BETA

Activities of Maria da Graça CARVALHO related to 2021/0218(COD)

Plenary speeches (1)

Renewable Energy Directive (debate)
2023/09/11
Dossiers: 2021/0218(COD)

Amendments (40)

Amendment 96 #
Proposal for a directive
Recital 3
(3) Directive (EU) 2018/2001 of the European Parliament and of the Council9 sets a binding Union target to reach a share of at least 32 % of energy from renewable sources in the Union's gross final consumption of energy by 2030. Under the Climate Target Plan, the share of renewable energy in gross final energy consumption would need to increase to 405% by 2030, subject to confirmation by impact assessments by the European Parliament and the Commission, in order to achieve the Union’s greenhouse gas emissions reduction target10 . Therefore, the target set out in Article 3 of that Directive needs to be increased. __________________ 9 Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the promotion of the use of energy from renewable sources, OJ L 328, 21.12.2018, p. 82–209 10 Point 3 of the Communication from the Commission COM(2020) 562 final of 17.9.2020, Stepping up Europe’s 2030 climate ambition Investing in a climate- neutral future for the benefit of our people
2022/03/17
Committee: ITRE
Amendment 115 #
Proposal for a directive
Recital 4
(4) There is a growing recognition of the need for alignment of bioenergy policies with the cascading principle of biomass use11 , with a view to ensuring fair access to the biomass raw material market for the development of innovative, high value-added bio-based solutions and a sustainable circular bioeconomy. When developing support schemes for bioenergy, Member States should therefore take into consideration the available sustainable supply of biomass for energy and non- energy uses and the maintenance of the national forest carbon sinks and ecosystems as well as the principles of the circular economy and the biomass cascading use, and the waste hierarchy established in Directive 2008/98/EC of the European Parliament and of the Council12 . For this, they should grant no support to the production of energy from saw logs, veener logs, stumps and roots and avoid promoting the use of quality roundwood for energy except in well-defined circumstances. In line with the cascading principle, woody biomass should be used according to its highest economic and environmental added value in the following order of priorities: 1) wood-based products, 2) extending their service life, 3) re-use, 4) recycling, 5) bio-energy and 6) disposal. Where no other use for woody biomass is economically viable or environmentally appropriate, energy recovery helps to reduce energy generation from non- renewable sources. Member States’ support schemes for bioenergy should therefore be directed to such feedstocks for which little market competition exists with the material sectors, and whose sourcing is considered positive for both climate and biodiversity, in order to avoid negative incentives for unsustainable bioenergy pathways, as identified in the JRC report ‘The use of woody biomass for energy production in the EU’13 . On the other hand, in defining the further implications of the cascading principle, it is necessary to recognise the national specificities which guide Member States in the design of their support schemesWaste prevention, reuse and recycling of waste should be the priority option. Member States should avoid creating support schemes which would be counter to targets on treatment of waste and which would lead to the inefficient use of recyclable waste. Moreover, in order to ensure a more efficient use of bioenergy, from 2026 on Member States should not give new support anymore to electricity-only plants , unless the installations are in regions with a specific use status as regards their transition away from fossil fuels or, if the installations use carbon capture and storage or if there is no cost-effective potential to apply high-efficient co-generation. __________________ 11 The cascading principle aims to achieve resource efficiency of biomass use through prioritising biomass material use to energy use wherever possible, increasing thus the amount of biomass available within the system. In line with the cascading principle, woody biomass should be used according to its highest economic and environmental added value in the following order of priorities: 1) wood-based products, 2) extending their service life, 3) re-use, 4) recycling, 5) bio-energy and 6) disposal. 12 Directive 2008/98/EC of the European Parliament and of the Council of 19 November 2008 on waste and repealing certain Directives (OJ L 312, 22.11.2008, p. 3). 13 https://publications.jrc.ec.europa.eu/reposit ory/handle/JRC122719
2022/03/17
Committee: ITRE
Amendment 120 #
Proposal for a directive
Recital 5
(5) The rapid growth and increasing cost-competitiveness of renewable electricity production can be used to satisfy a growing share of energy demand, for instance using heat pumps for space heating or low-temperature industrial processes, electric vehicles for transport, or electric furnaces in certain industries. Renewable electricity can also be used to produce synthetic fuels for consumption in hard-to-decarbonise transport sectors such as aviation and maritime transport. A framework for electrification needs to enable robust and efficient coordination and expand market mechanisms to match both supply and demand in space and time, stimulate investments in flexibility, and help integrate large shares of variable renewable generation. Member States should therefore ensure that the deployment of renewable electricity continues to increase at an adequate pace to meet growing demand. For this, Member States should establish a framework that includes market-compatible mechanisms to tackle remaining barriers to have secure and adequate electricity systems fit for a high level of renewable energy, as well as storage facilities, fully integrated into the electricity system. In particular, this framework shall tackle remaining barriers, including non- for the full integration of non- programmable RES into the electricity system and for the decarbonisation process of the generation fleet by ensuring the availability of market instruments which provide long term price signals for investment decisions, including investments in system adequacy, stability and flexibility through competitive, transparent and non- discriminatory bidding process, which provide for a remuneration of the awarded recipients based on market prices. The framework shall also tackle non-financial barriers, including non- financial ones such as insufficient digital and human resources of authorities to process a growing number of permitting applications.
