BETA


2024/0049(BUD) Mobilisation of the European Globalisation Adjustment Fund: redundancies in the metal sector in Germany

Progress: Awaiting Parliament's position on the draft budget

RoleCommitteeRapporteurShadows
Lead BUDG GEIER Jens (icon: S&D S&D) COLLADO JIMÉNEZ Ana (icon: EPP EPP), DLABAJOVÁ Martina (icon: Renew Renew), VANA Monika (icon: Verts/ALE Verts/ALE), RZOŃCA Bogdan (icon: ECR ECR), PAPADIMOULIS Dimitrios (icon: GUE/NGL GUE/NGL)
Committee Opinion EMPL PÎSLARU Dragoş (icon: Renew Renew)
Committee Opinion REGI
Lead committee dossier:

Events

2024/04/09
   EP - Budgetary report tabled for plenary, 1st reading
Documents
2024/04/09
   EP - Budgetary report tabled for plenary
Documents
2024/04/08
   EP - Vote in committee
2024/03/26
   EP - Amendments tabled in committee
Documents
2024/03/19
   EP - Specific opinion
Documents
2024/03/05
   EP - Committee draft report
Documents
2024/03/05
   EP - PÎSLARU Dragoş (Renew) appointed as rapporteur in EMPL
2024/02/29
   EC - Non-legislative basic document published
Details

PURPOSE: to mobilise the European Globalisation Adjustment Fund (EGF) to support Germany in the face of redundancies in the metal manufacturing sector.

PROPOSED ACT: Decision of the European Parliament and of the Council.

CONTENT: on 15 November 2023, Germany submitted an application for a financial contribution from the EGF, following displacements in Vallourec (Vallourec Deutschland GmbH (VAD)) in Germany.

Following the assessment of this application, the Commission concluded, in accordance with all the relevant provisions of the EGF Regulation, that the conditions for a financial contribution from the EGF are met.

Grounds for the application

Germany submitted the application under the intervention criteria of Article 4(2), point (a), of EGF Regulation, which requires the cessation of activity of at least 200 displaced workers over a reference period of four months in an enterprise in a Member State.

The application relates to 1 518 displaced workers whose activity has ceased in Vallourec (Vallourec Deutschland GmbH (VAD)). This enterprise operates in the economic sector classified under the NACE Revision 2 division 24 (Manufacture of basic metals). The reference period of four months for the application runs from 26 April 2023 to 26 August 2023.

Events leading to the displacements and cessation of operations

The enterprise, Vallourec Deutschland GmbH (VAD), is the German subsidiary of Vallourec S.A, France. The enterprise manufactured seamless hot-rolled steel tubes at its two steel mills in Germany, namely in the neighbouring cities of Düsseldorf and Mülheim an der Ruhr. The steel mills, previously known as Mannesmannröhren-Werke AG, were founded in 1899 and 1966, respectively.

The enterprise had been reporting losses since 2014, and, as a consequence, responded by several restructuring and downsizing measures. In 2018, the VAD Recovery Plan was launched, with the aim of leading to substantial savings by 2020. Despite some success, the economic situation following the Covid-19 pandemic resulted in further difficulties for the German tube mills. Since 2015, more than 1 400 jobs were already lost due to restructuring.

On 17 November 2021, the supervisory board of Vallourec S.A. decided to sell the German tube mills, and to offshore production to Brazil.

Even though Vallourec S.A. received offers from potential buyers, none of the offers proved viable. On 18 May 2022, the supervisory board declared that all attempts to sell the production sites had failed. This meant the definitive closure of the sites, as no successor to operate the facilities could be found.

Production will continue until the offshoring process is completed. Therefore, it has been decided to close the sites in three phases. A first batch of workers has left the company by 1 January 2024, a second batch will leave by 1 July 2024, and the third batch by 1 January 2025.

The enterprise will continue activities in Germany, but only as a sales company.

Beneficiaries

An estimated 835 redundant workers are expected to participate in the following measures.

The personalised services to be provided to the redundant workers include the following actions: (i) upskilling measures; (ii) guidance counselling and vocational orientation/activation measures; (iii) business start-up advisory services; (iv) business start-up grants; (iv) job search assistance; (v) upskilling incentives; (vi) training allowance; (vii) digital basic skills.

Germany has informed about activities already undertaken for the assistance of the displaced workers.

The estimated total costs are EUR 4 974 379, comprising expenditure for personalised services of EUR 4 783 057 and expenditure for preparatory, management, information and publicity, control and reporting activities of EUR 191 322.

