(2) The Presidency Conclusions of the European Council of 8 and 9 March 2007 emphasized the need to increase energy efficiency in the Union to achieve the objective of saving 20% of the Union's primary energy consumption by 2020 compared to projections. This amounts to a reduction of the Union's primary energy consumption of 368 Mtoe in 2020 or to an improvement of the Union's energy intensity to 104 tonnes of oil equivalent per million euro gross domestic product expressed in 2005 prices. This Directive represents, in combination with a number of existing legislative measures (such as the emissions trading scheme, the Renewable Energy Directive, the Ecodesign Directive, etc), an important instrument to achieve the objective.
2011/11/16
Committee: ITRE
Amendment 161 #
Proposal for a directive
Recital 12
(12) An integrated approach must be taken to tap all the existing energy savingefficiency potential, encompassing savings in the energy supply and the end-use sectors. At the same time, the provisions of Directive 2004/8/EC on promotion of cogeneration based on a useful heat demand in the internal energy market and Directive 2006/32/EC on energy end-use efficiency and energy services should be strengthened.
2011/11/16
Committee: ITRE
Amendment 189 #
Proposal for a directive
Recital 15
(15) The rate of building renovation needs to be increased, as the existing building stock represents the single biggest potential sector for energy savings. Moreover, buildings are crucial to achieving the EU objective of reducing greenhouse gas emissions by 80-95% by 2050 compared to 1990greater energy efficiency and savings. Buildings owned by public bodies account for a considerable share of the building stock and have high visibility in public life. It is therefore appropriate, in due consideration of tight public finances, to set an annual rate of renovation of all buildings owned by public bodies to upgrade their energy performance. This renovation rate should be without prejudice to the obligations with regard to nearly- zero energy buildings set in Directive 2010/31/EU of the European Parliament and of the Council of 19 May 2010 on the energy performance of buildings. The obligation to renovate public buildings complements the provisions of that Directive, which requires Member States to ensure that when existing buildings undergo major renovation their energy performance is upgraded so that they meet minimum energy performance requirements.
2011/11/16
Committee: ITRE
Amendment 198 #
Proposal for a directive
Recital 16
(16) A number of municipalities and other public bodies in the Member States have already put into place integrated approaches to energy saving and energy supply, for example via sustainable energy action plans, such as those developed under the Covenant of Mayors initiative, and integrated urban approaches which go beyond individual interventions in buildings or transport modes. Member States shouldAs a precondition to local integrated and sustainable energy efficiency plans, Member States should encourage local authorities to define such local development strategies based on a dialogue with local stakeholders and further encourage municipalities and other public bodies to adopt integrated and sustainable energy efficiency plans with clear objectives, to involve local stakeholders and citizens in their development and implementation and to adequately inform them about their content and progress in achieving objectives. Such plans can yield considerable energy savings, especially if they are implemented by energy management systems that allow the concerned public bodies to better manage their energy consumption. Exchange of experience between cities, towns and other public bodies should be encouraged with respect to the more innovative experiences.
2011/11/16
Committee: ITRE
Amendment 212 #
Proposal for a directive
Recital 18
(18) An assessment of the possibility of establishing a ‘white certificate’ scheme at Union level has shown that, in the current situation, such a system would create excessive administrative costs and that there is a risk that energy savings would be concentrated in a number of Member States and not introduced across the Union. The latter objective can better be achieved, at least at this stage, by means of national energy efficiency obligation schemes or other alternative measures that achieve the same amount of energy savings. The Commission should however define, by a delegated act, common criteria according to which energy efficiency measures could be measured and verified as well as the conditions under which a Member State could in future recognise the energy savings achieved in another Member State. It is appropriate for the level of ambition of such schemes to be established in a common framework at Union level while providing significant flexibility to Member States to take full account of the national organisation of market actors, the specific context of the energy sector and final customers' habits. The common framework should give energy utilities and other eligible actors the option of offering energy services to all final customers, not only to those to whom they sell energy. This increases competition in the energy market because energy utilities can differentiate their product by providing complementary energy services. The common framework should allow Member States to include requirements in their national scheme that pursue a social aim, notably in order to ensure that vulnerable customers have access to the benefits of higher energy efficiency. It should also allow Member States to exempt small companies from the energy efficiency obligation. The Commission Communication ‘Small Business Act’ sets out principles that should be taken into account by Member States that decide to abstain from applying this possibility.
