BETA


2024/0056(BUD) Amending budget 1/2024: amendments required due to the MFF revision

Progress: Procedure completed

RoleCommitteeRapporteurShadows
Lead BUDG MUREŞAN Siegfried (icon: EPP EPP) NEGRESCU Victor (icon: S&D S&D), KELLER Fabienne (icon: Renew Renew), ANDRESEN Rasmus (icon: Verts/ALE Verts/ALE), RZOŃCA Bogdan (icon: ECR ECR), PAPADIMOULIS Dimitrios (icon: GUE/NGL GUE/NGL)
Committee Opinion AFET
Committee Opinion DEVE
Committee Opinion EMPL
Committee Opinion ITRE
Committee Opinion IMCO
Committee Opinion REGI
Committee Opinion LIBE
Lead committee dossier:

Events

2024/06/14
   Final act published in Official Journal
Details

PURPOSE: to adopt amending budget (AB) No 1 to the 2024 budget which reflects the impact of the revision of the Multiannual Financial Framework (MFF) on the 2024 financial year.

LEGISLATIVE ACT: Definitive adoption (EU, Euratom) 2024/1430 of Amending budget No 1 of the European Union for the financial year 2024.

CONTENT: amending budget No 1 to the 2024 budget is focused on including in the 2024 budget the necessary changes stemming from the recently agreed MFF revision. It increases expenditure by EUR 5.83 billion in commitment appropriations and EUR 4.14 billion in payment appropriations.

This amended budget will enable the Union to continue delivering this year on the EU's common priorities, for the benefit of European citizens and beyond. In particular, it will reinforce support to Ukraine, boost investments in critical technologies and defence, and provide additional resources to support partners in the Western Balkans.

With the adoption of this Draft amending budget, the 2024 Union budget will be more fit for purpose, more flexible and better equipped to meet the challenges the Union faces.

This amendment of the annual EU budget 2024 covers the following elements:

- reinforcement of the Ukraine Facility and mobilisation of the Ukrainian Reserve , with an amount of EUR 4.8 billion ;

- reinforcement of the European Defence Fund within the framework of the Strategic Technologies for Europe Platform (STEP) by EUR 376 million ;

- reinforcement of the European Solidarity Reserve and the Emergency Aid Reserve (former Solidarity and Emergency Aid Reserve) by EUR 365 million ;

- reinforcement of the Reform and Growth Facility for the Western Balkans , by EUR 501 million ;

- adaptation of the reserve for the European Globalisation Adjustment Fund for Displaced Workers to actual needs in recent years.

2024/04/25
   EP - Decision by Parliament
Details

The European Parliament adopted by 465 votes to 53, with 16 abstentions, a resolution on the Council position on Draft amending budget No 1/2024 of the European Union for the financial year 2024 Amendments of the 2024 budget required due to the MFF revision.

Parliament approved the Council position on the draft amending budget No 1/2024.

MFF revision

Draft amending budget No 1/2024 is focused on including in the 2024 budget the necessary changes stemming from the recently agreed MFF revision. It increases expenditure by EUR 5 833.7 million in commitment appropriations and EUR 4 143.6 million in payment appropriations.

With the adoption of this Draft amending budget, the 2024 Union budget will be more fit for purpose, more flexible and better equipped to meet the challenges the Union faces.

Ukraine reserve

Parliament welcomed the proposal to mobilise EUR 4.8 billion from the newly created Ukraine Reserve to enable the payment of grants to Ukraine. The payment of loans does not require an amending budget and therefore that the Union is already providing support to the Ukrainian government so that it can maintain essential services. The grant- and loan-based financial support through the Ukraine Facility will help to keep the state and essential services functioning, while supporting Ukraine on its path to reconstruction, recovery, reform and membership of the Union.

European Defence Fund

The resolution welcomed the EUR 376 million reinforcement for the European Defence Fund (EDF) in 2024, resulting from the Strategic Technologies for Europe Platform (STEP) Regulation(10); notes that, in contrast to the legislative financial statement annexed to the STEP proposal, the Commission now considers that no additional payment appropriations are required in 2024.

On 5 March 2024, the Commission put forward a proposal to establish a new defence programme - the European Defence Industry Programme - for the period 2025-2027, with a planned transfer of EUR 1.5 billion from the EDF, precisely the amount of the EDF reinforcement agreed under STEP. Parliament insisted that the additional resources assigned to the EDF for the remainder of the MFF period be used for STEP objectives as per the agreement of the co-legislators.

Western Balkans

The resolution welcomed the additional EUR 500 million for the Western Balkans, placed in reserve subject to the adoption of the proposed regulation establishing the Reform and Growth Facility for the Western Balkans. Parliament intends, with the Council, to review the nomenclature as part of the 2025 budgetary procedure in order to ensure appropriate political and budgetary scrutiny.

Emergency Aid Reserve

The Union will be better able to respond to crises as a result of the increased financing for natural disasters and other emergencies included in Draft amending budget No 1/2024. This Draft amending budget creates new lines in accordance with the decision to split the Solidarity and Emergency Aid Reserve into two parts - the European Solidarity Reserve for natural disasters and public health emergencies within the Union and in accession countries and the Emergency Aid Reserve for rapid response to emergencies inside and outside the Union. This new architecture will make the funds easier to manage.

Humanitarian aid

Recalling that humanitarian aid for Ukraine is not covered by the Ukraine Facility, Parliament called on the Commission to monitor humanitarian aid needs closely and to propose any necessary measures to the budgetary authority in good time. In this regard, the Flexibility Instrument has been reinforced by around EUR 500 million for 2024 as part of the MFF revision.

European Globalisation Adjustment Fund

Parliament noted that the 2024 allocation for the European Globalisation Adjustment Fund for Displaced Workers (EGF) is reduced to EUR 33.8 million, in accordance with the revised MFF Regulation. The Commission is called on to monitor EGF implementation and for all institutions to take any necessary measures to ensure that all justified requests for EGF support, as a manifestation of Union solidarity, can be met.

Artificial Intelligence Act (AI Office)

Members noted the changes to the budgetary remarks to enable the Digital Europe programme to finance the costs of recruiting contractual agents for the Artificial Intelligence Office established under the recently agreed Artificial Intelligence Act. They insisted that covering staffing costs for the new Office in this manner is acceptable only as a temporary fix and does not constitute a precedent, that a long-term structural solution under Heading 7 must be found beyond the current MFF.

Documents
2024/04/10
   EP - Budgetary report tabled for plenary, 1st reading
Documents
2024/04/10
   EP - Committee referral announced in Parliament
2024/04/10
   EP - Budgetary report tabled for plenary
Documents
2024/04/08
   EP - Vote in committee
2024/03/25
   EP - Amendments tabled in committee
Documents
2024/03/19
   CSL - Council position on draft budget
Documents
2024/03/19
   CSL - Council position on draft budget published
Documents
2024/03/19
   CSL - Draft budget approved by Council
2024/03/13
   EP - Committee draft report
Documents
2024/02/29
   EC - Commission draft budget published
Details

PURPOSE: presentation of draft amending budget 1/2024 (DAB 1/2024) reflecting the impact of the revision of the Multiannual Financial Framework (MFF) on the 2024 financial year.

CONTENT: the purpose of Draft Amending Budget No 1 for the year 2024 is to introduce the necessary changes to the 2024 budget stemming from the revision of the Multiannual Financial Framework.

The revision of the MFF Regulation applies retroactively as of 1st January 2024 and includes inter alia amendments to the MFF ceilings.

In order to reflect the impact of the MFF revision on the financial year 2024, DAB 1 covers the following elements:

Ukraine Facility

The revised Multiannual Financial Framework Regulation creates a new special instrument - the Ukraine Reserve - for the period 2024-2027 for the sole purpose of financing the new Ukraine Facility. The latter aims to support Ukraine's efforts to sustain macro-financial stability, support reconstruction as well as modernise the country whilst implementing key reforms on its EU accession track.

