Activites

  • 2012/10/23 Budgetary text adopted by Parliament
    • Results of vote in Parliament
    • T7-0378/2012 summary
  • #3192
  • 2012/10/16 Council Meeting
  • 2012/10/16 Budgetary report tabled for plenary, 1st reading
    • A7-0334/2012 summary
  • 2012/10/10 Vote in committee, 1st reading/single reading
  • 2012/09/24 Amendments tabled in committee
  • 2012/09/20 Deadline Amendments
  • 2012/09/11 Committee referral announced in Parliament, 1st reading/single reading
  • 2012/09/03 Committee draft report
  • 2012/07/16 Non-legislative basic document
    • COM(2012)0395 summary
    • DG {'url': 'http://ec.europa.eu/dgs/budget/', 'title': 'Budget'}, LEWANDOWSKI Janusz
  • 2012/07/16 Date

Documents

AmendmentsDossier
12 2012/2154(BUD)
2012/09/24 BUDG 12 amendments...
source: PE-496.459

History

(these mark the time of scraping, not the official date of the change)

activities/10
date
2012-11-07T00:00:00
type
Final act published in Official Journal
procedure/final
url
http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!CELEXnumdoc&lg=EN&numdoc=32012D0681
title
Decision 2012/681
procedure/stage_reached
Old
Procedure completed, awaiting publication in Official Journal
New
Procedure completed
activities/9/docs/0/text
  • The European Parliament adopted by 572 votes to 63, with 13 abstentions, a resolution approving the annexed proposal for a decision on the mobilisation of the European Globalisation Adjustment Fund (EGF), for an amount of EUR 2 898 594 in commitment and payment appropriations in respect of redundancies in the building construction sector in the Netherlands.

    Parliament recalls that the European Union has set up the appropriate legislative and budgetary instruments to provide additional support to workers who are suffering from the consequences of major structural changes in world trade patterns and to assist their reintegration into the labour market. Noting that the Netherlands has requested assistance for 516 redundancies, 435 of which are targeted for assistance, in 54 enterprises operating in the NACE Revision 2 Division 41 ('Construction of buildings') in the region of Gelderland (NL), Parliament requests the institutions involved to accelerate the mobilisation of the EGF. It agrees with the Commission that the conditions set out in Article 2(b) of the EGF Regulation are met and that, therefore, the Netherlands are entitled to a financial contribution under that Regulation.

    Parliament welcomes this call for the EGF financial contribution by the Dutch Government even though this Member State has opposed the extension of the crisis derogation for the current EGF and jeopardises the future of the EGF after 2013.

    Parliament also stresses that the number of people working in construction is relatively high (approximately 60 000 in 2011) compared with other sectors of industry. The unemployment rate in 2011 in Gelderland was 5.9 %, a fraction higher than the Dutch average. Gelderland is the biggest province of the Netherlands, counting approximately 2 million inhabitants, and counts about 146 000 companies. Parliament points out that the vast majority of redundant workers come from elementary professions. Therefore, there is a necessity for further training and education in order to allow them to re-integrate in the labour market, although it notes the very high cost of training amounting to EUR 18 000 per worker (foreseen for 75 workers) and the outplacement assistance - EUR 8 500 per worker (foreseen for 150 workers) and requests more information concerning those two measures and operators carrying them out.

    Parliament welcomes the fact that, in order to provide workers with speedy assistance, the Dutch authorities decided to start the implementation of the measures well ahead of the final decision on granting the EGF support for the proposed coordinated package. It also recalls the importance of improving the employability of all workers by means of tailored training and the recognition of skills and competences gained throughout the professional career. It also w elcomes the fact that the EGF contribution is planned to support solely active labour measures (training and counselling) and will not be used for subsistence allowances.

    Lessons from the implementation of the EGF: Parliament highlights the fact that lessons should be learned from the preparation and implementation of this and other applications addressing mass dismissals in a high number of small and medium enterprises (SMEs) in one sector, in particular, in terms of the eligibility of self-employed and owners of the SMEs for EGF support in the future regulation. It calls on the institutions involved to make the necessary efforts to improve procedural and budgetary arrangements in order to accelerate the mobilisation of the EGF. It appreciates the improved procedure put in place by the Commission, following its request for accelerating the release of grants. It hopes that further improvements in the procedure will be integrated in the new Regulation on the EGF (2014–2020) and that greater efficiency, transparency and visibility of the EGF will be achieved.

