56 Amendments of Bart GROOTHUIS related to 2020/0360(COD)
Amendment 139 #
Proposal for a regulation
Recital 12 a (new)
Recital 12 a (new)
(12 a) To enable sector integration, to acknowledge changes in consumer behaviour and to increase demand for green transport, charging infrastructure for electric vehicles should be eligible for the PCI Status;
Amendment 142 #
Proposal for a regulation
Recital 13
Recital 13
(13) The Commission’s communication on energy system integration underlines the need for integrated energy infrastructure planning across energy carriers, infrastructures, and consumption sectors. Such system integration starts from the point of departure of applying the energy efficiency first principle and taking a holistic approach in policy and beyond individual sectors. It also addresses the decarbonisation needs of the hard to abate sectors, such as parts of industry or certain modes of transport, where direct electrification is, currently, technically or economically challenging. Such investments include hydrogen and electrolysers, which are progressing towards commercial large-scale deployment. The Commission’s Hydrogen Strategy gives priority to hydrogen production from renewable electricity, which is the cleanest solution and is most compatible with the EU climate neutrality objective. In a transitional phase however, other forms of low-carbon hydrogen are needed to more rapidly replace existing hydrogen and kick-start an economy of scale.
Amendment 153 #
Proposal for a regulation
Recital 15 a (new)
Recital 15 a (new)
(15 a) Moreover, a focus should equally be laid on flexibility and energy storage solutions to support investments that allow for the stability of the grid and enable further integration of renewable energy sources; energy storage will be a crucial feature of the power grid given the volatile nature of renewable energy sources on the one hand and our need for grid stability and security of supply on the other;
Amendment 155 #
Proposal for a regulation
Recital 15 a (new)
Recital 15 a (new)
(15 a) Moreover, a new infrastructure category shall be introduced for network components contributing to operational safety and ancillary services to support investments that allow for the stability of the grid, power and voltage quality while enabling further integration of renewable energy sources.
Amendment 171 #
Proposal for a regulation
Recital 18
Recital 18
(18) Furthermore, to achieve the Union’s 2030 and 2050 climate and energy targets and climate neutrality objective, Europe needs to significantly scale up renewable electricity generation. The existing infrastructure categories for electricity transmission and storage are crucial for the integration of the significant increase in renewable electricity generation in the power grid and for the achievement of the 15 % electricity interconnection target for 2030. In addition, that requires stepping up investment in offshore renewable energy30 . Coordinating long- term planning and development of offshore and onshore electricity grids should also be addressed. In particular, offshore infrastructure planning should move away from the project-by-project approach towards a coordinated comprehensive approach ensuring the sustainable development of integrated offshore grids in line with the offshore renewable potential of each sea basin, environmental protection and other uses of the sea. _________________ 30Offshore Strategy Communication
Amendment 183 #
Proposal for a regulation
Recital 22
Recital 22
(22) To ensure voltage and frequency stability, particular attention should be given to the stability of the European electricity network under the changing conditions, for instance through exploring all possible sustainable energy storage solutions, especially in view of the growing share of renewable electricity.
Amendment 195 #
Proposal for a regulation
Recital 27
Recital 27
(27) Projects of common interest should be implemented as quickly as possible and should be closely monitored and evaluated, while keeping the administrative burden for project promoters to a minimum. The Commission should nominate European coordinators for projects facing particular difficulties or delays. The progress in the implementation of the specific projects as well as the fulfilment of the obligations pertaining to this Regulation should be taken into account in the selection process for subsequent Union lists for the respective projects.
