6 Amendments of Andrea LOSCO related to 2007/0195(COD)
Amendment 17 #
Proposal for a directive – amending act
Recital 22 a (new)
Recital 22 a (new)
(22a) Regional cooperation should be developed further in order to achieve a fully integrated European electricity grid, enabling the national electricity markets in the European Union can be joined together.
Amendment 43 #
Proposal for a directive – amending act
Article 1 – point 4
Article 1 – point 4
Directive 2003/54/EC
Article 8 – paragraph 4
Article 8 – paragraph 4
Amendment 45 #
Proposal for a directive – amending act
Article 1 – point 4
Article 1 – point 4
Directive 2003/54/EC
Article 8 – paragraph 5
Article 8 – paragraph 5
5. The obligation set out in paragraph 1(a) is deemed to be fulfilled in a situation where several undertakings which own transmission systems have created a joint venture which acts as a transmission system operator in several Member States for the transmission systems concerned. No other undertaking may be part of the joint venture, unless it has been approved under Article 10 as an independent system operatorcomplies fully with this Article.
Amendment 56 #
Proposal for a directive – amending act
Article 1 – point 8
Article 1 – point 8
Directive 2003/54/EC
Article 10
Article 10
Article deleted
Amendment 57 #
Proposal for a directive – amending act
Article 1 – point 8
Article 1 – point 8
Directive 2003/54/EC
Article 10 a (new)
Article 10 a (new)
Article deleted
Amendment 70 #
Proposal for a directive – amending act
Article 1 – point 12
Article 1 – point 12
Directive 2003/54/EC
Article 22c – paragraph 4 – point a
Article 22c – paragraph 4 – point a
(a) connection and access to national networks, including transmission and distribution tariffs, or preliminary tariffs in case the methodology to fix the tariff is assessed during a regulatory period before fixing the final tariff. The regulatory period shall not exceed five years. These tariffs shall allow the necessary investments in the networks to be carried out in a manner allowing these investments to ensure the viability of the networks.