    Parliament reiterates its usual position in respect of a dossier of this type:

    • the need to ensure a smooth and rapid procedure for the adoption of the decisions on the mobilisation of the EGF;
    • the fact that assistance from the EGF must not replace actions which are the responsibility of companies by virtue of national law or collective agreements, nor measures restructuring companies or sectors and that it can co-finance only active labour market measures which lead to durable, long-term employment;
    • assistance from the EGF must not replace actions which are the responsibility of companies by virtue of national law or collective agreements, nor measures restructuring companies or sectors;
    • the fact that the EGF should not provide an incentive for companies to replace their contractual workforce with a more precarious and short-term one;
    • the fact that the information provided on the coordinated package of personalised services to be funded from the EGF includes information on the complementarity with actions funded by the Structural Funds;
    • the need for a comparative evaluation of those data in the annual report on the Funds;
    • the need to ensure that no duplication of Union-funded services can occur.

    Parliament welcomes the fact that following its requests, the 2012 budget shows payment appropriations of EUR 50 million on the EGF budget line 04 05 01. It recalls that the EGF was created as a separate specific instrument with its own objectives and deadlines and that it therefore deserves a dedicated allocation, which will avoid there being transfers from other budget lines, as happened in the past, which could be detrimental to the achievement of the policy objectives of the EGF. Parliament regrets the decision of the Council to block the extension of the "crisis derogation", allowing the increase in the rate of Union cofinancing to 65% of the programme costs, for applications submitted after the 31 December 2011 deadline, and calls on the Council to reintroduce this measure without delay.

activities/8/docs/0/text/0
Old

The Committee on Budgets adopted the report by Frédéric DAERDEN (S&D, BE) on the proposal for a decision on the mobilisation of the European Globalisation Adjustment Fund, the sum of EUR 2 898 594 in commitment and payment appropriations, in order to provide a financial contribution for the application submitted by the Netherlands with respect to redundancies in the construction sector.

Members recall that the European Union has set up the appropriate legislative and budgetary instruments to provide additional support to workers who are suffering from the consequences of major structural changes in world trade patterns and to assist their reintegration into the labour market. Noting that the Netherlands has requested assistance for 516 redundancies, 435 of which are targeted for assistance, in 54 enterprises operating in the NACE Revision 2 Division 41 ('Construction of buildings') in the region of Gelderland (NL), Members request the institutions involved to accelerate the mobilisation of the EGF. They agree with the Commission that the conditions set out in Article 2(a) of the EGF Regulation are met and that, therefore, the Netherlands is entitled to a financial contribution under that Regulation.

They welcome this call for the EGF financial contribution by the Dutch Government even though this Member State has opposed the extension of the crisis derogation for the current EGF and jeopardises the future oft the EGF after 2013.

Members also stress that the number of people working in construction is relatively high (approximately 60 000 in 2011) compared with other sectors of industry. The unemployment rate in 2011 in Gelderland was 5,9 %, a fraction higher than the Dutch average. Gelderland is the biggest province of the Netherlands, counting approximately 2 million inhabitants, and counts about 146 000 companies. Members point out that the vast majority of redundant workers come from elementary professions.  Therefore, there is a necessity for further training and education in order to allow them to re-integrate in the labour market.

At the same time, Members welcome the fact that, in order to provide workers with speedy assistance, the Dutch authorities decided to start the implementation of the measures well ahead of the final decision on granting the EGF support for the proposed coordinated package.

They recall the importance of improving the employability of all workers by means of tailored training and the recognition of skills and competences gained throughout the professional career.

Lessons to be learned from the implementation of the EGF: the report highlights the fact that lessons should be learned from the preparation and implementation of this and other applications addressing mass dismissals, especially with respect to the activities in anticipation of redundancies and timeliness of the preparation of EGF applications. It requests the institutions involved to make the necessary efforts to improve procedural and budgetary arrangements to accelerate the mobilisation of the EGF. Members appreciate the improved procedure put in place by the Commission, following Parliament's request for accelerating the release of grants, aimed at presenting to the budgetary authority the Commission's assessment on the eligibility of an EGF application together with the proposal to mobilise the EGF. They hope that further improvements in the procedure will be integrated in the new Regulation on the European Globalisation Adjustment Fund (2014–2020).

The committee reiterates its usual position on the approach to this kind of application:

·        the need to ensure a smooth and rapid procedure for the adoption of the decisions on the mobilisation of the EGF;

·        assistance from the EGF must not replace actions which are the responsibility of companies by virtue of national law or collective agreements, nor measures restructuring companies or sectors, and must support the reintegration of individual redundant workers into long-term employment; 

·        the EGF should not provide an incentive for companies to replace their contractual workforce with a more precarious and short-term one;

·        the fact that information provided on the coordinated package of personalised services to be funded from the EGF includes information on the complementarity with actions funded by the Structural Funds;

·        the need for a comparative evaluation of those data in its annual reports in order to ensure full respect of the existing regulations and

·        no duplication of Union-funded services can occur.