Amendment 199 #
Proposal for a regulation
Recital 33
Recital 33
(33) In order to simplify and expedite the permitting process for offshore grids for renewable energy, the Member States around a particular sea basin should endevour to harmonise the relevant legislation and procedures and create one unique points of contact, referred to as an ‘offshore one-stop shop’, in view of regional specificities and geography, for the for facilitating, integrating and coordinating the process of granting of permits toall permit granting procedures of such projects. Moreover, the establishment of a one-stop shop per sea basin for offshore grids for renewable energy should reduce complexity, increase efficiency and speed up the permitting process of offshore transmission assets often crossing many jurisdictions. It shall issue comprehensive decisions for these projects on behalf of the relevant national Member States in a coordinated, collaborative or integrated manner.
Amendment 208 #
Proposal for a regulation
Recital 40 a (new)
Recital 40 a (new)
(40 a) The needs of an integrated energy market will go beyond a physical cross- border footprint of infrastructure projects in order to contribute to the TEN-E pillars, such as sustainability or security of supply. There will be an equal a need for cross-border and local projects that will have a positive effect on the Union's power grid, such as electrolysers, district heating and cooling networks or storage infrastructure of a certain capacity and ability to be replicable in more than one Member State.
Amendment 258 #
Proposal for a regulation
Article 2 – paragraph 1 – point 8
Article 2 – paragraph 1 – point 8
(8) ‘smart electricity grid’ means an electricity network where the grid operator can digitally monitor the actions of the users connected to it, and information and communication technologies (ICT) for communicating with related grid operators, generators, energy storage, consumers and/or prosumers, with a view to transmitting electricity in a sustainable, cost-efficient and secure way;
Amendment 265 #
Proposal for a regulation
Article 2 – paragraph 1 – point 9 a (new)
Article 2 – paragraph 1 – point 9 a (new)
(9 a) ’low carbon gas’ means gases such as biogas, biomethane, and hydrogen with the lifecycle greenhouse gas emissions savings requirement of 70 % relative to a fossil fuel comparator of 94g CO2e/MJ as set out in Article 25(2) and Annex V of Directive (EU) 2018/2001 of the European Parliament and of the Council
Amendment 313 #
Proposal for a regulation
Article 4 – paragraph 1 – point c – point ii
Article 4 – paragraph 1 – point c – point ii
(ii) is located on the territory of one Member State and has a significantpositive cross- border impacteffect or is replicable as set out in point (1) of Annex IV, whereas ‘replicable’ requires both knowledge sharing and knowledge transfer of at least two Member States or regions. The replicability of a project shall contribute to, amongst others, decarbonisation, the energy efficiency first principle, increase of the share of renewable energies or improvement of sector integration.
Amendment 323 #
Proposal for a regulation
Article 4 – paragraph 2 – point a
Article 4 – paragraph 2 – point a
(a) the project contributes significantly to the decarbonisation objectives of the Union and those of the third country and to sustainability, including through the integration of renewable energy into the grid and the transmission and distribution of renewable generation to major consumption centres and storage sites, and;
Amendment 349 #
Proposal for a regulation
Article 4 – paragraph 3 – point a – introductory part
Article 4 – paragraph 3 – point a – introductory part
(a) for electricity transmission and storage projects falling under the energy infrastructure categories set out in points (1)(a), (b), (c) and (e) of Annex II, the project is to contribute significantly to sustainability through the integration of renewable and low-carbon energy into the grid and the transmission of renewable generation to major consumption centres and storage sites, and at least one of the following specific criteria:
Amendment 350 #
Proposal for a regulation
Article 4 – paragraph 3 – point a – point i
Article 4 – paragraph 3 – point a – point i
(i) market integration, including through lifting the isolation of at least one Member State and, reducing energy infrastructure bottlenecks; competition and system flexibility; and reinvestments in existing infrastructure, necessary to maintain current levels of system integration;
Amendment 356 #
Proposal for a regulation
Article 4 – paragraph 3 – point b – introductory part
Article 4 – paragraph 3 – point b – introductory part
(b) for smart electricity grid projects and network components falling under the energy infrastructure category set out in point (1)(d) and (1)(e) of Annex II, the project is to contribute significantly to sustainability through the integration of renewable energy into the grid, and at least two of the following specific criteria:
