BETA

Activities of Edit HERCZOG related to 2011/0043(NLE)

Shadow reports (1)

REPORT on the proposal for a Council decision concerning the specific programme, to be carried out by means of indirect actions, implementing the Framework Programme of the European Atomic Energy Community for nuclear research and training activities (2012 - 2013) PDF (183 KB) DOC (219 KB)
2016/11/22
Committee: ITRE
Dossiers: 2011/0043(NLE)
Documents: PDF(183 KB) DOC(219 KB)

Amendments (2)

Amendment 19 #
Proposal for a decision
Article 3
In accordance with Article 3 of Decision [Reference of Euratom FP Council Decision to be added when adopted], the amount deemed necessary for the execution of the specific programme is EUR 2 327 054408 809 000, of which up to 15 % shall be for the Commission's administrative expenditure. This amount is allocated as follows (in EUR): (a) fusion energy research: 2 208 809 000 (b) nuclear fission and radiation protection: 118 245200 000 000.
2011/09/19
Committee: ITRE
Amendment 32 #
Proposal for a decision
Annex – part I – section I.B – point 2 – paragraph 2
Nuclear installation safety: Operational safety of current and future nuclear installations, especially plant life assessment and management, safety culture (minimising the risk of human and organisational error), advanced safety assessment methodologies, numerical simulation tools, instrumentation and control, and prevention and mitigation of severe accidents, with associated activities to optimise knowledge management and maintain competences. Additional work to be undertaken as a consequence of the Fukushima accident should include: improved seismic resistance, redefinition of ‘beyond design basis’ accidents, analysis of common failure modes, better emergency management, avoidance of hydrogen accumulation from hot metal/steam reactions, hydrogen recombination, design of filter/scrubber systems able to withstand gas overpressure.
2011/09/19
Committee: ITRE