Budgetary proposal

The EGF should not exceed a maximum annual amount of EUR 186 million (in 2018 prices), as laid down in Council Regulation (EU, Euratom) No 2020/2093 laying down the multiannual financial framework for the years 2021 to 2027.

Having examined the application, the Commission proposes to mobilise the EGF for the amount of EUR 2 984 627, representing 60 % of the total costs of the proposed measures, in order to provide a financial contribution for the application.

2024/02/29
   EP - Committee referral announced in Parliament
2024/02/29
   EP - GEIER Jens (S&D) appointed as rapporteur in BUDG

Documents

  • Budgetary report tabled for plenary, 1st reading: A9-0166/2024
  • Budgetary report tabled for plenary: A9-0166/2024
  • Amendments tabled in committee: PE759.851
  • Specific opinion: PE759.834
  • Committee draft report: PE759.759
  • Non-legislative basic document published: EUR-Lex
  • Non-legislative basic document published: COM(2024)0030
  • Committee draft report: PE759.759
  • Specific opinion: PE759.834
  • Amendments tabled in committee: PE759.851
  • Budgetary report tabled for plenary, 1st reading: A9-0166/2024

Votes

A9-0166/2024 – Jens Geier – Proposal for a decision #

2024/04/24 Outcome: +: 602, -: 24, 0: 3
DE FR ES IT PL RO BE PT NL AT BG HU EL HR IE DK LT SK CZ FI LV SI EE SE LU MT
Total
88
75
57
56
44
28
21
21
28
17
16
16
14
12
12
14
10
12
21
13
8
8
7
21
6
4
icon: PPE PPE
158

Hungary PPE

1

Denmark PPE

For (1)

1

Estonia PPE

For (1)

1

Luxembourg PPE

2

Malta PPE

For (1)

1
icon: S&D S&D
125

Belgium S&D

2

Greece S&D

1

Lithuania S&D

2

Slovakia S&D

For (1)

1

Czechia S&D

For (1)

1

Latvia S&D

2

Slovenia S&D

2

Estonia S&D

2

Luxembourg S&D

For (1)

1
icon: Renew Renew
98

Poland Renew

1

Austria Renew

For (1)

1

Bulgaria Renew

2

Hungary Renew

For (1)

1

Greece Renew

1

Croatia Renew

For (1)

1

Ireland Renew

2

Lithuania Renew

1

Finland Renew

3

Latvia Renew

For (1)

1

Slovenia Renew

2

Estonia Renew

3

Sweden Renew

3

Luxembourg Renew

2
icon: Verts/ALE Verts/ALE
67

Spain Verts/ALE

3

Italy Verts/ALE

For (1)

1

Poland Verts/ALE

For (1)

1

Romania Verts/ALE

1

Belgium Verts/ALE

3

Portugal Verts/ALE

1

Netherlands Verts/ALE

3

Austria Verts/ALE

3

Greece Verts/ALE

For (1)

1

Ireland Verts/ALE

2

Denmark Verts/ALE

2

Lithuania Verts/ALE

2

Czechia Verts/ALE

3

Finland Verts/ALE

2

Sweden Verts/ALE

3

Luxembourg Verts/ALE

For (1)

1
icon: ID ID
50
3

Denmark ID

Against (1)

1

Czechia ID

Abstain (1)

1

Estonia ID

For (1)

1
icon: ECR ECR
61

Germany ECR

1

France ECR

For (1)

1

Romania ECR

1

Bulgaria ECR

2

Greece ECR

Abstain (1)

1

Croatia ECR

1

Lithuania ECR

1

Slovakia ECR

Against (1)

1

Finland ECR

2

Latvia ECR

For (1)

1

Sweden ECR

3
icon: NI NI
38

Romania NI

Against (1)

1

Belgium NI

For (1)

1

Netherlands NI

Against (1)

1

Czechia NI

Against (1)

1

Latvia NI

1
icon: The Left The Left
32

Belgium The Left

For (1)

1

Greece The Left

2

Denmark The Left

1

Czechia The Left

1

Finland The Left

For (1)

1

Sweden The Left

For (1)