2022/03/17
Committee: ITRE
Amendment 138 #
Proposal for a directive
Recital 8
(8) The Offshore Renewable Energy Strategy introduces an ambitious objective of 300 GW of offshore wind and 40 GW of ocean energy across all the Union’s sea basins by 2050. To ensure this step change, Member States will need to work together across borders at sea-basin level. Member States should therefore jointly define the amount of offshore renewable generation to be deployed within each sea basin by 2050, with intermediate steps in 2030 and 2040. These objectives should be reflected in the updated national energy and climate plans that will be submitted in 2023 and 2024 pursuant to Regulation (EU) 2018/1999. In defining the amount, Member States should take into account the offshore renewable energy potential of each sea basin, the technical and economic feasibility of the transmission grid infrastructure, environmental protection, climate adaptation and other uses of the sea, as well as the Union’s decarbonisation targets. In addition, Member States should increasingly consider the possibility of combining offshore renewable energy generation withneed for an integrated planning in terms of RES and networks and the possibility of developing transmission lines interconnecting several Member States, in the form of hybrid projects or, at a later stage, a more meshed grid. This would allow electricity to flow in different directions, thus maximising socio- economic welfare, optimising infrastructure expenditure and enabling a more sustainable usage of the sea. The targets for each basin must be established in strong coordination with the electricity TSOs.
2022/03/17
Committee: ITRE
Amendment 145 #
Proposal for a directive
Recital 10
(10) Overly complex and excessively long administrative procedures constitute a major barrier for the deployment of renewable energy. Further streamlining of administrative and permitting procedures is needed to ease the administrative burden for both renewable energy projects and the related grid infrastructure projects. Member States should define a minimum set of clear and general rules at EU level to ease and accelerate the national transposition processes, facilitate a homogeneous application throughout the EU of permitting procedures and ease the ex-post monitoring of the measures adopted by Member States from the Commission. These rules should foresee an integrated or coordinated process for renewable energy plants and the transmission grid infrastructures which are essential for their integration in the energy system and simplified permitting procedures for projects which respect clearly defined criteria. On the basis of the measures to improve administrative procedures for renewable energy installations that Member States are to report on by 15 March 2023 in their first integrated national energy and climate progress reports pursuant to Regulation (EU) 2018/1999 of the European Parliament and of the Council15 , the Commission should assess whether the provisions included in this Directive to streamline these procedures have resulted in smooth and proportionate procedures. If that assessment reveals significant scope for improvement, the Commission should take appropriate measures to ensure Member States have streamlined and efficient administrative procedures in place. __________________ 15 Regulation (EU) 2018/1999 of the European Parliament and of the Council of 11 December 2018 on the Governance of the Energy Union and Climate Action, amending Regulations (EC) No 663/2009 and (EC) No 715/2009 of the European Parliament and of the Council, Directives 94/22/EC, 98/70/EC, 2009/31/EC, 2009/73/EC, 2010/31/EU, 2012/27/EU and 2013/30/EU of the European Parliament and of the Council, Council Directives 2009/119/EC and (EU) 2015/652 and repealing Regulation (EU) No 525/2013 of the European Parliament and of the Council (OJ L 328, 21.12.2018, p. 1).
