BETA


2023/0068(BUD) Mobilisation of the European Globalisation Adjustment Fund: redundancies in metal sector in Spain
Next event: Vote in plenary scheduled 2023/05/09

Progress: Awaiting Parliament's position on the draft budget

RoleCommitteeRapporteurShadows
Lead BUDG GARDIAZABAL RUBIAL Eider (icon: S&D S&D) WINZIG Angelika (icon: EPP EPP), POPTCHEVA Eva Maria (icon: Renew Renew), VANA Monika (icon: Verts/ALE Verts/ALE), KUHS Joachim (icon: ID ID), PAPADIMOULIS Dimitrios (icon: GUE/NGL GUE/NGL)
Committee Opinion EMPL TOMC Romana (icon: EPP EPP) Vilija BLINKEVIČIŪTĖ (icon: S&D S&D), José GUSMÃO (icon: GUE/NGL GUE/NGL), Marie-Pierre VEDRENNE (icon: RE RE), Elżbieta RAFALSKA (icon: ECR ECR), Cindy FRANSSEN (icon: PPE PPE), Elena LIZZI (icon: ID ID), Sara MATTHIEU (icon: Verts/ALE Verts/ALE)
Committee Opinion REGI
Lead committee dossier:

Events

2023/05/09
   Vote in plenary scheduled
2023/04/20
   EP - Budgetary report tabled for plenary
2023/04/17
   EP - Vote in committee
2023/04/04
   EP - Specific opinion
Documents
2023/03/29
   EP - Amendments tabled in committee
Documents
2023/03/29
   EP - Committee referral announced in Parliament
2023/03/20
   EP - Committee draft report
Documents
2023/03/17
   EP - GARDIAZABAL RUBIAL Eider (S&D) appointed as rapporteur in BUDG
2023/03/16
   EC - Non-legislative basic document published
Details

PURPOSE: to mobilise the European Globalisation Adjustment Fund (EGF) in support of Spain in relation to displaced workers in the metallurgy sector in Alu Ibérica LC S.L.

PROPOSED ACT: Decision of the European Parliament and of the Council.

CONTENT: on 30 November 2022, Spain submitted an application for a financial contribution from the EGF, relating to the redundancies in Alu Ibérica LC S.L . in Spain.

Following its assessment of this application, the Commission has concluded, in accordance with all applicable provisions of the EGF Regulation, that the conditions for awarding a financial contribution from the EGF are met.

Grounds for the application

Spain submitted this application under the intervention criterion of Article 4(2)(a) of the EGF Regulation, which requires at least 200 workers to be made redundant over a reference period of four months in an enterprise in a Member State.

The application concerns 303 workers made redundant in Alu Ibérica. The enterprise concerned was active in the manufacture of metal sector. The redundancies took place in the NUTS 2 region of Galicia. The four-month reference period runs from 10 May 2022 to 10 September 2022.

Events that led to the displacements and cessation of activity

The event giving rise to these displacements is the loss of competitiveness resulting from the increase in the prices of energy and raw materials, such as magnesium, together with the decline in world aluminum prices resulting from production overcapacity in China that led Alu Ibérica into liquidation.

About one million tonnes of aluminium production were halted or idled between October 2021 (when energy prices started to rise) and October 2022, because of rising energy prices and the difficulties in securing energy contracts at long-term fixed prices. Halting or closing production in Europe triggers increased imports. According to Eurometaux, China covers more than half of the global production of processed minerals and metals and is the major EU supplier for several critical raw materials (in particular magnesium, a key material in aluminium production).

According to OECD, China’s growing dominance of the aluminium industry has led to substantial disruption for other countries and global trade patterns.

The closure of Alu Ibérica has a significant impact on the labour market and the economy of the city of A Coruña, due to its size. The impact of the closure of Alu Ibérica is estimated at 615 job losses (303 direct and 312 in in ancillary enterprises), which represent a loss of 8.2% of the manufacturing jobs.

The context of the COVID-19 crisis coupled with the Russian war of aggression against Ukraine worsen the outlook for economic development. According to the Spanish authorities, 35% of Alu Ibérica redundant workers belong to the 45+ age group, the displacements are expected to have a strong impact on the unemployment of this age group.

Beneficiaries

An estimated 303 redundant workers are expected to participate in the measures.

The personalised services to be provided to the redundant workers include the following measures: (i) general information services and preparatory workshops; (ii) occupational guidance towards employment or self-employment; (iii) training on key competencies (in particular IT skills) and re-skilling; (iv) intensive job search assistance; (v) post-reintegration tutoring; (vi) incentives.

The estimated total costs are EUR 1 500 000 , comprising expenditure for personalised services of EUR 1 429 400 and expenditure for preparatory, management, information and publicity, control and reporting activities of EUR 70 600.

Budget proposal

The EGF should not exceed a maximum annual amount of EUR 186 million (in 2018 prices), as laid down in Article 8 of Council Regulation (EU, Euratom) No 2020/2093 laying down the multiannual financial framework for the years 2021 to 2027.

Having examined the application, the proposed measures and the estimated costs, the Commission proposes to mobilise the EGF for the amount of EUR 1 275 000 , representing 85 % of the total costs of the proposed measures, in order to provide a financial contribution for the application.

2023/03/10
   EP - TOMC Romana (EPP) appointed as rapporteur in EMPL

Documents

AmendmentsDossier
11 2023/0068(BUD)
2023/03/29 BUDG 11 amendments...
source: 745.437

History

(these mark the time of scraping, not the official date of the change)