Amendment 358 #
Proposal for a regulation
Article 4 – paragraph 3 – point b – introductory part
Article 4 – paragraph 3 – point b – introductory part
(b) for smart electricity grid projects falling under the energy infrastructure category set out in point (1)(d) of Annex II, the project is to contribute significantly to sustainability through the integration of renewable and low-carbon energy into the grid, and at least two of the following specific criteria:
Amendment 361 #
Proposal for a regulation
Article 4 – paragraph 3 – point b – point ii
Article 4 – paragraph 3 – point b – point ii
(ii) market integration, including through efficient system operation and, use of interconnectors; and reinvestments in existing infrastructure; necessary to maintain operational conditions;
Amendment 363 #
Proposal for a regulation
Article 4 – paragraph 3 – point b – point iii a (new)
Article 4 – paragraph 3 – point b – point iii a (new)
(iii a) sector integration, through the improvement of the interaction of different energy vectors or energy sectors, for instance through the increase of synergies in adjacent sectors, such as transport and mobility;
Amendment 431 #
Proposal for a regulation
Article 4 – paragraph 5 – subparagraph 1 – point b a (new)
Article 4 – paragraph 5 – subparagraph 1 – point b a (new)
(b a) synergies with priority corridors and areas identified under trans- European networks for transport and telecommunications;
Amendment 460 #
Proposal for a regulation
Article 8 – paragraph 6
Article 8 – paragraph 6
6. By [31 July 2022] and for each specific Regional Group per priority offshore grid corridor, as defined in Annex I, national competent authorities in Member States belonging to the respective Group, shall jointly create one unique points of contact per priority offshore grid corridor, ‘offshore one-stop shops’, for project promoters, which shall be. The offshore one-stop shop shall, without prejudice to relevant requirements under international and Union law, facilitate the issuing of the comprehensive decision. The comprehensive decision shall be the final proof that the project of common interest has achieved ready-to-build status and there shall be no other requirements for any additional permits or authorisations in that respect. The comprehensive decision shall be issued within the time limit referred to in Article 10(1) and (2) and in accordance with schemes similar to those laid out in Article 8 Paragraph 3. The offshore one-stop shall be further responsible for facilitating and coordinating the permit granting process for offshore grids for renewable energy projects of common interest, taking into account also the need for coordination between the permitting process for the energy infrastructure and the one for the generation assets. The offshore one-stop shops shall act as a repository of existing sea basin studies and plans, aiming at facilitating the permitting process of individual projects of common interest and coordinate the issuance of the comprehensive decisions for such projects by the relevant national competent authorities. Each Regional Group per priority offshore grid corridor, with the assistance of the national competent authorities in the Members States belonging to the Group, shall set-up the offshore one-stop shops depending on regional specificities and geography and determine their location, resource allocation and specific rules for their functioning.
Amendment 473 #
Proposal for a regulation
Article 10 – paragraph 1 – point a – introductory part
Article 10 – paragraph 1 – point a – introductory part
(a) the pre-application procedure, covering the period between the start of the permit granting process and the acceptance of the submitted application file by the competent authority, shall take place within an indicative period of two years.
Amendment 480 #
Proposal for a regulation
Article 10 – paragraph 2 – introductory part
Article 10 – paragraph 2 – introductory part
2. The competent authority shall ensure that the combined duration of the two procedures referred to in paragraph 1 does not exceed a period of three years and six months. However, where the competent authority considers that one or both of the two procedures of the permit granting process will not be completed within the time limits set out in paragraph 1, it may decide, before their expiry and on a case by case basis, to extend one or both of those time limits by a maximum of nine months for both procedures combined. The Commission should monitor the permitting process more closely and in case of any delay the European Commission shall be notified immediately by the competent authority, whereas the latter shall duly justify the delay.
