BETA

73 Amendments of Jerzy BUZEK related to 2021/0214(COD)

Amendment 79 #
Proposal for a regulation
Recital 8
(8) As long as a significant number of the Union’s international partners have policy approaches that do not result indo not achieve the same level of climate ambition, there is a risk of carbon leakage, which would undermine the Union’s competitiveness on global markets. Carbon leakage occurs if, for reasons of costs related to climate policies, businesses in certain industry sectors or subsectors were to transfer production to other countries or imports from those countries would replace equivalent but less GHG emissions intensive products-intensive products on the internal market, as well as export markets, or investment into such sectors and subsectors would predominantly flow to such countries and not the Union. That cwould lead to an increase in their total emissions globally, thus jeopardising the reduction of GHG emissions that is urgently needed if the world is to keep the global average temperature to well below 2 °C above pre- industrial levels.
2022/02/08
Committee: ITRE
Amendment 100 #
Proposal for a regulation
Recital 9
(9) The initiative for a carbon border adjustment mechanism (‘CBAM’) is a part of the ‘Fit for 55 Package’. That mechanism is to serve as an essential element of the EU toolbox to meet the objective of a climate-neutral Union by 2050 in line with the Paris Agreement by addressing risks ofpreventing carbon leakage resulting from the increased Union climate ambition.
2022/02/08
Committee: ITRE
Amendment 109 #
Proposal for a regulation
Recital 10
(10) Existing mechanisms to address the risk of carbon leakage in sectors or sub- sectors at risk of carbon leakage are the transitional free allocation of EU ETS allowances and financial measures to compensate for indirect emission costs incurred from GHG emission costs passed on in electricity prices respectively laid down in Articles 10a(6) and 10b of Directive 2003/87/EC. However, free allocation under the EU ETS weakens the price signal that the system provides for the installations receiving it compared to full auctioning and thus affects the incentives for investment into further abatement of emissions. Free allocation at the level of best performers has been an adequate policy instrument for certain industrial sectors to address the risk of carbon leakage in the absence of a fair level playing field.
2022/02/08
Committee: ITRE
Amendment 117 #
Proposal for a regulation
Recital 11
(11) The CBAM seeks tointends to complement and progressively replace these existing mechanisms by addressing the risk of carbon leakage in a different way, namely by ensuring equivalent carbon pricing for imports and domestic products. To ensure a gradual transition from the current system of free allowances to the CBAM, the CBAM should be progressively phased in while free allowances in sectors covered by the CBAM are phased out. The combined and transitional application of EU ETS allowances allocated free of charge and of the CBAMshould be phased out only after a comprehensive transitional period between 2026 and 2030 and once the CBAM has proven to be efficient, fit for purpose, operational and tested to mitigate the risk of carbon leakage. The combined application of EU ETS allowances allocated free of charge and of the CBAM is needed to allow producers, importers and traders to adjust to the new regime and to assess the effective implementation of the CBAM but should in no case result in more favourable treatment for Union goods compared to goods imported into the customs territory of the Union as continuous trade with third countries are essential for the Union and its diversified supply chains.
2022/02/08
Committee: ITRE
Amendment 134 #
Proposal for a regulation
Recital 12
(12) While the objective of the CBAM is to prevent the risk of carbon leakage, this Regulation would also encourage the use of more GHG emissions-efficient technologies by producers from third countries, so that less emissions per unit of output are generated. The CBAM hence might be an effective measure to lower emissions in third countries while ensuring European industry competitiveness. Reducing emissions in the Union as well as in third countries is an effective way to reduce the risk of carbon leakage. The CBAM should be seen as a step towards global pricing on carbon emissions which would further reduce the risk of carbon leakage globally.
2022/02/08
Committee: ITRE
Amendment 142 #
Proposal for a regulation
Recital 12 a (new)
(12 a) While the surrendering of CBAM certificates for EU importers addresses the risk of carbon leakage on the EU market, it is essential that the CBAM would also seek to reduce the possibility of European low-carbon exports being replaced by carbon-intensive items on third country markets or by goods that are not subject to equivalent climate policy and carbon costs, undermining the goal of lowering global emissions. It is therefore necessary to continue addressing the risk of carbon leakage associated with European exports to third countries that have not yet limited or priced GHG emissions at the same levels as the EU.
2022/02/08
Committee: ITRE
Amendment 149 #
Proposal for a regulation
Recital 13
(13) As an instrument to prevent carbon leakage and reduce GHG emissions the CBAM should ensure that imported products are subject to a regulatory system that applies carbon costs equivalent to the ones that otherwise would have been borne under the EU ETS. The CBAM is a climate measure which should prevent the risk of carbon leakage and support the Union’s increased ambition on climate mitigation, while ensuring WTO compatibility and industrial competitiveness.
