3 Amendments of Ramon TREMOSA i BALCELLS related to 2011/0302(COD)
Amendment 632 #
Proposal for a regulation
Annex – Part I – point 3 – row 5
Annex – Part I – point 3 – row 5
Barcelona Port interconnections rail with port (construction of the new accesses) and airport
Amendment 633 #
Proposal for a regulation
Annex – Part I – point 3 – row 6
Annex – Part I – point 3 – row 6
Barcelona - Perpignan Rail cross-border section, works ongoing, new line completed by 2015, upgrading existing line. Introduction of UIC on the Iberian existing line through Port Bou. Adaptation of the line to 750m-trains. Development of intermodal platforms and connection with the rail network on UIC + Iberian gauge
Amendment 634 #
Proposal for a regulation
Annex – Part I – point 3 – row 6 a (new)
Annex – Part I – point 3 – row 6 a (new)
Madrid-Zaragoza- Rail Upgrading of existing Barcelona lines: Introduction of UIC on the Iberian existing line. Adaptation of the line and sidetracks to 750m-trains. Development of intermodal platforms and connection with the rail network on UIC + Iberian gauge