Progress: Procedure completed
Role | Committee | Rapporteur | Shadows |
---|---|---|---|
Lead | REGI | KIRILOV Evgeni ( S&D) | SCHROEDTER Elisabeth ( Verts/ALE), VLASÁK Oldřich ( ECR) |
Committee Opinion | EMPL | BASTOS Regina ( PPE) | |
Committee Opinion | CONT | ||
Committee Opinion | BUDG | GODMANIS Ivars ( ALDE) |
Lead committee dossier:
Legal Basis:
TFEU 177-p1
Legal Basis:
TFEU 177-p1Subjects
Events
PURPOSE: to simplify further the rules governing cohesion policy to help accelerate investments in Member States and regions and to increase the impact of the funding on the economy.
LEGISLATIVE ACT: Regulation (EU) No 539/2010 of the European Parliament and of the Council of 16 June 2010 amending Council Regulation (EC) No 1083/2006 laying down general provisions on the European Regional Development Fund, the European Social Fund and the Cohesion Fund as regards simplification of certain requirements and as regards certain provisions relating to financial management.
CONTENT: the Council adopted this Regulation facilitating access to EU structural funds in order to counter the economic crisis, following a first-reading agreement with the European Parliament. The Czech, Maltese, Polish, Slovenian, Slovakian and UK delegations abstained. The Regulation aims at ensuring the liquidity of the Member States worst hit by the crisis, improve the absorption of funds for certain operational programmes and simplify the rules for the management of the structural funds.
The main points are as follows:
Additional pre-financing : in order to tackle cash flow problems, five Member States (Estonia, Latvia, Lithuania, Hungary and Romania) will receive additional advance payments for an amount totalling EUR 775 million, by increasing the advance payments from the European Social Fund (ESF) by 4% and from the Cohesion Fund by 2%.
Decommitment rules : in a reaction to the slower than expected start up and late approval of programmes, the decommitment rules are eased. By way of derogation, the deadlines for automatic decommitment will not apply to the commitment appropriations of 2007. It is recalled that under the N+2 decommitment rule, commitment appropriations for 2007 are automatically decommited if the money is not spend by the end of 2009. This rule applies to the 15 Member States that were members of the EU before 1 May 2004 except for Portugal and Greece.
One sixth of the amount of the annual commitments for 2007 will be added to the budget appropriations for each of the years between 2008 and 2013. This will avoid Member States losing a total amount of about EUR 220 million (EUR 125 million for Spain, EUR 56 million for Italy, EUR 20 million for territorial cooperation between several Member States, EUR 9 million for the United Kingdom, EUR 6 million for Germany and EUR 4 million for the Netherlands).
Simplification: the Regulation also provides for a simplification of the rules for the structural funds in order to facilitate the management of EU funding, to help accelerate investments in Member States and regions and to increase the impact of the funding on the economy. This includes, inter alia, the introduction of uniform thresholds for the definition of major projects. The text now states that the ERDF and the Cohesion Fund may finance expenditure comprising a series of works, activities or services intended in itself to accomplish an indivisible task of a precise economic or technical nature which has clearly identified goals and whose total cost exceeds EUR 50 million (a major project).
Under this Regulation, a single major project may be co-financed by more than one programme . The latter amendment is of particular relevance for projects of nation-wide scope or EU importance, which cover several regions, and which in the absence of this possibility would have to be artificially separated in multiple projects.
ENTRY INTO FORCE: 25/06/2010. However, certain articles will apply form 01/08/2006, 01/01/2007, and 10/06/2010 respectively.
The European Parliament adopted by 519 votes to 83, with 33 abstentions, a legislative resolution on the proposal for a regulation of the European Parliament and of the Council amending regulation (EC) No 1083/2006 concerning general provisions on the European Regional Development Fund, the European Social Fund and the Cohesion Fund as regards simplification of certain requirements and as regards provisions relating to financial management.
It adopted its position at first reading under the ordinary legislative procedure (formerly known as the codecision procedure).
Parliament amends the Commission’s proposal as follows:
Additional pre-financing : Parliament underlines that due to exceptional circumstances and given the serious and unprecedented impact of the current economic and financial crisis on the budgets of Member States, an additional pre-financing instalment for 2010 is needed for the Member States worst hit by the crisis in order to allow for a regular cash flow and to facilitate payments to beneficiaries during programme implementation. Members propose that the Member States that were granted medium-term assistance in accordance with Council Regulation (EC) No 332/2002 and Member States with a GDP decrease in 2009 of more than 10 % in real terms in comparison to 2008, may receive advance payments in 2010 of 2% from the European Social Fund and 4% from the Cohesion Fund .
Interim payments and final balance : Parliament deleted the proposed amendment concerning the common rules for calculating interim payments and payments of final balance. In doing so, it rejected the most pertinent of the Commission’s proposal concerning the suggestion which would allow Member States to apply for 100% reimbursement of interim payments from the European Social Fund during 2009 and 2010.
Decommitment rules : these rules have been eased. Parliament states that it is appropriate to extend the deadline for the calculation of the automatic decommitment of the annual budget commitment related to 2007 total annual contribution to improve the absorption of funds committed for certain operational programmes. Such flexibility is necessary due to slower than expected start up and late approval of the programmes.
The Commission shall automatically decommit any part of the amount calculated in an operational programme that has not been used for payment of the pre-financing or interim payments or for which an application for payment has not been sent by 31 December of the second year following the year of budget commitment under the programme. For the purpose of the automatic decommitment, the Commission shall calculate the amount by adding one sixth of the annual budget commitment related to 2007 total annual contribution to each of 2008 to 2013 budget commitments. By way of derogation, the deadlines for automatic decommitment shall not apply to the annual budget commitment related to 2007 total annual contribution.
