Amendment 19 #
Proposal for a regulation – amending act
Recital 8
(8) All market participants have an interest in the work expected of the European network of transmission system operators. The consultation process is therefore essential and existing structures that are set up to facilitate and streamline the consultation process, such as the Union for the Coordination of Transmission of Electricity (UCTE), should play an important role.deleted
2008/04/07
Committee: ITRE
Amendment 30 #
Proposal for a regulation – amending act
Article 1 – point 3
Regulation (EC) No 1228/2003
Article 2b – paragraph 1
1. By […] at the latest the transmission system operators for electricity shall submit to the Commission and to the Agency the draft of statutes, a list of future members and draft rules of procedure, including the rules of procedure on the consultation of other stakeholders, of the European Network for Transmission System Operators for Electricity to be established.
2008/04/07
Committee: ITRE
Amendment 32 #
Proposal for a regulation – amending act
Article 1 – point 3
Regulation (EC) No 1228/2003
Article 2c
1. The European Network of Transmission System Operators for Electricity shall adopt: (a) technical and marketgree and submit to the Agency for approval following the procedure provided for in Article 2d in conjunction with Article 6(3) of Regulation (EC) No … establishing the Agency for the Cooperation of Energy Regulators: (a) draft technical codes in the areas mentioned in paragraph 3; (b) common network operation tools and research plans; (c) a 10-year investment plan, including a generation adequacy outlook, every two years; (d) an annual work programme based on the priorities set by the Agency; (e) an annual report; (f) annual summer and winter generation adequacy outlooks. 2. The annual work programme referred to in paragraph 1(d) shall contain a list and description of the technical and market codes, a plan on common operation of the network and research and development activities, to be drawn up in that year and an indicative calendar. 3. The detailed technical and market codes shall cover the following areas, according to the priorities defined in the annual work programme: (a) security and reliability rules; (b) grid connection and access rules; (c) data exchange and settlement rules; (d) interoperability rules; (e) operational procedures in an emergencyincluding interoperability and procedures in emergency situations; (b) grid connection and access rules; (fc) capacity allocation and congestion management rules; (g) rules for trading; (hd) transparency rules; (ie) balancing and settlement rules including reserve power rules; (jf) rules regarding harmonised transportation tariff structures including locational signals and rules regarding inter- TSO compensation rules; (kg) energy efficiency regarding electricity networks. 4. The European Network of Transmission System Operators for Electricity shall monitor the implementation of the technical and market codes and include the results of its monitoring activities in the annual report referred to in paragraph 1(e). 5. The European Network of Transmission System Operators for Electricity shall publish a Community-wide 10-year network investment plan every two years following its approval by the Agency. The investment plan shall include the modelling of the integrated network, scenario development, a generation adequacy report and an assessment of the resilience of the system. The investment plan shall, in particular, build on national investment plans and on the Guidelines for Trans-European energy networks in accordance with Decision No 1364/2006/EC of the European Parliament and of the Council21. The investment plan shall identify investment gaps, notably with respect to cross border capacities. 6. Upon request of the Commission, the European Network of Transmission System Operators for Electricity shall advise the Commission on the adoption of Guidelines as laid down in Article 8taking into account regional and European aspects of network planning. The investment plan shall identify investment gaps, notably with respect to cross border capacities.
2008/04/07
Committee: ITRE
Amendment 63 #
Proposal for a regulation – amending act
Article 1 – point 3
Regulation (EC) No 1228/2003
Article 2 d
1. The Agency shall monitor the execution of the tasks referred to in Article 2c(1) of the European Network of Transmission System Operators for Electricity. 2. The European Network of Transmission System Operators for Electricity shall submit the draft technical and market codes, the draft 10- year investment plan and the draft annual work programme, including the information regarding the consultation process, to the Agency. The Agency may provide an opinion to for approval to the Agency. The Agency shall approve the documents referred to in Article 2c(1) as prepared by the European Networks of Transmission System Operators for Electricity within 3 months. The Agency shall provide a duly justified opinion to the Commission wmonitor the implementation of the technical codes, the 10-year investment plan and the annual work programme and include the re it considers that the draft annual work programme or the draft 10-year investment plan do not ensure non-discrimination, effective competition and the efficient functioning of the marketsults of its monitoring activities in its annual report. In case of non-compliance by the transmission system operators with the technical codes, the 10-year investment plan and the annual work programme of the European Network of Transmission System Operators for Electricity the Agency shall provide information to the Commission.
