Martusciello, Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-393","location":[[" Proposal for a regulation","Article 30 \u2013 paragraph 3 a (new)"]],"meps":[125670,96775,124828,36392],"meta":{"created":"2019-07-03T06:30:54"},"new":["3a. The Agency Working Groups,","under the guidance of the Board of","Regulators, shall carry out the activities","assigned to them in the programming","document adopted pursuant to Article","20(1) (e) and any activities assigned to","them by the Board of Regulators and the","Director."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"393","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Patrizia Toia","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-394","justification":"Given that the Agency Working Groups, consisting primarily of staff from national energy\nregulators, play a key role in developing energy regulatory proposals, it is appropriate that\nthe ACER Director (responsible for management) and the Board of Regulators (responsible\nfor approving proposed energy regulatory policy) guides their work and development\n(including their internal rules of procedure) - rather than the Administrative Board which is\nnot the relevant Agency body in this area. The proposed amendment will again promote\ngreater co-operation among NRAs and increase the efficiency of the Agency.","location":[["Proposal for a regulation","Article 30 \u2013 paragraph 3 a (new)"]],"meps":[28340],"meta":{"created":"2019-07-03T06:30:54"},"new":["3a. The Agency Working Groups,","under the guidance of the Board of","Regulators, shall carry out the activities","assigned to them in the programming","document adopted pursuant to Article","20(1)(e) and any activities assigned to","them by the Board of Regulators and the","Director."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"394","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Edouard Martin, Pervenche Ber\u00e8s","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-395","justification":" This is necessary for pressing reasons relating to the internal logic of the text or because the\n amendments are inextricably linked to other admissible amendments","location":[["Proposal for a regulation","Article 30 \u2013 paragraph 3 a (new)"]],"meps":[124947,1985],"meta":{"created":"2019-07-03T06:30:54"},"new":["3a. The Agency Working Groups,","under the guidance of the Board of","Regulators, shall carry out the activities","assigned to them in the programming","document adopted pursuant to Article","20(1)(e) and any activities assigned to","them by the Board of Regulators and the","Director."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"395","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Aldo Patriciello","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-396","location":[[" Proposal for a regulation","Article 30 \u2013 paragraph 3 a (new)"]],"meps":[36392],"meta":{"created":"2019-07-03T06:30:54"},"new":["3a. The Agency Working Groups,","under the guidance of the Board of","Regulators, shall carry out the activities","assigned to them in the programming","document adopted pursuant to Article","20(1)(e) and any activities assigned to","them by the Board of Regulators and the","Director."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"396","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Hans-Olaf Henkel","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-397","location":[[" Proposal for a regulation","Article 30 \u2013 paragraph 3 a (new)"]],"meps":[124823],"meta":{"created":"2019-07-03T06:30:54"},"new":["3a. The working groups shall carry","out the activities assigned to them in the","programming document adopted pursuant","Art. 20(1)(e) and any further tasks","assigned to them by the Director and","Board of Regulators"],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"397","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Davor \u0160krlec on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-398","justification":"The fees should provide the Agency with additional resources to carry out its functions and\naddress the problem of the chronic underfunding of the Agency.","location":[["Proposal for a regulation","Article 31 \u2013 paragraph 1 \u2013 point c a (new)"]],"meps":[124756],"meta":{"created":"2019-07-03T06:30:54"},"new":["(ca) charges for publications, training","and any other services provided by the","Agency;"],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"398","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Davor \u0160krlec on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-399","justification":"Expenses relating to the Stakeholder group.","location":[["Proposal for a regulation","Article 31 \u2013 paragraph 2"]],"meps":[124756],"meta":{"created":"2019-07-03T06:30:54"},"new":["2. The expenditure of the Agency","shall include staff, administrative,","infrastructure, and operational expenses","including expenses referred to in Article","2a."],"old":["2. The expenditure of the Agency","shall include staff, administrative,","infrastructure, and operational expenses."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"399","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Miroslav Poche, Zigmantas Bal\u010dytis, Patrizia Toia, Soledad Cabez\u00f3n Ruiz, Jeppe Kofod, Jens Geier, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-400","justification":" Given the current and persistent resource limitations of the Agency, the Agency should be\n given the right to charge fees for its activities. This would allow the Agency to produce more\n significant and stable revenues for the Agency.","location":[[" Proposal for a regulation","Article 32 \u2013 paragraph 1"]],"meps":[124699,96680,28340,125041,124870,96833,124784],"meta":{"created":"2019-07-03T06:30:54"},"new":["1. Fees shall be due to the Agency for","the following:","(a) requesting an exemption decision","pursuant to Article 11(1) and taking","decisions on cross border cost allocation","provided by the Agency pursuant to Article","12 of Regulation (EU) No 347/201339;","(b) requesting registration as","reporting party pursuant to the third","subparagraph of Article 11(1) of","Commission Implementing Regulation","(EU) No 1348/2014 and ongoing","supervision of registered reporting parties","by the Agency;","(c) overseeing the activities and the","cooperation of transmission system","operators, including through the ENTSO","for Electricity. 