BETA

18 Amendments of Eugen FREUND related to 2016/0381(COD)

Amendment 87 #
Proposal for a directive
Recital 6 a (new)
(6a) The 2015 Paris Agreement on climate change (COP21) must be reflected in the Union’s efforts to decarbonise its buildings stock, taking into account that almost 50% of the Union’s final energy demand is used for heating and cooling, of which 80% is used in buildings. The Union’s energy and climate goals therefore need to be based 100% on renewable energy by 2050, which can be achieved only making full use of energy saving potential and the “energy efficiency first” principle.
2017/06/13
Committee: ITRE
Amendment 95 #
Proposal for a directive
Recital 7
(7) The provisions on long-term renovation strategies provided for in Directive 2012/27/EU of the European Parliament and of the Council13 should be moved to Directive 2010/31/EU, where they fit more coherently, and updated to ensure access to affordable energy also for the most vulnerable citizens. __________________ 13 Directive 2012/27/EU of the European Parliament and of the Council of 25 October 2012 on energy efficiency, amending Directives 2009/125/EC and 2010/30/EU and repealing Directives 2004/8/EC and 2006/32/EC (OJ L 315, 14.11.2012, p. 1).
2017/06/13
Committee: ITRE
Amendment 112 #
Proposal for a directive
Recital 8
(8) The agendas of the Digital Single Market and the Energy Union should be aligned and serve common goals. The digitalisation of the energy system is quickly changing the energy landscape, from the integration of renewables to smart grids and smart-ready buildings. In order to digitise the building sector, targeted incentives should be provided to promote smart-ready systems and digital solutions in the built environment. Those targets should, however, take into account the less digitally engaged consumers who should not be left behind. In-building physical communications infrastructure is addressed in Directive 2014/61/EU of the European Parliament and of the Council. Targeted incentives should take into account the Union's connectivity targets, which are a prerequisite to the development of connected, smart homes. However, nearly zero emission buildings with good insulation may block indoor mobile connection and hamper the development of small cells and 5G networks unless the issue is considered during construction and renovation.
2017/06/13
Committee: ITRE
Amendment 116 #
Proposal for a directive
Recital 8 a (new)
(8a) It is crucial to bear in mind the extraordinary potential of the opportunities created by the development of ICT technologies, smart controls, big data and the internet of things when designing measures to improve energy efficiency.
2017/06/13
Committee: ITRE
Amendment 122 #
Proposal for a directive
Recital 9
(9) In order to adapt this Directive to the technical progress, the power to adopt acts in accordance with Article 290 of the Treaty on the Functioning of the European Union should be delegated to the Commission to supplement it by defining the smartness indicator and enabling its implementation. The smartness indicator should be used to measure buildings’ capacity to use ICT and electronic systems to optimise operation and interact with the grid. TWhile the smartness indicator will raise awareness amongst building owners and occupants of the value behind building automation and electronic monitoring of technical building systems and will give confidence to the occupant about the actual savings of these new enhanced- functionalities, consumers should always be in control of their data.
2017/06/13
Committee: ITRE
Amendment 211 #
Proposal for a directive
Article 1 – paragraph 1 – point 1
Directive 2010/31/EU
Article 2 – point 3
3. ‘technical building system’ means technical equipment for space heating, space cooling, ventilation, domestic hot water, built-in lightingindoor and outdoor lighting, elevators and escalators, building automation and control, solar shading, on- site electricity generation, on-site infrastructure for electro-mobility, or a combination of such systems, including those using energy from renewable sources, of a building or building unit;;
2017/06/13
Committee: ITRE
Amendment 221 #
Proposal for a directive
Article 1 – paragraph 1 – point 1 b (new)
Directive 2010/31/EU
Article 2 – point 3 b (new)
(1b) in Article 2, the following point is inserted: "(3b) 'trigger point' means a key moment in the life of a building when it is easier and more economical to take an investment decision to undertake energy renovation works;"
2017/06/13
Committee: ITRE
Amendment 225 #
Proposal for a directive
Article 1 – paragraph 1 – point 1 d (new)
Directive 2010/31/EU
Article 2 – point 3 d (new)
(1d) In Article 2, the following point is inserted: "(3d) 'indoor air quality' means the temperature, relative humidity, CO2, VOC, Radon, mould and other particulate matter;"
2017/06/13
Committee: ITRE
Amendment 245 #
Proposal for a directive
Article 1 – paragraph 1 – point 2 – point a
Directive 2010/31/EU
Article 2 a – paragraph 1
(a) the first paragraph consists of Article 4 of the Directive 2012/27/EU on energy efficiency16 , other than its last subparagraph; __________________ 16 OJ L 315, 14.11.2012, p. 13ollowing paragraph is inserted: '1. Member States shall establish a long-term strategy for mobilising investment in the renovation of the national stock of both public and private buildings with the aim of providing for the decarbonisation of the building stock by 2050 and delivering affordability for tenants and owners of the buildings. That strategy shall encompass: (a) an overview of the national building stock, based, as appropriate, on statistical sampling; (b) identification of cost-effective approaches and actions to stimulate renovations relevant to the building type and climatic zone, considering relevant trigger points in the life-cycle of the building; (c) policies and measures to stimulate cost-effective deep renovations of buildings, including staged deep renovations and decarbonisation of the heating demand, as well as targeted, small, very low cost renovations, e.g. thresholds and thermostatic radiator valves (d) policies and actions to target the worst performing segments of the national building stock, households subject to energy poverty and households subject to split-incentive dilemmas for renovations, including by requiring that the buildings in the lowest energy classes of the energy performance certificate are not rented after 1 January 2023; (e) policies and actions to target all public buildings, including social housing; (f) an overview of national initiatives to promote skills and education in the construction and energy efficiency sectors as well as education in smart technologies; (g) a forward-looking perspective to guide investment decisions of individuals, the construction industry, public institutions including municipalities, and financial institutions; (h) an evidence-based estimate of expected energy savings and wider benefits, such as health; (i) the introduction of building renovation passports; (j) policies delivering Very High Capacity Network to premises in accordance with Directive XXXX/XX/EU (European Electronic Communications Code) and in-building physical infrastructure in accordance with Directive 2014/61/EU.’