1
AmendmentsDossier
7 2024/0049(BUD)
2024/03/26 BUDG 7 amendments...
source: 759.851

History

(these mark the time of scraping, not the official date of the change)

forecasts
  • date: 2024-04-24T00:00:00 title: Vote in plenary scheduled
forecasts
  • date: 2024-04-24T00:00:00 title: Vote in plenary scheduled
forecasts/0
date
2024-04-24T00:00:00
title
Vote in plenary scheduled
forecasts/0
date
2024-04-22T00:00:00
title
Indicative plenary sitting date
commission
  • body: EC dg: Budget commissioner: SCHMIT Nicolas
docs/3
date
2024-04-09T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/A-9-2024-0166_EN.html title: A9-0166/2024
type
Budgetary report tabled for plenary, 1st reading
body
EP
events/2
date
2024-04-08T00:00:00
type
Vote in committee
body
EP
events/3
date
2024-04-09T00:00:00
type
Budgetary report tabled for plenary
body
EP
docs
url: https://www.europarl.europa.eu/doceo/document/A-9-2024-0166_EN.html title: A9-0166/2024
procedure/Other legal basis
Rules of Procedure EP 159
procedure/stage_reached
Old
Awaiting committee decision
New
Awaiting Parliament's position on the draft budget
commission
  • body: EC dg: Budget commissioner: SCHMIT Nicolas
docs/3
date
2024-04-09T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/A-9-2024-0166_EN.html title: A9-0166/2024
type
Budgetary report tabled for plenary, 1st reading
body
EP
events/2
date
2024-04-08T00:00:00
type
Vote in committee
body
EP
events/3
date
2024-04-09T00:00:00
type
Budgetary report tabled for plenary
body
EP
docs
url: https://www.europarl.europa.eu/doceo/document/A-9-2024-0166_EN.html title: A9-0166/2024
procedure/Other legal basis
Rules of Procedure EP 159
procedure/stage_reached
Old
Awaiting committee decision
New
Awaiting Parliament's position on the draft budget
commission
  • body: EC dg: Budget commissioner: SCHMIT Nicolas
docs/3
date
2024-04-09T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/A-9-2024-0166_EN.html title: A9-0166/2024
type
Budgetary report tabled for plenary, 1st reading
body
EP
events/2
date
2024-04-08T00:00:00
type
Vote in committee
body
EP
events/3
date
2024-04-09T00:00:00
type
Budgetary report tabled for plenary
body
EP
docs
url: https://www.europarl.europa.eu/doceo/document/A-9-2024-0166_EN.html title: A9-0166/2024
procedure/Other legal basis
Rules of Procedure EP 159
procedure/stage_reached
Old
Awaiting committee decision
New
Awaiting Parliament's position on the draft budget
commission
  • body: EC dg: Budget commissioner: SCHMIT Nicolas
docs/3
date
2024-04-09T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/A-9-2024-0166_EN.html title: A9-0166/2024
type
Budgetary report tabled for plenary, 1st reading
body
EP
events/2
date
2024-04-08T00:00:00
type
Vote in committee
body
EP
events/3
date
2024-04-09T00:00:00
type
Budgetary report tabled for plenary
body
EP
docs
url: https://www.europarl.europa.eu/doceo/document/A-9-2024-0166_EN.html title: A9-0166/2024
procedure/Other legal basis
Rules of Procedure EP 159
procedure/stage_reached
Old
Awaiting committee decision
New
Awaiting Parliament's position on the draft budget
commission
  • body: EC dg: Budget commissioner: SCHMIT Nicolas
docs/3
date
2024-04-09T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/A-9-2024-0166_EN.html title: A9-0166/2024
type
Budgetary report tabled for plenary, 1st reading
body
EP
events/2
date
2024-04-08T00:00:00
type
Vote in committee
body
EP
events/3
date
2024-04-09T00:00:00
type
Budgetary report tabled for plenary
body
EP
docs
url: https://www.europarl.europa.eu/doceo/document/A-9-2024-0166_EN.html title: A9-0166/2024
procedure/Other legal basis
Rules of Procedure EP 159
procedure/stage_reached
Old
Awaiting committee decision
New
Awaiting Parliament's position on the draft budget
commission
  • body: EC dg: Budget commissioner: SCHMIT Nicolas
docs/3
date
2024-04-09T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/A-9-2024-0166_EN.html title: A9-0166/2024
type
Budgetary report tabled for plenary, 1st reading
body
EP
events/2
date
2024-04-08T00:00:00
type
Vote in committee
body
EP
events/3
date
2024-04-09T00:00:00
type
Budgetary report tabled for plenary
body
EP
docs
url: https://www.europarl.europa.eu/doceo/document/A-9-2024-0166_EN.html title: A9-0166/2024
procedure/Other legal basis
Rules of Procedure EP 159
procedure/stage_reached
Old
Awaiting committee decision
New
Awaiting Parliament's position on the draft budget
committees/2/opinion
False
docs/0
date
2024-02-29T00:00:00
docs
type
Non-legislative basic document
body
EC
docs/1
date
2024-03-19T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/EMPL-AL-759834_EN.html title: PE759.834
committee
EMPL
type
Specific opinion
body
EP
docs/2
date
2024-03-26T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/BUDG-AM-759851_EN.html title: PE759.851
type
Amendments tabled in committee
body
EP
events/0/summary