1 OJ L 115, 25.4.2013, p.","39. 1a Commission Implementing","Regulation (EU) No 1348/2014 of 17","December 2014 on data reporting","implementing Article 8(2) and Article 8(6)","of Regulation (EU) No 1227/2011 of the","European Parliament and of the Council","(OJ L 363, 18.12.2014, p. 121).","__________________","39","OJ L 115, 25.4.2013, p. 39. OJ L 115, 25.4.2013, p. 39."],"old":["1. Fees shall be due to the Agency for","requesting an exemption decision pursuant","to Article 11(1) and for decisions on cross","border cost allocation provided by the","Agency pursuant to Article 12 of","Regulation (EU) No 347/201339.","__________________","39"],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"400","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Davor \u0160krlec on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-401","justification":"The fees should provide the Agency with additional resources to carry out its functions and\naddress the problem of the chronic underfunding of the Agency.","location":[["Proposal for a regulation","Article 32 \u2013 paragraph 1"]],"meps":[124756],"meta":{"created":"2019-07-03T06:30:54"},"new":["1. Fees shall be levied for:","(a) requesting an exemption decision","pursuant to Article 119(1) and for","decisions on cross border cost allocation","provided by the Agency pursuant to Article","12 of Regulation (EU) No 347/201339 of","the European Parliament and of the","Council of 17April 2013 on guidelines for","trans-European energy infrastructure[1];","(b) registering market participants in","accordance with Article 8 of Regulation","(EU) 1227/2011;","(c) the provision of other services","provided by the Agency, including the","publications, and training provided by the","Agency and the supervision of the","cooperation of transmission system","operators and distribution system","operators through the ENTSO for","Electricity and the EU DSO entity;","(d) the processing of appeals.","__________________","39","OJ L 115, 25.4.2013, p. 39."],"old":["1. Fees shall be due to the Agency for","requesting an exemption decision pursuant","to Article 11(1) and for decisions on cross","border cost allocation provided by the","Agency pursuant to Article 12 of","Regulation (EU) No 347/201339.","__________________","39","OJ L 115, 25.4.2013, p. 39."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"401","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-402","justification":" To charge fees for some of Agency\u00b4s activities can be one way to overcome ACER\u2019s persistent\n underfunding and shortage of human resources. However, fees should be proportionate to\n administrative and other costs related to them and shall be kept at a lowest possible level.","location":[[" Proposal for a regulation","Article 32 \u2013 paragraph 1"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:54"},"new":["1. Fees shall be due to the Agency for","the following:","(a) requesting an exemption decision","pursuant to Article 11(1) and taking","decisions on cross border cost allocation","provided by the Agency pursuant to Article","12 of Regulation (EU) No 347/201339;","(b) requesting registration as","reporting party pursuant to the third","subparagraph of Article 11(1) of","Commission Implementing Regulation","(EU) No 1348/2014 and ongoing","supervision of registered reporting parties","by the Agency.","__________________","39","OJ L 115, 25.4.2013, p. 39. OJ L 115, 25.4.2013, p. 39."],"old":["1. Fees shall be due to the Agency for","requesting an exemption decision pursuant","to Article 11(1) and for decisions on cross","border cost allocation provided by the","Agency pursuant to Article 12 of","Regulation (EU) No 347/201339.","__________________","39"],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"402","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Hans-Olaf Henkel","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-403","justification":"This amendment is necessary for pressing reasons relating to the internal logic of the text or\ninextricably linked to other admissible amendments.","location":[[" Proposal for a regulation","Article 32 \u2013 paragraph 1"]],"meps":[124823],"meta":{"created":"2019-07-03T06:30:54"},"new":["1. Fees shall be due to the Agency for","the following:","(a) requesting an exemption decision","pursuant to Article 11(1) and for decisions","on cross border cost allocation provided by","the Agency pursuant to Article 12 of","Regulation (EU) No 347/201339;","(b) requesting registration as","reporting party pursuant to the third","subparagraph of Article 11(1) of","Commission Implementing Regulation","(EU) No 1348/2014 and ongoing","supervision of registered reporting parties","by the Agency.","__________________","39","OJ L 115, 25.4.2013, p. 39."],"old":["1. Fees shall be due to the Agency for","requesting an exemption decision pursuant","to Article 11(1) and for decisions on cross","border cost allocation provided by the","Agency pursuant to Article 12 of","Regulation (EU) No 347/201339.","__________________","39","OJ L 115, 25.4.2013, p. 39."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"403","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Werner Langen, Markus Pieper","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-404","justification":" The main part of ACER\u00b4s budget comes from the EU, and covers all its regular activities. This\n paragraph only covers exceptional decisions, and should be applied to exceptional activities\n and only then the rules on self-financed agencies apply. Self-financed agencies, according to\n the \"Common Approach\" on EU decentralized agencies, have to receive their funds through\n payment of the cost of services they provide and not charge amounts for any other reasons.","location":[["Proposal for a regulation","Article 32 \u2013 paragraph 1"]],"meps":[1928,28224],"meta":{"created":"2019-07-03T06:30:54"},"new":["1. Fees shall be due to the Agency for","requesting an exemption decision pursuant","to Article 11(1) and taking decisions on","cross border cost allocation provided by","the Agency pursuant to Article 12 of","Regulation (EU) No 347/201339 for","exceptional activities.","__________________","39","OJ L 115, 