Adaptation to the Lisbon Treaty : Parliament clarifies that following, inter alia, the change in the decision-making process resulting from the entry into force of the Lisbon Treaty, amendments provided for by this Regulation have not been introduced in time to prevent the application of current Article 93(1) of Regulation 1083/2006. Consequently, decommitments made by the Commission would result, pursuant to Article 11 of Council Regulation (EC, Euratom) No 1605/2002 of 25 June 2002 on the Financial Regulation applicable to the general budget of the European Communities in cancelling appropriations of financial year 2007 which should be spread over the financial years 2008 to 2013 in implementation of the rules introduced by this Regulation.
It is therefore appropriate, as a transitory measure , to provide for the possibility to reconstitute, as necessary, the corresponding appropriations for the purposes of implementing the amended decommitment rules.
The Committee on Regional Development adopted the report by Evgeni KIRILOV (S&D, BG) on the proposal for a regulation of the European Parliament and of the Council amending regulation (EC) No 1083/2006 concerning general provisions on the European Regional Development Fund, the European Social Fund and the Cohesion Fund as regards simplification of certain requirements and as regards provisions relating to financial management.
It recommended that the European Parliament’s position at first reading under the ordinary legislative procedure (formerly known as the codecision procedure) should be to amend the Commission proposal as follows:
Additional pre-financing : the committee proposes to include a new amendment stipulating that due to exceptional circumstances and given the serious and unprecedented impact of the current economic and financial crisis on the budgets of Member States, an additional pre-financing instalment for 2010 is needed for the Member States worst hit by the crisis in order to allow for a regular cash flow and to facilitate payments to beneficiaries during programme implementation. Members propose that the Member States that were granted medium-term assistance in accordance with Council Regulation (EC) No 332/2002 and Member States with a GDP decrease in 2009 of more than 10 % in real terms in comparison to 2008, may receive advance payments in 2010 of 2% from the European Social Fund and 4% from the Cohesion Fund .
Interim payments and final balance : Members deleted the proposed amendment concerning the common rules for calculating interim payments and payments of final balance. In doing so, they rejected the most pertinent of the Commission’s proposal concerning the suggestion which would allow Member States to apply for 100% reimbursement of interim payments from the European Social Fund during 2009 and 2010.
Decommitment rules : these rules have been eased. The committee states that it is appropriate to extend the deadline for the calculation of the automatic decommitment of the annual budget commitment related to 2007 total annual contribution to improve the absorption of funds committed for certain operational programmes. Such flexibility is necessary due to slower than expected start up and late approval of the programmes.
The Commission shall automatically decommit any part of the amount calculated in an operational programme that has not been used for payment of the pre-financing or interim payments or for which an application for payment has not been sent by 31 December of the second year following the year of budget commitment under the programme. For the purpose of the automatic decommitment, the Commission shall calculate the amount by adding one sixth of the annual budget commitment related to 2007 total annual contribution to each of 2008 to 2013 budget commitments. By way of derogation, the deadlines for automatic decommitment shall not apply to the annual budget commitment related to 2007 total annual contribution.
Adaptation to the Lisbon Treaty : the committee clarifies that following, inter alia, the change in the decision-making process resulting from the entry into force of the Lisbon Treaty, amendments provided for by this Regulation have not been introduced in time to prevent the application of current Article 93(1) of Regulation 1083/2006. Consequently, decommitments made by the Commission would result, pursuant to Article 11 of Council Regulation (EC, Euratom) No 1605/2002 of 25 June 2002 on the Financial Regulation applicable to the general budget of the European Communities in cancelling appropriations of financial year 2007 which should be spread over the financial years 2008 to 2013 in implementation of the rules introduced by this Regulation.
It is therefore appropriate, as a transitory measure , to provide for the possibility to reconstitute, as necessary, the corresponding appropriations for the purposes of implementing the amended decommitment rules.
The Lisbon Treaty, which entered into force on 1 December 2009, amended the EU's two core treaties, the Treaty on European Union (TEU) and the Treaty establishing the European Community (EC Treaty). The latter was renamed the Treaty on the Functioning of the European Union (TFEU).
These changes had various consequences for many ongoing procedures. First of all, the articles of the TEU and of the old EC Treaty that constitute the legal basis of all the proposals founded on those Treaties were renumbered in accordance with the table of equivalences mentioned in Article 5 of the Lisbon Treaty.
In addition, some proposals underwent a change to their legal basis going beyond a mere change to their numbering, and this resulted in changes to the type of procedure .
The Lisbon Treaty also introduced new concepts of decision-making procedure . The old "codecision procedure" was extended to new areas and renamed the "ordinary legislative procedure". A new "consent procedure" replaced the old "assent procedure". New interinstitutional procedures were also set up for the adoption of certain non-legislative acts, for example the conclusion of some international agreements.
The ongoing proposals concerned by these changes were formally modified by the Commission in a Communication published on 2 December 2009 ( COM(2009)0665 ).
In the case of the proposal for a Council Regulation amending Regulation (EC) No 1083/2006 concerning general provisions on the European Regional Development Fund, the European Social Fund and the Cohesion Fund as regards simplification of certain requirements and as regards certain provisions relating to financial management, the entry into force of the Lisbon Treaty had the following impacts :
· the old legal basis - Treaty/EC/Art.161 – became Art. 177 of the TFEU. Please note that the numbering of the old legal basis corresponds to the consolidated version of the Treaty that was applicable immediately before the entry into force of the Lisbon Treaty, and may differ from the references in the original Commission proposal ;
· the proposal, which had previously fallen under the old assent procedure (AVC), was classified as an ordinary legislative procedure (COD).
PURPOSE: to simplify the management of European Structural Funds in order to help regions counter the effects of the crisis.
PROPOSED ACT: Council Regulation.