2022/03/17
Committee: ITRE
Amendment 180 #
Proposal for a directive
Recital 19
(19) Distributed storage assets, such as domestichousehold and community batteries and batteries of electric vehicles and energy conversion assets, such as grid-connected electrolysers, have the potential to offer considerable flexibility and balancing services to the grid through aggregation. In order to facilitate the development of such services, the regulatory provisions concerning connection and operation of the storage assets, such as tariffs, commitment times and connection specifications, should be designed in a way that does not hamper the potential of all storage assets, including small and mobile ones, to offer flexibility and balancing services to the system and to contribute to the further penetration renewable electricity, in comparison with larger, stationary storage assets.
2022/03/17
Committee: ITRE
Amendment 183 #
Proposal for a directive
Recital 20
(20) Recharging points where electric vehicles typically park for extended periods of time, such as where people park for reasons of residence or employment, are highly relevant to energy system integration, therefore smart charging functionalities need to be ensured. In this regard, the operation of non-publicly accessible normal charging infrastructure, for instance through smart metering systems, is particularly important for the integration of electric vehicles in the electricity system as it is located where electric vehicles are parked repeatedly for long periods of time, such as in buildings with restricted access, employee parking or parking facilities rented out to natural or legal persons.
2022/03/17
Committee: ITRE
Amendment 202 #
Proposal for a directive
Recital 25 a (new)
(25a) Member States should avoid distortive situations resulting in the extensive importation of resources from third countries. A life-cycle approach should be considered and promoted in that respect.
2022/03/17
Committee: ITRE
Amendment 275 #
Proposal for a directive
Article 1 – paragraph 1 – point 1 – point -a (new)
DIRECTIVE (EU) 2018/2001
Article 2 – paragraph 2 – point 1
(-a) point (1) is replaced by the following: "(1) ‘energy from renewable sources’ or ‘renewable energy’ means energy from renewable non-fossil sources, namely wind, solar (solar thermal and solar photovoltaic) and geothermal energy, osmotic energy, ambient energy, tide, wave and other ocean energy, hydropower, biomass, landfill gas, sewage treatment plant gas, and biogas; ' content/EN/TXT/HTML/?uri=CELEX:32018L2001&from=FR#d1e1159-82-1)" Or. en (https://eur-lex.europa.eu/legal-
2022/03/17
Committee: ITRE
Amendment 316 #
Proposal for a directive
Article 1 – paragraph 1 – point 1 – point c
Directive (EU) 2018/2001
Article 2
(22a) ‘renewable fuels’ means biofuels, bioliquids, biogas, biomass fuels and renewable fuels of non-biological origin;
2022/03/17
Committee: ITRE
Amendment 335 #
Proposal for a directive
Article 1 – paragraph 1 – point 1 – point c
Directive (EU) 2018/2001
Article 2
(44ba) "low carbon fuels" means liquid and gaseous fuels that are produced from feedstock of non-renewable origin, complying with the minimum greenhouse gases emissions savings thresholds of Article 29b.
2022/03/17
Committee: ITRE
Amendment 337 #
Proposal for a directive
Article 1 – paragraph 1 – point 1 – point c
DIRECTIVE (EU) 2018/2001
Article 2 – paragraph 2
(44ba) ‘osmotic energy’ means energy naturally created from the difference in salt concentration between two fluids, commonly fresh and salt water;
2022/03/17
Committee: ITRE
Amendment 380 #
Proposal for a directive
Article 1 – paragraph 1 – point 2 – point a
Directive (EU) 2018/2001
Article 3 – paragraph 1
1. Member States shall collectively ensure that the share of energy from renewable sources in the Union’s gross final consumption of energy in 2030 is at least 40%5%, subject to confirmation by impact assessments by the European Parliament and the Commission.;
2022/03/17
Committee: ITRE
Amendment 434 #
Proposal for a directive
Article 1 – paragraph 1 – point 2 – point b
Directive 2018/2001
Article 3 – paragraph 3 – point b
(b) FWithout prejudice to the provisions set out in Article 6, from 31 December 2026, and without prejudice to the obligations in the first sub-paragraph, Member States shall grant no new support to the production of electricity from forest biomass in electricity-only-installations, unless such electricity meets at least one of the following conditions:
2022/03/17
Committee: ITRE
Amendment 458 #
Proposal for a directive
Article 1 – paragraph 1 – point 2 – point b
Directive 2018/2001
Article 3 – paragraph 3 – point b
(iia) it is produced in electricity installations if there is no cost-effective potential for the application of high efficiency cogeneration technology according to the assessment done in accordance with Article 14 of Directive 2012/27/EU.