25.4.2013, p. 39. OJ L 115, 25.4.2013, p. 39."],"old":["1. Fees shall be due to the Agency for","requesting an exemption decision pursuant","to Article 11(1) and for decisions on cross","border cost allocation provided by the","Agency pursuant to Article 12 of","","Regulation (EU) No 347/201339.","__________________","39"],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"404","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Davor \u0160krlec on behalf of the Verts/ALE Group","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-405","justification":" It is necessary to specify that the Commission shall set the fees at the appropriate level.","location":[[" Proposal for a regulation","Article 32 \u2013 paragraph 2"]],"meps":[124756],"meta":{"created":"2019-07-03T06:30:54"},"new":["2. The fees referred to in paragraph 1","shall be set by the Commission in","consultation with the Administrative","Board. The Commission shall determine","in particular the matters for which fees","and charges are due, the amount of the","fees and charges and the way in which","they are to be paid. The amount of the","fees and charges shall be fixed at such a","level as to ensure that the revenue in","respect thereof is in principle sufficient to","cover the full cost of the services","delivered. The Commission shall re-","examine when necessary the level of the","fees and charges on the basis of an","evaluation of needs and the level of fees."],"old":["2. The fees referred to in paragraph 1","shall be set by the Commission."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"405","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Hans-Olaf Henkel","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-406","justification":"This amendment is necessary for pressing reasons relating to the internal logic of the text or\ninextricably linked to other admissible amendments.","location":[["Proposal for a regulation","Article 32 \u2013 paragraph 2"]],"meps":[124823],"meta":{"created":"2019-07-03T06:30:54"},"new":["2. The fees referred to in paragraph 1","shall be set by the Commission after","consulting the Agency."],"old":["2. The fees referred to in paragraph 1","shall be set by the Commission."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"406","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Pavel Teli\u010dka","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-407","justification":"To charge fees for some of Agency\u00b4s activities can be one way to overcome ACER\u2019s persistent\nunderfunding and shortage of human resources. However, fees should be proportionate to\nadministrative and other costs related to them and shall be kept at a lowest possible level.","location":[["Proposal for a regulation","Article 32 \u2013 paragraph 2 a (new)"]],"meps":[124706],"meta":{"created":"2019-07-03T06:30:54"},"new":["2a. The fees referred in paragraph","1(b) shall cover all necessary and","legitimate administrative costs incurred by","the Agency for assessment, registration","and on-going supervision of a particular","reporting party and shall be kept at the","lowest possible level."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"407","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Esther de Lange","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-408","justification":" The amendments are necessary for pressing reasons relating to the internal logic of the text\n or inextricably linked to other admissible amendments.","location":[[" Proposal for a regulation","Article 33 \u2013 paragraph 8 a (new)"]],"meps":[38398],"meta":{"created":"2019-07-03T06:30:55"},"new":["8a. 12 months after the entry into","force of this Regulation, the European","Commission shall conduct an evaluation","of the Agency\u2019s assigned budget with the","aim of securing adequate funding and","human resources allowing the Agency to","fulfil its role of working towards a single","energy market and contributing to energy","security to the benefit of EU consumers.","The European Commission will then, if","appropriate, come forward with proposals","to alter the Agency\u2019s budget."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"408","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Neoklis Sylikiotis, Sofia Sakorafa","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-409","justification":"The agreements must be lawful and comply with Union law in general. The third countries\nparticipating in the Agency should not, in any case, jeopardise the sovereignty and sovereign\nrights of the Member States.","location":[[" Proposal for a regulation","Article 43 \u2013 paragraph 2"]],"meps":[124689,125091],"meta":{"created":"2019-07-03T06:30:55"},"new":["2. Under the relevant provisions of","those agreements, arrangements shall be","made specifying, in particular, the nature, a","performance assessment and a sunset","clause, scope and procedural aspects of the","involvement of those countries in the work","of the Agency, including provisions","relating to financial contributions and to","staff. Third countries participating in the","Agency shall respect the sovereignty and","sovereign rights of all Member States."],"old":["2. Under the relevant provisions of","those agreements, arrangements shall be","made specifying, in particular, the nature,","scope and procedural aspects of the","involvement of those countries in the work","of the Agency, including provisions","relating to financial contributions and to","staff.","",""],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"409","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Neoklis Sylikiotis, Sofia Sakorafa","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-410","justification":"ACER doesn't a have a political mandate. A strategy for relations with third countries or\ninternational organizations is not justified. Paragraphs 1 and 2 form already the necessary\nframework through the cooperation agreements.","location":[["Proposal for a regulation","Article 43 \u2013 paragraph 3"]],"meps":[124689,125091],"meta":{"created":"2019-07-03T06:30:55"},"new":["deleted"],"old":["3. The Administrative Board shall","adopt a strategy for relations with third","countries or international organisations","for which the Agency is competent. The","Commission shall ensure that the Agency","operates within