  • PURPOSE: to mobilise the European Globalisation Adjustment Fund (EGF) to support Germany in the face of redundancies in the metal manufacturing sector.
  • PROPOSED ACT: Decision of the European Parliament and of the Council.
  • CONTENT: on 15 November 2023, Germany submitted an application for a financial contribution from the EGF, following displacements in Vallourec (Vallourec Deutschland GmbH (VAD)) in Germany.
  • Following the assessment of this application, the Commission concluded, in accordance with all the relevant provisions of the EGF Regulation, that the conditions for a financial contribution from the EGF are met.
  • Grounds for the application
  • Germany submitted the application under the intervention criteria of Article 4(2), point (a), of EGF Regulation, which requires the cessation of activity of at least 200 displaced workers over a reference period of four months in an enterprise in a Member State.
  • The application relates to 1 518 displaced workers whose activity has ceased in Vallourec (Vallourec Deutschland GmbH (VAD)). This enterprise operates in the economic sector classified under the NACE Revision 2 division 24 (Manufacture of basic metals). The reference period of four months for the application runs from 26 April 2023 to 26 August 2023.
  • Events leading to the displacements and cessation of operations
  • The enterprise, Vallourec Deutschland GmbH (VAD), is the German subsidiary of Vallourec S.A, France. The enterprise manufactured seamless hot-rolled steel tubes at its two steel mills in Germany, namely in the neighbouring cities of Düsseldorf and Mülheim an der Ruhr. The steel mills, previously known as Mannesmannröhren-Werke AG, were founded in 1899 and 1966, respectively.
  • The enterprise had been reporting losses since 2014, and, as a consequence, responded by several restructuring and downsizing measures. In 2018, the VAD Recovery Plan was launched, with the aim of leading to substantial savings by 2020. Despite some success, the economic situation following the Covid-19 pandemic resulted in further difficulties for the German tube mills. Since 2015, more than 1 400 jobs were already lost due to restructuring.
  • On 17 November 2021, the supervisory board of Vallourec S.A. decided to sell the German tube mills, and to offshore production to Brazil.
  • Even though Vallourec S.A. received offers from potential buyers, none of the offers proved viable. On 18 May 2022, the supervisory board declared that all attempts to sell the production sites had failed. This meant the definitive closure of the sites, as no successor to operate the facilities could be found.
  • Production will continue until the offshoring process is completed. Therefore, it has been decided to close the sites in three phases. A first batch of workers has left the company by 1 January 2024, a second batch will leave by 1 July 2024, and the third batch by 1 January 2025.
  • The enterprise will continue activities in Germany, but only as a sales company.
  • Beneficiaries
  • An estimated 835 redundant workers are expected to participate in the following measures.
  • The personalised services to be provided to the redundant workers include the following actions: (i) upskilling measures; (ii) guidance counselling and vocational orientation/activation measures; (iii) business start-up advisory services; (iv) business start-up grants; (iv) job search assistance; (v) upskilling incentives; (vi) training allowance; (vii) digital basic skills.
  • Germany has informed about activities already undertaken for the assistance of the displaced workers.
  • The estimated total costs are EUR 4 974 379, comprising expenditure for personalised services of EUR 4 783 057 and expenditure for preparatory, management, information and publicity, control and reporting activities of EUR 191 322.
  • Budgetary proposal
  • The EGF should not exceed a maximum annual amount of EUR 186 million (in 2018 prices), as laid down in Council Regulation (EU, Euratom) No 2020/2093 laying down the multiannual financial framework for the years 2021 to 2027.
  • Having examined the application, the Commission proposes to mobilise the EGF for the amount of EUR 2 984 627, representing 60 % of the total costs of the proposed measures, in order to provide a financial contribution for the application.
committees/2/opinion
False
docs/0
date
2024-02-29T00:00:00
docs
type
Non-legislative basic document
body
EC
docs/1
date
2024-03-19T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/EMPL-AL-759834_EN.html title: PE759.834
committee
EMPL
type
Specific opinion
body
EP
events/0/summary
  • PURPOSE: to mobilise the European Globalisation Adjustment Fund (EGF) to support Germany in the face of redundancies in the metal manufacturing sector.
  • PROPOSED ACT: Decision of the European Parliament and of the Council.
