Amendment 73 #
Proposal for a regulation
Recital 3
(3) To achieve those targets, there is a need for policies to speed up and lower the costs of the deployment of very high- capacity fixed and wireless networks across the Union, including proper planning, coordination and the reduction of administrative burdens, while keeping costs for public authorities low.
2023/07/07
Committee: ITRE
Amendment 105 #
Proposal for a regulation
Recital 17
(17) In the absence of a justified exception, physical infrastructure elements owned or controlled by public sector bodies, even when they are not part of a network, can also host electronic communications network elements and should be made accessible to facilitate installing network elements of very high capacity networks, in particular wireless networks. Examples of physical infrastructure elements are buildings, including rooftops, entries to buildings, and any other asset, including street furniture, such as light poles, street signs, traffic lights, billboards, bus and tramway stops and metro stations. It is for Member States to identify specific buildings owned or controlled by public sector bodies in their territories where access obligations cannot apply, for example, for reasons of architectural, historical, religious or natural value.
2023/07/07
Committee: ITRE
Amendment 111 #
Proposal for a regulation
Recital 20
(20) To ensure proportionality and, preserve investment incentives, especially for VHCN pioneers, and thus create an incentive for the rapid rollout of VHCNs to rural areas, a network operator or public sector body should have the right to refuse access to specific physical infrastructure for objective and justified reasons. In particular, a physical infrastructure for which access has been requested could be technically unsuitable due to specific circumstances, or because of lack of currently available space or future needs for space that are sufficiently demonstrated, for instance, in publicly available investment plans. To ensure proportionality and preserve investment incentives, a network operator or public sector body may refuse access to specific physical infrastructure. To avoid any potential distortion of competition or any possible abuse of the conditions to refuse access, any such refusal should be duly justified and based on objective and detailed reasons. For example such reasons would not be considered objective where an undertaking providing or authorised to provide electronic communications networks has deployed physical infrastructure thanks to civil works coordination with a network operator other than an electronic communications network operator and refuses to grant access based on an alleged lack of availability of space to host the elements of very high capacity networks which results from decisions made by the undertaking under its control. In such case, a competition distortion could arise if there is no other VHCN in the area concerned by the access request. Similarly, in specific circumstances, sharing the infrastructure could jeopardise safety or public health, network integrity and security, including that of critical infrastructure, or could endanger the provision of services that are primarily provided over the same infrastructure. Moreover, where thea network operator already provides a viable alternative means of wholesale physical access to electronic communications networks that would meet the needs of the access seeker, such as dark fibre or fibre unbundling, access to the underlying physical infrastructure, or to parallel physical infrastructure, could have an adverse economic impact on its business model, in particular that of wholesale-only operators, and on incentives to invest. It may also risk an inefficient duplication of network elements, which in particular shall be avoided until sufficient coverage of rural areas with VHCNs is achieved. The assessment of the fair and reasonable character of the terms and conditions for such alternative means of wholesale physical access should take into account, inter alia, the underlying business model of the undertaking providing or authorised to provide public electronic communications networks granting access and the need to avoid any reinforcement of the significant market power, if any, of either party.
2023/07/07
Committee: ITRE
Amendment 125 #
Proposal for a regulation
Recital 25
(25) Operators should have access to minimum information on physical infrastructure and planned civil works in the area of deployment. This will enable them to effectively plan deploying very high capacity networks and ensure the most effective use of existing physical infrastructure, suitable for rolling out such networks, and planned civil works. Such minimum information is a pre-requisite to assess the potential for using existing physical infrastructure or coordinating the planned civil works in a specific area, as well as to reduce damage to any existing physical infrastructures. In view of the number of stakeholders involved (covering publicly and privately financed civil works as well as existing or planned physical infrastructure) and to facilitate access to that information (across sectors and borders), the network operators and public sector bodies subject to transparency obligations should, where feasible, proactively (rather than upon request) provide and maintain such minimum information via a single information point. This will simplify managing requests to access such information and enable operators to express their interest in accessing physical infrastructure or coordinating civil works, for which timing is critical. The minimum information on planned civil works should be provided via a single information point as soon as the information is available to the network operator concerned and, in any event and where permits are required, no later than 3 months before the permit application is first submitted to the competent authorities.
2023/07/07
Committee: ITRE
Amendment 181 #
Proposal for a regulation
Article 2 – paragraph 2 – point 1 – point a
(a) an operator as defined in Article 2, point (29), of Directive (EU) 2018/1972undertaking that is authorised to provide or effectively provides a public electronic communications network; ;
2023/07/07
Committee: ITRE
Amendment 183 #
Proposal for a regulation
Article 2 – paragraph 2 – point 1 – point b – point ii
(ii) transport services, including railways, roads, tunnels, ports and airports;
2023/07/07
Committee: ITRE
Amendment 205 #
Proposal for a regulation
Article 2 – paragraph 2 – point 11 a (new)
(11a) 'rights of way' means rights granted in accordance with Art 43 of the Directive (EU) 2018/1972;
2023/07/07
Committee: ITRE
Amendment 269 #
Proposal for a regulation
Article 4 – paragraph 1 – subparagraph 1 – point a
(a) georeferenced location and route;
2023/07/07
Committee: ITRE
Amendment 273 #
Proposal for a regulation
Article 4 – paragraph 2
2. In cases, where Network operators and public sector bodies shall make availablepossess the minimum information referred to in paragraph 1, via the single information point and in electronic forma in electronic format, and in cases referred to in paragraph 1 point a) in georeferenced and electronic format, they shall make it available via the single information point, by [DATE OF ENTRY INTO FORCE + 12 MONTHS]. Under the same conditions, network operators and public sector bodies shall make available promptly any update to that information and any new minimum information referred to in paragraph 1.
2023/07/07
Committee: ITRE
Amendment 322 #
Proposal for a regulation
Article 7 – paragraph 3
3. Any operator shall have the right to submit, via a single information point in electronic format, applications for permits or rights of way and to retrieve information applications for permits or rights of way in electronic format. Permit granting authorities shall upon request inform applicants about the status of itstheir application without unnecessary delay.
2023/07/07