its mandate and the","existing institutional framework by","concluding an appropriate working","arrangement with the Agency's Director."],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"410","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":"Miroslav Poche, Peter Kouroumbashev, Zigmantas Bal\u010dytis, Patrizia Toia, Soledad Cabez\u00f3n Ruiz, Jos\u00e9 Blanco L\u00f3pez, Edouard Martin, Jeppe Kofod, Dan Nica","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-411","justification":" Any changes in the future roles of the Agency should be discussed by Board of Regulators,\n which should issue opinion on future operation of the Agency.","location":[["Proposal for a regulation","Article 45 \u2013 paragraph 2"]],"meps":[124699,124857,96680,28340,125041,125044,124947,124870,124784],"meta":{"created":"2019-07-03T06:30:55"},"new":["2. Where the Commission considers","that the continuation of the Agency is no","longer justified with regard to its assigned","objectives, mandate and tasks, it shall","consult the Board of Regulators. Board of","Regulators shall issue an opinion on","future roles of the Agency within 12","months of receiving the Commission","request. Commission, while taking duly","into account the opinion of the Board of","Regulators, may propose that this","Regulation is amended accordingly or","repealed."],"old":["2. Where the Commission considers","that the continuation of the Agency is no","longer justified with regard to its assigned","objectives, mandate and tasks, it may","propose that this Regulation be amended","accordingly or repealed"],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"411","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"},{"authors":" Andr\u00e1s Gy\u00fcrk","changes":{},"committee":["ITRE"],"date":"2017-09-21T00:00:00","id":"PE610.755-412","location":[[" Proposal for a regulation","Article 45 \u2013 paragraph 2"]],"meps":[23816],"meta":{"created":"2019-07-03T06:30:55"},"new":["2. Where the Commission, having","consulted the National Regulatory","Authorities, considers that the continuation","of the Agency is no longer justified with","regard to its assigned objectives, mandate","and tasks, it may propose that this","Regulation be amended accordingly or","repealed"],"old":["2. Where the Commission considers","that the continuation of the Agency is no","longer justified with regard to its assigned","objectives, mandate and tasks, it may","propose that this Regulation be amended","accordingly or repealed"],"orig_lang":"en","peid":"PE610.755v01-00","reference":"2016/0379(COD)","seq":"412","src":"http://www.europarl.europa.eu/doceo/document/ITRE-AM-610755_EN.pdf"}],"changes":{"2016-12-16T02:29:39":[{"data":[{"body":"EC","commission":[],"date":"2016-11-30T00:00:00","docs":[{"celexid":"CELEX:52016PC0861:EN","title":"COM(2016)0861","type":"Legislative proposal published","url":"http://www.europarl.europa.eu/RegData/docs_autres_institutions/commission_europeenne/com/2016/0861/COM_COM(2016)0861_EN.pdf"}],"type":"Legislative proposal published"}],"path":["activities"],"type":"added"},{"data":[],"path":["other"],"type":"added"},{"data":[{"body":"EP","committee":"ECON","committee_full":"Economic and Monetary Affairs","responsible":false},{"body":"EP","committee":"IMCO","committee_full":"Internal Market and Consumer Protection","responsible":false},{"body":"EP","committee":"ITRE","committee_full":"Industry, Research and Energy","responsible":true},{"body":"EP","committee":"JURI","committee_full":"Legal Affairs","responsible":null}],"path":["committees"],"type":"added"},{"data":{},"path":["links"],"type":"added"},{"data":{"instrument":"Regulation","legal_basis":["Treaty on the Functioning of the EU TFEU 194-p2"],"reference":"2016/0379(COD)","stage_reached":"Preparatory phase in Parliament","subject":["3.60.03 Gas, electricity, natural gas, biogas","3.60.06 Trans-European energy networks"],"subtype":"Recast","summary":["Repealing Regulation (EC) No 714/2009"],"title":"Internal market for electricity. Recast","type":"COD - Ordinary legislative procedure (ex-codecision procedure)"},"path":["procedure"],"type":"added"}],"2017-02-16T18:14:10":[{"data":["
PURPOSE: to recast the rules on the internal\nelectricity market.
\nLEGISLATIVE ACT: Regulation of the European Parliament\nand of the Council.
\nROLE OF THE EUROPEAN PARLIAMENT: the European\nParliament decides in accordance with the ordinary legislative\nprocedure and on an equal footing with the Council.
\nBACKGROUND: the energy sector plays a key role in the\nobligation to reduce greenhouse gas emissions in the Union by at\nleast 40% until 2030 with an expected share of 50% of renewables by\n2030. The European Parliament adopted a\nresolution in September 2016 stressing that a well-functioning\nintegrated energy market is the best tool to guarantee affordable\nenergy prices, secure energy supplies and to allow for the\nintegration and development of larger volumes of electricity\nproduced from renewable sources in a cost efficient\nmanner.
\nThe current electricity market design is based on the\nrules of the Third\nEnergy Package, adopted in 2009. The latter has brought\ntangible progress for consumers but new developments have led to\nfundamental changes in European electricity markets. The share\nof electricity generated from renewable energy sources (RES-E) has\nsteeply increased, and this shift will continue as it is a key\ncondition to fulfilling the Union's obligations under the Paris\nAgreement on climate. The physical nature of RES-E more\nvariable, less predictable and decentralised than traditional\ngeneration requires an adaptation of market and grid\noperation rules to the more flexible nature of the market.\nIn parallel, state interventions, often designed in an\nuncoordinated manner, have led to distortions of the wholesale\nelectricity market, with negative consequences for investments and\ncross-border trade. Significant changes are also taking place on\nthe technological side. The shortcomings of the current\nmarket arrangements also reduce the attractiveness of the energy\nsector for new investment. At the\nlevel of wholesale markets, barriers to cross-border trade persist\nand interconnector capacities are rarely fully exploited. With\nregards to retail markets, competition performance could be\nsignificantly improved.