BACKGROUND: in the context of the current crisis, ensuring a smooth implementation of Cohesion programmes is of particular relevance as they represent the most powerful and relevant lever for assisting the real economy. With total financial resources of EUR 347 billion for the period 2007‑2013, Cohesion policy provides a powerful support for both budgetary stability and public investment in the Member States and the regions of the European Union. Experience shows that more effort is needed to facilitate the management of the Community funding in order to speed up the flow of the funding to the beneficiaries that are most affected by the economic downturn.
The December 2008 European Council agreed on a European Economic Recovery Plan (EERP), which envisages the initiation of priority action to enable European economies to adjust more rapidly to current challenges. Moreover, the Commission has endeavoured to contribute to the debate currently taking place within the Union and with its international partners on how best to react to the current financial crisis and to its socio-economic consequences. In particular, in the framework of its recovery package , the Commission proposed a number of regulatory changes to simplify the implementation rules for Cohesion Policy and to increase the pre-financing (advance payments) to ERDF and ESF programmes. The additional advance payments have provided an immediate cash injection of EUR 6.25 billion in 2009 to pre-finance investment, within the financial envelope agreed for each Member State for the period 2007‑2013. This amendment brings the total of advance payments in 2009 to EUR 11.25 billion. The Commission proposal was adopted by the Council in May 2009 and all advance payments now have been paid to Member States.
Moreover, in June 2009 the Commission presented a Communication on "A Shared Commitment for Employment" (COM(2009)0257) in which it proposed additional measures to strengthen the creation of jobs and to counter the effects of the crisis on employment.
Therefore, this proposal includes further elements of simplification , with the overall objective of accelerating co-financed investments in Member States and regions and increasing the impact of the funding on the economy as a whole.
IMPACT ASSESSMENT: this proposal completes a series of regulatory and non‑regulatory adjustments which all seek to stimulate the implementation of cohesion programmes on the ground. The proposal to provide Member States in the case of operational programmes co-financed by the ESF an option to reimburse interim payment claims at 100% for a limited period (up to the end of 2010) will ensure that all certified expenditure of 2009 and 2010 can be paid back without creating a gap in national budgets.
Further simplification and clarification of rules governing cohesion policy will undeniably have a positive impact on the pace of programme implementation, particularly by providing national, regional and local authorities clearer and less bureaucratic rules that will allow more flexibility to adapt the programmes to the new challenges.
CONTENT: the new measures presented by the Commission aim to simplify certain rules governing cohesion policy. The main changes are as follows:
in 2009 and 2010, as part of its 'anti-crisis' measures, the Commission may at the request of the Member States reimburse 100% of the public costs declared by the Member States for projects financed by the ESF . Specifically, Member States will not be obliged to provide national co‑financing, thus speeding up the implementation of projects to support employment. This option does not call into question the distribution of the Funds between the Member States, nor the total budget for the Funds, nor the obligation for Member States to provide subsequent co‑financing; the Commission proposes establishing a single category of 'major project' . Previously, the Commission's approval was required for projects where the total cost exceeded EUR 25 million for the environment and EUR 50 million for other sectors. The threshold for approval is now set at EUR 50 million for all areas . Given the Community importance of the investments in environment as such, the Commission will ask Member States: (i) to ensure an appropriate monitoring of all the investments, including those below the threshold provided in the Regulation; and (ii) to inform the Commission about the implementation progress in the annual reports on operational programmes. Another modification consists of creating the possibility that a single major project is co-financed by more than one programme. This is of particular relevance for projects of nation-wide scope or Community importance, which straddle several regions, and which in the absence of this possibility would have to be artificially separated in multiple projects; the rules relating to 'revenue-generating' projects (for example, toll motorways or projects involving the leasing or sale of land) are also simplified in order to reduce the administrative burdens on the Member States. The proposed modifications intend to simplify the monitoring of revenues and to align this with the overall life-cycle of programmes. Therefore, the duration of the provisions on monitoring revenue is now limited to the date of submission of the closure documents of a programme; Cohesion Policy programmes may be simplified by Member States to take account of the new realities . In addition, certain provisions concerning the obligation to maintain investments over a five-year period will not apply to undertakings which go bankrupt; a proposed modification intends to clarify that in the context of advance payments on State aids admissible guarantees include guarantees by banks or other financial institutions, but also a facility provided for this purpose by public institutions and the Member States themselves; investments in sectors linked to energy efficiency and the use of renewable energies in housing will be encouraged, given their considerable potential to provide growth and jobs; the Commission proposes a modification aimed at increasing flexibility with regard to the rules on decommitment . For example, grants for a major project will in principle be protected as soon as the Member State submits the project to the Commission. Grants are currently only protected once the Commission has approved the project; the European Regional Development Fund (ERDF) will be able to support the renovation or construction of housing for communities faced with social exclusion , particularly Roma, in both rural and urban areas. Previously, the construction of housing was ineligible under the ERDF and only housing in urban areas was eligible for renovation.
BUDGETARY IMPLICATIONS: there is no impact on commitment appropriations since no modification is proposed to the maximum amounts of ESF financing provided for in the Operational Programmes for the programming period 2007‑2013.
Where Member States decide to make use of the option to request 100% reimbursements during 2009 and 2010 there will be an impact on payment appropriations. The analysis of the Member States' payment forecasts and the payment appropriations available in the budget for 2009 and the Draft Budget for 2010 show that the maximum additional payment appropriations to be paid under the 100% reimbursement option in 2009 and 2010 for the ESF programmes would represent approximately EUR 6.6 billion. This will be compensated by a reduced need for payment appropriations later in the programming period.