2011/11/16
Committee: ITRE
Amendment 253 #
Proposal for a directive
Recital 23
(23) High-efficiency cogeneration (CHP) and district heating and cooling has significant potential for saving primary energy which is largely untapped in the Union. Member States should draw up national plansanalyses of their potential to develop high-efficiency CHP and district heating and cooling. These plans should cover a sufficiently long period toMember States should aim at provideing investors with information concerning national development plans anover a sufficiently long period which would contribute to a stable and supportive investment environment. NWhere the cost-benefit analysis is positive, new electricity generation installations and existing installations which are substantially refurbished or whose permit or licence is updated should be equipped with high-efficient CHP units to recover waste heat stemming from the production of electricity. This waste heat could then be transported where it is needed through district heating networks. To this end, Member States should adopt authorisation criteria to ensure the location of installations in sites close to heat demand points. Member States should however be able to lay down conditions for exemption from these obligations where certain conditions are met. When adopting authorisation criteria Member States should ensure that the regional and local competences as regards spatial planning are fully respected.
2011/11/16
Committee: ITRE
Amendment 292 #
Proposal for a directive
Recital 34
(34) In the implementation of the 20% energy efficiency target, the Commission will have to monitor the impact of new measures on Directive 2003/87/EC establishing the EU's emissions trading directive (ETS) in order to maintain the incentives in the emissions trading system rewarding low carbon investments and preparing the ETS sectors for the innovations needed in the future.deleted
2011/11/16
Committee: ITRE
Amendment 300 #
Proposal for a directive
Recital 35
(35) Directive 2006/32/EC requires Member States to adopt and aim to achieve an overall national indicative energy savings target of 9% by 2016, to be reached by deploying energy services and other energy efficiency improvement measures. That Directive states that the second Energy Efficiency Plan adopted by the Member States shall be followed, as appropriate and where necessary, by Commission proposals for additional measures, including extending the period of application of targets. If a report concludes that insufficient progress has been made towards achieving the indicative national targets laid down by that Directive, these proposals are to address the level and nature of the targets. The impact assessment accompanying this Directive finds that the Member States are on track to achieve the 9% target, which is substantially less ambitious than the subsequently adopted 20% energy savingefficiency target for 2020, and therefore there is no need to address the level of the targetsambition.
2011/11/16
Committee: ITRE
Amendment 316 #
Proposal for a directive
Article 1 – paragraph 1 – subparagraph 1
This Directive establishes a common framework of measures for the promotion of energy efficiency within the Union in order to ensure the achievement of the Union's target of 20% primary energy savings by 20202020 20% goal on energy efficiency and to pave the way for further energy efficiency improvements beyond that date.
2011/11/16
Committee: ITRE
Amendment 326 #
Proposal for a directive
Article 1 – paragraph 1 – subparagraph 2
It lays down rules designed to remove barriers in the energy market and overcome market failures that impede efficiency in the supply and use of energy, and provides for the establishment of indicative national energy efficiency targets for 2020.
2011/11/16
Committee: ITRE
Amendment 334 #
Proposal for a directive
Article 2 – paragraph 1 – point 1 a (new)
1 a. ‘energy efficiency’ means the use of less energy inputs while maintaining an equivalent level of economic activity or service;
2011/11/16
Committee: ITRE
Amendment 353 #
Proposal for a directive
Article 2 – paragraph 1 – point 2 b (new)
2 b. ‘energy saving’ means a reduction of energy consumption through the implementation of energy efficiency, behaviour change or decreased economic activity;
2011/11/16
Committee: ITRE
Amendment 370 #
Proposal for a directive
Article 2 – paragraph 1 – point 4 a (new)
4 a. 'cost-optimal level’ means the energy performance level of products or services which leads to the lowest cost during the estimated economic lifecycle, where: (a) the lowest cost is determined taking into account energy-related investment costs, maintenance and operating costs, where applicable, and disposal costs, where applicable; and (b) the estimated economic lifecycle is determined by each Member State by product or service category. The cost-optimal level shall lie within the range of performance levels where the cost benefit analysis calculated over the estimated economic lifecycle is positive; For cost-optimal levels related to buildings and building refurbishment, Article 2(14) of Directive 2010/31/EU shall apply;
2011/11/16
Committee: ITRE
Amendment 416 #
Proposal for a directive
Article 2 – paragraph 1 – point 26
26. ‘efficient district heating and cooling’ means a district heating or cooling system using at least 50% renewable, waste or cogenerated heat or a combination thereof and; or having a primary energy factor, as referred to in Directive 2010/31/EU, of at least 0.8;
2011/11/16
Committee: ITRE
Amendment 439 #
Proposal for a directive
Article 3 – paragraph 1
1. Member States shall set an indicative national energy efficiency target expressed as an absolute level of primary energy consumption in 2020 relative to the projected GDP per Capita in that year. When setting these targets, they shall take into account the Union’s target of 20 % energy savings2020 20% goal on energy efficiency, the measures provided for in this Directive, the measures adopted to reach the national energy saving targets adopted pursuant to Article 4(1) of Directive 2006/32/EC and other measures to promote energy efficiency within Member States and at Union level. Member States may take into account of the level of their development when setting national energy efficiency targets.