2022/02/08
Committee: ITRE
Amendment 151 #
Proposal for a regulation
Recital 13 a (new)
(13 a) As CBAM is a mechanism that addresses the risk of carbon leakage on the EU market for EU imports, it is essential to avoid the risk that EU exports are replaced by more carbon intensive goods on the global market. Hence, the Commission shall analyse its implementation and effectiveness throughout the administrative transitional period and shall by the end of this period submit a report to the European Parliament and Council that specifies the carbon leakage risk on export markets accompanied with a proposal preventing the carbon leakage risk on export markets with safeguards of products intended for exports, such as export rebates.
2022/02/08
Committee: ITRE
Amendment 166 #
Proposal for a regulation
Recital 17
(17) The GHG emissions to be regulated by the CBAM should correspond to those GHG emissions covered by Annex I to the EU ETS in Directive 2003/87/EC, namely carbon dioxide (‘CO2’) as well as, where relevant, nitrous oxide (‘N2O’) and perfluorocarbons (‘PFCs’). The CBAM should initially apply to direct emissions of those GHG from the production of goods up to the time of import into the customs territory of the Union, and after the end of athe administrative transitional period and upon further assessment on the impact on carbon leakage for energy-intensive sectors with a withdrawal of EU ETS compensation, as well to indirect emissions, mirroring the scope of the EU ETS.
2022/02/08
Committee: ITRE
Amendment 173 #
Proposal for a regulation
Recital 19
(19) However, while the EU ETS sets an absolute cap on the GHG emissions from the activities under its scope and allows tradability of allowances (so called ‘cap and trade system’), the CBAM shouldmust not establish quantitative limits to import, so as to ensure that trade flows are not restricted or disrupted. Moreover, while the EU ETS applies to installations based in the Union, the CBAM should be applied to certain goods imported into the customs territory of the Union to ensure a level playing field and prevent the risk of carbon leakage while ensuring compatibility with WTO.
2022/02/08
Committee: ITRE
Amendment 189 #
Proposal for a regulation
Recital 24
(24) In terms of sanctions, Member States should apply penalties to infringements or circumvention practises of this Regulation and ensure that they are implemented. The amount of those penalties should be identical to penalties currently applied within the Union in case of infringement of EU ETS according to Article 16(3) and (4) of Directive 2003/87/EC.
2022/02/08
Committee: ITRE
Amendment 193 #
Proposal for a regulation
Recital 28
(28) Whilst the ultimate objective of the CBAM is a broader product coverage, it would beis prudent to start with a selected number of sectors with relatively homogeneous products where there is a risk of carbon leakage. The Commission should consider to further extend the scope of included goods, when CBAM is proven efficient to reduce carbon leakage for the sectors included in Annex I of this Regulation. A proposal of the inclusion of finished goods shall be presented by the Commission before the comprehensive transitional period. Union sectors deemed at risk of carbon leakage are listed in Commission Delegated Decision 2019/70842 . __________________ 42Commission Delegated Decision (EU) 2019/708 of 15 February 2019 supplementing Directive 2003/87/EC of the European Parliament and of the Council concerning the determination of sectors and subsectors deemed at risk of carbon leakage for the period 2021 to 2030 (OJ L 120, 8.5.2019, p. 2).
2022/02/08
Committee: ITRE
Amendment 200 #
Proposal for a regulation
Recital 29
(29) The goods under this Regulation should be selected after a careful analysis of their relevance in terms of cumulated GHG emissions and risk of carbon leakage in the corresponding EU ETS sectors while limiting complexity and administrative burden for European industry, affected authorities, companies and SMEs. In particular, the actual selection should take into account basic materials and basic products covered by the EU ETS with the objective of ensuring that imports of energy intensive products into the Union are on equal footing with EU products in terms of EU ETS carbon pricing, and to mitigate risks of carbon leakage. Other relevant criteria to narrow the selection should be: firstly, relevance of sectors in terms of emissions, namely whether the sector is one of the largest aggregate emitters of GHG emissions; secondly, sector’s exposure to significant risk of carbon leakage, as defined pursuant to Directive 2003/87/EC; thirdly, the need to balance broad coverage in terms of GHG emissions while limiting complexity and administrative effort.
2022/02/08
Committee: ITRE
Amendment 221 #
Proposal for a regulation
Recital 38
(38) As importers of goods covered by this Regulation should not have to fulfil their CBAM obligations under this Regulation at the time of importation, specific administrative measures should be applied to ensure that the obligations are fulfilled at a later stage. Therefore, importers should only be entitled to import CBAM goods after they have been granted an authorisation by competent authorities responsible for the application of this Regulation.CBAM Authority (This amendment applies throughout the text. Adopting it will necessitate corresponding changes throughout.)
2022/02/08
Committee: ITRE
Amendment 236 #
Proposal for a regulation
Recital 46
(46) To avoid risks of circumvention and improve the traceability of actual CO2 emissions from import of electricity and its use in goods, the calculation of actual emissions should only be permitted through a number of strict conditions. In particular, it should be necessary to demonstrate a firm nomination of the allocated interconnection capacity and that there is a direct contractual relation between the purchaser and the producer of the renewable and low carbon electricity, or between the purchaser and the producer of electricity having lower than default value emissions. .
