BETA

7 Amendments of Ivars IJABS related to 2023/0046(COD)

Amendment 187 #
Proposal for a regulation
Article 2 – paragraph 2 – point 2 – paragraph 1 – point a
(a) any element of a network that is intended to host other elements of a network without becoming an active element of the network itself, such as pipes, masts, ducts, inspection chambers, manholes, cabinets, antenna installations, towers and poles, as well as buildings or entries to buildings, and any other asset including rooftop or part of a façade, street furniture, such as light poles, street signs, traffic lights, billboards, bus and tramway stops and metro stations;
2023/07/07
Committee: ITRE
Amendment 192 #
Proposal for a regulation
Article 2 – paragraph 2 – point 2 – paragraph 1 – point b
(b) where they are not part of a network and are owned or controlled by public sector bodies: buildings or entries to buildings, and any other asset including rooftop or part of a façade, street furniture, such as light poles, street signs, traffic lights, billboards, bus and tramway stops and metro stations.
2023/07/07
Committee: ITRE
Amendment 210 #
Proposal for a regulation
Article 3 – paragraph 1
1. Upon written request of an operator, public sector bodies owning or controlling physical infrastructure or network operators shall meet all reasonable requests for access to that physical infrastructure under fair and reasonable terms and conditions, including price, with a view to deploying elements of very high capacity networks or associated facilities, including antennas, mobile base stations and transmission network elements. . Public sector bodies owning or controlling physical infrastructure shall meet all reasonable requests for access also under non-discriminatory terms and conditions. Such written requests shall specify the elements of the physical infrastructure for which the access is requested, including a specific time frame. and parameters of the electricity connection.
2023/07/07
Committee: ITRE
Amendment 385 #
Proposal for a regulation
Article 8 – paragraph 1
1. All buildings at the end user’s location, including elements under joint ownership, newly constructed or undergoing major renovation works, for which applications for building permits have been submitted after [ENTRY INTO FORCE + 12 MONTHS], shall be equipped with a fibre-ready in-building physical infrastructure up to the network termination points as well as with in- building fibre wiring and provided with a functional 5G mobile broadband internet coverage.
2023/07/07
Committee: ITRE
Amendment 390 #
Proposal for a regulation
Article 8 – paragraph 3
3. By [ENTRY INTO FORCE + 12 MONTHS], all buildings at the end-users’ location, including elements thereof under joint ownership, undergoing major renovations as defined in point 10 of Article 2 of Directive 2010/31/EU shall be equipped with a fibre-ready in-building physical infrastructure, up to the network termination points, as well as with in- building fibre wiring. All multi-dwelling buildings undergoing major renovations as defined in point 10 of Article 2 of Directive 2010/31/EU shall also be equipped with an access point and provided with a functional 5G mobile broadband internet coverage.
2023/07/07
Committee: ITRE
Amendment 400 #
Proposal for a regulation
Article 8 – paragraph 4 – point f a (new)
(fa) the essential parts of buildings or premises where functional 5G coverage must be provided, as well as the technical parameters and signal levels at which 5G coverage is considered functional.
2023/07/07
Committee: ITRE
Amendment 402 #
Proposal for a regulation
Article 8 – paragraph 5
5. Buildings equipped in accordance with this Article shall be eligible to receive a ‘fibre-ready’ and ‘VHCN-ready’ label.
2023/07/07
Committee: ITRE