BETA

Activities of Teresa RIERA MADURELL related to 2007/0195(COD)

Plenary speeches (1)

Internal market in electricity - Conditions for access to the network for cross-border exchanges in electricity - Agency for the Cooperation of Energy Regulators - Towards a European Charter on the Rights of Energy Consumers (debate)
2016/11/22
Dossiers: 2007/0195(COD)

Amendments (10)

Amendment 94 #
Proposal for a directive – amending act
Recital 3 a (new)
(3a) Ownership unbundling between companies generating and supplying electricity and undertakings that own transmission systems is essential for the installation of new renewable power in Europe.
2008/03/17
Committee: ITRE
Amendment 96 #
Proposal for a directive – amending act
Recital 3 b (new)
(3c) Given that renewable sources are continuous energy sources, it is essential to develop electricity interconnection capacity at European Union level, paying special attention to the most isolated countries and regions in the Union’s energy market, in order to provide the Member States with the necessary means to achieve the objective of 20% renewable energy by 2020.
2008/03/17
Committee: ITRE
Amendment 199 #
Proposal for a directive – amending act
Article 1 – point 3
Directive 2003/54/EC
Article 5 a
Member States shall cooperate among themselves for the purpose of integrating their national markets at least at the regional level. In particular, Member States shall promote the cooperation of network operators at a regional level, and foster the consistency of their legal and regulatory framework. The geographical area covered by the regional cooperations shall be in line with the definition of geographical areas by the Commission in accordance with referred to in this article shall correspond to the geographical areas defined in Article 2h(3) of Regulation (EC) No 1228/2003 of the European Parliament and of the Council of 26 June 2003 on conditions for access to the network for cross-border exchanges in electricity, even though this cooperation may apply to other geographical areas ."
2008/03/17
Committee: ITRE
Amendment 223 #
Proposal for a directive – amending act
Article 1 – point 3 h (new)
Directive 2003/54/EC
Article 7 a (new)
(3h) The following Article shall be inserted: "Article 7a In setting their national models for the transmission system operation, Member States can choose between the following: (a) existence of one or more transmission system operators as defined in Article 8 or one or more independent system operators as defined in Article 10; (b) existence of one or more transmission system operators and one or more independent system operators." Or. en (Adding a new Article 7a to Directive 2003/54/EC)
2008/03/17
Committee: ITRE
Amendment 345 #
Proposal for a directive – amending act
Article 1 – point 11 e (new)
Directive 2003/54/EC
Article 21 – paragraph 2 a (new)
(11e) In Article 21, the following paragraph shall be added: "2a. In the event of market failures, Member States may implement necessary and proportional transitional measures for energy-intensive businesses, as defined in Article 17(1)(a) of Directive 2003/96/EC, in order to help them to adapt to a future and fully competitive framework." Or. en (Adds new paragraph 2a to article 21 of Directive 2003/54/EC)
2008/03/19
Committee: ITRE
Amendment 362 #
Proposal for a directive – amending act
Article 1 – point 12
Directive 2003/54/EC
Article 22b – title and introductory part
PolicyGeneral objectives of the regulatory authority In carrying out the regulatory tasks specified in this Directive, the regulatory authority shall take all reasonable measures to achieve the following objectives in keeping with its powers and responsibilities under Article 22c of this Directive, subject to consultation, where appropriate and without prejudice to its powers, of other relevant national authorities:
2008/03/19
Committee: ITRE
Amendment 368 #
Proposal for a directive – amending act
Article 1 – point 12
Directive 2003/54/EC
Article 22b – point (d)
(d) ensufostering the development of secure, reliable and efficient systems, promoting energy efficiency, and system adequacy, and research and innovation to meet demand and the development of innovative renewable and low carbon technologies, in both short and long term;
2008/03/19
Committee: ITRE
Amendment 507 #
Proposal for a directive – amending act
Article 1 – point 12
Directive 2003/54/EC
Article 22d - paragraph 2
2. RThe Member States’ regulatory authorities shall cooperate at least on a regional level to foster the creation of operational arrangements in order to ensure an optimal management of the network, develop joint electricity exchanges and the allocation of cross- border capacity, and to ensure a minimum level of interconnection capacity within the region to allow for effective competition to develop.
2008/03/19
Committee: ITRE
Amendment 514 #
Proposal for a directive – amending act
Article 1 – point 12
Directive 2003/54/EC
Article 22d - paragraph 3
3. The Agency shall decide upon the regulatory regime for infrastructure connecting at least two Member States: a) upon a joint request from the competent national regulatory authorities, or, b) where the competent national regulatory authorities have not been able to reach an agreement on the appropriate regulatory regime within six months from the date the file was brought before the last of these regulatory authorities.
2008/03/19
Committee: ITRE
Amendment 515 #
Proposal for a directive – amending act
Article 1 – point 12
Directive 2003/54/EC
Article 22d - paragraph 4
4. The Commission may adopt guidelines on the extent of the duties of the regulatory authorities to cooperate with each other and with the Agency, and on the situations in which the Agency becomes competent to decide upon the regulatory regime for infrastructures connecting at least two Member States. These measures, designed to amend non- essential elements of this Directive by supplementing it, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 27b(3).deleted
2008/03/19
Committee: ITRE