The Commission will set up a monitoring tool to supervise closely the consumption of the additional credits for the European Social Fund. For the payment claims submitted as of 1 January 2011, the regular co‑financing rate agreed in the programme decision will apply. The Commission believes that the proposed measures to simplify the implementation may significantly increase the pace of expenditure on the ground and consequently accelerate the submission of interim payments to the Commission.
PURPOSE: to simplify the management of European Structural Funds in order to help regions counter the effects of the crisis.
PROPOSED ACT: Council Regulation.
BACKGROUND: in the context of the current crisis, ensuring a smooth implementation of Cohesion programmes is of particular relevance as they represent the most powerful and relevant lever for assisting the real economy. With total financial resources of EUR 347 billion for the period 2007‑2013, Cohesion policy provides a powerful support for both budgetary stability and public investment in the Member States and the regions of the European Union. Experience shows that more effort is needed to facilitate the management of the Community funding in order to speed up the flow of the funding to the beneficiaries that are most affected by the economic downturn.
The December 2008 European Council agreed on a European Economic Recovery Plan (EERP), which envisages the initiation of priority action to enable European economies to adjust more rapidly to current challenges. Moreover, the Commission has endeavoured to contribute to the debate currently taking place within the Union and with its international partners on how best to react to the current financial crisis and to its socio-economic consequences. In particular, in the framework of its recovery package , the Commission proposed a number of regulatory changes to simplify the implementation rules for Cohesion Policy and to increase the pre-financing (advance payments) to ERDF and ESF programmes. The additional advance payments have provided an immediate cash injection of EUR 6.25 billion in 2009 to pre-finance investment, within the financial envelope agreed for each Member State for the period 2007‑2013. This amendment brings the total of advance payments in 2009 to EUR 11.25 billion. The Commission proposal was adopted by the Council in May 2009 and all advance payments now have been paid to Member States.
Moreover, in June 2009 the Commission presented a Communication on "A Shared Commitment for Employment" (COM(2009)0257) in which it proposed additional measures to strengthen the creation of jobs and to counter the effects of the crisis on employment.
Therefore, this proposal includes further elements of simplification , with the overall objective of accelerating co-financed investments in Member States and regions and increasing the impact of the funding on the economy as a whole.
IMPACT ASSESSMENT: this proposal completes a series of regulatory and non‑regulatory adjustments which all seek to stimulate the implementation of cohesion programmes on the ground. The proposal to provide Member States in the case of operational programmes co-financed by the ESF an option to reimburse interim payment claims at 100% for a limited period (up to the end of 2010) will ensure that all certified expenditure of 2009 and 2010 can be paid back without creating a gap in national budgets.
Further simplification and clarification of rules governing cohesion policy will undeniably have a positive impact on the pace of programme implementation, particularly by providing national, regional and local authorities clearer and less bureaucratic rules that will allow more flexibility to adapt the programmes to the new challenges.
CONTENT: the new measures presented by the Commission aim to simplify certain rules governing cohesion policy. The main changes are as follows:
in 2009 and 2010, as part of its 'anti-crisis' measures, the Commission may at the request of the Member States reimburse 100% of the public costs declared by the Member States for projects financed by the ESF . Specifically, Member States will not be obliged to provide national co‑financing, thus speeding up the implementation of projects to support employment. This option does not call into question the distribution of the Funds between the Member States, nor the total budget for the Funds, nor the obligation for Member States to provide subsequent co‑financing; the Commission proposes establishing a single category of 'major project' . Previously, the Commission's approval was required for projects where the total cost exceeded EUR 25 million for the environment and EUR 50 million for other sectors. The threshold for approval is now set at EUR 50 million for all areas . Given the Community importance of the investments in environment as such, the Commission will ask Member States: (i) to ensure an appropriate monitoring of all the investments, including those below the threshold provided in the Regulation; and (ii) to inform the Commission about the implementation progress in the annual reports on operational programmes. Another modification consists of creating the possibility that a single major project is co-financed by more than one programme. This is of particular relevance for projects of nation-wide scope or Community importance, which straddle several regions, and which in the absence of this possibility would have to be artificially separated in multiple projects; the rules relating to 'revenue-generating' projects (for example, toll motorways or projects involving the leasing or sale of land) are also simplified in order to reduce the administrative burdens on the Member States. The proposed modifications intend to simplify the monitoring of revenues and to align this with the overall life-cycle of programmes. Therefore, the duration of the provisions on monitoring revenue is now limited to the date of submission of the closure documents of a programme; Cohesion Policy programmes may be simplified by Member States to take account of the new realities . In addition, certain provisions concerning the obligation to maintain investments over a five-year period will not apply to undertakings which go bankrupt; a proposed modification intends to clarify that in the context of advance payments on State aids admissible guarantees include guarantees by banks or other financial institutions, but also a facility provided for this purpose by public institutions and the Member States themselves; investments in sectors linked to energy efficiency and the use of renewable energies in housing will be encouraged, given their considerable potential to provide growth and jobs; the Commission proposes a modification aimed at increasing flexibility with regard to the rules on decommitment . For example, grants for a major project will in principle be protected as soon as the Member State submits the project to the Commission. Grants are currently only protected once the Commission has approved the project; the European Regional Development Fund (ERDF) will be able to support the renovation or construction of housing for communities faced with social exclusion , particularly Roma, in both rural and urban areas. Previously, the construction of housing was ineligible under the ERDF and only housing in urban areas was eligible for renovation.
BUDGETARY IMPLICATIONS: there is no impact on commitment appropriations since no modification is proposed to the maximum amounts of ESF financing provided for in the Operational Programmes for the programming period 2007‑2013.
Where Member States decide to make use of the option to request 100% reimbursements during 2009 and 2010 there will be an impact on payment appropriations. The analysis of the Member States' payment forecasts and the payment appropriations available in the budget for 2009 and the Draft Budget for 2010 show that the maximum additional payment appropriations to be paid under the 100% reimbursement option in 2009 and 2010 for the ESF programmes would represent approximately EUR 6.6 billion. This will be compensated by a reduced need for payment appropriations later in the programming period.