The Commission proposes to make the necessary adjustments to the budget nomenclature and budget remarks and proposes to mobilise the Ukraine facility in this DAB. This includes creating eight new budget lines. It is proposed to mobilise an amount of EUR 4 767.5 million of commitment appropriations and EUR 3 754.8 million of payment appropriations.

European Defence Fund (EDF) within the Strategic Technologies for Europe Platform (STEP)

In order to boost the defence investment capacity contributing to the STEP objectives, the revision of the Multiannual Financial Framework includes an increase of EUR 1.5 billion for the remainder of the MFF, for which an increase of EUR 376 million of commitment appropriations in 2024 is proposed, split between both strands of the programme (i.e. defence research, and capability development).

European Solidarity Reserve and Emergency Aid Reserve

Following the revision of the Multiannual Financial Framework, the Solidary and Emergency Aid Reserve (SEAR) has been split in two separate instruments retroactively as of 1st January 2024:

- the European Solidarity Reserve (ESR) with an annual amount of EUR 1 016 million (in 2018 prices, corresponding to EUR 1 144.2 million in 2024 prices) for assistance to respond to emergency situations covered by the European Union Solidarity Fund (EUSF);

- the Emergency Aid Reserve (EAR) with an annual amount of EUR 508 million (in 2018 prices, corresponding to EUR 572.1 million in 2024 prices) for rapid responses to specific emergency needs within the Union or in third countries.

Reform and Growth Facility for the Western Balkans

The revision of the MFF includes the additional allocation for Western Balkans, which will be implemented through a new Reform and Growth Facility for the Western Balkans.

The Commission proposes to make the necessary adjustments to the budget nomenclature, budget remarks and level of appropriations in this DAB 1. Three new budget lines are to be created.

Additionally, it is proposed to include and allocate an amount of EUR 501 million of commitment appropriations and EUR 23.9 million of payment appropriations in reserve pending the adoption of the legal basis.

European Globalisation Adjustment Fund

The revision of the MFF foresees a reduction of the annual allocation of EGF for the period 2024-27, which should not exceed a maximum amount of EUR 30 million (in 2018 prices, corresponding to EUR 33.8 million in 2024 prices). Consequently, a reduction of commitment appropriations in 2024 by EUR 175.7 million is proposed.

Artificial Intelligence Act (AI Office)

Additionally, DAB 1 includes an adjustment to the budget remarks of the budget line for support expenditure of the Digital Europe Programme following the political agreement reached in December 2023 by the European Parliament and the Council on the establishment of the Artificial Intelligence Office.

The establishment of the Artificial Intelligence Office necessitates a larger set of tasks and responsibilities as initially set out. Therefore, increased staffing levels, and subsequently costs, are required to be able to effectively deliver on those tasks.

Financing

Overall, the net impact of DAB 1 on expenditure amounts to an increase of EUR 5 833.7 million in commitment appropriations and EUR 4 143.6 million of payment appropriations.

2024/02/05
   EP - MUREŞAN Siegfried (EPP) appointed as rapporteur in BUDG

Documents

  • Decision by Parliament: T9-0374/2024
  • Budgetary report tabled for plenary, 1st reading: A9-0174/2024
  • Budgetary report tabled for plenary: A9-0174/2024
  • Amendments tabled in committee: PE759.975
  • Council position on draft budget: 07432/2024
  • Council position on draft budget published: 07432/2024
  • Committee draft report: PE759.895
  • Commission draft budget published: COM(2024)0080
  • Commission draft budget published: EUR-Lex
  • Committee draft report: PE759.895
  • Council position on draft budget: 07432/2024
  • Amendments tabled in committee: PE759.975
  • Budgetary report tabled for plenary, 1st reading: A9-0174/2024

Votes

A9-0174/2024 – Siegfried Mureşan – Motion for a resolution #

2024/04/25 Outcome: +: 465, -: 53, 0: 16
DE ES PL IT FR NL SE RO CZ BG FI BE HU AT LT HR SK PT DK IE LV SI LU EE MT EL
Total
84
51
42
39
67
24
19
18
21
12
12
18
10
14
9
12
12
14
11
12
8
6
6
7
1
5
icon: PPE PPE
134

Finland PPE

2

Belgium PPE

2
3

Denmark PPE

For (1)

1

Luxembourg PPE

2

Estonia PPE

For (1)

1
icon: S&D S&D
100

Czechia S&D

For (1)

1

Bulgaria S&D

3

Belgium S&D

1

Lithuania S&D

2

Slovakia S&D

For (1)

1

Denmark S&D

2

Latvia S&D

2

Luxembourg S&D

For (1)

1

Estonia S&D

2

Malta S&D

1
icon: Renew Renew
91

Poland Renew

1

Sweden Renew

2

Bulgaria Renew

2

Finland Renew

3

Austria Renew

For (1)

1

Lithuania Renew

1

Croatia Renew

For (1)

1

Ireland Renew

2

Latvia Renew

For (1)

1

Slovenia Renew

2

Luxembourg Renew

2

Estonia Renew

3

Greece Renew

1
icon: Verts/ALE Verts/ALE
59

Spain Verts/ALE

2

Poland Verts/ALE

For (1)

1

Italy Verts/ALE

For (1)

1

Netherlands Verts/ALE

3

Sweden Verts/ALE

2

Czechia Verts/ALE

3

Finland Verts/ALE

3

Belgium Verts/ALE

3

Austria Verts/ALE

2

Lithuania Verts/ALE

2

Portugal Verts/ALE

1

Denmark Verts/ALE

For (1)

1

Ireland Verts/ALE

2

Luxembourg Verts/ALE

For (1)

1
icon: ECR ECR
48

Germany ECR

1

France ECR

Abstain (1)

1

Netherlands ECR

Abstain (1)

2

Romania ECR

1

Bulgaria ECR

2

Finland ECR

1

Croatia ECR

1

Slovakia ECR

For (1)

1

Latvia ECR

For (1)

1
icon: NI NI
32

Germany NI

For (1)

3

Spain NI

1

France NI

2

Netherlands NI

Against (1)

1

Romania NI

For (1)

1

Czechia NI

Against (1)

1

Belgium NI

For (1)

1

Croatia NI

2

Latvia NI

Against (1)

1

Greece NI

For (1)

3
icon: The Left The Left
27

Germany The Left

Against (1)

4

Sweden The Left

For (1)

1

Czechia The Left

Against (1)

1

Finland The Left

For (1)

1

Belgium The Left

Against (1)

1

Portugal The Left

3

Denmark The Left

Abstain (1)

1

Ireland The Left

For (1)

Against (2)

Abstain (1)

4

Greece The Left

1
icon: ID ID
43

Czechia ID

Against (1)

1

Austria ID

Against (2)

2

Denmark ID

Against (1)

1

Estonia ID

Against (1)