The committee welcomes the fact that following repeated requests from Parliament, the 2012 budget shows payment appropriations of EUR 50 000 000 on the EGF budget line 04 05 01. It recalls that the EGF was created as a separate specific instrument with its own objectives and deadlines and therefore deserves a dedicated allocation, which will avoid transfers from other budget lines, as happened in the past, which could be detrimental to the achievement of the policy objectives of the EGF. Members regret the decision of the Council to block the extension of the "crisis derogation", allowing to provide financial assistance to workers made redundant as a result of the current financial and economic crisis in addition to those losing their job because of changes in global trade patterns, and allowing the increase in the rate of Union co-financing to 65% of the programme costs, for applications submitted after the 31 December 2011 deadline. They call on the Council to reintroduce this measure without delay.

New

The Committee on Budgets adopted the report by Frédéric DAERDEN (S&D, BE) on the proposal for a decision on the mobilisation of the European Globalisation Adjustment Fund, the sum of EUR 2 898 594 in commitment and payment appropriations, in order to provide a financial contribution for the application submitted by the Netherlands with respect to redundancies in the construction sector.

Members recall that the European Union has set up the appropriate legislative and budgetary instruments to provide additional support to workers who are suffering from the consequences of major structural changes in world trade patterns and to assist their reintegration into the labour market. Noting that the Netherlands has requested assistance for 516 redundancies, 435 of which are targeted for assistance, in 54 enterprises operating in the NACE Revision 2 Division 41 ('Construction of buildings') in the region of Gelderland (NL), Members request the institutions involved to accelerate the mobilisation of the EGF. They agree with the Commission that the conditions set out in Article 2(b) of the EGF Regulation are met and that, therefore, the Netherlands is entitled to a financial contribution under that Regulation.

They welcome this call for the EGF financial contribution by the Dutch Government even though this Member State has opposed the extension of the crisis derogation for the current EGF and jeopardises the future of the EGF after 2013.

Members also stress that the number of people working in construction is relatively high (approximately 60 000 in 2011) compared with other sectors of industry. The unemployment rate in 2011 in Gelderland was 5.9 %, a fraction higher than the Dutch average. Gelderland is the biggest province of the Netherlands, counting approximately 2 million inhabitants, and counts about 146 000 companies. Members point out that the vast majority of redundant workers come from elementary professions. Therefore, there is a necessity for further training and education in order to allow them to re-integrate in the labour market.

At the same time, Members welcome the fact that, in order to provide workers with speedy assistance, the Dutch authorities decided to start the implementation of the measures well ahead of the final decision on granting the EGF support for the proposed coordinated package.

They recall the importance of improving the employability of all workers by means of tailored training and the recognition of skills and competences gained throughout the professional career.

Lessons to be learned from the implementation of the EGF: the report highlights the fact that lessons should be learned from the preparation and implementation of this and other applications addressing mass dismissals, especially with respect to the activities in anticipation of redundancies and timeliness of the preparation of EGF applications. It requests the institutions involved to make the necessary efforts to improve procedural and budgetary arrangements to accelerate the mobilisation of the EGF. Members appreciate the improved procedure put in place by the Commission, following Parliament's request for accelerating the release of grants, aimed at presenting to the budgetary authority the Commission's assessment on the eligibility of an EGF application together with the proposal to mobilise the EGF. They hope that further improvements in the procedure will be integrated in the new Regulation on the European Globalisation Adjustment Fund (2014–2020).

The committee reiterates its usual position on the approach to this kind of application:

  • the need to ensure a smooth and rapid procedure for the adoption of the decisions on the mobilisation of the EGF;
  • assistance from the EGF must not replace actions which are the responsibility of companies by virtue of national law or collective agreements, nor measures restructuring companies or sectors, and must support the reintegration of individual redundant workers into long-term employment; 
  • the EGF should not provide an incentive for companies to replace their contractual workforce with a more precarious and short-term one;
  • the fact that information provided on the coordinated package of personalised services to be funded from the EGF includes information on the complementarity with actions funded by the Structural Funds;
  • the need for a comparative evaluation of those data in its annual reports in order to ensure full respect of the existing regulations and
  • no duplication of Union-funded services can occur.