\nThe present electricity market design initiative thus\naims to adapt the current market rules to new market\nrealities, by allowing electricity to move freely to where it\nis most needed when it is most needed via undistorted price\nsignals, whilst empowering consumers, reaping maximum benefits for\nsociety from cross-border competition and providing the right\nsignals and incentives to drive the necessary investments to\ndecarbonise our energy system. It will also give priority to\nenergy efficiency solutions, and contribute to the goal of becoming\na world leader in energy production from renewable energy sources,\nthus contributing to the Union's target to create jobs,\ngrowth and attract investments.
\nThe proposal for a recast of this Regulation on the\nelectricity market, the\nproposal on the recast of the Directive on common rules for the\ninternal market in electricity, and the\nproposal on the recast of the Regulation establishing a\nEuropean Agency for the Cooperation of Energy Regulators are part\nof the Commission's broader package of initiatives (\"Clean Energy\nfor All\"). That Package comprises the Commission's key proposals to\nimplement the Energy\nUnion.
\nThe proposal is also closely linked to the\nproposal for a revised Renewable Energy Directive, providing\nfor a framework to achieve the 2030 renewable target, including\nprinciples in relation to support schemes for renewable energy\nsources.
\nIMPACT ASSESSMENT: this endorsed an enhancement of\ncurrent market rules in order to create a level-playing field among\nall generation technologies and resources by removing existing\nmarket distortions. It addresses rules that discriminate\nbetween resources and which limit or favour the access of certain\ntechnologies to the electricity grid. In addition, all market\nparticipants would bear financial responsibility for imbalances\ncaused on the grid and all resources would be remunerated in the\nmarket on equal terms. Barriers to demand-response would be\nremoved. The chosen option would also strengthen short-term\nmarkets by bringing them closer to real-time
\nCONTENT : the draft regulation contains seven\nChapters, which may be summarised as follows:
\nSubject-matter: the\nproposal aims at:
\nGeneral rules for the electricity\nmarket: new provisions set out the\nkey principles to be respected by national energy legislation in\norder to allow for a functioning internal electricity market. The\ntext also sets out the main legal principles for electricity\ntrading rules within different trading timeframes (balancing,\nintraday, day-ahead and forward markets), including principles for\nprice formation. It clarifies the principle of balancing\nresponsibility and provides for a framework for more market\ncompatible rules for the dispatch and curtailment of generation and\ndemand response.
\nNetwork access and congestion\nmanagement: this Chapter describes\nthe process to define bidding zones in a coordinated manner. In\norder to address the persisting problem of significant national\nlimitations to cross-border electricity flows, the conditions for\nsuch exceptional limitations are clarified, notably by rules that\nshall ensure that electricity imports and exports are not\nrestricted by national actors for economic reasons. The Chapter\ncontains amendments to pre-existing principles for transmission and\ndistribution network tariffs and sets a procedure for fostering the\nprogressive convergence of transmission and distribution tariff\nmethodologies. It also sets out amended rules for the usage of\ncongestion rents.
\nResource adequacy: this\nChapter sets out principles and a procedure for the development of\na European resource adequacy assessment to better determine\nthe need for capacity mechanisms and, if appropriate, the setting\nof a reliability standard by Member States. It clarifies how and\nunder which conditions capacity mechanisms can be introduced in a\nmarket-compatible manner. It also clarifies market compatible\ndesign principles for capacity mechanisms, including rules for the\nparticipation of capacity located in another Member State and for\ninterconnection usage. It sets out how Regional Operational\nCentres, national TSOs, the ENTSO for electricity and national\nregulators via ACER will be involved in the development of\ntechnical parameters for the participation of capacities located in\nanother Member State as well as the operational rules for their\nparticipation.
\nTransmission system operation (TSO): the Chapter sets out the tasks and duties of\nthe European network of transmission system operators for\nelectricity (ENTSO) and the monitoring tasks of ACER\nin this regard whilst clarifying its duty to act independently and\nfor the European good. It defines the mission of Regional\nOperational Centres and provides for criteria and a procedure for\ndefining system operation regions covered by each Regional\nOperational Centre and the coordination functions that these\ncentres perform. It also sets out working and organisational\narrangements, consultation requirements, procedures for the\nadoption of decisions and recommendations and their revision, the\ncomposition and responsibilities of the management board and\nliability arrangements of Regional Operational Centres. The Chapter\nalso incorporates rules on the connection of cogeneration units,\npreviously included in Directive 2012/27/EU on energy efficiency.\nThe rules on a ten-year network development plan,\ninter-transmission system operator compensation, information\nexchange and certification remain largely unchanged.
\nDistribution system operation (DSO): the draft regulation sets up a European entity\nfor DSOs, defines a procedure for its establishment and its\ntasks including with regard to the consultation of stakeholders. It\nalso provides detailed rules on the cooperation between DSOs and\nTSOs with regard to the planning and operation of their\nnetworks.
\nNetwork codes and guidelines: the Commission is empowered to adopt delegated acts\nin the form of network codes or guidelines. The text provides for\nclarifications as to the legal nature and the adoption of network\ncodes and guidelines and enlarges their possible content to areas\nsuch as distribution tariff structures. It also includes the\nEuropean entity for DSOs and other stakeholders more closely in the\nprocedure on the development of proposals for electricity network\ncodes.