1
AmendmentsDossier
20 2024/0056(BUD)
2024/03/25 BUDG 20 amendments...
source: 759.975

History

(these mark the time of scraping, not the official date of the change)

events/0
date
2024-02-29T00:00:00
type
Commission draft budget published
body
EC
docs
summary
events/0
date
2024-02-29T00:00:00
type
Commission draft budget published
body
EC
docs
summary
events/2
date
2024-03-19T00:00:00
type
Draft budget approved by Council
body
CSL
procedure/stage_reached
Old
Awaiting budgetary conciliation convocation
New
Procedure completed
events/6
date
2024-06-14T00:00:00
type
Final act published in Official Journal
summary
procedure/Other legal basis
Old
Rules of Procedure EP 159
New
Rules of Procedure EP 165
procedure/final
title
Corrigendum to final act 32024B1430R(01)
url
https://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexapi!prod!CELEXnumdoc&lg=EN&model=guicheti&numdoc=32024B1430R(01)
procedure/title
Old
Draft amending budget 1/2024: amendments required due to the MFF revision
New
Amending budget 1/2024: amendments required due to the MFF revision
events/6
date
2024-06-14T00:00:00
type
Final act published in Official Journal
summary
procedure/Other legal basis
Old
Rules of Procedure EP 159
New
Rules of Procedure EP 165
procedure/final
title
Corrigendum to final act 32024B1430R(01)
url
https://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexapi!prod!CELEXnumdoc&lg=EN&model=guicheti&numdoc=32024B1430R(01)
procedure/title
Old
Draft amending budget 1/2024: amendments required due to the MFF revision
New
Amending budget 1/2024: amendments required due to the MFF revision
events/6
date
2024-06-14T00:00:00
type
Final act published in Official Journal
summary
procedure/Other legal basis
Old
Rules of Procedure EP 159
New
Rules of Procedure EP 165
procedure/final
title
Corrigendum to final act 32024B1430R(01)
url
https://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexapi!prod!CELEXnumdoc&lg=EN&model=guicheti&numdoc=32024B1430R(01)
procedure/title
Old
Draft amending budget 1/2024: amendments required due to the MFF revision
New
Amending budget 1/2024: amendments required due to the MFF revision
events/6
date
2024-06-14T00:00:00
type
Final act published in Official Journal
summary
procedure/Other legal basis
Old
Rules of Procedure EP 159
New
Rules of Procedure EP 165
procedure/final
title
Corrigendum to final act 32024B1430R(01)
url
https://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexapi!prod!CELEXnumdoc&lg=EN&model=guicheti&numdoc=32024B1430R(01)
procedure/title
Old
Draft amending budget 1/2024: amendments required due to the MFF revision
New
Amending budget 1/2024: amendments required due to the MFF revision
events/6
date
2024-06-14T00:00:00
type
Final act published in Official Journal
summary
procedure/Other legal basis
Old
Rules of Procedure EP 159
New
Rules of Procedure EP 165
procedure/final
title
Corrigendum to final act 32024B1430R(01)
url
https://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexapi!prod!CELEXnumdoc&lg=EN&model=guicheti&numdoc=32024B1430R(01)
procedure/title
Old
Draft amending budget 1/2024: amendments required due to the MFF revision
New
Amending budget 1/2024: amendments required due to the MFF revision
events/6
date
2024-06-14T00:00:00
type
Final act published in Official Journal
summary
procedure/Other legal basis
Old
Rules of Procedure EP 159
New
Rules of Procedure EP 165
procedure/final
title
Corrigendum to final act 32024B1430R(01)
url
https://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexapi!prod!CELEXnumdoc&lg=EN&model=guicheti&numdoc=32024B1430R(01)
procedure/title
Old
Draft amending budget 1/2024: amendments required due to the MFF revision
New
Amending budget 1/2024: amendments required due to the MFF revision
events/6
date
2024-06-14T00:00:00
type
Final act published in Official Journal
procedure/Other legal basis
Old
Rules of Procedure EP 159
New
Rules of Procedure EP 165
procedure/final
title
Corrigendum to final act 32024B1430R(01)
url
https://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexapi!prod!CELEXnumdoc&lg=EN&model=guicheti&numdoc=32024B1430R(01)
procedure/title
Old
Draft amending budget 1/2024: amendments required due to the MFF revision
New
Amending budget 1/2024: amendments required due to the MFF revision
events/6
date
2024-06-14T00:00:00
type
Final act published in Official Journal
procedure/Other legal basis
Old
Rules of Procedure EP 159
New
Rules of Procedure EP 165
procedure/final
title
Corrigendum to final act 32024B1430R(01)
url
https://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexapi!prod!CELEXnumdoc&lg=EN&model=guicheti&numdoc=32024B1430R(01)
procedure/title
Old
Draft amending budget 1/2024: amendments required due to the MFF revision
New
Amending budget 1/2024: amendments required due to the MFF revision
events/6
date
2024-06-14T00:00:00
type
Final act published in Official Journal
procedure/final
title
Corrigendum to final act 32024B1430R(01)
url
https://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexapi!prod!CELEXnumdoc&lg=EN&model=guicheti&numdoc=32024B1430R(01)
procedure/title
Old
Draft amending budget 1/2024: amendments required due to the MFF revision
New
Amending budget 1/2024: amendments required due to the MFF revision
events/6
date
2024-06-14T00:00:00
type
Final act published in Official Journal
procedure/final
title
Corrigendum to final act 32024B1430R(01)
url
https://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexapi!prod!CELEXnumdoc&lg=EN&model=guicheti&numdoc=32024B1430R(01)
procedure/title
Old
Draft amending budget 1/2024: amendments required due to the MFF revision
New
Amending budget 1/2024: amendments required due to the MFF revision
events/6
date
2024-06-14T00:00:00
type
Final act published in Official Journal
procedure/final
title
Corrigendum to final act 32024B1430R(01)
url
https://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexapi!prod!CELEXnumdoc&lg=EN&model=guicheti&numdoc=32024B1430R(01)
procedure/title
Old
Draft amending budget 1/2024: amendments required due to the MFF revision
New
Amending budget 1/2024: amendments required due to the MFF revision
events/6
date
2024-06-05T00:00:00
type
Final act published in Official Journal
procedure/title
Old
Draft amending budget 1/2024: amendments required due to the MFF revision
New
Amending budget 1/2024: amendments required due to the MFF revision
events/6
date
2024-06-05T00:00:00
type
Final act published in Official Journal
procedure/title
Old
Draft amending budget 1/2024: amendments required due to the MFF revision
New
Amending budget 1/2024: amendments required due to the MFF revision
events/6
date
2024-06-05T00:00:00
type
Final act published in Official Journal
procedure/title
Old
Draft amending budget 1/2024: amendments required due to the MFF revision
New
Amending budget 1/2024: amendments required due to the MFF revision
events/6
date
2024-06-05T00:00:00
type
Final act published in Official Journal
procedure/title
Old
Draft amending budget 1/2024: amendments required due to the MFF revision
New
Amending budget 1/2024: amendments required due to the MFF revision
events/6
date
2024-06-05T00:00:00
type
Final act published in Official Journal
procedure/title
Old
Draft amending budget 1/2024: amendments required due to the MFF revision
New
Amending budget 1/2024: amendments required due to the MFF revision
docs/4
date
2024-04-25T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/TA-9-2024-0374_EN.html title: T9-0374/2024
type
Budgetary text adopted by Parliament
body
EP
events/5/summary
  • The European Parliament adopted by 465 votes to 53, with 16 abstentions, a resolution on the Council position on Draft amending budget No 1/2024 of the European Union for the financial year 2024 Amendments of the 2024 budget required due to the MFF revision.
  • Parliament approved the Council position on the draft amending budget No 1/2024.
  • MFF revision
  • Draft amending budget No 1/2024 is focused on including in the 2024 budget the necessary changes stemming from the recently agreed MFF revision. It increases expenditure by EUR 5 833.7 million in commitment appropriations and EUR 4 143.6 million in payment appropriations.
  • With the adoption of this Draft amending budget, the 2024 Union budget will be more fit for purpose, more flexible and better equipped to meet the challenges the Union faces.
  • Ukraine reserve