docs/3
date
2023-04-20T00:00:00
docs
title: A9-0154/2023
type
Budgetary report tabled for plenary, 1st reading
body
EP
events/3/docs
  • title: A9-0154/2023
forecasts/0
date
2023-05-09T00:00:00
title
Vote in plenary scheduled
forecasts/0
date
2023-05-08T00:00:00
title
Indicative plenary sitting date
events/3
date
2023-04-20T00:00:00
type
Budgetary report tabled for plenary
body
EP
procedure/dossier_of_the_committee
  • BUDG/9/11524
procedure/stage_reached
Old
Preparatory phase in Parliament
New
Awaiting Parliament's position on the draft budget
events/2
date
2023-04-17T00:00:00
type
Vote in committee
body
EP
procedure/Other legal basis
Rules of Procedure EP 159
docs/1
date
2023-03-22T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/EMPL-AL-745298_EN.html title: PE745.298
committee
EMPL
type
Specific opinion
body
EP
docs/2
date
2023-03-22T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/EMPL-AL-745298_EN.html title: PE745.298
committee
EMPL
type
Specific opinion
body
EP
docs/2/date
Old
2023-03-22T00:00:00
New
2023-04-04T00:00:00
events/1
date
2023-03-29T00:00:00
type
Committee referral announced in Parliament
body
EP
docs/0
date
2023-03-16T00:00:00
docs
type
Non-legislative basic document
body
EC
docs/2
date
2023-03-29T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/BUDG-AM-745437_EN.html title: PE745.437
type
Amendments tabled in committee
body
EP
events/0/summary
  • PURPOSE: to mobilise the European Globalisation Adjustment Fund (EGF) in support of Spain in relation to displaced workers in the metallurgy sector in Alu Ibérica LC S.L.
  • PROPOSED ACT: Decision of the European Parliament and of the Council.
  • CONTENT: on 30 November 2022, Spain submitted an application for a financial contribution from the EGF, relating to the redundancies in Alu Ibérica LC S.L . in Spain.
  • Following its assessment of this application, the Commission has concluded, in accordance with all applicable provisions of the EGF Regulation, that the conditions for awarding a financial contribution from the EGF are met.
  • Grounds for the application
  • Spain submitted this application under the intervention criterion of Article 4(2)(a) of the EGF Regulation, which requires at least 200 workers to be made redundant over a reference period of four months in an enterprise in a Member State.
  • The application concerns 303 workers made redundant in Alu Ibérica. The enterprise concerned was active in the manufacture of metal sector. The redundancies took place in the NUTS 2 region of Galicia. The four-month reference period runs from 10 May 2022 to 10 September 2022.
  • Events that led to the displacements and cessation of activity
  • The event giving rise to these displacements is the loss of competitiveness resulting from the increase in the prices of energy and raw materials, such as magnesium, together with the decline in world aluminum prices resulting from production overcapacity in China that led Alu Ibérica into liquidation.
  • About one million tonnes of aluminium production were halted or idled between October 2021 (when energy prices started to rise) and October 2022, because of rising energy prices and the difficulties in securing energy contracts at long-term fixed prices. Halting or closing production in Europe triggers increased imports. According to Eurometaux, China covers more than half of the global production of processed minerals and metals and is the major EU supplier for several critical raw materials (in particular magnesium, a key material in aluminium production).
  • According to OECD, China’s growing dominance of the aluminium industry has led to substantial disruption for other countries and global trade patterns.
  • The closure of Alu Ibérica has a significant impact on the labour market and the economy of the city of A Coruña, due to its size. The impact of the closure of Alu Ibérica is estimated at 615 job losses (303 direct and 312 in in ancillary enterprises), which represent a loss of 8.2% of the manufacturing jobs.
  • The context of the COVID-19 crisis coupled with the Russian war of aggression against Ukraine worsen the outlook for economic development. According to the Spanish authorities, 35% of Alu Ibérica redundant workers belong to the 45+ age group, the displacements are expected to have a strong impact on the unemployment of this age group.
  • Beneficiaries
  • An estimated 303 redundant workers are expected to participate in the measures.
  • The personalised services to be provided to the redundant workers include the following measures: (i) general information services and preparatory workshops; (ii) occupational guidance towards employment or self-employment; (iii) training on key competencies (in particular IT skills) and re-skilling; (iv) intensive job search assistance; (v) post-reintegration tutoring; (vi) incentives.
  • The estimated total costs are EUR 1 500 000 , comprising expenditure for personalised services of EUR 1 429 400 and expenditure for preparatory, management, information and publicity, control and reporting activities of EUR 70 600.
  • Budget proposal
  • The EGF should not exceed a maximum annual amount of EUR 186 million (in 2018 prices), as laid down in Article 8 of Council Regulation (EU, Euratom) No 2020/2093 laying down the multiannual financial framework for the years 2021 to 2027.
  • Having examined the application, the proposed measures and the estimated costs, the Commission proposes to mobilise the EGF for the amount of EUR 1 275 000 , representing 85 % of the total costs of the proposed measures, in order to provide a financial contribution for the application.
docs/0
date
2023-03-16T00:00:00
docs
type
Non-legislative basic document
body
EC
docs/0
date
2023-03-16T00:00:00
docs
type
Non-legislative basic document
body
EC
events/0
date
2023-03-16T00:00:00
type
Non-legislative basic document published
body
EC
docs
events/0
date
2023-03-16T00:00:00
type
Non-legislative basic document published
body
EC
docs
committees/2
type
Committee Opinion
body
EP
committee_full
Regional Development
committee
REGI
associated
False
opinion
False
committees/2
type
Committee Opinion
body
EP
committee_full
Regional Development
committee
REGI
associated
False
rapporteur
name: OMARJEE Younous date: 2023-03-22T00:00:00 group: The Left group in the European Parliament - GUE/NGL abbr: GUE/NGL
docs/2
date
2023-03-22T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/EMPL-AL-745298_EN.html title: PE745.298
committee
EMPL
type
Specific opinion
body
EP
docs/1
date
2023-03-20T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/BUDG-PR-745347_EN.html title: PE745.347
type
Committee draft report
body
EP
committees/0/shadows/4
name
PAPADIMOULIS Dimitrios
group
The Left group in the European Parliament - GUE/NGL
abbr
GUE/NGL
committees/2/rapporteur