BETA


2014/2946(RSP) Resolution on delays in the start-up of cohesion policy for 2014-2020

Progress: Procedure completed

RoleCommitteeRapporteurShadows
Lead REGI MIHAYLOVA Iskra (icon: ALDE ALDE)
Lead committee dossier:

Events

2015/03/10
   EC - Commission response to text adopted in plenary
Documents
2014/11/27
   EP - Results of vote in Parliament
2014/11/27
   EP - Decision by Parliament
Details

The European Parliament adopted by 608 votes to 31, with 27 abstentions, a resolution on delays in the start-up of cohesion policy for 2014-2020.

The resolution adopted in plenary was tabled on behalf of the EPP, S&D, ECR, ALDE, GUE/NGL, Greens/EFA and EFDD groups.

Parliament recalled that cohesion policy represents the main EU-wide investment policy in the real economy and is an established catalyst for growth and jobs in the EU, with a budget of over EUR 350 billion until 2020 , targeted at a limited number of strategic goals with growth-enhancing potential, such as innovation and research, the digital agenda, support for small and medium-sized enterprises (SMEs), the low-carbon economy, training, education and infrastructure.

In accordance with Regulation (EU) No 1303/2013 , Partnership Agreements should have been adopted by the end of August 2014 and Operational Programmes by the end of January 2015 at the latest.

However, there is a clear delay in the programming process , with only a limited number of Operational Programmes (just over 100) expected to be adopted by the end of 2014.

Two scenarios are envisaged for the adoption of Operational Programmes, both implying further delays as regards the start of implementation, namely:

(i) the carry-over procedure for those programmes considered ‘ready for adoption’ by 31 December 2014, and

(ii) the rebudgeting of the unused 2014 allocation for the European Structural and Investment Funds – entailing a technical revision of the multiannual financial framework (MFF) – for those considered ’not ready for adoption’ by the end of 2014.

According to the timeline presented by the Commission, Operational Programmes could be adopted between 15 February and 31 March 2015 under the carry-over procedure, and after 1 May 2015 under the rebudgeting procedure.

In this context, Parliament expressed its serious concern as regards the significant delay in the implementation of cohesion policy for the 2014-2020 period, while stressing that the current delays are challenging national, regional and local authorities’ capacity to plan effectively and implement the European Structural and Investment Funds for the 2014-2020 period.

Implementation of the 2014-2020 programming period : Parliament urged the Commission and the Member States to show responsibility and do their utmost to speed up the adoption of a maximum number of Operational Programmes in 2014 , and to ensure that as many programmes as possible are ‘ready for adoption’ by 31 December 2014 so that they can benefit from the carry-over procedure.

As regards the second scenario, applicable to those Operational Programmes not ready for adoption by the end of 2014, Parliament invited the Commission to engage as soon as possible in discussions with Parliament and the Council in order to lay out a credible roadmap that ensures the adoption of the MFF revision as early as possible in 2015.

The Commission is asked to present to Parliament the measures it envisages taking to facilitate, as soon as possible, the implementation of the Operational Programmes, together with the timeline it envisages.

Backlog in payments : in addition to the delay in implementation for the 2014-2020 programming period, cohesion policy also faces a backlog in payments amounting to some EUR 23 billion for the 2007-2013 programming period .

Parliament stresses the importance and the urgency of reaching an agreement on the subject, on the basis of new proposals from the Commission, by the end of 2014.

The Commission is called upon to explain the impact of this delay in payments on the start of implementation of the new Operational Programmes, and to put forward solutions for limiting the damage as far as possible.

Lastly, Parliament requested that the EUR 315 billion investment package to be announced by the Commission be fully complementary with the 2014-2020 cohesion policy.