2022/03/17
Committee: ITRE
Amendment 510 #
Proposal for a directive
Article 1 – paragraph 1 – point 2 – point c a (new)
Directive (EU) 2018/2001
Article 4
Member States may also consider(ca) Article 4 is amended as follows: in paragraph 4, the third subparagraph is replaced by the following " Member States shall establishing mechanisms to ensure the regional diversificefficient system integration inof the deployment of renewable electricity, i plants. In particular to ensure cost-efficient system integration. , support schemes shall be designed so as to integrate locational price signals which incentivise the geographical development of RES plants, including offshore RES, compatibly with the electricity grid potentialities. " Or. en (COM(2021)0557 - C9-0329/2021 – 2021/0218(COD))
2022/03/17
Committee: ITRE
Amendment 528 #
Proposal for a directive
Article 1 – paragraph 1 – point 3 – point c
Directive (EU) 2018/2001
Article 7 – Paragraph 4
(a) Final consumption of energy from renewable sources in the transport sector shall be calculated as the sum of all biofuels, biogas, recycled carbon fuels and renewable fuels of non-biological origin consumed in the transport sector.;
2022/03/17
Committee: ITRE
Amendment 543 #
Proposal for a directive
Article 1 – paragraph 1 – point 4 – point b
Directive (EU) 2018 – 2001
Article 9
7a. Member States bordering a sea basin shall cooperate to jointly define the amount of offshore renewable energy they plan to produce in that sea basin by 2050, with intermediate steps in 2030 and 2040. They shall take into account the specificities and development in each region including the technical and economic feasibility of the transmission grid infrastructure, the offshore renewable potential of the sea basin and the importance of ensuring the associated integrated grid planning. Member States shall notify that amount in the updated integrated national energy and climate plans submitted pursuant to Article 14 of Regulation (EU) 2018/1999.;
2022/03/17
Committee: ITRE
Amendment 568 #
Proposal for a directive
Article 1 – paragraph 1 – point 5 – point c
Directive (EU) 2018/2001
Article 15 paragraph 8
Member States shall describe their policies and measures promoting the uptake of renewables powerenergy purchase agreements in their integrated national energy and climate plans referred to in Articles 3 and 14 of Regulation (EU) 2018/1999 and progress reports submitted pursuant to Article 17 of that Regulation. They shall also provide, in those reports, an indication of the volume of renewable power generation supported by renewables power purchase agreements.;
2022/03/17
Committee: ITRE
Amendment 572 #
Proposal for a directive
Article 1 – paragraph 1 – point 5 – point c a (new)
(ca) In the planning and permit- granting process, Member States shall ensure that the deployment of energy from renewable sources and the related grid infrastructure is considered as being in the overriding public interest and serving public safety, in accordance with relevant Union law.
2022/03/17
Committee: ITRE
Amendment 574 #
Proposal for a directive
Article 1 – paragraph 1 – point 5 – point c b (new)
(cb) Member States shall ensure that applicants are allowed to submit all relevant documents also in digital form. If an applicant makes use of the digital application option, the entire permitting process including the administrative internal processes needs to be carried out digitally. Member States shall further ensure the digitalization of the public hearings and the participation procedures.
2022/03/17
Committee: ITRE
Amendment 585 #
Proposal for a directive
Article 1 – paragraph 1 – point 5 – point d
(EU) 2018/2001
Article 15– paragraph 9
9. By one year after the entry into forcefull transposition of this amending Directive by all Member States, the Commission shall carry out, an evaluation of the need for reviewing, and where appropriate, proposeing modifications to, the rules on administrative procedures set out in Articles 15, 16 and 17 and their application, and may take additional measures to support Member States in their implementation.;
2022/03/17
Committee: ITRE
Amendment 669 #
Proposal for a directive
Article 1 – paragraph 1 – point 7 b (new)
Directive (EU) 2018/2001
Article 16 – paragraph 6
(7b) "6.Member States shall facilitate the repowering of existing renewable energy plants by ensuring a simplified and swift permit-granting process. The length of that process shall not exceed one yeartwo years including all relevant procedures of competent authorities. Where duly justified on the grounds of extraordinary circumstances, such as on grounds of overriding safety reasons where the repowering project impacts substantially on the grid or the original capacity, size or performance of the installation, that one- year period may be extended by up to one year. In the event the repowering project determines an increase in the capacity of the installation and the need for further network developments without increasing the occupied area, the repowering project and the grid development projects associated to the repowering are authorized through the same simplified procedure pursuant to the first subparagraph. 6bis. Member States shall appoint a competent body or authority which differs from the authority empowered to issue authorisation decisions with substitution powers on the latter. Those powers shall be exercised where the terms referred to in paragraphs 4 and 6 for deciding on the authorisation for power plants and the assets necessary for their connection and integration in the grid are infringed. The substituting competent body or authority shall decide on the procedure within halved timings as referred to in paragraphs 4 and 6. " Or. en (COM(2021)0557 - C9-0329/2021 – 2021/0218(COD))
