BETA

Activities of Jordi SOLÉ related to 2022/0104(COD)

Shadow opinions (1)

OPINION on the proposal for a directive of the European Parliament and of the Council amending Directive 2010/75/EU of the European Parliament and of the Council of 24 November 2010 on industrial emissions (integrated pollution prevention and control) and Council Directive 1999/31/EC of 26 April 1999 on the landfill of waste
2023/03/29
Committee: ITRE
Dossiers: 2022/0104(COD)
Documents: PDF(198 KB) DOC(168 KB)
Authors: [{'name': 'Tomas TOBÉ', 'mepid': 197402}]

Amendments (19)

Amendment 31 #
Proposal for a directive
Recital 9
(9) In order to foster energy efficiency of installations within the scope of Directive 2010/75/EU which are carrying out activities listed in Annex I to Directive 2003/87/EC, it is appropriate to submit those installations to energy efficiency requirements in respect of combustion units or other units emitting carbon dioxide on the siter other greenhouse gases on the site. Similarly, emission limits for greenhouse gases should be set, where necessary in order to achieve climate neutrality by 2050 at the latest.
2022/12/09
Committee: ITRE
Amendment 34 #
Proposal for a directive
Recital 16
(16) The contribution of Directive 2010/75/EU to resource and energy efficiency and circular economy in the Union should be made more effective, taking into consideration the ‘Energy Efficiency First’ as a guiding principle of the Union energy policy. Therefore, the permits should establish, where possible, mandatory environmental performance limit values on consumption and resource efficiency levels, including on the use of water, energy and recycled materials, based on the environmental performance levels associated with the best available techniques (BAT AEPLs) set out in decisions on BAT conclusions. Where those environmental performance levels are expressed in a range of values, competent authorities should be required to set in permits the lowest possible emission limit values which reflect the performance of BAT for the specific installations, taking into consideration the whole range of BAT-AELs and aiming at the best environmental performance possible for the installations;
2022/12/09
Committee: ITRE
Amendment 44 #
Proposal for a directive
Recital 25
(25) Achieving Union objectives regarding a clean, circular and climate neutral economy by 2050 calls for a deep transformation of the Union economy. Consistently with the 8th Environmental Action Programme, operators of installations covered by Directive 2010/75/EU should therefore be required to include transformation plans in their environmental management systems. Such transformation plans will also complement the Corporate Sustainability Reporting requirements under Directive 2013/34/EU of the European Parliament and of the Council75 by providing a means for concrete implementation of these requirements at installation level. The first priority is the transformation of energy- intensive activities listed in Annex I. Therefore, the operators of energy- intensive installations should produce transformation plans by 30 June 2030. Operators of installations carrying out other activities listed in Annex I should be required to produce transformation plans as part of the permit reconsideration and update following the publication of decisions on BAT conclusions published after 1 January 2030. Whilst the transformation plans should remain indicative documents prepared under the responsibility of the operators, trefore, the operators of activities listed in Annex I should produce transformation plans by 30 June 2027. After this date, competent authorities should be required to check that permits contain transformation plans in line with Union environmental and climate objectives Transformation plans should be regularly reviewed and updated in order to follow technological progress. The audit organisation contracted by the operators as part of their environmental management systems should check that they contain the minimum information to beset according to this Directive and set by the European Commission in an implementing delegated act, and the operators should make the transformation plans publicas well as the progress in their fulfilment publicly accessible and easy to find. _________________ 75 Directive 2013/34/EU of the European Parliament and of the Council of 26 June 2013 on the annual financial statements, consolidated financial statements and related reports of certain types of undertakings, amending Directive 2006/43/EC of the European Parliament and of the Council and repealing Council Directives 78/660/EEC and 83/349/EEC; OJ L 182, 29.6.2013, p. 19–76.