\nFinal provisions: this\nincludes the pre-existing rules for the exemption of new direct\ncurrent interconnectors from certain requirement of the Electricity\nDirective and Regulation whilst clarifying the procedure for\nsubsequent amendments made by NRAs. The Annex to the proposed\nRegulation defines in more detail the functions attributed to the\nRegional Operational Centers created by the Regulation.
\nBUDGETARY IMPLICATIONS: the\nbudgetary impact associated to the proposal under this package\nconcerns the resources of the Agency\nfor the Cooperation of Energy Regulators (ACER). Essentially,\nthe new tasks to be carried out by ACER, notably as regards the\nassessment of system adequacy and the establishment of Regional\nOperation Centres, require a phasing in of 18 additional full-time\nstaff in the Agency in 2020, as well as corresponding financial\nresources.
\nThe Committee on Industry, Research and Energy adopted\nthe report by Krijānis KARIŅ (EPP, LV) on the\nproposal for a regulation of the European Parliament and of the\nCouncil on the internal market for electricity (recast).
\nThe committee recommended that the European Parliament\nadopt its position at first reading under the ordinary legislative\nprocedure, taking into account the recommendations of the\nConsultative Working Party of the legal services of the European\nParliament, the Council and the Commission.
\nThe main changes to the Commission's proposal are as\nfollows:
\nAim: the Regulation\nshall set the basis for an efficient achievement of the objectives\nof the European Energy Union by enabling market signals to be\ndelivered for increased flexibility, efficiency,\ndecarbonisation, innovation and a higher share of renewable energy\nsources.
\nMembers pointed out that electricity markets\nshall be operated according to the following principles:
\nJust transition: the\nCommission shall:
\nDefinition of bidding zones: the proposed Regulation describes the process of\ndefining bidding zones in a coordinated manner. The amended text\nstipulated that the configuration of bidding zones in the Union\nshall be designed in such a way as to ensure liquidity of day\nahead and intraday markets, and thus to maximise economic\nefficiency and cross-border trading opportunities while maintaining\nsecurity of supply.
\nMembers stated that the transmission system operators\nparticipating in the bidding zone review shall submit a proposal to\nthe relevant Member States whether to amend or maintain the bidding\nzone configuration
\nAfter the bidding zone review, relevant Member\nStates shall agree unanimously on the bidding zone structure\nand concrete commitments where necessary. When an agreement cannot\nbe reached, the Commission shall step in to resolve the\ndisagreement.
\nNetwork access, use of networks and network\nreinforcements: charges shall be\ntransparent, take into account the need for network security\nand flexibility and reflect actual costs. They shall not\ndiscriminate against energy storage, specifically not double\ncharging energy storage, and aggregation and shall not create\ndisincentives for self-generation, self-consumption, nor for\nparticipation in demand response.
\nAdequacy of capacity and capacity\nmechanisms: the proposal lays down\nnew general principles for Member States to respond in a\ncoordinated manner to concerns about resource adequacy.
\nThe amended text foresees that a Member State with\nidentified adequacy concerns shall publish an implementation\nplan with a timeline for adopting measures to eliminate any\nidentified regulatory distortions and/or market failures. When\naddressing resource adequacy concerns, the Member States\nshall in particular:
\nMember States shall submit the implementation plan to\nthe Commission for review. The Commission may decide whether the\nmeasures are sufficient.
\nMembers considered that a capacity mechanisms\nshall only be introduced if ENTSO's assessment of ENTSO's adequacy\nof resources at EU level has identified adequacy issues or the\nCommission has taken an affirmative decision on the implementation\nplan.
\nCapability mechanisms shall only be introduced by\nMember States as a last resort, subject to certain\nconditions and EU State aid rules, when the elimination of existing\nmarket distortions does not solve the problems of adequacy\nmeans.
\nRegional cooperation:\nMembers consider that market rules shall provide for strong\nregional cooperation where effective.
\nTo ensure system security, Members considered it\nessential that transmission system operators cooperate more at\nregional level.
\nRegional coordination centres shall carry out functions where their regionalisation\nbrings added value compared to functions performed at national\nlevel. All transmission system operators shall adhere to a single\nregional coordination centre. The functions carried out by regional\ncoordination centres should exclude real time operation of the\nelectricity system.
\nPURPOSE: to recast the rules on the internal\nelectricity market.
\nLEGISLATIVE ACT: Regulation of the European Parliament\nand of the Council.
\nROLE OF THE EUROPEAN PARLIAMENT: the European\nParliament decides in accordance with the ordinary legislative\nprocedure and on an equal footing with the Council.
\nBACKGROUND: the energy sector plays a key role in the\nobligation to reduce greenhouse gas emissions in the Union by at\nleast 40% until 2030 with an expected share of 50% of renewables by\n2030. The European Parliament adopted a\nresolution in September 2016 stressing that a well-functioning\nintegrated energy market is the best tool to guarantee affordable\nenergy prices, secure energy supplies and to allow for the\nintegration and development of larger volumes of electricity\nproduced from renewable sources in a cost efficient\nmanner.
