96 Amendments of Susana SOLÍS PÉREZ related to 2021/0223(COD)
Amendment 109 #
Proposal for a regulation
Recital 4 a (new)
Recital 4 a (new)
(4 a) In order to ensure a coherent legislative framework for the use and deployment of alternative fuels this Regulation should be aligned with the ReFuelEU aviation FuelEU Maritime, the revision of CO2 emission performance for new passenger cars and light duty vehicles Regulation, the CO2 emission performance for heavy duty vehicles Regulation and its upcoming revisions, and the revision of Directive 2003/96/EC (Energy Taxation Directive).
Amendment 124 #
Proposal for a regulation
Recital 9
Recital 9
(9) The deployment of publicly accessible recharging infrastructure for light-duty electric vehicles has been uneven across the Union. Continued uneven distribution would jeopardize the uptake of such vehicles, limiting connectivity across the Union and across regions. Continuing divergence in policy ambitions and approaches at national level will not create the long-term certainty needed for substantive market investment. Mandatory minimum targets for Member States at national level should therefore provide policy orientations and complement National Policy Frameworks. That approach should combine national fleet based targets with distance-based targets for the trans-European network for transport (TEN-T). National fleet based targets should ensure that vehicle uptake in each Member State is matched with the deployment of sufficient publicly accessible recharging infrastructure while allowing for the market to self regulate once a certain penetration of electric vehicles has been reached. Distance-based targets for the TEN-T network should ensure full coverage of electric recharging points along the Union’s main road networks and thereby ensure easy and seamless travel throughout the Union. This targets shall be complemented with additional recharging infrastructure across all regions to ensure an even deployment across all territory, including in depopulated or sparsely populated areas.
Amendment 128 #
Proposal for a regulation
Recital 9 a (new)
Recital 9 a (new)
(9 a) While recognizing the importance of private investment and a market driven deployment of alternative fuels infrastructure, public investment and further state aid rules flexibility is encouraged to guarantee an even distribution across all regions, especially in sparsely populated and depopulated areas.
Amendment 141 #
Proposal for a regulation
Recital 21 a (new)
Recital 21 a (new)
(21a) The possibility of bidirectional charging at both private and publicly accessible infrastructure can be an incentive to encourage people to purchase electric vehicles, as they can then be used for mobility as well as energy storage. Therefore, a sufficient number of private and publicly accessible charging stations should allow for smart, bidirectional charging.
Amendment 144 #
Proposal for a regulation
Recital 32 a (new)
Recital 32 a (new)
(32 a) Given the cost and complexity associated with the roll-out of shore-side electricity in maritime ports, it is essential to prioritise the investments, particularly where it makes the most sense in terms of geographic location, emissions reduction and economic viability taking into account frequency of use, regularity of calls and availability of grid capacity.
Amendment 145 #
Proposal for a regulation
Recital 34
Recital 34
(34) These targets should take into account the types of vessels served and their respective traffic volumes. Maritime ports with low traffic volumes of certain ship categories, should be exempted from the mandatory requirements for the corresponding ship categories based on a minimum level of traffic volume, so as to avoid underused capacity being installed. Similarly, the mandatory targets should not aim to target maximum demand, but a sufficiently high volume, in order to avoid underused capacity and to take account of port operational characteristics. Maritime transport is an important link for the cohesion and economic development of islands in the Union. Energy production capacity in these islands may not always be sufficient to account for the power demand required to support the provision of shore- side electricity supply. In such a case islands should be exempted from this requirement unless and until such ansufficient electrical supply connection with the mainland has been completed or there is a sufficient locally generated capacity from clean energy sources. In this regard, terminals that only occasionally receive ship segments falling under the scope of the Regulation should be exempted from OPS/SSE infrastructure investments.
