Activities of Florent MARCELLESI related to 2016/0379(COD)

Shadow reports (1)

REPORT on the proposal for a regulation of the European Parliament and of the Council on the internal market for electricity (recast) PDF (1 MB) DOC (264 KB)
2016/11/22
Committee: ITRE
Dossiers: 2016/0379(COD)
Documents: PDF(1 MB) DOC(264 KB)

Amendments (8)

Amendment 482 #
Proposal for a regulation
Article 11 – paragraph 1
1. Dispatching of power generation facilities and demand response shall be non-discriminatory and market based unless otherwise provided under paragraphs 2 to 4Member States shall ensure that when dispatching electricity-generating installations, transmission system operators shall give priority to generating installations using variable renewable energy sources in so far as the secure operation of the national electricity system permits and based on transparent and non-discriminatory criteria.
2017/09/25
Committee: ITRE
Amendment 495 #
Proposal for a regulation
Article 11 – paragraph 2
2. When dispatching electricity generating installations, transmission system operators shall give priority to generating installations using renewable energy sources or high-efficiency cogeneration from small generating installations or generating installations using emerging technologies to the following extent: (a) generating installations using renewable energy sources or high- efficiency cogeneration with an installed electricity capacity of less than 500 kW; or (b) demonstration projects for innovative technologies.deleted
2017/09/25
Committee: ITRE
Amendment 508 #
Proposal for a regulation
Article 11 – paragraph 2 – point a
(a) generating installations using renewable energy sources or high- efficiency cogeneration with an installed electricity capacity of less than 500 kW; ordeleted
2017/09/25
Committee: ITRE
Amendment 518 #
Proposal for a regulation
Article 11 – paragraph 2 – point b
(b) demonstration projects for innovative technologies.deleted
2017/09/25
Committee: ITRE
Amendment 532 #
Proposal for a regulation
Article 11 – paragraph 3 – subparagraph 1
Where the total capacity of generating installations subject to priority dispatch under paragraph 2 is higher than 15 % of the total installed generating capacity in a Member State, point (a) of paragraph 2 shall apply only to additional generating installations using renewable energy sources or high-efficiency cogeneration with an installed electricity capacity of less than 250 kW.deleted
2017/09/25
Committee: ITRE
Amendment 541 #
Proposal for a regulation
Article 11 – paragraph 3 – subparagraph 2
From 1 January 2026, point (a) of paragraph 2 shall apply only to generating installations using renewable energy sources or high-efficiency cogeneration with an installed electricity capacity of less than 250 kW or, if the threshold under the first sentence of this paragraph has been reached, of less than 125 kW.deleted
2017/09/25
Committee: ITRE
Amendment 543 #
Proposal for a regulation
Article 11 – paragraph 4
4. Generating installations using renewable energy sources or high- efficiency cogeneration which have been commissioned prior to [OP: entry into force] and have, when commissioned, been subject to priority dispatch under Article 15(5) of Directive 2012/27/EU of the European Parliament and of the Council or Article 16(2) of Directive 2009/28/EC of the European Parliament and of the Council35 shall remain subject to priority dispatch. Priority dispatch shall no longer be applicable from the date where the generating installation is subject to significant modifications, which shall be the case at least where a new connection agreement is required or the generation capacity is increased. _________________ 35 Directive 2009/28/EC of the European Parliament and of the Council of 23 April 2009 on the promotion of the use of energy from renewable sources and amending and subsequently repealing Directives 2001/77/EC and 2003/30/EC (OJ L 140, 5.6.2009, p. 16).deleted
2017/09/25
Committee: ITRE
Amendment 558 #
Proposal for a regulation
Article 11 – paragraph 5
5. Priority dispatch shall not endanger the secure operation of the electricity system, shall not be used as a justification for curtailment of cross- border capacities beyond what is provided for in Article 14 and shall be based on transparent and non-discriminatory criteria.deleted
2017/09/25
Committee: ITRE