2011/11/16
Committee: ITRE
Amendment 480 #
Proposal for a directive
Article 3 – paragraph 2 a (new)
2a. By 31 December 2014, the Commission shall establish, by means of a delegated act in accordance with Article 18, a common and cost-effective methodology for monitoring energy efficiency per capita, which will permit to quantify efforts of Member States on an equivalent basis by drawing on available statistical indicators.
2011/11/16
Committee: ITRE
Amendment 506 #
Proposal for a directive
Article 4 – paragraph 1
1. Without prejudice to Article 7 of Directive 2010/31/EU, Member States shall ensure that as from 1 January 2014, 38% of the total floor area owned by their public bodies is renovated eachvery four years to meet at least the minimum energy performance requirements set by the Member State concerned in application of Article 4 of Directive 2010/31/EU. The 38% rate shall be calculated on the total floor area of buildings with a total useful floor area over 500 m2 and as of 31 December 2018 over 250 m2 owned by the public bodies of the Member State concerned that, on 1 January of each year, does not meet the national minimum energy performance requirements set in application of Article 4 of Directive 2010/31/EU.
2011/11/16
Committee: ITRE
Amendment 533 #
Proposal for a directive
Article 4 – paragraph 1 a (new)
1a. Member States may decide not to set or apply the requirements set out in paragraph 1 to officially protected buildings on the basis of, inter alia, their architectural or historical merit. Protected buildings shall be included in the inventory listed in paragraph 3 with a note to their status.
2011/11/16
Committee: ITRE
Amendment 559 #
Proposal for a directive
Article 4 – paragraph 2
2. Member States may allow their public bodies to count towards their annual renovation rate the excess of renovated building floor area in a given year as if it has instead been renovated in any of the two previous or following years.
2011/11/16
Committee: ITRE
Amendment 574 #
Proposal for a directive
Article 4 – paragraph 3 – introductory part
3. For the purposes of paragraph 1 and without prejudice to Directive 2010/31/EU, by 1 January 2014, Member States shall establish and make publicly available an inventory of buildings owned by their public bodies with a total useful floor area over 500 m2 and by 31 December 2018 over 250 m2 indicating:
2011/11/17
Committee: ITRE
Amendment 580 #
Proposal for a directive
Article 4 – paragraph 3 – point a
(a) the floor area in m2; and
2011/11/17
Committee: ITRE
Amendment 582 #
Proposal for a directive
Article 4 – paragraph 3 – point b
(b) the energy performance of each building. for which an energy performance certificate has been issued in accordance with directive 2010/31/EU; and
2011/11/17
Committee: ITRE
Amendment 583 #
Proposal for a directive
Article 4 – paragraph 3 – point b a (new)
(ba) if applicable, any officially protected status giving exemption under Paragraph 1a;
2011/11/17
Committee: ITRE
Amendment 589 #
Proposal for a directive
Article 4 – paragraph 3 a (new)
3a. Member States shall encourage the establishment of a publicly available inventory of buildings owned by their public bodies which are less than 250m2 indicating: (a) the floor area in m2; and (b) the energy performance of each building, if known.
2011/11/17
Committee: ITRE
Amendment 590 #
Proposal for a directive
Article 4 – paragraph 3 b (new)
3b. The inventories listed in paragraph 3 and 3a shall reviewed at least every five years and updated, if needed, on the basis of changes to a building's energy performance, ownership and protective status.
2011/11/17
Committee: ITRE
Amendment 591 #
Proposal for a directive
Article 4 – paragraph 3 c (new)
3c. As an alternative approach to paragraphs 1 and 2, Member States may take other measures to achieve an equivalent improvement of the energy performance of the buildings owned by their public bodies as required in paragraph 1. Member States may prioritise renovation of the buildings owned by their public bodies, based on the most cost-effective improvement of the energy performance of their building stock. Member States opting for an alternative approach shall notify to the Commission, by 1 January 2014 at the latest, the alternative measures that they plan to adopt and showing how they would achieve an equivalent improvement of the energy performance of the buildings owned by their public bodies.
