Activities of Silvia-Adriana ȚICĂU related to 2009/0106(CNS)

Plenary speeches (1)

Investment projects in energy infrastructure within the European Community (debate)
2016/11/22
Dossiers: 2009/0106(CNS)

Amendments (11)

Amendment 50 #
Proposal for a regulation
Article 1 – paragraph 1
1. This Regulation establishes a common framework for the notification to the Commission of data and information both on investment projects implemented within the European Union and on those implemented by European companies in third countries, in energy infrastructure in the oil, natural gas, electricity and bio- fuel sectors, and on investment projects related to carbon dioxide produced by these sectors.
2009/12/15
Committee: ITRE
Amendment 56 #
Proposal for a regulation
Article 2 – point 2 – point c a (new)
(ca) renovating and dispatching for natural gas and crude oil pipeline systems, building real time data acquisition and control systems, constructing and implementing systems for increasing the security of natural gas supply;
2009/12/15
Committee: ITRE
Amendment 57 #
Proposal for a regulation
Article 2 – point 2 – point c b (new)
(cb) developing new interconnections with energy transport systems between the European Union and neighbouring countries;
2009/12/15
Committee: ITRE
Amendment 76 #
Proposal for a regulation
Article 3 – paragraph 1 – subparagraph 1
1. While keeping the collection and reporting burden proportionate, Member States or the entity they delegate this task to shall compile all data and information specified in this Regulation from the beginning of 20101 and from then onwards every two years.
2009/12/15
Committee: ITRE
Amendment 78 #
Proposal for a regulation
Article 3 – paragraph 1 – subparagraph 2
They shall notify the aggregated data and relevant project information to the Commission in 20101, that year being the first reporting year, and from then onwards every two years.
2009/12/15
Committee: ITRE
Amendment 112 #
Proposal for a regulation
Annex – point 1 – point 1.2 – last paragraph
These projects also include investment projects in the fields of renovating and dispatching for petroleum product pipelines, the implementation of real time data acquisition and control systems and the construction and implementation of systems for increasing the security of petroleum product supply. Pipelines for military purposes and those supplying plants outside the scope of point 1.1 are excluded.
2009/12/15
Committee: ITRE
Amendment 114 #
Proposal for a regulation
Annex – point 1 – point 1.3 – last paragraph
These projects also include investment projects in the fields of dispatching for crude oil and petroleum product storage facilities and real time data acquisition and control systems. Tanks intended for military purposes and those supplying plants outside the scope of point 1.1 are excluded.
2009/12/15
Committee: ITRE
Amendment 118 #
Proposal for a regulation
Annex – point 2 – point 2.1 – last paragraph a (new)
These projects also include investment projects in the fields of renovating and dispatching for gas pipelines, the implementation of real time data acquisition and control systems and systems for increasing the security of gas supply.
2009/12/15
Committee: ITRE
Amendment 120 #
Proposal for a regulation
Annex – point 2 – point 2.3 – last paragraph
These projects also include investment projects in the fields of dispatching for gas storage facilities and real time data acquisition and control systems. Gas pipelines, terminals and installations for military purposes and those supplying chemical plants which do not produce energy products, or which produce them only as by-products, are excluded.
2009/12/15
Committee: ITRE
Amendment 134 #
Proposal for a regulation
Annex – point 5 – point 5.2 – last paragraph
This section also applies to projects for the geological storage of carbon dioxide provided for in the Regulation establishing a programme to aid economic recovery by granting Community financial assistance to projects in the field of energy. Storage installations intended for research and technological development are excluded.
2009/12/15
Committee: ITRE
Amendment 135 #
Proposal for a regulation
Annex – point 5 – point 5.2 – last paragraph
These projects also include investment projects in the fields of dispatching for carbon dioxide storage facilities and real time data acquisition and control systems. Storage installations intended for research and technological development are excluded.
2009/12/15
Committee: ITRE