20 Amendments of Edward CZESAK related to 2016/0382(COD)

Amendment 594 #
Proposal for a directive
Article 4 – paragraph 4
4. Member States shall assess the effectiveness of their support for electricity from renewable sources at least every fourive years. Decisions on the continuation or prolongation of support and design of new support shall be based on the results of the assessments.
2017/07/04
Committee: ITRE
Amendment 618 #
Proposal for a directive
Article 5 – paragraph 1
1. Member States shallmay open support for electricity generated from renewable sources to generators located in other Member States under the conditions laid down in this Article.
2017/07/04
Committee: ITRE
Amendment 626 #
Proposal for a directive
Article 5 – paragraph 2
2. Member States shall ensure that support for at least 10% of the newly- supported capacity in each year between 2021 and 2025 and at least 15% of the newly-supported capacity in each year between 2026 and 2030 is open to installations located in other Member States.deleted
2017/07/04
Committee: ITRE
Amendment 643 #
Proposal for a directive
Article 5 – paragraph 4
4. The Commission shall assess by 2025 the costs and the benefits on the cost-effective deployment of renewable electricity in the Union of provisions set out in this Article. On the basis of this assessment, the Commission may propose to increase the percentages set out in paragraph 2.
2017/07/04
Committee: ITRE
Amendment 652 #
Proposal for a directive
Article 6 – paragraph 1
Without prejudice to adaptations necessary to comply with State aid rules, Member States shall ensure that the level of, and the conditions attached to, the support granted to renewable energy projects are not revised in a way that negatively impacts the rights conferred thereunder and the economics of supported projects. Exceptions are allowed in extraordinary situations i.e. energy security or safety reasons.
2017/07/04
Committee: ITRE
Amendment 700 #
Proposal for a directive
Article 13 – paragraph 1 – introductory part
1. Without prejudice to the obligations of Member States under Article 5, two or more Member States may decide, on a voluntary basis, to join or partly coordinate their national support schemes. In such cases, a certain amount of energy from renewable sources produced in the territory of one participating Member State may count towards the national renewable energy share of another participating Member State if the Member States concerned:
2017/07/04
Committee: ITRE
Amendment 714 #
Proposal for a directive
Article 15 – paragraph 3
3. Member States shall ensure that investors have sufficient predictability of the planned support for energy from renewable sources. To this aim, Member States shallmay define and publish in a non- legislative act a long-term schedule in relation to expected allocation for support, covering at least the following three years and including for each scheme e.g. the indicative timing, the capacity, the budget expected to be allocated, as well as a consultation of stakeholders on the design of the support.
2017/07/04
Committee: ITRE
Amendment 767 #
Proposal for a directive
Article 16 – paragraph 1
1. By 1 January 2021 Member States shallmay set up one or more single administrative contact points which will coordinate the entire permit granting process for applicants for permits to build and operate plants and associated transmission and distribution network infrastructures for the production of energy from renewable energy sources.
2017/07/04
Committee: ITRE
Amendment 771 #
Proposal for a directive
Article 16 – paragraph 2
2. The single administrative contact point shall guide the applicant through the application process in a transparent manner, provide the applicant with all necessary information, coordinate and involve, where appropriate, other authorities, and deliver a legally binding decision at the end of the process.. ,
2017/07/04
Committee: ITRE
Amendment 803 #
Proposal for a directive
Article 17 – paragraph 1
1. Demonstration projects and installations with an electricity capacity of less than 50 kW shall be allowed to connect to the grid following a notification to the distribution system operator if this is possible without strengthening the network.
2017/07/04
Committee: ITRE
Amendment 810 #
Proposal for a directive
Article 17 – paragraph 2 – subparagraph 1
Repowering shall be allowed following a notification to the single administrative contact point established in accordance with Article 16, where no singnificant negative environmental or social impact is expected. The single administrative contact point shall decide within sixtwelve months of the receipt of the notification if this is sufficient.
2017/07/04
Committee: ITRE
Amendment 811 #
Proposal for a directive
Article 17 – paragraph 2 – subparagraph 2
Where the single administrative contact point decides that the notification is sufficient, the permit shall be automatically grant the permited.
2017/07/04
Committee: ITRE
Amendment 986 #
Proposal for a directive
Article 22 – paragraph 1 – subparagraph 2 – introductory part
For the purposes of this Directive, a renewable energy community shall be an SME or a not-for-profit organisation, theassociation, a cooperative, a partnership, a non-profit organisation or other legal entity which is effectively controlled by local shareholders or members, of which cooperate in the generation, distribution, storage or supply of energy from renewable sources, fulfilling at least four out of the following criteria:
2017/07/05
Committee: ITRE
Amendment 996 #
Proposal for a directive
Article 22 – paragraph 1 – subparagraph 2 – point a
(a) shareholders or members are natural persons, local authorities, including municipalities, or SMEs or any other legal entity operating in the fields or renewable energy;
2017/07/05
Committee: ITRE
Amendment 1001 #
Proposal for a directive
Article 22 – paragraph 1 – subparagraph 2 – point b
(b) at least 510% of the shareholders or members with voting rights of the entity are natural persons;
2017/07/05
Committee: ITRE
Amendment 1004 #
Proposal for a directive
Article 22 – paragraph 1 – subparagraph 2 – point c
(c) at least 51% of the shares or participation rights of the entity are owned by local members, i.e. representatives of local public and local private socio- economic interests or citizen, etc. having a direct interest in the community activity and its impacts;
2017/07/05
Committee: ITRE
Amendment 1008 #
Proposal for a directive
Article 22 – paragraph 1 – subparagraph 2 – point d
(d) at least 51% of the seats in the board of directors or managing bodies of the entity are reserved to local members, i.e. representatives of local public and local private socio-economic interests or, citizens, etc. having a direct interest in the community activity and its impacts;
2017/07/05
Committee: ITRE
Amendment 1011 #
Proposal for a directive
Article 22 – paragraph 1 – subparagraph 2 – point e
(e) the community has not installed more than 1820 MWe or 50 MWth of renewable capacity for electricity, heating and cooling and transport as a yearly average in the previous 5 year.
2017/07/05
Committee: ITRE
Amendment 1032 #
Proposal for a directive
Article 23 – paragraph 1
1. In order to facilitate the penetration of renewable energy in the heating and cooling sector, each Member State shallould endeavour to increase the share of renewable energy supplied for heating and cooling by at least 1 percentage point (pp) every year, expressed in terms of national share of final energy consumption and calculated according to the methodology set out in Article 7.
2017/07/05
Committee: ITRE
Amendment 1111 #
Proposal for a directive
Article 24 – paragraph 2
2. Member States shall lay down the necessary measures to allow customers of those district heating or cooling systems which are not 'efficient district heating and cooling' or will not become one within the next 5 years according to their investment plans within the meaning of Article 2(41) of Directive 2012/27/EU to disconnect from the system in order to produce heating or cooling from renewable energy sources themselves, or to switch to another supplier of heat or cold which has access to the system referred to in paragraph 4.
2017/07/05
Committee: ITRE