The committee welcomes the fact that following repeated requests from Parliament, the 2012 budget shows payment appropriations of EUR 50 000 000 on the EGF budget line 04 05 01. It recalls that the EGF was created as a separate specific instrument with its own objectives and deadlines and therefore deserves a dedicated allocation, which will avoid transfers from other budget lines, as happened in the past, which could be detrimental to the achievement of the policy objectives of the EGF. Members regret the decision of the Council to block the extension of the "crisis derogation", allowing to provide financial assistance to workers made redundant as a result of the current financial and economic crisis in addition to those losing their job because of changes in global trade patterns, and allowing the increase in the rate of Union co-financing to 65% of the programme costs, for applications submitted after the 31 December 2011 deadline. They call on the Council to reintroduce this measure without delay.

activities/9/docs/1
url
http://www.europarl.europa.eu/oeil/popups/sda.do?id=22082&l=en
type
Results of vote in Parliament
title
Results of vote in Parliament
activities/9/docs/0/url
http://www.europarl.europa.eu/sides/getDoc.do?type=TA&language=EN&reference=P7-TA-2012-378
activities/1/date
Old
2012-10-23T00:00:00
New
2012-07-16T00:00:00
activities/1/docs
  • url: http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2012&nu_doc=395 celexid: CELEX:52012PC0395:EN type: Non-legislative basic document published title: COM(2012)0395
activities/1/type
Old
Prev DG PRES
New
Non-legislative basic document
activities/8
date
2012-10-16T00:00:00
docs
url: http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A7-2012-334&language=EN type: Budgetary report tabled for plenary, 1st reading title: A7-0334/2012
body
EP
type
Budgetary report tabled for plenary, 1st reading
activities/8/body
Old
EC
New
EP
activities/8/commission
  • DG: url: http://ec.europa.eu/dgs/budget/ title: Budget Commissioner: LEWANDOWSKI Janusz
activities/8/date
Old
2012-07-16T00:00:00
New
2012-10-16T00:00:00
activities/8/docs/0/celexid
CELEX:52012PC0395:EN
activities/8/docs/0/text/0
Old

PURPOSE: to mobilise the European Globalisation Adjustment Fund (EGF) in respect of redundancies in the construction of buildings in the Netherlands.

PROPOSED ACT: Decision of the European Parliament and of the Council.

CONTENT: the European Globalisation Adjustment Fund (EGF) was established by Council Regulation No 1927/2006 to provide additional support to redundant workers who suffer from the consequences of major structural changes in world trade patterns and to assist them with their reintegration into the labour market.

The Interinstitutional Agreement of 17 May 2006 on budgetary discipline allows for the mobilisation of the European Globalisation Adjustment Fund (EGF) through a flexibility mechanism, within the annual ceiling of EUR 500 million over and above the relevant headings of the financial framework.

The Commission services have carried out a thorough examination of the application submitted by the Netherlands to mobilise the EGF. The main elements of the assessment are as follows:

The Netherlands: application EGF/2011/009 NL/Gelderland Construction 41: on 15 December 2011, the Netherlands submitted application EGF/2011/009 NL/Gelderland Construction 41 for a financial contribution from the EGF, following redundancies in 54 enterprises operating in the NACE Revision 2 Division 41 ('Construction of buildings') in the NUTS II region of Gelderland (NL22) in the Netherlands. The application was supplemented by additional information up to 11 June 2012.

In order to establish the link between the redundancies and the global financial and economic crisis, the Netherlands argues that the construction sector in the Netherlands as well as in the entire European Union has been severely affected by the crisis. Loans to the construction sector and to individuals have been drastically reduced, prices of the construction materials increased while the demand for new houses decreased due to declining consumer confidence and the lack of cash.

A sharp decline in output by 12.9% from 2008 to 2010 was identified in the Dutch construction industry. The economic growth in the third quarter of 2011 compared to the same period of 2010 in the province of Gelderland slowed down more than in the rest of the country. The price level of houses in 2011 declined further by 3.6% in comparison to 2010 and reached the level of 2005; this had a negative impact on the construction sector. Furthermore, the market for new housing has been shrinking due to the declining investments of housing corporations and municipalities.

The Netherlands submitted this application under the intervention criteria of Article 2(b) of Regulation (EC) No 1927/2006, which requires at least 500 redundancies over a nine-month period in enterprises operating in the same NACE Revision 2 Division in one region or two contiguous regions at NUTS II level in a Member State. The application cites 516 redundancies in 54 enterprises operating in the NACE Revision 2 Division 41 ('Construction of buildings') in the NUTS II region of Gelderland (NL22) during the nine-month reference period from 1 February 2011 to 1 November 2011.

After a thorough examination of this application, the Commission has concluded in accordance with Article 10 of Regulation (EC) No 1927/2006 that the conditions for a financial contribution under this Regulation are met.

On the basis of the application from the Netherlands, the proposed contribution from the EGF to the coordinated package of personalised services is EUR 2 898 594, representing 65% of the total cost.

IMPACT ASSESSMENT: no impact assessment was carried out.

