BETA

3 Amendments of Constance LE GRIP related to 2011/0437(COD)

Amendment 684 #
Proposal for a directive
Article 16 – paragraph 1
1. The duration of the concessions shall be limited to the time estimated to be necessary for the concessionaire to recoup the investments made in operating the works or services toge. The grantor shall estimate the duration on the basis of the works or services requested. When the cost of investments must be met by the concessionaire, the duration of a concession shall reflect the nature and amount of the investments involved and may not, under these circumstances, exceed the normal amortisation period. If the concessionaire is not required to make investments, the duration of the concession shall reflect the amount of time deemed necessary to meet the objectives set in the contract, in particular as regards the provision of the service in question. 2. The normal amortisation period shall correspond to the time that concessionaires could reasonably be expected to take to recoup their withinvestment costs and secure a reasonable return on invested capital.
2012/10/23
Committee: IMCO
Amendment 904 #
Proposal for a directive
Article 42 – paragraph 2 a (new)
2a. Provided the overall nature of the concession remains the same, modification of the concession shall not be considered substantial where: (a) the modification has been provided for in the original concession contract in clear, precise and unequivocal review clauses or options which state the scope and nature of possible modifications as well as the conditions under which they may be used; or (b) the value thereof does not exceed the threshold laid down in Article 6 and is below 5% of the updated value of the original contract. Where several successive modifications are made, the value shall be assessed on the basis of the updated cumulative value of the successive modifications.
2012/10/23
Committee: IMCO
Amendment 920 #
Proposal for a directive
Article 42 – paragraph 6 – subparagraph 1 – point c
(fc) in case of concessions awarded by contracting authorities where any increase in price is not higher than 50% of thethe value of the intended modification does not exceed 50% of the updated initial value of the original concession.;
2012/10/23
Committee: IMCO