Documents
2014/11/27
   EP - End of procedure in Parliament
2014/11/24
   EP - Motion for a resolution
Documents
2014/11/24
   EP - Motion for a resolution
Documents
2014/11/24
   EP - Motion for a resolution
Documents
2014/11/24
   EP - Motion for a resolution
Documents
2014/11/24
   EP - Motion for a resolution
Documents
2014/11/24
   EP - Motion for a resolution
Documents
2014/11/24
   EP - Motion for a resolution
Documents
2014/11/24
   Joint motion for resolution
Documents
2014/11/24
   EP - Debate in Parliament
2014/11/20
   EP - Oral question/interpellation by Parliament
Documents
2014/11/19
   CSL - Resolution/conclusions adopted by Council
Details

The Council adopted the conclusions welcoming the Commission’s sixth report on cohesion, in which it noted that cohesion policy is the main investment policy at EU level for pursuing economic, social and territorial cohesion at a time when Europe is facing challenges in terms of competitiveness, high and persistent unemployment, poverty and social exclusion.

Recalling that in the current programming period cohesion policy continues to play a key role for the re-launch of growth and jobs across the EU, the Council welcomed the commitment to support growth and jobs. It noted that it supports the incoming Commission's intention to launch an initiative mobilising EUR 300 billion of additional investment from public and private sources over the period 2015-2017.

The Council called on the Commission and the Member States to accelerate the negotiation and the procedures leading to adoption of all the Partnership Agreements and all the 2014-2020 Programmes. It stressed the negative impacts that could derive from a late adoption of the programmes.

The Council stressed the importance of ensuring the availability of the allocated resources , as agreed within the Multi-annual Financial Framework 2014-2020. It urged the Commission and the Member States to cooperate and explore all the possibilities in order to facilitate the prompt and timely implementation of the programmes 2014-2020 and to speed up all procedural steps needed to preserve the availability of the financial resources within the EU budget.

The conclusions also focused on:

the importance of continuing efforts to simplify the implementation of cohesion policy, in order to enhance the result orientation of the policy and to reduce administrative burdens at all levels; the need to take account of the cohesion policy’s role in the context of the Europe 2020 strategy review and its potential contribution to prepare EU economy for the future; the need to explore by the Member States opportunities linked to sound and transparent financial instruments and to involvement of private resources, while minimising the risks and ensuring that no additional burdens are put in the long-term on public budgets; the Commission to implement measures to link the effectiveness of ESI Funds to sound economic governance in dialogue with Member States; reprogramming which should be used only in cases where it could indeed have a direct impact on the correction of the challenges identified in the relevant country-specific recommendations under the economic governance mechanisms; reinforcing the institutional and administrative capacity to ensure the efficiency and the effectiveness of the investments by facilitating the exchange of good practice and knowledge in that respect; further analysing and developing the territorial dimension of cohesion policy.

Lastly, the Council recommended that a regular debate in the General Affairs Council takes place among relevant ministers to discuss on the implementation and results of the European structural and investment funds.

2014/11/19
   CSL - Council Meeting
2014/11/04
   EP - MIHAYLOVA Iskra (ALDE) appointed as rapporteur in REGI

Documents

Activities

Votes

RC-B8-0278/2014 - Résolution #

2014/11/27 Outcome: +: 608, -: 31, 0: 27
DE IT ES FR PL RO GB PT HU CZ BE BG SE NL EL SK DK HR AT FI IE LT SI LV EE MT LU CY
Total
89
63
47
66
48
26
65
20
20
20
17
15
18
22
14
13
12
11
17
10
9
8
8
7
6
6
5
3
icon: PPE PPE
203

Denmark PPE

For (1)

1
2

Estonia PPE

For (1)

1

Luxembourg PPE

3

Cyprus PPE

1
icon: S&D S&D
171

Netherlands S&D

3

Greece S&D

2

Croatia S&D

2

Ireland S&D

For (1)

1

Slovenia S&D

For (1)

1

Latvia S&D

1

Estonia S&D

For (1)

1

Malta S&D

3

Luxembourg S&D

For (1)

1

Cyprus S&D

1
icon: ECR ECR
62

Czechia ECR

2

Bulgaria ECR

1

Netherlands ECR

2

Greece ECR

For (1)

1

Croatia ECR

For (1)

1

Finland ECR

2

Latvia ECR

For (1)

1
icon: ALDE ALDE
58

Romania ALDE

3

United Kingdom ALDE

1

Denmark ALDE

2

Croatia ALDE

2

Austria ALDE

For (1)

1

Finland ALDE

1

Ireland ALDE

For (1)

