Progress: Procedure completed
Role | Committee | Rapporteur | Shadows |
---|---|---|---|
Lead | ITRE | HARMS Rebecca ( Verts/ALE) | |
Committee Opinion | ENVI | ||
Committee Opinion | CONT |
Lead committee dossier:
Legal Basis:
RoP 54
Legal Basis:
RoP 54Subjects
Events
In October 2004, the Commission presented its first report to the European Parliament on the use of financial resources earmarked for the decommissioning of nuclear power plants.
The report was drafted partly as a result of concerns regarding potential safety implications, should adequate decommissioning funds not be available when needed, and partially because of concerns regarding the distortion of competition within the internal market. The 2004 report was well received and led to an own-initiative report from the European Parliament.
Since the adoption of its first report, the Commission has undertaken an extensive consultation process with all interested parties and stakeholders and adopted a Recommendation on decommissioning funds in 2006 . This is a second report on the matter of funds that have been ring-fenced for the decommissioning of nuclear power plants. Its purpose is to compare EU nuclear operators and Member States’ funding practices.
The main findings of the study are that the decommissioning of nuclear plants is set to become an increasingly important issue in the years ahead. It can be assumed that under present policies, around one third of the reactors currently operating in the EU will need to be decommissioned by 2025. In spite of specific national legislation more could be done to improve aspects of fund adequacy and management use – in particular through detailed monitoring and reporting. Differences in decommissioning strategies and fund management may lead to a distortion on the liberalised EU energy markets. Decommissioning costs, including the final disposal of waste, has to be seen as part of the electricity production costs and should be compatible with state aid rules.
The report urges the Member States to adopt a more transparent approach when reporting on the financial resources for decommissioning. Liability assessments should follow agreed accounting principles with estimates and provisions being made available to the public.
The main differences that currently exist between the Member States relate to the structure and ownership of energy utilities – a distinction that was formed before the internal market in electricity was set up. Liberalising the energy market has brought about an increased need for transparency and more harmonisation in the management of these financial resources. For its part, the Commission, urges the Member States to step up cooperation.
One of the most important objectives that needs to be factored into any future strategy is to ensure that financial resources are set aside to meet the requirements of nuclear plant decommissioning and that they will be available as and when required. Any resources that have been set aside will need to be managed in a transparent manner. Information concerning decommissioning should be made publicly available and not made confidential.
The benefits of harmonised decommissioning methodologies should be explored further at an EU level and common approaches, in the case of new constructions, rigorously pursued.
For its part, the Commission will focus attention on the adequacy of funding, its financial security and the ring fencing that is required in order to guarantee that funds are used only for the purposes for which it was intended.
The European Parliament adopted a resolution based on the own-initiative report by Rebecca HARMS (Greens/EFA, DE) on the use of financial resources earmarked for the decommissioning of nuclear power plants. (Please see the summary of 26/09/2005.)
The importance of decommissioning nuclear power plants: Parliament r ecognised that it is important, for the protection of human beings and the environment, that nuclear power plants are properly decommissioned after they are shut down. A lack of financial resources for decommissioning might in some cases delay the decommissioning of nuclear power plants and hence should be avoided. Parliament noted the Commission's intention to adopt a non-binding recommendation on this subject in the coming weeks, as well as the Commission's intention to undertake significant survey work on this subject during 2006 in order to support the formulation of Community policy and legislative initiatives.
Financial resources earmarked for decommissioning. In all Member States, all nuclear undertakings must have sufficient financial resources available when needed to cover all the costs of decommissioning, including waste management in order to uphold the polluter pays principle and avoid any recourse to State aid. Parliament called on the Commission, with due regard for the principle of subsidiarity , to draw up precise definitions concerning the use of financial resources earmarked for decommissioning in each Member State, taking into account decommissioning as well as the management, conditioning and final disposal of the resultant radioactive waste. The approach to the management of such financial resources differs from one Member State to another. Parliament stated that these financial resources to be used for fair investments fully in line with Community competition law, thereby avoiding distortions.
Safety and environmental aspects: Parliament n oted that at each step in the decommissioning of nuclear power plants the safety of humans and the environment must be considered and that previous experience should be put to good use as far as possible. There are two strategies - immediate decommissioning and staged decommissioning strategies whose respective advantages and disadvantages should be weighed up in view of the location and the characteristics of the reactor. Safety issues relating to the protection of humans and the environment should be paramount in respect of the choice of decommissioning strategy. Parliament called for a review in all Member States of the practice of releasing low-level radioactive substances in particularly large quantities in areas subject to nuclear and radiation protection legislation when a plant is decommissioned.