FINANCIAL IMPLICATIONS: considering the maximum possible amount of a financial contribution from the EGF under Article 10(1) of Regulation (EC) No 1927/2006, as well as the scope for reallocating appropriations, the Commission proposes to mobilise the EGF for the total amount referred to above, to be allocated under heading 1a of the financial framework.

The proposed amount of financial contribution will leave more than 25 % of the maximum annual amount earmarked for the EGF available for allocations during the last four months of the year.

By presenting this proposal to mobilise the EGF, the Commission initiates the simplified trialogue procedure, as required by Point 28 of the Interinstitutional Agreement of 17 May 2006, with a view to securing the agreement of the two arms of the budgetary authority on the need to use the EGF and the amount required. The Commission invites the first of the two arms of the budgetary authority that reaches agreement on the draft mobilisation proposal, at appropriate political level, to inform the other arm and the Commission of its intentions. In case of disagreement by either of the two arms of the budgetary authority, a formal trialogue meeting will be convened.

The Commission presents separately a transfer request in order to enter in the 2012 budget specific commitment appropriations, as required in Point 28 of the Interinstitutional Agreement of 17 May 2006. Appropriations from the EGF budget line will be used to cover the amount of EUR 2 898 594 needed for the present application.

New

The Committee on Budgets adopted the report by Frédéric DAERDEN (S&D, BE) on the proposal for a decision on the mobilisation of the European Globalisation Adjustment Fund, the sum of EUR 2 898 594 in commitment and payment appropriations, in order to provide a financial contribution for the application submitted by the Netherlands with respect to redundancies in the construction sector.

Members recall that the European Union has set up the appropriate legislative and budgetary instruments to provide additional support to workers who are suffering from the consequences of major structural changes in world trade patterns and to assist their reintegration into the labour market. Noting that the Netherlands has requested assistance for 516 redundancies, 435 of which are targeted for assistance, in 54 enterprises operating in the NACE Revision 2 Division 41 ('Construction of buildings') in the region of Gelderland (NL), Members request the institutions involved to accelerate the mobilisation of the EGF. They agree with the Commission that the conditions set out in Article 2(a) of the EGF Regulation are met and that, therefore, the Netherlands is entitled to a financial contribution under that Regulation.

They welcome this call for the EGF financial contribution by the Dutch Government even though this Member State has opposed the extension of the crisis derogation for the current EGF and jeopardises the future oft the EGF after 2013.

Members also stress that the number of people working in construction is relatively high (approximately 60 000 in 2011) compared with other sectors of industry. The unemployment rate in 2011 in Gelderland was 5,9 %, a fraction higher than the Dutch average. Gelderland is the biggest province of the Netherlands, counting approximately 2 million inhabitants, and counts about 146 000 companies. Members point out that the vast majority of redundant workers come from elementary professions.  Therefore, there is a necessity for further training and education in order to allow them to re-integrate in the labour market.

At the same time, Members welcome the fact that, in order to provide workers with speedy assistance, the Dutch authorities decided to start the implementation of the measures well ahead of the final decision on granting the EGF support for the proposed coordinated package.

They recall the importance of improving the employability of all workers by means of tailored training and the recognition of skills and competences gained throughout the professional career.

Lessons to be learned from the implementation of the EGF: the report highlights the fact that lessons should be learned from the preparation and implementation of this and other applications addressing mass dismissals, especially with respect to the activities in anticipation of redundancies and timeliness of the preparation of EGF applications. It requests the institutions involved to make the necessary efforts to improve procedural and budgetary arrangements to accelerate the mobilisation of the EGF. Members appreciate the improved procedure put in place by the Commission, following Parliament's request for accelerating the release of grants, aimed at presenting to the budgetary authority the Commission's assessment on the eligibility of an EGF application together with the proposal to mobilise the EGF. They hope that further improvements in the procedure will be integrated in the new Regulation on the European Globalisation Adjustment Fund (2014–2020).

The committee reiterates its usual position on the approach to this kind of application:

·        the need to ensure a smooth and rapid procedure for the adoption of the decisions on the mobilisation of the EGF;

·        assistance from the EGF must not replace actions which are the responsibility of companies by virtue of national law or collective agreements, nor measures restructuring companies or sectors, and must support the reintegration of individual redundant workers into long-term employment; 

·        the EGF should not provide an incentive for companies to replace their contractual workforce with a more precarious and short-term one;

·        the fact that information provided on the coordinated package of personalised services to be funded from the EGF includes information on the complementarity with actions funded by the Structural Funds;

·        the need for a comparative evaluation of those data in its annual reports in order to ensure full respect of the existing regulations and

·        no duplication of Union-funded services can occur.