2022/03/17
Committee: ITRE
Amendment 673 #
Proposal for a directive
Article 1 – paragraph 1 – point 7 f (new)
Directive (EU) 2018/2001
Article 19 – paragraph 11
(7f) Article 19 - paragraph 11 " The Commissions shall issue Guidelines clarifying the EU requirements for recognising guarantees of origin issued by a third country, including the underlying governance arrangements associated, to the purpose of streamlining and accelerating the achievement of such agreements with third countries. Based on such Guidelines, Member States shall recognise guarantees of origins issued by a third country which has set up an Issuance Body where the Union has concluded an agreement with that third country on mutual recognition of guarantees of origin issued in the Union and compatible guarantees of origin systems established in that third country, and only where there is direct import or export of energy . " Or. en (COM(2021)0557 - C9-0329/2021 – 2021/0218(COD))
2022/03/17
Committee: ITRE
Amendment 700 #
Proposal for a directive
Article 1 – paragraph 1 – point 8 – point a b (new)
(EU) 2018/2001
Article 19– paragraph 7– point b–
(ab) Point (b) is amended as follows : "(b) whether it relates to : (i) electricity; (ii) gas, including (iii) hydrogen; or (iii(iv) heating or cooling; " Or. en ((EU) 2018/2001)
2022/03/17
Committee: ITRE
Amendment 702 #
Proposal for a directive
Article 1 – paragraph 1 – point 8 – point a c (new)
(EU) 2018/2001
Article 19– paragraph 7– point g (new)
(ac) g) greenhouse gas emissions over the life cycle of the guaranteed energy
2022/03/17
Committee: ITRE
Amendment 722 #
Proposal for a directive
Article 1 – paragraph 1 – point 9 a (new)
Directive (EU) 2018/2001
Article 20 – Paragraph 1
(9a) Article 20 - Paragraph 1 is replaced by the following: "1. Where relevant, Member States shall assess the need to extend existing gas network infrastructure to facilitate the integration of gas from renewable sources. , or to reduce the reliance on gas in line with the Joint European Action for more affordable, secure and sustainable energy set out in Commission communication of 8 March 2022, in particular if that infrastructure contributes significantly to the interconnection between at least two Member States or between a Member State and a third country. " Or. en (Directive (EU) 2018/2001)
2022/03/17
Committee: ITRE
Amendment 749 #
Proposal for a directive
Article 1 – paragraph 1 – point 10
(UE) 2018/2001
Article 20a– Paragraph 3
3. In addition to the requirements in [the proposal for a Regulation concerning the deployment of alternative fuel infrastructure, repealing Directive 2014/94/EU], Member States shall ensure that non–publicly accessible normal power recharging points installed in their territory from [the transposition deadline of this amending Directive] can support smart charging functionalities and, interface with smart metering systems, and where appropriate based on assessment by the regulatory authority, bidirectional charging functionalities.
2022/03/17
Committee: ITRE
Amendment 756 #
Proposal for a directive
Article 1 – paragraph 1 – point 10
(EU) 2018/2001
Article 20a– paragraph 4
4. Member States shall ensure that all means of electricity generation, including units producing electricity from renewable sources, shall be involved in providing system and balancing services. Moreover, Member States shall ensure that the national regulatory framework does not discriminate against participation in the electricity markets, including congestion management and the provision of flexibility and balancing services, of small or mobile systems such as domestic batteries and electric vehicles, both directly and through aggregation.;
2022/03/17
Committee: ITRE
Amendment 792 #
Proposal for a directive
Article 1 – paragraph 1 – point 11
Directive (EU) 2018/2001
Article 22a – paragraph 1
Member States shall ensure that the contribution of renewable fuels of non- biological origin used for final energy and non-energy purposes shall be 50 % of the hydrogen used for final energy and non- energyand low-carbon hydrogen shall be 50 % of the hydrogen fully produced or purpochasesd in industry by 2030. For the calculation of that percentage, the following rules shall apply:
2022/03/17
Committee: ITRE
Amendment 799 #
Proposal for a directive
Article 1 – paragraph 1 – point 11
Directive (EU) 2018/2001
Article 22a
(a) For the calculation of the denominator, the energy content of hydrogen for final energy and non-energy purposeseither purchased or produced as final product shall be taken into account, excluding hydrogen used as intermediate products for the production of conventional transport fuels.
