Proposal for a regulation
Article 2 – point e
(e) 'investment phase' shall mean the phase of a project during which advanced technical studies and construction takes place and capital costs are incurred;
2009/03/16
Committee: ITRE
Amendment 70 #
Proposal for a regulation
Article 4 – point b
(b) optimisation of the capacity of the energy network and the integration of the internal energy market, in particular concerning cross-border section, which shall be oriented to the connection of all national markets in Member States and shall not be limited to certain regions;
2009/03/16
Committee: ITRE
Amendment 72 #
Proposal for a regulation
Article 4 – point d
(d) connection and integration of renewable energy resources; and
2009/03/16
Committee: ITRE
Amendment 80 #
Proposal for a regulation
Article 9 – paragraph 2 – point a
(a) maturity, in relation in particular to the ability to start work early and commit funds by the end of 20101;
2009/03/16
Committee: ITRE
Amendment 81 #
Proposal for a regulation
Article 9 – paragraph 2 – point a a (new)
(aa) the period in which the increase of interconnection capacity must be available to market agents, which shall not be more than three years since the granting of the assistance;
2009/03/16
Committee: ITRE
Amendment 82 #
Proposal for a regulation
Article 9 – paragraph 2 – point a b (new)
(ab) the increase of electricity or gas transport capacity at least between the borders of the Member States involved in the project, regardless of whether the assistance is granted to one or more of those Member States;
2009/03/16
Committee: ITRE
Amendment 83 #
Proposal for a regulation
Article 9 – paragraph 2 – point a c (new)
(ac) the extent to which the project is in line with the priorities established in each of the Regional Initiatives led by the European Regulators´ Group for Electricity and Gas (ERGEG) with the aim of achieving a single European energy market;
2009/03/16
Committee: ITRE
Amendment 91 #
Proposal for a regulation
Article 15 – paragraph 2 –point e a (new)
(ea) the extent to which the Community undertakings referred to in Article 14(2) duly integrate the relevant European industry.
2009/03/16
Committee: ITRE
Amendment 104 #
Proposal for a regulation
Article 19 – paragraph 1 – point b
(b) the project timetable shall provide for the possibility of committing funds in 2011 and shall include substantial capital expenditure in 2009 andby the end of 20102.
2009/03/16
Committee: ITRE
Amendment 149 #
Proposal for a regulation
Annex – point A – point 1 – part 6
Mediterranean Reinforcement of FR gas network on the Africa- France , Spain 150200 Reinforcement of the Africa- Spain-France axis