The committee welcomes the fact that following repeated requests from Parliament, the 2012 budget shows payment appropriations of EUR 50 000 000 on the EGF budget line 04 05 01. It recalls that the EGF was created as a separate specific instrument with its own objectives and deadlines and therefore deserves a dedicated allocation, which will avoid transfers from other budget lines, as happened in the past, which could be detrimental to the achievement of the policy objectives of the EGF. Members regret the decision of the Council to block the extension of the "crisis derogation", allowing to provide financial assistance to workers made redundant as a result of the current financial and economic crisis in addition to those losing their job because of changes in global trade patterns, and allowing the increase in the rate of Union co-financing to 65% of the programme costs, for applications submitted after the 31 December 2011 deadline. They call on the Council to reintroduce this measure without delay.

activities/8/docs/0/title
Old
COM(2012)0395
New
A7-0334/2012
activities/8/docs/0/type
Old
Non-legislative basic document published
New
Budgetary report tabled for plenary, 1st reading
activities/8/docs/0/url
Old
http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2012&nu_doc=395
New
http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A7-2012-334&language=EN
activities/8/type
Old
Non-legislative basic document
New
Budgetary report tabled for plenary, 1st reading
activities/9/docs
  • type: Decision by Parliament, 1st reading/single reading title: T7-0378/2012
activities/9/type
Old
Vote scheduled
New
Budgetary text adopted by Parliament
procedure/stage_reached
Old
Awaiting Parliament 1st reading / single reading / budget 1st stage
New
Procedure completed, awaiting publication in Official Journal
activities/8/docs/0/text
  • The Committee on Budgets adopted the report by Frédéric DAERDEN (S&D, BE) on the proposal for a decision on the mobilisation of the European Globalisation Adjustment Fund, the sum of EUR 2 898 594 in commitment and payment appropriations, in order to provide a financial contribution for the application submitted by the Netherlands with respect to redundancies in the construction sector.

    Members recall that the European Union has set up the appropriate legislative and budgetary instruments to provide additional support to workers who are suffering from the consequences of major structural changes in world trade patterns and to assist their reintegration into the labour market. Noting that the Netherlands has requested assistance for 516 redundancies, 435 of which are targeted for assistance, in 54 enterprises operating in the NACE Revision 2 Division 41 ('Construction of buildings') in the region of Gelderland (NL), Members request the institutions involved to accelerate the mobilisation of the EGF. They agree with the Commission that the conditions set out in Article 2(a) of the EGF Regulation are met and that, therefore, the Netherlands is entitled to a financial contribution under that Regulation.

    They welcome this call for the EGF financial contribution by the Dutch Government even though this Member State has opposed the extension of the crisis derogation for the current EGF and jeopardises the future oft the EGF after 2013.

    Members also stress that the number of people working in construction is relatively high (approximately 60 000 in 2011) compared with other sectors of industry. The unemployment rate in 2011 in Gelderland was 5,9 %, a fraction higher than the Dutch average. Gelderland is the biggest province of the Netherlands, counting approximately 2 million inhabitants, and counts about 146 000 companies. Members point out that the vast majority of redundant workers come from elementary professions.  Therefore, there is a necessity for further training and education in order to allow them to re-integrate in the labour market.

    At the same time, Members welcome the fact that, in order to provide workers with speedy assistance, the Dutch authorities decided to start the implementation of the measures well ahead of the final decision on granting the EGF support for the proposed coordinated package.

    They recall the importance of improving the employability of all workers by means of tailored training and the recognition of skills and competences gained throughout the professional career.

    Lessons to be learned from the implementation of the EGF: the report highlights the fact that lessons should be learned from the preparation and implementation of this and other applications addressing mass dismissals, especially with respect to the activities in anticipation of redundancies and timeliness of the preparation of EGF applications. It requests the institutions involved to make the necessary efforts to improve procedural and budgetary arrangements to accelerate the mobilisation of the EGF. Members appreciate the improved procedure put in place by the Commission, following Parliament's request for accelerating the release of grants, aimed at presenting to the budgetary authority the Commission's assessment on the eligibility of an EGF application together with the proposal to mobilise the EGF. They hope that further improvements in the procedure will be integrated in the new Regulation on the European Globalisation Adjustment Fund (2014–2020).

    The committee reiterates its usual position on the approach to this kind of application:

    ·        the need to ensure a smooth and rapid procedure for the adoption of the decisions on the mobilisation of the EGF;

    ·        assistance from the EGF must not replace actions which are the responsibility of companies by virtue of national law or collective agreements, nor measures restructuring companies or sectors, and must support the reintegration of individual redundant workers into long-term employment; 

    ·        the EGF should not provide an incentive for companies to replace their contractual workforce with a more precarious and short-term one;

    ·        the fact that information provided on the coordinated package of personalised services to be funded from the EGF includes information on the complementarity with actions funded by the Structural Funds;

    ·        the need for a comparative evaluation of those data in its annual reports in order to ensure full respect of the existing regulations and

    ·        no duplication of Union-funded services can occur.

