BETA

137 Amendments of Christophe GRUDLER related to 2020/0360(COD)

Amendment 139 #
Proposal for a regulation
Recital 12 a (new)
(12 a) To enable sector integration, to acknowledge changes in consumer behaviour and to increase demand for green transport, charging infrastructure for electric vehicles should be eligible for the PCI Status;
2021/04/22
Committee: ITRE
Amendment 153 #
Proposal for a regulation
Recital 15 a (new)
(15 a) Moreover, a focus should equally be laid on flexibility and energy storage solutions to support investments that allow for the stability of the grid and enable further integration of renewable energy sources; energy storage will be a crucial feature of the power grid given the volatile nature of renewable energy sources on the one hand and our need for grid stability and security of supply on the other;
2021/04/22
Committee: ITRE
Amendment 155 #
Proposal for a regulation
Recital 15 a (new)
(15 a) Moreover, a new infrastructure category shall be introduced for network components contributing to operational safety and ancillary services to support investments that allow for the stability of the grid, power and voltage quality while enabling further integration of renewable energy sources.
2021/04/22
Committee: ITRE
Amendment 157 #
Proposal for a regulation
Recital 15 b (new)
(15 b) Moreover, a new infrastructure category should be created for district heating and cooling systems.
2021/04/22
Committee: ITRE
Amendment 166 #
Proposal for a regulation
Recital 17
(17) The Union should facilitate infrastructure projects linking the Union’s energy networks with third-country networks that are mutually beneficial and necessary for the energy transition and the achievement of the climate targets, and which also meet the specific criteria of the relevant infrastructure categories pursuant to this Regulation, in particular with neighbouring countries and with countries with which the Union has established specific energy cooperation. Therefore, this Regulation should include in its scope projects of mutual interest where they are sustainable and able to demonstrate significant net socio-economic benefits for at least two Member States and at least one third country. Such projects would be eligible for inclusion in the Union list upon conditions of regulatory approximation with the Union and upon demonstrating a contribution to the Union’s overall energy and climate objectives in terms of security of supply and decarbonisation. Such regulatory alignment or convergence should be presumed for the European Economic Area or, Energy Community Contracting Parties or third countries within the synchronous area of continental Europe. In addition, the third country with which the Union cooperates in the development of projects of mutual interest should facilitate a similar timeline for accelerated implementation and other policy support measures, as stipulated in this Regulation. Therefore, in this Regulation, projects of mutual interest should be considered in the same manner as projects of common interest with all provisions relative to projects of common interest applying also to projects of mutual interest, unless otherwise specified.
2021/04/22
Committee: ITRE
Amendment 171 #
Proposal for a regulation
Recital 18
(18) Furthermore, to achieve the Union’s 2030 and 2050 climate and energy targets and climate neutrality objective, Europe needs to significantly scale up renewable electricity generation. The existing infrastructure categories for electricity transmission and storage are crucial for the integration of the significant increase in renewable electricity generation in the power grid and for the achievement of the 15 % electricity interconnection target for 2030. In addition, that requires stepping up investment in offshore renewable energy30 . Coordinating long- term planning and development of offshore and onshore electricity grids should also be addressed. In particular, offshore infrastructure planning should move away from the project-by-project approach towards a coordinated comprehensive approach ensuring the sustainable development of integrated offshore grids in line with the offshore renewable potential of each sea basin, environmental protection and other uses of the sea. _________________ 30Offshore Strategy Communication
2021/04/22
Committee: ITRE
Amendment 183 #
Proposal for a regulation
Recital 22
(22) To ensure voltage and frequency stability, particular attention should be given to the stability of the European electricity network under the changing conditions, for instance through exploring all possible sustainable energy storage solutions, especially in view of the growing share of renewable electricity.
2021/04/22
Committee: ITRE
Amendment 199 #
Proposal for a regulation
Recital 33
(33) In order to simplify and expedite the permitting process for offshore grids for renewable energy, the Member States around a particular sea basin should endevour to harmonise the relevant legislation and procedures and create one unique points of contact, referred to as an ‘offshore one-stop shop’, in view of regional specificities and geography, for the for facilitating, integrating and coordinating the process of granting of permits toall permit granting procedures of such projects. Moreover, the establishment of a one-stop shop per sea basin for offshore grids for renewable energy should reduce complexity, increase efficiency and speed up the permitting process of offshore transmission assets often crossing many jurisdictions. It shall issue comprehensive decisions for these projects on behalf of the relevant national Member States in a coordinated, collaborative or integrated manner.
2021/04/22
Committee: ITRE
Amendment 208 #
Proposal for a regulation
Recital 40 a (new)
(40 a) The needs of an integrated energy market will go beyond a physical cross- border footprint of infrastructure projects in order to contribute to the TEN-E pillars, such as sustainability or security of supply. There will be an equal a need for cross-border and local projects that will have a positive effect on the Union's power grid, such as electrolysers, district heating and cooling networks or storage infrastructure of a certain capacity and ability to be replicable in more than one Member State.
2021/04/22
Committee: ITRE
Amendment 258 #
Proposal for a regulation
Article 2 – paragraph 1 – point 8
(8) ‘smart electricity grid’ means an electricity network where the grid operator can digitally monitor the actions of the users connected to it, and information and communication technologies (ICT) for communicating with related grid operators, generators, energy storage, consumers and/or prosumers, with a view to transmitting electricity in a sustainable, cost-efficient and secure way;
2021/04/22
Committee: ITRE
Amendment 282 #
Proposal for a regulation
Article 3 – paragraph 1 – introductory part
1. Regional gGroups shall be established (‘Groups’) as set out in Section 1 of Annex III. The membership of each Group shall be based on each priority corridor and area and their respective geographical coverage as set out in Annex I. Decision-making powers in the Groups shall be restricted to Member States and the Commission, who shall, for those purposes, be referred to as the decision- making body of the Groups.
2021/04/22
Committee: ITRE
Amendment 313 #
Proposal for a regulation
Article 4 – paragraph 1 – point c – point ii
(ii) is located on the territory of one Member State and has a significantpositive cross- border impacteffect or is replicable as set out in point (1) of Annex IV, whereas ‘replicable’ requires both knowledge sharing and knowledge transfer of at least two Member States or regions. The replicability of a project shall contribute to, amongst others, decarbonisation, the energy efficiency first principle, increase of the share of renewable energies or improvement of sector integration.
2021/04/22
Committee: ITRE
Amendment 314 #
Proposal for a regulation
Article 4 – paragraph 1 – point c – point ii a (new)
(ii a) is located in islands non sufficiently connected to the trans- European energy networks that are islands territories, including small connected systems or isolated systems according to Directive 2019/944, and contribute significantly to the decarbonisation objectives of the island energy system and those of Union, and to sustainability in the territory in which it is located.