Amendment 179 #
Proposal for a regulation
Article 2 – paragraph 1 – point 57
Article 2 – paragraph 1 – point 57
(57) ‘ship at berth’ means a ship at berth as defined in Article 3, point (n) of Regulation (EU) 2015/757which is securely moored at the terminal in a port falling under the jurisdiction of a Member State, where it is carrying out its main loading and unloading operations, including the time spent when not engaged in cargo operations; in case of cruise vessels, hoteling is included;
Amendment 180 #
Proposal for a regulation
Article 2 – paragraph 1 – point 58
Article 2 – paragraph 1 – point 58
(58) ‘shore-side electricity supply’ at berth means the provision of shore-side electrical power through a standardised interface to seagoing ships or inland waterway vessels at berth through a fixed, floating, or mobile installation;
Amendment 185 #
Proposal for a regulation
Article 3 – paragraph 1 – subparagraph 1 – point a
Article 3 – paragraph 1 – subparagraph 1 – point a
(a) for each battery electric light-duty vehicle registered in their territory, a total power output of at least 1 kW is provided through publicly accessible recharging stations; and if a Member State’s EV share of the total projected vehicle fleet is greater than 10%; and for each battery electric light-duty vehicle registered in their territory, a total power output of at least 1.5kW is provided through publicly accessible recharging stations if a Member State’s EV share of the total projected vehicle fleet is greater than 7.5% and below 10%;and for each battery electric light-duty vehicle registered in their territory, a total power output of at least 2 kW is provided through publicly accessible recharging stations if a Member State’s EV share of the total projected vehicle fleet is greater than5% and below 7.5%;and for each battery electric light-duty vehicle registered in their territory, a total power output of at least 2.5 kW is provided through publicly accessible recharging stations if a Member State’s EV share of the total projected vehicle fleet is greater than 2.5% and below 5%;and for each battery electric light-duty vehicle registered in their territory, a total power output of at least 3 kW is provided through publicly accessible recharging stations if a Member State’s EV share of the total projected vehicle fleet is below 2.5%;
Amendment 190 #
Proposal for a regulation
Recital 4 a (new)
Recital 4 a (new)
(4 a) In order to ensure a coherent legislative framework for the use and deployment of alternative fuels this Regulation should be aligned with the ReFuelEU aviation FuelEU Maritime, the revision of CO2 emission performance for new passenger cars and light duty vehicles Regulation, the CO2 emission performance for heavy duty vehicles Regulation and its upcoming revisions, and the revision of Directive 2003/96/EC (Energy Taxation Directive).
Amendment 193 #
Proposal for a regulation
Recital 5
Recital 5
(5) Therefore all modes of transport should be addressed in one instrument which should take into account a variety of alternative fuels. The use of zero-emission powertrain technologies is at different stages of maturity in the different modes of transport. In particular, in the road sector, a rapid uptake of battery-electric and plug-in hybrid vehicles is taking place and therefore requiring higher targets for this mature technology. Hydrogen fuel-cell road vehicles are available to markets, as well. In addition, smaller hydrogen and battery electric vessels and hydrogen fuel- cell trains are currently being deployed in different projects and in first commercial operations, with full commercial roll out expected in the next years. In contrast, the aviation and waterborne sectors continue to be dependent on liquid and gaseous fuels, as zero- and low-emission powertrain solutions are expected to enter the market only around 2030 and in particular for the aviation sector even later, with full commercialisation taking its time, therefore encouraging a technologically neutral approach to encourage maturity of developing technologies. The use of fossil gaseous or liquid fuels is only possible if it is clearly embedded into a clear decarbonisation pathway that is in line with the long-term objective of climate neutrality in the Union, is endorsed by a Cost-Benefit Analysis (CAB) and ensures it is the Best Alternative Technology (BAT), requiring increasing blending with or replacement by renewable fuels such as bio-methane, advanced biofuels or renewable and low- carbon synthetic gaseous and liquid fuels as soon as possible.
Amendment 196 #
Proposal for a regulation
Article 3 – paragraph 1 a (new)
Article 3 – paragraph 1 a (new)
1 a. at least one recharging station at recharging pool in urban areas and along TEN-T core and TEN-T comprehensive network is dedicated to light commercial vehicles with a trailer, taking into account their special demands relating to the amount of cargo space used by such vehicles;
Amendment 199 #
Proposal for a regulation
Article 3 – paragraph 2 – point a – introductory part
Article 3 – paragraph 2 – point a – introductory part
(a) along the TEN-T core and comprehensive network, publicly accessible recharging pools dedicated to light-duty vehicles and meeting the following requirements are deployed in each direction of travel with a maximum distance of 60 km in-between them:
Amendment 203 #
Proposal for a regulation
Article 3 – paragraph 2 – point a – point i
Article 3 – paragraph 2 – point a – point i
(i) by 31 December 2025, each recharging pool shall offer a power output of at least 3600 kW and include at least one recharging station with an individual power output of at least 150 300kW;
Amendment 205 #
Proposal for a regulation
Article 3 – paragraph 2 – point a – point ii
Article 3 – paragraph 2 – point a – point ii
(ii) by 31 December 2030, each recharging pool shall offer a power output of at least 61200 kW and include at least two recharging stations with an individual power output of at least 150 300kW;
Amendment 207 #
Proposal for a regulation
Article 3 – paragraph 2 – point b
Article 3 – paragraph 2 – point b
Amendment 208 #
Proposal for a regulation
Recital 9
Recital 9
(9) The deployment of publicly accessible recharging infrastructure for light-duty electric vehicles has been uneven across the Union and across regions. Continued uneven distribution would jeopardize the uptake of such vehicles, limiting connectivity across the Union. Continuing divergence in policy ambitions and approaches at national level will not create the long-term certainty needed for substantive market investment. Mandatory minimum targets for Member States at national level should therefore provide policy orientations and complement National Policy Frameworks. That approach should combine national fleet based targets with distance-based targets for the trans-European network for transport (TEN-T). National fleet based targets should ensure that vehicle uptake in each Member State is matched with the deployment of sufficient publicly accessible recharging infrastructure while allowing for the market to self regulate once a certain penetration of electric vehicles has been reached. Distance-based targets for the TEN-T network should ensure full coverage of electric recharging points along the Union’s main road networks and thereby ensure easy and seamless travel throughout the Union. This targets shall be complemented with additional recharging infrastructure across all regions to ensure an even deployment across all territory, including in depopulated or sparseley populated areas.