2022/12/09
Committee: ITRE
Amendment 105 #
Proposal for a directive
Article 1 – paragraph 1 – point 6 a (new)
Directive 2010/75/EU
Article 9 – paragraph 1
1. Where emissions of a greenhouse gas from an installation are specified in Annex I to Directive 2003/87/EC in relation to an activity carried out in that installation, the permit shall not include an emission limit value for direct emissions of that gas, unless necessary to ensure that no significant local pollution is caused. (6a) In Article 9, paragraph (1) is deleted. "" Or. en (32010L0075)
2022/12/09
Committee: ITRE
Amendment 155 #
Proposal for a directive
Article 1 – paragraph 1 – point 12 Directive 2010/75/EU
The competent authority shall set the strictest possible emission limit values that are consistent with the lowest emissions achievable by applying the most effective BAT in the installation, and that ensure that, under normal operating conditions, emissions do not exceed the emission levels associated with the best available techniques (BAT- AELs) as laid down in the decisions on BAT conclusions referred to in Article 13(5). The emission limit values shall be based on an assessment by the operator analysing the technical non- feasibility of meeting the strictest end of the BAT-AEL range and demonstrating the best performance the installation can achieve by applying the most effective BAT as described in BAT conclusions. The emission limit values shall be set through either of the following:
2022/12/09
Committee: ITRE
Amendment 163 #
Proposal for a directive
Article 1 – paragraph 1 – point 12
Directive 2010/75/EU
Article 15 – paragraph 3 a
3a. The competent authority shall set the strictest environmental performance limit values that are consistent with the best performance achievable by applying the most effective BAT in the installation, and that ensure that, under normal operating conditions, such performance limits values do not exceed the environmental performance levels associated with BATs as laid down in the decisions on BAT conclusions referred to in Article 13(5). The environmental performance limit values shall be based on an assessment by the operator analysing the technical non-feasibility of meeting the strictest end of the BAT- AEPL range and demonstrating the best performance the installation can achieve by applying most effective BAT(s) as described in BAT conclusions
2022/12/09
Committee: ITRE
Amendment 200 #
Proposal for a directive
Article 1 – paragraph 1 – point 22
Directive 2010/75/EU
Article 27 a (new) – paragraph 2 a (new)
2a. The centre shall develop guidance on transformation indicators that contribute to the emergence of a sustainable, clean, non-toxic, circular and climate-neutral economy respecting the planetary boundaries by 2050.
2022/12/09
Committee: ITRE
Amendment 201 #
Proposal for a directive
Article 1 – paragraph 1 – point 22
Directive 2010/75/EU
Article 27 a (new) – paragraph 3 – point (g)
(g) non-governmental organisations promoting environmental protectionthe protection of human health or the environment;
2022/12/09
Committee: ITRE
Amendment 205 #
Proposal for a directive
Article 1 – paragraph 1 – point 22
Directive 2010/75/EU
Article 27 b (new)
Without prejudice to Article 18, the competent authority may grant temporary derogations from the requirements set out in Article 15(2) and (3) and from the principles set out in Article 11, points (a) and (b), for the testing of emerging techniques for a total period of time not exceeding 124 months.
2022/12/09
Committee: ITRE
Amendment 214 #
Proposal for a directive
Article 1 – paragraph 1 – point 22
Directive 2010/75/EU
Article 27 d (new) – title
Transformation towards a clean, non-toxic, circular and climate neutral industry
2022/12/09
Committee: ITRE
Amendment 220 #
Proposal for a directive
Article 1 – paragraph 1 – point 22
Directive 2010/75/EU
Article 27 d (new) – paragraph 1 – first part
Member States shall require that by 30 June 2030 27the operator includes in its environmental management system referred to in Article 14a a transformation plan for each installation carrying out any activity listed in points 1, 2, 3, 4, 6.1 a, and 6.1 b of Annex I. The transformation plan shall contain information on how the installation will transform itself during the 2030-2050 period in order to contribute to the emergence of a sustainable, clean, non- toxic, circular and climate-neutral economy by 2050, using the format referred to in paragraph 4.
2022/12/09
Committee: ITRE
Amendment 228 #
Proposal for a directive
Article 1 – paragraph 1 – point 22
Directive 2010/75/EU