2011/11/17
Committee: ITRE
Amendment 606 #
Proposal for a directive
Article 4 – paragraph 4 – point a
(a) adopt an energy efficiency plan, freestanding or as part of a broader climate or environmental plan, containing specific energy savingefficiency objectives, with a view to continuously improving the body's energy efficiency;
2011/11/17
Committee: ITRE
Amendment 615 #
Proposal for a directive
Article 4 – paragraph 4 – point b a (new)
(ba) carry out energy performance certification on all public owned building;
2011/11/17
Committee: ITRE
Amendment 628 #
Proposal for a directive
Article 4 – paragraph 4 a (new)
4a. Subject to submission by a Member State to the Commission for the approval, European funding for energy efficiency actions from the ERDF or other sources shall be subject to a waiver or reduction of co-financing requirements.
2011/11/17
Committee: ITRE
Amendment 629 #
Proposal for a directive
Article 4 – paragraph 4 b (new)
4b. Member States shall ensure that access to energy efficiency measures and initiatives to public bodies in both urban and rural locations.
2011/11/17
Committee: ITRE
Amendment 635 #
Proposal for a directive
Article 5 – paragraph 1
Member States shall ensure that public bodies purchase only products, services and buildings with high energy efficiency performance, taking into account cost- effectiveness based on a life-cycle analysis, economical feasibility and technical suitability, as well as sufficient competition, as referred to in Annex III.
2011/11/17
Committee: ITRE
Amendment 653 #
Proposal for a directive
Article 6 – title
Energy efficiency obligation schemessupport schemes [This amendment applies throughout the text. Adopting it would necessitate corresponding changes throughout the text]
2011/11/17
Committee: ITRE
Amendment 683 #
Proposal for a directive
Article 6 – paragraph 1
1. Each Member State shall set up an energy efficiency obligation scheme. This scheme shall ensure that either all energy distributors or all retail energy sales companies operating on the Member State's territory achieve annual energy savings equal to 1.5at least 1% of their projected energy sales, by volume, ibased on the previous year in that Member State excluding energy used in transport. This amount of energy savings shall be achieved by the obligated parties among final customers, subject to measures to avoid discrimination, cross-subsidisation and distortion of competition.
2011/11/17
Committee: ITRE
Amendment 702 #
Proposal for a directive
Article 6 – paragraph 1 a (new)
1a. Member States shall define eligible sectors and measures, country-specific measurement and verification rules in accordance with subparagraph 1b, including qualitative project requirements and eligible actors others than the obligated parties. Member States shall retain the possibility to couple the support scheme with a trading mechanism designed according to national needs and circumstances.
2011/11/17
Committee: ITRE
Amendment 703 #
Proposal for a directive
Article 6 – paragraph 1 b (new)
1b. By December 2013, the Commission shall establish, by means of delegated acts in accordance with Article 18, common and cost-effective criteria for measuring and verifying energy efficiency measures including their energy savings potential which will allow to quantify energy efficiency efforts by obligated parties resulting from this article. Country- specific measurement and verification rules set by the Member States shall be based on these criteria.
2011/11/17
Committee: ITRE
Amendment 714 #
Proposal for a directive
Article 6 – paragraph 2
2. Member States shall express the amount of the achieved energy savings potential required from each obligated party in terms of either final or primary energy consumption. The method chosen for expressing the required amount of energy savings shall also be used for calculating the savings claimed by obligated parties. The conversion factors in Annex IV shall apply.
2011/11/17
Committee: ITRE
Amendment 719 #
Proposal for a directive
Article 6 – paragraph 3
3. Measures that target short-term savings, as defined in Annex V(1), shall not account for more than 10% of the amount of energy savings required from each obligated party and shall only be eligible to count towards the obligation laid down in paragraph 1 if combined with measures to which longer- term savings potential are attributed. Member States shall define measures targeting short-term savings and may use Annex V(1) as guideline.
2011/11/17
Committee: ITRE
Amendment 735 #
Proposal for a directive
Article 6 – paragraph 4
4. Member States shall ensure that the savingsachieved energy savings potential claimed by obligated parties are calculated and verified in accordance with Annex V(2). They shall put in place control systems under which at least a statistically significant proportion of the energy efficiency improvement measures put in place by the obligated parties is independently verifiedthe common general measurement and verification criteria and the specific national rules.