2022/03/17
Committee: ITRE
Amendment 814 #
Proposal for a directive
Article 1 – paragraph 1 – point 11
Directive (EU) 2018/2001
Article 22 a – paragraph 2 a (new)
2 a. By ... [one year after the entry into force of this amending Directive], the Commission shall develop a global import strategy for renewable fuels of non- biological origin, renewable hydrogen and low carbon hydrogen. That strategy shall include indicative targets and measures for imports of renewable electricity, renewable fuels of non-biological origin and renewable hydrogen. Member States shall take appropriate measures to implement the strategy in their integrated national energy and climate plans and progress reports submitted pursuant to Articles 3, 14 and 17 of Regulation (EU) 2018/1999.
2022/03/17
Committee: ITRE
Amendment 835 #
Proposal for a directive
Article 1 – paragraph 1 – point 12 – point a
Directive (EU) 2018/2001
Article 23
That increase shall be of 1.5 percentage points for Member States where waste heat and cold is used. In that case, Member States may count waste heat and cold up to 40 % of the average annual increase.
2022/03/17
Committee: ITRE
Amendment 962 #
Proposal for a directive
Article 1 – paragraph 1 – point 14
(EU) 2018/2001
Article 25– paragraph 1– subparagraph 1– point (a)
(a) the amount of renewable fuels and renewable electricity and other low carbon fuels supplied to the transport sector leads to a greenhouse gas intensity reduction of at least 13 % by 2030, compared to the baseline set out in Article 27(1), point (b), in accordance with an indicative trajectory set by the Member State;
2022/03/17
Committee: ITRE
Amendment 987 #
Proposal for a directive
Article 1 – paragraph 1 – point 14
(EU) 2018/2001
Article 25– paragraph 1– subparagraph 2
For the calculation of the reduction referred to in point (a) and the share referred to in point (b), Member States shall take into account renewable fuels of non-biological origin also when they are used as intermediate products for the production of conventional fuels or other renewable fuels. For the calculation of the reduction referred to in point (a), Member States may take into account recycled carbon fuels.
2022/03/17
Committee: ITRE
Amendment 1042 #
Proposal for a directive
Article 1 – paragraph 1 – point 15 – point a a (new)
(EU) 2018/2001
Article 26– paragraph 1 a
(aa) paragraph 1 a is inserted after paragraph 1: “For the calculation referred to in paragraph 1, point 1, the contribution of zero-emission, zero-deforestation biofuels is not capped.”
2022/03/17
Committee: ITRE
Amendment 1044 #
Proposal for a directive
Article 1 – paragraph 1 – point 15 – point b a (new)
(ba) c) in the second paragraph, the following subparagraph is inserted after the fifth subparagraph: “Soy is included in the list of feedstocks with a high indirect land-use change-risk for which a significant expansion of the production area into land with high carbon stock is observed.”
2022/03/17
Committee: ITRE
Amendment 1095 #
Proposal for a directive
Article 1 – paragraph 1 – point 16 – point d a (new)
(EU) 2018/2001
Article 27– paragraph 2
(da) the share of biofuels and biogas for transport produced from grape marcs and wine lees may be considered to be twice its energy content.
2022/03/17
Committee: ITRE
Amendment 1165 #
Proposal for a directive
Article 1 – paragraph 1 – point 18 – point a – point iii a (new)
(EU) 2018/2001
Article 29– Paragraph 1– subparagraph 6 (new)
(iiia) the following subparagraph is inserted after the fifth subparagraph: The Commission will implement, at the latest by 2025, the legal framework for applying EU health, environmental and waste standards, including processes and production methods, to imported renewable fuels, and identify concrete initiatives to ensure better consistency in their application, in conformity with WTO rules.
2022/03/17
Committee: ITRE
Amendment 1302 #
Proposal for a directive
Annex I – paragraph 1 – point 8 – point a a (new)
(a a) In Part A, the following feedstocks are inserted: “r) intermediate crops which do not trigger demand for additional land”
2022/03/17
Committee: ITRE