Amendment 213 #
Proposal for a regulation
Recital 9 a (new)
Recital 9 a (new)
(9 a) While recognizing the importance of private investment and a market driven deployment of alternative fuels infrastructure, public investment and further state aid rules flexibility is encouraged to guarantee an even distribution across all regions, especially in sparseley populated and depopulated areas
Amendment 213 #
Proposal for a regulation
Article 3 – paragraph 3 a (new)
Article 3 – paragraph 3 a (new)
3 a. Commercial buildings with public parking facilities with more than 10 parking spaces for light duty vehicles, shall equip at least 15% of their parking spaces with publicly accessible recharging points by 31 December 2025;
Amendment 214 #
Proposal for a regulation
Article 3 – paragraph 3 b (new)
Article 3 – paragraph 3 b (new)
3 b. 3 b. The Commission should review, if necessary, the targets set in this regulation for electric recharging infrastructure dedicated to light-duty vehicles to align them with the requirements set in the Regulation on the CO2 emission standards for light-duty vehicles.
Amendment 219 #
Proposal for a regulation
Article 4 – paragraph 1 – point a – introductory part
Article 4 – paragraph 1 – point a – introductory part
(a) along the TEN-T core network, publicly accessible recharging pools dedicated to heavy-duty vehicles and meeting the following requirements are deployed in each direction of travel with a maximum distance of 60 km in-between them, considering local conditions:
Amendment 221 #
Proposal for a regulation
Article 4 – paragraph 1 – point a – point i
Article 4 – paragraph 1 – point a – point i
(i) by 31 DecemberJuly 2025, each recharging pool shall offer a power output of at least 145000 kW and include at least onefour recharging stations with an individual power output of at least 350 kW and at least four recharging stations with an individual power output of at least 800 kW;
Amendment 222 #
Proposal for a regulation
Recital 11
Recital 11
(11) Implementation in Member States should ensure that a sufficient number of publicly accessible recharging points is installed, in particular at public transport stations, such as port passenger terminals, airports or railway stations and support multimodal travel. A sufficient number of publicly accessible fast recharging points dedicated to light-duty vehicles should also be deployed to increase consumer convenience in particular across the TEN-T network to ensure full cross-border connectivity and allow electric vehicles to circulate throughout the Union.
Amendment 228 #
Proposal for a regulation
Article 4 – paragraph 1 – point a – point ii
Article 4 – paragraph 1 – point a – point ii
(ii) by 31 DecemberJuly 2030, each recharging pool shall offer a power output of at least 36500 kW and include at least twofour recharging stations with an individual power output of at least 351200 kW;
Amendment 229 #
Proposal for a regulation
Article 4 – paragraph 1 – point b – introductory part
Article 4 – paragraph 1 – point b – introductory part
(b) along the TEN-T comprehensive network, publicly accessible recharging pools dedicated to heavy-duty vehicles and meeting the following requirements are deployed in each direction of travel with a maximum distance of 100 km in-between them, considering local conditions:
Amendment 233 #
Proposal for a regulation
Article 4 – paragraph 1 – point b – point i
Article 4 – paragraph 1 – point b – point i
(i) by 31 DecemberJuly 203027, each recharging pool shall offer a power output of at least 1400 kW and include at least onetwo recharging stations with an individual power output of at least 350 kW;
Amendment 236 #
Proposal for a regulation
Recital 21 a (new)
Recital 21 a (new)
(21 a) The possibility of bidirectional charging at both private and publicly accessible infrastructure can be an incentive to encourage people to purchase electric vehicles, as they can then be used for mobility as well as energy storage. Therefore, incentives are encouraged to ensure a sufficient number of private and publicly accessible charging stations that allow for smart, bidirectional charging (V2G).
Amendment 237 #
Proposal for a regulation
Article 4 – paragraph 1 – point b – point ii
Article 4 – paragraph 1 – point b – point ii
(ii) by 1 DecemberJuly 20350, each recharging pool shall offer a power output of at least 35000 kW and include at least two recharging stations with an individual power output of at least 350 800kW;
Amendment 238 #
Proposal for a regulation
Recital 25 a (new)
Recital 25 a (new)
(25 a) To ensure the security and stability of the network of recharging points across the Union, operators of digitally connected recharging points should comply with minimum cybersecurity rules as laid down in Directive of the European Parliament and of the Council on measures for a high common level of cybersecurity across the Union, repealing Directive (EU) 2016/1148.