2022/02/08
Committee: ITRE
Amendment 238 #
Proposal for a regulation
Recital 46 a (new)
(46 a) To reduce the risk of carbon leakage as well as to ensure a level playing field for European industry, all practices of circumvention shall be prohibited. The Commission shall evaluate the risk of circumvention practices, especially the likelihood of modified trade patterns towards downstream products, as well as resource shuffling, cost absorption, manipulation of emissions data, wrongful labelling of goods and slight modifications of the product so as to import a product under a different customs code of all sectors included in Annex I of this Regulation. The Commission shall be empowered to adopt delegated acts to strengthen anti- circumvention measures when appropriate.
2022/02/08
Committee: ITRE
Amendment 243 #
Proposal for a regulation
Recital 48
(48) Integration of third countries into the Union electricity market is an important drive for those countries to accelerate their transition to energy systems with high shares of renewable energies. Market coupling for electricity, as set out in Commission Regulation (EU) 2015/122246 , enables third countries to better integrate electricity from renewable and low carbon energies into the electricity market, to exchange such electricity in an efficient manner within a wider area, balancing supply and demand with the larger Union market, and reduce the carbon intensity of their electricity generation. Integration of third countries into the Union electricity market also contributes to the security of electricity supplies in those countries and in the neighbouring Member States. __________________ 46Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity allocation and congestion management (OJ L 197, 25.7.2015, p. 24).
2022/02/08
Committee: ITRE
Amendment 247 #
Proposal for a regulation
Recital 49 a (new)
(49 a) This Regulation shall progressively enter into force in two steps. Between 2023 and 2025 an administrative transitional period where Articles set out in Article 36 (a) and (c) of this Regulation shall apply. Between 2026 and 2030 a comprehensive transitional period where all Articles set out in Article 36 of this Regulation shall apply. During this period free allocation should remain in place.
2022/02/08
Committee: ITRE
Amendment 250 #
Proposal for a regulation
Recital 50
(50) An administrative transitional period without financial adjustment should apply during the period 2023 until 2025. A CBAM without financial adjustment should applyto 2025, with the objective to facilitate a smooth roll out of the mechanism hence reducing the risk of disruptive impacts on trade and European industry. Declarants should have to report on a quarterly basis the actual embedded emissions in goods imported during the administrative transitional period, detailing direct and indirect emissions as well as any carbon price paid abroad.
2022/02/08
Committee: ITRE
Amendment 257 #
Proposal for a regulation
Recital 50 a (new)
(50 a) A comprehensive transitional period with financial adjustment should apply during the period 2026 to 2030, with the objective to facilitate a smooth roll out of the mechanism hence reducing the risk of disproportionate impacts on European industry.
2022/02/08
Committee: ITRE
Amendment 258 #
Proposal for a regulation
Recital 50 b (new)
(50 b) A temporary Carbon Leakage Protection Reserve should be established between 2031 to 2035, linked to the reduction of free allocation. Each year, the free allocation no longer provided to the CBAM sectors, based on the free allocation phase-out calculation, should be placed into the temporary Carbon Leakage Reserve. To this purpose the Commission shall every year, from 2031 to 2035, present to the parliament and Council a report on the effectiveness of this Regulation in lowering carbon leakage. By 28 February, the following year the Commission shall report to the Parliament and the Council on the entry into force of CBAM and its effectiveness during the preceding year. If the assessment is positive, the allowances placed in the reserve should automatically be auctioned. If the assessment proves negative impact on lowering carbon leakage, the allowances placed in the reserve should automatically be returned to industry, to mitigate the risk of carbon leakage.
2022/02/08
Committee: ITRE
Amendment 259 #
Proposal for a regulation
Recital 51
(51) To facilitate and ensure a proper functioning of the CBAM, the Commission should provide support to the competent authorities responsible for the application of this Regulation in carrying out their obligations.deleted
2022/02/08
Committee: ITRE
Amendment 265 #
Proposal for a regulation
Recital 52
(52) The Commission should evaluate the application of this Regulation before the end of the administrative transitional period and report to the European Parliament and the Council. The report of the Commission should in particular focus on possibilities to enhance climate actions towards the objective of a climate neutral Union by 2050. The Commission should, as part of that evaluation, initiate collection of information necessary to possibly extend the scope of Annex I to indirect emissions, as well as to other goods and services at risk of carbon leakage, such as finished goods, and to develop methods of calculating embedded emissions based on the environmental footprint methods47 .. The Commission should in particular focus on: (a) the impact on competitiveness of European industry and downstream industry, impact on SMEs, possible disproportionate administrative burden, possible circumvention practices, distortion in trade patterns and possibilities to enhance climate actions towards a climate neutral Union by 2050. Accompanied by proposals to avoid negative impact on such sectors; (b) a proposal to avoid possible carbon leakage in export markets; (c) a proposal to extend the scope of this Regulation to finished goods containing goods listed in Annex I; to ensure competitiveness of European manufacturing industry and prevent carbon leakage; __________________ 47Commission Recommendation 2013/179/EU of 9 April 2013 on the use of common methods to measure and communicate the life cycle environmental performance of products and organisations (OJ L 124, 4.5.2013, p. 1).