  • Parliament welcomed the proposal to mobilise EUR 4.8 billion from the newly created Ukraine Reserve to enable the payment of grants to Ukraine. The payment of loans does not require an amending budget and therefore that the Union is already providing support to the Ukrainian government so that it can maintain essential services. The grant- and loan-based financial support through the Ukraine Facility will help to keep the state and essential services functioning, while supporting Ukraine on its path to reconstruction, recovery, reform and membership of the Union.
  • European Defence Fund
  • The resolution welcomed the EUR 376 million reinforcement for the European Defence Fund (EDF) in 2024, resulting from the Strategic Technologies for Europe Platform (STEP) Regulation(10); notes that, in contrast to the legislative financial statement annexed to the STEP proposal, the Commission now considers that no additional payment appropriations are required in 2024.
  • On 5 March 2024, the Commission put forward a proposal to establish a new defence programme - the European Defence Industry Programme - for the period 2025-2027, with a planned transfer of EUR 1.5 billion from the EDF, precisely the amount of the EDF reinforcement agreed under STEP. Parliament insisted that the additional resources assigned to the EDF for the remainder of the MFF period be used for STEP objectives as per the agreement of the co-legislators.
  • Western Balkans
  • The resolution welcomed the additional EUR 500 million for the Western Balkans, placed in reserve subject to the adoption of the proposed regulation establishing the Reform and Growth Facility for the Western Balkans. Parliament intends, with the Council, to review the nomenclature as part of the 2025 budgetary procedure in order to ensure appropriate political and budgetary scrutiny.
  • Emergency Aid Reserve
  • The Union will be better able to respond to crises as a result of the increased financing for natural disasters and other emergencies included in Draft amending budget No 1/2024. This Draft amending budget creates new lines in accordance with the decision to split the Solidarity and Emergency Aid Reserve into two parts - the European Solidarity Reserve for natural disasters and public health emergencies within the Union and in accession countries and the Emergency Aid Reserve for rapid response to emergencies inside and outside the Union. This new architecture will make the funds easier to manage.
  • Humanitarian aid
  • Recalling that humanitarian aid for Ukraine is not covered by the Ukraine Facility, Parliament called on the Commission to monitor humanitarian aid needs closely and to propose any necessary measures to the budgetary authority in good time. In this regard, the Flexibility Instrument has been reinforced by around EUR 500 million for 2024 as part of the MFF revision.
  • European Globalisation Adjustment Fund
  • Parliament noted that the 2024 allocation for the European Globalisation Adjustment Fund for Displaced Workers (EGF) is reduced to EUR 33.8 million, in accordance with the revised MFF Regulation. The Commission is called on to monitor EGF implementation and for all institutions to take any necessary measures to ensure that all justified requests for EGF support, as a manifestation of Union solidarity, can be met.
  • Artificial Intelligence Act (AI Office)
  • Members noted the changes to the budgetary remarks to enable the Digital Europe programme to finance the costs of recruiting contractual agents for the Artificial Intelligence Office established under the recently agreed Artificial Intelligence Act. They insisted that covering staffing costs for the new Office in this manner is acceptable only as a temporary fix and does not constitute a precedent, that a long-term structural solution under Heading 7 must be found beyond the current MFF.
docs/4
date
2024-04-25T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/TA-9-2024-0374_EN.html title: T9-0374/2024
type
Budgetary text adopted by Parliament
body
EP
events/5/summary
  • The European Parliament adopted by 465 votes to 53, with 16 abstentions, a resolution on the Council position on Draft amending budget No 1/2024 of the European Union for the financial year 2024 Amendments of the 2024 budget required due to the MFF revision.
  • Parliament approved the Council position on the draft amending budget No 1/2024.
  • MFF revision
  • Draft amending budget No 1/2024 is focused on including in the 2024 budget the necessary changes stemming from the recently agreed MFF revision. It increases expenditure by EUR 5 833.7 million in commitment appropriations and EUR 4 143.6 million in payment appropriations.
  • With the adoption of this Draft amending budget, the 2024 Union budget will be more fit for purpose, more flexible and better equipped to meet the challenges the Union faces.
  • Ukraine reserve
  • Parliament welcomed the proposal to mobilise EUR 4.8 billion from the newly created Ukraine Reserve to enable the payment of grants to Ukraine. The payment of loans does not require an amending budget and therefore that the Union is already providing support to the Ukrainian government so that it can maintain essential services. The grant- and loan-based financial support through the Ukraine Facility will help to keep the state and essential services functioning, while supporting Ukraine on its path to reconstruction, recovery, reform and membership of the Union.
  • European Defence Fund
  • The resolution welcomed the EUR 376 million reinforcement for the European Defence Fund (EDF) in 2024, resulting from the Strategic Technologies for Europe Platform (STEP) Regulation(10); notes that, in contrast to the legislative financial statement annexed to the STEP proposal, the Commission now considers that no additional payment appropriations are required in 2024.
  • On 5 March 2024, the Commission put forward a proposal to establish a new defence programme - the European Defence Industry Programme - for the period 2025-2027, with a planned transfer of EUR 1.5 billion from the EDF, precisely the amount of the EDF reinforcement agreed under STEP. Parliament insisted that the additional resources assigned to the EDF for the remainder of the MFF period be used for STEP objectives as per the agreement of the co-legislators.
  • Western Balkans
  • The resolution welcomed the additional EUR 500 million for the Western Balkans, placed in reserve subject to the adoption of the proposed regulation establishing the Reform and Growth Facility for the Western Balkans. Parliament intends, with the Council, to review the nomenclature as part of the 2025 budgetary procedure in order to ensure appropriate political and budgetary scrutiny.
  • Emergency Aid Reserve
  • The Union will be better able to respond to crises as a result of the increased financing for natural disasters and other emergencies included in Draft amending budget No 1/2024. This Draft amending budget creates new lines in accordance with the decision to split the Solidarity and Emergency Aid Reserve into two parts - the European Solidarity Reserve for natural disasters and public health emergencies within the Union and in accession countries and the Emergency Aid Reserve for rapid response to emergencies inside and outside the Union. This new architecture will make the funds easier to manage.
  • Humanitarian aid
  • Recalling that humanitarian aid for Ukraine is not covered by the Ukraine Facility, Parliament called on the Commission to monitor humanitarian aid needs closely and to propose any necessary measures to the budgetary authority in good time. In this regard, the Flexibility Instrument has been reinforced by around EUR 500 million for 2024 as part of the MFF revision.
  • European Globalisation Adjustment Fund
  • Parliament noted that the 2024 allocation for the European Globalisation Adjustment Fund for Displaced Workers (EGF) is reduced to EUR 33.8 million, in accordance with the revised MFF Regulation. The Commission is called on to monitor EGF implementation and for all institutions to take any necessary measures to ensure that all justified requests for EGF support, as a manifestation of Union solidarity, can be met.
  • Artificial Intelligence Act (AI Office)
  • Members noted the changes to the budgetary remarks to enable the Digital Europe programme to finance the costs of recruiting contractual agents for the Artificial Intelligence Office established under the recently agreed Artificial Intelligence Act. They insisted that covering staffing costs for the new Office in this manner is acceptable only as a temporary fix and does not constitute a precedent, that a long-term structural solution under Heading 7 must be found beyond the current MFF.
docs/4
date