Amendment 238 #
Proposal for a regulation
Article 4 – paragraph 1 – point b – point ii a (new)
Article 4 – paragraph 1 – point b – point ii a (new)
Amendment 241 #
Proposal for a regulation
Article 4 – paragraph 1 – point c
Article 4 – paragraph 1 – point c
(c) by 31 December 203025, in each safe and secure parking area at least one recharging station dedicated to heavy-duty vehicles with a power output of at least 100 kW is installed;
Amendment 249 #
Proposal for a regulation
Recital 32 a (new)
Recital 32 a (new)
(32 a) Given the cost and complexity associated with the roll-out of shore-side electricity in maritime ports, it is essential to prioritise the investments, particularly where it makes the most sense in terms of geographic location, emissions reduction and economic viability taking into account frequency of use, regularity of calls and availability of grid capacity;
Amendment 251 #
Proposal for a regulation
Article 4 – paragraph 2 a (new)
Article 4 – paragraph 2 a (new)
2 a. The Commission should review, if necessary, the targets set in this Regulation for electric recharging infrastructure dedicated to heavy-duty vehicles to align them with the new requirements set in the updated regulation EU 2019/1242 on the CO2 emission standards for heavy-duty vehicles.
Amendment 255 #
Proposal for a regulation
Recital 33
Recital 33
(33) Container ships, especially larger container vessels exceeding 366 meters, and passenger ships, being the ship categories which are producing the highest amount of emissions per ship at berth, should as a priority be provided with shore- side electricity supply. In order to take into account power demand characteristics while at berth of different passenger ships, as well as port operational characteristics, it is necessary to distinguish between the passenger ship requirements for ro-ro passenger ships and high speed passenger vessels, and those for othershore-side electricity (SSE) requirements for cruise ships and those for the other passenger ships, namely ferries, ro-ro passenger ships and high speed passenger shipvessels.
Amendment 257 #
Proposal for a regulation
Recital 34
Recital 34
(34) These targets should take into account the types of vessels served and their respective traffic volumes. Maritime ports with low traffic volumes of certain ship categories, should be exempted from the mandatory requirements for the corresponding ship categories based on a minimum level of traffic volume, so as to avoid underused capacity being installed. Similarly, the mandatory targets should not aim to target maximum demand, but a sufficiently high volume, in order to avoid underused capacity and to take account of port operational characteristics. Maritime transport is an important link for the cohesion and economic development of islands in the Union. Energy production capacity in these islands may not always be sufficient to account for the power demand required to support the provision of shore- side electricity supply. In such a case islands should be exempted from this requirement unless and until such ansufficient electrical connectionsupply with the mainland has been completed or there is a sufficient locally generated capacity from clean energy sources. In this regard, terminals that only occasionally receive ship segments falling under the scope of the Regulation should be exempted from OPS/SSE infrastructure investments.
Amendment 275 #
Proposal for a regulation
Article 2 – paragraph 1 – point 66 a (new)
Article 2 – paragraph 1 – point 66 a (new)
(66a) ‚payment card‘ means a payment service that works on the basis of a physical or digital debit or credit card and comprises payment cards embedded in a smartphone application.
Amendment 276 #
Proposal for a regulation
Article 2 – paragraph 1 – point 66 b (new)
Article 2 – paragraph 1 – point 66 b (new)
(66b) ‚payment service’ means a payment service as defined in Article 4(3) of Directive (EU) 2015/2366.
Amendment 280 #
Proposal for a regulation
Recital 52
Recital 52
(52) In the application of this Regulation, the Commission should consult relevant expert groups and stakeholders, and in particular the Sustainable Transport Forum (‘STF’) and the European Sustainable Shipping Forum (‘ESSF’). Such expert consultation is of particular importance when the Commission intends to adopt delegated or implementing acts under this Regulation.
Amendment 284 #
Proposal for a regulation
Recital 54
Recital 54
(54) The market for alternative fuels and in particular for zero emission fuels is still in the early stages of development and technology is evolving fast. This should likely affect the demand for alternative fuels and consequently for alternative fuels infrastructure across the modes. The Commission should therefore, based on an analysis of the latest technological developments and market readiness and taking into consideration the national policy frameworks, review this Regulation by the end of 2026 in particular as regards the targets setting for electric recharging points for HDV as well as targets for infrastructure for alternative fuels for zero- emission vessels and aircraft in waterborne transport and aviation, in order to ensure legal certainty and predictability for the industry.