2022/02/08
Committee: ITRE
Amendment 275 #
Proposal for a regulation
Recital 52 a (new)
(52 a) During the comprehensive transitional period, biannual between 2025-2030 and every year thereafter until 2035, the Commission shall evaluate the application of this Regulation and report to the European parliament and the Council. The Commission should in particular focus on: (a) the impact on European industry and downstream industry of sectors listed in Annex I, and possible additional administrative burden; (b) the effectiveness of this Regulation in reducing carbon leakage and possible circumvention practices; and (c) the impact of CBAM on Union trade of goods listed in Annex I and possible distortion in trade patterns;
2022/02/08
Committee: ITRE
Amendment 279 #
Proposal for a regulation
Recital 52 b (new)
(52 b) In case the CBAM is proven not to be efficient in lowering carbon leakage, creates disproportionate disadvantages for European industry or severe shortcomings appear in the implementation of this Regulation during the comprehensive transitional period, the Commission shall present a new or revised legislative proposal aiming at lowering carbon leakage in order for the Union to reach its goal of climate neutrality 2050.
2022/02/08
Committee: ITRE
Amendment 280 #
Proposal for a regulation
Recital 52 c (new)
(52 c) If the CBAM is challenged by WTO and as an effect not implemented, the Commission shall present a revised legislative proposal aiming at lowering carbon leakage.
2022/02/08
Committee: ITRE
Amendment 282 #
Proposal for a regulation
Recital 53
(53) In light of the above, a dialogue with third countries should continue and there should be space for cooperation and solutions that could inform the specific choices that will be made on the details of the design of the measure during the implementation, in particular during the transitional periods.
2022/02/08
Committee: ITRE
Amendment 286 #
Proposal for a regulation
Recital 54
(54) The Commission should strive to engage in an even handed manner and in line with the international obligations of the EU, with the third countries whose trade to the EU is affected by this Regulation, to explore possibilities for dialogue and cooperation with regard to the implementation of specific elements of the Mechanism set out this Regulation and related implementing acts. It should also explore possibilities for concluding agreements to take into account their carbon pricing mechanism, provided that they deliver equivalent GHG emissions reductions and carbon costs constraints.
2022/02/08
Committee: ITRE
Amendment 293 #
Proposal for a regulation
Recital 58
(58) In order for CBAM to be efficient in lowering carbon leakage, all possible circumvention practices should be addressed by this Regulation. In order to remedy circumvention of the provisions of this Regulation, the power to adopt acts in accordance with Article 290 of TFEU should be delegated to the Commission in respect of supplementing the list of goods in Annex I.
2022/02/08
Committee: ITRE
Amendment 302 #
Proposal for a regulation
Article 1 – paragraph 1
1. This Regulation establishes a carbon border adjustment mechanism (the ‘CBAM’) for addressing greenhouse gas emissions embedded in the goods referred to in Annex I, upon their importation into the customs territory of the Union, in order to prevent the risk of carbon leakage from the EU and contribute to the reduction of global carbon emissions.
2022/02/08
Committee: ITRE
Amendment 321 #
2022/02/08
Committee: ITRE
Amendment 366 #
Proposal for a regulation
Article 3 – paragraph 1 – point 11
(11) ‘competent authority’ means the authority, designated by each Member State in accordance with Article 11 of this Regulation;deleted
2022/02/08
Committee: ITRE
Amendment 436 #
Proposal for a regulation
Chapter III – title
III Competent aCBAM Authoritiesy
2022/02/08
Committee: ITRE
Amendment 437 #
Proposal for a regulation
Article 11 – title
Competent aAppointment of the CBAM Authoritiesy
2022/02/08
Committee: ITRE
Amendment 440 #
Proposal for a regulation
Article 11 – paragraph 1
1. Each Member State shall designate the competent authority to carry out the obligations under this Regulation and inform the Commission thereof. The Commission shall make available to the Member States a list of all competent authorities and publish this information in the Official Journal of the European Union.deleted
2022/02/08
Committee: ITRE
Amendment 445 #
Proposal for a regulation
Article 11 – paragraph 1 – subparagraph 1
The Commission shall make available to the Member States a list of all competent authorities and publish this information in the Official Journal of the European Union.deleted
2022/02/08
Committee: ITRE
Amendment 449 #
Proposal for a regulation
Article 11 – paragraph 1 a (new)
1a. The Commission shall appoint the competent authority to perform obligations referred to in Articles 17 to 24 as the CBAM Authority.
