BETA

6 Amendments of Markus PIEPER related to 2016/0382(COD)

Amendment 217 #
Proposal for a directive
Recital 36
(36) The lack of transparent rules and coordination between the different authorisation bodies has been shown to hinder the deployment of energy from renewable sources. The establishment of a single administrative contact point integrating or coordinating all permit- granting processes should reduce complexity and increase efficiency and transparencMember States are therefore urged to coordinate their efforts more closely. Administrative approval procedures should be streamlined with transparent timetables for installations using energy from renewable sources. Planning rules and guidelines should be adapted to take into consideration cost- effective and environmentally beneficial renewable heating and cooling and electricity equipment. This Directive, in particular the provisions on the organisation and duration of the permit granting process, should apply without prejudice to international and Union law, including provisions to protect the environment and human health.
2017/07/04
Committee: ITRE
Amendment 250 #
Proposal for a directive
Recital 76
(76) To ensure that, despite the growing demand for forest biomass, harvesting is carried out in a sustainable manner in forests where regeneration is ensured, that special attention is given to areas explicitly designated for the protection of biodiversity, landscapes and specific natural elements, that biodiversity resources are preserved and that carbon stocks are tracked, woody raw material should come only from forests that are harvested in accordance with the principles of sustainable forest management developed under international forest processes such as Forest Europe and are implemented through national laws or the best management practices at the forest holding level. Operators should take the appropriate steps in order to minimise the risk of using unsustainable forest biomass for the production of bioenergy. To that end, operators should put in place a risk- based approach. In this context, it is apporopriate for the Commission to develop operational guidance on the verification of compliance with the risk based approach, following the consultation of the Energy Union Governance Committee, and the Standing Forestry Committee established by Council Decision 89/367/EEC24. __________________ 24 Council Decision 89/367/EEC of 29 May 1989 setting up a Standing Forestry Committee (OJ L 165, 15.6.1989, p. 14).
2017/07/20
Committee: ENVI
Amendment 387 #
Proposal for a directive
Article 2 – paragraph 2 – point y
(y) 'waste heat or cold' means heat or cold which is produced in residential or industrial buildings or the heat or cold generated as by-product in industrial or power generation installations and which would be dissipated unused in air or water without access to a district heating or cooling system;
2017/07/04
Committee: ITRE
Amendment 740 #
Proposal for a directive
Article 26 – paragraph 5
5. Biofuels, bioliquids and biomass fuels produced from forest biomass taken into account for the purposes referred to in points (a), (b) and (c) of paragraph 1 shall meet the following requirements to minimise the risk of using unsustainable forest biomass production: (a) biomass was harvested has national and/or sub-national laws applicable in the area of harvest as well as monitoring and enforcement systems in place ensuring that: i) harvesting is carried out in accordance to the conditions of the harvesting permit within legally gazetted boundaries; ii) areas takes place; iii) areas of high conservation value, including wetlands and peatlands, are protected; iv) the impacts of forest harvesting on soil quality and biodiversity are minimised; and v) long-term production capacity of the forest; (b) first subparagraph is not available, the biofuels, bioliquids and biomass fuels produced from forest biomass shall be taken into account for the purposes referred to in points (a), (b) and (c) of paragraph 1 if management systems are in place at forest holding level to ensure that: i) the forest biomass has been harvested according to a legal permit; ii) areas takes place; iii) including peatlands and wetlands, are identified and protected; iv) quality and biodiversity are minimised; v) long-term production capacity of the forest.deleted the country in which forest forest regeneration of harvested harvesting does not exceed the when evidence referred to in the forest regeneration of harvested areas of high conservation value, impacts of forest harvesting on soil harvesting does not exceed the
2017/07/24
Committee: ENVI
Amendment 766 #
Proposal for a directive
Article 16
Organisation and duration of the permit (1) shall set up one or more single administrative contact points which will coordinate the entire permit granting process for applicants for permits to build and operate plants and associated transmission and distribution network infrastructures for the production of energy from renewable energy sources. (2) The single administrative contact point shall guide the applicant through the application process in a transparent manner, provide the applicant with all necessary information, coordinate and involve, where appropriate, other authorities, and deliver a legally binding decision at the end of the process. (3) point, in collaboration with transmission and distribution system operators, shall publish a manual of procedures for renewable project developers, including for small scale projects and renewable self-consumers projects. (4) referred to in paragraph 1 shall not exceed a period of three years, except for the cases set out in Article 16(5) and Article 17. (5) Member States shall facilitate the repowering of existing renewable energy plants by, inter alia, ensuring a simplified and swift permit granting process, which shall not exceed one year from the date on which the request for repowering is submitted to the single administrative contact point.Article 16 deleted granting process By 1 January 2021 Member States The single administrative contact The permit granting process
2017/07/04
Committee: ITRE
Amendment 1271 #
Proposal for a directive
Article 32 – paragraph 1
(1) The power to adopt delegated acts is conferred on the Commission subject to the conditions laid down in this Article.
2017/07/31
Committee: ITRE