Amendment 294 #
Proposal for a regulation
Article 3 – paragraph 1 – subparagraph 1 – point a
Article 3 – paragraph 1 – subparagraph 1 – point a
(a) for each battery electric light-duty vehicle registered in their territory, a total power output of at least 1 kW is provided through publicly accessible recharging stations; and if a Member State’s EV share of the total projected vehicle fleet is greater than 7.5%; and for each battery electric light-duty vehicle registered in their territory, a total power output of at least 1.5kW is provided through publicly accessible recharging stations if a Member State’s EV share of the total projected vehicle fleet is greater than 5% and below 7.5%; and for each battery electric light-duty vehicle registered in their territory, a total power output of at least 2 kW is provided through publicly accessible recharging stations if a Member State’s EV share of the total projected vehicle fleet is greater than 2.5% and below 5%; and for each battery electric light-duty vehicle registered in their territory, a total power output of at least 2.5 kW is provided through publicly accessible recharging stations if a Member State’s EV share of the total projected vehicle fleet is greater than 1%and below 2.5%; and for each battery electric light-duty vehicle registered in their territory, a total power output of at least 3 kW is provided through publicly accessible recharging stations if a Member State’s EV share of the total projected vehicle fleet is below 1%;
Amendment 299 #
Proposal for a regulation
Article 9 – paragraph 3
Article 9 – paragraph 3
3. Where the maritime port of the TEN-T core network and the TEN-T comprehensive network is located on an island which is notor outermost region which is not sufficiently connected directly to the electricity grid, paragraph 1 shall not apply, until such a connection has been completed or there is a sufficient locally generated capacity from clean energy sources.
Amendment 313 #
Proposal for a regulation
Article 3 – paragraph 1 – subparagraph 1 – point b a (new)
Article 3 – paragraph 1 – subparagraph 1 – point b a (new)
(ba) without prejudice to points a - b of this Article, Member States shall ensure the deployment of a minimum amount of recharging infrastructure at national level that is sufficient for - 2% of electric vehicles in the total projected vehicle fleet by 31 December 2025; - 5% of electric vehicles in the total projected vehicle fleet by 31 December 2027; - 10% of electric vehicles in the total projected vehicle fleet by 31 December 2030
Amendment 315 #
Proposal for a regulation
Article 2 – paragraph 1 – point 57
Article 2 – paragraph 1 – point 57
(57) ‘ship at berth’ means a ship at berth as defined in Article 3, point (n) of Regulation (EU) 2015/757which is securely moored at the terminal in a port falling under the jurisdiction of a Member State, where it is carrying out its main loading and unloading operations, including the time spent when not engaged in cargo operations; in case of cruise vessels, hoteling is included;
Amendment 318 #
Proposal for a regulation
Article 3 – paragraph 1 – indent 2 a (new)
Article 3 – paragraph 1 – indent 2 a (new)
- a sufficient number of publicly accessible recharging stations for light- duty vehicles is enabled for smart and bi- directional charging.
Amendment 320 #
Proposal for a regulation
Article 2 – paragraph 1 – point 58
Article 2 – paragraph 1 – point 58
(58) ‘shore-side electricity supply at berth’ means the provision of shore-side electrical power through a standardised interface to seagoing ships or inland waterway vessels at berth;through a fixed, floating, or mobile installation.
Amendment 322 #
Proposal for a regulation
Article 2 – paragraph 1 – point 66 a (new)
Article 2 – paragraph 1 – point 66 a (new)
(66 a) "payment card" means a payment service that works on the basis of a physical or digital debit or credit card and comprises payment cards embedded in a smartphone application.
Amendment 323 #
Proposal for a regulation
Article 2 – paragraph 1 – point 66 b (new)
Article 2 – paragraph 1 – point 66 b (new)
Amendment 327 #
Proposal for a regulation
Article 3 – paragraph 1 – indent 2 a (new)
Article 3 – paragraph 1 – indent 2 a (new)
- a sufficient number of publicly accessible recharging stations for light- duty vehicles is enabledfor smart and bi- directional charging.
Amendment 330 #
Proposal for a regulation
Article 3 – paragraph 1 – subparagraph 1 – point a
Article 3 – paragraph 1 – subparagraph 1 – point a
(a) for each battery electric light-duty vehicle registered in their territory, a total power output of at least 1 kW is provided through publicly accessible recharging stations; and if a Member State’s EV share of the total projected vehicle fleet is greater than 10%; and for each battery electric light-duty vehicle registered in their territory, a total power output of at least 1.5kW is provided through publicly accessible recharging stations if a Member State’s EV share of the total projected vehicle fleet is greater than 7.5% and below 10%; and for each battery electric light-duty vehicle registered in their territory, a total power output of at least 2 kW is provided through publicly accessible recharging stations if a Member State’s EV share of the total projected vehicle fleet is greater than 5% and below 7.5%; and for each battery electric light-duty vehicle registered in their territory, a total power output of at least 2.5 kW is provided through publicly accessible recharging stations if a Member State’s EV share of the total projected vehicle fleet is greater than 2.5% and below 5%; and for each battery electric light-duty vehicle registered in their territory, a total power output of at least 3 kW is provided through publicly accessible recharging stations if a Member State’s EV share of the total projected vehicle fleet is below 2.5%;
Amendment 334 #
Proposal for a regulation
Article 3 – paragraph 1 – subparagraph 1 – point b
Article 3 – paragraph 1 – subparagraph 1 – point b
(b) for each plug-in hybrid light-duty vehicle registered in their territory, a total power output of at least 0.661,5 kW is provided through publicly accessible recharging stations.
