BETA

Activities of Susana SOLÍS PÉREZ related to 2022/0160(COD)

Plenary speeches (1)

Renewable Energy, Energy Performance of Buildings and Energy Efficiency Directives: amendments (REPowerEU) (continuation of debate)
2022/12/13
Dossiers: 2022/0160(COD)

Amendments (3)

Amendment 90 #
Proposal for a directive
Article 1 – paragraph 1 – point 1
Directive 2018/2001
Article 2 9a
(9a) ’renewables go-to area’ means a specific location, whether on land or sea, which has been designated by a Member State as particularly suitable for the installation of plants for the production of energy from renewable sources, other than biomass combustion plants, as well as for the installation of their related grid.
2022/09/29
Committee: ITRE
Amendment 185 #
Proposal for a directive
Article 1 – paragraph 1 – point 5
Directive 2018/2001
Article 15c – paragraph 1 – subparagraph 1 – point b
(b) Establish appropriate rules for the designated renewable go-to areas, including on the mitigation measures to be adopted for the installation of renewable energy plants, co-located energy storage facilities, as well as assets necessary for their connection to the grid and the related grid itself, in order to avoid or, if not possible, to significantly reduce the negative environmental impacts that may arise. Where appropriate, Member States shall ensure that appropriate mitigation measures are applied to prevent the situations described in Articles 6(2) and 12(1) of Directive 92/43/EEC, Article 5 of Directive 2009/147/EEC and Article 4(1)(a)(i) and (ii) of Directive 2000/60/EC. Such rules shall be targeted to the specificities of each identified renewable go-to area, the renewable energy technology or technologies to be deployed in each area and the identified environmental impacts. Compliance with such rules and the implementation of the appropriate mitigation measures by the individual projects shall result in the presumption that projects are not in breach of those provisions without prejudice to paragraphs 4 and 5 of Article 16a. Where novel mitigation measures to prevent as much as possible the killing or disturbance of species protected under Council Directive 92/43/EEC and Directive 2009/147/EEC, or any other environmental impact, have not been widely tested as regards their effectiveness, Member States may allow their use for one or several pilot projects for a limited time period, provided that the effectiveness of such measures is closely monitored and appropriate steps are taken immediately if they do not prove to be effective. .
2022/09/29
Committee: ITRE
Amendment 205 #
Proposal for a directive
Article 1 – paragraph 1 – point 6
Directive 2018/2001
Article 16 – paragraph 1
(1) The permit-granting process shall cover all relevant administrative permits to build, repower and operate plants for the production of energy from renewable sources, co-located energy storage facilities, as well as assets necessary for their connection to the grid and the related grid itself, including grid connection permits and environmental assessments where these are required. The permit- granting process shall comprise all procedures from the acknowledgment of the validity of the application in accordance with paragraph 2 to the notification of the final decision on the outcome of the procedure by the relevant authority or authorities.
2022/09/29
Committee: ITRE