    The committee welcomes the fact that following repeated requests from Parliament, the 2012 budget shows payment appropriations of EUR 50 000 000 on the EGF budget line 04 05 01. It recalls that the EGF was created as a separate specific instrument with its own objectives and deadlines and therefore deserves a dedicated allocation, which will avoid transfers from other budget lines, as happened in the past, which could be detrimental to the achievement of the policy objectives of the EGF. Members regret the decision of the Council to block the extension of the "crisis derogation", allowing to provide financial assistance to workers made redundant as a result of the current financial and economic crisis in addition to those losing their job because of changes in global trade patterns, and allowing the increase in the rate of Union co-financing to 65% of the programme costs, for applications submitted after the 31 December 2011 deadline. They call on the Council to reintroduce this measure without delay.

activities/7
date
2012-10-16T00:00:00
body
CSL
type
Council Meeting
council
General Affairs
meeting_id
3192
activities/8/docs/0/url
http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A7-2012-334&language=EN
activities/7
date
2012-10-16T00:00:00
docs
type: Budgetary report tabled for plenary, 1st reading title: A7-0334/2012
body
EP
type
Budgetary report tabled for plenary, 1st reading
activities/6/committees
  • body: EP responsible: True committee: BUDG date: 2012-09-06T00:00:00 committee_full: Budgets rapporteur: group: S&D name: DAERDEN Frédéric
  • body: EP responsible: False committee_full: Employment and Social Affairs committee: EMPL
  • body: EP responsible: False committee_full: Regional Development committee: REGI
activities/6/type
Old
Prev Adopt in Cte
New
Vote in committee, 1st reading/single reading
activities/7/type
Old
EP 1R Plenary
New
Vote scheduled
activities/5/docs/0/url
http://www.europarl.europa.eu/sides/getDoc.do?type=COMPARL&mode=XML&language=EN&reference=PE496.459
activities/6/type
Old
Vote scheduled in committee, 1st reading/single reading
New
Prev Adopt in Cte
activities/5
date
2012-09-24T00:00:00
docs
type: Amendments tabled in committee title: PE496.459
body
EP
type
Amendments tabled in committee
activities/6/type
Old
Indicative plenary sitting date, 1st reading/single reading
New
EP 1R Plenary
activities/7
body
EC
date
2012-10-23T00:00:00
type
Prev DG PRES
commission
DG: url: http://ec.europa.eu/dgs/budget/ title: Budget Commissioner: LEWANDOWSKI Janusz
activities/2/docs/0/url
http://www.europarl.europa.eu/sides/getDoc.do?type=COMPARL&mode=XML&language=EN&reference=PE494.790
activities/3
date
2012-09-11T00:00:00
body
EP
type
Committee referral announced in Parliament, 1st reading/single reading
committees
procedure/dossier_of_the_committee
BUDG/7/10150
procedure/stage_reached
Old
Preparatory phase in Parliament
New
Awaiting Parliament 1st reading / single reading / budget 1st stage
activities/3
body
EP
date
2012-09-20T00:00:00
type
Deadline Amendments
activities/2
date
2012-09-03T00:00:00
docs
type: Committee draft report title: PE494.790
body
EP
type
Committee draft report
committees/0/date
2012-09-06T00:00:00
committees/0/rapporteur
  • group: S&D name: DAERDEN Frédéric
activities/2
date
2012-10-10T00:00:00
body
EP
type
Vote scheduled in committee, 1st reading/single reading
activities/1/docs/0/text
  • PURPOSE: to mobilise the European Globalisation Adjustment Fund (EGF) in respect of redundancies in the construction of buildings in the Netherlands.

    PROPOSED ACT: Decision of the European Parliament and of the Council.

    CONTENT: the European Globalisation Adjustment Fund (EGF) was established by Council Regulation No 1927/2006 to provide additional support to redundant workers who suffer from the consequences of major structural changes in world trade patterns and to assist them with their reintegration into the labour market.

    The Interinstitutional Agreement of 17 May 2006 on budgetary discipline allows for the mobilisation of the European Globalisation Adjustment Fund (EGF) through a flexibility mechanism, within the annual ceiling of EUR 500 million over and above the relevant headings of the financial framework.