2022/02/08
Committee: ITRE
Amendment 451 #
Proposal for a regulation
Article 11 – paragraph 2
2. Member States shall require that competent authorities exchange any information that is essential or relevant to the exercise of their functions and duties.deleted
2022/02/08
Committee: ITRE
Amendment 458 #
Proposal for a regulation
Article 12 – title
Commission Decisions taken by the CBAM Authority 1. The CBAM Authority shall, without delay, take any decision that is required to implement the provisions of this Regulation. 2. Any decision of the CBAM Authority shall take effect from the date of its notification to the holder of the decision. 3. If the CBAM Authority considers that it does not have all the necessary information to take a decision, it shall contact the holder of the decision and specify what additional information is required. The holder of the decision shall submit the required information to the CBAM Authority without delay. 4. The holder of the decision shall inform the CBAM Authority without delay of any changes to the information provided arising after the decision was taken, which may influence its continuation or content. In this case, the CBAM Authority shall reassess its decision in light of that information. 5. Any decision taken by the CBAM Authority which adversely affects the holder of the decision shall set out the grounds on which it is based and shall include a reference to the right of appeal provided for in Article 27a. Before the decision is taken, the CBAM Authority shall give the holder of the decision the opportunity to make its point of view known to the CBAM Authority within a given period of time. Following the expiry of that period, the holder of the decision shall be notified of the decision in the appropriate form. 6. The CBAM Authority may, at any time, annul, revoke or amend its decision upon reasoned request by the holder of the decision or on its own initiative, if appropriate. 7. The Commission shall specify, by means of implementing acts, any further detailed arrangement or procedural rule concerning the decision-making of the CBAM Authority. Those implementing acts shall be adopted in accordance with the examination procedure referred to in Article [29(2)].
2022/02/08
Committee: ITRE
Amendment 460 #
Proposal for a regulation
Article 12 – paragraph 1
The Commission shall assist the competent authorities in carrying out their obligations under this Regulation and coordinate their activities.deleted
2022/02/08
Committee: ITRE
Amendment 468 #
Proposal for a regulation
Article 14 – title
National registries and central database CBAM Registry 1. The CBAM Authority shall set up a CBAM Registry for the execution of processes relating to CBAM certificates, in accordance with the conditions set in Articles 22to 26. 2. The CBAM Registry shall contain a database with information about each authorised declarant, in particular:(a) name and contact details of the authorised declarant;(b) EORI number of the authorised declarant;(c) CBAM account number;(d) number, price and date of purchase of CBAM certificates held by each authorised declarant. 3. The CBAM Registry shall also contain, in a separate section of the database, the names and additional details of the operator and of the third country installations registered in accordance with Article 11. 4. This database shall be confidential. Only the names of the authorised declarants and of the operator and of the third country installations included in the database shall be accessible to the public. 5. The Commission shall adopt implementing acts concerning the infrastructure and specific processes of the CBAM Registry and the electronic databases containing the information above. Those implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 29(2).
2022/02/08
Committee: ITRE
Amendment 471 #
Proposal for a regulation
Article 14 – paragraph 1
1. The competent authority of each Member State shall establish a national registry of declarants authorised in that Member State in the form of a standardised electronic database containing the data regarding the CBAM certificates of those declarants, and to provide for confidentiality in accordance with the conditions set out in Article 13.deleted
2022/02/08
Committee: ITRE
Amendment 475 #
Proposal for a regulation
Article 14 – paragraph 2
2. The database referred to in paragraph 1 shall contain accounts with information about each authorised declarant, in particular: (a) the name and contact details of the authorised declarant; (b) the EORI number of the authorised declarant; (c) (d) date of purchase, the date of surrenddeleted the CBAM account number; the number, or the date of re-purchase, or that of the cancellation by the competent authority, of CBAM certificates for each authorised declarant.price of sale, the
2022/02/08
Committee: ITRE
Amendment 478 #
Proposal for a regulation
Article 14 – paragraph 3
3. The information in the database referred to in paragraph 2 shall be confidential.deleted
2022/02/08
Committee: ITRE
Amendment 483 #
Proposal for a regulation
Article 14 – paragraph 4
4. The Commission shall establish a central database accessible to the public containing the names, addresses and contact details of the operators and the location of installations in third countries in accordance with Article 10(2). An operator may choose not to have its name, address and contact details accessible to the public.deleted
2022/02/08
Committee: ITRE
Amendment 490 #
Proposal for a regulation
Article 15
1. central administrator to maintain an independent transaction log recording the purchase of CBAM certificates, their holding, surrender, re-purchase and cancellation and ensure coordination of national registries. 2. carry out risk-based controls on transactions recorded in national registries through an independent transaction log to ensure that there are no irregularities in the purchase, holding, surrender, re-purchase and cancellation of CBAM certificates. 3. result of tArticle 15 deleted Central administrator The Commission shall act as The coentrols carried out under paragraph 2, the Commission shall inform the Member State or Member States concerned for further investigation in order to correct the identified irregularities.al administrator shall If irregularities are identified as a
2022/02/08
Committee: ITRE
Amendment 496 #
Proposal for a regulation
Article 16 – title
Accounts in the national registries CBAM Registry 1. The CBAM Authority shall assign to each authorised declarant a unique CBAM account number. Each declarant shall be granted access to its account in the CBAM Registry to fulfil its obligations pursuant to Article 10. 2. The CBAM Authority shall set up the account at the time of authorisation and notify the authorised declarant thereof. 3. If the authorised declarant has ceased activity or the CBAM authorisation is withdrawn, the CBAM Authority shall close the account of that declarant. 4. The Commission shall adopt implementing acts laying down procedures concerning the accounts of the CBAM Registry. Those implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 29(2).
