10 Amendments of Anneleen VAN BOSSUYT related to 2016/0379(COD)

Amendment 1171 #
Proposal for a regulation
Article 33 – paragraph 1 – introductory part
1. By [OP: six months after entry into force of this Regulation] the ENTSO for Electricity shall submit to the Agency a proposal defining system operation regions covered by regional operational centresfor which a cooperative process as described in Art. 62 of [directive on common rules for the internal market in electricity recast, COM (2016)864] is established, taking into account existing regional security coordinators, on the basis of the following criteria:
2017/09/25
Committee: ITRE
Amendment 1173 #
Proposal for a regulation
Article 33 – paragraph 1 – point b
(b) the synchronous connection of the systemsregion;
2017/09/25
Committee: ITRE
Amendment 1174 #
Proposal for a regulation
Article 33 – paragraph 1 – point c
(c) the size of the region, which shall cover at least one capacity calculation region;
2017/09/25
Committee: ITRE
Amendment 1175 #
Proposal for a regulation
Article 33 – paragraph 1 – point d
(d) the geographical optimization of balancing reserverelationship to the capacity calculation regions.
2017/09/25
Committee: ITRE
Amendment 1183 #
Proposal for a regulation
Article 34 – paragraph 1 – introductory part
1. Each rRegional opercoordinational centres shall performrovide all the following functionservices in the system operation region where it is establisthedy and regional operational centres shall perform at least the following functions, set out in more detail in Annex Ire established:
2017/09/25
Committee: ITRE
Amendment 1188 #
Proposal for a regulation
Article 34 – paragraph 1 – point c
(c) creation of common system modelsgrid models in accordance with the methodologies and procedures developed pursuant to Articles 68 - 70 and 79 of Regulation ... [The Commission Regulation establishing a Guideline on electricity transmission system operation];
2017/09/25
Committee: ITRE
Amendment 1191 #
Proposal for a regulation
Article 34 – paragraph 1 – point e
(e) coordination and optimization of regional restoration;deleted
2017/09/25
Committee: ITRE
Amendment 1196 #
Proposal for a regulation
Article 34 – paragraph 1 – point g
(g) regional sizing of reserve capacity;deleted
2017/09/25
Committee: ITRE
Amendment 1197 #
Proposal for a regulation
Article 34 – paragraph 1 – point h
(h) facilitate the regional procurement of balancing capacity;deleted
2017/09/25
Committee: ITRE
Amendment 1202 #
Proposal for a regulation
Article 34 – paragraph 1 – point i
(i) regional week ahead to intradayup to day ahead system adequacy forecasts and preparation of risk reducing actions in accordance with the methodology set out Article 8 of [Regulation on risk preparedness as proposed by COM(2016) 862] and the procedures set out in Article 81 of [The Commission Regulation establishing a Guideline on electricity transmission system operation];
2017/09/25
Committee: ITRE