The Commission will set up a monitoring tool to supervise closely the consumption of the additional credits for the European Social Fund. For the payment claims submitted as of 1 January 2011, the regular co‑financing rate agreed in the programme decision will apply. The Commission believes that the proposed measures to simplify the implementation may significantly increase the pace of expenditure on the ground and consequently accelerate the submission of interim payments to the Commission.
Documents
- Commission response to text adopted in plenary: SP(2010)3805
- Final act published in Official Journal: Regulation 2010/539
- Final act published in Official Journal: OJ L 158 24.06.2010, p. 0001
- Draft final act: 00009/2010
- Results of vote in Parliament: Results of vote in Parliament
- Decision by Parliament, 1st reading: T7-0125/2010
- Debate in Parliament: Debate in Parliament
- Committee report tabled for plenary, 1st reading/single reading: A7-0055/2010
- Committee report tabled for plenary, 1st reading: A7-0055/2010
- Committee opinion: PE430.307
- Committee opinion: PE438.465
- Amendments tabled in committee: PE439.242
- Committee draft report: PE438.425
- Economic and Social Committee: opinion, report: CES1721/2009
- Legislative proposal: COM(2009)0384
- Legislative proposal: EUR-Lex
- Legislative proposal published: COM(2009)0384
- Legislative proposal published: EUR-Lex
- Legislative proposal: COM(2009)0384 EUR-Lex
- Economic and Social Committee: opinion, report: CES1721/2009
- Committee draft report: PE438.425
- Amendments tabled in committee: PE439.242
- Committee opinion: PE430.307
- Committee opinion: PE438.465
- Committee report tabled for plenary, 1st reading/single reading: A7-0055/2010
- Draft final act: 00009/2010
- Commission response to text adopted in plenary: SP(2010)3805
Activities
- Elisabeth SCHROEDTER
Plenary Speeches (3)
- 2016/11/22 General provisions on the European Regional Development Fund, the European Social Fund and the Cohesion Fund as regards simplification of certain requirements and as regards certain provisions relating to financial management (debate)
- 2016/11/22 General provisions on the European Regional Development Fund, the European Social Fund and the Cohesion Fund as regards simplification of certain requirements and as regards certain provisions relating to financial management (debate)
- 2016/11/22 General provisions on the European Regional Development Fund, the European Social Fund and the Cohesion Fund as regards simplification of certain requirements and as regards certain provisions relating to financial management (debate)
- Karin KADENBACH
Plenary Speeches (2)
- 2016/11/22 General provisions on the European Regional Development Fund, the European Social Fund and the Cohesion Fund as regards simplification of certain requirements and as regards certain provisions relating to financial management (debate)
- 2016/11/22 General provisions on the European Regional Development Fund, the European Social Fund and the Cohesion Fund as regards simplification of certain requirements and as regards certain provisions relating to financial management (debate)
- Miguel Angel MARTÍNEZ MARTÍNEZ
Plenary Speeches (2)
- 2016/11/22 General provisions on the European Regional Development Fund, the European Social Fund and the Cohesion Fund as regards simplification of certain requirements and as regards certain provisions relating to financial management (debate)
- 2016/11/22 General provisions on the European Regional Development Fund, the European Social Fund and the Cohesion Fund as regards simplification of certain requirements and as regards certain provisions relating to financial management (debate)
- Lambert van NISTELROOIJ
Plenary Speeches (2)
- 2016/11/22 General provisions on the European Regional Development Fund, the European Social Fund and the Cohesion Fund as regards simplification of certain requirements and as regards certain provisions relating to financial management (debate)
- 2016/11/22 General provisions on the European Regional Development Fund, the European Social Fund and the Cohesion Fund as regards simplification of certain requirements and as regards certain provisions relating to financial management (debate)
- Sophie AUCONIE
- Regina BASTOS
- Elena BĂSESCU
- Alain CADEC
- Ioan ENCIU
- Pat the Cope GALLAGHER
- Pascale GRUNY
- Sidonia MAZUR
- Ramona Nicole MĂNESCU
- Iosif MATULA
- Marie-Thérèse SANCHEZ-SCHMID
- Sergio Paolo Francesco SILVESTRIS
- Monika SMOLKOVÁ
- Georgios STAVRAKAKIS
- Kay SWINBURNE
- Csaba Sándor TABAJDI
- Oldřich VLASÁK
Votes
Rapport KIRILOV A7-0055/2010 - AM 19 #
Rapport KIRILOV A7-0055/2010 - AM 22 #
Rapport KIRILOV A7-0055/2010 - AM 23 #
Rapport KIRILOV A7-0055/2010 - AM 18 #
Rapport KIRILOV A7-0055/2010 - RÉSOLUTION LÉGISLATIVE #
Amendments | Dossier |
30 |
2009/0107(COD)
2010/02/26
REGI
8 amendments...
Amendment 20 #
Proposal for a regulation – amending act Recital 12 a (new) (12a) Due to exceptional circumstances and given the serious and unprecedented impact of the current economic and financial crisis on the budgets of Member States, an additional pre-financing instalment for 2010 is needed for the Member States worst hit by the crisis in order to allow for regular cash flow and to facilitate payments to beneficiaries during programme implementation. Member States should provide timely publication of online information on major projects and projects between EUR 25 and 50 million as soon as possible after the Commission receives an application for funding from a Member State and before any Commission decision on their financing, including direct access to project documentation, such as the application, the feasibility study, the cost- benefit analysis, and the environmental impact assessment. The purpose of such a Commission webpage is to facilitate the submission of comments regarding such projects.