1

Lithuania ALDE

2

Slovenia ALDE

For (1)

1

Estonia ALDE

3

Luxembourg ALDE

For (1)

1
icon: Verts/ALE Verts/ALE
44

France Verts/ALE

4

Hungary Verts/ALE

2

Belgium Verts/ALE

For (1)

1

Netherlands Verts/ALE

For (1)

1

Denmark Verts/ALE

For (1)

1

Croatia Verts/ALE

For (1)

1

Austria Verts/ALE

3

Finland Verts/ALE

For (1)

1

Lithuania Verts/ALE

For (1)

1

Slovenia Verts/ALE

For (1)

1

Latvia Verts/ALE

1

Estonia Verts/ALE

For (1)

1
icon: GUE/NGL GUE/NGL
44

United Kingdom GUE/NGL

1

Czechia GUE/NGL

2

Sweden GUE/NGL

For (1)

1

Netherlands GUE/NGL

For (1)

3

Denmark GUE/NGL

For (1)

1

Finland GUE/NGL

For (1)

1

Ireland GUE/NGL

3

Cyprus GUE/NGL

1
icon: NI NI
41

Germany NI

Against (1)

Abstain (1)

2

Poland NI

2

Belgium NI

Abstain (1)

1

Netherlands NI

3

Austria NI

3
icon: EFDD EFDD
42

France EFDD

Against (1)

1

Poland EFDD

1

Czechia EFDD

Against (1)

1

Sweden EFDD

2

Lithuania EFDD

1

History

(these mark the time of scraping, not the official date of the change)

docs/1/docs/0/url
Old
http://www.europarl.europa.eu/doceo/document/B-8-2014-0278_EN.html
New
https://www.europarl.europa.eu/doceo/document/B-8-2014-0278_EN.html
docs/2/docs/0/url
Old
http://www.europarl.europa.eu/doceo/document/B-8-2014-0279_EN.html
New
https://www.europarl.europa.eu/doceo/document/B-8-2014-0279_EN.html
docs/3/docs/0/url
Old
http://www.europarl.europa.eu/doceo/document/B-8-2014-0280_EN.html
New
https://www.europarl.europa.eu/doceo/document/B-8-2014-0280_EN.html
docs/4/docs/0/url
Old
http://www.europarl.europa.eu/doceo/document/B-8-2014-0281_EN.html
New
https://www.europarl.europa.eu/doceo/document/B-8-2014-0281_EN.html
docs/5/docs/0/url
Old
http://www.europarl.europa.eu/doceo/document/B-8-2014-0282_EN.html
New
https://www.europarl.europa.eu/doceo/document/B-8-2014-0282_EN.html
docs/6/docs/0/url
Old
http://www.europarl.europa.eu/doceo/document/B-8-2014-0283_EN.html
New
https://www.europarl.europa.eu/doceo/document/B-8-2014-0283_EN.html
docs/7/docs/0/url
Old
http://www.europarl.europa.eu/doceo/document/B-8-2014-0284_EN.html
New
https://www.europarl.europa.eu/doceo/document/B-8-2014-0284_EN.html
docs/8/docs/0/url
Old
http://www.europarl.europa.eu/doceo/document/RC-8-2014-0278_EN.html
New
https://www.europarl.europa.eu/doceo/document/RC-8-2014-0278_EN.html
events/1/docs/0/url
Old
http://www.europarl.europa.eu/sides/getDoc.do?secondRef=TOC&language=EN&reference=20141124&type=CRE
New
https://www.europarl.europa.eu/doceo/document/CRE-8-2014-11-24-TOC_EN.html
events/3
date
2014-11-27T00:00:00
type
Decision by Parliament
body
EP
docs
url: https://www.europarl.europa.eu/doceo/document/TA-8-2014-0068_EN.html title: T8-0068/2014
summary
events/3
date
2014-11-27T00:00:00
type
Decision by Parliament, 1st reading/single reading
body
EP
docs
url: http://www.europarl.europa.eu/doceo/document/TA-8-2014-0068_EN.html title: T8-0068/2014
summary
procedure/Modified legal basis
Rules of Procedure EP 136-p5
procedure/Other legal basis
Rules of Procedure EP 136-p5
committees/0
type
Responsible Committee
body
EP
committee_full
Regional Development
committee
REGI
associated
False
rapporteur
name: MIHAYLOVA Iskra date: 2014-11-04T00:00:00 group: Alliance of Liberals and Democrats for Europe abbr: ALDE
committees/0
type
Responsible Committee
body
EP
committee_full
Regional Development
committee
REGI
associated
False
date
2014-11-04T00:00:00
rapporteur
name: MIHAYLOVA Iskra group: Alliance of Liberals and Democrats for Europe abbr: ALDE
docs/1/docs/0/url
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=MOTION&reference=B8-2014-0278&language=EN
New
http://www.europarl.europa.eu/doceo/document/B-8-2014-0278_EN.html
docs/2/docs/0/url
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=MOTION&reference=B8-2014-0279&language=EN
New
http://www.europarl.europa.eu/doceo/document/B-8-2014-0279_EN.html
docs/3/docs/0/url
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=MOTION&reference=B8-2014-0280&language=EN
New
http://www.europarl.europa.eu/doceo/document/B-8-2014-0280_EN.html
docs/4/docs/0/url
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=MOTION&reference=B8-2014-0281&language=EN
New
http://www.europarl.europa.eu/doceo/document/B-8-2014-0281_EN.html
docs/5/docs/0/url
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=MOTION&reference=B8-2014-0282&language=EN
New
http://www.europarl.europa.eu/doceo/document/B-8-2014-0282_EN.html
docs/6/docs/0/url
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=MOTION&reference=B8-2014-0283&language=EN
New
http://www.europarl.europa.eu/doceo/document/B-8-2014-0283_EN.html
docs/7/docs/0/url
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=MOTION&reference=B8-2014-0284&language=EN
New
http://www.europarl.europa.eu/doceo/document/B-8-2014-0284_EN.html
docs/8/docs/0/url
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=MOTION&reference=P8-RC-2014-0278&language=EN
New
http://www.europarl.europa.eu/doceo/document/RC-8-2014-0278_EN.html
docs/9/body
EC
events/3/docs/0/url
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=TA&language=EN&reference=P8-TA-2014-0068
New
http://www.europarl.europa.eu/doceo/document/TA-8-2014-0068_EN.html
committees/0
type
Responsible Committee
body
EP
committee_full
Regional Development
committee
REGI
associated
False
date
2014-11-04T00:00:00
rapporteur
name: MIHAYLOVA Iskra group: Alliance of Liberals and Democrats for Europe abbr: ALDE
committees/0
body
EP
responsible
True
committee
REGI
date
2014-11-04T00:00:00
committee_full
Regional Development
rapporteur
group: ALDE name: MIHAYLOVA Iskra
activities
  • body: CSL meeting_id: 3347 council: General Affairs date: 2014-11-19T00:00:00 type: Council Meeting
  • date: 2014-11-24T00:00:00 docs: url: http://www.europarl.europa.eu/sides/getDoc.do?secondRef=TOC&language=EN&reference=20141124&type=CRE type: Debate in Parliament title: Debate in Parliament body: EP type: Debate in Parliament
  • date: 2014-11-27T00:00:00 docs: url: http://www.europarl.europa.eu/oeil/popups/sda.do?id=25010&l=en type: Results of vote in Parliament title: Results of vote in Parliament url: http://www.europarl.europa.eu/sides/getDoc.do?type=TA&language=EN&reference=P8-TA-2014-0068 type: Decision by Parliament, 1st reading/single reading title: T8-0068/2014 body: EP type: Results of vote in Parliament
council