\nThe current electricity market design is based on the\nrules of the Third\nEnergy Package, adopted in 2009. The latter has brought\ntangible progress for consumers but new developments have led to\nfundamental changes in European electricity markets. The share\nof electricity generated from renewable energy sources (RES-E) has\nsteeply increased, and this shift will continue as it is a key\ncondition to fulfilling the Union's obligations under the Paris\nAgreement on climate. The physical nature of RES-E more\nvariable, less predictable and decentralised than traditional\ngeneration requires an adaptation of market and grid\noperation rules to the more flexible nature of the market.\nIn parallel, state interventions, often designed in an\nuncoordinated manner, have led to distortions of the wholesale\nelectricity market, with negative consequences for investments and\ncross-border trade. Significant changes are also taking place on\nthe technological side. The shortcomings of the current\nmarket arrangements also reduce the attractiveness of the energy\nsector for new investment. At the\nlevel of wholesale markets, barriers to cross-border trade persist\nand interconnector capacities are rarely fully exploited. With\nregards to retail markets, competition performance could be\nsignificantly improved.
\nThe present electricity market design initiative thus\naims to adapt the current market rules to new market\nrealities, by allowing electricity to move freely to where it\nis most needed when it is most needed via undistorted price\nsignals, whilst empowering consumers, reaping maximum benefits for\nsociety from cross-border competition and providing the right\nsignals and incentives to drive the necessary investments to\ndecarbonise our energy system. It will also give priority to\nenergy efficiency solutions, and contribute to the goal of becoming\na world leader in energy production from renewable energy sources,\nthus contributing to the Union's target to create jobs,\ngrowth and attract investments.
\nThe proposal for a recast of this Regulation on the\nelectricity market, the\nproposal on the recast of the Directive on common rules for the\ninternal market in electricity, and the\nproposal on the recast of the Regulation establishing a\nEuropean Agency for the Cooperation of Energy Regulators are part\nof the Commission's broader package of initiatives (\"Clean Energy\nfor All\"). That Package comprises the Commission's key proposals to\nimplement the Energy\nUnion.
\nThe proposal is also closely linked to the\nproposal for a revised Renewable Energy Directive, providing\nfor a framework to achieve the 2030 renewable target, including\nprinciples in relation to support schemes for renewable energy\nsources.
\nIMPACT ASSESSMENT: this endorsed an enhancement of\ncurrent market rules in order to create a level-playing field among\nall generation technologies and resources by removing existing\nmarket distortions. It addresses rules that discriminate\nbetween resources and which limit or favour the access of certain\ntechnologies to the electricity grid. In addition, all market\nparticipants would bear financial responsibility for imbalances\ncaused on the grid and all resources would be remunerated in the\nmarket on equal terms. Barriers to demand-response would be\nremoved. The chosen option would also strengthen short-term\nmarkets by bringing them closer to real-time
\nCONTENT : the draft regulation contains seven\nChapters, which may be summarised as follows:
\nSubject-matter: the\nproposal aims at:
\nGeneral rules for the electricity\nmarket: new provisions set out the\nkey principles to be respected by national energy legislation in\norder to allow for a functioning internal electricity market. The\ntext also sets out the main legal principles for electricity\ntrading rules within different trading timeframes (balancing,\nintraday, day-ahead and forward markets), including principles for\nprice formation. It clarifies the principle of balancing\nresponsibility and provides for a framework for more market\ncompatible rules for the dispatch and curtailment of generation and\ndemand response.
\nNetwork access and congestion\nmanagement: this Chapter describes\nthe process to define bidding zones in a coordinated manner. In\norder to address the persisting problem of significant national\nlimitations to cross-border electricity flows, the conditions for\nsuch exceptional limitations are clarified, notably by rules that\nshall ensure that electricity imports and exports are not\nrestricted by national actors for economic reasons. The Chapter\ncontains amendments to pre-existing principles for transmission and\ndistribution network tariffs and sets a procedure for fostering the\nprogressive convergence of transmission and distribution tariff\nmethodologies. It also sets out amended rules for the usage of\ncongestion rents.
\nResource adequacy: this\nChapter sets out principles and a procedure for the development of\na European resource adequacy assessment to better determine\nthe need for capacity mechanisms and, if appropriate, the setting\nof a reliability standard by Member States. It clarifies how and\nunder which conditions capacity mechanisms can be introduced in a\nmarket-compatible manner. It also clarifies market compatible\ndesign principles for capacity mechanisms, including rules for the\nparticipation of capacity located in another Member State and for\ninterconnection usage. It sets out how Regional Operational\nCentres, national TSOs, the ENTSO for electricity and national\nregulators via ACER will be involved in the development of\ntechnical parameters for the participation of capacities located in\nanother Member State as well as the operational rules for their\nparticipation.
\nTransmission system operation (TSO): the Chapter sets out the tasks and duties of\nthe European network of transmission system operators for\nelectricity (ENTSO) and the monitoring tasks of ACER\nin this regard whilst clarifying its duty to act independently and\nfor the European good. It defines the mission of Regional\nOperational Centres and provides for criteria and a procedure for\ndefining system operation regions covered by each Regional\nOperational Centre and the coordination functions that these\ncentres perform. It also sets out working and organisational\narrangements, consultation requirements, procedures for the\nadoption of decisions and recommendations and their revision, the\ncomposition and responsibilities of the management board and\nliability arrangements of Regional Operational Centres. The Chapter\nalso incorporates rules on the connection of cogeneration units,\npreviously included in Directive 2012/27/EU on energy efficiency.\nThe rules on a ten-year network development plan,\ninter-transmission system operator compensation, information\nexchange and certification remain largely unchanged.