2021/04/22
Committee: ITRE
Amendment 323 #
Proposal for a regulation
Article 4 – paragraph 2 – point a
(a) the project contributes significantly to the decarbonisation objectives of the Union and those of the third country and to sustainability, including through the integration of renewable energy into the grid and the transmission and distribution of renewable generation to major consumption centres and storage sites, and;
2021/04/22
Committee: ITRE
Amendment 327 #
Proposal for a regulation
Article 4 – paragraph 2 – point b
(b) the potential overall benefits of the project identified on the territory oft he Union and in countries applying the EU acquis and which have concluded an agreement with the Union, assessed in accordance with the respective specific criteria in paragraph 3, outweigh its costs on the same perimeter, including in the longer term;
2021/04/22
Committee: ITRE
Amendment 349 #
Proposal for a regulation
Article 4 – paragraph 3 – point a – introductory part
(a) for electricity transmission and storage projects falling under the energy infrastructure categories set out in points (1)(a), (b), (c) and (e) of Annex II, the project is to contribute significantly to sustainability through the integration of renewable and low-carbon energy into the grid and the transmission of renewable generation to major consumption centres and storage sites, and at least one of the following specific criteria:
2021/04/22
Committee: ITRE
Amendment 350 #
Proposal for a regulation
Article 4 – paragraph 3 – point a – point i
(i) market integration, including through lifting the isolation of at least one Member State and, reducing energy infrastructure bottlenecks; competition and system flexibility; and reinvestments in existing infrastructure, necessary to maintain current levels of system integration;
2021/04/22
Committee: ITRE
Amendment 356 #
Proposal for a regulation
Article 4 – paragraph 3 – point b – introductory part
(b) for smart electricity grid projects and network components falling under the energy infrastructure category set out in point (1)(d) and (1)(e) of Annex II, the project is to contribute significantly to sustainability through the integration of renewable energy into the grid, and at least two of the following specific criteria:
2021/04/22
Committee: ITRE
Amendment 358 #
Proposal for a regulation
Article 4 – paragraph 3 – point b – introductory part
(b) for smart electricity grid projects falling under the energy infrastructure category set out in point (1)(d) of Annex II, the project is to contribute significantly to sustainability through the integration of renewable and low-carbon energy into the grid, and at least two of the following specific criteria:
2021/04/22
Committee: ITRE
Amendment 361 #
Proposal for a regulation
Article 4 – paragraph 3 – point b – point ii
(ii) market integration, including through efficient system operation and, use of interconnectors; and reinvestments in existing infrastructure; necessary to maintain operational conditions;
2021/04/22
Committee: ITRE
Amendment 363 #
Proposal for a regulation
Article 4 – paragraph 3 – point b – point iii a (new)
(iii a) sector integration, through the improvement of the interaction of different energy vectors or energy sectors, for instance through the increase of synergies in adjacent sectors, such as transport and mobility;
2021/04/22
Committee: ITRE
Amendment 379 #
(d) for hydrogen projects falling under the energy infrastructure categories set out in point (3) of Annex II the project is to contribute significantly to sustainability, including by ensuring compliance with a carbon footprint threshold, reducing greenhouse gas emissions, by enhancing the deployment of renewable hydrogen and supporting variable renewable power generation by offering flexibility and/or storage solutions. Furthermore, the project is to contribute significantly to at least one of the following specific criteria:
2021/04/22
Committee: ITRE
Amendment 384 #
Proposal for a regulation
Article 4 – paragraph 3 – point d – point i
(i) market integration, including by connecting existing or facilitating the future connection of emerging hydrogen networks of Member States, or otherwise contributing to the emergence of an Union- wide network for the transport and storage of hydrogen and derived-hydrogen fuels, and ensuring potential interoperability of connected systems;
2021/04/22
Committee: ITRE
Amendment 389 #
Proposal for a regulation
Article 4 – paragraph 3 – point d – point iii
(iii) competition, including by allowing access to multiple indigenous supply sources and network users where relevant on a transparent and non- discriminatory basis.
2021/04/22
Committee: ITRE
Amendment 413 #
Proposal for a regulation
Article 4 – paragraph 3 – point f – point iii
(iii) enabling flexibility services such as demand response and storage by facilitating smart energy sector integration through the creation of links to other energy carriers and sectors and enabling demand response.
2021/04/22
Committee: ITRE
Amendment 418 #
Proposal for a regulation
Article 4 – paragraph 3 – point f a (new)
(f a) for district heating and cooling networks falling under the energy infrastructure category set out in point [6 new] of Annex II the project is to contribute significantly to sustainability and to reaching the climate targets 2030 as well as climate neutrality 2050 through a reduction of greenhouse gas emissions as well as an increase of the share of renewable energy in the heating and cooling sector, as well as a better integration and interlinking of the sectors.
2021/04/22
Committee: ITRE
Amendment 431 #
Proposal for a regulation
Article 4 – paragraph 5 – subparagraph 1 – point b a (new)
(b a) synergies with priority corridors and areas identified under trans- European networks for transport and telecommunications;
2021/04/22
Committee: ITRE
Amendment 443 #
Proposal for a regulation
Article 5 – paragraph 6
6. By 30 April of each year when a new Union list should be adopted, the Agency shall submit, to the Groups a consolidated report for the projects of common interest subject to the competency of national regulatory authorities, evaluating the progress achieved and the evolution of the expected project costs and make, where appropriate, recommendations on how to overcome the delays and difficulties encountered. That consolidated report shall also evaluate, in accordance with Article 5 of Regulation (EU) 2019/942, the consistent implementation of the Union-wide network development plans with regard to the energy infrastructure priority corridors and areas.
2021/04/22
Committee: ITRE
Amendment 445 #
Proposal for a regulation
Article 5 – paragraph 6 a (new)
6 a. At the Agency’s request, project promoters shall provide to the Agency the implementation plan and other information necessary for the purpose of carrying out the Agency’s tasks set out in paragraph 6.
2021/04/22
Committee: ITRE
Amendment 460 #
Proposal for a regulation
Article 8 – paragraph 6
6. By [31 July 2022] and for each specific Regional Group per priority offshore grid corridor, as defined in Annex I, national competent authorities in Member States belonging to the respective Group, shall jointly create one unique points of contact per priority offshore grid corridor, ‘offshore one-stop shops’, for project promoters, which shall be. The offshore one-stop shop shall, without prejudice to relevant requirements under international and Union law, facilitate the issuing of the comprehensive decision. The comprehensive decision shall be the final proof that the project of common interest has achieved ready-to-build status and there shall be no other requirements for any additional permits or authorisations in that respect. The comprehensive decision shall be issued within the time limit referred to in Article 10(1) and (2) and in accordance with schemes similar to those laid out in Article 8 Paragraph 3. The offshore one-stop shall be further responsible for facilitating and coordinating the permit granting process for offshore grids for renewable energy projects of common interest, taking into account also the need for coordination between the permitting process for the energy infrastructure and the one for the generation assets. The offshore one-stop shops shall act as a repository of existing sea basin studies and plans, aiming at facilitating the permitting process of individual projects of common interest and coordinate the issuance of the comprehensive decisions for such projects by the relevant national competent authorities. Each Regional Group per priority offshore grid corridor, with the assistance of the national competent authorities in the Members States belonging to the Group, shall set-up the offshore one-stop shops depending on regional specificities and geography and determine their location, resource allocation and specific rules for their functioning.
2021/04/22
Committee: ITRE
Amendment 473 #
Proposal for a regulation
Article 10 – paragraph 1 – point a – introductory part
(a) the pre-application procedure, covering the period between the start of the permit granting process and the acceptance of the submitted application file by the competent authority, shall take place within an indicative period of two years.
2021/04/22
Committee: ITRE
Amendment 489 #
Proposal for a regulation
Article 11 – paragraph 1 – introductory part
1. By [16 November 2022], the European Network of Transmission System Operators (ENTSO) for Electricity and the ENTSO for Gas shall publish and submit to Member States, the Commission and the Agency their respective methodologies, including the network and market modelling, for a harmonised energy system-wide cost-benefit analysis at Union level for projects of common interest falling under the categories set out in points (1)(a), (bc), (cd) and (e) and point (3) of Annex II.
2021/04/22
Committee: ITRE
Amendment 500 #
Proposal for a regulation
Article 11 – paragraph 2
2. Within three months of the receipt of the methodologies together with the input received in the consultation process and a report on how it was taken into account, the Agency shall provide an opincarry out an extensive consultation ton the ENTSO for Electricity, the ENTSO for Gas, the Member States, and the Commission and publish it on the Agency’s websitesubmitted draft methodologies.
2021/04/22
Committee: ITRE
Amendment 501 #
Proposal for a regulation
Article 11 – paragraph 2 – point a (new)
(a) Within three months of the receipt of the methodologies, the Commission and Member States may deliver an opinion on the methodologies. The opinions shall be submitted to the Agency, the ENTSO for Electricity or the ENTSO for Gas.
