BETA

Activities of Silvia-Adriana ȚICĂU related to 2007/0198(COD)

Plenary speeches (2)

Common rules for the internal market in electricity - Agency for the Cooperation of Energy Regulators - Access to the network: cross-border exchanges in electricity - Internal market in natural gas - Conditions for access to the natural gas transmission networks - Fuel efficiency: labelling of tyres - The energy performance of buildings (debate)
2016/11/22
Dossiers: 2007/0198(COD)
Common rules for the internal market in electricity - Agency for the Cooperation of Energy Regulators - Access to the network: cross-border exchanges in electricity - Internal market in natural gas - Conditions for access to the natural gas transmission networks - Fuel efficiency: labelling of tyres - The energy performance of buildings (debate)
2016/11/22
Dossiers: 2007/0198(COD)

Amendments (3)

Amendment 21 #
Proposal for a regulation – amending act
Recital 10
(10) Equal access to information on the physical status and efficiency of the system is necessary to enable all market participants to assess the overall demand and supply situation and identify the reasons for movements in the wholesale price. This includes more precise information on electricity generation, supply and demand, network capacity, flows and maintenance, balancing and reserve capacity.
2008/04/07
Committee: ITRE
Amendment 105 #
Proposal for a regulation – amending act
Article 1 – point 3
Regulation (EC) No 1228/2003
Article 2 h – paragraph 3 – subparagraph 1
3. The geographical area covered by each regional cooperation structure may be defined by the Commission only after consultation of the Member States within that geographical area. That measure, designed to amend non-essential elements of this Regulation by supplementing it, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 13(2)...
2008/04/07
Committee: ITRE
Amendment 130 #
Proposal for a regulation – amending act
Article 1 – point 6
Regulation (EC) No 1228/2003
Article 7 – paragraph 6 – subparagraph 4
The Commission's approval of an exemption decision shall lose its effect after twohree years from its adoption if construction of the interconnector has not yet started, and after fiseven years if the interconnector has not become operational.
2008/04/07
Committee: ITRE