Amendment 541 #
Proposal for a regulation
Article 11 – paragraph 11
Article 11 – paragraph 11
11. By [31 December 2023], the ENTSO for Electricity and the ENTSO for Gas shall jointly submit to the Commission and the Agency a consistent and interlinked energy market and network model including electricity, gas, heat and hydrogen transmission infrastructure as well as storage, power plants, LNG and electrolysers, covering the energy infrastructure priority corridors and the areas drawn up in line with the principles laid down in Annex V. Where relevant, the model should take into consideration the distribution infrastructure.
Amendment 559 #
Proposal for a regulation
Article 12 – paragraph 1 – subparagraph 1
Article 12 – paragraph 1 – subparagraph 1
The guidelines shall define standards for a transparent, non-discriminatory and robust elaboration of the scenarios taking into account good practices in the field of network development planning. In particular, the guidelines shall include the energy efficiency first principle and ensure that the underlying ENTSO for Electricity and ENTSO for Gas scenarios are fully in line with the latest medium and long-term European Union decarbonisation targets and the latest available Commission scenarios.
Amendment 631 #
Proposal for a regulation
Article 14 – paragraph 2
Article 14 – paragraph 2
2. By [31 July 2023] the ENTSO for Electricity, with the involvement of the relevant TSOs, the national regulatory authorities and of the Commission and in line with the agreement referred to in paragraph 1, shall develop and publish integrated offshore network development plans starting from the 2050 objectives, with intermediate steps for 2030 and 2040, for each sea-basin, in line with the priority offshore grid corridors referred to in Annex I, taking into account environmental protection and other uses of the sea. Those integrated offshore network development plans shall thereafter be updated every threewo years.
Amendment 632 #
Proposal for a regulation
Article 14 – paragraph 3
Article 14 – paragraph 3
3. The integrated offshore network development plans shall be compatible with the latest Union-wide ten-Year Network Development Plans in order to ensure coherent development of onshore and offshore grid planning providing for an adequate and reliable transmission grid for transfer of electricity onshore as well as between coastal regions, regions inland, and landlocked Member States and to provide for a stable supply of electricity to centres of consumption or energy storage facilities.
Amendment 710 #
Proposal for a regulation
Article 17 – paragraph 2
Article 17 – paragraph 2
2. In their decision granting the incentives referred to in paragraph 1, national regulatory authorities shall consider the results of the cost-benefit analysis on the basis of the methodology drawn up pursuant to Article 11 and in particular the regional or Union-wide positive externalities generated by the project. The national regulatory authorities shall further analyse the specific risks incurred by the project promoters, the risk mitigation measures taken and the justification of the risk profile in view of the net positive impact provided by the project, when compared to a lower-risk alternative. Eligible risks shall in particular include risks related to new transmission and distribution technologies, both onshore and offshore, risks related to under-recovery of costs and development risks.
Amendment 777 #
Proposal for a regulation
Annex I – Part 1 – point 3 – paragraph 1
Annex I – Part 1 – point 3 – paragraph 1
Member States concerned: Denmark, Estonia, Finland, Germany, Latvia, Lithuania, Netherlands Poland and Sweden.
Amendment 779 #
Proposal for a regulation
Annex I – Part 2 – point 4 – introductory part
Annex I – Part 2 – point 4 – introductory part
(4) Northern Seas offshore grids (‘NSOG’): integrated offshore electricity and hydrogen grids development and the related interconnectors in the North Sea, the Irish Sea, the English Channel and neighbouring waters to transport electricity and hydrogen from renewable offshore energy sources to centres of consumption and storage and to increase cross-border electricitrenewable energy exchange.
Amendment 780 #
Proposal for a regulation
Annex I – Part 2 – point 5 – introductory part
Annex I – Part 2 – point 5 – introductory part
(5) Baltic Energy Market Interconnection Plan offshore grids (‘BEMIP offshore’): integrated offshore electricity and hydrogen grids development and the related interconnectors in the Baltic Sea and neighbouring waters to transport electricity and hydrogen from renewable offshore energy sources to centres of consumption and storage and to increase cross-border electricitrenewable energy exchange.