2021/04/22
Committee: ITRE
Amendment 507 #
Proposal for a regulation
Article 11 – paragraph 4
4. Within three months of the day of receipt of the updated methodologies, the Commission shall submit its opinion to the ENTSO for Electricity and the ENTSO for Gas.deleted
2021/04/22
Committee: ITRE
Amendment 512 #
Proposal for a regulation
Article 11 – paragraph 5
5. No later than threesix months of the day ofafter the receipt of the Commission’s opinion, as referred to in paragraph 4, the ENTSO for Electricity and the ENTSO for Gasdraft methodologies, the Agency shall adaopt their respective methodologies taking due account of the Commission’s opiniona decision on each of the methodologies, whether to approve them or to amend them or request amendments to them, and spubmit them to the Commission for approvallish it on the Agency’s website.
2021/04/22
Committee: ITRE
Amendment 515 #
Proposal for a regulation
Article 11 – paragraph 5 – point a (new)
(a) Within the deadline set by the Agency’s request for amendments, the ENTSO for Electricity or the ENTSO for Gas shall submit the amended CBA methodology to the Agency for its approval.
2021/04/22
Committee: ITRE
Amendment 517 #
Proposal for a regulation
Article 11 – paragraph 6
6. Where the changes to the methodologies are considered to be of incremental nature, not affecting the definition of benefits, costs and other relevant cost-benefit parameters, as defined in the latest Energy system wide cost-benefit analysis methodology approved by the Commission, the ENTSO for Electricity and the ENTSO for Gas shall adapt their respective methodologies taking due account of the Agency’s opinion, as set out in paragraph 2, and submit them for the Agency’s approval.deleted
2021/04/22
Committee: ITRE
Amendment 523 #
Proposal for a regulation
Article 11 – paragraph 7
7. In parallel, the ENTSO for Electricity and the ENTSO for Gas shall submit to the Commission a document justifying the reasons behind the proposed updates and why those updates are considered of incremental nature. Where the Commission deems that those updates are not of incremental nature, it shall, by written request, ask the ENTSO for Electricity and the ENTSO for Gas to submit to it the methodologies. In such case the process described in paragraphs 2 to 5 applies.deleted
2021/04/22
Committee: ITRE
Amendment 535 #
Proposal for a regulation
Article 11 – paragraph 10
10. Every threefour years, the Agency shall lestablish and make publicly available a set of indicators and corresponding reference values for the comparison of unit investment costs for comparable projects of the infrastructure categories included in points (1), (2) and (3) of Annex II. Those reference values may be used by the ENTSO for Electricity and the ENTSO for Gas for the cost-benefit analyses carried out for subsequent Union-wide ten-year network development plans. The first of such indicators shall be published by [1 November 20223]. Infrastructure owners, system operators and third-party promoters are obliged to provide the requested data to the national regulatory authorities and to the Agency.
2021/04/22
Committee: ITRE
Amendment 541 #
Proposal for a regulation
Article 11 – paragraph 11
11. By [31 December 2023], the ENTSO for Electricity and the ENTSO for Gas shall jointly submit to the Commission and the Agency a consistent and interlinked energy market and network model including electricity, gas, heat and hydrogen transmission infrastructure as well as storage, power plants, LNG and electrolysers, covering the energy infrastructure priority corridors and the areas drawn up in line with the principles laid down in Annex V. Where relevant, the model should take into consideration the distribution infrastructure.
2021/04/22
Committee: ITRE
Amendment 547 #
Proposal for a regulation
Article 11 – paragraph 13 a (new)
13 a. Every four years starting from its approval according to paragraph 13, the interlinked model shall be updated according to the procedure described in paragraphs 11 to 13.
2021/04/22
Committee: ITRE
Amendment 559 #
Proposal for a regulation
Article 12 – paragraph 1 – subparagraph 1
The guidelines shall define standards for a transparent, non-discriminatory and robust elaboration of the scenarios taking into account good practices in the field of network development planning. In particular, the guidelines shall include the energy efficiency first principle and ensure that the underlying ENTSO for Electricity and ENTSO for Gas scenarios are fully in line with the latest medium and long-term European Union decarbonisation targets and the latest available Commission scenarios.
2021/04/22
Committee: ITRE
Amendment 570 #
Proposal for a regulation
Article 12 – paragraph 4
4. The ENTSO for Electricity and the ENTSO for Gas shall publish and submit the draft joint scenarios report to the Agency for its opinion and to the Commission for their opinionits approval.
2021/04/22
Committee: ITRE
Amendment 576 #
Proposal for a regulation
Article 12 – paragraph 5
5. Within three months from the receipt of the draft joint scenarios report together with the input received in the consultation process and a report on how it was taken into account, the Agency shall submit its opinion including recommendations for amendments to the ENTSO for Electricity, ENTSO for gas and the Commission.
2021/04/22
Committee: ITRE
Amendment 577 #
Proposal for a regulation
Article 12 – paragraph 6
6. The Commission, giving due consideration to the Agency opinion defined under paragraph 5, shall submit its opinion to the ENTSO for Electricity and the ENTSO for Gas.deleted
2021/04/22
Committee: ITRE
Amendment 583 #
Proposal for a regulation
Article 12 – paragraph 7
7. The ENTSO for Electricity and the ENTSO for Gas shall adaptCommission shall approve, amend or request amendments on their joint scenarios report, taking due account of the Agency’s opinion, in line with the Commission’s opinion and submit the updated report to the Commission for its approval referred to in paragraph 5.
2021/04/22
Committee: ITRE
Amendment 586 #
Proposal for a regulation
Article 12 – paragraph 7 – point a (new)
(a) Within the deadline set by the Commission’s request for amendments, the ENTSO for Electricity and the ENTSO for Gas shall submit the amended scenarios to the Commission for its approval.
2021/04/22
Committee: ITRE
Amendment 592 #
Proposal for a regulation
Article 13 – paragraph 1 – introductory part
1. Every two years the ENTSO for Electricity and the ENTSO for Gas shall publish and submit to the Commission and the Agency the infrastructure gaps reports developed within the framework of the Union-wide ten-year network development plans.
2021/04/22
Committee: ITRE
Amendment 597 #
Proposal for a regulation
Article 13 – paragraph 1 – subparagraph 1
When assessing the infrastructure gaps the ENTSO for Electricity and the ENTSO for Gas shall base their analysis on all the scenarios established under Article 12, implement the energy efficiency first principle, and consider with priority all relevant non-infrastructure relatedsolutions which do not require new infrastructure to address the identified gaps. When considering new infrastructure solutions, to address the identified gaphe infrastructure gaps assessment shall take into account all relevant costs, including related network reinforcements.
2021/04/22
Committee: ITRE
Amendment 604 #
Proposal for a regulation
Article 13 – paragraph 2
2. The ENTSO for Electricity and the ENTSO for Gas shall submit their respective draft infrastructure gaps reports to the Agency and the Commission for their opinionfor its opinion, referred to in Article 4(3)(b) of Regulation (EU) 2019/942.
2021/04/22
Committee: ITRE
Amendment 606 #
Proposal for a regulation
Article 13 – paragraph 3
3. Within three months following receipt of the infrastructure gaps report together with the input received in the consultation process and a report on how it was taken into account, the Agency shall submit its opinion to the ENTSO for Electricity or ENTSO for Gas and the Commission.deleted
2021/04/22
Committee: ITRE
Amendment 611 #
Proposal for a regulation
Article 13 – paragraph 4
4. The Commission, considering the Agency’s opinion referred to in paragraph 3, shall draft and submit its opinion to the ENTSO for Electricity or the ENTSO for Gas.deleted
2021/04/22
Committee: ITRE
Amendment 613 #
Proposal for a regulation
Article 13 – paragraph 5
5. The ENTSO for Electricity and the ENTSO for Gas shall adapt their infrastructure gaps reports taking due account of the Agency’s opinion and in line with the Commission’s opinion before the publication of the final infrastructure gaps reports.deleted
2021/04/22
Committee: ITRE
Amendment 630 #
Proposal for a regulation
Article 14 – paragraph 2
2. By [31 July 2023] tThe ENTSO for Electricity, with the involvement of the relevant TSOs, the national regulatory authorities and of the Commission and in line with the agreement referred to in paragraph 1, shall develop and publish integratedintegrate within the Union-wide Ten- Year Network Development Plan developed by the ENTSO for Electricity pursuant to Article 30 of Regulation (EU) 2019/943, starting from its 2024 edition, offshore network development plans starting from the 2050 objectives, with intermediate steps for 2030 and 2040, for each sea-basin, in line with the priority offshore grid corridors referred to in Annex I, taking into account environmental protection and other uses of the sea. Those integrated offshore network development plans shall thereafter be updated every three years.
