Activities of António Fernando CORREIA DE CAMPOS related to 2011/0300(COD)

Plenary speeches (2)

Trans-European energy infrastructure (debate)
2016/11/22
Dossiers: 2011/0300(COD)
Trans-European energy infrastructure (debate)
2016/11/22
Dossiers: 2011/0300(COD)

Reports (1)

REPORT on the proposal for a regulation of the European Parliament and of the Council on guidelines for trans-European energy infrastructure and repealing Decision No 1364/2006/EC PDF (1 MB) DOC (1 MB)
2016/11/22
Committee: ITRE
Dossiers: 2011/0300(COD)
Documents: PDF(1 MB) DOC(1 MB)

Amendments (9)

Amendment 248 #
Proposal for a regulation
Article 3 – paragraph 5
5. For electricity and gas projects falling under the categories set out in points 1 and 2 of Annex II, the Agency shall submit, within twohree months from the date of receipt of the proposed lists of projects of common interest set out in the first subparagraph of paragraph 4, an opin reasoned recommendation to the Commission on the proposed lists of projects of common interest, in particular taking into account the consistent application ofproposing: - for each regional list, a ranking of projects aggregated by clusters, in a limited number of categories, according to their priority; - a single Union-wide list of projects of common interest, aggregated according to the corresponding clusters; In its analysis the Agency shall take into account the criteria set out in Article 4 across the Groups, and, the results of the analysis carried out by the ENTSOs for Electricity and Gas in accordance with point 2.6 of Annex III, and their consistent application across the Groups. The Agency shall also take into account the consistency of the projects with a coherent expansion of the network in regard to economic efficiency, cross- border operational integration, as well as the specific potential of each region to best contribute towards reaching the Union’s energy and climate policy goals. The opinion of the Agency shall be adopted in accordance with the procedure in Article 15(1) of Regulation No 713/2009.
2012/05/08
Committee: ITRE
Amendment 431 #
Proposal for a regulation
Article 6 – paragraph 5 a (new)
5a. The power given to the coordinator in order to take measures for facilitating the project(s) implementation shall be defined between the concerned member States and the Commission.
2012/05/08
Committee: ITRE
Amendment 550 #
Proposal for a regulation
Article 13 – paragraph 6 – subparagraph 4
The cost allocation decision shall be published. Articles 19, 20 and 22 of Regulation (EC) No. 713/2009 are applicable.
2012/05/08
Committee: ITRE
Amendment 573 #
Proposal for a regulation
Article 14 – paragraph 6
6. The Commission may, in cooperation with ACER, shall issue guidelines regarding the incentives laid down in this Article in accordance with Article 18(1) to (3) of Regulation (EC) No 714/2009 and Article 23 (1) of Regulation (EC) No 715/2009, taking into account national specificities, where necessary.
2012/05/08
Committee: ITRE
Amendment 578 #
Proposal for a regulation
Article 14 a (new)
Article 14 a Operational Coordination 1. In order to ensure the reliable and efficient operation of the European energy infrastructure, including projects of common interest, the ENTSO for electricity and the ENTSO for gas shall submit to the Agency and to the Commission, within 6 months of the entry into force of this Regulation, their respective proposals for the design and implementation of appropriate real-time operational coordination. The submission may take the form of specific and binding provisions of network codes to be approved according to existing procedures. 2. The proposals shall include: a) complete functional specifications, clearly indicating the information to be collected and shared among all interconnected transmission system operators within each interconnected area; b) governance model, including ownership; c) implementation schedule. 3. Within 3 months of the date of the receipt of the proposals, the Agency shall publish a reasoned opinion on the proposals. 4. Within 3 months of the date of the receipt of the Agency's opinion, the Commission shall instruct the ENTSO for electricity and the ENTSO for gas to start the implementation of the appropriate operational coordination. 5. The operational information referred to in Article 2a shall be made available in real-time to all interconnected system operators and to the Agency. Each system operator shall designate a contact point in charge of answering inquiries from the Agency or from other system operators, concerning such information.
2012/05/08
Committee: ITRE
Amendment 627 #
Proposal for a regulation
Article 17 – paragraph 1 – point a a (new)
(aa) regularly updated information on the work of the Groups established pursuant to Article 3(2) including the agenda and the minutes of the meetings while excluding any commercially secret information;
2012/05/08
Committee: ITRE
Amendment 630 #
Proposal for a regulation
Article 18 a (new)
Article 18 a Regulation EC No 713/2009 is hereby amended as follows: Art. 22 (a)shall be replaced by the following: Fees shall be due to the Agency for requesting an exemption decision pursuant to Article 9 (1) and any other services provided by the Agency pursuant to [Regulation on guidelines for trans- European energy infrastructure and repealing Decision No 1364/2006/EC].
2012/05/08
Committee: ITRE
Amendment 810 #
Proposal for a regulation
Annex V – point 6 – introductory part
(6) For electricity transmission and storage, the cost-benefit analysis shall at least take into account the impacts on the indicators defined in Annex III. In line with the methods applied for the elaboration of the latest available ten-year network development plan in electricity, it shall in addition notably take into account the impacts of the project on the following, as well as benefits incurred by an accelerated project realization offsetting grid congestion costs due the deployment of all technology options listed under Annex II (1a), or a combination thereof:
2012/05/08
Committee: ITRE
Amendment 822 #
Proposal for a regulation
Annex V – point 11
(11) The methodology shall define the analysis to be carried out, based on the relevant input data set, by calculating the results of the objective function with and without each project. The analysis shall identify the Member States on which the project has net positive impacts (beneficiaries) and those Member States on which the project has a net negative impact (cost bearers). Each cost-benefit analysis shall include sensitivity analyses concerning the input data set, the commissioning date of different projects in the same area of analysis and other relevant parameters, as well as risk assessment.
2012/05/08
Committee: ITRE