  • CONTENT: on 15 November 2023, Germany submitted an application for a financial contribution from the EGF, following displacements in Vallourec (Vallourec Deutschland GmbH (VAD)) in Germany.
  • Following the assessment of this application, the Commission concluded, in accordance with all the relevant provisions of the EGF Regulation, that the conditions for a financial contribution from the EGF are met.
  • Grounds for the application
  • Germany submitted the application under the intervention criteria of Article 4(2), point (a), of EGF Regulation, which requires the cessation of activity of at least 200 displaced workers over a reference period of four months in an enterprise in a Member State.
  • The application relates to 1 518 displaced workers whose activity has ceased in Vallourec (Vallourec Deutschland GmbH (VAD)). This enterprise operates in the economic sector classified under the NACE Revision 2 division 24 (Manufacture of basic metals). The reference period of four months for the application runs from 26 April 2023 to 26 August 2023.
  • Events leading to the displacements and cessation of operations
  • The enterprise, Vallourec Deutschland GmbH (VAD), is the German subsidiary of Vallourec S.A, France. The enterprise manufactured seamless hot-rolled steel tubes at its two steel mills in Germany, namely in the neighbouring cities of Düsseldorf and Mülheim an der Ruhr. The steel mills, previously known as Mannesmannröhren-Werke AG, were founded in 1899 and 1966, respectively.
  • The enterprise had been reporting losses since 2014, and, as a consequence, responded by several restructuring and downsizing measures. In 2018, the VAD Recovery Plan was launched, with the aim of leading to substantial savings by 2020. Despite some success, the economic situation following the Covid-19 pandemic resulted in further difficulties for the German tube mills. Since 2015, more than 1 400 jobs were already lost due to restructuring.
  • On 17 November 2021, the supervisory board of Vallourec S.A. decided to sell the German tube mills, and to offshore production to Brazil.
  • Even though Vallourec S.A. received offers from potential buyers, none of the offers proved viable. On 18 May 2022, the supervisory board declared that all attempts to sell the production sites had failed. This meant the definitive closure of the sites, as no successor to operate the facilities could be found.
  • Production will continue until the offshoring process is completed. Therefore, it has been decided to close the sites in three phases. A first batch of workers has left the company by 1 January 2024, a second batch will leave by 1 July 2024, and the third batch by 1 January 2025.
  • The enterprise will continue activities in Germany, but only as a sales company.
  • Beneficiaries
  • An estimated 835 redundant workers are expected to participate in the following measures.
  • The personalised services to be provided to the redundant workers include the following actions: (i) upskilling measures; (ii) guidance counselling and vocational orientation/activation measures; (iii) business start-up advisory services; (iv) business start-up grants; (iv) job search assistance; (v) upskilling incentives; (vi) training allowance; (vii) digital basic skills.
  • Germany has informed about activities already undertaken for the assistance of the displaced workers.
  • The estimated total costs are EUR 4 974 379, comprising expenditure for personalised services of EUR 4 783 057 and expenditure for preparatory, management, information and publicity, control and reporting activities of EUR 191 322.
  • Budgetary proposal
  • The EGF should not exceed a maximum annual amount of EUR 186 million (in 2018 prices), as laid down in Council Regulation (EU, Euratom) No 2020/2093 laying down the multiannual financial framework for the years 2021 to 2027.
  • Having examined the application, the Commission proposes to mobilise the EGF for the amount of EUR 2 984 627, representing 60 % of the total costs of the proposed measures, in order to provide a financial contribution for the application.
committees/2/opinion
False
docs/0
date
2024-02-29T00:00:00
docs
type
Non-legislative basic document
body
EC
docs/1
date
2024-03-19T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/EMPL-AL-759834_EN.html title: PE759.834
committee
EMPL
type
Specific opinion
body
EP
events/0/summary
  • PURPOSE: to mobilise the European Globalisation Adjustment Fund (EGF) to support Germany in the face of redundancies in the metal manufacturing sector.
  • PROPOSED ACT: Decision of the European Parliament and of the Council.
  • CONTENT: on 15 November 2023, Germany submitted an application for a financial contribution from the EGF, following displacements in Vallourec (Vallourec Deutschland GmbH (VAD)) in Germany.
  • Following the assessment of this application, the Commission concluded, in accordance with all the relevant provisions of the EGF Regulation, that the conditions for a financial contribution from the EGF are met.