Amendment 21 #
Proposal for a regulation – amending act Article 1 – point 1 Regulation (EC) No 1083/2006 Article 39 As part of an operational programme or operational programmes, the ERDF and the Cohesion Fund may finance expenditure comprising a series of works, activities or services intended in itself to accomplish an indivisible task of a precise economic or technical nature, which has clearly identified goals and whose total cost exceeds EUR
Amendment 22 #
Proposal for a regulation – amending act Article 1 – point 2 – point a Regulation (EC) No 1083/2006 Article 40 – introductory part “The Member State or the managing authorities shall provide the Commission with the following information on major projects and projects between EUR 25 million and EUR 50 million:”
Amendment 23 #
Proposal for a regulation – amending act Article 1 – point 4 – point a Regulation (EC) No 1083/2006 Article 44 – paragraph 1 – point a a) financial engineering instruments for enterprises, primarily small and medium sized ones, such as venture capital funds, guarantee funds, micro-lending and loan funds;
Amendment 24 #
Proposal for a regulation – amending act Article 1 – point 5 Regulation (EC) No 1083/2006 Article 48 – paragraph 3 “3. During the programming period, Member States shall carry out evaluations linked to the monitoring of operational programmes in particular where that monitoring reveals a significant departure from the goals initially set. Where proposals are made for the revision of operational programmes, as referred to in Article 33, analysis shall be provided on the reasons for the revision, including any implementation difficulties, and the expected impact of the revision, including
Amendment 25 #
Proposal for a regulation – amending act Article 1 – point 8 – point a Regulation (EC) No 1083/2006 Article 57 – paragraph 1 “1. The Member State or managing authority shall ensure that an operation comprising investment in infrastructure or productive investment retains the contribution from the Funds only if it does not, within
Amendment 26 #
Proposal for a regulation – amending act Article 1– point 8 – point a Regulation (EC) No 1083/2006 Article 57 – paragraph 1 – subparagraph 3 Member States may reduce the time limits set out in the first subparagraph to three years in case of the maintenance of an investment
Amendment 27 #
Proposal for a regulation – amending act Article 1 - point 12 Regulation (EC) No 1083/2006 Article 88 – paragraph 3 “However, in cases where the Member State has detected and rectified irregularities in operations which have been subject to a declaration of partial closure
source: PE-439.242
2010/03/05
EMPL
22 amendments...
Amendment 10 #
Proposal for a regulation – amending act Recital 6 (6) In order to facilitate the adaptation of operational programmes to respond to the current financial and economic crisis and its effects on businesses and employment, the Member States should provide an analysis justifying the revision of an operational programme instead of an evaluation.
Amendment 11 #
Proposal for a regulation – amending act Recital 11 a (new) (11a) In times of crisis above all, with increased pressure on the job market and a greater risk of redundancies, it is necessary to be able to respond with a flexible approach in order to provide targeted support for those Member States and individual regions particularly affected. It is important, therefore, to establish rules that will enable the European Social Fund to respond quickly in future, to prevent delays in the implementation of programmes and negative effects on the preservation and creation of sustainable jobs ensuring participation in society.
Amendment 12 #
Proposal for a regulation – amending act Recital 11 a (new) (11a) It is necessary to implement operational programmes accurately and to use Union funding optimally in order to respond to the need to implement active labour market measures, such as training the unemployed, anticipating and managing restructuring measures, upgrading skills of employees to the needs of the labour market in accordance with the economy as well as providing high- quality apprenticeships for young people. The need to keep people in employment or allow them to find a job is more urgent in the economic and financial crisis.
Amendment 13 #
Proposal for a regulation – amending act Recital 12 a (new) (12a) In view of the exceptional circumstances and the severe and unprecedented impact of the present economic and financial crisis on Member State budgets, an additional pre-financing instalment for 2010 is required for those Member States or individual regions worst affected by the crisis, so that a regular flow of funds can be assured and payments can be made to beneficiaries as programmes are implemented.
Amendment 14 #
Proposal for a regulation – amending act Recital 14 a (new) (14a) The deadline for calculating the automatic decommitment of the annual budget commitment related to the 2007 total annual contribution should be extended to allow better absorption of funding for individual operational programmes. This flexibility is necessary because the programmes have been slower to start up than expected and were subject to late approval. In view of the crisis, such a measure will ensure adequate support for job creation and preservation initiatives.
Amendment 15 #
Proposal for a regulation – amending act Article 1 – point 4 – point a Regulation (EC) No 1083/2006 Article 44 – paragraph 1 – point a a) financial engineering instruments for enterprises, primarily small and medium sized ones, such as venture capital funds, guarantee funds, micro-credit and loan funds;
Amendment 16 #
Proposal for a regulation – amending act Article 1 – point 4 a (new) Regulation (EC) No 1083/2006 Article 47 – paragraph 1 (4a) Article 47(1) is replaced by the following: ‘1. Evaluations shall aim to improve the quality, effectiveness and consistency of the assistance from the Funds and the strategy and implementation of operational programmes with respect to the specific structural problems affecting the Member States and regions concerned, while taking account of the objective of sustainable development and of the relevant EU legislation concerning environmental impact, including the process of barrier-free environment for the disabled and strategic environmental assessment.’
Amendment 17 #
Proposal for a regulation – amending act Article 1 – point 5 a (new) Regulation (EC) No 1083/2006 Article 55 – paragraph 2 – subparagraph 3 (5a) In Article 55(2), subparagraph 3 is replaced by the following: ‘In the calculation, the managing authority shall take account of the reference period appropriate to the category of investment concerned, the category of project, the profitability normally expected of the category of investment concerned, the application of the polluter-pays principle, and, wherever appropriate, considerations of equity linked to the relative prosperity of the Member State concerned.’