2021/04/22
Committee: ITRE
Amendment 631 #
Proposal for a regulation
Article 14 – paragraph 2
2. By [31 July 2023] the ENTSO for Electricity, with the involvement of the relevant TSOs, the national regulatory authorities and of the Commission and in line with the agreement referred to in paragraph 1, shall develop and publish integrated offshore network development plans starting from the 2050 objectives, with intermediate steps for 2030 and 2040, for each sea-basin, in line with the priority offshore grid corridors referred to in Annex I, taking into account environmental protection and other uses of the sea. Those integrated offshore network development plans shall thereafter be updated every threewo years.
2021/04/22
Committee: ITRE
Amendment 632 #
Proposal for a regulation
Article 14 – paragraph 3
3. The integrated offshore network development plans shall be compatible with the latest Union-wide ten-Year Network Development Plans in order to ensure coherent development of onshore and offshore grid planning providing for an adequate and reliable transmission grid for transfer of electricity onshore as well as between coastal regions, regions inland, and landlocked Member States and to provide for a stable supply of electricity to centres of consumption or energy storage facilities.
2021/04/22
Committee: ITRE
Amendment 635 #
Proposal for a regulation
Article 14 – paragraph 3
3. The integrated offshore network development plans shall be compatiblepublished together with the latest Union-wide ten- Year Network Development Plans in order to ensure coherent development of onshore and offshore grid planning.
2021/04/22
Committee: ITRE
Amendment 637 #
Proposal for a regulation
Article 14 – paragraph 3 a (new)
3 a. Prior to submitting the draft integrated offshore network development plans to the Commission, the ENTSO for Electricity shall conduct an extensive consultation process involving all relevant electricity stakeholders, including the DSO entity, all offshore sector stakeholders and all the Member States that are part of the priority offshore grid corridors defined in Annex I.
2021/04/22
Committee: ITRE
Amendment 638 #
Proposal for a regulation
Article 14 – paragraph 4
4. The ENTSO for Electricity shall submit the draft integrated network development offshore plans to the Commission for its opinion.deleted
2021/04/22
Committee: ITRE
Amendment 645 #
Proposal for a regulation
Article 14 – paragraph 5
5. The ENTSO for Electricity shall adapt the integrated offshore network development plans taking due account of the Commission opinion before the publication of the final reports and submit them to the relevant priority offshore grid corridors, set out in Annex I.deleted
2021/04/22
Committee: ITRE
Amendment 651 #
Proposal for a regulation
Article 14 – paragraph 6
6. For the purpose of ensuring the timely development of the offshore grids for renewable energy, should the ENTSO for Electricity not develop, in time, the integrated offshore network development plans, referred to in paragraph 2, the Commission shall, on the basis of expert advice, draw-up an integrated offshore network development plan per sea-basin for each priority offshore grid corridor set out in Annex I.deleted
2021/04/22
Committee: ITRE
Amendment 658 #
Proposal for a regulation
Article 15 – paragraph 1
1. The Commission shall develop, by means of implementing acts, principles for a specific cost-benefit an[By 1 March 2024] The Agency shall develop a Recommendation on the principles for an adapted cost-sharing methodology for the deployment of the integrated offshore network development plan referred to in Article 14(2) in accordance with the agreement referred to in Article 14(1) as part of the guidelines referred to in Article 16(10). Those implementing acts shall be adopted. The Agency shall update its recommendation when appropriate, taking into accordance with the advisory procedure referred to in Article 21(2)unt the results of the implementation of the principles.
2021/04/22
Committee: ITRE
Amendment 663 #
Proposal for a regulation
Article 15 – paragraph 2
2. Within 12 months from the publication of the principles referred to in paragraph 1, the ENTSO for Electricity, with the involvement of the relevant TSOs, the national regulatory authorities and of the Commission, shall present the results of the application of the cost-benefit and cost-sharing methodology to the priority offshore grid corridors.
2021/04/22
Committee: ITRE
Amendment 667 #
Proposal for a regulation
Article 15 – paragraph 3
3. Within six months from the presentation of the results as referred[By 31 July 2024 and then every two in paragraph 2years], the relevant Member States, shall update their written agreement referred to in Article 14(1) with the updated joint definition of the amount of the offshore renewable generation to be deployed within each sea basin in 2050, with intermediate steps in 2030 and 2040, and the relevant agreement to cooperate for the achievement of such amounts.
2021/04/22
Committee: ITRE
Amendment 670 #
Proposal for a regulation
Article 15 – paragraph 4
4. Within six months fromAfter the updated written agreements referred to in paragraph 3, for each sea basin, the ENTSO for Electricity shall update the integrated offshore network development plans by following the procedure set out in Article 14(2) to (5). The procedure described in Article 14(6) shall apply.next Union-wide Ten- Year network development plans
2021/04/22
Committee: ITRE
Amendment 677 #
Proposal for a regulation
Article 16 – paragraph 1
1. The efficiently incurred investment costs, which excludes maintenance costs, related to a project of common interest falling under the categories set out in points (1)(a), (b), (c) and (e) of Annex II and projects of common interest falling under the category set out in point (3) of Annex II, where they fall under the competency of national regulatory authorities, shall be borne by the relevant TSOgrid operators or the project promoters of the transmission or distribution infrastructure of the Member States which the project provides a net positive impact, and, to the extent not covered by congestion rents or other charges, be paid for by network users through tariffs for network access in that or those Member States.
2021/04/22
Committee: ITRE
Amendment 679 #
Proposal for a regulation
Article 16 – paragraph 2 – introductory part
2. The provisions of this Article shall apply to a project of common interest falling under the categories set out in points (1)(a), (b), (c) and (e) of Annex II where at least one project promoter requests the relevant national authorities their application for the costs of the project. They shall apply to a project of common interest falling under the category set out in point (3) of Annex II, as relevant, only where an assessment of market demand has already been carried out and indicated that the efficiently incurred investment costs cannot be expected to be covered by the tariffs.
2021/04/22
Committee: ITRE
Amendment 684 #
Proposal for a regulation
Article 16 – paragraph 3 – subparagraph 1 – point a
(a) up-to-date project-specific cost- benefit analysis consistent with the methodology drawn up pursuant to Article 11 and taking into account benefits beyond the borders of the Member States on the territory of which the project is located by using the same scenario as used in the selection process for the elaboration of the Union list where the project of common interest is listedconsidering at least the joint scenarios established for network development planning under Article 12;
2021/04/22
Committee: ITRE
Amendment 688 #
Proposal for a regulation
Article 16 – paragraph 4 – introductory part
4. Within six months of the date on 4. which the last investment request is received by the relevant national regulatory authorities, those national regulatory authorities shall, after consulting the project promoters concerned, take joint coordinated decisions on the allocation of efficiently incurred investment costs to be borne by each system operator for the project, as well as their inclusion in tariffs. The national regulatory authorities shall include all the efficiently incurred investment costs in tariffs in line with the allocation of investment costs to be borne by each system operator for the project or on the rejection of the investment request or of part of the project if the common analysis of national regulatory authorities concludes that the project or a part of it fails to provide a significant net benefit at Union level. The national regulatory authorities shall include the reafter assess, where appropriate, whether any affordability issues might arise due to the incluslevant efficiently incurred investment costs in tariffs inline with the allocation of the investment costs in tariffsto be borne by each systemoperator for the project.