Amendment 781 #
Proposal for a regulation
Annex I – Part 2 – point 6 – introductory part
Annex I – Part 2 – point 6 – introductory part
(6) South and East offshore grids: integrated offshore electricity and hydrogen grids development and the related interconnectors in the Mediterranean Sea, Black Sea and neighbouring waters to transport electricity and hydrogen from renewable offshore energy sources to centres of consumption and storage and to increase cross-border electricitrenewable energy exchange.
Amendment 785 #
Proposal for a regulation
Annex I – Part 2 – point 7 – introductory part
Annex I – Part 2 – point 7 – introductory part
(7) South Western Europe offshore grids: integrated offshore electricity and hydrogen grids development and the related interconnectors in the North Atlantic Ocean waters to transport electricity and hydrogen from renewable offshore energy sources to centres of consumption and storage and to increase cross-border electricitrenewable energy exchange.
Amendment 804 #
Proposal for a regulation
Annex I – Part 4 – point 11 – introductory part
Annex I – Part 4 – point 11 – introductory part
(11) Smart electricity grids deployment: adoption of smart grid technologies across the Union to efficiently integrate the behaviour and actions of all users connected to the electricity network, in particular the generation of large amounts of electricity from renewable or distributed energy sources and, demand response by consumers, energy storage and other flexibility sources.
Amendment 805 #
Proposal for a regulation
Annex I – Part 4 – point 11 – introductory part
Annex I – Part 4 – point 11 – introductory part
(11) Smart electricity grids deployment: adoption of smart grid technologies across the Union to efficiently integrate the behaviour and actions of all users connected to the electricity network, in particular the generation of large amounts of electricity from renewable or distributed energy sources and demand response by consumers, energy storage.
Amendment 829 #
Proposal for a regulation
Annex II – paragraph 1 – point 1 – point b a (new)
Annex II – paragraph 1 – point 1 – point b a (new)
(b a) charging infrastructure for electric vehicles;
Amendment 835 #
Proposal for a regulation
Annex II – paragraph 1 – point 1 – point d
Annex II – paragraph 1 – point 1 – point d
(d) systems and components integrating ICT, through operational digital platforms, control systems and sensor technologies both at transmission and, medium and low voltage distribution level, aiming at a more efficient and intelligent electricity transmission and distribution network, increased capacity to integrate new forms of generation, storage and consumption and facilitating new business models and market structures;
Amendment 838 #
Proposal for a regulation
Annex II – paragraph 1 – point 1 – point e a (new)
Annex II – paragraph 1 – point 1 – point e a (new)
(e a) equipment, installation or network components that contribute to operational security or increased voltage quality by providing ancillary services, remedial actions or other services necessary for electricity system defence and restoration, including services providing inertia, synthetic inertia, fault current injection, grid forming capacities, voltage regulation, frequency regulation, protection, monitoring and control systems at all voltage levels and substations;
Amendment 841 #
Proposal for a regulation
Annex II – paragraph 1 – point 2 – point a
Annex II – paragraph 1 – point 2 – point a
(a) any of the following equipment or installation aiming at enabling and facilitating the integration of renewable and low-carbon gases with a carbon threshold of which the life cycle greenhouse gas emissions savings requirement of 70 % relative to a fossil fuel comparator of 94g CO2e/MJ as set out in Article 25(2) and Annex V of Directive (EU) 2018/2001 of the European Parliament and of the Council. Life cycle greenhouse gas emissions savings are calculated using the methodology referred to in Article 28(5) of Directive (EU)2018/2001 or, alternatively, using ISO 14067 or ISO 14064-1 taking into account the carbon intensity of the electricity in the country of production for electricity use. Quantified life-cycle GHG emission savings are verified in line with Article 30 of Directive (EU) 2018/2001 where applicable, or by an independent third party, (including biomethane or hydrogen) into the network: digital systems and components integrating ICT, control systems and sensor technologies to enable the interactive and intelligent monitoring, metering, quality control and management of gas production, transmission, distribution and consumption within a gas network. Furthermore, such projects may also include equipment to enable reverse flows from the distribution to the transmission level and related necessary upgrades to the existing network.