Amendment 18 #
Proposal for a regulation – amending act Article 1 – point 6 Regulation (EC) No 1083/2006 Article 55 – paragraph 3 3. Where it is objectively not possible or technically reliable to estimate the revenue in advance, the net revenue generated within five years of the completion of an operation shall be deducted from the expenditure declared to the Commission.
Amendment 19 #
Proposal for a regulation – amending act Article 1 – point 8 – subpoint a Regulation (EC) No 1083/2006 Article 57 – paragraph 1 – subparagraph 1 1. The Member State or managing authority shall ensure that an operation comprising investment in infrastructure or productive investment retains the
Amendment 20 #
Proposal for a regulation – amending act Article 1 – point 8 – subpoint a Regulation (EC) No 1083/2006 Article 57 – paragraph 1 – subparagraph 3 Member States may reduce the time limits set out in the first subparagraph to
Amendment 21 #
Proposal for a regulation – amending act Article 1 – point 11 a (new) Regulation (EC) No 1083/2006 Article 82 – paragraph 1 – point e a (new) (11a) In Article 82(1) the following point is added: ‘(ea) for Member States that were granted assistance in 2009 in accordance with Council Regulation (EC) No 332/2002 of 18 February 2002 establishing a facility providing medium-term financial assistance for Member States’ balances of payments1 or Member States with a GDP decrease in 2009 of more than 10% in real terms in comparison with the previous year or in which the unemployment rate, either nationally or in particular regions, has increased by more than three percentage points on the previous year, in 2010 2% of the contribution from the Cohesion Fund and 4% of the contribution from the European Social Fund to the operational programme. 1 OJ L 53, 23.2.2002, p. 1.’
Amendment 22 #
Proposal for a regulation – amending act Article 1 – point 12 a (new) Regulation (EC) No 1083/2006 Article 93 – paragraph 1 (12a) Article 93(1) is replaced by the following: ‘1. The Commission shall automatically decommit any part of the amount calculated in accordance with the second subparagraph in an operational programme that has not been used for payment of the pre-financing or interim payments or for which an application for payment has not been sent in conformity with Article 86 by 31 December of the second year following the year of budget commitment under the programme, with the exception mentioned in paragraph 2. For the purpose of automatic decommitment referred to in the first subparagraph, the Commission shall calculate the amount by adding one sixth of the annual budget commitment related to 2007 total annual contribution to each of 2008 to 2013 budget commitments.’
Amendment 23 #
Proposal for a regulation – amending act Article 1 – point 12 a (new) Regulation (EC) No 1083/2006 Article 93 – paragraph 1 (12a) Article 93(1) is replaced by the following: ‘1. The Commission shall automatically decommit any part of the amount calculated in accordance with the second subparagraph in an operational programme that has not been used for payment of the pre-financing or interim payments or for which an application for payment has not been sent in conformity with Article 86 by 31 December of the second year following the year of budget commitment under the programme, with the exception mentioned in paragraph 2. For the purposes of the automatic decommitment referred to in the first subparagraph, the Commission shall calculate the amount by adding one-sixth of the annual budget commitment related to the 2007 total annual contribution to the respective budget commitments for 2008 to 2013.’
Amendment 24 #
Proposal for a regulation – amending act Article 1 – point 12 b (new) Regulation (EC) No 1083/2006 Article 93 – paragraph 2 a (new) (12b) In Article 93, the following paragraph is inserted: ‘2a. By way of derogation from the first subparagraph of paragraph 1 and from paragraph 2, the deadlines for automatic decommitment shall not apply to the annual budget commitment related to the 2007 total annual contribution.’
Amendment 25 #
Proposal for a regulation – amending act Article 1 – point 12 b (new) Regulation (EC) No 1083/2006 Article 93 – paragraph 2 a (new) (12b) In Article 93, the following paragraph is inserted: 2a. ‘By way of derogation from the first subparagraph of paragraph 1 and from paragraph 2, the deadlines for automatic decommitment shall not apply to the annual budget commitment related to the 2007 total annual contribution.’
Amendment 26 #
Proposal for a regulation – amending act Article 1 a (new) Article 1a Transitional measures In order to meet the exceptional circumstances of the transition to the decommitment rules introduced by this Regulation, appropriations which have been cancelled because of decommitments made by the Commission for the financial year 2007 in the implementation of the first subparagraph of Article 93(1) and of Article 97 of Regulation (EC) No 1083/2006, pursuant to Article 11 of the Financial Regulation, shall be reconstituted to the extent necessary for the implementation of the second subparagraph of Article 93(1) of Regulation (EC) No 1083/2006.
Amendment 5 #
Proposal for a regulation – amending act Recital 1 a (new) (1a) Underlines the importance of the greater use of the synergies and complementarities of the various financial instruments available, including the European Regional Development Fund, the Cohesion Fund, the European Social Fund, the European Integration Fund, the programme of Community action on public health and the European Agricultural Fund for Rural Development, in order to meet the complex targets of the EU 2020 Strategy, which aims to deliver smarter, socially inclusive and greener growth and to support more effectively the least favoured micro-regions and the most vulnerable groups facing complex multi-dimensional disadvantages.
