BETA

4 Amendments of Henri WEBER related to 2011/0300(COD)

Amendment 288 #
Proposal for a regulation
Article 4 – paragraph 2 – point a – introductory part
(a) concerning electricity transmission, distribution and storage projects falling under the categories set out in points 1(a) to (d) of Annex II, the project shall contribute significantly to at least one of the following specific criteria:
2012/05/08
Committee: ITRE
Amendment 688 #
Proposal for a regulation
Annex II – point 1 – point e
(e) any equipment or installation, both at transmission and medium and low voltage distribution level, aiming at two-way digital communication, real-time or close to real-time, interactive and intelligent monitoring and management of electricity generation, transmission, distribution and consumption within an electricity network in view of developing a network efficiently integrating the behaviour and actions of all users connected to it – generators, consumers and those that do both – in order to ensure an economically efficient, sustainable electricity system with low losses and high quality and security of supply and safety;
2012/05/08
Committee: ITRE
Amendment 705 #
Proposal for a regulation
Annex III – part 1 – point 1 – paragraph 1
(1) For electricity projects falling under the categories set out in point 1 of Annex II, each Group shall be composed of representatives of the Member States, national regulatory authorities, transmission and distribution system operators following their obligation to cooperate on a regional level in accordance with Article 6 of Directive 2009/72/EC and Article 12 of Regulation (EC) No 714/2009 and project promoters concerned by each of the relevant priorities designated in Annex I, as well as the Commission, the Agency and the ENTSO for Electricity.
2012/05/08
Committee: ITRE
Amendment 767 #
Proposal for a regulation
Annex IV – point 1 – point e
(e) for smart grids, the project is designed for equipments and installations at high- voltage and medium-voltage level designed for a voltage of 10kV or more, medium- and low-voltage level as defined by the applicable European standards. It involves transmission and distribution system operators from at least two Member States, which cover at least 1050,000 users that generate or consume electricity or do both in a consumption area of at least 30150 Gigawatthours/year, of which at least 20% originate from non dispatchable resources and/or distributed resources.
2012/05/08
Committee: ITRE