2011/11/17
Committee: ITRE
Amendment 747 #
Proposal for a directive
Article 6 – paragraph 5 – point b
(b) permit obligated parties to count towards their obligation certified energy savings achieved by energy service providers or other third parties; in this case they shall establishMember States shall ensure that an accreditation process is in place that is clear, transparent and open to all market actors, and that aims at minimising the costs of certification;
2011/11/17
Committee: ITRE
Amendment 756 #
Proposal for a directive
Article 6 – paragraph 6 – introductory part
6. Member States shall publish the achieved energy savings achievedpotential by each obligated party and data on the annual trend of energy savingefficiency improvements under the scheme. For the purposes of publishing and verifying the energy savings achievedachieved energy efficiency measures including their energy savings potential, Member States shall require obligated parties to submit to them at least the followingthe relevant data:.
2011/11/17
Committee: ITRE
Amendment 797 #
Proposal for a directive
Article 6 – paragraph 9 – subparagraph 1
As an alternative to paragraph 1, Member States may opt to take otheralternative or complementary measures to achievinitiate energy savingefficiency measures among final customers. The annual amount of the energy savings potential by the energy efficiency measures achieved through this approach shall be equivalent to the amount of energy savings required in paragraph 1.
2011/11/17
Committee: ITRE
Amendment 803 #
Proposal for a directive
Article 6 – paragraph 9 – subparagraph 2
Member States opting for this option shall notify to the Commission, by 1 January 2013 at the latest, the alternative measures that they plan to adopt, including the rules on penalties referred to in Article 9, and demonstrating how they would achieve the required amount of savingsefficiency. The Commission may refuse such measures or make suggestions for modifications in the 3 months following notification. In such cases, the alternative approach shall not be applied by the Member State concerned until the Commission expressly accepts the resubmitted or modified draft measuresThe Member States shall take these suggestions or modifications into account.
2011/11/17
Committee: ITRE
Amendment 823 #
Proposal for a directive
Article 6 – paragraph 10
10. If appropriate, the Commission shall establish, by means of a delegated act in accordance with Article 18, a system of mutual recognition of energy savings achieved under national energy efficiency obligationsupport schemes. Such a system shall allow obligated parties to count energy savingefficiency measures achieved and certified in a given Member State towards their obligations in another Member State.
2011/11/17
Committee: ITRE
Amendment 871 #
Proposal for a directive
Article 7 – paragraph 2
2. Member States shall ensure that enterprises not included in the second subparagraph of paragraph 1 are subject to an energy audit carried out in an independent and cost-effective manner by qualified or accredited experts at the latest by 30 June 2014 andtwo years after entry into force of this directive and at least every threfive years from the date of the previous energy audit.
2011/11/17
Committee: ITRE
Amendment 890 #
Proposal for a directive
Article 7 – paragraph 3
3. Energy audits carried out in an independent manner on the basis of European harmonised standards resulting from energy management systems or implemented under voluntary agreements concluded between organisations of stakeholders and an appointed body and supervised by the Member State concerned or by the Commission, shall be considered as fulfilling the requirements of paragraph 2.
2011/11/17
Committee: ITRE
Amendment 908 #
Proposal for a directive
Article 8 – title
Metering and informative billing Metering and billing information
2011/11/17
Committee: ITRE
Amendment 933 #
Proposal for a directive
Article 8 – paragraph 1 – subparagraph 1
When smart meters are installed Member States shall ensure that final customers for electricity, natural gas, district heating or cooling and district- supplied domestic hot water are provided with individual meters that accurately measure and allow to make available their actual energy consumption and provide information on actual time of use, in accordance with Annex VI.
2011/11/17
Committee: ITRE
Amendment 959 #
Proposal for a directive
Article 8 – paragraph 1 – subparagraph 4
In case of heating and cooling, where a building is supplied from a district heating network or through central heating or from individual heat sources, a heat meter shall be installed at the building entry or at the outlet of the boiler respectively. In multi-apartmenunit buildings, individual heat consumption metermetering devices shall also be installed to measure the consumption of heat or cooling for each apartmenunit. Where the use of individual heat consumption meters is not technically feasible, individual heat cost allocators, in accordance with the specifications in Annex VI(1.2), shall be used for measuring heat consumption at each radiator.
2011/11/17
Committee: ITRE
Amendment 984 #
Proposal for a directive
Article 8 – paragraph 1 – subparagraph 5
Member States shall introduce rules on cost allocation of heat consumption in multi-apartmenunit buildings supplied with centralised heat or cooling. Such rules shall include guidelines on correction factors to reflect building characteristics such as heat transfers between apartmenunits.