\nDistribution system operation (DSO): the draft regulation sets up a European entity\nfor DSOs, defines a procedure for its establishment and its\ntasks including with regard to the consultation of stakeholders. It\nalso provides detailed rules on the cooperation between DSOs and\nTSOs with regard to the planning and operation of their\nnetworks.
\nNetwork codes and guidelines: the Commission is empowered to adopt delegated acts\nin the form of network codes or guidelines. The text provides for\nclarifications as to the legal nature and the adoption of network\ncodes and guidelines and enlarges their possible content to areas\nsuch as distribution tariff structures. It also includes the\nEuropean entity for DSOs and other stakeholders more closely in the\nprocedure on the development of proposals for electricity network\ncodes.
\nFinal provisions: this\nincludes the pre-existing rules for the exemption of new direct\ncurrent interconnectors from certain requirement of the Electricity\nDirective and Regulation whilst clarifying the procedure for\nsubsequent amendments made by NRAs. The Annex to the proposed\nRegulation defines in more detail the functions attributed to the\nRegional Operational Centers created by the Regulation.
\nBUDGETARY IMPLICATIONS: the\nbudgetary impact associated to the proposal under this package\nconcerns the resources of the Agency\nfor the Cooperation of Energy Regulators (ACER). Essentially,\nthe new tasks to be carried out by ACER, notably as regards the\nassessment of system adequacy and the establishment of Regional\nOperation Centres, require a phasing in of 18 additional full-time\nstaff in the Agency in 2020, as well as corresponding financial\nresources.
\nThe Committee on Industry, Research and Energy adopted\nthe report by Krijānis KARIŅ (EPP, LV) on the\nproposal for a regulation of the European Parliament and of the\nCouncil on the internal market for electricity (recast).
\nThe committee recommended that the European Parliament\nadopt its position at first reading under the ordinary legislative\nprocedure, taking into account the recommendations of the\nConsultative Working Party of the legal services of the European\nParliament, the Council and the Commission.
\nThe main changes to the Commission's proposal are as\nfollows:
\nAim: the Regulation\nshall set the basis for an efficient achievement of the objectives\nof the European Energy Union by enabling market signals to be\ndelivered for increased flexibility, efficiency,\ndecarbonisation, innovation and a higher share of renewable energy\nsources.
\nMembers pointed out that electricity markets\nshall be operated according to the following principles:
\nJust transition: the\nCommission shall:
\nDefinition of bidding zones: the proposed Regulation describes the process of\ndefining bidding zones in a coordinated manner. The amended text\nstipulated that the configuration of bidding zones in the Union\nshall be designed in such a way as to ensure liquidity of day\nahead and intraday markets, and thus to maximise economic\nefficiency and cross-border trading opportunities while maintaining\nsecurity of supply.
\nMembers stated that the transmission system operators\nparticipating in the bidding zone review shall submit a proposal to\nthe relevant Member States whether to amend or maintain the bidding\nzone configuration
\nAfter the bidding zone review, relevant Member\nStates shall agree unanimously on the bidding zone structure\nand concrete commitments where necessary. When an agreement cannot\nbe reached, the Commission shall step in to resolve the\ndisagreement.
\nNetwork access, use of networks and network\nreinforcements: charges shall be\ntransparent, take into account the need for network security\nand flexibility and reflect actual costs. They shall not\ndiscriminate against energy storage, specifically not double\ncharging energy storage, and aggregation and shall not create\ndisincentives for self-generation, self-consumption, nor for\nparticipation in demand response.
\nAdequacy of capacity and capacity\nmechanisms: the proposal lays down\nnew general principles for Member States to respond in a\ncoordinated manner to concerns about resource adequacy.
\nThe amended text foresees that a Member State with\nidentified adequacy concerns shall publish an implementation\nplan with a timeline for adopting measures to eliminate any\nidentified regulatory distortions and/or market failures. When\naddressing resource adequacy concerns, the Member States\nshall in particular:
\nMember States shall submit the implementation plan to\nthe Commission for review. The Commission may decide whether the\nmeasures are sufficient.
\nMembers considered that a capacity mechanisms\nshall only be introduced if ENTSO's assessment of ENTSO's adequacy\nof resources at EU level has identified adequacy issues or the\nCommission has taken an affirmative decision on the implementation\nplan.
\nCapability mechanisms shall only be introduced by\nMember States as a last resort, subject to certain\nconditions and EU State aid rules, when the elimination of existing\nmarket distortions does not solve the problems of adequacy\nmeans.
\nRegional cooperation:\nMembers consider that market rules shall provide for strong\nregional cooperation where effective.
\nTo ensure system security, Members considered it\nessential that transmission system operators cooperate more at\nregional level.
\nRegional coordination centres shall carry out functions where their regionalisation\nbrings added value compared to functions performed at national\nlevel. All transmission system operators shall adhere to a single\nregional coordination centre. The functions carried out by regional\ncoordination centres should exclude real time operation of the\nelectricity system.
\n