2022/02/08
Committee: ITRE
Amendment 498 #
Proposal for a regulation
Article 16 – paragraph 1
1. The competent authority shall assign to each authorised declarant a unique CBAM account number.deleted
2022/02/08
Committee: ITRE
Amendment 501 #
Proposal for a regulation
Article 16 – paragraph 2
2. Each authorised declarant shall be granted access to its account in the registry.deleted
2022/02/08
Committee: ITRE
Amendment 503 #
Proposal for a regulation
Article 16 – paragraph 3
3. The competent authority shall set up the account as soon as the authorisation referred to in Article 17(1) is granted and notify the authorised declarant thereof.deleted
2022/02/08
Committee: ITRE
Amendment 504 #
Proposal for a regulation
Article 16 – paragraph 4
4. If the authorised declarant has ceased its economic activity or its authorisation was revoked, the competent authority shall close the account of that declarant.deleted
2022/02/08
Committee: ITRE
Amendment 516 #
Proposal for a regulation
Article 17 – paragraph 3
3. If the competent authority refuses to authorise a declarant, the declarant requesting the authorisation may, prior to an appeal, object to the relevant authority under national law, who shall either instruct the national administrator to open the account or uphold the refusal in a reasoned decision, subject to requirements of national law that pursue a legitimate objective compatible with this Regulation and are proportionate.deleted
2022/02/08
Committee: ITRE
Amendment 523 #
Proposal for a regulation
Article 17 – paragraph 4 – point c
(c) the CBAM account number in the CBAM Registry.
2022/02/08
Committee: ITRE
Amendment 535 #
Proposal for a regulation
Article 17 – paragraph 8 a (new)
8a. The CBAM Authority may verify the accuracy and completeness of the information given by the applicant in accordance with Article 5(3) and the existence, authenticity, accuracy and validity of any supporting document. Such controls may be carried out at the premises of the applicant.
2022/02/08
Committee: ITRE
Amendment 539 #
Proposal for a regulation
Article 17 – paragraph 9 a (new)
9a. The Commission shall adopt, by means of implementing acts, the modalities for the application of the criteria referred to in paragraph 1 and for guarantees referred to in paragraph 6. Those implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 29(2).
2022/02/08
Committee: ITRE
Amendment 542 #
Proposal for a regulation
Article 18 – paragraph 2
2. In addition to paragraph 1, a national accreditation bodThe CBAM Authority may on request accredit a person as a verifier under this Regulation after checking the documentation attesting its capacity to apply the verification principles referred to Annex V to perform the obligations of control of the embedded emissions established in Articles 8, 10 and 38.
2022/02/08
Committee: ITRE
Amendment 557 #
Proposal for a regulation
Article 19 – paragraph 4
4. The recipient of the notification referred to in paragraph 3 may lodge an appeal of the notification. The recipient of the notification shall be provided with information regarding the procedure to be followed in the event of an appeal.deleted
2022/02/08
Committee: ITRE
Amendment 560 #
Proposal for a regulation
Article 19 a (new)
Article 19 a Revenues The revenues generated by the sale of CBAM certificates shall constitute internal assigned revenue in accordance with Article 21(4) of Regulation (EU, Euratom) No 966/2012 of the European Parliament and of the Council . They shall be assigned to cover the costs of the operation and maintenance of the CBAM Authority. Any revenue remaining after covering these costs shall be assigned to the Union budget.
2022/02/08
Committee: ITRE
Amendment 585 #
Proposal for a regulation
Article 22 – paragraph 4
4. The recipient of the notification referred to in paragraph 3 may lodge an appeal of the notification. The recipient of the notification shall be provided with information regarding the procedure to be followed in the event of an appeal.deleted
2022/02/08
Committee: ITRE
Amendment 598 #
Proposal for a regulation
Article 25 – paragraph 5 a (new)
5a. As of the initiation of investigations under Articles 28 and 29 and having informed the Member States in due time, the Commission may direct the customs authorities to take the appropriate steps to register imports, so that measures may subsequently be applied against those imports from the date of such registration. Imports shall be made subject to registration following a request, from the Union industry, which contains sufficient evidence to justify such action. Imports may also be made subjecte introduced by Commission regulation. Such regulation shall specify the purpose of the action and, if appropriate, the estimated amount of possible future liability. Imports shall not be made subject to registration for a period longer than nine months.
