3 Amendments of Alejo VIDAL-QUADRAS related to 2007/0197(COD)

Amendment 85 #
Proposal for a regulation
Article 6 – paragraph 3
3. The Agency may provide an opinion toshall approve the 10-year investment plan of the European Networks of Transmission System Operators for Electricity as provided fornd Gas, referred to in Article 2d(2)c of Regulation (EC) No 1228/2003 and to the European Network of Transmission System Operators for Gas as provided for in Article 2d(2)c of Regulation (EC) No 1775/2005 on the technical or market codes, on the draft annual work programme and the draft 10-year investment plan, ensuring non-discrimination, effective competition and the efficient and secure functioning of the market.
2008/04/01
Committee: ITRE
Amendment 96 #
Proposal for a regulation
Article 6 – paragraph 3 a (new)
3a. The Agency, having regard to the priority list drawn up by the Commission, shall, at the request of the Commission, develop draft guidelines to be followed by the ENTSOs in the preparation of codes and other tasks set out under Article 2c of Regulation (EC) No 1228/2003 and in Article 2c of Regulation (EC) No 1775/2005. In the drafting of the above mentioned guidelines the agency shall consult extensively. The Agency shall submit the draft guidelines to the Commission which shall submit them to the Committee referred to in Article 13 (1) for their final adoption in accordance with the procedure referred to in Article 13(2) of Regulation(EC) No 1228/2003 and in Art.13(2) of Regulation (EC) No 1775/2005. The ENTSOs shall prepare draft codes in a way that meets the objectives and any criteria set out in the Guidelines as adopted according to the above mentioned procedure. The Agency shall finalize and adopt the draft codes prepared by ENTSOs and shall be responsible also for monitoring their implementation by the ENTOs.
2008/04/01
Committee: ITRE
Amendment 137 #
Proposal for a regulation
Article 8 a (new)
Article 8a Time limit for decisions on exemptions If the Agency doesn’t adopt a decision in the matters where the Agency has, according to Art. 8 of this Regulation, binding powers, within the maximum time-limit of three months from the date of the request by the interested parties, the decision shall be taken by the European Commission.
2008/04/01
Committee: ITRE