BETA

Awaiting Parliament 1st reading / single reading / budget 1st stage



2015/2322(INI) Towards a new energy market design
Next event: Vote in committee, 1st reading/single reading 2016/06/14 more...
RoleCommitteeRapporteurShadows
Lead ITRE LANGEN Werner (EPP) ZANONATO Flavio (S&D), KRASNODĘBSKI Zdzisław (ECR), TELIČKA Pavel (ALDE), TURMES Claude (Verts/ALE), TAMBURRANO Dario (EFD)
Lead committee dossier: ITRE/8/05064
Legal Basis RoP 052

Activites

  • 2016/09/13 Vote in plenary scheduled
  • 2016/09/12 Debate scheduled
  • 2016/06/21 Committee report tabled for plenary, single reading
    • A8-0214/2016 summary
  • 2016/06/14 Vote in committee, 1st reading/single reading
  • 2015/11/26 Committee referral announced in Parliament, 1st reading/single reading

Documents

  • Committee report tabled for plenary, single reading: A8-0214/2016
AmendmentsDossier
590 2015/2322(INI)
2016/03/29 ITRE 291 amendments...
source: 580.478
2016/04/05 ITRE 299 amendments...
source: 578.777

History

(these mark the time of scraping, not the official date of the change)

activities/3/type
Old
Debate in plenary scheduled
New
Debate scheduled
activities/2/docs/0/text
  • The Committee on Industry, Research and Energy adopted the report by Werner LANGEN (EPP, DE) on Towards a New Energy Market Design.

    While welcoming the Commission communication of 15 July 2015 on a new energy market design, the report endorsed the view that the transformed electricity market should be coupled with the implementation of existing legislation.

    This market should enhance regional cooperation on all dimensions of energy supply and demand, and should focus on improved, more decentralised and more flexible markets, in order to ensure a well-regulated, market-based system which is capable of delivering on all of the EU's established energy and climate goals for 2030.

    Improve the regulatory framework: Members called for the existing regulatory framework for European markets to be adjusted in order to allow a growing share of renewable energy sources and to close existing cross-border regulatory gaps.

    A new market design for electricity as part of an increasingly decentralised energy system must be based on market principles, which would stimulate investment, ensure that SMEs have access to the energy market and unlock a sustainable and efficient electricity supply through a stable, integrated and smart energy system. The Commission is urged to secure the implementation of the current regulatory framework.

    Member States are called upon to be more proactively involved in designing a flexible and decentralised European internal market in electricity in order to enhance coordination between national transition strategies.

    Prosumers: Members called on the Commission to guide a participative process aimed at reaching a common practical understanding of the definition of prosumers at the EU level and to include a new chapter on prosumers in the revised Renewable Energy Directive.

    Price signals: Members stated that a strengthened European internal market in electricity is possible, on the basis of stronger price signals on the wholesale market through prices that reflect actual scarcity and surplus of supplies, including price spikes, which, along with other measures, play the role of investment signals for new capacity and flexibility services. Members stated that whether prices that reflect the actual scarcity of supply in fact lead to adequate investment in electricity production capacity should be evaluated on a regular basis.

    In working on new energy market design, the Commission should ensure a level playing field between power producers in EU and non-EU countries and to provide European consumers with secure, sustainable and affordable energy.

    Regional cooperation: stressing the enormous potential of strengthened regional cooperation, the report stressed the importance of a common analysis of system adequacy at regional level, facilitated by the Agency for the Cooperation of Energy Regulators (ACER) and the European Network of Transmission System Operators (ENTSO-E). It called for the transmission system operators (TSOs) of neighbouring markets to devise a common methodology, approved by the Commission, to that end. It also stressed the importance of coordinated long-term planning for the efficient development of transmission infrastructure and electricity markets in Europe.

    Interconnection: Members regretted that there are still large gaps in the interconnections within and between some Member States, leading to network bottlenecks and significantly impairing operational security and cross-border energy trading. They called for new approaches to be developed with a view to overcoming bottlenecks and achieving a smart distribution grid that allows the smooth integration and provision of services by decentralised generators, prosumers and consumers. They also reiterated support for EU regional interoperability targets.

    Storage: the report stressed the need to promote the deployment of energy storage systems and to create a level playing field on which energy storage can compete with other flexibility options, on the basis of a technology-neutral design of the energy market.

    It called on the Commission to clarify the position of storage in different steps of the electricity chain, and to allow transmission and distribution operators to invest in, use and exploit energy storage services for the purpose of grid balancing and other ancillary services.