2011/11/17
Committee: ITRE
Amendment 986 #
Proposal for a directive
Article 8 – paragraph 1 – subparagraph 5 a (new)
Member States may lay down conditions for the exemption of building categories as defined in Article 4(2) of Directive 2010/31/EU from the provisions of this Article.
2011/11/17
Committee: ITRE
Amendment 1002 #
Proposal for a directive
Article 8 – paragraph 2 – subparagraph 1
In addition to the obligations resulting from Directive 2009/72/EC and Directive 2009/73/EC with regard to billing, Member States shall ensure, not later than 1 January 2015, that billing is accurate and that billing information is based on actual consumption, for all the sectors covered by the present Directive, including energy distributors, distribution system operators and retail energy sales companies, in accordance with the minimum frequency set out in Annex VI(2.1). Appropriate information shall be made available with the bill to provide final customers with a comprehensive account of current energy costs, in accordance with Annex VI(2.2) and the relevant provisions for electricity in Directive 2009/72/EC and for gas in Directive 2009/73/EC.
2011/11/17
Committee: ITRE
Amendment 1033 #
Proposal for a directive
Article 9 – paragraph 1
Member States, if they have not chosen to apply approved alternative approaches, shall lay down rules on penalties applicable in case of non- compliance with the national provisions adopted pursuant to Articles 6 to 8 and shall take the necessary measures to ensure that they are implemented. These penalties provided must be effective, proportionate and dissuasivemay take the form of requirements to purchase additional ETS credits on the open market. Member States shall communicate those provisions to the Commission by [12 months after entry into force of this Directive] at the latest and shall notify it without delay of any subsequent amendment affecting them.
2011/11/17
Committee: ITRE
Amendment 1054 #
Proposal for a directive
Article 10 – paragraph 1
1. By 1 January 2014, Member States shall establish and notify to the Commission a national heating and cooling plan for developing the potential for the application of high-efficiency cogeneration, including micro- cogeneration, and efficient district heating and cooling, containing the information set out in Annex VII. The plans shall be updated and notified to the Commission every five years. Member States shall ensure by means of their regulatory framework that national heating and cooling plans are taken into account in local and regional development plans, including urban and rural spatial plans, and fulfil the design criteria in Annex VII.
2011/11/17
Committee: ITRE
Amendment 1102 #
Proposal for a directive
Article 10 – paragraph 3 – subparagraph 1 – introductory part
Member States shall ensure, subject to economic feasibility and technical suitability, that all new thermal combustion electricity generation installations with a total thermal input exceeding 20 MW:
2011/11/18
Committee: ITRE
Amendment 1153 #
Proposal for a directive
Article 10 – paragraph 3 – subparagraph 2
Member States shall adopt authorisation criteria as referred to in Article 7 of Directive 2009/72/EC, or equivalent permit criteria, to ensure that the provisions of the first subparagraph are met. They shall in particular ensure that the location of new installations takes into account the availability of suitable additional heat loads for cogeneration, not yet covered by heat from high efficient cogeneration in accordance with Annex VIII.
2011/11/18
Committee: ITRE
Amendment 1201 #
Proposal for a directive
Article 10 – paragraph 5
5. Member States shall ensure that national regulations on urban and rural spatial planning are adapted to the authorisation criteria referred to in paragraph 3 and are in line with the national heating and cooling plans referred to in paragraph 1.
2011/11/18
Committee: ITRE
Amendment 1213 #
Proposal for a directive
Article 10 – paragraph 6 – subparagraph 1
Member States shall ensure that, whenever an existing electricity generation installation with a total rated thermal input exceeding 20 MW is substantially refurbished or when, in accordance with Article 21 of Directive 2010/75/EC, its permit is updated, conversion to allow its operation as a high-efficiency cogeneration installation is set as a condition in the new or updated permit or licence, provided that the installation is sited in a location where the waste heat can be used by additional heat demand points in accordance with point 1 of Annex VIII and where a cost- benefit analysis shows a benefit over the life-cycle of the installation.
2011/11/18
Committee: ITRE
Amendment 1386 #
Proposal for a directive
Article 12 – paragraph 5 – subparagraph 3
Member States may particularly facilitate the connection to the grid system of electricity produced from high-efficiency cogeneration from small scale and micro cogeneration units. For micro cogeneration units which are installed by individual citizens, the relevant authorities shall consider the possibility of replacing authorisations by simple notifications to the competent bodies. Member States that provide for priority access for produced from high-efficiency cogeneration as well as for electricity produced from renewable energy sources shall introduce national rules to ensure the stability of the power system.
