BETA

7 Amendments of Inés AYALA SENDER related to 2008/0015(COD)

Amendment 87 #
Proposal for a directive – amending act
Recital 7a (new)
(7a) Each of the different components of capture, transport and storage of CO2 has been the object of demonstration projects on a smaller scale than that required for their industrial application. However, they still need to be integrated into a complete CCS process, and technological costs need to be reduced. The main projects for CO2 storage which include the participation of European enterprises are the Sleipner project in the North Sea (Statoil) and the In Salah project in Algeria (Statoil, BP and Sonatrach). The large-scale pilot projects under way are the Schwartze Pumpe project in Germany (Vattenfall), the CCS project in the Lacq basin in France (Total), and the El Bierzo project in Spain (CIUDEN).
2008/07/18
Committee: ENVI
Amendment 190 #
Proposal for a directive – amending act
Article 3 - point 16
(16) 'significant irregularity' means any irregularity in the injection or storage operations or, in the condition of the site itself, which impli or in the performance of the storage complex that materially increases the risk of a leakage;
2008/07/18
Committee: ENVI
Amendment 318 #
Proposal for a directive – amending act
Article 13 – paragraph 1 – introductory part
1. Member States shall ensure that the operator carries out monitoring of the injection facilities, the storage complex (including where possible, especially the CO2 plume), and where appropriate the surrounding environment for the purpose of:
2008/07/24
Committee: ENVI
Amendment 324 #
Proposal for a directive – amending act
Article 13 – paragraph 1 – point f
(f) assessing whether the stored CO2 will be completely contained forupdating the assessment of the safety and integrity of the storage site in the short and long term based on quantitative assessment criteria to be determined in the guindeflinite futurees referred to in Article 4(3).
2008/07/24
Committee: ENVI
Amendment 328 #
Proposal for a directive – amending act
Article 15 – paragraph 3
3. Routine inspections shall be carried out at least every year in the first ten years after the injection has started and thereafter as often as deemed necessary by the competent authority. They shall examine the relevant injection and monitoring facilities as well as the full range of relevant environmental effects from the storage complex.
2008/07/24
Committee: ENVI
Amendment 329 #
Proposal for a directive – amending act
Article 16 – paragraph 1
1. Member States shall ensure that in case of significant irregularities or leakages that could have a negative impact on human health or the environment, as defined by the criteria to be determined in the guidelines referred to in Article 4(3), the operator immediately notifies the competent authority and takes the necessary corrective measures.
2008/07/24
Committee: ENVI
Amendment 423 #
Proposal for a directive – amending act
Annex I – Step 1 – introductory sentence
Sufficient data shall be accumulated to construct a volumetric and dynamic three-dimensional (3- D)- earth model for the storage site and storage complex including the caprock, and the surrounding area including the hydraulically connected areas, and sufficient data for generating the corresponding future evolution scenarios for the site. This data shall cover at least the following intrinsic complex characteristics:
2008/07/24
Committee: ENVI