2024-04-25T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/TA-9-2024-0374_EN.html title: T9-0374/2024
type
Budgetary text adopted by Parliament
body
EP
events/5/summary
  • The European Parliament adopted by 465 votes to 53, with 16 abstentions, a resolution on the Council position on Draft amending budget No 1/2024 of the European Union for the financial year 2024 Amendments of the 2024 budget required due to the MFF revision.
  • Parliament approved the Council position on the draft amending budget No 1/2024.
  • MFF revision
  • Draft amending budget No 1/2024 is focused on including in the 2024 budget the necessary changes stemming from the recently agreed MFF revision. It increases expenditure by EUR 5 833.7 million in commitment appropriations and EUR 4 143.6 million in payment appropriations.
  • With the adoption of this Draft amending budget, the 2024 Union budget will be more fit for purpose, more flexible and better equipped to meet the challenges the Union faces.
  • Ukraine reserve
  • Parliament welcomed the proposal to mobilise EUR 4.8 billion from the newly created Ukraine Reserve to enable the payment of grants to Ukraine. The payment of loans does not require an amending budget and therefore that the Union is already providing support to the Ukrainian government so that it can maintain essential services. The grant- and loan-based financial support through the Ukraine Facility will help to keep the state and essential services functioning, while supporting Ukraine on its path to reconstruction, recovery, reform and membership of the Union.
  • European Defence Fund
  • The resolution welcomed the EUR 376 million reinforcement for the European Defence Fund (EDF) in 2024, resulting from the Strategic Technologies for Europe Platform (STEP) Regulation(10); notes that, in contrast to the legislative financial statement annexed to the STEP proposal, the Commission now considers that no additional payment appropriations are required in 2024.
  • On 5 March 2024, the Commission put forward a proposal to establish a new defence programme - the European Defence Industry Programme - for the period 2025-2027, with a planned transfer of EUR 1.5 billion from the EDF, precisely the amount of the EDF reinforcement agreed under STEP. Parliament insisted that the additional resources assigned to the EDF for the remainder of the MFF period be used for STEP objectives as per the agreement of the co-legislators.
  • Western Balkans
  • The resolution welcomed the additional EUR 500 million for the Western Balkans, placed in reserve subject to the adoption of the proposed regulation establishing the Reform and Growth Facility for the Western Balkans. Parliament intends, with the Council, to review the nomenclature as part of the 2025 budgetary procedure in order to ensure appropriate political and budgetary scrutiny.
  • Emergency Aid Reserve
  • The Union will be better able to respond to crises as a result of the increased financing for natural disasters and other emergencies included in Draft amending budget No 1/2024. This Draft amending budget creates new lines in accordance with the decision to split the Solidarity and Emergency Aid Reserve into two parts - the European Solidarity Reserve for natural disasters and public health emergencies within the Union and in accession countries and the Emergency Aid Reserve for rapid response to emergencies inside and outside the Union. This new architecture will make the funds easier to manage.
  • Humanitarian aid
  • Recalling that humanitarian aid for Ukraine is not covered by the Ukraine Facility, Parliament called on the Commission to monitor humanitarian aid needs closely and to propose any necessary measures to the budgetary authority in good time. In this regard, the Flexibility Instrument has been reinforced by around EUR 500 million for 2024 as part of the MFF revision.
  • European Globalisation Adjustment Fund
  • Parliament noted that the 2024 allocation for the European Globalisation Adjustment Fund for Displaced Workers (EGF) is reduced to EUR 33.8 million, in accordance with the revised MFF Regulation. The Commission is called on to monitor EGF implementation and for all institutions to take any necessary measures to ensure that all justified requests for EGF support, as a manifestation of Union solidarity, can be met.
  • Artificial Intelligence Act (AI Office)
  • Members noted the changes to the budgetary remarks to enable the Digital Europe programme to finance the costs of recruiting contractual agents for the Artificial Intelligence Office established under the recently agreed Artificial Intelligence Act. They insisted that covering staffing costs for the new Office in this manner is acceptable only as a temporary fix and does not constitute a precedent, that a long-term structural solution under Heading 7 must be found beyond the current MFF.
docs/4
date
2024-04-25T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/TA-9-2024-0374_EN.html title: T9-0374/2024
type
Budgetary text adopted by Parliament
body
EP
events/5/summary
  • The European Parliament adopted by 465 votes to 53, with 16 abstentions, a resolution on the Council position on Draft amending budget No 1/2024 of the European Union for the financial year 2024 Amendments of the 2024 budget required due to the MFF revision.
  • Parliament approved the Council position on the draft amending budget No 1/2024.
  • MFF revision
  • Draft amending budget No 1/2024 is focused on including in the 2024 budget the necessary changes stemming from the recently agreed MFF revision. It increases expenditure by EUR 5 833.7 million in commitment appropriations and EUR 4 143.6 million in payment appropriations.
  • With the adoption of this Draft amending budget, the 2024 Union budget will be more fit for purpose, more flexible and better equipped to meet the challenges the Union faces.
  • Ukraine reserve
  • Parliament welcomed the proposal to mobilise EUR 4.8 billion from the newly created Ukraine Reserve to enable the payment of grants to Ukraine. The payment of loans does not require an amending budget and therefore that the Union is already providing support to the Ukrainian government so that it can maintain essential services. The grant- and loan-based financial support through the Ukraine Facility will help to keep the state and essential services functioning, while supporting Ukraine on its path to reconstruction, recovery, reform and membership of the Union.
  • European Defence Fund
  • The resolution welcomed the EUR 376 million reinforcement for the European Defence Fund (EDF) in 2024, resulting from the Strategic Technologies for Europe Platform (STEP) Regulation(10); notes that, in contrast to the legislative financial statement annexed to the STEP proposal, the Commission now considers that no additional payment appropriations are required in 2024.
  • On 5 March 2024, the Commission put forward a proposal to establish a new defence programme - the European Defence Industry Programme - for the period 2025-2027, with a planned transfer of EUR 1.5 billion from the EDF, precisely the amount of the EDF reinforcement agreed under STEP. Parliament insisted that the additional resources assigned to the EDF for the remainder of the MFF period be used for STEP objectives as per the agreement of the co-legislators.
  • Western Balkans
  • The resolution welcomed the additional EUR 500 million for the Western Balkans, placed in reserve subject to the adoption of the proposed regulation establishing the Reform and Growth Facility for the Western Balkans. Parliament intends, with the Council, to review the nomenclature as part of the 2025 budgetary procedure in order to ensure appropriate political and budgetary scrutiny.
  • Emergency Aid Reserve
  • The Union will be better able to respond to crises as a result of the increased financing for natural disasters and other emergencies included in Draft amending budget No 1/2024. This Draft amending budget creates new lines in accordance with the decision to split the Solidarity and Emergency Aid Reserve into two parts - the European Solidarity Reserve for natural disasters and public health emergencies within the Union and in accession countries and the Emergency Aid Reserve for rapid response to emergencies inside and outside the Union. This new architecture will make the funds easier to manage.
  • Humanitarian aid