2021/04/22
Committee: ITRE
Amendment 689 #
Proposal for a regulation
Article 16 – paragraph 4 – subparagraph 3
In allocating costs across borders, the relevant national regulatory authorities, in consultation with the TSOgrid operators concerned, shall seek a mutual agreement based on, but not limited to, the information specified in paragraphs 3(a) and (b). Their assessment shall be based on the same scenario as used in consider all relevant scenarios established under Article 12 and other selection process for the elaboration of the Union list where the project of common interests is listedcenarios for network development planning, allowing a robust analysis of the contribution of the project of common interest to the Union energy policy targets of decarbonisation, market integration, competition, sustainability and security of supply.
2021/04/22
Committee: ITRE
Amendment 696 #
Proposal for a regulation
Article 16 – paragraph 6 – subparagraph 1
In that case or upon a joint request from at least one of the relevant national regulatory authorities, the decision on the investment request including cross-border cost allocation referred to in paragraph 3 as well as the necessity for the inclusion of the cost of the investments, in its totality, as allocated across borders in the tariffs shall be taken by the Agency within three months of the date of referral to the Agency.
2021/04/22
Committee: ITRE
Amendment 699 #
Proposal for a regulation
Article 16 – paragraph 6 – subparagraph 3
The assessment of the Agency shall be based on the same scenario as used in consider all relevant scenarios established under Article 12 and other selection process for the elaboration of the Union list where the project of common interest is listedcenarios for network development planning, allowing a robust analysis of the contribution of the project of common interest to the Union energy policy targets of decarbonisation, market integration, competition, sustainability and security of supply.
2021/04/22
Committee: ITRE
Amendment 702 #
Proposal for a regulation
Article 16 – paragraph 10
10. By [31 December 2022], the CommissionAgency shall adopt implementing acts containing binding guidelines to ensure uniform conditions for the implementation of this Article and the offshore grids for renewable energy cross- border cost sharing as referred to in Article 15(1). The guidelines shall also address the special situa Recommendation to identify good practices for the treatment of investment requests for Projects of Common Interests. The recommendation shall be regularly updated as found necessary and for consistency with the Recommendation ofn the offshore grids for renewable energy projects of common interest by including principles on how their cross-border cost allocation shall be coordinated with the financing, market and political arrangements of offshore generation sites connected to them. In adopting or amending the guidelines, the Commission shall consult ACER, the ENTSO for Electricity, the ENTSO for Gas, and, where relevant, other stakeholders. Those implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 21(2)cross-border cost sharing as referred to in Article 15(1). In adopting or amending the Recommendation, the Agency shall carryout an extensive consultation process, involving all relevant stakeholders.
2021/04/22
Committee: ITRE
Amendment 706 #
Proposal for a regulation
Article 16 – paragraph 10 – point a (new)
(a) Projects of mutual interest shall be assimilated with projects of common interest and be eligible for cross-border cost allocation decisions for the part of the investment costs located on the territory of the Union or in countries applying the EU acquis and which have concluded an agreement with the Union
2021/04/22
Committee: ITRE
Amendment 710 #
Proposal for a regulation
Article 17 – paragraph 2
2. In their decision granting the incentives referred to in paragraph 1, national regulatory authorities shall consider the results of the cost-benefit analysis on the basis of the methodology drawn up pursuant to Article 11 and in particular the regional or Union-wide positive externalities generated by the project. The national regulatory authorities shall further analyse the specific risks incurred by the project promoters, the risk mitigation measures taken and the justification of the risk profile in view of the net positive impact provided by the project, when compared to a lower-risk alternative. Eligible risks shall in particular include risks related to new transmission and distribution technologies, both onshore and offshore, risks related to under-recovery of costs and development risks.
2021/04/22
Committee: ITRE
Amendment 729 #
Proposal for a regulation
Article 18 – paragraph 2 – point a
(a) thea project specific cost-benefit analysis pursuant toaccording to the cost benefit analysis methodology in Article 16(3)(a)1 provides evidence concerning the existence of significant positive externalities, such as security of supply, system flexibility, solidarity, sustainability or innovation;
2021/04/22
Committee: ITRE
Amendment 733 #
Proposal for a regulation
Article 18 – paragraph 2 – point b
(b) the project has receivedevidence listed in point (a) have been identified jointly by the concerned national regulatory authorities where the project falls under their competence, including via a cross- border cost allocation decision pursuant to Article 16 if adopted or, as regards projects of common interest falling under the category set out in point (3) of Annex II, where they do not fall under the competency of national regulatory authorities, and therefore they do not receive a cross- border cost allocation decision, the project aims at providing services across borders, bring technological innovation and ensure the safety of cross-border grid operation;
2021/04/22
Committee: ITRE
Amendment 735 #
Proposal for a regulation
Article 18 – paragraph 2 – point c a (new)
(c a) (c)(a) the implementation of the project may raise affordability issues according assessments carried out in particular by the national regulatory authority.
2021/04/22
Committee: ITRE
Amendment 737 #
Proposal for a regulation
Article 18 – paragraph 4
4. Projects of common interest falling under the categories set out in points (1)(d), (2) and (5) of Annex II shall also be eligible for Union financial assistance in the form of grants for works, where the concerned project promoters can clearly demonstrate significant positive externalities, such as security of supply, system flexibility, solidarity, sustainability or innovation, generated by the projects and provide clear evidence of their lack of commercial viability, in accordance with the cost- benefit analysis, the business plan and assessments carried out, in particular by potential investors or creditors or, where applicable,or where the project may raise affordability issues, according to assessments carried out by a national regulatory authority.
2021/04/22
Committee: ITRE
Amendment 740 #
Proposal for a regulation
Article 18 – paragraph 4 a (new)
4 a. Projects of common interest in island territories where, due to their geographical situation, it is not feasible to demonstrate a physical cross-border impact, shall also be eligible for Union financial assistance in the form of grants for works, where the concerned project promoters can clearly demonstrate in an evaluation carried out by the relevant national authority or, where applicable, the national regulatory authority: significant positive externalities, such as effective contribution to sustainability security of supply, system flexibility or innovation , generated by the projects and provide clear evidence of their lack of commercial viability, in accordance with the cost-benefit analysis, the business plan and assessments carried out, in particular by potential investors or creditors.
2021/04/22
Committee: ITRE
Amendment 764 #
Proposal for a regulation
Article 25 – paragraph 1 – point a (new)
(a) The following Article 8(13) is added to Regulation (EC) 715/2009: ‘13. By 31 March 2023, the Agency shall publish guidelines, which shall be followed by European Network of Transmission System Operators for Gas, for the development of the draft Union- wide network development plan referred to in point (b) of paragraph 3. The guidelines shall be regularly updated, as found necessary. The Agency shall be entitled to issue binding amendment requests on the draft Union-wide network development plan referred to in point (b) of paragraph 3.’
2021/04/23
Committee: ITRE
Amendment 772 #
Proposal for a regulation
Annex I – Part 1 – title
1 PRIORITY ELECTRICITY CORRIDOR(1) Electricity onshore and offshore grid interconnections in Europe: interconnections between Member States, offshore electricity grid development and internal grid infrastructures to integrate electricity from renewable energy sources and to foster market integration. Member States concerned: all;
2021/04/23
Committee: ITRE
Amendment 777 #
Proposal for a regulation
Annex I – Part 1 – point 3 – paragraph 1
Member States concerned: Denmark, Estonia, Finland, Germany, Latvia, Lithuania, Netherlands Poland and Sweden.