Article 27 d (new) – paragraph 1 – second part
Member States shall take the necessary measures to ensure that by 31 December 203128, the audit organisation contracted by the operator as part of its environmental management system assesses the conformity of the transformation plans referred to in the first subparagraph of paragraph 1 with the requirements set out in the implementing act referred to in paragraph 4.
2022/12/09
Committee: ITRE
Amendment 230 #
Proposal for a directive
Article 1 – paragraph 1 – point 22
Directive 2010/75/EU
Article 27 d (new) – paragraph 2 – first part
Member States shall require that, as part of the review of the permit conditions pursuant to Article 21(3) following the publication of decisions on BAT conclusions after 1 January 2030, the operator includes in its environmental management system referred to in Article 14a a transformation plan for each installation carrying out any activity listed in Annex I that is not referred to in paragraph 1. The transformation plan shall contain information on how the installation will transform itself during the 2030-2050 period in order to contribute to the emergence of a sustainable, clean, circular and climate- neutral economy by 2050, using the format referred to in paragraph 4.deleted
2022/12/09
Committee: ITRE
Amendment 241 #
Proposal for a directive
Article 1 – paragraph 1 – point 22
Directive 2010/75/EU
Article 27 d (new) – paragraph 2 – second part
Member States shall take the necessary measures to ensure that the audit organisation contracted by the operator as part of its environmental management system assesses the conformity of the transformation plans referred to in the first subparagraph of paragraph 2 with the requirements set out in the implementing act referred to in paragraph 4.deleted
2022/12/09
Committee: ITRE
Amendment 242 #
Proposal for a directive
Article 1 – paragraph 1 – point 22
Directive 2010/75/EU
Article 27 d (new) – paragraph 2 a (new)
2a. Transformation plans shall include clear objectives, planned measures and a concrete timeline at least for each of these transformation indicators, taking into account the guidance developed in accordance with Article 27a (2b), where available: (a) climate neutrality, including a greenhouse gases emissions reduction pathway; (b) zero pollution, including measures planned regarding the phase out and substitution of substances of concern; (c) circularity, including a planned trajectory of the evolution of water, energy and virgin and secondary materials consumption; (d) ecosystem restoration; (e) local and sustainable economic development, including an estimate of the needs to re- and upskill the workforce; For each indicator intermediary targets at least for 2030, 2035 and 2040 shall be established.
2022/12/09
Committee: ITRE
Amendment 243 #
Proposal for a directive
Article 1 – paragraph 1 – point 22
Directive 2010/75/EU
Article 27 d (new) – paragraph 2 b (new)
2b. The operator shall annually assess the progress made towards intermediate targets and update its transformation plan every five years at the latest.
2022/12/09
Committee: ITRE
Amendment 247 #
Proposal for a directive
Article 1 – paragraph 1 – point 22
Directive 2010/75/EU
Article 27 d (new) – paragraph 3
3. The operator shall make its transformation plan, its updates as well as the results of the assessment referred to in paragraphs 1, 2 and 2b public, as part of the publication of its environmental management system.
2022/12/09
Committee: ITRE
Amendment 249 #
Proposal for a directive
Article 1 – paragraph 1 – point 22
Directive 2010/75/EU
Article 27 d (new) – paragraph 3 a (new)
3a. Member States shall ensure that the competent authorities perform adequate checks of transformation plans, taking into account sectors and operators with the highest potential for transformation. Where competent authority finds the transformation plan inadequate to achieve the objectives of this Directive, the operator shall be required to adopt an updated plan within three months.
2022/12/09
Committee: ITRE
Amendment 253 #
Proposal for a directive
Article 1 – paragraph 1 – point 22
Directive 2010/75/EU
Article 27 d (new) – paragraph 4
4. The Commission shall by 30 June1 December 20285, adopt an implementing act establishing the format for the transformation plans. This implementing act shall be adopted in accordance with the examination procedure referred to in Article 75(2). delegated act accordance with Article 76 to supplement this Directive by establishing mandatory sector specific transformation indicators to be included and the format for the transformation plans.
2022/12/09
Committee: ITRE