10 Amendments of Joel HASSE FERREIRA related to 2007/0198(COD)

Amendment 15 #
Proposal for a regulation – amending act
Recital 3
(3) However, at present, the right to sell electricity in any Member State on equal terms, without discrimination or disadvantage cannot yet be guaranteed to any company in the Community. In particular, non-discriminatory network access and an equally effective level of regulatory supervision in each Member State do not yet exist.
2008/03/26
Committee: IMCO
Amendment 16 #
Proposal for a regulation – amending act
Recital 6
(6) In particular, increased cooperation and coordination among transmission system operators is required to ensure progressive compatibility of the technical and commercial codes for providing and managing effective access to the transmission networks across borders, and to ensure coordinated and sufficiently forward looking planning and sound technical evolution of the transmission system in the Community, with due regard to the environment, and to promote energy efficiency and research and innovation notably with respect to ensuring penetration of renewables and dissemination of low carbon technology. Transmission system operators should operate their networks according to these compatible technical and market codes.
2008/03/26
Committee: IMCO
Amendment 18 #
Proposal for a regulation – amending act
Recital 7
(7) In order to ensure an optimal management of the electricity transmission network and to allow trading and supplying electricity to retail customers across borders in the Community a European network of the transmission system operators should be established. Its tasks should be carried out in compliance with Community competition rules which remain applicable to the decisions of the European network of the transmission system operators. Its tasks should be well- defined and their working method should be such as to ensure efficiency, representativity and transparency. Given that more effective progress may be achieved through an approach at regional level, transmission system operators should set up regional structures within the overall cooperation structure, whilst ensuring that results at regional level are compatible with codes and investment plans at Community level. Cooperation within such regional structures presupposes effective unbundling of network activities from production and supply activities in the absence of which regional cooperation between transmission system operators gives rise to a risk of anti-competitive conduct. Member States should promote cooperation at regional level, and monitor the effectiveness of the network at that level. Cooperation at regional level should be compatible with progress towards a competitive and efficient European electricity market.
2008/03/26
Committee: IMCO
Amendment 21 #
Proposal for a regulation – amending act
Recital 8 b (new)
(8b) To ensure greater transparency of the situation regarding the entire electricity transmission network in Europe, the Commission should draw up, publish and update a road map for the electricity network in Europe. All feasible electricity transmission networks and possible regional connections should be included in this road map.
2008/03/26
Committee: IMCO
Amendment 25 #
Proposal for a regulation – amending act
Article 1 – point 3
Regulation (EC) n° 1228/2003
Article 2c – paragraph 5
5. The European Network of Transmission System Operators for Electricity shall publish a Community-wide 10-year network investment plan every two years. The investment plan shall include the modelling of the integrated network, scenario development, a generation adequacy report and an assessment of the resilience of the system. The investment plan shall, in particular, build on national investment plans and on the Guidelines for Trans-European energy networks in accordance with Decision No 1364/2006/EC of the European Parliament and of the Council. The investment plan shall identify investment gaps, notably with respect to cross border capacities. The investment plan shall be linked to a strategic energy scenario for the next 20 to 25 years.
2008/03/26
Committee: IMCO
Amendment 26 #
Proposal for a regulation – amending act
Article 1 – point 3
Regulation (EC) n° 1228/2003
Article 2d – paragraph 2
2. The European Network of Transmission System Operators for Electricity shall submit the draftits opinions and recommendations on the technical and market codes, the draft 10- year investment plan and the draft annual work programme, including the information regarding the consultation process, to the Agency.
2008/03/26
Committee: IMCO
Amendment 27 #
Proposal for a regulation – amending act
Article 1 – point 3
Regulation (EC) n° 1228/2003
Article 2e – paragraph 1
1. After consulting the Agency, the Commission may invite the European Network of Transmission System Operators for Electricity, the Commission may invite the Agency, within a reasonable period of time, to prepare codes in the areas listed in Article 2c(3) where it considers that such codes are necessary for the efficient functioning of the market.
2008/03/26
Committee: IMCO
Amendment 28 #
Proposal for a regulation – amending act
Article 1 – point 3
Regulation (EC) n° 1228/2003
Article 2f – paragraph 1
1. In carrying out its tasks, the European Network of Transmission System Operators for Electricity shall consult extensively, at an early stage and in an open and transparent manner, in particular while preparing the technical and market codes and its annual work programme referred to in Article 2c(1) and (3), with all appropriate market participants; the consultation shall include supply and generation undertakings, customers, system users, distribution system operators, including relevant (industry) associations, technical bodies and stakeholder platforms.
2008/03/26
Committee: IMCO
Amendment 29 #
Proposal for a regulation – amending act
Article 1 – point 4
Regulation (EC) n° 1228/2003
Article 5 – paragraph 6
6. Generation companies which own or operate generation assets, of which one has an installed capacity of at least 250 MW, shall keep at the disposal of the national regulatory authority, the national competition authority, the Agency and the Commission, for five years all hourly data per plant that is necessary to verify all operational dispatching decisions and the bidding behaviour at power exchanges, interconnection auctions, reserve markets and OTC markets. The per plant and per hour information to be stored includes, but is not limited to, data on available generation capacity and committed reserves, including allocation of these committed reserves on a per plant level, at the time the bidding is carried out and when production takes place.
2008/03/26
Committee: IMCO
Amendment 30 #
Proposal for a regulation – amending act
Article 1 – point 7
Regulation (EC) n° 1228/2003
Article 7a – paragraph 1
In order to facilitate the emergence of well functioning and transparent cross-border retail markets on a regional and Community scale, Member States shall ensure that the roles and responsibilities of transmission system operators, distribution system operators, supply undertakings and customers and if necessary other market participants are thoroughly defined with respect to contractual arrangements, commitment to customers, data exchange and settlement rules, data ownership and metering responsibility.
2008/03/26
Committee: IMCO