Amendment 852 #
Proposal for a regulation
Annex II – paragraph 1 – point 3 – point a
Annex II – paragraph 1 – point 3 – point a
(a) transmission pipelines for the transport of hydrogen, giving access to multiple network users on a transparent and non-discriminatory basis, which mainly contains high-pressure hydrogen pipelines, excluding pipelines for the local distribution of hydrogen;
Amendment 856 #
Proposal for a regulation
Annex II – paragraph 1 – point 3 – point a
Annex II – paragraph 1 – point 3 – point a
(a) transmission pipelines for the transport of hydrogen, giving access to multiple network users on a transparent and non-discriminatory basis, which mainly contains high-pressure hydrogen pipelines, for hydrogen in gaseous or liquid state, excluding pipelines for the local distribution of hydrogen;
Amendment 862 #
Proposal for a regulation
Annex II – paragraph 1 – point 3 – point a
Annex II – paragraph 1 – point 3 – point a
(a) transmission pipelines for the transport of hydrogen, giving access to multiple network users on a transparent and non-discriminatory basis, which mainly contains high-pressure hydrogen pipelines, exincluding pipelines for the local distribution of hydrogen;
Amendment 866 #
Proposal for a regulation
Annex II – paragraph 1 – point 3 – point b
Annex II – paragraph 1 – point 3 – point b
(b) underground storage facilities connected to the high-pressure hydrogen pipelines referred to in point (a);
Amendment 873 #
(c a) storage facilities connected to the electricity networks that enable integration with electricity sectors, enabling the operations of the energy systems across multiple energy carriers ;
Amendment 895 #
Proposal for a regulation
Annex II – paragraph 1 – point 4 – point a
Annex II – paragraph 1 – point 4 – point a
(a) electrolysers that: (i) have at least 1020 MW capacity, (ii) the production complies with the life cycle greenhouse gas emissions savings requirement of 70 % relative to a fossil fuel comparator of 94g CO2e/MJ as set out in Article 25(2) and Annex V of Directive (EU) 2018/2001 of the European Parliament and of the Council.60 Life cycle greenhouse gas emissions savings are calculated using the methodology referred to in Article 28(5) of Directive (EU) 2018/2001 or, alternatively, using ISO 14067 or ISO 14064-1. Quantified life-cycle GHG emission savings are verified in line with Article 30 of Directive (EU) 2018/2001 where applicable, or by an independent third party, and (iii) have also a network-related function; _________________ 60 OJ L 328, 21.12.2018, p. 82.
