BETA

Activities of Oldřich VLASÁK related to 2010/2305(INI)

Shadow reports (1)

REPORT on absorption of Structural and Cohesion Funds: lessons learnt for the future cohesion policy of the EU PDF (233 KB) DOC (150 KB)
2016/11/22
Committee: REGI
Dossiers: 2010/2305(INI)
Documents: PDF(233 KB) DOC(150 KB)

Amendments (7)

Amendment 7 #
Motion for a resolution
Recital B
B. whereas absorption capacity is not a parameter but a variable and whereas it differs widely in the different Member States, so that individual solutions are necessary to increase this capacity,(Does not apply to EN version)
2011/06/09
Committee: REGI
Amendment 13 #
Motion for a resolution
Recital C
C. whereas aiming at absorbing as much financial support as possible requires continuous efforts by the Member States and the involvement of the local and regional level of administration in every stage of the process,(Does not apply to EN version)
2011/06/09
Committee: REGI
Amendment 47 #
Motion for a resolution
Paragraph 3
3. Reiterates the need for simplification of rules and procedures at both EU and national level without creating major difficulties for the beneficiaries; believes that simplification will contribute to the speedy allocation of funds, higher absorption rates, increased efficiency, fewer errors and reduced payment periods; considers that a balance needs to be struck between simplification and the stability of rules and procedures;(Does not apply to EN version)
2011/06/09
Committee: REGI
Amendment 52 #
Motion for a resolution
Paragraph 4
4. Takes the view that emphasis should be placed on payments for delivery of results and achievement of objectives rather than checking inputs;. believes, in this context, that a better balance should be found between, on the one hand, the rules and procedures required for ensuring the legality and regularity of EU expenditure and, on the other, making cohesion policy more performance-oriented and cost- efficient;
2011/06/09
Committee: REGI
Amendment 56 #
Motion for a resolution
Paragraph 6
6. Stresses that proportionalitythe balance between the volume of support and control requirements should be strengthenimproved, and emphasises that the coordination of audit activity should be enhanced and the single audit principle followed in the next programming period; considers that the control process in the single audit framework must bring about an overall simplification of the control mechanism;
2011/06/09
Committee: REGI
Amendment 79 #
Motion for a resolution
Paragraph 13
13. Calls on the Commission to explore the introduction of harmonised information and communication systems, bearing in mind the differences between the management and control systems of the Member States;(Does not apply to EN version)
2011/06/09
Committee: REGI
Amendment 89 #
Motion for a resolution
Paragraph 14 a (new)
14a. Calls on the Commission to verify the existence and examine the efficiency of the legislative bases for the implementation of PPP projects and, where appropriate, to recommend to those Member States which have not adopted such legislative measures to prepare and adopt as soon as possible, with a view to permitting the mobilisation of resources from the structural funds and the Cohesion Fund for PPP projects in the next programming period, procedures for efficient implementation of these projects at regional and local level;
2011/06/09
Committee: REGI