2021/04/23
Committee: ITRE
Amendment 778 #
Proposal for a regulation
Annex I – Part 2
2 (4) Northern Seas offshore grid (‘NSOG’): integrated offshore electricity grid development and the related interconnectors in the North Sea, the Irish Sea, the English Channel and neighbouring waters to transport electricity from renewable offshore energy sources to centres of consumption and storage and to increase cross-border electricity exchange. Member States concerned: Belgium, Denmark, France, Germany, Ireland, Luxemburg, the Netherlands and Sweden; (5) Baltic Energy Market Interconnection Plan offshore grid (‘BEMIP offshore’): integrated offshore electricity grid development and the related interconnectors in the Baltic Sea and neighbouring waters to transport electricity from renewable offshore energy sources to centres of consumption and storage and to increase cross-border electricity exchange. Member States concerned: Denmark, Estonia, Finland, Germany, Latvia, Lithuania, Poland and Sweden; (6) South and East offshore grid: integrated offshore electricity grid development and the related interconnectors in the Mediterranean Sea, Black Sea and neighbouring waters to transport electricity from renewable offshore energy sources to centres of consumption and storage and to increase cross-border electricity exchange. Member States concerned: Bulgaria, Cyprus, Croatia, France, Greece, Italy, Malta, Romania, Slovenia, and Spain; (7) South Western Europe offshore grid: integrated offshore electricity grid development and the related interconnectors in the North Atlantic Ocean waters to transport electricity from renewable offshore energy sources to centres of consumption and storage and to increase cross-border electricity exchange. Member States concerned: France, Ireland, Portugal and Spain.deleted
2021/04/23
Committee: ITRE
Amendment 779 #
Proposal for a regulation
Annex I – Part 2 – point 4 – introductory part
(4) Northern Seas offshore grids (‘NSOG’): integrated offshore electricity and hydrogen grids development and the related interconnectors in the North Sea, the Irish Sea, the English Channel and neighbouring waters to transport electricity and hydrogen from renewable offshore energy sources to centres of consumption and storage and to increase cross-border electricitrenewable energy exchange.
2021/04/23
Committee: ITRE
Amendment 780 #
Proposal for a regulation
Annex I – Part 2 – point 5 – introductory part
(5) Baltic Energy Market Interconnection Plan offshore grids (‘BEMIP offshore’): integrated offshore electricity and hydrogen grids development and the related interconnectors in the Baltic Sea and neighbouring waters to transport electricity and hydrogen from renewable offshore energy sources to centres of consumption and storage and to increase cross-border electricitrenewable energy exchange.
2021/04/23
Committee: ITRE
Amendment 781 #
Proposal for a regulation
Annex I – Part 2 – point 6 – introductory part
(6) South and East offshore grids: integrated offshore electricity and hydrogen grids development and the related interconnectors in the Mediterranean Sea, Black Sea and neighbouring waters to transport electricity and hydrogen from renewable offshore energy sources to centres of consumption and storage and to increase cross-border electricitrenewable energy exchange.
2021/04/23
Committee: ITRE
Amendment 785 #
Proposal for a regulation
Annex I – Part 2 – point 7 – introductory part
(7) South Western Europe offshore grids: integrated offshore electricity and hydrogen grids development and the related interconnectors in the North Atlantic Ocean waters to transport electricity and hydrogen from renewable offshore energy sources to centres of consumption and storage and to increase cross-border electricitrenewable energy exchange.
2021/04/23
Committee: ITRE
Amendment 788 #
Proposal for a regulation
Annex I – Part 3 – title
3 PRIORITY ELECTRICITY CORRIDOR(8) Electricity onshore and offshore grid interconnections in Europe: interconnections between Member States, offshore electricity grid development and internal grid infrastructures to integrate electricity from renewable energy sources and to foster market integration. Member States concerned: all;
2021/04/23
Committee: ITRE
Amendment 804 #
Proposal for a regulation
Annex I – Part 4 – point 11 – introductory part
(11) Smart electricity grids deployment: adoption of smart grid technologies across the Union to efficiently integrate the behaviour and actions of all users connected to the electricity network, in particular the generation of large amounts of electricity from renewable or distributed energy sources and, demand response by consumers, energy storage and other flexibility sources.
2021/04/23
Committee: ITRE
Amendment 805 #
Proposal for a regulation
Annex I – Part 4 – point 11 – introductory part
(11) Smart electricity grids deployment: adoption of smart grid technologies across the Union to efficiently integrate the behaviour and actions of all users connected to the electricity network, in particular the generation of large amounts of electricity from renewable or distributed energy sources and demand response by consumers, energy storage.
2021/04/23
Committee: ITRE
Amendment 816 #
Proposal for a regulation
Annex I – Part 4 – point 13 a (new)
(13 a) District Heating and Cooling:Upgrading and consolidation of district heating and district cooling networks to ensure a decarbonised supply of heat and cold and increase these sectors, as well as applying the energy efficiency first principle and sector integration through the use of waste heat and increasing flexibility for the energy system through power-to-heat. Member States concerned: all
2021/04/23
Committee: ITRE
Amendment 823 #
Proposal for a regulation
Annex II – paragraph 1 – point 1 – point a
(a) high-voltage overhead transmission and distribution lines, if they have been designed for a voltage of 22110 kV or more, and underground and submarine transmission cables, if they have been designed for a voltage of 1510 kV or more;
2021/04/23
Committee: ITRE
Amendment 826 #
Proposal for a regulation
Annex II – paragraph 1 – point 1 – point b
(b) electricitnergy storage facilities used for storing electricitnergy on a permanent or temporary basis in above-ground or underground infrastructure or geological sites, provided they are directly connected to high-voltage transmission lines designed for a voltage of 110 kV or more; deferring the final use of electricity to a later moment than when it was generated or the conversion of electrical energy into a form of energy which can be stored, the storing of that energy, and the subsequent reconversion of that energy back into electrical energy or use as another energy carrier;
2021/04/23
Committee: ITRE
Amendment 829 #
Proposal for a regulation
Annex II – paragraph 1 – point 1 – point b a (new)
(b a) charging infrastructure for electric vehicles;
2021/04/23
Committee: ITRE
Amendment 834 #
Proposal for a regulation
Annex II – paragraph 1 – point 1 – point d
(d) systems and components integrating ICT, through operational digital platforms, control systems and sensor technologies both at transmission and medium voltage distribution level, aiming at a more efficient and intelligent electricity transmission and distribution network, increased capacity to integrate new forms of generation, storage, demand response and consumption and facilitating new business models and market structures;
2021/04/23
Committee: ITRE
Amendment 835 #
Proposal for a regulation
Annex II – paragraph 1 – point 1 – point d
(d) systems and components integrating ICT, through operational digital platforms, control systems and sensor technologies both at transmission and, medium and low voltage distribution level, aiming at a more efficient and intelligent electricity transmission and distribution network, increased capacity to integrate new forms of generation, storage and consumption and facilitating new business models and market structures;
2021/04/23
Committee: ITRE
Amendment 838 #
Proposal for a regulation
Annex II – paragraph 1 – point 1 – point e a (new)
(e a) equipment, installation or network components that contribute to operational security or increased voltage quality by providing ancillary services, remedial actions or other services necessary for electricity system defence and restoration, including services providing inertia, synthetic inertia, fault current injection, grid forming capacities, voltage regulation, frequency regulation, protection, monitoring and control systems at all voltage levels and substations;
2021/04/23
Committee: ITRE
Amendment 841 #
Proposal for a regulation
Annex II – paragraph 1 – point 2 – point a
(a) any of the following equipment or installation aiming at enabling and facilitating the integration of renewable and low-carbon gases with a carbon threshold of which the life cycle greenhouse gas emissions savings requirement of 70 % relative to a fossil fuel comparator of 94g CO2e/MJ as set out in Article 25(2) and Annex V of Directive (EU) 2018/2001 of the European Parliament and of the Council. Life cycle greenhouse gas emissions savings are calculated using the methodology referred to in Article 28(5) of Directive (EU)2018/2001 or, alternatively, using ISO 14067 or ISO 14064-1 taking into account the carbon intensity of the electricity in the country of production for electricity use. Quantified life-cycle GHG emission savings are verified in line with Article 30 of Directive (EU) 2018/2001 where applicable, or by an independent third party, (including biomethane or hydrogen) into the network: digital systems and components integrating ICT, control systems and sensor technologies to enable the interactive and intelligent monitoring, metering, quality control and management of gas production, transmission, distribution and consumption within a gas network. Furthermore, such projects may also include equipment to enable reverse flows from the distribution to the transmission level and related necessary upgrades to the existing network.
