BETA

Activities of Miloslav RANSDORF related to 2007/0199(COD)

Plenary speeches (1)

Conditions for access to the natural gas transmission networks - Internal market in natural gas - European strategic energy technology plan (debate)
2016/11/22
Dossiers: 2007/0199(COD)

Amendments (11)

Amendment 55 #
Proposal for a regulation – amending act
Recital 12
(12) Equal access to information on the physical status of the system is necessary to enable all market participants to assess the overall demand and supply situation and identify the reasons for movements in the wholesale price. This includes more precise information on aggregate supply and demand, network capacity, flows and maintenance, balancing and availability and usage of storage. The importance of this aggregate information for the functioning of the market requires thsome lifting of the limitations to publication for confidentiality reasons at relevant points, without prejudice to the confidentiality of individual user accounts.
2008/04/14
Committee: ITRE
Amendment 88 #
Proposal for a regulation – amending act
Article 1 – point 3
Regulation (EC) No 1775/2005
Article 2 c – paragraph 1 – point c
(c) a 10-year investnetwork development plan every two years, which shall be the basis for individual open season procedures assessing actual market demand;
2008/04/14
Committee: ITRE
Amendment 115 #
Proposal for a regulation – amending act
Article 1 – point 3
Regulation (EC) No 1775/2005
Article 2 c – paragraph 5
5. The European Network of Transmission System Operators for Gas shall publish a Community-wide 10-year network investdevelopment plan every two years. The investment planplan shall comply with the following conditions: (a) it shall include the modelling of the integrated network, scenario development, a supply and demand adequacy report and an assessment of the resilience of the system. The investment plan shall, in particular,; (b) it shall build on national investnetwork development plans and on the Guidelines for Trans-European eEnergy nNetworks in accordance with Decision No 1364/2006/EC of the European Parliament and of the Council. The investment plan; (c) it shall identify the investment gaps, notably with respect to cross border capacitie including the interconnection gaps defined by the Commission. The plan shall be consulted on with other stakeholders, especially network users.
2008/04/14
Committee: ITRE
Amendment 136 #
Proposal for a regulation – amending act
Article 1 – point 3
Regulation (EC) No 1775/2005
Article 2 d – paragraph 2 – subparagraph 1
2. The European Network of Transmission System Operators for Gas shall submit the draft technical and market codes, the draft 10-year investnetwork development plan and the draft annual work programme, including the information regarding the consultation process, to the Agency
2008/04/14
Committee: ITRE
Amendment 177 #
Proposal for a regulation – amending act
Article 1 – point 3
Regulation (EC) No 1775/2005
Article 2 h – paragraph 1
1. Transmission system operators shall establish regional cooperation within the European Network for Transmission System Operators for Gas to contribute to the tasks mentioned in Article 2c(1). In particular, they shall publish a regional investnetwork development plan every two years, and may take investment decisions based on the regional investnetwork development plan. The regional investnetwork development plan may not be contradictory to the 10 year investnetwork development plan referred to in Article 2c(1)(c).
2008/04/14
Committee: ITRE
Amendment 217 #
Proposal for a regulation – amending act
Article 1 – point 9 – point b
Regulation (EC) No 1775/2005
Article 6 – paragraph 5
(b) paragraph 5 is deleted;
2008/04/14
Committee: ITRE
Amendment 221 #
Proposal for a regulation – amending act
Article 1 – point 9 – point c
Regulation (EC) No 1775/2005
Article 6 – paragraph 7
"7. TNetwork users may request transmission system operators shall make public ex-ante and ex-post supply and demand information, based on nominations, forecasts and realised flows in and out of the system. The level of detail of the information that is made public shallto keep such data confidential, , when they consider that such data breach operation- and business confidentiality. In such a case the transmission system operator shall seek an authorisation from the appropriate authority to limit publication with reflspect the information available to the transmission system operator. Transmission system operatorso the point or points in question. The competent authorities shall grant or refuse the authorisation on a case-by-case basis. If the authorisation is granted, available capacity shall makbe public measures taken as well as costs incurred and revenues generated to balance the system. The market participants concerned shall provide the transmission system operators with the data referred to in this Article."shed without indicating the numerical data that would contravene confidentiality. No such authorisation as referred to in this paragraph shall be granted where three or more network users have contracted capacity at the same point.”
2008/04/14
Committee: ITRE
Amendment 226 #
Proposal for a regulation – amending act
Article 1 – point 10
Regulation (EC) No 1775/2005
Article 6 a – paragraph 2
2. For the services provided, each LNG and storage system operator shall make public information on contracted and available storage and LNG facility capacities on a numerical basis on a regular and rolling basis and in a user-friendly standardised manner, as long as three or more users have contracted capacities.
2008/04/14
Committee: ITRE
Amendment 232 #
Proposal for a regulation – amending act
Article 1 – point 10
Regulation (EC) No 1775/2005
Article 6 a – paragraph 4
4. As long as three or more users have contracted capacities, all LNG and storage system operators shall make public the amount of gas in each storage or LNG facility, inflows and outflows, and the available storage and LNG facility capacities, including for those facilities exempted from third party access. The information shall also be communicated to the transmission system operator who shall make it public on an aggregated level per system or subsystem defined by the relevant points. The information shall be updated at least every day.
2008/04/14
Committee: ITRE
Amendment 241 #
Proposal for a regulation – amending act
Article 1 – point 10
Regulation (EC) No 1775/2005
Article 6 b
Record keeping for system operators Transmission system operators, storage system operators and LNG system operators shall keep at the disposal of the national regulatory authority, the national competition authority and the Commission all information referred to in Article 6 and 6a, and in part 3 of the Annex for a period of five years.”Article 6b deleted
2008/04/14
Committee: ITRE
Amendment 246 #
Proposal for a regulation – amending act
Article 1 – point 11 – point b
Regulation (EC) No 1775/2005
Article 7 – paragraph 2
"2. In order to enable network users to take timely corrective action, transmission system operators shall provide to the network users sufficient, well-timed and reliable on-line based information on their individual balancing status of network user, without prejudice to the confidentiality of individual user accounts. The information provided shall reflect the level of information available to the transmission system operator and the settlement period for which imbalance charges are calculated. No charge shall be made for the provision of such information."
2008/04/14
Committee: ITRE