  • Recalling that humanitarian aid for Ukraine is not covered by the Ukraine Facility, Parliament called on the Commission to monitor humanitarian aid needs closely and to propose any necessary measures to the budgetary authority in good time. In this regard, the Flexibility Instrument has been reinforced by around EUR 500 million for 2024 as part of the MFF revision.
  • European Globalisation Adjustment Fund
  • Parliament noted that the 2024 allocation for the European Globalisation Adjustment Fund for Displaced Workers (EGF) is reduced to EUR 33.8 million, in accordance with the revised MFF Regulation. The Commission is called on to monitor EGF implementation and for all institutions to take any necessary measures to ensure that all justified requests for EGF support, as a manifestation of Union solidarity, can be met.
  • Artificial Intelligence Act (AI Office)
  • Members noted the changes to the budgetary remarks to enable the Digital Europe programme to finance the costs of recruiting contractual agents for the Artificial Intelligence Office established under the recently agreed Artificial Intelligence Act. They insisted that covering staffing costs for the new Office in this manner is acceptable only as a temporary fix and does not constitute a precedent, that a long-term structural solution under Heading 7 must be found beyond the current MFF.
docs/4
date
2024-04-25T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/TA-9-2024-0374_EN.html title: T9-0374/2024
type
Budgetary text adopted by Parliament
body
EP
events/5
date
2024-04-25T00:00:00
type
Decision by Parliament
body
EP
docs
url: https://www.europarl.europa.eu/doceo/document/TA-9-2024-0374_EN.html title: T9-0374/2024
procedure/stage_reached
Old
Awaiting Parliament's position on the draft budget
New
Awaiting budgetary conciliation convocation
docs/4
date
2024-04-25T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/TA-9-2024-0374_EN.html title: T9-0374/2024
type
Budgetary text adopted by Parliament
body
EP
events/5
date
2024-04-25T00:00:00
type
Decision by Parliament
body
EP
docs
url: https://www.europarl.europa.eu/doceo/document/TA-9-2024-0374_EN.html title: T9-0374/2024
procedure/stage_reached
Old
Awaiting Parliament's position on the draft budget
New
Awaiting budgetary conciliation convocation
forecasts
  • date: 2024-04-22T00:00:00 title: Indicative plenary sitting date
forecasts
  • date: 2024-04-22T00:00:00 title: Indicative plenary sitting date
forecasts/0
date
2024-04-24T00:00:00
title
Vote scheduled
forecasts/0
date
2024-04-22T00:00:00
title
Indicative plenary sitting date
forecasts/0
date
2024-04-24T00:00:00
title
Vote in plenary scheduled
forecasts/0
date
2024-04-22T00:00:00
title
Indicative plenary sitting date
forecasts/0
date
2024-04-24T00:00:00
title
Vote in plenary scheduled
forecasts/0
date
2024-04-22T00:00:00
title
Indicative plenary sitting date
forecasts/0
date
2024-04-24T00:00:00
title
Vote in plenary scheduled
forecasts/0
date
2024-04-22T00:00:00
title
Indicative plenary sitting date
forecasts/0
date
2024-04-24T00:00:00
title
Vote in plenary scheduled
forecasts/0
date
2024-04-22T00:00:00
title
Indicative plenary sitting date
forecasts/0
date
2024-04-24T00:00:00
title
Vote in plenary scheduled
forecasts/0
date
2024-04-22T00:00:00
title
Indicative plenary sitting date
commission
  • body: EC dg: Budget commissioner: HAHN Johannes
committees/1/opinion
False
committees/2/opinion
False
committees/4/opinion
False
committees/7/opinion
False
docs/1/type
Old
Document attached to the procedure
New
Council position on draft budget
docs/3
date
2024-04-10T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/A-9-2024-0174_EN.html title: A9-0174/2024
type
Budgetary report tabled for plenary, 1st reading
body
EP
events/1
date
2024-03-19T00:00:00
type
Council position on draft budget published
body
CSL
docs
title: 07432/2024
events/2
date
2024-04-08T00:00:00
type
Vote in committee
body
EP
events/3
date
2024-04-10T00:00:00
type
Committee referral announced in Parliament
body
EP
events/4
date
2024-04-10T00:00:00
type
Budgetary report tabled for plenary
body
EP
docs
url: https://www.europarl.europa.eu/doceo/document/A-9-2024-0174_EN.html title: A9-0174/2024
procedure/Other legal basis
Rules of Procedure EP 159
procedure/dossier_of_the_committee
  • BUDG/9/14139
procedure/stage_reached
Old
Preparatory phase in Parliament
New
Awaiting Parliament's position on the draft budget
commission
  • body: EC dg: Budget commissioner: HAHN Johannes
committees/1/opinion
False
committees/2/opinion
False
committees/4/opinion
False
committees/7/opinion
False
docs/1/type
Old
Document attached to the procedure
New
Council position on draft budget
docs/3
date
2024-04-10T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/A-9-2024-0174_EN.html title: A9-0174/2024
type
Budgetary report tabled for plenary, 1st reading
body
EP
events/1
date
2024-03-19T00:00:00
type
Council position on draft budget published
body
CSL
docs
title: 07432/2024
events/2
date
2024-04-08T00:00:00
type
Vote in committee
body
EP
events/3
date
2024-04-10T00:00:00
type
Committee referral announced in Parliament
body
EP
events/4
date
2024-04-10T00:00:00
type
Budgetary report tabled for plenary
body
EP
docs
url: https://www.europarl.europa.eu/doceo/document/A-9-2024-0174_EN.html title: A9-0174/2024
procedure/Other legal basis
Rules of Procedure EP 159
procedure/dossier_of_the_committee
  • BUDG/9/14139
procedure/stage_reached
Old
Preparatory phase in Parliament
New
Awaiting Parliament's position on the draft budget
commission
  • body: EC dg: Budget commissioner: HAHN Johannes
committees/1/opinion
False
committees/2/opinion
False
committees/4/opinion
False
committees/7/opinion
False
docs/1/type
Old
Document attached to the procedure
New
Council position on draft budget
docs/3
date
2024-04-10T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/A-9-2024-0174_EN.html title: A9-0174/2024
type
Budgetary report tabled for plenary, 1st reading
body
EP
events/1
date
2024-03-19T00:00:00
type
Council position on draft budget published
body
CSL
docs
title: 07432/2024
events/2
date
2024-04-08T00:00:00
type
Vote in committee
body
EP
events/3
date
2024-04-10T00:00:00
type
Committee referral announced in Parliament
body
EP
events/4
date
2024-04-10T00:00:00
type
Budgetary report tabled for plenary
body
EP
docs
url: https://www.europarl.europa.eu/doceo/document/A-9-2024-0174_EN.html title: A9-0174/2024
procedure/Other legal basis
Rules of Procedure EP 159
procedure/dossier_of_the_committee
  • BUDG/9/14139
procedure/stage_reached
Old
Preparatory phase in Parliament
New
Awaiting Parliament's position on the draft budget
commission
  • body: EC dg: Budget commissioner: HAHN Johannes
committees/1/opinion
False
committees/2/opinion
False
committees/4/opinion
False
committees/7/opinion
False
docs/1/type
Old
Document attached to the procedure
New
Council position on draft budget
docs/3
date
2024-04-10T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/A-9-2024-0174_EN.html title: A9-0174/2024
type
Budgetary report tabled for plenary, 1st reading
body
EP
events/1
date
2024-03-19T00:00:00
type
Council position on draft budget published
body
CSL
docs
title: 07432/2024
events/2
date
2024-04-08T00:00:00
type
Vote in committee
body
EP
events/3
date
2024-04-10T00:00:00
type
Committee referral announced in Parliament
body
EP
events/4
date
2024-04-10T00:00:00
type
Budgetary report tabled for plenary
body
EP
docs
url: https://www.europarl.europa.eu/doceo/document/A-9-2024-0174_EN.html title: A9-0174/2024
procedure/Other legal basis
Rules of Procedure EP 159
procedure/dossier_of_the_committee
  • BUDG/9/14139
procedure/stage_reached
Old
Preparatory phase in Parliament
New
Awaiting Parliament's position on the draft budget
commission
  • body: EC dg: Budget commissioner: HAHN Johannes
committees/1/opinion
False
committees/2/opinion
False
committees/4/opinion
False
committees/7/opinion
False
docs/1/type
Old
Document attached to the procedure
New
Council position on draft budget
docs/3
date
2024-04-10T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/A-9-2024-0174_EN.html title: A9-0174/2024
type
Budgetary report tabled for plenary, 1st reading
body
EP
events/1
date
2024-03-19T00:00:00
type
Council position on draft budget published
body
CSL
docs
title: 07432/2024
events/2
date
2024-04-08T00:00:00
type
Vote in committee
body
EP
events/3
date
2024-04-10T00:00:00
type
Committee referral announced in Parliament
body
EP
events/4
date
2024-04-10T00:00:00
type
Budgetary report tabled for plenary
body
EP
docs
url: https://www.europarl.europa.eu/doceo/document/A-9-2024-0174_EN.html title: A9-0174/2024
procedure/Other legal basis
Rules of Procedure EP 159
procedure/dossier_of_the_committee
  • BUDG/9/14139