2021/04/23
Committee: ITRE
Amendment 852 #
Proposal for a regulation
Annex II – paragraph 1 – point 3 – point a
(a) transmission pipelines for the transport of hydrogen, giving access to multiple network users on a transparent and non-discriminatory basis, which mainly contains high-pressure hydrogen pipelines, excluding pipelines for the local distribution of hydrogen;
2021/04/23
Committee: ITRE
Amendment 856 #
Proposal for a regulation
Annex II – paragraph 1 – point 3 – point a
(a) transmission pipelines for the transport of hydrogen, giving access to multiple network users on a transparent and non-discriminatory basis, which mainly contains high-pressure hydrogen pipelines, for hydrogen in gaseous or liquid state, excluding pipelines for the local distribution of hydrogen;
2021/04/23
Committee: ITRE
Amendment 860 #
Proposal for a regulation
Annex II – paragraph 1 – point 3 – point a
(a) transmissionhigh-pressure pipelines for the transport of hydrogen, giving access to multiple network users on a transparent and non-discriminatory basis, which mainly contains high-pressure hydrogen pipelines, excluding pipelines for the local distribution of hydrogen;
2021/04/23
Committee: ITRE
Amendment 862 #
Proposal for a regulation
Annex II – paragraph 1 – point 3 – point a
(a) transmission pipelines for the transport of hydrogen, giving access to multiple network users on a transparent and non-discriminatory basis, which mainly contains high-pressure hydrogen pipelines, exincluding pipelines for the local distribution of hydrogen;
2021/04/23
Committee: ITRE
Amendment 866 #
Proposal for a regulation
Annex II – paragraph 1 – point 3 – point b
(b) underground storage facilities connected to the high-pressure hydrogen pipelines referred to in point (a);
2021/04/23
Committee: ITRE
Amendment 873 #
(c a) storage facilities connected to the electricity networks that enable integration with electricity sectors, enabling the operations of the energy systems across multiple energy carriers ;
2021/04/23
Committee: ITRE
Amendment 881 #
Proposal for a regulation
Annex II – paragraph 1 – point 3 – point d – paragraph 1
Any of the assets listed in points (a), (b), (c), and (d) may be newly constructed assets or assets converted from natural gas dedicated to hydrogen or hydrogen- derived fuels, or a combination of the two. These assets will be dimensioned to satisfied a credible, reliable and sustainable demand without creating overcapacity.
2021/04/23
Committee: ITRE
Amendment 895 #
Proposal for a regulation
Annex II – paragraph 1 – point 4 – point a
(a) electrolysers that: (i) have at least 1020 MW capacity, (ii) the production complies with the life cycle greenhouse gas emissions savings requirement of 70 % relative to a fossil fuel comparator of 94g CO2e/MJ as set out in Article 25(2) and Annex V of Directive (EU) 2018/2001 of the European Parliament and of the Council.60 Life cycle greenhouse gas emissions savings are calculated using the methodology referred to in Article 28(5) of Directive (EU) 2018/2001 or, alternatively, using ISO 14067 or ISO 14064-1. Quantified life-cycle GHG emission savings are verified in line with Article 30 of Directive (EU) 2018/2001 where applicable, or by an independent third party, and (iii) have also a network-related function; _________________ 60 OJ L 328, 21.12.2018, p. 82.
2021/04/23
Committee: ITRE
Amendment 912 #
Proposal for a regulation
Annex II – paragraph 1 – point 5 a (new)
(5 a) concerning district heating and cooling: district heating and cooling systems meeting the following criteria: (a) at least 1000 MW installed capacity for heating or 100 MW installed capacity for cooling, (b) existence of a district heating network for the transport of hot steam or water or a distribution network for the transport of chilled liquids in at least one of the following categories: low cooling temperature (5-25 degrees Celsius), low temperature (30-40 degrees Celsius), average temperature (40-90 degrees Celsius) or high temperature (from 100 degrees Celsius), (c) heat generators producing heat or waste heat that can be injected in the district heating network pursuant to the definition of ‘waste heat and cold’ of (EU) 2018/2001; ‘highly efficient cogeneration of (EU) 2012/27, geothermal energy, heat pumps or bioenergy;
2021/04/23
Committee: ITRE
Amendment 934 #
Proposal for a regulation
Annex III – Part 2 – point 4
(4) as of 1 January 2024, the proposed hydrogen projects of common interest falling under the categories set out in point (3) of Annex II are projects that are part of the latest available Union-wide ten-year network development plan for gas, developed by the ENTSO for Gas pursuant Article 8 of Regulation (EC) No 715/2009 with the participation and close cooperation of hydrogen project promoters, and subject to the Agency opinion referred to in Article 4(3)(b) of Regulation EU (2019/942).
2021/04/23
Committee: ITRE
Amendment 938 #
Proposal for a regulation
Annex III – Part 2 – point 5 – introductory part
(5) by 30 June 2022 and, subsequently, for every Union-wide ten-year net work development plans, the ENTSO for Electricity and ENTSO for GasAgency shall issue updated guidelines for inclusion of projects in their respective Union-wide ten-year network development plans, referred to in points (3) and (4), in order to ensure equal treatment and transparency of the process. For all the projects included in the Union list of projects of common interest in force at the time, the guidelines shall define a simplified process of includata provision infor the Union-wide ten- year network development plans by automatic inclusion taking into account the documentation and data already submitted during the previous Union-wide ten-year network development plan processes as long as the information therein remains valid.
2021/04/23
Committee: ITRE
Amendment 946 #
Proposal for a regulation
Annex III – Part 2 – point 11
(11) the Group shall meet to examine and rank the proposed projects based on a transparent assessment of the projects, using the criteria set out in Article 4taking into account the assessment of the regulators, or the assessment of the Commission for projects not falling within the competency of national regulatory authorities.
2021/04/23
Committee: ITRE
Amendment 951 #
Proposal for a regulation
Annex IV – point 1 – introductory part
(1) a project with significant cross- border impacteffect or cross-border replicability is a project on the territory of a Member State, which fulfils the following conditions:
2021/04/23
Committee: ITRE
Amendment 953 #
Proposal for a regulation
Annex IV – point 1 – point a
(a) for electricity transmission, the project increases theor ensures maintained grid transfer capacity, or the capacity available for commercial flows, at the border of that Member State with one or several other Member States, having the effect of increasing the cross- border grid transfer capacity at the border of that Member State with one or several other Member States, by at least 500 Megawatt compared to the situation without commissioning of the project;
2021/04/23
Committee: ITRE
Amendment 955 #
Proposal for a regulation
Annex IV – point 1 – point a
(a) for electricity transmission, the project increases the grid transfer capacity, or the capacity available for commercial flows, at the border of that Member State with one or several other Member States, having the effect of increasing the cross- border grid transfer capacity at the border of that Member State with one or several other Member States, by at least 5200 Megawatt compared to the situation without commissioning of the project;
2021/04/23
Committee: ITRE
Amendment 957 #
Proposal for a regulation
Annex IV – point 1 – point a a (new)
(a a) for network components that contribute to operational security or increased voltage quality, the project is designed for equipment and installations at high-voltage, medium-voltage or low- voltage level. This includes transmission and distribution system operators or solely distribution system operators from at least two Member States. Projects involving solely distribution system operators without the direct involvement of transmission system operators can be involved only with the support of the transmission system operators in the form of a letter of intent, of at least two Member States, that are closely associated to the project. A project covers at least 50000 users, generators, consumers or prosumers of electricity, in a consumption area of at least 300 GWH/year, of which at least 20 % originate from variable renewable resources;
2021/04/23
Committee: ITRE
Amendment 960 #
Proposal for a regulation
Annex IV – point 1 – point b
(b) for electricity storage, the project provides at least 2250 MW installed capacity and has a storage capacity that allows a net annual electricity generation of 250 Gigawatt-hours/year;
2021/04/23
Committee: ITRE
Amendment 963 #
Proposal for a regulation
Annex IV – point 1 – point c
(c) for smart electricity grids, the project is designed for equipment and installations at high-voltage and medium- voltage level. It involves transmission system operators, transmission and distribution system operators or distribution system operators from at least two Member States. Distribution system operators can be involved only with the support of the transmission system operators, of at least two Member States, that are closely associated to the project and ensure interoperabilityone Member State. A project covers at least 50000 users, generators, consumers or prosumers of electricity, in a consumption area of at least 300 Gigawatthours/year, of which at least 20 % originate from variable renewable resources;
2021/04/23
Committee: ITRE
Amendment 980 #
Proposal for a regulation
Annex IV – point 1 – point g a (new)
(g a) for district heating and cooling the project has at least 1000 Megawatt heat production capacity or 100 Megawatt cooling capacity.
