16 Amendments of Zdzisław KRASNODĘBSKI related to 2021/0223(COD)
Amendment 289 #
(2 a) ‘along the TEN-T core or comprehensive network’ means, for electric recharging stations, that they are located on the TEN-T network or within 3 km driving distance from the nearest exit of a TEN-T road and for hydrogen refuelling stations, that the yare located on the TEN-T network or within 10 km driving distance from the nearest exit of a TEN-T road.
Amendment 329 #
Proposal for a regulation
Article 3 – paragraph 1 – subparagraph 1 – introductory part
Article 3 – paragraph 1 – subparagraph 1 – introductory part
To that end Member States shall ensure that, at the end of each year, starting from the year referred to in Article 24eighteen months after 1 January of the year following that of the entry into force of this Regulation, the following power output targets are met cumulatively:
Amendment 346 #
Proposal for a regulation
Article 3 – paragraph 2 – point a – point i
Article 3 – paragraph 2 – point a – point i
(i) by 31 December 20257, each recharging pool shall offer a power output of at least 300 kW and include at least one recharging station with an individual power output of at least 150 kW;
Amendment 365 #
Proposal for a regulation
Article 3 – paragraph 3
Article 3 – paragraph 3
3. Neighbouring Member States shall take the necessary measures to ensure that the maximum distances referred to in points (a) and (b) are not exceeded for cross-border sections of the TEN-T core and the TEN-T comprehensive network.
Amendment 366 #
Proposal for a regulation
Article 3 – paragraph 3 a (new)
Article 3 – paragraph 3 a (new)
3 a. The provisions of Article 3 shall not apply to existing sections of the TEN- T core network which at the date specified in Article 3 are under upgrade/construction process, and in accordance with Regulation1315/2013 has a status of section “to be upgraded”. Member states shall ensure a minimum coverage of publicly accessible recharging points, for all newly constructed, upgraded and retrofitted sections of the TEN-T core network in accordance with the provisions of Article 3 or within 24 months after the completion of works [if the date of completion is beyond the date provided in Article 3].
Amendment 377 #
Proposal for a regulation
Article 4 – paragraph 1 – point a – introductory part
Article 4 – paragraph 1 – point a – introductory part
(a) along the TEN-T core network, publicly accessible recharging pools dedicated to heavy-duty vehicles and meeting the following requirements are deployed in each direction of travel with a maximum distance of 6100 km, considering local conditions, in-between them:
Amendment 384 #
Proposal for a regulation
Article 4 – paragraph 1 – point a – point i
Article 4 – paragraph 1 – point a – point i
(i) by 31 December 202530, each recharging pool shall offer a power output of at least 1400 kW and include at least one recharging station with an individual power output of at least 350 kW;
Amendment 386 #
Amendment 389 #
Proposal for a regulation
Article 4 – paragraph 1 – point a – point ii
Article 4 – paragraph 1 – point a – point ii
(ii) by 31 December 20303, each recharging pool shall offer a power output of at least 3500 kW and include at least two recharging stations with an individual power output of at least 350 kW;
Amendment 396 #
Proposal for a regulation
Article 4 – paragraph 1 – point b – point i
Article 4 – paragraph 1 – point b – point i
(i) by 31 December 20305, each recharging pool shall offer a power output of at least 1400 kW and include at least one recharging station with an individual power output of at least 350 kW;
Amendment 400 #
Proposal for a regulation
Article 4 – paragraph 1 – point b – point ii
Article 4 – paragraph 1 – point b – point ii
Amendment 402 #
Proposal for a regulation
Article 4 – paragraph 1 – point b – point ii
Article 4 – paragraph 1 – point b – point ii
(ii) by 1 December 20358, each recharging pool shall offer a power output of at least 3500 kW and include at least two recharging stations with an individual power output of at least 350 kW;
Amendment 409 #
Proposal for a regulation
Article 4 – paragraph 1 – point c
Article 4 – paragraph 1 – point c
(c) by 31 December 20303, in each safe and secure parking area at least one recharging station dedicated to heavy-duty vehicles with a power output of at least 100 kW is installed;
Amendment 413 #
Proposal for a regulation
Article 4 – paragraph 1 – point d
Article 4 – paragraph 1 – point d
(d) by 31 December 20258, in each urban node publicly accessible recharging points dedicated to heavy-duty vehicles providing an aggregated power output of at least 600 kW are deployed, provided by recharging stations with an individual power output of at least 150 kW;
Amendment 416 #
Proposal for a regulation
Article 4 – paragraph 1 – point e
Article 4 – paragraph 1 – point e
(e) by 31 December 20303, in each urban node publicly accessible recharging points dedicated to heavy-duty vehicles providing an aggregated power output of at least 1200 kW are deployed, provided by recharging stations with an individual power output of at least 150 kW.
Amendment 421 #
Proposal for a regulation
Article 4 – paragraph 2
Article 4 – paragraph 2
2. Neighbouring Member States shall take the necessary measures to ensure that the maximum distances referred to in points (a) and (b) are not exceeded for cross-border sections of the TEN-T core and the TEN-T comprehensive network.