Amendment 337 #
Proposal for a regulation
Article 3 – paragraph 1 a (new)
Article 3 – paragraph 1 a (new)
1 a. at least one recharging station at recharging pool in urban areas and along TEN-T core and TEN-T comprehensive network is dedicated to light commercial vehicles with a trailer, taking into account their special demands relating to the amount of cargo space used by such vehicles;
Amendment 340 #
Proposal for a regulation
Article 3 – paragraph 2 – point a – introductory part
Article 3 – paragraph 2 – point a – introductory part
(a) along the TEN-T core and comprehensive network, publicly accessible recharging pools dedicated to light-duty vehicles and meeting the following requirements are deployed in each direction of travel with a maximum distance of 60 km in-between them:
Amendment 347 #
Proposal for a regulation
Article 3 – paragraph 2 – point a – point i
Article 3 – paragraph 2 – point a – point i
(i) by 31 December 2025, each recharging pool shall offer a power output of at least 3600 kW and include at least one recharging station with an individual power output of at least 150 300kW;
Amendment 350 #
Proposal for a regulation
Article 3 – paragraph 2 – point a – point ii
Article 3 – paragraph 2 – point a – point ii
(ii) by 31 December 2030, each recharging pool shall offer a power output of at least 61200 kW and include at least two recharging stations with an individual power output of at least 150 300kW;
Amendment 351 #
Proposal for a regulation
Article 3 – paragraph 2 – point b
Article 3 – paragraph 2 – point b
Amendment 362 #
Proposal for a regulation
Article 3 – paragraph 3 a (new)
Article 3 – paragraph 3 a (new)
3a. Where a recharging pool is serving both light- and heavy-duty vehicles, the recharging pool and the recharging stations within shall be regarded as publicly accessible recharging infrastructure for both light-duty and heavy-duty road vehicles, provided that the total installed capacity and type of chargers are as required for both light- and heavy-duty vehicles.
Amendment 366 #
Proposal for a regulation
Article 3 – paragraph 3 a (new)
Article 3 – paragraph 3 a (new)
3a. Commercial buildings with public parking facilities with more than 10 parking spaces for light duty vehicles, shall equip at least 15% of their parking spaces with publicly accessible recharging points by 31 December 2025.
Amendment 369 #
Proposal for a regulation
Article 3 – paragraph 3 a (new)
Article 3 – paragraph 3 a (new)
3 a. commercial buildings with public parking facilities with more than 10 parking spaces for light duty vehicles, shall equip at least 15% of their parking spaces with publicly accessible recharging points by 31 December 2025;
Amendment 370 #
Proposal for a regulation
Article 3 – paragraph 3 b (new)
Article 3 – paragraph 3 b (new)
Amendment 379 #
Proposal for a regulation
Article 4 – paragraph 1 – point a – introductory part
Article 4 – paragraph 1 – point a – introductory part
(a) along the TEN-T core network, publicly accessible recharging pools dedicated to heavy-duty vehicles and meeting the following requirements are deployed in each direction of travel with a maximum distance of 60 km in-between them, considering local conditions:
Amendment 381 #
Proposal for a regulation
Article 4 – paragraph 1 – point a – point i
Article 4 – paragraph 1 – point a – point i
(i) by 31 DecemberJuly 2025, each recharging pool shall offer a power output of at least 145000 kW and include at least onefour recharging stations with an individual power output of at least 350 kW and at least four recharging stations with an individual power output of at least 800 kW;
Amendment 382 #
Proposal for a regulation
Article 4 – paragraph 1 – point a – point i
Article 4 – paragraph 1 – point a – point i
(i) by 31 December 2025, each recharging pool shall offer a power output of at least 142000 kW and include at least onetwo recharging stations with an individual power output of at least 350 kW;
Amendment 391 #
Proposal for a regulation
Article 4 – paragraph 1 – point a – point ii
Article 4 – paragraph 1 – point a – point ii
(ii) by 31 DecemberJuly 2030, each recharging pool shall offer a power output of at least 36500 kW and include at least two four recharging stations with an individual power output of at least 351200 kW;
Amendment 393 #
Proposal for a regulation
Article 4 – paragraph 1 – point b – introductory part
Article 4 – paragraph 1 – point b – introductory part