2008/04/07
Committee: ITRE
Amendment 72 #
Proposal for a regulation – amending act
Article 1 – point 3
Regulation (EC) No 1228/2003
Article 2 e
1. After consultation with all stakeholders in accordance with Article … of Regulation (EC) … establishing the Agency, for the Commission may invite the European Network of Transmission System Operators for Electricity, within a reasonable period of time, to prepare codes in the areas listed in Article 2c(3) where it considers that such codes are necessary for the efficient functioning of the market. 2. The Agency shall provide a duly justified opinion to the Commission where it considers that: (a) a technical or market code adopted by the European Network of Transmission System Operators for Electricity inoperation of Energy Regulators, the Agency shall prepare Strategic Guidelines for the European Network of Transmission System Operators for Electricity in the areas listed in Article 2c(3) and (5) which shall constitute the basis for the development of the detailed technical codes and for the 10-year investment plan, including a generation adequacy outlook. Once prepared, the Agency shall transmit the draft Strategic Guidelines to the Commission which may adopt these Strategic Guidelines in accordance with the areas listed in Article 2c(3) does not ensure non-discrimination, effective competition and the efficient functioning of the market; (b) tgulatory procedure with scrutiny referred to in Article 13(2). 1a. The European Network of Transmission System Operators for Electricity fails to agreeshall, within a reasonable period of time on a technical or marke, prepare draft codes in the areas listed in Article 2c(3); (c) the transmission system operators fail to implement a technical or market code adopted by the European Network of Transmission System Operators for Electricity in the areas listed in Article 2c(3). 3. The Commission may adopt, on its own initiative or upon recommendation of the Agency, guidelines on the areas listed in Article 2c(3) when it considers that: (a) a and a draft 10-year investment plan, including a generation adequacy outlook included in Article 2c(5) based on the Strategic Guidelines adopted by the Commission pursuant to paragraph 1. The European Network of Transmission System Operators for Electricity shall submit to the Agency for approval the draft technical codes and the draft 10-year investment plan. 1b. The Agency shall approve the draft technical codes and the draft 10-year investment plan, pursuant to Article X and Article Y of Regulation … establishing an Agency for the Cooperation of Energy Regulators. Before approving the codes and the draft 10-year investment plan, the Agency shall ensure that the detailed technical or market codes adopted by the European Network of Transmission System Operators for Electricity in the areas listed in Article 2c(3) does not ensure non-discrimination, effective competition and the efficient functioning of the market;nd the draft 10-year investment plan are in line with the Strategic Guidelines and that they ensure non-discrimination, effective competition and the efficient functioning of the market. 2. The Agency shall provide a duly justified opinion to the Commission where it considers that: (ba) the European Network of Transmission System Operators for Electricity fails to agree within a reasonable period of time on a technical or market code in the areas listed in Article 2c(3); (cb) the transmission system operators fail to implement a technical or market code adoptcode prepared by the European Network of Transmission System Operators for Electricity in the areas listed in Article 2c(3) and approved by the Agency in accordance with paragraph 1b. 2a. The Commission may adopt upon recommendation of the Agency guidelines on the market codes. Those measures designed to amend non- essential elements of this Regulation by supplementing it shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 13(2). 42b. Paragraph 32a shall beapply without prejudice to the Commission's right to adopt and amend guidelines as laid down in Article 8.
2008/04/07
Committee: ITRE
Amendment 90 #
Proposal for a regulation – amending act
Article 1 – point 3
Regulation (EC) No 1228/2003
Article 2 f
1. In carrying out its tasks, the European Network of Transmission System Operators for Electricity shall consult extensively, at an early stage and in an open and transparent manner, in particular while preparing the technical and market codes and its annual work programme referred to in Article 2c(1) and (3), with all appropriate market participants; the consultation shall include supply and generation undertakings, customers, system users, distribution system operators, including relevant (industry) associations, technical bodies and stakeholder platforms. 2. All documents and minutes of meetings related to the issues referred to in paragraph 1 shall be made public. 3. Before adopting the annual work programme and the technical and market codes referred to in Article 2c(1) and (3), the European Network of Transmission System Operators for Electricity shall indicate the observations received in the consultation and how these observations have been taken into consideration. It shall provide reasons where observations have not been taken into account.Article 2 f deleted Consultations
2008/04/07
Committee: ITRE
Amendment 97 #
Proposal for a regulation – amending act
Article 1 – point 3
Regulation (EC) No 1228/2003
Article 2 g
The costs related with the activities of the European Network of Transmission System Operators for Electricity mentioned in Articles 2a to 2h shall be borne by the transmission system operators and shall be taken into account in the calculation of tariffs. Regulatory authorities shall approve these costs only if they are reasonable and proportionate.
2008/04/07
Committee: ITRE
Amendment 111 #
Proposal for a regulation – amending act
Article 1 – point 4 a (new)
Regulation (EC) No 1228/2003
Article 6 – paragraph 1 a (new)
(4a) In Article 6, the following paragraph 1a is inserted: "1a. The regulatory authorities shall monitor congestion management within national electricity systems and interconnectors. Transmission system operators shall submit their congestion management procedures including capacity allocation for approval to regulatory authorities. Regulatory authorities may request amendments to these rules before approving them." Or. en (Adds new paragraph 1a to Article 6 of Regulation 1228/2003/EC)
2008/04/07
Committee: ITRE
Amendment 150 #
Proposal for a regulation – amending act
Article 1 – point 8
Regulation (EC) No 1228/2003
Article 8 – paragraph 3 a (new)
3a.. Where appropriate and after a proposal by the Agency following Article 2e(1), the Commission may adopt Strategic Guidelines in the areas listed in Article 2c(3) and (5) as a basis for the European Network of Transmission System Operators for Electricity to develop the detailed draft technical codes referred to in Article 2c(3) and the draft 10-year investment plan referred to in Article 2c(5).
2008/04/07
Committee: ITRE