procedure/stage_reached
Old
Preparatory phase in Parliament
New
Awaiting Parliament's position on the draft budget
commission
  • body: EC dg: Budget commissioner: HAHN Johannes
committees/1/opinion
False
committees/2/opinion
False
committees/4/opinion
False
committees/7/opinion
False
docs/1/type
Old
Document attached to the procedure
New
Council position on draft budget
docs/3
date
2024-04-10T00:00:00
docs
title: A9-0174/2024
type
Budgetary report tabled for plenary, 1st reading
body
EP
events/1
date
2024-03-19T00:00:00
type
Council position on draft budget published
body
CSL
docs
title: 07432/2024
events/2
date
2024-04-08T00:00:00
type
Vote in committee
body
EP
events/3
date
2024-04-10T00:00:00
type
Budgetary report tabled for plenary
body
EP
docs
title: A9-0174/2024
procedure/Other legal basis
Rules of Procedure EP 159
commission
  • body: EC dg: Budget commissioner: HAHN Johannes
committees/1/opinion
False
committees/2/opinion
False
committees/4/opinion
False
committees/7/opinion
False
docs/1/type
Old
Document attached to the procedure
New
Council position on draft budget
events/1
date
2024-03-19T00:00:00
type
Council position on draft budget published
body
CSL
docs
title: 07432/2024
events/2
date
2024-04-08T00:00:00
type
Vote in committee
body
EP
procedure/Other legal basis
Rules of Procedure EP 159
committees/1/opinion
False
committees/2/opinion
False
committees/4/opinion
False
committees/7/opinion
False
docs/1/type
Old
Document attached to the procedure
New
Council position on draft budget
events/1
date
2024-03-19T00:00:00
type
Council position on draft budget published
body
CSL
docs
title: 07432/2024
committees/1/opinion
False
committees/2/opinion
False
committees/4/opinion
False
committees/7/opinion
False
docs/1/type
Old
Document attached to the procedure
New
Council position on draft budget
events/1
date
2024-03-19T00:00:00
type
Council position on draft budget published
body
CSL
docs
title: 07432/2024
committees/1/opinion
False
committees/2/opinion
False
committees/4/opinion
False
committees/7/opinion
False
docs/1/type
Old
Document attached to the procedure
New
Council position on draft budget
events/1
date
2024-03-19T00:00:00
type
Council position on draft budget published
body
CSL
docs
title: 07432/2024
committees/1/opinion
False
committees/2/opinion
False
committees/4/opinion
False
committees/7/opinion
False
docs/1/type
Old
Document attached to the procedure
New
Council position on draft budget
events/1
date
2024-03-19T00:00:00
type
Council position on draft budget published
body
CSL
docs
title: 07432/2024
committees/0
type
Responsible Committee
body
EP
committee_full
Budgets
committee
BUDG
associated
False
rapporteur
name: MUREŞAN Siegfried date: 2024-02-05T00:00:00 group: Group of European People's Party abbr: EPP
shadows
committees/0
type
Responsible Committee
body
EP
committee_full
Budgets
committee
BUDG
associated
False
rapporteur
name: MUREŞAN Siegfried date: 2024-02-05T00:00:00 group: Group of European People's Party abbr: EPP
shadows
committees/5/opinion
False
committees/6/opinion
False
docs/0
date
2024-02-29T00:00:00
docs
type
Commission draft budget
body
EC
docs/1
date
2024-03-19T00:00:00
docs
title: 07432/2024
type
Document attached to the procedure
body
CSL
docs/2
date
2024-03-25T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/BUDG-AM-759975_EN.html title: PE759.975
type
Amendments tabled in committee
body
EP
events/0/summary
  • PURPOSE: presentation of draft amending budget 1/2024 (DAB 1/2024) reflecting the impact of the revision of the Multiannual Financial Framework (MFF) on the 2024 financial year.
  • CONTENT: the purpose of Draft Amending Budget No 1 for the year 2024 is to introduce the necessary changes to the 2024 budget stemming from the revision of the Multiannual Financial Framework.
  • The revision of the MFF Regulation applies retroactively as of 1st January 2024 and includes inter alia amendments to the MFF ceilings.
  • In order to reflect the impact of the MFF revision on the financial year 2024, DAB 1 covers the following elements:
  • Ukraine Facility
  • The revised Multiannual Financial Framework Regulation creates a new special instrument - the Ukraine Reserve - for the period 2024-2027 for the sole purpose of financing the new Ukraine Facility. The latter aims to support Ukraine's efforts to sustain macro-financial stability, support reconstruction as well as modernise the country whilst implementing key reforms on its EU accession track.
  • The Commission proposes to make the necessary adjustments to the budget nomenclature and budget remarks and proposes to mobilise the Ukraine facility in this DAB. This includes creating eight new budget lines. It is proposed to mobilise an amount of EUR 4 767.5 million of commitment appropriations and EUR 3 754.8 million of payment appropriations.
  • European Defence Fund (EDF) within the Strategic Technologies for Europe Platform (STEP)
  • In order to boost the defence investment capacity contributing to the STEP objectives, the revision of the Multiannual Financial Framework includes an increase of EUR 1.5 billion for the remainder of the MFF, for which an increase of EUR 376 million of commitment appropriations in 2024 is proposed, split between both strands of the programme (i.e. defence research, and capability development).
  • European Solidarity Reserve and Emergency Aid Reserve
  • Following the revision of the Multiannual Financial Framework, the Solidary and Emergency Aid Reserve (SEAR) has been split in two separate instruments retroactively as of 1st January 2024:
  • - the European Solidarity Reserve (ESR) with an annual amount of EUR 1 016 million (in 2018 prices, corresponding to EUR 1 144.2 million in 2024 prices) for assistance to respond to emergency situations covered by the European Union Solidarity Fund (EUSF);
  • - the Emergency Aid Reserve (EAR) with an annual amount of EUR 508 million (in 2018 prices, corresponding to EUR 572.1 million in 2024 prices) for rapid responses to specific emergency needs within the Union or in third countries.
  • Reform and Growth Facility for the Western Balkans
  • The revision of the MFF includes the additional allocation for Western Balkans, which will be implemented through a new Reform and Growth Facility for the Western Balkans.
  • The Commission proposes to make the necessary adjustments to the budget nomenclature, budget remarks and level of appropriations in this DAB 1. Three new budget lines are to be created.
  • Additionally, it is proposed to include and allocate an amount of EUR 501 million of commitment appropriations and EUR 23.9 million of payment appropriations in reserve pending the adoption of the legal basis.
  • European Globalisation Adjustment Fund
  • The revision of the MFF foresees a reduction of the annual allocation of EGF for the period 2024-27, which should not exceed a maximum amount of EUR 30 million (in 2018 prices, corresponding to EUR 33.8 million in 2024 prices). Consequently, a reduction of commitment appropriations in 2024 by EUR 175.7 million is proposed.
  • Artificial Intelligence Act (AI Office)
  • Additionally, DAB 1 includes an adjustment to the budget remarks of the budget line for support expenditure of the Digital Europe Programme following the political agreement reached in December 2023 by the European Parliament and the Council on the establishment of the Artificial Intelligence Office.
  • The establishment of the Artificial Intelligence Office necessitates a larger set of tasks and responsibilities as initially set out. Therefore, increased staffing levels, and subsequently costs, are required to be able to effectively deliver on those tasks.
  • Financing
  • Overall, the net impact of DAB 1 on expenditure amounts to an increase of EUR 5 833.7 million in commitment appropriations and EUR 4 143.6 million of payment appropriations.
committees/0
type
Responsible Committee
body
EP
committee_full
Budgets
committee
BUDG
associated
False
rapporteur
name: MUREŞAN Siegfried date: 2024-02-05T00:00:00 group: Group of European People's Party abbr: EPP
shadows
committees/0
type
Responsible Committee
body
EP
committee_full
Budgets
committee
BUDG
associated
False
rapporteur
name: MUREŞAN Siegfried date: 2024-02-05T00:00:00 group: Group of European People's Party abbr: EPP
shadows
committees/5/opinion
False
committees/6/opinion
False
docs/0
date
2024-02-29T00:00:00
docs
type
Commission draft budget
body
EC
docs/1
date
2024-03-19T00:00:00
docs
title: 07432/2024
type
Document attached to the procedure
body
CSL
events/0/summary