  • Grounds for the application
  • Germany submitted the application under the intervention criteria of Article 4(2), point (a), of EGF Regulation, which requires the cessation of activity of at least 200 displaced workers over a reference period of four months in an enterprise in a Member State.
  • The application relates to 1 518 displaced workers whose activity has ceased in Vallourec (Vallourec Deutschland GmbH (VAD)). This enterprise operates in the economic sector classified under the NACE Revision 2 division 24 (Manufacture of basic metals). The reference period of four months for the application runs from 26 April 2023 to 26 August 2023.
  • Events leading to the displacements and cessation of operations
  • The enterprise, Vallourec Deutschland GmbH (VAD), is the German subsidiary of Vallourec S.A, France. The enterprise manufactured seamless hot-rolled steel tubes at its two steel mills in Germany, namely in the neighbouring cities of Düsseldorf and Mülheim an der Ruhr. The steel mills, previously known as Mannesmannröhren-Werke AG, were founded in 1899 and 1966, respectively.
  • The enterprise had been reporting losses since 2014, and, as a consequence, responded by several restructuring and downsizing measures. In 2018, the VAD Recovery Plan was launched, with the aim of leading to substantial savings by 2020. Despite some success, the economic situation following the Covid-19 pandemic resulted in further difficulties for the German tube mills. Since 2015, more than 1 400 jobs were already lost due to restructuring.
  • On 17 November 2021, the supervisory board of Vallourec S.A. decided to sell the German tube mills, and to offshore production to Brazil.
  • Even though Vallourec S.A. received offers from potential buyers, none of the offers proved viable. On 18 May 2022, the supervisory board declared that all attempts to sell the production sites had failed. This meant the definitive closure of the sites, as no successor to operate the facilities could be found.
  • Production will continue until the offshoring process is completed. Therefore, it has been decided to close the sites in three phases. A first batch of workers has left the company by 1 January 2024, a second batch will leave by 1 July 2024, and the third batch by 1 January 2025.
  • The enterprise will continue activities in Germany, but only as a sales company.
  • Beneficiaries
  • An estimated 835 redundant workers are expected to participate in the following measures.
  • The personalised services to be provided to the redundant workers include the following actions: (i) upskilling measures; (ii) guidance counselling and vocational orientation/activation measures; (iii) business start-up advisory services; (iv) business start-up grants; (iv) job search assistance; (v) upskilling incentives; (vi) training allowance; (vii) digital basic skills.
  • Germany has informed about activities already undertaken for the assistance of the displaced workers.
  • The estimated total costs are EUR 4 974 379, comprising expenditure for personalised services of EUR 4 783 057 and expenditure for preparatory, management, information and publicity, control and reporting activities of EUR 191 322.
  • Budgetary proposal
  • The EGF should not exceed a maximum annual amount of EUR 186 million (in 2018 prices), as laid down in Council Regulation (EU, Euratom) No 2020/2093 laying down the multiannual financial framework for the years 2021 to 2027.
  • Having examined the application, the Commission proposes to mobilise the EGF for the amount of EUR 2 984 627, representing 60 % of the total costs of the proposed measures, in order to provide a financial contribution for the application.
committees/2/opinion
False
docs/0
date
2024-02-29T00:00:00
docs
type
Non-legislative basic document
body
EC
docs/1
date
2024-03-19T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/EMPL-AL-759834_EN.html title: PE759.834
committee
EMPL
type
Specific opinion
body
EP
events/0/summary
  • PURPOSE: to mobilise the European Globalisation Adjustment Fund (EGF) to support Germany in the face of redundancies in the metal manufacturing sector.
  • PROPOSED ACT: Decision of the European Parliament and of the Council.
  • CONTENT: on 15 November 2023, Germany submitted an application for a financial contribution from the EGF, following displacements in Vallourec (Vallourec Deutschland GmbH (VAD)) in Germany.
  • Following the assessment of this application, the Commission concluded, in accordance with all the relevant provisions of the EGF Regulation, that the conditions for a financial contribution from the EGF are met.
  • Grounds for the application
  • Germany submitted the application under the intervention criteria of Article 4(2), point (a), of EGF Regulation, which requires the cessation of activity of at least 200 displaced workers over a reference period of four months in an enterprise in a Member State.
  • The application relates to 1 518 displaced workers whose activity has ceased in Vallourec (Vallourec Deutschland GmbH (VAD)). This enterprise operates in the economic sector classified under the NACE Revision 2 division 24 (Manufacture of basic metals). The reference period of four months for the application runs from 26 April 2023 to 26 August 2023.
  • Events leading to the displacements and cessation of operations
  • The enterprise, Vallourec Deutschland GmbH (VAD), is the German subsidiary of Vallourec S.A, France. The enterprise manufactured seamless hot-rolled steel tubes at its two steel mills in Germany, namely in the neighbouring cities of Düsseldorf and Mülheim an der Ruhr. The steel mills, previously known as Mannesmannröhren-Werke AG, were founded in 1899 and 1966, respectively.
  • The enterprise had been reporting losses since 2014, and, as a consequence, responded by several restructuring and downsizing measures. In 2018, the VAD Recovery Plan was launched, with the aim of leading to substantial savings by 2020. Despite some success, the economic situation following the Covid-19 pandemic resulted in further difficulties for the German tube mills. Since 2015, more than 1 400 jobs were already lost due to restructuring.
  • On 17 November 2021, the supervisory board of Vallourec S.A. decided to sell the German tube mills, and to offshore production to Brazil.
  • Even though Vallourec S.A. received offers from potential buyers, none of the offers proved viable. On 18 May 2022, the supervisory board declared that all attempts to sell the production sites had failed. This meant the definitive closure of the sites, as no successor to operate the facilities could be found.
  • Production will continue until the offshoring process is completed. Therefore, it has been decided to close the sites in three phases. A first batch of workers has left the company by 1 January 2024, a second batch will leave by 1 July 2024, and the third batch by 1 January 2025.
  • The enterprise will continue activities in Germany, but only as a sales company.
  • Beneficiaries
  • An estimated 835 redundant workers are expected to participate in the following measures.
  • The personalised services to be provided to the redundant workers include the following actions: (i) upskilling measures; (ii) guidance counselling and vocational orientation/activation measures; (iii) business start-up advisory services; (iv) business start-up grants; (iv) job search assistance; (v) upskilling incentives; (vi) training allowance; (vii) digital basic skills.
  • Germany has informed about activities already undertaken for the assistance of the displaced workers.
  • The estimated total costs are EUR 4 974 379, comprising expenditure for personalised services of EUR 4 783 057 and expenditure for preparatory, management, information and publicity, control and reporting activities of EUR 191 322.
  • Budgetary proposal
  • The EGF should not exceed a maximum annual amount of EUR 186 million (in 2018 prices), as laid down in Council Regulation (EU, Euratom) No 2020/2093 laying down the multiannual financial framework for the years 2021 to 2027.
  • Having examined the application, the Commission proposes to mobilise the EGF for the amount of EUR 2 984 627, representing 60 % of the total costs of the proposed measures, in order to provide a financial contribution for the application.
committees/2/opinion
False
docs/0
date
2024-02-29T00:00:00
docs
type
Non-legislative basic document
body
EC
docs/1
date
2024-03-19T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/EMPL-AL-759834_EN.html title: PE759.834
committee
EMPL
type
Specific opinion
body
EP
events/0/summary
  • PURPOSE: to mobilise the European Globalisation Adjustment Fund (EGF) to support Germany in the face of redundancies in the metal manufacturing sector.
  • PROPOSED ACT: Decision of the European Parliament and of the Council.
  • CONTENT: on 15 November 2023, Germany submitted an application for a financial contribution from the EGF, following displacements in Vallourec (Vallourec Deutschland GmbH (VAD)) in Germany.
  • Following the assessment of this application, the Commission concluded, in accordance with all the relevant provisions of the EGF Regulation, that the conditions for a financial contribution from the EGF are met.
  • Grounds for the application
  • Germany submitted the application under the intervention criteria of Article 4(2), point (a), of EGF Regulation, which requires the cessation of activity of at least 200 displaced workers over a reference period of four months in an enterprise in a Member State.