    Renewable energies: stressing that full integration of renewables into the electricity market is essential, the report called for the completion of the integration of internal market and balancing and reserve services by fostering liquidity and cross-border trading in all market timeframes. Members stressed the importance of stable and cost-effective renewable support schemes for long-term investment that remain responsive and adaptable in the short term and are tailored to national needs and circumstances, allowing the gradual phasing-out of subsidies for mature renewable technologies.

activities/2/docs
  • url: http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A8-2016-0214&language=EN type: Committee report tabled for plenary, single reading title: A8-0214/2016
activities/3/type
Old
Indicative plenary sitting date, 1st reading/single reading
New
Debate in plenary scheduled
activities/4
date
2016-09-13T00:00:00
body
EP
type
Vote in plenary scheduled
activities/2
date
2016-06-21T00:00:00
body
EP
type
Committee report tabled for plenary, single reading
procedure/stage_reached
Old
Awaiting committee decision
New
Awaiting Parliament 1st reading / single reading / budget 1st stage
activities/1
date
2016-06-14T00:00:00
body
EP
type
Vote in committee, 1st reading/single reading
committees
body: EP shadows: group: S&D name: ZANONATO Flavio group: ECR name: KRASNODĘBSKI Zdzisław group: ALDE name: TELIČKA Pavel group: Verts/ALE name: TURMES Claude group: EFD name: TAMBURRANO Dario responsible: True committee: ITRE date: 2015-10-28T00:00:00 committee_full: Industry, Research and Energy rapporteur: group: EPP name: LANGEN Werner
activities/1
date
2016-06-14T00:00:00
body
EP
type
Vote scheduled in committee, 1st reading/single reading
activities/2/date
Old
2016-07-04T00:00:00
New
2016-09-12T00:00:00
activities/0/committees/0/shadows/1/mepref
Old
4f1ac8b6b819f25efd0000eb
New
53b2dc34b819f205b00000a3
activities/0/committees/0/shadows/1/name
Old
GRÓBARCZYK Marek Józef
New
KRASNODĘBSKI Zdzisław
committees/0/shadows/1/mepref
Old
4f1ac8b6b819f25efd0000eb
New
53b2dc34b819f205b00000a3
committees/0/shadows/1/name
Old
GRÓBARCZYK Marek Józef
New
KRASNODĘBSKI Zdzisław
activities/1/date
Old
2016-05-24T00:00:00
New
2016-06-14T00:00:00
activities/2/date
Old
2016-06-06T00:00:00
New
2016-07-04T00:00:00
activities/1/date
Old
2016-04-21T00:00:00
New
2016-05-24T00:00:00
activities/2/date
Old
2016-05-09T00:00:00
New
2016-06-06T00:00:00
activities/2
date
2016-05-09T00:00:00
body
EP
type
Indicative plenary sitting date, 1st reading/single reading
activities/0
date
2015-11-26T00:00:00
body
EP
type
Committee referral announced in Parliament, 1st reading/single reading
committees
body: EP shadows: group: S&D name: ZANONATO Flavio group: ECR name: GRÓBARCZYK Marek Józef group: ALDE name: TELIČKA Pavel group: Verts/ALE name: TURMES Claude group: EFD name: TAMBURRANO Dario responsible: True committee: ITRE date: 2015-10-28T00:00:00 committee_full: Industry, Research and Energy rapporteur: group: EPP name: LANGEN Werner
procedure/dossier_of_the_committee
ITRE/8/05064
procedure/stage_reached
Old
Preparatory phase in Parliament
New
Awaiting committee decision
activities
  • date: 2016-04-21T00:00:00 body: EP type: Vote scheduled in committee, 1st reading/single reading
committees
  • body: EP shadows: group: S&D name: ZANONATO Flavio group: ECR name: GRÓBARCZYK Marek Józef group: ALDE name: TELIČKA Pavel group: Verts/ALE name: TURMES Claude group: EFD name: TAMBURRANO Dario responsible: True committee: ITRE date: 2015-10-28T00:00:00 committee_full: Industry, Research and Energy rapporteur: group: EPP name: LANGEN Werner
links
other
  • body: EC dg: url: http://ec.europa.eu/dgs/energy/index_en.htm title: Energy commissioner: ŠEFČOVIČ Maroš
procedure
reference
2015/2322(INI)
title
Towards a new energy market design
legal_basis
Rules of Procedure of the European Parliament EP 052
stage_reached
Preparatory phase in Parliament
subtype
Initiative
type
INI - Own-initiative procedure
subject
3.60 Energy policy