BETA

13 Amendments of Pernille WEISS related to 2023/0081(COD)

Amendment 466 #
Proposal for a regulation
Article 2 – paragraph 1
This Regulation applies to net-zero technologies, except for Articles 26 and 27 of this Regulation, which apply to innovative net-zero technologies and other innovative technologies with the potential to enable the shift towards a clean, climate-neutral economy and reduce strategic dependencies. Raw materials processed materials or components falling under the scope of Regulation (EU) …/… [add footnote with publication references of the Critical Raw Materials Regulation] shall be excluded from the scope of this Regulation.
2023/06/23
Committee: ITRE
Amendment 522 #
Proposal for a regulation
Article 3 – paragraph 1 – point b
(b) ‘component’ means a smallnufactured part of a net-zero technology that is manufactured and traded by a company starting from processed materials;
2023/06/23
Committee: ITRE
Amendment 536 #
Proposal for a regulation
Article 3 – paragraph 1 – point c a (new)
(ca) 'other innovative technologies’ means technologies that have the potential to enable the transition to a clean and climate neutral economy, and which are advanced enough to be tested in a controlled environment.
2023/06/23
Committee: ITRE
Amendment 565 #
Proposal for a regulation
Article 3 – paragraph 1 – point f
(f) ‘permit granting process’ means a process covering all relevant administrative permits to plan, build, expand and operate net-zero technology manufacturing projects, including building, chemical and grid connection permits and environmental assessments and authorisations where these are required, and encompassing all administrative applications and procedures from the acknowledgment of the validity of the application to the notification ofreception of the project application to the national competent authority until the comprehensive decision on the outcome of the procedure by the responsible national competent authority;
2023/06/23
Committee: ITRE
Amendment 574 #
Proposal for a regulation
Article 3 – paragraph 1 – point i
(i) ‘net-zero regulatory sandbox’ means a scheme that enables undertakings to test innovative net-zero technologies and other innovative technologies in a controlled real-world environment, under a specific plan, developed and monitored by a competent authority.
2023/06/23
Committee: ITRE
Amendment 576 #
Proposal for a regulation
Article 3 – paragraph 1 – point j
(j) ‘technology readiness level’ means a method of estimating the maturity of technologies, according to the classification used by the International Energy Agency;deleted
2023/06/23
Committee: ITRE
Amendment 594 #
Proposal for a regulation
Article 3 – paragraph 1 – point s a (new)
(sa) ‘smart water management’ is the activity of planning, developing, distributing, and managing the use of water resources through a variety of technologies that are intended to enhance efficiency and ensure more reasonable and sustainable use of these water resources.
2023/06/23
Committee: ITRE
Amendment 728 #
Proposal for a regulation
Article 7 – paragraph 1
1. Where an environmental impact assessment must be carried out in accordance with Articles 5 to 9 of Directive 2011/92/EU, the project promoter concerned shall request an opinion to the competent authority referred to in Article 4 on the scope and level of detail of the information to be included in the environmental impact assessment report pursuant to Article 5(1) of that Directive. The national competent authority shall ensure that the opinion referred to in the first subparagraph is issued as soon as possible and within a period of time not exceeding 3015 days from the date on which the project promoter submitted its request.
2023/06/23
Committee: ITRE
Amendment 791 #
Proposal for a regulation
Article 10 – paragraph 1 – point b – point ii
(ii) it manufactures technologies with improved sustainability and performance, included but not limited to energy efficiency and optimised water usage;
2023/06/23
Committee: ITRE
Amendment 803 #
Proposal for a regulation
Article 10 – paragraph 1 – point b – point iv
(iv) it adopts comprehensive low- carbon and circular manufacturing practices, including waste heat recovery and smart water management.
2023/06/23
Committee: ITRE
Amendment 1074 #
Proposal for a regulation
Article 17 – paragraph 2 a (new)
2a. By three months from the entry into force of this Regulation, the Commission and Member States shall draw up a common strategy to ensure that emitters of CO2 have an economic incentive to use CCS infrastructure. This strategy shall be reviewed every 2 years.
2023/06/23
Committee: ITRE
Amendment 1244 #
Proposal for a regulation
Article 19 – paragraph 4 a (new)
4a. The Commission shall provide guidance on the implementation of the procurement provisions no later than [2 months after the entry into force of this Regulation].
2023/06/23
Committee: ITRE
Amendment 1442 #
Proposal for a regulation
Article 29 – paragraph 1
1. The Platform shall be composed by Member States and of, the Commission and relevant industry stakeholders. It shall be chaired by a representative of the Commission.
2023/06/23
Committee: ITRE