Economic aspects: Parliament considered it acceptable for exceptions to apply, for example in the new Member States , due to safety considerations. It questioned whether the accounting provisions made so far in a number of Member States and the corresponding financial resources are equal to the real needs, but welcomed the financial support granted by the European Union to certain decommissioning projects in the new Member States. Parliament went on to state that it supported the Commission's position that the cost of nuclear decommissioning, which is to be understood as covering other external costs and subsidies for other types of electricity production, must also be taken into account in assessing the economic viability of any power plant in such a way as to avoid distortions of competition. Finally, Parliament noted that the operator of a nuclear power plant is responsible for arranging insurance to cover civil liability during the entire decommissioning period against unforeseen incidents or accidents in line with international liability conventions.
The committee adopted the own initiative report drawn up by Rebecca HARMS (Greens/EFA, DE) in response to the Commission communication on financial resources earmarked for the decommissioning of nuclear power plants.
MEPs said that it was important, "for the protection of human beings and the environment", that nuclear power plants should be properly decommissioned after they have been shut down definitively. They noted that a lack of financial resources might in some cases delay decommissioning and said that it was necessary to ensure that in each Member State all nuclear undertakings have sufficient financial resources available when needed to cover all the costs of decommissioning, including waste management. They added that the approach to managing financial resources earmarked for decommissioning differed from one Member State to the other, and called for the sound management of these resources, which should be used for fair investments "fully in line with EU competition law avoiding distortion".
The Commission should, with due regard for the subsidiarity principle, draw up precise definitions concerning the use of financial resources in each Member States, taking into account the decommissioning as well as the management, conditioning and final disposal of the resultant radioactive waste. The report stressed that the resources should be managed and used with maximum transparency, and that external auditing should be guaranteed.
The committee felt that the Commission's communication provided an opportunity to draw attention to the safety aspects of decommissioning nuclear power plants and said that safety issues relating to the protection of humans and the environment should be "paramount" when it came to the choice of decommissioning strategy. It called for a review, in all Member States, of the practice of releasing low-level radioactive substances from areas subject to nuclear and radiation protection legislation when a plant is decommissioned.
Other points raised in the report included support for the Commission's position that the cost of nuclear decommissioning must be taken into account when assessing the economic viability of any power plant, and a reminder that, in line with the international liability conventions, nuclear power plant operators are responsible for arranging insurance to cover civil liability during the entire decommissioning period against unforeseen incidents or accidents. In conclusion, MEPs wondered whether the accounting provisions made so far in a number of Member States and the corresponding financial resources were equal to the real needs, and they welcomed the financial support, subject to certain basic conditions, granted by the EU to various decommissioning projects in the new Member States.
Fulfilling the undertaking it gave to the European Parliament when the Directive on the internal market in electricity was adopted, this report has been prepared by the Commission on the use of financial resources earmarked for the decommissioning of nuclear plants.
Underlining that this is set to become an increasingly important issue (of the 155 reactors currently operating in the enlarged EU, some 50 to 60 are likely to be decommissioned by 2025), the Commission believes it is vital to ensure that, when the time comes, sufficient financial resources will be available to cover the costs of decommissioning work while guaranteeing a high level of nuclear safety. In addition, the creation of the internal market in electricity requires that these resources be managed with complete transparency and that they be used for the purpose for which they have been set aside.
Decommissioning nuclear plants is a technically complex operation requiring considerable funding. The amount needed to rehabilitate the site of a plant is currently estimated to be around 10 to 15% of the initial investment cost for each reactor to be decommissioned. Whatever means nuclear operators select for setting aside resources, that these sums should be commercially managed is not in itself open to criticism. However, it is not easy to draw a dividing line between “normal” management of these resources and practices that may lead to distortions of competition on the internal market in electricity. The Commission has compiled its report using information received from the 14 Member States that have nuclear plants. This information reveals widely differing situations, in terms both of decommissioning strategies and of the way financial resources are managed. It indicates that the majority of the Member States have chosen the option of external management, i.e. separate from the accounts of the nuclear operator, which seems to offer the greatest transparency and, probably, the best guarantee as to the ultimate use of the financial resources. In some countries, however, financial resources earmarked for decommissioning are entered in the accounts of the electricity producers in the form of provisions.