2011/11/18
Committee: ITRE
Amendment 1418 #
Proposal for a directive
Article 13 a (new)
Information and training 1. Member States shall ensure that information on available energy efficiency mechanisms and financial and legal frameworks is transparent and widely and actively disseminated to all relevant market actors, including consumers, builders, architects, engineers, environmental auditors and installers of building elements as defined in Directive 2010/31/EU. They shall ensure that banks and other financial institutions are informed of the possibilities of participating, including through the creation of public/private partnerships, in the financing of energy efficiency improvement measures. 2. Member States shall establish appropriate conditions and incentives for market operators to provide adequate and targeted information and advice to energy consumers on energy efficiency. 3. Member States, with the participation of stakeholders, including local and regional authorities, shall develop suitable information, awareness-raising and training programmes to inform citizens of the benefits and practicalities of taking energy efficiency improvement measures. 4. The Commission shall ensure that information on best energy-saving practices in Member States is exchanged and widely disseminated.
2011/11/18
Committee: ITRE
Amendment 1473 #
Proposal for a directive
Article 15 a (new)
Article 16 a (new) Funds and funding mechanisms 1. Without prejudice to Articles 107 and 108 of the Treaty on the Functioning of the European Union, Member States may establish a fund or funds to subsidise the delivery of energy efficiency improvement programmes and measures and to promote the development of a market for energy efficiency improvement measures. Such measures may include the promotion of energy auditing and financial instruments for energy savings. The fund may, among other sources, include the revenues generated by the auctions under the emission trading scheme. 2. When funds subsidise the delivery of energy efficiency improvement measures, access to funds shall be made conditional upon the actual achievement of energy savings or energy efficiency improvements. Such achievement shall be proved by appropriate means, such as energy performance certificates for buildings or energy labels for products.
2011/11/18
Committee: ITRE
Amendment 1496 #
Proposal for a directive
Article 19 – paragraph 1
1. By 30 April each year, Member States shall report on the progress achieved towards national energy efficiency targets, in accordance with Annex XIV(1). Every three years the national reports shall be accompanied by supplementary information in accordance with Annex XIV(2).
2011/11/22
Committee: ITRE
Amendment 1509 #
Proposal for a directive
Article 19 – paragraph 2 – subparagraph 2
The Commission shall, not later than 1 January 2014, provide a template as guidance for the supplementary reports. This template shall be adopted in accordance with the advisory procedure referred to in Article 20(2). The supplementary reports shall in any case include the information specified in Annex XIV. While setting their national energy efficiency plans, the Member States shall take into account cost-effective energy efficiency measures and the risk of carbon leakage.
2011/11/22
Committee: ITRE
Amendment 1515 #
Proposal for a directive
Article 19 – paragraph 4
4. The Commission shall evaluate the annual reports and supplementary reports and assess the extent to which Member States have made progress towards the achievement of the national energy efficiency targets required by Article 3(1) and towards the implementation of this Directive. This assessment shall take into account developments in energy intensity calculated using the indicators in Annex XIV, Part 1, paragraph (a). The Commission shall send its assessment to the European Parliament and the Council. Based on its assessment of the reports the Commission may issue recommendations to Member States.
2011/11/22
Committee: ITRE
Amendment 1530 #
Proposal for a directive
Article 19 – paragraph 5 – subparagraph 2
The Commission shall also monitor the impact of implementing this Directive on Directive 2003/87/EC, Directive 2009/28/EC as well as Directive 2010/31/EC. If the Commission considers that adjustment measures are necessary, these adjustment measures shall not interfere with the implementation of Directive 2003/87/EC, Directive 2009/28/EC as well as Directive 2010/31/EC.