2022/02/08
Committee: ITRE
Amendment 606 #
Proposal for a regulation
Article 26 – paragraph 4 – point f
(f) of the right of the authorised declarant or of the person to appeal under national rules.deleted
2022/02/08
Committee: ITRE
Amendment 616 #
Proposal for a regulation
Article 27 – paragraph 2
2. Practices of circumvention include situations where a change in the pattern of trade in relation to goods included in the scope of this Regulation, whether slightly modified or not, stems from a practice, process or work that have has insufficient due cause or economic justification other than avoiding obligations as laid down in this Regulation and consist in replacing those goods with slightly modified products, which are not included in the list of goods in Annex I but belong to a sector included in the scope of this Regulation, or undermining their effects, including on overall GHG emissions and on prices of the like products.
2022/02/08
Committee: ITRE
Amendment 618 #
Proposal for a regulation
Article 27 – paragraph 2 – point 1 (new)
(1) The practice, processor work referred to in the first subparagraph include, inter alia:
2022/02/08
Committee: ITRE
Amendment 619 #
Proposal for a regulation
Article 27 – paragraph 2 – subparagraph 1 (new)
(a) the slight modification of a product to make it fall under another customs code which are not subject to the obligations of this Regulation; b) false declarations regarding identity of the producer, the product concerned, the nature of the product concerned or the production process; (c) the consignment of the product concerned via third countries where no or more favourable obligations apply; (d) the reorganisation by exporters or producers of their patterns and channels of sales in order to avoid obligations of this Regulation, or undermine their effects, for instance via practices of resource shuffling. Resource shuffling shall be defined as any practice, process or work that that have insufficient due cause or economic justification other than avoiding obligations as laid down in this Regulation, or undermining their effects, without delivering environmental benefits on global GHG emissions; (e) in the circumstances indicated in paragraph 2, the assembly of parts by an assembly operation in the Union or a third country.
2022/02/08
Committee: ITRE
Amendment 634 #
Proposal for a regulation
Chapter VI a (new)
Appeals Article 27a Appeals against decisions taken by the CBAM Authority 1. An appeal shall lie from decisions of the CBAM Authority that adversely affect any interested person, including decisions on penalties, circumvention and actual mission values. Those decisions shall take effect only as from the date of expiration of the appeal period of two months. The filing of the appeal shall have suspensive effect. Products concerned by an appeal will be subject to registration according to Article 25(5a). 2. Any party to proceedings adversely affected by a decision may appeal. Any other parties to the proceedings shall be parties to the appeal proceedings as of right. 3. The Board of Appeal shall be newly set up and consist of three full members, to be respectively appointed by the Council, by the European Parliament and by the Commission. The chair will be appointed by the Council. The Council and the European Parliament will respectively appoint two additional alternate members. 4. The Commission shall adopt delegated acts pursuant to Article 28, to define the composition, the appointment and the procedures of the Board of Appeal with a view to assure the independence of its members, including during the transitional period. During the transitional period the Commission will hold the functions of the Board of Appeal. Article 27b Examination of appeals 1. The Board of Appeal shall examine whether the appeal is admissible. 2. In the examination of the appeal, the Board of Appeal shall invite the parties, as often as necessary, to file observations, within a period to be fixed by the Board of Appeal, on communications from the other parties or issued by itself. 3. Following the examination as to the admissibility of the appeal, the Board of Appeal shall decide on the appeal. The Board of Appeal may either exercise any power within the competence of the CBAM Authority or remit the case to the latter for further prosecution. 4. If the Board of Appeal remits the case for further prosecution to the CBAM Authority, the latter shall be bound by the line of reasoning of the Board of Appeal, in so far as the facts are the same. 5. The decisions of the Board of Appeal shall take effect only as from the date of expiry of a period of two months, if an action has been brought before the General Court within that period, as from the date of dismissal of such action or of any appeal filed with the Court of Justice against the decision of the General Court. Article 27c Actions before the Court of Justice 1. Actions may be brought before the General Court against decisions of the Boards of Appeal in relation to appeals. 2. Actions may be brought before the General Court against any decision of the CBAM Authority. In this case administrative appeal under Article 27b will be precluded. 3. The action may be brought on grounds of lack of competence, infringement of an essential procedural requirement, infringement of the TFEU, infringement of this Regulation or of any rule of law relating to their application or misuse of power. 4. The General Court shall have jurisdiction to annul or to alter the contested decision. 5. The action shall be open to any party to proceedings before the Board of Appeal adversely affected by its decision. 6. The action shall be brought before the General Court within two months of the date of notification of the decision of the Board of Appeal in case of action under paragraph 1 of this Article and within two month of the date of the notification of the decision of the CBAM Authority in case of actions under paragraph 2 of this Article. 7. The CBAM Authority shall take the necessary measures to comply with the judgment of the General Court or, in the event of an appeal against that judgment, the Court of Justice.