  • body: CSL type: Council Meeting council: General Affairs meeting_id: 3347 url: http://register.consilium.europa.eu/content/out?lang=EN&typ=SET&i=SMPL&ROWSPP=25&RESULTSET=1&NRROWS=500&DOC_LANCD=EN&ORDERBY=DOC_DATE+DESC&CONTENTS=3347*&MEET_DATE=19/11/2014 date: 2014-11-19T00:00:00
docs
  • date: 2014-11-20T00:00:00 docs: title: B8-0042/2014 type: Oral question/interpellation by Parliament body: EP
  • date: 2014-11-24T00:00:00 docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=MOTION&reference=B8-2014-0278&language=EN title: B8-0278/2014 type: Motion for a resolution body: EP
  • date: 2014-11-24T00:00:00 docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=MOTION&reference=B8-2014-0279&language=EN title: B8-0279/2014 type: Motion for a resolution body: EP
  • date: 2014-11-24T00:00:00 docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=MOTION&reference=B8-2014-0280&language=EN title: B8-0280/2014 type: Motion for a resolution body: EP
  • date: 2014-11-24T00:00:00 docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=MOTION&reference=B8-2014-0281&language=EN title: B8-0281/2014 type: Motion for a resolution body: EP
  • date: 2014-11-24T00:00:00 docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=MOTION&reference=B8-2014-0282&language=EN title: B8-0282/2014 type: Motion for a resolution body: EP
  • date: 2014-11-24T00:00:00 docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=MOTION&reference=B8-2014-0283&language=EN title: B8-0283/2014 type: Motion for a resolution body: EP
  • date: 2014-11-24T00:00:00 docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=MOTION&reference=B8-2014-0284&language=EN title: B8-0284/2014 type: Motion for a resolution body: EP
  • date: 2014-11-24T00:00:00 docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=MOTION&reference=P8-RC-2014-0278&language=EN title: RC-B8-0278/2014 type: Joint motion for resolution
  • date: 2015-03-10T00:00:00 docs: url: /oeil/spdoc.do?i=25010&j=0&l=en title: SP(2015)64 type: Commission response to text adopted in plenary
events
  • date: 2014-11-19T00:00:00 type: Resolution/conclusions adopted by Council body: CSL summary: The Council adopted the conclusions welcoming the Commission’s sixth report on cohesion, in which it noted that cohesion policy is the main investment policy at EU level for pursuing economic, social and territorial cohesion at a time when Europe is facing challenges in terms of competitiveness, high and persistent unemployment, poverty and social exclusion. Recalling that in the current programming period cohesion policy continues to play a key role for the re-launch of growth and jobs across the EU, the Council welcomed the commitment to support growth and jobs. It noted that it supports the incoming Commission's intention to launch an initiative mobilising EUR 300 billion of additional investment from public and private sources over the period 2015-2017. The Council called on the Commission and the Member States to accelerate the negotiation and the procedures leading to adoption of all the Partnership Agreements and all the 2014-2020 Programmes. It stressed the negative impacts that could derive from a late adoption of the programmes. The Council stressed the importance of ensuring the availability of the allocated resources , as agreed within the Multi-annual Financial Framework 2014-2020. It urged the Commission and the Member States to cooperate and explore all the possibilities in order to facilitate the prompt and timely implementation of the programmes 2014-2020 and to speed up all procedural steps needed to preserve the availability of the financial resources within the EU budget. The conclusions also focused on: the importance of continuing efforts to simplify the implementation of cohesion policy, in order to enhance the result orientation of the policy and to reduce administrative burdens at all levels; the need to take account of the cohesion policy’s role in the context of the Europe 2020 strategy review and its potential contribution to prepare EU economy for the future; the need to explore by the Member States opportunities linked to sound and transparent financial instruments and to involvement of private resources, while minimising the risks and ensuring that no additional burdens are put in the long-term on public budgets; the Commission to implement measures to link the effectiveness of ESI Funds to sound economic governance in dialogue with Member States; reprogramming which should be used only in cases where it could indeed have a direct impact on the correction of the challenges identified in the relevant country-specific recommendations under the economic governance mechanisms; reinforcing the institutional and administrative capacity to ensure the efficiency and the effectiveness of the investments by facilitating the exchange of good practice and knowledge in that respect; further analysing and developing the territorial dimension of cohesion policy. Lastly, the Council recommended that a regular debate in the General Affairs Council takes place among relevant ministers to discuss on the implementation and results of the European structural and investment funds.
  • date: 2014-11-24T00:00:00 type: Debate in Parliament body: EP docs: url: http://www.europarl.europa.eu/sides/getDoc.do?secondRef=TOC&language=EN&reference=20141124&type=CRE title: Debate in Parliament
  • date: 2014-11-27T00:00:00 type: Results of vote in Parliament body: EP docs: url: https://oeil.secure.europarl.europa.eu/oeil/popups/sda.do?id=25010&l=en title: Results of vote in Parliament
  • date: 2014-11-27T00:00:00 type: Decision by Parliament, 1st reading/single reading body: EP docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=TA&language=EN&reference=P8-TA-2014-0068 title: T8-0068/2014 summary: The European Parliament adopted by 608 votes to 31, with 27 abstentions, a resolution on delays in the start-up of cohesion policy for 2014-2020. The resolution adopted in plenary was tabled on behalf of the EPP, S&D, ECR, ALDE, GUE/NGL, Greens/EFA and EFDD groups. Parliament recalled that cohesion policy represents the main EU-wide investment policy in the real economy and is an established catalyst for growth and jobs in the EU, with a budget of over EUR 350 billion until 2020 , targeted at a limited number of strategic goals with growth-enhancing potential, such as innovation and research, the digital agenda, support for small and medium-sized enterprises (SMEs), the low-carbon economy, training, education and infrastructure. In accordance with Regulation (EU) No 1303/2013 , Partnership Agreements should have been adopted by the end of August 2014 and Operational Programmes by the end of January 2015 at the latest. However, there is a clear delay in the programming process , with only a limited number of Operational Programmes (just over 100) expected to be adopted by the end of 2014. Two scenarios are envisaged for the adoption of Operational Programmes, both implying further delays as regards the start of implementation, namely: (i) the carry-over procedure for those programmes considered ‘ready for adoption’ by 31 December 2014, and (ii) the rebudgeting of the unused 2014 allocation for the European Structural and Investment Funds – entailing a technical revision of the multiannual financial framework (MFF) – for those considered ’not ready for adoption’ by the end of 2014. According to the timeline presented by the Commission, Operational Programmes could be adopted between 15 February and 31 March 2015 under the carry-over procedure, and after 1 May 2015 under the rebudgeting procedure. In this context, Parliament expressed its serious concern as regards the significant delay in the implementation of cohesion policy for the 2014-2020 period, while stressing that the current delays are challenging national, regional and local authorities’ capacity to plan effectively and implement the European Structural and Investment Funds for the 2014-2020 period. Implementation of the 2014-2020 programming period : Parliament urged the Commission and the Member States to show responsibility and do their utmost to speed up the adoption of a maximum number of Operational Programmes in 2014 , and to ensure that as many programmes as possible are ‘ready for adoption’ by 31 December 2014 so that they can benefit from the carry-over procedure. As regards the second scenario, applicable to those Operational Programmes not ready for adoption by the end of 2014, Parliament invited the Commission to engage as soon as possible in discussions with Parliament and the Council in order to lay out a credible roadmap that ensures the adoption of the MFF revision as early as possible in 2015. The Commission is asked to present to Parliament the measures it envisages taking to facilitate, as soon as possible, the implementation of the Operational Programmes, together with the timeline it envisages. Backlog in payments : in addition to the delay in implementation for the 2014-2020 programming period, cohesion policy also faces a backlog in payments amounting to some EUR 23 billion for the 2007-2013 programming period . Parliament stresses the importance and the urgency of reaching an agreement on the subject, on the basis of new proposals from the Commission, by the end of 2014. The Commission is called upon to explain the impact of this delay in payments on the start of implementation of the new Operational Programmes, and to put forward solutions for limiting the damage as far as possible. Lastly, Parliament requested that the EUR 315 billion investment package to be announced by the Commission be fully complementary with the 2014-2020 cohesion policy.
  • date: 2014-11-27T00:00:00 type: End of procedure in Parliament body: EP
links
other
    procedure/Modified legal basis
    Old
    Rules of Procedure of the European Parliament EP 128-p5
    New
    Rules of Procedure EP 136-p5
    procedure/dossier_of_the_committee
    Old
    REGI/8/01984
    New
    • REGI/8/01984
    procedure/subject
    Old
    • 4.70.02 Cohesion policy, Cohesion Fund
    New
    4.70.02
    Cohesion policy, Cohesion Fund (CF)
    procedure/subtype
    Old
    Debate or resolution on oral questions
    New
    Debate or resolution on oral question/interpellation
    activities/2/docs/0
    url
    http://www.europarl.europa.eu/oeil/popups/sda.do?id=25010&l=en
    type
    Results of vote in Parliament
    title
    Results of vote in Parliament
    activities/2/type
    Old
    Decision by Parliament, 1st reading/single reading
    New
    Results of vote in Parliament
    activities/0/text
    • The Council adopted the conclusions welcoming the Commission’s sixth report on cohesion, in which it noted that cohesion policy is the main investment policy at EU level for pursuing economic, social and territorial cohesion at a time when Europe is facing challenges in terms of competitiveness, high and persistent unemployment, poverty and social exclusion.

