BETA

Activities of Silvia-Adriana ȚICĂU related to 2007/0199(COD)

Plenary speeches (1)

Conditions for access to the natural gas transmission networks - Internal market in natural gas - European strategic energy technology plan (debate)
2016/11/22
Dossiers: 2007/0199(COD)

Amendments (7)

Amendment 56 #
Proposal for a regulation – amending act
Recital 13
(13) To enhance trust in the market, its participants need to be sure that abusive behaviour can be sanctioned. Competent authorities should be enabled to effectively investigate allegations of market abuse. Therefore access to data by the competent authorities is necessary that provides information on operational decisions made by supply undertakings. In the gas market all these decisions are communicated to the system operators in the form of capacity reservations, nominations and realised flows. System operators should keep this information available to the competent authorities for a fixed period of timefive years.
2008/04/14
Committee: ITRE
Amendment 70 #
Proposal for a regulation – amending act
Article 1 – point 3
Regulation (EC) No 1775/2005
Article 2 a
All transmission system operators shall cooperate at Community level through establishing the European Network of Transmission System Operators for Gas in order to ensure the optimal management and sound technical evolution of the European gas transmission network. No transmission system operator shall may be prevented from participating in cooperation in the framework of the European Network of Transmission System Operators for Gas.
2008/04/14
Committee: ITRE
Amendment 186 #
Proposal for a regulation – amending act
Article 1 – point 3
Regulation (EC) No 1775/2005
Article 2 h – paragraph 2
2. Transmission system operators shall promote operational arrangements in order to ensure optimum management of the network, and promote the development of energy exchanges, the allocation of cross- border capacity through implicit auctions and the integration of balancing mechanisms.
2008/04/14
Committee: ITRE
Amendment 192 #
Proposal for a regulation – amending act
Article 1 – point 3
Regulation (EC) No 1775/2005
Article 2 h – paragraph 3 – subparagraph 1
3.(3) The geographical area covered by each regional cooperation structure may be defined by the Commission only after consultation with the Member States within that geographical area. That measure, designed to amend non-essential elements of this Regulation by supplementing it, shall be adopted in accordance with the regulatory procedure with scrutiny referred to in Article 14(2).
2008/04/14
Committee: ITRE
Amendment 201 #
Proposal for a regulation – amending act
Article 1 – point 6
Regulation (EC) No 1775/2005
Article 4 a – paragraph 5
5.(5) Contractual limits on the required minimum size of LNG facility capacity and storage capacity shall be justified on the basis of technical constraints, and shall permit smaller storage users to gain access to storage services. Conditions concerning solvency guarantees must be published in the Official Journal and forwarded to the Commission and the Agency for their opinion. The Commission and the Agency shall issue an opinion within 30 days.
2008/04/14
Committee: ITRE
Amendment 205 #
Proposal for a regulation – amending act
Article 1 – point 7 – point b
Regulation (EC) No 1775/2005
Article 5 – paragraph 3 – point a
(a) in the event of contractual congestion, the transmission system operator shall offer unused capacity on the primary market at least on a day-ahead and interruptible basis on a non-discriminatory basis and in accordance with the principles of free competition;
2008/04/14
Committee: ITRE
Amendment 250 #
Proposal for a regulation – amending act
Article 1 – point 12
Regulation (EC) No 1775/2005
Article 8 – paragraph 1
Each transmission, storage and LNG system operator shall take reasonable steps to allow capacity rights to be freely tradable and to facilitate such trade. Trading shall take place in accordance with the principles of transparency and non-discrimination. Each such operator shall develop harmonised transportation, LNG facility and storage contracts and procedures on the primary market to facilitate secondary trade of capacity and recognise the transfer of primary capacity rights where notified by system users.
2008/04/14
Committee: ITRE