16 Amendments of Asger CHRISTENSEN related to 2020/0360(COD)

Amendment 309 #
Proposal for a regulation
Recital 15 a (new)
(15a) Moreover, a new infrastructure category shall be introduced for network components contributing to operational safety and ancillary services to support investments that allow for the stability of the grid, power and voltage quality while enabling further integration of renewable energy sources.
2021/05/04
Committee: ENVI
Amendment 310 #
Proposal for a regulation
Recital 15 b (new)
(15b) Moreover, a new infrastructure category should be created for district heating and cooling systems.
2021/05/04
Committee: ENVI
Amendment 518 #
Proposal for a regulation
Article 4 – paragraph 3 – point a – point i
(i) market integration, including through lifting the isolation of at least one Member State and, reducing energy infrastructure bottlenecks; competition and system flexibility; and reinvestments in existing infrastructure, necessary to maintain current levels of system integration;
2021/05/04
Committee: ENVI
Amendment 521 #
Proposal for a regulation
Article 4 – paragraph 3 – point b – introductory part
(b) for smart electricity grid projects and network components falling under the energy infrastructure category set out in point (1)(d) and (1)(e) of Annex II, the project is to contribute significantly to sustainability through the integration of renewable energy into the grid, and at least two of the following specific criteria:
2021/05/04
Committee: ENVI
Amendment 523 #
Proposal for a regulation
Article 4 – paragraph 3 – point b – point ii
(ii) market integration, including through efficient system operation and, use of interconnectors and reinvestments in existing infrastructure; necessary to maintain operational conditions;
2021/05/04
Committee: ENVI
Amendment 914 #
Proposal for a regulation
Annex I – Part 1 – point 3 – paragraph 1
Member States concerned: Denmark, Estonia, Finland, Germany, Latvia, Lithuania, Netherlands Poland and Sweden.
2021/05/04
Committee: ENVI
Amendment 995 #
Proposal for a regulation
Annex II – paragraph 1 – point 1 – point e a (new)
(ea) equipment, installation or network components that contribute to operational security or increased voltage quality by providing ancillary services, remedial actions or other services necessary for electricity system defence and restoration, including services providing inertia, synthetic inertia, fault current injection, grid forming capacities, voltage regulation, frequency regulation, protection, monitoring and control systems at all voltage levels and substations;
2021/05/04
Committee: ENVI
Amendment 1024 #
Proposal for a regulation
Annex II – paragraph 1 – point 3 – point a
(a) transmission pipelines for the transport of hydrogen, giving access to multiple network users on a transparent and non-discriminatory basis, which mainly contains high-pressure hydrogen pipelines, for hydrogen in gaseous or liquid state, excluding pipelines for the local distribution of hydrogen;
2021/05/04
Committee: ENVI
Amendment 1064 #
Proposal for a regulation
Annex II – paragraph 1 – point 5 – point b
(b) facilities for liquefaction and buffer storage of carbon dioxide in view of its further transportation. This does not include infrastructure within a geological formation used for the permanent geological storage of carbon dioxide pursuant to Directive 2009/31/EC and associated surface and injection facilities;
2021/05/04
Committee: ENVI
Amendment 1066 #
Proposal for a regulation
Annex II – paragraph 1 – point 5 – point b a (new)
(ba) Equipment and infrastructure within a geological formation used for the permanent geological storage of carbon dioxide pursuant to Directive 2009/31/EC and associated surface and injection facilities;
2021/05/04
Committee: ENVI
Amendment 1109 #
Proposal for a regulation
Annex IV – point 1 – point a
(a) for electricity transmission, the project increases theor ensures maintained grid transfer capacity, or the capacity available for commercial flows, at the border of that Member State with one or several other Member States, having the effect of increasing the cross- border grid transfer capacity at the border of that Member State with one or several other Member States, by at least 500 Megawatt compared to the situation without commissioning of the project;
2021/05/04
Committee: ENVI
Amendment 1110 #
Proposal for a regulation
Annex IV – point 1 – point a a (new)
(aa) for network components that contribute to operational security or increased voltage quality, the project is designed for equipment and installations at high-voltage, medium-voltage or low- voltage level. This includes transmission and distribution system operators or solely distribution system operators from at least two Member States. Projects involving solely distribution system operators without the direct involvement of transmission system operators can be involved only with the support of the transmission system operators in the form of a letter of intent, of at least two Member States, that are closely associated to the project. A project covers at least 50000 users, generators, consumers or prosumers of electricity, in a consumption area of at least 300 GWH/year, of which at least 20 % originate from variable renewable resources;
2021/05/04
Committee: ENVI
Amendment 1129 #
Proposal for a regulation
Annex IV – point 2 – point a
(a) for projects of mutual interest in the category set out in point (1)(a) and (e) of Annex II, the project increases theor ensures maintained grid transfer capacity, or the capacity available for commercial flows, at the border of that Member State with one or more third countries and brings significant benefits, under the specific criteria listed in in Article 4(3), to at least two Member States. The calculation of the benefits for the Member States shall be performed and published by the ENTSO for Electricity in the frame of Union-wide ten-year network development plan;
2021/05/04
Committee: ENVI
Amendment 1135 #
Proposal for a regulation
Annex IV – point 3 – point a – point i
(i) calculating, for cross-border projects and reinvestment projects, the impact on the grid transfer capability in both power flow directions, measured in terms of amount of power (in megawatt), and their contribution to reaching the minimum 15% interconnection target, for projects with significant cross-border impact, the impact on grid transfer capability at borders between relevant Member States, between relevant Member States and third countries or within relevant Member States and on demand- supply balancing and network operations in relevant Member States;
2021/05/04
Committee: ENVI
Amendment 1140 #
Proposal for a regulation
Annex IV – point 3 – point b – point ii
(ii) or electricitnergy storage, comparing newthe capacity provided by the project with total existing capacity for the same storage technology in the area of analysis as defined in Annex V;
2021/05/04
Committee: ENVI
Amendment 1143 #
Proposal for a regulation
Annex IV – point 4 – introductory part
(4) Concerning projects falling under the category set out in point (1)(d) and (1)(e a new) of Annex II, the criteria listed in Article 4 shall be evaluated as follows:
2021/05/04
Committee: ENVI