The Commission is now asking the Member States to provide it with further information which it will use first of all to come up with a common framework and, in the longer term, to harmonise the methods by which decommissioning is financed in the EU. The Union should in fact ensure that resources, once set aside, are managed in accordance with Community law.
The Commission will begin in 2005 by presenting a recommendation to the Member States on the basis of the Euratom Treaty, calling on them to take the necessary measures to ensure that financial resources are managed in a transparent manner and that, when the time comes, they are available to maintain a high level of nuclear safety during decommissioning work.
The European Commission is presenting this Report in response to Parliamentary concerns over the use of funds set aside for the decommissioning of nuclear power plants by the Member States. The issue was raised within the context of debates relating to the common rules for the internal market in electricity. One of the issues of particular concern was whether or not these financial resources could lead to a distortion of competition. All of the EU institutions, the Parliament, Council and Commission are committed to ensuring that the funds set aside for decommissioning are actually available for the purpose for which they have been established and are managed in a transparent way. In other words they must not create obstacles to fair competition in the energy market.
When assessing this matter the Commission notes that decommissioning is a technically complex operation requiring considerable funding. The amount needed to rehabilitate a site is estimated to be around 10-15% of the initial investment cost for each reactor to be decommissioned. The sums are so large that as soon as a nuclear installation's productive life begins the operator has to factor in the cost of decommissioning.
The results of a consultation exercise with the Member States on the use of these funds revealed widely differing situations. Some Member States have opted for the immediate decommissioning of nuclear installations, whilst others have opted for a deferred decommissioning strategy. Six Member States have chosen immediate decommissioning, namely Finland, Germany, Italy, Lithuania, Slovenia and Spain. In their case the funds must be available as soon as decommissioning begins. Four Member States, the Czech Republic, Hungary, the Netherlands and Slovakia, have opted to defer their decommissioning. Lastly, there are those countries for which no definitive decommissioning strategy is foreseen. They are Belgium, France, Sweden and the United Kingdom.
Concerning the management of the financial resources, the Commission has identified three main management structures – external management, internal management and other modes. Ten Member States have chosen to have their finances managed by external operators. According to the Commission this offers the greatest transparency and, probably, the best guarantee as to the ultimate use of financial resources – particularly in the event of the operator going bankrupt. France and Germany rely on internal management, with the financial resources earmarked for decommissioning entered in the accounts for the electricity producers in the form of provisions. This means that the nuclear operator has both financial and technical responsibility for the finances. The Commission is concerned that such a management structure is neither transparent, nor that the finances for decommissioning will be available when needed. Technically, the Commission suggests, internal management could give rise to anti-competitive practices on the internal market in electricity.
Belgium has opted to organize its finances in such a way that the State holds a "golden share" enabling it to enter a veto if it considers that the management of resources is liable to compromise security.
To conclude, the Commission notes that the main purpose of dedicating financial resources to decommissioning is to make sure that it will be possible to carry out the decommissioning when the time comes, while ensuring a high level of nuclear safety. One future priority should be to ensure that the resources, once set aside, are managed in accordance with Community law. In 2005 the Commission intends to present a Recommendation asking the Member States to take certain measures, ensuring that:
- Financial resources are set-aside during the operating period of nuclear power plans.
- The resources set aside are available and sufficient to cover the cost of decommissioning work.
- These resources are used for the purpose for which they have been set aside and that the management thereof is transparent.
