BETA

10 Amendments of Sari ESSAYAH related to 2011/0172(COD)

Amendment 289 #
Proposal for a directive
Recital 34
(34) In the implementation of the 20% energy efficiency target, the Commission will have to monitor the impact of new measures on Directive 2003/87/EC establishing the EU's emissions trading directive (ETS) in order to maintain the incentives in the emissions trading system rewarding low carbon investments and preparing the ETS sectors for the innovations needed in the future.deleted
2011/11/16
Committee: ITRE
Amendment 445 #
Proposal for a directive
Article 3 – paragraph 1
1. Member States shall set a national energy efficiency target expressed as an absolute level of primary or final energy consumption (and also energy production, transmission and distribution) in 2020. When setting these targets, they shall take into account the Union’s target of 20 % energy savings, the measures provided for in this Directive, the measures adopted to reach the national energy saving targets adopted pursuant to Article 4(1) of Directive 2006/32/EC and other measures to promote energy efficiency within Member States and at Union level.
2011/11/16
Committee: ITRE
Amendment 495 #
Proposal for a directive
Article 4 – paragraph 1
1. Without prejudice to Article 7 of Directive 2010/31/EU, Member States shall ensure that as from 1 January 2014, 3% of the total floor area owned by their public bodies is renovated each year to meet at least the minimum energy performance requirements set by the Member State concerned in application of Article 4 of Directive 2010/31/EU. The 3% rate shall be calculated on the total floor area of buildings with a total useful floor area over 250 m2 owned by the public bodies of the Member State concerned that, on 1 January of each year, does not meet the national minimum energy performance requirements set in application of Article 4 of Directive 2010/31/EU. An alternative to the 3% renovation requirement may be a correspondingly large improvement in energy efficiency by means of other measures applied to the existing building stock, but in this case deducting from the 3% proportion the increase in energy consumption brought about by ventilation installations in order to comply with indoor air requirements.
2011/11/16
Committee: ITRE
Amendment 680 #
Proposal for a directive
Article 6 – paragraph 1
1. Each Member State shall set up an energy efficiency obligation scheme. This scheme or other alternative measures (determined in paragraph 9). This scheme or other measures (according to paragraph 9) shall ensure that either all energy distributors or all retail energy sales companies operating on the Member State's territory achieve annual energy savings equal to 1.5% of their energy sales, by volume, in the previous year inthe target, which is determined by the Member State. This indicative target will be determined from thate Member State excluding energy used in transpors’ national final energy target. This amount of energy savings shall be achieved by the obligated parties among final customers.
2011/11/17
Committee: ITRE
Amendment 972 #
Proposal for a directive
Article 8 – paragraph 1 – subparagraph 4
In case of heating and cooling, where a building is supplied from a district heating network, a heat meter shall be installed at the building entry. In multi-apartment buildings, individual heat consumption meters shall also be installed to measure the consumption of heat or cooling for each apartment. Where the use of individual heat consumption meters is not technically feasible, individual heat cost allocators, in accordance with the specifications in Annex VI(1.2), shall be used for measuring heat consumption at each radiatorin the building.
2011/11/17
Committee: ITRE
Amendment 1052 #
Proposal for a directive
Article 10 – paragraph 1
1. By 1 January 2014, Member States shall establish and notify to the Commission a national heating and cooling plan for developing the potential for the application of high-efficiency cogeneration and efficient district heating and cooling, containing the information set out in Annex VII. The plans shall be updated and notified to the Commission every five years. Member States shall ensure by means of their regulatory framework that national heating and cooling plans are taken into account in local and regional development plans, including urban and rural spatial plans, and fulfil the design criteria in Annex VII. If the potential for cogeneration of electricity and heat has already been relatively fully exploited in a Member State, so that new measures would be significantly less cost-effective than in other countries, the Commission may grant the Member State concerned a derogation from the provisions of the present Article 10 on substantiated grounds.
2011/11/17
Committee: ITRE
Amendment 1376 #
Proposal for a directive
Article 12 – paragraph 5 – subparagraph 1 – point b
b) provide priority or guaranteed access to the grid of electricity from high efficiency cogeneration;
2011/11/18
Committee: ITRE
Amendment 1377 #
Proposal for a directive
Article 12 – paragraph 5 – subparagraph 1 – point c
c) when dispatching electricity generating installations, provide priority dispatch of electricity from high efficiency cogeneration.deleted
2011/11/18
Committee: ITRE
Amendment 1529 #
Proposal for a directive
Article 19 – paragraph 5 – subparagraph 2
The Commission shall also monitor the impact of implementing this Directive on Directive 2003/87/EC, Directive 2009/28/EC as well as Directive 2010/31/EC.deleted
2011/11/22
Committee: ITRE
Amendment 1773 #
Proposal for a directive
Annex VIII – section 1 – subparagraph 1
Where a heat demand point of the capacity given in the column C exists or there is a potential heat demand point, it is recommended that the power plant must be located at less than the corresponding distance in column A. A potential heat demand point is defined as one where it can be shown that one can reasonably be created, for example by constructing a district heating network. For example, using standard estimation techniques, if an aggregate heat load in excess of 15 MW / km2 can be shown to exist, this is deemed to be a heat demand point. The total sum of such connectible km square loads shall be deemed to be the demand capacity of such heat demand points.
2011/11/22
Committee: ITRE