      Recalling that in the current programming period cohesion policy continues to play a key role for the re-launch of growth and jobs across the EU, the Council welcomed the commitment to support growth and jobs. It noted that it supports the incoming Commission's intention to launch an initiative mobilising EUR 300 billion of additional investment from public and private sources over the period 2015-2017.

      The Council called on the Commission and the Member States to accelerate the negotiation and the procedures leading to adoption of all the Partnership Agreements and all the 2014-2020 Programmes. It stressed the negative impacts that could derive from a late adoption of the programmes.

      The Council stressed the importance of ensuring the availability of the allocated resources, as agreed within the Multi-annual Financial Framework 2014-2020. It urged the Commission and the Member States to cooperate and explore all the possibilities in order to facilitate the prompt and timely implementation of the programmes 2014-2020 and to speed up all procedural steps needed to preserve the availability of the financial resources within the EU budget.

      The conclusions also focused on:

      • the importance of continuing efforts to simplify the implementation of cohesion policy, in order to enhance the result orientation of the policy and to reduce administrative burdens at all levels;
      • the need to take account of the cohesion policy’s role in the context of the Europe 2020 strategy review and its potential contribution to prepare EU economy for the future;
      • the need to explore by the Member States opportunities linked to sound and transparent financial instruments and to involvement of private resources, while minimising the risks and
      • ensuring that no additional burdens are put in the long-term on public budgets;
      • the Commission to implement measures to link the effectiveness of ESI Funds to sound economic governance in dialogue with Member States;
      • reprogramming which should be used only in cases where it could indeed have a direct impact on the correction of the challenges identified in the relevant country-specific recommendations under the economic governance mechanisms;
      • reinforcing the institutional and administrative capacity to ensure the efficiency and the effectiveness of the investments by facilitating the exchange of good practice and knowledge in that respect;
      • further analysing and developing the territorial dimension of cohesion policy.

      Lastly, the Council recommended that a regular debate in the General Affairs Council takes place among relevant ministers to discuss on the implementation and results of the European structural and investment funds.

    activities/2/docs/0/text
    • The European Parliament adopted by 608 votes to 31, with 27 abstentions, a resolution on delays in the start-up of cohesion policy for 2014-2020.

      The resolution adopted in plenary was tabled on behalf of the EPP, S&D, ECR, ALDE, GUE/NGL, Greens/EFA and EFDD groups.

      Parliament recalled that cohesion policy represents the main EU-wide investment policy in the real economy and is an established catalyst for growth and jobs in the EU, with a budget of over EUR 350 billion until 2020, targeted at a limited number of strategic goals with growth-enhancing potential, such as innovation and research, the digital agenda, support for small and medium-sized enterprises (SMEs), the low-carbon economy, training, education and infrastructure.

      In accordance with Regulation (EU) No 1303/2013, Partnership Agreements should have been adopted by the end of August 2014 and Operational Programmes by the end of January 2015 at the latest.

      However, there is a clear delay in the programming process, with only a limited number of Operational Programmes (just over 100) expected to be adopted by the end of 2014.

      Two scenarios are envisaged for the adoption of Operational Programmes, both implying further delays as regards the start of implementation, namely:

      (i) the carry-over procedure for those programmes considered ‘ready for adoption’ by 31 December 2014, and

      (ii) the rebudgeting of the unused 2014 allocation for the European Structural and Investment Funds – entailing a technical revision of the multiannual financial framework (MFF) – for those considered ’not ready for adoption’ by the end of 2014.