Documents
- Follow-up document: COM(2007)0794
- Follow-up document: EUR-Lex
- Follow-up document: SEC(2007)1654
- Follow-up document: EUR-Lex
- Commission response to text adopted in plenary: SP(2006)0311
- Commission response to text adopted in plenary: SP(2005)5015
- Results of vote in Parliament: Results of vote in Parliament
- Decision by Parliament: T6-0432/2005
- Debate in Parliament: Debate in Parliament
- Committee report tabled for plenary, single reading: A6-0279/2005
- Committee report tabled for plenary: A6-0279/2005
- Amendments tabled in committee: PE360.222
- Follow-up document: COM(2004)0719
- Follow-up document: EUR-Lex
- Non-legislative basic document published: COM(2004)0719
- Non-legislative basic document published: EUR-Lex
- Follow-up document: COM(2004)0719 EUR-Lex
- Amendments tabled in committee: PE360.222
- Committee report tabled for plenary, single reading: A6-0279/2005
- Commission response to text adopted in plenary: SP(2005)5015
- Commission response to text adopted in plenary: SP(2006)0311
- Follow-up document: COM(2007)0794 EUR-Lex
- Follow-up document: SEC(2007)1654 EUR-Lex
History
(these mark the time of scraping, not the official date of the change)
docs/0 |
|
docs/0 |
|
docs/1/docs/0/url |
https://www.europarl.europa.eu/doceo/document/ITRE-AM-360222_EN.html
|
docs/3/docs/0/url |
/oeil/spdoc.do?i=4303&j=0&l=en
|
docs/4/docs/0/url |
Old
/oeil/spdoc.do?i=4303&j=0&l=enNew
/oeil/spdoc.do?i=4303&j=1&l=en |
docs/5/docs/0/url |
Old
http://www.europarl.europa.eu/RegData/docs_autres_institutions/commission_europeenne/com/2007/0794/COM_COM(2007)0794_EN.pdfNew
http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/com/2007/0794/COM_COM(2007)0794_EN.pdf |
events/0 |
|
events/0 |
|
docs/0 |
|
docs/2 |
|
docs/2/docs/0/url |
Old
http://www.europarl.europa.eu/doceo/document/A-6-2005-0279_EN.htmlNew
https://www.europarl.europa.eu/doceo/document/A-6-2005-0279_EN.html |
docs/3 |
|
docs/3 |
|
docs/4 |
|
docs/4/docs/0/url |
/oeil/spdoc.do?i=4303&j=1&l=en
|
events/0 |
|
events/0 |
|
events/1/type |
Old
Committee referral announced in Parliament, 1st reading/single readingNew
Committee referral announced in Parliament |
events/2/type |
Old
Vote in committee, 1st reading/single readingNew
Vote in committee |
events/3 |
|
events/3 |
|
events/4/docs/0/url |
Old
http://www.europarl.europa.eu/sides/getDoc.do?secondRef=TOC&language=EN&reference=20051115&type=CRENew
https://www.europarl.europa.eu/doceo/document/EN&reference=20051115&type=CRE |
events/6 |
|
events/6 |
|
procedure/legal_basis/0 |
Rules of Procedure EP 54
|
procedure/legal_basis/0 |
Rules of Procedure EP 052
|
committees/0 |
|
committees/0 |
|
docs/0/docs/0/url |
Old
http://www.europarl.europa.eu/RegData/docs_autres_institutions/commission_europeenne/com/2004/0719/COM_COM(2004)0719_EN.pdfNew
http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/com/2004/0719/COM_COM(2004)0719_EN.pdf |
docs/3/docs/0/url |
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A6-2005-279&language=ENNew
http://www.europarl.europa.eu/doceo/document/A-6-2005-0279_EN.html |
docs/4/body |
EC
|
docs/5/body |
EC
|
docs/6/docs/0/url |
Old
http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/com/2007/0794/COM_COM(2007)0794_EN.pdfNew
http://www.europarl.europa.eu/RegData/docs_autres_institutions/commission_europeenne/com/2007/0794/COM_COM(2007)0794_EN.pdf |
events/0/docs/0/url |
Old
http://www.europarl.europa.eu/RegData/docs_autres_institutions/commission_europeenne/com/2004/0719/COM_COM(2004)0719_EN.pdfNew
http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/com/2004/0719/COM_COM(2004)0719_EN.pdf |
events/3/docs/0/url |
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A6-2005-279&language=ENNew
http://www.europarl.europa.eu/doceo/document/A-6-2005-0279_EN.html |
events/6/docs/0/url |
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=TA&language=EN&reference=P6-TA-2005-432New
http://www.europarl.europa.eu/doceo/document/TA-6-2005-0432_EN.html |
activities |
|
committees/0 |
|
committees/0 |
|
committees/1 |
|
committees/1 |
|
committees/2 |
|
committees/2 |
|
docs |
|
events |
|
links |
|
other |
|
procedure/dossier_of_the_committee |
Old
ITRE/6/26195New
|
procedure/legal_basis/0 |
Rules of Procedure EP 052
|
procedure/legal_basis/0 |
Rules of Procedure of the European Parliament EP 052
|
procedure/subject |
Old
New
|
activities/0/docs/0/url |
Old
http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/com/2004/0719/COM_COM(2004)0719_EN.pdfNew
http://www.europarl.europa.eu/RegData/docs_autres_institutions/commission_europeenne/com/2004/0719/COM_COM(2004)0719_EN.pdf |
activities |
|
committees |
|
links |
|
other |
|
procedure |
|