  • The application relates to 1 518 displaced workers whose activity has ceased in Vallourec (Vallourec Deutschland GmbH (VAD)). This enterprise operates in the economic sector classified under the NACE Revision 2 division 24 (Manufacture of basic metals). The reference period of four months for the application runs from 26 April 2023 to 26 August 2023.
  • Events leading to the displacements and cessation of operations
  • The enterprise, Vallourec Deutschland GmbH (VAD), is the German subsidiary of Vallourec S.A, France. The enterprise manufactured seamless hot-rolled steel tubes at its two steel mills in Germany, namely in the neighbouring cities of Düsseldorf and Mülheim an der Ruhr. The steel mills, previously known as Mannesmannröhren-Werke AG, were founded in 1899 and 1966, respectively.
  • The enterprise had been reporting losses since 2014, and, as a consequence, responded by several restructuring and downsizing measures. In 2018, the VAD Recovery Plan was launched, with the aim of leading to substantial savings by 2020. Despite some success, the economic situation following the Covid-19 pandemic resulted in further difficulties for the German tube mills. Since 2015, more than 1 400 jobs were already lost due to restructuring.
  • On 17 November 2021, the supervisory board of Vallourec S.A. decided to sell the German tube mills, and to offshore production to Brazil.
  • Even though Vallourec S.A. received offers from potential buyers, none of the offers proved viable. On 18 May 2022, the supervisory board declared that all attempts to sell the production sites had failed. This meant the definitive closure of the sites, as no successor to operate the facilities could be found.
  • Production will continue until the offshoring process is completed. Therefore, it has been decided to close the sites in three phases. A first batch of workers has left the company by 1 January 2024, a second batch will leave by 1 July 2024, and the third batch by 1 January 2025.
  • The enterprise will continue activities in Germany, but only as a sales company.
  • Beneficiaries
  • An estimated 835 redundant workers are expected to participate in the following measures.
  • The personalised services to be provided to the redundant workers include the following actions: (i) upskilling measures; (ii) guidance counselling and vocational orientation/activation measures; (iii) business start-up advisory services; (iv) business start-up grants; (iv) job search assistance; (v) upskilling incentives; (vi) training allowance; (vii) digital basic skills.
  • Germany has informed about activities already undertaken for the assistance of the displaced workers.
  • The estimated total costs are EUR 4 974 379, comprising expenditure for personalised services of EUR 4 783 057 and expenditure for preparatory, management, information and publicity, control and reporting activities of EUR 191 322.
  • Budgetary proposal
  • The EGF should not exceed a maximum annual amount of EUR 186 million (in 2018 prices), as laid down in Council Regulation (EU, Euratom) No 2020/2093 laying down the multiannual financial framework for the years 2021 to 2027.
  • Having examined the application, the Commission proposes to mobilise the EGF for the amount of EUR 2 984 627, representing 60 % of the total costs of the proposed measures, in order to provide a financial contribution for the application.
committees/2/opinion
False
docs/2
date
2024-03-19T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/EMPL-AL-759834_EN.html title: PE759.834
committee
EMPL
type
Specific opinion
body
EP
docs/2
date
2024-03-19T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/EMPL-AL-759834_EN.html title: PE759.834
committee
EMPL
type
Specific opinion
body
EP
docs/2
date
2024-03-19T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/EMPL-AL-759834_EN.html title: PE759.834
committee
EMPL
type
Specific opinion
body
EP
docs/1
date
2024-03-05T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/BUDG-PR-759759_EN.html title: PE759.759
type
Committee draft report
body
EP
committees/1/rapporteur
  • name: PÎSLARU Dragoş date: 2024-03-05T00:00:00 group: Renew Europe group abbr: Renew
committees/0
type
Responsible Committee
body
EP
committee_full
Budgets
committee
BUDG
associated
False
rapporteur
name: GEIER Jens date: 2024-02-29T00:00:00 group: Group of Progressive Alliance of Socialists and Democrats abbr: S&D
shadows
committees/0
type
Responsible Committee
body
EP
committee_full
Budgets
committee
BUDG
associated
False
docs/0/docs/0
url
https://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2024&nu_doc=0030
title
EUR-Lex
events/0/docs/0
url
https://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2024&nu_doc=0030
title
EUR-Lex
events/1
date
2024-02-29T00:00:00
type
Committee referral announced in Parliament
body
EP
forecasts
  • date: 2024-04-22T00:00:00 title: Indicative plenary sitting date
procedure/dossier_of_the_committee
  • BUDG/9/14305
procedure/stage_reached
Old
Preparatory phase in Parliament
New
Awaiting committee decision