(b) along the TEN-T comprehensive network, publicly accessible recharging pools dedicated to heavy-duty vehicles and meeting the following requirements are deployed in each direction of travel with a maximum distance of 100 km in-between them, considering local conditions:
Amendment 394 #
Proposal for a regulation
Article 4 – paragraph 1 – point a – point ii
Article 4 – paragraph 1 – point a – point ii
(ii) by 31 December 2030, each recharging pool shall offer a power output of at least 3500 kW and include at least two recharging stations with an individual power output of at least 3750 kW;
Amendment 398 #
Proposal for a regulation
Article 4 – paragraph 1 – point b – introductory part
Article 4 – paragraph 1 – point b – introductory part
(b) along the TEN-T comprehensive network, publicly accessible recharging pools dedicated to heavy-duty vehicles and meeting the following requirements are deployed in each direction of travel with a maximum distance of 1060 km in-between them:
Amendment 399 #
Proposal for a regulation
Article 4 – paragraph 1 – point b – point i
Article 4 – paragraph 1 – point b – point i
(i) by 31 DecemberJuly 203027, each recharging pool shall offer a power output of at least 1400 kW and include at least onetwo recharging stations with an individual power output of at least 350 kW;
Amendment 401 #
Proposal for a regulation
Article 4 – paragraph 1 – point b – point i
Article 4 – paragraph 1 – point b – point i
(i) by 31 December 2030, each recharging pool shall offer a power output of at least 142000 kW and include at least onetwo recharging station with an individual power output of at least 350 kW;
Amendment 404 #
Proposal for a regulation
Article 4 – paragraph 1 – point b – point ii
Article 4 – paragraph 1 – point b – point ii
(ii) by 1 DecemberJuly 20350, each recharging pool shall offer a power output of at least 35000 kW and include at least two recharging stations with an individual power output of at least 35800 kW;
Amendment 406 #
Proposal for a regulation
Article 4 – paragraph 1 – point b – point ii a (new)
Article 4 – paragraph 1 – point b – point ii a (new)
(ii a) by 1 July 2035, each recharging pool shall offer a power output of at least 5000 kW and include at least two recharging stations with an individual power output of at least 1200 kW;
Amendment 408 #
Proposal for a regulation
Article 4 – paragraph 1 – point c
Article 4 – paragraph 1 – point c
(c) by 31 December 203025, in each safe and secure parking area at least one recharging station dedicated to heavy-duty vehicles with a power output of at least 100 kW is installed;
Amendment 411 #
Proposal for a regulation
Article 4 – paragraph 1 – point c a (new)
Article 4 – paragraph 1 – point c a (new)
(c a) by 31 December 2030, in each safe and secure parking area at least four recharging station dedicated to heavy- duty vehicles with a power output of at least 100 kW is installed;
Amendment 413 #
Proposal for a regulation
Article 4 – paragraph 1 – point b – point ii
Article 4 – paragraph 1 – point b – point ii
(ii) by 1 December 2035, each recharging pool shall offer a power output of at least 3500 kW and include at least two recharging stations with an individual power output of at least 3750 kW;
Amendment 423 #
Proposal for a regulation
Article 4 – paragraph 2 a (new)
Article 4 – paragraph 2 a (new)
2 a. The Commission should review, if necessary, the targets set in this Regulation for electric recharging infrastructure dedicated to heavy-duty vehicles to align them with the new requirements set in the updated regulation EU 2019/1242 on the CO2 emission standards for heavy-duty vehicles.
Amendment 432 #
Proposal for a regulation
Article 4 – paragraph 1 – point e
Article 4 – paragraph 1 – point e
(e) by 31 December 2030, in each urban node publicly accessible recharging points dedicated to heavy-duty vehicles providing an aggregated power output of at least 12600 kW are deployed, provided by recharging stations with an individual power output of at least 150 kW.
Amendment 438 #
Proposal for a regulation
Article 4 – paragraph 2 – subparagraph 1 (new)
Article 4 – paragraph 2 – subparagraph 1 (new)
The Commission should review, if necessary, the targets set in this regulation for electric recharging infrastructure dedicated to heavy-duty vehicles to align them with the new requirements set in the updated regulation EU 2019/1242 on the CO2 emission standards for heavy-duty vehicles.