    The Commission services have carried out a thorough examination of the application submitted by the Netherlands to mobilise the EGF. The main elements of the assessment are as follows:

    The Netherlands: application EGF/2011/009 NL/Gelderland Construction 41: on 15 December 2011, the Netherlands submitted application EGF/2011/009 NL/Gelderland Construction 41 for a financial contribution from the EGF, following redundancies in 54 enterprises operating in the NACE Revision 2 Division 41 ('Construction of buildings') in the NUTS II region of Gelderland (NL22) in the Netherlands. The application was supplemented by additional information up to 11 June 2012.

    In order to establish the link between the redundancies and the global financial and economic crisis, the Netherlands argues that the construction sector in the Netherlands as well as in the entire European Union has been severely affected by the crisis. Loans to the construction sector and to individuals have been drastically reduced, prices of the construction materials increased while the demand for new houses decreased due to declining consumer confidence and the lack of cash.

    A sharp decline in output by 12.9% from 2008 to 2010 was identified in the Dutch construction industry. The economic growth in the third quarter of 2011 compared to the same period of 2010 in the province of Gelderland slowed down more than in the rest of the country. The price level of houses in 2011 declined further by 3.6% in comparison to 2010 and reached the level of 2005; this had a negative impact on the construction sector. Furthermore, the market for new housing has been shrinking due to the declining investments of housing corporations and municipalities.

    The Netherlands submitted this application under the intervention criteria of Article 2(b) of Regulation (EC) No 1927/2006, which requires at least 500 redundancies over a nine-month period in enterprises operating in the same NACE Revision 2 Division in one region or two contiguous regions at NUTS II level in a Member State. The application cites 516 redundancies in 54 enterprises operating in the NACE Revision 2 Division 41 ('Construction of buildings') in the NUTS II region of Gelderland (NL22) during the nine-month reference period from 1 February 2011 to 1 November 2011.

    After a thorough examination of this application, the Commission has concluded in accordance with Article 10 of Regulation (EC) No 1927/2006 that the conditions for a financial contribution under this Regulation are met.

    On the basis of the application from the Netherlands, the proposed contribution from the EGF to the coordinated package of personalised services is EUR 2 898 594, representing 65% of the total cost.

    IMPACT ASSESSMENT: no impact assessment was carried out.

    FINANCIAL IMPLICATIONS: considering the maximum possible amount of a financial contribution from the EGF under Article 10(1) of Regulation (EC) No 1927/2006, as well as the scope for reallocating appropriations, the Commission proposes to mobilise the EGF for the total amount referred to above, to be allocated under heading 1a of the financial framework.

    The proposed amount of financial contribution will leave more than 25 % of the maximum annual amount earmarked for the EGF available for allocations during the last four months of the year.

    By presenting this proposal to mobilise the EGF, the Commission initiates the simplified trialogue procedure, as required by Point 28 of the Interinstitutional Agreement of 17 May 2006, with a view to securing the agreement of the two arms of the budgetary authority on the need to use the EGF and the amount required. The Commission invites the first of the two arms of the budgetary authority that reaches agreement on the draft mobilisation proposal, at appropriate political level, to inform the other arm and the Commission of its intentions. In case of disagreement by either of the two arms of the budgetary authority, a formal trialogue meeting will be convened.

    The Commission presents separately a transfer request in order to enter in the 2012 budget specific commitment appropriations, as required in Point 28 of the Interinstitutional Agreement of 17 May 2006. Appropriations from the EGF budget line will be used to cover the amount of EUR 2 898 594 needed for the present application.

activities/2
date
2012-10-23T00:00:00
body
EP
type
Indicative plenary sitting date, 1st reading/single reading
activities
  • body: EP date: 2012-07-16T00:00:00 type: Date
  • date: 2012-07-16T00:00:00 docs: url: http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2012&nu_doc=395 celexid: CELEX:52012PC0395:EN type: Non-legislative basic document published title: COM(2012)0395 type: Non-legislative basic document body: EC commission: DG: url: http://ec.europa.eu/dgs/budget/ title: Budget Commissioner: LEWANDOWSKI Janusz
committees
  • body: EP responsible: True committee_full: Budgets committee: BUDG
  • body: EP responsible: False committee_full: Employment and Social Affairs committee: EMPL
  • body: EP responsible: False committee_full: Regional Development committee: REGI
links
other
  • body: EC dg: url: http://ec.europa.eu/dgs/budget/ title: Budget commissioner: LEWANDOWSKI Janusz
procedure
reference
2012/2154(BUD)
title
Mobilisation of the European Globalisation Adjustment Fund: redundancies in construction of buildings in the Netherlands
geographical_area
Netherlands
stage_reached
Preparatory phase in Parliament
subtype
Mobilisation of funds
type
BUD - Budgetary procedure
subject