Amendment 906 #
Proposal for a regulation
Annex II – paragraph 1 – point 5 – point b
Annex II – paragraph 1 – point 5 – point b
(b) facilities for liquefaction and buffer storage of carbon dioxide in view of its further transportation. This does not include infrastructure within a geological formation used for the permanent geological storage of carbon dioxide pursuant to Directive 2009/31/EC and associated surface and injection facilities;
Amendment 911 #
Proposal for a regulation
Annex II – paragraph 1 – point 5 – point b a (new)
Annex II – paragraph 1 – point 5 – point b a (new)
(b a) equipment and infrastructure within a geological formation used for the permanent geological storage of carbon dioxide pursuant to Directive 2009/31/EC and associated surface and injection facilities;
Amendment 953 #
Proposal for a regulation
Annex IV – point 1 – point a
Annex IV – point 1 – point a
(a) for electricity transmission, the project increases theor ensures maintained grid transfer capacity, or the capacity available for commercial flows, at the border of that Member State with one or several other Member States, having the effect of increasing the cross- border grid transfer capacity at the border of that Member State with one or several other Member States, by at least 500 Megawatt compared to the situation without commissioning of the project;
Amendment 957 #
Proposal for a regulation
Annex IV – point 1 – point a a (new)
Annex IV – point 1 – point a a (new)
(a a) for network components that contribute to operational security or increased voltage quality, the project is designed for equipment and installations at high-voltage, medium-voltage or low- voltage level. This includes transmission and distribution system operators or solely distribution system operators from at least two Member States. Projects involving solely distribution system operators without the direct involvement of transmission system operators can be involved only with the support of the transmission system operators in the form of a letter of intent, of at least two Member States, that are closely associated to the project. A project covers at least 50000 users, generators, consumers or prosumers of electricity, in a consumption area of at least 300 GWH/year, of which at least 20 % originate from variable renewable resources;
Amendment 960 #
Proposal for a regulation
Annex IV – point 1 – point b
Annex IV – point 1 – point b
(b) for electricity storage, the project provides at least 2250 MW installed capacity and has a storage capacity that allows a net annual electricity generation of 250 Gigawatt-hours/year;
Amendment 983 #
Proposal for a regulation
Annex IV – point 2 – point a
Annex IV – point 2 – point a
(a) for projects of mutual interest in the category set out in point (1)(a) and (e) of Annex II, the project increases theor ensures maintained grid transfer capacity, or the capacity available for commercial flows, at the border of that Member State with one or more third countries and brings significant benefits, under the specific criteria listed in in Article 4(3), to at least two Member States. The calculation of the benefits for the Member States shall be performed and published by the ENTSO for Electricity in the frame of Union-wide ten-year network development plan;
Amendment 998 #
Proposal for a regulation
Annex IV – point 3 – point a – point i
Annex IV – point 3 – point a – point i
(i) calculating, for cross-border projects and reinvestment projects, the impact on the grid transfer capability in both power flow directions, measured in terms of amount of power (in megawatt), and their contribution to reaching the minimum 15% interconnection target, for projects with significant cross-border impact, the impact on grid transfer capability at borders between relevant Member States, between relevant Member States and third countries or within relevant Member States and on demand- supply balancing and network operations in relevant Member States;
Amendment 1002 #
Proposal for a regulation
Annex IV – point 3 – point b – point ii
Annex IV – point 3 – point b – point ii
(ii) or electricitnergy storage, comparing new capacity provided by the project with total existing capacity for the same storage technology in the area of analysis as defined in Annex V;
Amendment 1003 #
Proposal for a regulation
Annex IV – point 3 – point b – point ii
Annex IV – point 3 – point b – point ii
(ii) or electricitnergy storage, comparing newthe capacity provided by the project with total existing capacity for the same storage technology in the area of analysis as defined in Annex V;
Amendment 1005 #
Proposal for a regulation
Annex IV – point 3 – point c
Annex IV – point 3 – point c
(c) security of supply, interoperability and secure system operation measured in line with the analysis made in the latest available Union-wide ten-year network development plan in electricity, notably by assessing the impact of the project on the loss of load expectation for the area of analysis as defined in Annex V in terms of generation and transmission adequacy for a set of characteristic load periods, taking into account expected changes in climate- related extreme weather events and their impact on infrastructure resilience, expected changes in the economic and social development of the area and the expected significant increase in power demand from the transport sector, in particular for electric vehicles along highways and in urban areas.. Where applicable, the impact of the project on independent and reliable control of system operation and services shall be measured.
Amendment 1007 #
Proposal for a regulation
Annex IV – point 4 – introductory part
Annex IV – point 4 – introductory part
(4) Concerning projects falling under the category set out in point (1)(d) and (1)(e a new) of Annex II, the criteria listed in Article 4 shall be evaluated as follows: