12 Amendments of Umberto GUIDONI related to 2007/0199(COD)
Amendment 51 #
Proposal for a regulation – amending act
Recital 8
Recital 8
Amendment 74 #
Proposal for a regulation – amending act
Article 1 – point 3
Article 1 – point 3
Regulation (EC) No 1775/2005
Article 2 b – paragraph 1
Article 2 b – paragraph 1
1. By […] at the latest the transmission system operators for gas shall submit to the Commission and to the Agency the draft of statutes, a list of future members and draft rules of procedure, including the rules of procedure on the consultation of other stakeholders, of the European Network for Transmission System Operators for Gas to be established.
Amendment 81 #
Proposal for a regulation – amending act
Article 1 – point 3
Article 1 – point 3
Regulation (EC) No 1775/2005
Article 2 c – paragraph 1
Article 2 c – paragraph 1
1. The European Network of Transmission System Operators for Gas shall adopt: (a) technical and marketprepare and submit to the Agency for approval following the procedure provided for in Article 2e in conjunction with Article X of Regulation (EC) No … establishing the Agency for the Cooperation of Energy Regulators: (a) draft technical codes in the areas mentioned in paragraph 3; (b) common network operation tools and research plans; (c) a 10-year investment plan every two years; (d) an annual work programme based on the priorities set by the Agency; (e) an annual report; (f) annual summer and winter supply outlooks.
Amendment 94 #
Proposal for a regulation – amending act
Article 1 – point 3
Article 1 – point 3
Regulation (EC) No 1775/2005
Article 2 c – paragraph 2
Article 2 c – paragraph 2
2. The annual work programme referred to in paragraph 1(d) shall contain a list and description of the technical and market codes, a plan on coordination of operation of the network and research and development activities, to be drawn up in that year and an indicative calendar.
Amendment 105 #
Proposal for a regulation – amending act
Article 1 – point 3
Article 1 – point 3
Regulation (EC) No 1775/2005
Article 2 c – paragraph 3
Article 2 c – paragraph 3
3. The detailed technical and market codes shall cover the following areas, according to the priorities defined in the annual work programme: (a) security and reliability rules; (b) grid connection and access rules; (c) data exchange and settlement rules; (d) interoperability rules; (e) operational procedures in an emergency; (f) capacity allocation and congestion management rules; (g) rules for trading; (h) transparency rules; (ih) balancing rules including rules on nominations procedures, rules for imbalance charges and rules for operational balancing between transmission system operators systems; (ji) rules regarding harmonised transportation tariff structures; (kj) energy efficiency regarding gas networks.
Amendment 106 #
Proposal for a regulation – amending act
Article 1 – point 3
Article 1 – point 3
Regulation (EC) No 1775/2005
Article 2 c – paragraph 4
Article 2 c – paragraph 4
Amendment 112 #
Proposal for a regulation – amending act
Article 1 – point 3
Article 1 – point 3
Regulation (EC) No 1775/2005
Article 2 c – paragraph 5
Article 2 c – paragraph 5
5. The European Network of Transmission System Operators for Gas shall publish a Community-wide 10-year network investment plan every two years following approval by the Agency. The investment plan shall include the modelling of the integrated network taking into account storage and LNG facilities, scenario development, a supply and demand adequacy report, technical and economical feasibility of expansion projects and an assessment of the resilience of the system. The investment plan shall, in particular, build on national investment plans and on the Guidelines for Trans-European energy networks in accordance with Decision No 1364/2006/EC of the European Parliament andtaking into account the regional and European aspects of the Councilnetwork. The investment plan shall identify investment gaps, notably with respect to cross border capacities.
Amendment 123 #
Proposal for a regulation – amending act
Article 1 – point 3
Article 1 – point 3
Regulation (EC) No 1775/2005
Article 2 c – paragraph 6
Article 2 c – paragraph 6
Amendment 131 #
Proposal for a regulation – amending act
Article 1 – point 3
Article 1 – point 3
Regulation (EC) No 1775/2005
Article 2 d – paragraph 2
Article 2 d – paragraph 2
2. The European Network of Transmission System Operators for Gas shall submit the draft technical and market codes, the draft 10-year investment plan and the draft annual work programme, including the information regarding the consultation process, to the Agency. The Agency may provide an opinion to for approval to the Agency. The Agency shall approve the documents provided for in Article 2c(1)(a)–(f) prepared by the European Networks of Transmission System Operators for Gas within 3 months. The Agency shall provide a duly justified opinion to the Commission wmonitor the implementation of the technical codes, the 10-year investment plan and the annual work programme and include the re it considers that the draft annual work programme or the draft 10-year investment plan do not ensure non- discrimination, effective competition and the efficient functioning of the market. sults of its monitoring activities in its annual report. In case of non-compliance by the transmission system operators with the technical codes, the 10-year investment plan or the annual work programme of the European Network of Transmission System Operators for Gas the Agency shall provide information to the Commission.
Amendment 144 #
Proposal for a regulation – amending act
Article 1 – point 3
Article 1 – point 3
Regulation (EC) No 1775/2005
Article 2 e
Article 2 e
Establishment and evaluation of technical and market codes 1. After consulting the Agency, the Commission may invite the European Network of Transmission System Operators for Gas, within a reasonable period of time, to prepare codes in the areas listed in Article 2c(3) where it considers that such codes are necessary for the efficient funcation with all stakeholders following Article .. of Regulation (EC) … establishing the Agency for the Cooperationing of the market. 2. The Agency shall provide a duly justified opinion to the Commission where it considers that: (a) a technical or market code adopted byEnergy Regulators, the Agency shall prepare Strategic Guidelines for the European Network of Transmission System Operators for Gas in the areas listed in Article 2c(3) does not ensure non-discrimination, effectivand (5) . The Agency shall transmit the draft Strategic Guidelines to the cCompetition and the efficient functioning of the market; (b) tmission, which may adopt them in accordance with the regulatory procedure with scrutiny referred to in Article 13(2). The European Network of Transmission System Operators for Gas fails to agreeshall, within a reasonable period of time on a technical or marke, prepare draft codes in the areas listed in Article 2c(3); (c) the transmission system operators fail to implement a technical or market code adopted by the European Network of Transmission System Operators for Gas in the areas listed in Article 2c(3). 3. The Commission may adopt, on its own initiative or upon recommendation of the Agency, guidelines on the areas listed in Article 2c(3) when it considers that: (a) a technical or market and a draft 10-year investment plan, included in Article 2c(5) based on the Strategic Guidelines adopted by the Commission pursuant to paragraph 1. The European Network of Transmission System Operators for Gas shall submit to the Agency for approval the draft technical codes and the draft 10-year investment plan. The Agency shall approve the draft technical codes and the draft 10-year investment plan, pursuant to Article ... and Article ... of Regulation … establishing an Agency for the Cooperation of Energy Regulators. Before approving the codes adopted by the European Network of Transmission System Operators for Gas in the areas listed in Article 2c(3) does not ensure non-discrimination, effective competition and the efficient functioning of the market;nd the draft 10-year investment plan, the Agency shall ensure that the detailed technical codes and the draft 10-year investment plan comply with the Strategic Guidelines and that they ensure non-discrimination, effective competition and the efficient functioning of the market. 2. The Agency shall provide a duly justified opinion to the Commission where it considers that: (ba) the European Network of Transmission System Operators for Gas fails to agree within a reasonable period of time on a technical or market code in the areas listed in Article 2c(3); (cb) the transmission system operators fail to implement a technical or market code adopted by the European Network of Transmission System Operators for Gas in the areas listed in Article 2c(3)code in the areas listed in Article 2c(3) as approved by the Agency in accordance with paragraph 1b. 3. The Commission may adopt upon recommendation of the Agency guidelines on the market codes. Those measures designed to amend non- essential elements of this Regulation by supplementing it shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 14(2). 4. Paragraph 3 shall be without prejudice to the Commission's right to adopt and amend guidelines as laid down in Article 9.
Amendment 166 #
Proposal for a regulation – amending act
Article 1 – point 3
Article 1 – point 3
Regulation (EC) No 1775/2005
Article 2 f
Article 2 f
Amendment 270 #
Proposal for a regulation – amending act
Article 1 – point 14
Article 1 – point 14
Regulation (EC) No 1775/2005
Article 9 – paragraph 2 a (new)
Article 9 – paragraph 2 a (new)
2a. Where appropriate and after a proposal by the Agency following Article 2e(1), the Commission may adopt Strategic Guidelines in the areas listed in Article 2c(3) and (5) as a basis for the European Network of Transmission System Operators for Gas to develop the detailed draft technical codes listed in Article 2c(3) and the draft 10-year investment plan included in Article 2c(5).