2011/11/22
Committee: ITRE
Amendment 1570 #
Proposal for a directive
Annex III – introductory part
Public bodies that purchase products, services or buildings shall, taking into account cost-effectiveness as well as sufficient competition:
2011/11/22
Committee: ITRE
Amendment 1579 #
Proposal for a directive
Annex III – point a
a) where a product is covered by a delegated act adopted under Directive 2010/30/EU or Commission Directive implementing Directive 92/75/EEC, purchase only the products that comply with the criterion of belonging to the highest energy efficiency class while taking into account cost-effectiveness, economical feasibility and technical suitability, as well as sufficient competitionsubject to a minimum of three national supplier and a greater life-cycle cost efficiency over the next available energy efficiency class;
2011/11/22
Committee: ITRE
Amendment 1587 #
Proposal for a directive
Annex III – point b
b) where a product not covered under point a) is covered by an implementing measure under Directive 2009/125/EC adopted after the entry into force of this Directive, public bodies should purchase only products that comply with energy efficiency benchmarks specified in that implementing measure;
2011/11/22
Committee: ITRE
Amendment 1589 #
Proposal for a directive
Annex III – point c
c) public bodies should purchase office equipment products covered by Council Decision [2006/1005/EC39 ] that comply with energy efficiency requirements not less demanding than those listed in Annex C of the Agreement attached to that Decision;
2011/11/22
Committee: ITRE
Amendment 1593 #
Proposal for a directive
Annex III – point d
d) public bodies should purchase only tyres that comply with the criterion of having the highest fuel energy efficiency class, as defined by Regulation (EC) No 1222/200940. This requirement shall not prevent public bodies from purchasing tyres with the highest wet grip class or external rolling noise class where justified by safety or public health reasons;
2011/11/22
Committee: ITRE
Amendment 1598 #
Proposal for a directive
Annex III – point e
e) public bodies should require in their tenders for service contracts that service providers use, for the purposes of providing the services in question, only products that comply with the requirements referred to in points (a) to (d), when providing the services in question;
2011/11/22
Committee: ITRE
Amendment 1602 #
Proposal for a directive
Annex III – point f
f) purchase, or rentmake new rental agreements for, only buildings that comply at least with the minimum energy performance requirements referred to in Article 4(1) or that will comply at the time of occupation. Compliance with these requirements shall be verified by means of the energy performance certificates referred to in Article 11 of Directive 2010/31/EU.
2011/11/22
Committee: ITRE
Amendment 1605 #
Proposal for a directive
Annex III – subparagraph 1 a (new)
These requirements shall not prejudice the articles set out in Directive 2004/18/EC and Directive 2004/17/EC and any possible further revision of these directives. If deemed in conflict, these directives shall have priority over this annex.
2011/11/22
Committee: ITRE
Amendment 1606 #
Proposal for a directive
Annex III – subparagraph 1 b (new)
If it is not possible to ensure the cost- effectiveness, economical feasibility and technical suitability or sufficient competition for the products set out in points (a) to (d), public bodies may purchase the next best available energy efficiency product were these conditions are met;
2011/11/22
Committee: ITRE
Amendment 1607 #
Proposal for a directive
Annex III – subparagraph 1 c (new)
Point f) shall not apply to the purchase or rental of buildings officially protected as part of a designated environment or because of their special architectural or historical merit;
2011/11/22
Committee: ITRE
Amendment 1686 #
Proposal for a directive
Annex VI – section 2 – point 2.1 – subparagraph 1 – introductory part
In order to enable final customers to regulate their own energy consumption, billing information on the basis of actual consumption shall be performed with the following frequency:
2011/11/22
Committee: ITRE
Amendment 1706 #
Proposal for a directive
Annex VI – section 2 – point 2.1 – subparagraph 1 – point c
(c) With centralised heating and cooling, billing where individual meters are installed, billing based on actual consumption shall be provided free of charge on a monthly basis during the heating/cooling season, unless requested otherwise by a final customer.
2011/11/22
Committee: ITRE
Amendment 1718 #
Proposal for a directive
Annex VI – section 2 – point 2.1 – subparagraph 1 – point d
(d) At least every two months for hot water billing or, if provided by the same central system, with the same frequency as under (c).
2011/11/22
Committee: ITRE
Amendment 1803 #
Proposal for a directive
Annex XIV – Part 2 – title
General framework for supplementary reportsinformation [This amendment applies throughout the text. Adopting it will necessitate corresponding changes throughout]
2011/11/22
Committee: ITRE
Amendment 1804 #
Proposal for a directive
Annex XIV – Part 2 – section 3 – point 3.1
Supplementary reportsinformation shall include the list of public bodies having developed an energy efficiency plan in accordance with Article 4(3). Supplementary information can include information on the progress of alternative measures referred to in Art. 3(1a).
2011/11/22
Committee: ITRE
Amendment 1808 #
Proposal for a directive
Annex XIV – Part 2 – section 3 – point 3.4
Supplementary reports shall include an assessment of the progress achieved in implementing the national heating and cooling plan referred to inmeasures resulting from Article 10(1).