2021/04/23
Committee: ITRE
Amendment 983 #
Proposal for a regulation
Annex IV – point 2 – point a
(a) for projects of mutual interest in the category set out in point (1)(a) and (e) of Annex II, the project increases theor ensures maintained grid transfer capacity, or the capacity available for commercial flows, at the border of that Member State with one or more third countries and brings significant benefits, under the specific criteria listed in in Article 4(3), to at least two Member States. The calculation of the benefits for the Member States shall be performed and published by the ENTSO for Electricity in the frame of Union-wide ten-year network development plan;
2021/04/23
Committee: ITRE
Amendment 986 #
Proposal for a regulation
Annex IV – point 2 – point a
(a) for projects of mutual interest in the category set out in point (1)(a) and (e) of Annex II, the project increases the grid transfer capacity, or the capacity available for commercial flows, at the border of that Member State with one or more third countries and brings significant benefits, under the specific criteria listed in in Article 4(3), to at least twoone Member States. The calculation of the benefits for the Member States shall be performed and published by the ENTSO for Electricity in the frame of Union-wide ten-year network development plan;
2021/04/23
Committee: ITRE
Amendment 990 #
Proposal for a regulation
Annex IV – point 2 – point b
(b) for projects of mutual interest in the category set out in point (3) of Annex II, the hydrogen project enables the transmission of hydrogen across at the border of a Member State with one or more third countries and proves bringing significant benefits, under the specific criteria listed in in Article 4(3), to at least twoone Member States. The calculation of the benefits for the Member States shall be performed and published by the ENTSO for Gas in the frame of Union-wide ten- year network development plan;
2021/04/23
Committee: ITRE
Amendment 995 #
Proposal for a regulation
Annex IV – point 2 – point c
(c) for projects of mutual interest in the category set out in point (5) of Annex II, the project can be used to transport anthropogenic carbon dioxide by at least twoone Member States and a third country.
2021/04/23
Committee: ITRE
Amendment 998 #
Proposal for a regulation
Annex IV – point 3 – point a – point i
(i) calculating, for cross-border projects and reinvestment projects, the impact on the grid transfer capability in both power flow directions, measured in terms of amount of power (in megawatt), and their contribution to reaching the minimum 15% interconnection target, for projects with significant cross-border impact, the impact on grid transfer capability at borders between relevant Member States, between relevant Member States and third countries or within relevant Member States and on demand- supply balancing and network operations in relevant Member States;
2021/04/23
Committee: ITRE
Amendment 999 #
Proposal for a regulation
Annex IV – point 3 – point a a (new)
(a a) level of sustainability measured as the greenhouse gas emission savings ;
2021/04/23
Committee: ITRE
Amendment 1002 #
Proposal for a regulation
Annex IV – point 3 – point b – point ii
(ii) or electricitnergy storage, comparing new capacity provided by the project with total existing capacity for the same storage technology in the area of analysis as defined in Annex V;
2021/04/23
Committee: ITRE
Amendment 1003 #
Proposal for a regulation
Annex IV – point 3 – point b – point ii
(ii) or electricitnergy storage, comparing newthe capacity provided by the project with total existing capacity for the same storage technology in the area of analysis as defined in Annex V;
2021/04/23
Committee: ITRE
Amendment 1004 #
Proposal for a regulation
Annex IV – point 3 – point b – point ii a (new)
(ii a) the contribution to the reduction of greenhouse gas emissions.
2021/04/23
Committee: ITRE
Amendment 1005 #
Proposal for a regulation
Annex IV – point 3 – point c
(c) security of supply, interoperability and secure system operation measured in line with the analysis made in the latest available Union-wide ten-year network development plan in electricity, notably by assessing the impact of the project on the loss of load expectation for the area of analysis as defined in Annex V in terms of generation and transmission adequacy for a set of characteristic load periods, taking into account expected changes in climate- related extreme weather events and their impact on infrastructure resilience, expected changes in the economic and social development of the area and the expected significant increase in power demand from the transport sector, in particular for electric vehicles along highways and in urban areas.. Where applicable, the impact of the project on independent and reliable control of system operation and services shall be measured.
2021/04/23
Committee: ITRE
Amendment 1007 #
Proposal for a regulation
Annex IV – point 4 – introductory part
(4) Concerning projects falling under the category set out in point (1)(d) and (1)(e a new) of Annex II, the criteria listed in Article 4 shall be evaluated as follows:
2021/04/23
Committee: ITRE
Amendment 1011 #
Proposal for a regulation
Annex IV – point 5 – point a
(a) Sustainability measured as the contribution of a project to: lice-cycle greenhouse gas emission reducts savings (including indirect emissions) in different end-use applications, such as industry or transport, of 70 % relative to a fossil fuel comparator of 94g CO2e/MJ as set out in Article 25(2) and Annex V of Directive (EU)2018/2001. Life cycle greenhouse gas emissions savings are calculated using the methodology referred to in Article 28(5) of Directive (EU) 2018/2001 or, alternatively, using ISO 14067 or ISO 14064-1. They are verified in line with Article 30 of Directive (EU) 2018/2001 where applicable, or by an independent third party; flexibility and seasonal storage options for renewable electricity generation; or the integration of renewable hydrogen.
2021/04/23
Committee: ITRE
Amendment 1018 #
Proposal for a regulation
Annex IV – point 5 – point b
(b) market integration and interoperability measured by calculating the additional value of the project to the integration of market areas and price convergence, to the overall flexibilitysignificantly increasing existing cross-border hydrogen transport capacity at a border between two Member States compared to the situation prior to the commissioning of the system.project
2021/04/23
Committee: ITRE
Amendment 1020 #
Proposal for a regulation
Annex IV – point 5 – point c
(c) security of supply and flexibility measured by calculating the additional value of the project to the resilience, diversity and flexibility of hydrogen supply.deleted
2021/04/23
Committee: ITRE
Amendment 1033 #
Proposal for a regulation
Annex IV – point 6 – point c
(c) facilitation of smart energy sector integrationenabling flexibility services such as demand response and storage by facilitation of smart energy sector integration through the creation of links to other energy carriers and sectors, measured by assessing the cost savings enabled in connected energy sectors and systems, such as the heat and power system, transport and industry.
2021/04/23
Committee: ITRE
Amendment 1044 #
Proposal for a regulation
Annex V – paragraph 1
The cost-benefit analysis methodologies developed by the ENTSO for Electricity, the ENTSO for Gas and other parties should be consistent, whilst taking into account sectorial specificities. The methodology for a harmonised energy system-wide cost-benefit analysis for projects of common interest shall satisfy the following principles.
2021/04/23
Committee: ITRE
Amendment 1051 #
Proposal for a regulation
Annex V – point 4
(4) it shall give guidance for the development and use of network and market modelling necessary for the cost- benefit analysis. The modelling shall allow for a full assessment of economic, including market integration, security of supply and competition, social and environmental and climate impacts, including the cross-sectorial impacts. The methodology shall be fully transparent to all project promoters and include details on why, what and how each of the benefits and costs are calculated.
2021/04/23
Committee: ITRE
Amendment 1058 #
Proposal for a regulation
Annex V – point 7
(7) it shall, at least, take into account the capital expenditure, operational and maintenance expenditure costs over the assessment lifecycle of the project and decommissioning and waste management costs, where relevant. The methodology shall give guidance on discount rates, assessment lifetime and residual value to be used for the cost- benefit calculations. . It shall furthermore include a Benefit-to- Cost ratio and a Net Present Value.
2021/04/23
Committee: ITRE