2017/06/19
Committee: ITRE
Amendment 260 #
Proposal for a directive
Article 1 – paragraph 1 – point 2 – point b
Directive 2010/31/EU
Article 2 a – paragraph 2 – subparagraph 1
‘2. In their long-term renovation strategy referred to in paragraph 1, Member States shall set out a roadmap with clear milestones and measureactions to deliver on the long-term 2050 goal to ensure a highly energy efficient and decarbonise theird national building stock, with specific milestones for 2030. and 2040, including indicators measuring progress of implementation towards these milestones. Member States shall specify how their milestones contribute to achieving the Union's binding energy efficiency target of 40% in 2030 and the Union's target to reduce greenhouse gas emissions by 80- 95% by 2050.
2017/06/19
Committee: ITRE
Amendment 280 #
Proposal for a directive
Article 1 – paragraph 1 – point 2 – point b
Directive 2010/31/EU
Article 2 a – paragraph 2 – subparagraph 2
In addition, the long term renovation strategy shall contribute to the alleviation of energy povertyestablish specific measures and financing instruments to decrease energy demand, eradicate energy poverty and renovate the social housing stock while securing affordable housing.
2017/06/19
Committee: ITRE
Amendment 304 #
Proposal for a directive
Article 1 – paragraph 1 – point 2 – point b
Directive 2010/31/EU
Article 2 a – paragraph 3 – point c a (new)
(ca) accessible and transparent advisory tools, such as one-stop-shops for consumers, for guidance on energy efficiency, replacement of fossil fuel boilers with renewable-based alternatives and available financial instruments for energy efficiency renovations in buildings."
2017/06/19
Committee: ITRE
Amendment 332 #
Proposal for a directive
Article 1 – paragraph 1 – point 3 a (new)
Directive 2010/31/EU
Article 7 – paragraph 4 a (new)
(3a) in Article 7, the following paragraph is inserted after the fourth paragraph: "Member States shall ensure that energy performance upgrades also contribute to achieving a healthy indoor environment and avoiding problems such as mould."
2017/06/19
Committee: ITRE
Amendment 334 #
Proposal for a directive
Article 1 – paragraph 1 – point 4
Directive 2010/31/EU
Article 7 – subparagraph 5
(4) in Article 7, the fifth subparagraph is deleted;replaced by the following: "Member States shall encourage, in relation to buildings undergoing major renovation, the consideration and taking into account of alternative, high- efficiency systems, in so far as this is technically, functionally and economically feasible."
2017/06/19
Committee: ITRE
Amendment 355 #
Proposal for a directive
Article 1 – paragraph 1 – point 5 – point b
Directive 2010/31/EU
Article 8 – paragraph 2 – subparagraph 1
‘2. Member States shall ensure that in all new non-residential buildings and in all existing non-residential buildings undergoing major renovation with mwith more than ten parking spaces, that are undergoing major renovation on the electrical infrastructure of the building ore than ten parking spaces, at least one of every ten is equipped with a recharging pointe parking lot, every parking space is equipped with adequate conduits for the future set-up of recharging points for electric vehicles within the meaning of Directive 2014/94/EU on the deployment of alternative fuels infrastructure17 , which is capable of starting and stopping charging in reaction to price signalsith the power of at least 7kW on every parking space. This requirement shall apply to all non- residential buildings, with more than ten parking spaces, as of 1 January 2025. __________________ 17 OJ L 307, 28.10.2014, p. 1
2017/06/19
Committee: ITRE
Amendment 382 #
Proposal for a directive
Article 1 – paragraph 1 – point 5 – point b
Directive 2010/31/EU
Article 8 – paragraph 3
3. Member States shall ensure that newly built residential buildings and those undergoing major renovations, with more thbuildings with more than ten parking spaces, undergoing major renovations on the electrical infrastructure of the building and tehe adjacent or built-in parking spaceslot, include the pre- cablingadequate conduits with the power of at least 7kW to enable the installation of recharging points for electric vehicles for every parking space.
2017/06/19
Committee: ITRE
Amendment 604 #
Proposal for a directive
Annex I – paragraph 1 – point b
Directive 2010/31/EU
Annex I – point 2 – subparagraph 1
‘2. The energy needs for space heating, space cooling, domestic hot water and adequate, lighting and ventilation shall be calculated in order to ensure minimum healthmaximise health, indoor air quality and comfort levels defined by Member States at national or regional level.
2017/06/19
Committee: ITRE
Amendment 613 #
Proposal for a directive
Annex I – paragraph 1 – point b
Directive 2010/31/EU
Annex I – point 2 – paragraph 3
Primary energy factors shall discount the share of renewable energy in energy carriers so that calculations equally treat: (a) the energy from renewable sourceThe calculation by the Member States shall take into account renewable energy both with regard to the energy that is generated and used on-site (behind the individual meter, i.e. not accounted as supplied), and (b) the energy from renewable energy sourceswith regard to the energy supplied through the energy carrier.’;
2017/06/19
Committee: ITRE