2022/02/08
Committee: ITRE
Amendment 652 #
Proposal for a regulation
Article 30 – paragraph 2
2. Before the end of the transitional 2. period, the Commission shall present a report to the European Parliament and the Council on the application of this Regulation. The report shall contaThe Commission should evaluate the application of this Regulation before the end of the administrative transitional period and report to the European Parliament and the Council. The first report of the Commission should in particular focus on possibilities to enhance climate actions towards the objective of a climate neutral Union by 2050. The Commission should, as part of that evaluation, initiate collection of information necessary to possibly extend the scope of Annex I to indirect emissions, as well as to other goods and services at risk of carbon leakage, such as finished goods, and to develop methods of calculating embedded emissions based on the environmental footprint methods: (a) the impact on competitiveness of European industry and downstream industry, impact on SMEs, possible disproportionate administrative burden, possible circumvention practices, distortion in trade patterns and possibilities to enhance climate actions towards a climate neutral Union by 2050. Accompanied by proposals to avoid negative impact on such sectors; (b) a proposal to avoid possible carbon leakage in export markets; (c) a proposal to extend the scope of this Regulation to finished goods containing goods listed in Annex I; to ensure competitiveness of European manufacturin,g in particular,dustry and prevent carbon leakage; (d) the assessment of the possibilities to further extend the scope of embedded emissions to indirect emissions and to other goods at risk of carbon leakage than those already covered by this Regulation, as well as an assessment of the governance system. It shall also contain the assessment of the possibility to further extend the scope to embedded emissions of transportation services as well as to goods further down the value chain and services that may be subject to the risk of carbon leakage in the future.
2022/02/08
Committee: ITRE
Amendment 667 #
Proposal for a regulation
Article 30 – paragraph 2 a (new)
2a. During the comprehensive transitional period, biannual between 2025-2030 and every year thereafter until 2035 the Commission shall evaluate the application of this Regulation and report to the European parliament and the Council. The Commission should in particular focus on: (a) the impact on European industry and downstream industry of sectors listed in Annex I, as well as on SMEs and possible additional administrative burden for SMEs; (b) the effectiveness of this Regulation in reducing carbon leakage and possible circumvention practices; and (c) the impact of CBAM on Union trade of goods listed in Annex I and possible distortion in trade patterns;
2022/02/08
Committee: ITRE
Amendment 674 #
Proposal for a regulation
Article 30 – paragraph 3 a (new)
3a. In case the CBAM is proven not to be efficient in lowering carbon leakage, the Commission shall present a new or revised legislative proposal aiming at lowering carbon leakage. Once the CBAM has fully demonstrated its WTO- compatibility, its effectiveness in equalising CO2 costs between imported and domestic products and in protecting the competitiveness of European exports, the free allocation received by these sectors should be gradually phased out, however not prior to 2030. This phase-out of free allocation should be kept under review in light of the entry into force and effective implementation of the Carbon Border Adjustment Mechanism.
2022/02/08
Committee: ITRE
Amendment 676 #
Proposal for a regulation
Article 30 – paragraph 3 b (new)
3b. In the event that the Commission in its annual report between 2031-2035 concludes that, the CBAM has been effectively implemented in a way that leads to a level of carbon leakage protection at least equivalent to that of the free allocation system which it replaces under this Article, the allowances placed in the Carbon Border Adjustment Reserve for the preceding calendar year shall be made available to support innovation in accordance with Article 10a(8) of Directive 2003/87/EC.
2022/02/08
Committee: ITRE
Amendment 677 #
Proposal for a regulation
Article 30 – paragraph 3 c (new)
3c. In the event that the Commission in its report concludes that the CBAM has not been effectively implemented in a way that leads to a level of carbon leakage protection at least equivalent to that of the free allocation system which it replaces, the allowances placed in the Carbon Border Adjustment Reserve for the preceding calendar year shall be reallocated to installations in accordance with Article10a(1) of Directive 2003/87/EC.
2022/02/08
Committee: ITRE
Amendment 695 #
Proposal for a regulation
Article 31 – paragraph 2 a (new)
2a. For the first years of operation of this Regulation, the production of products listed in Annex I shall benefit from free allocation in reduced amounts. A factor reducing the free allocation for the production of those products shall be applied (CBAM factor). The CBAM factor shall be equal to 100 % for the period between 2026 and the end of 2030, 80 % in 2031 and shall be reduced by 20 percentage points each year to reach 0 % by the fifth year.
2022/02/08
Committee: ITRE
Amendment 700 #
Proposal for a regulation
Article 32 – paragraph 1
During the administrative transitional period of this Regulation, the CBAM mechanism shall apply as a reporting obligation as set out in Articles 33 to 35.
2022/02/08
Committee: ITRE
Amendment 745 #
Proposal for a regulation
Annex III – point 4 – point 4.1 – paragraph 1
When actual emissions cannot be adequately determined by the authorised declarant, default values shall be used. These values shall be set at the average emission intensity of the worst 10 per cent worst performing installations of each exporting country and for each of the goods listed in Annex I other than electricity, increased by a mark-up, the latter to be determined in the implementing acts of this Regulation. When reliable data for the exporting country cannot be applied for a type of goods, the default values shall be based on the average emission intensity of the 105 per cent worst performing EU installations for that type of goods.
2022/02/08
Committee: ITRE