Amendment 6 #
Proposal for a regulation – amending act Recital 2 (2) In order to facilitate the management of
Amendment 7 #
Proposal for a regulation – amending act Recital 2 (2) In order to facilitate the management of
Amendment 8 #
Proposal for a regulation – amending act Recital 2 (2) In order to facilitate the management of Community funding, to help accelerate the investments
Amendment 9 #
Proposal for a regulation – amending act Recital 2 a (new) (2a) The Commission should report to the European Parliament and the Council on the effect of this Regulation on the level of payments and to what extent it will take into account the level of payments in its draft budget and in the revision of the financial perspectives. The Commission report should also assess the effects on employment and social inclusion.
source: PE-439.426
|
History
(these mark the time of scraping, not the official date of the change)
docs/0 |
|
docs/7 |
|
docs/8 |
|
docs/8/docs/0/url |
/oeil/spdoc.do?i=18192&j=0&l=en
|
events/0/date |
Old
2009-07-22T00:00:00New
2009-07-21T00:00:00 |
links/National parliaments/url |
Old
http://www.ipex.eu/IPEXL-WEB/dossier/dossier.do?code=COD&year=2009&number=0107&appLng=ENNew
https://ipexl.europarl.europa.eu/IPEXL-WEB/dossier/code=COD&year=2009&number=0107&appLng=EN |
docs/0/docs/0/url |
Old
https://dm.eesc.europa.eu/EESCDocumentSearch/Pages/redresults.aspx?k=(documenttype:AC)(documentnumber:1721)(documentyear:2009)(documentlanguage:EN)New
https://dmsearch.eesc.europa.eu/search/public?k=(documenttype:AC)(documentnumber:1721)(documentyear:2009)(documentlanguage:EN) |
docs/1/docs/0/url |
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=COMPARL&mode=XML&language=EN&reference=PE438.425New
https://www.europarl.europa.eu/doceo/document/EN&reference=PE438.425 |
docs/2/docs/0/url |
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=COMPARL&mode=XML&language=EN&reference=PE439.242New
https://www.europarl.europa.eu/doceo/document/EN&reference=PE439.242 |
docs/3/docs/0/url |
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=COMPARL&mode=XML&language=EN&reference=PE430.307&secondRef=03New
https://www.europarl.europa.eu/doceo/document/EMPL-AD-430307_EN.html |
docs/4/docs/0/url |
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=COMPARL&mode=XML&language=EN&reference=PE438.465&secondRef=02New
https://www.europarl.europa.eu/doceo/document/BUDG-AD-438465_EN.html |
docs/5/docs/0/url |
Old
http://www.europarl.europa.eu/doceo/document/A-7-2010-0055_EN.htmlNew
https://www.europarl.europa.eu/doceo/document/A-7-2010-0055_EN.html |
docs/7/docs/0/url |
/oeil/spdoc.do?i=18192&j=0&l=en
|
events/0/docs/0/url |
Old
http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/com/2009/0384/COM_COM(2009)0384_EN.pdfNew
http://www.europarl.europa.eu/RegData/docs_autres_institutions/commission_europeenne/com/2009/0384/COM_COM(2009)0384_EN.pdf |
events/2/type |
Old
Committee referral announced in Parliament, 1st reading/single readingNew
Committee referral announced in Parliament, 1st reading |
events/3/type |
Old
Vote in committee, 1st reading/single readingNew
Vote in committee, 1st reading |
events/4 |
|
events/4 |
|
events/5/docs/0/url |
Old
http://www.europarl.europa.eu/sides/getDoc.do?secondRef=TOC&language=EN&reference=20100420&type=CRENew
https://www.europarl.europa.eu/doceo/document/EN&reference=20100420&type=CRE |
events/7 |
|
events/7 |
|
procedure/Modified legal basis |
Rules of Procedure EP 150
|
procedure/Other legal basis |
Rules of Procedure EP 159
|
committees/0 |
|
committees/0 |
|
committees/1 |
|
committees/1 |
|
committees/3 |
|
committees/3 |
|
docs/5/docs/0/url |
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A7-2010-55&language=ENNew
http://www.europarl.europa.eu/doceo/document/A-7-2010-0055_EN.html |
docs/7/body |
EC
|
events/0/docs/0/url |
Old
http://www.europarl.europa.eu/RegData/docs_autres_institutions/commission_europeenne/com/2009/0384/COM_COM(2009)0384_EN.pdfNew
http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/com/2009/0384/COM_COM(2009)0384_EN.pdf |
events/4/docs/0/url |
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A7-2010-55&language=ENNew
http://www.europarl.europa.eu/doceo/document/A-7-2010-0055_EN.html |
events/7/docs/0/url |
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=TA&language=EN&reference=P7-TA-2010-125New
http://www.europarl.europa.eu/doceo/document/TA-7-2010-0125_EN.html |
activities |
|
commission |
|
committees/0 |
|
committees/0 |
|
committees/1 |
|
committees/1 |
|
committees/2 |
|
committees/2 |
|
committees/3 |
|
committees/3 |
|
council |
|
docs |
|
events |
|
other |
|
procedure/Modified legal basis |
Old
Rules of Procedure of the European Parliament EP 150New
Rules of Procedure EP 150 |
procedure/dossier_of_the_committee |
Old
REGI/7/00750New
|
procedure/final/url |
Old
http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!CELEXnumdoc&lg=EN&numdoc=32010R0539New
https://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!CELEXnumdoc&lg=EN&numdoc=32010R0539 |
procedure/instrument |
Old
RegulationNew
|
procedure/subject |
Old
New
|
procedure/summary |
|
activities/0/commission/0/DG/title |
Old
Regional PolicyNew
Regional and Urban Policy |
activities/0/docs/0/url |
Old
http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/com/2009/0384/COM_COM(2009)0384_EN.pdfNew
http://www.europarl.europa.eu/RegData/docs_autres_institutions/commission_europeenne/com/2009/0384/COM_COM(2009)0384_EN.pdf |
links/European Commission/title |
Old
PreLexNew
EUR-Lex |
other/0/dg/title |
Old
Regional PolicyNew
Regional and Urban Policy |
procedure/subject/1 |
Old
4.70.02 Cohesion, Cohesion FundNew
4.70.02 Cohesion policy, Cohesion Fund |
activities |
|
committees |
|
links |
|
other |
|
procedure |
|