Amendment 443 #
Proposal for a regulation
Article 5 – paragraph 2 – introductory part
Article 5 – paragraph 2 – introductory part
2. Operators of recharging points shall, at the publicly accessible recharging points operated by them and deployed from the date referred to in Article 24, provide end users with the possibility to recharge their electric vehicle on an ad hoc basis using a payment instrument that is widely used in the Union. To that end: they shall accept electronic payments through terminals and devices used for payment services, at least via payment cards;
Amendment 447 #
Proposal for a regulation
Article 5 – paragraph 2 – point a
Article 5 – paragraph 2 – point a
Amendment 452 #
Proposal for a regulation
Article 5 – paragraph 2 – point a – point i
Article 5 – paragraph 2 – point a – point i
Amendment 454 #
Proposal for a regulation
Article 5 – paragraph 2 – point a – point ii
Article 5 – paragraph 2 – point a – point ii
Amendment 457 #
Proposal for a regulation
Article 5 – paragraph 2 – point a – point iii
Article 5 – paragraph 2 – point a – point iii
Amendment 461 #
Proposal for a regulation
Article 5 – paragraph 2 – point b
Article 5 – paragraph 2 – point b
Amendment 470 #
Proposal for a regulation
Article 5 – paragraph 2 – point b – point i
Article 5 – paragraph 2 – point b – point i
Amendment 474 #
Proposal for a regulation
Article 5 – paragraph 2 – point b – point ii
Article 5 – paragraph 2 – point b – point ii
Amendment 484 #
Proposal for a regulation
Article 5 – paragraph 2 – subparagraph 1
Article 5 – paragraph 2 – subparagraph 1
From 1 January 2027 onwards, operators of recharging points shall ensure that all publicly accessible recharging stations with a power output equal to or more than 50 kW operated by them comply with the requirement in point (b)aragraph 2.
Amendment 487 #
Proposal for a regulation
Article 5 – paragraph 2 – subparagraph 2
Article 5 – paragraph 2 – subparagraph 2
The requirements laid down in points (a) and (b)aragraph 2 shall not apply to publicly accessible recharging points that do not require payment for the recharging service.
Amendment 522 #
Proposal for a regulation
Article 5 – paragraph 7
Article 5 – paragraph 7
7. From the date referred to in Article 24, operators of recharging points shall ensure that all newly installed or renovated publicly accessible recharging points operated by them are digitally-connected recharging points.
Amendment 527 #
Proposal for a regulation
Article 5 – paragraph 8
Article 5 – paragraph 8
8. From the date referred to in Article 24, operators of recharging points shall ensure that all newly installed or renovated publicly accessible normal power recharging points operated by them are capable of smart recharging.
Amendment 555 #
Proposal for a regulation
Article 6 – paragraph 1 – subparagraph 2
Article 6 – paragraph 1 – subparagraph 2
They shall ensure that by 31 December 2030, at least onetwo publicly accessible hydrogen refuelling station iss are deployed in each urban node. An analysis on the best location shall be carried out for such refuelling stations that shall in particular consider the deployment of such stations in multimodal hubs where also other transport modes could be supplied.
Amendment 632 #
Proposal for a regulation
Article 10 – paragraph 1 – point b
Article 10 – paragraph 1 – point b
(b) at least one installation providing shore-side electricity supply to inland waterway vessels is deployed at all TEN-T comprehensive inland waterway ports by 1 January 203027.
Amendment 645 #
Proposal for a regulation
Article 11 a (new)
Article 11 a (new)
Article 11 a Targets for supply of renewable hydrogen and ammonia in maritime ports Member States shall ensure that an appropriate number of refuelling points for renewable hydrogen and ammonia are put in place at TEN-T core maritime ports referred to in paragraph 2, to enable seagoing ships to circulate throughout the TEN-T core network by 1 January 2025. Member States shall cooperate with neighbouring Member States where necessary to ensure adequate coverage of the TEN-T core network. Member States shall designate in their national policy frameworks TEN-T core maritime ports that shall provide access to the refuelling points for renewable hydrogen and ammonia referred to in paragraph 1, also taking into consideration actual market needs and developments.
Amendment 654 #
Proposal for a regulation
Article 12 – paragraph 2
Article 12 – paragraph 2
2. As ofBy 1 January 2030 at the latest, Member States shall take the necessary measures to ensure that the electricity supplied pursuant to paragraph 1 comes from the electricity grid or is generated on site as renewable energy.
Amendment 670 #
Proposal for a regulation
Article 13 – paragraph 1 – subparagraph 1 – point a a (new)
Article 13 – paragraph 1 – subparagraph 1 – point a a (new)
(aa) an assessment of the current state and future development of grid capacity, including the needed measures and financing;
Amendment 718 #
Proposal for a regulation
Article 13 – paragraph 5
Article 13 – paragraph 5
5. Support measures for alternative fuels infrastructure shall be aligned to climate objectives to avoid creating stranded assets and comply with the relevant State aid rules of the TFEU.
Amendment 729 #
Proposal for a regulation
Article 14 – paragraph 1
Article 14 – paragraph 1
1. Each Member State shall submit to the Commission a standalone progress report on the implementation of its national policy framework for the first time by 1 January 20275 and every two years thereafter.
Amendment 733 #
Proposal for a regulation
Article 14 – paragraph 3
Article 14 – paragraph 3