      According to the timeline presented by the Commission, Operational Programmes could be adopted between 15 February and 31 March 2015 under the carry-over procedure, and after 1 May 2015 under the rebudgeting procedure.

      In this context, Parliament expressed its serious concern as regards the significant delay in the implementation of cohesion policy for the 2014-2020 period, while stressing that the current delays are challenging national, regional and local authorities’ capacity to plan effectively and implement the European Structural and Investment Funds for the 2014-2020 period.

      Implementation of the 2014-2020 programming period: Parliament urged the Commission and the Member States to show responsibility and do their utmost to speed up the adoption of a maximum number of Operational Programmes in 2014, and to ensure that as many programmes as possible are ‘ready for adoption’ by 31 December 2014 so that they can benefit from the carry-over procedure.

      As regards the second scenario, applicable to those Operational Programmes not ready for adoption by the end of 2014, Parliament invited the Commission to engage as soon as possible in discussions with Parliament and the Council in order to lay out a credible roadmap that ensures the adoption of the MFF revision as early as possible in 2015.

      The Commission is asked to present to Parliament the measures it envisages taking to facilitate, as soon as possible, the implementation of the Operational Programmes, together with the timeline it envisages.

      Backlog in payments: in addition to the delay in implementation for the 2014-2020 programming period, cohesion policy also faces a backlog in payments amounting to some EUR 23 billion for the 2007-2013 programming period.

      Parliament stresses the importance and the urgency of reaching an agreement on the subject, on the basis of new proposals from the Commission, by the end of 2014.

      The Commission is called upon to explain the impact of this delay in payments on the start of implementation of the new Operational Programmes, and to put forward solutions for limiting the damage as far as possible.

      Lastly, Parliament requested that the EUR 315 billion investment package to be announced by the Commission be fully complementary with the 2014-2020 cohesion policy.

    activities/2/docs
    • url: http://www.europarl.europa.eu/sides/getDoc.do?type=TA&language=EN&reference=P8-TA-2014-0068 type: Decision by Parliament, 1st reading/single reading title: T8-0068/2014
    activities/2/type
    Old
    Vote scheduled
    New
    Decision by Parliament, 1st reading/single reading
    procedure/stage_reached
    Old
    Awaiting Parliament 1st reading / single reading / budget 1st stage
    New
    Procedure completed
    procedure/title
    Old
    Delays in the start-up of cohesion policy 2014-2020
    New
    Resolution on delays in the start-up of cohesion policy for 2014-2020
    activities/2/type
    Old
    Vote in plenary scheduled
    New
    Vote scheduled
    activities/1/docs
    • url: http://www.europarl.europa.eu/sides/getDoc.do?secondRef=TOC&language=EN&reference=20141124&type=CRE type: Debate in Parliament title: Debate in Parliament
    procedure/subject/0
    Old
    4.70.02 Cohesion, Cohesion Fund
    New
    4.70.02 Cohesion policy, Cohesion Fund
    activities/1/type
    Old
    Debate in plenary scheduled
    New
    Debate in Parliament
    activities
    • date: 2014-11-19T00:00:00 body: CSL type: Council Meeting council: General Affairs meeting_id: 3347
    • date: 2014-11-24T00:00:00 body: EP type: Debate in plenary scheduled
    • date: 2014-11-27T00:00:00 body: EP type: Vote in plenary scheduled
    committees
    • body: EP responsible: True committee: REGI date: 2014-11-04T00:00:00 committee_full: Regional Development rapporteur: group: ALDE name: MIHAYLOVA Iskra
    links
    other
      procedure
      dossier_of_the_committee
      REGI/8/01984
      reference
      2014/2946(RSP)
      title
      Delays in the start-up of cohesion policy 2014-2020
      stage_reached
      Awaiting Parliament 1st reading / single reading / budget 1st stage
      subtype
      Debate or resolution on oral questions
      Modified legal basis
      Rules of Procedure of the European Parliament EP 128-p5
      type
      RSP - Resolutions on topical subjects
      subject
      4.70.02 Cohesion, Cohesion Fund