  • PURPOSE: presentation of draft amending budget 1/2024 (DAB 1/2024) reflecting the impact of the revision of the Multiannual Financial Framework (MFF) on the 2024 financial year.
  • CONTENT: the purpose of Draft Amending Budget No 1 for the year 2024 is to introduce the necessary changes to the 2024 budget stemming from the revision of the Multiannual Financial Framework.
  • The revision of the MFF Regulation applies retroactively as of 1st January 2024 and includes inter alia amendments to the MFF ceilings.
  • In order to reflect the impact of the MFF revision on the financial year 2024, DAB 1 covers the following elements:
  • Ukraine Facility
  • The revised Multiannual Financial Framework Regulation creates a new special instrument - the Ukraine Reserve - for the period 2024-2027 for the sole purpose of financing the new Ukraine Facility. The latter aims to support Ukraine's efforts to sustain macro-financial stability, support reconstruction as well as modernise the country whilst implementing key reforms on its EU accession track.
  • The Commission proposes to make the necessary adjustments to the budget nomenclature and budget remarks and proposes to mobilise the Ukraine facility in this DAB. This includes creating eight new budget lines. It is proposed to mobilise an amount of EUR 4 767.5 million of commitment appropriations and EUR 3 754.8 million of payment appropriations.
  • European Defence Fund (EDF) within the Strategic Technologies for Europe Platform (STEP)
  • In order to boost the defence investment capacity contributing to the STEP objectives, the revision of the Multiannual Financial Framework includes an increase of EUR 1.5 billion for the remainder of the MFF, for which an increase of EUR 376 million of commitment appropriations in 2024 is proposed, split between both strands of the programme (i.e. defence research, and capability development).
  • European Solidarity Reserve and Emergency Aid Reserve
  • Following the revision of the Multiannual Financial Framework, the Solidary and Emergency Aid Reserve (SEAR) has been split in two separate instruments retroactively as of 1st January 2024:
  • - the European Solidarity Reserve (ESR) with an annual amount of EUR 1 016 million (in 2018 prices, corresponding to EUR 1 144.2 million in 2024 prices) for assistance to respond to emergency situations covered by the European Union Solidarity Fund (EUSF);
  • - the Emergency Aid Reserve (EAR) with an annual amount of EUR 508 million (in 2018 prices, corresponding to EUR 572.1 million in 2024 prices) for rapid responses to specific emergency needs within the Union or in third countries.
  • Reform and Growth Facility for the Western Balkans
  • The revision of the MFF includes the additional allocation for Western Balkans, which will be implemented through a new Reform and Growth Facility for the Western Balkans.
  • The Commission proposes to make the necessary adjustments to the budget nomenclature, budget remarks and level of appropriations in this DAB 1. Three new budget lines are to be created.
  • Additionally, it is proposed to include and allocate an amount of EUR 501 million of commitment appropriations and EUR 23.9 million of payment appropriations in reserve pending the adoption of the legal basis.
  • European Globalisation Adjustment Fund
  • The revision of the MFF foresees a reduction of the annual allocation of EGF for the period 2024-27, which should not exceed a maximum amount of EUR 30 million (in 2018 prices, corresponding to EUR 33.8 million in 2024 prices). Consequently, a reduction of commitment appropriations in 2024 by EUR 175.7 million is proposed.
  • Artificial Intelligence Act (AI Office)
  • Additionally, DAB 1 includes an adjustment to the budget remarks of the budget line for support expenditure of the Digital Europe Programme following the political agreement reached in December 2023 by the European Parliament and the Council on the establishment of the Artificial Intelligence Office.
  • The establishment of the Artificial Intelligence Office necessitates a larger set of tasks and responsibilities as initially set out. Therefore, increased staffing levels, and subsequently costs, are required to be able to effectively deliver on those tasks.
  • Financing
  • Overall, the net impact of DAB 1 on expenditure amounts to an increase of EUR 5 833.7 million in commitment appropriations and EUR 4 143.6 million of payment appropriations.
committees/0
type
Responsible Committee
body
EP
committee_full
Budgets
committee
BUDG
associated
False
rapporteur
name: MUREŞAN Siegfried date: 2024-02-05T00:00:00 group: Group of European People's Party abbr: EPP
shadows
committees/0
type
Responsible Committee
body
EP
committee_full
Budgets
committee
BUDG
associated
False
rapporteur
name: MUREŞAN Siegfried date: 2024-02-05T00:00:00 group: Group of European People's Party abbr: EPP
shadows
committees/5/opinion
False
committees/6/opinion
False
docs/0
date
2024-02-29T00:00:00
docs
type
Commission draft budget
body
EC
events/0/summary
  • PURPOSE: presentation of draft amending budget 1/2024 (DAB 1/2024) reflecting the impact of the revision of the Multiannual Financial Framework (MFF) on the 2024 financial year.
  • CONTENT: the purpose of Draft Amending Budget No 1 for the year 2024 is to introduce the necessary changes to the 2024 budget stemming from the revision of the Multiannual Financial Framework.
  • The revision of the MFF Regulation applies retroactively as of 1st January 2024 and includes inter alia amendments to the MFF ceilings.
  • In order to reflect the impact of the MFF revision on the financial year 2024, DAB 1 covers the following elements:
  • Ukraine Facility
  • The revised Multiannual Financial Framework Regulation creates a new special instrument - the Ukraine Reserve - for the period 2024-2027 for the sole purpose of financing the new Ukraine Facility. The latter aims to support Ukraine's efforts to sustain macro-financial stability, support reconstruction as well as modernise the country whilst implementing key reforms on its EU accession track.
  • The Commission proposes to make the necessary adjustments to the budget nomenclature and budget remarks and proposes to mobilise the Ukraine facility in this DAB. This includes creating eight new budget lines. It is proposed to mobilise an amount of EUR 4 767.5 million of commitment appropriations and EUR 3 754.8 million of payment appropriations.
  • European Defence Fund (EDF) within the Strategic Technologies for Europe Platform (STEP)
  • In order to boost the defence investment capacity contributing to the STEP objectives, the revision of the Multiannual Financial Framework includes an increase of EUR 1.5 billion for the remainder of the MFF, for which an increase of EUR 376 million of commitment appropriations in 2024 is proposed, split between both strands of the programme (i.e. defence research, and capability development).
  • European Solidarity Reserve and Emergency Aid Reserve
  • Following the revision of the Multiannual Financial Framework, the Solidary and Emergency Aid Reserve (SEAR) has been split in two separate instruments retroactively as of 1st January 2024:
  • - the European Solidarity Reserve (ESR) with an annual amount of EUR 1 016 million (in 2018 prices, corresponding to EUR 1 144.2 million in 2024 prices) for assistance to respond to emergency situations covered by the European Union Solidarity Fund (EUSF);
  • - the Emergency Aid Reserve (EAR) with an annual amount of EUR 508 million (in 2018 prices, corresponding to EUR 572.1 million in 2024 prices) for rapid responses to specific emergency needs within the Union or in third countries.
  • Reform and Growth Facility for the Western Balkans
  • The revision of the MFF includes the additional allocation for Western Balkans, which will be implemented through a new Reform and Growth Facility for the Western Balkans.
  • The Commission proposes to make the necessary adjustments to the budget nomenclature, budget remarks and level of appropriations in this DAB 1. Three new budget lines are to be created.
  • Additionally, it is proposed to include and allocate an amount of EUR 501 million of commitment appropriations and EUR 23.9 million of payment appropriations in reserve pending the adoption of the legal basis.
  • European Globalisation Adjustment Fund
  • The revision of the MFF foresees a reduction of the annual allocation of EGF for the period 2024-27, which should not exceed a maximum amount of EUR 30 million (in 2018 prices, corresponding to EUR 33.8 million in 2024 prices). Consequently, a reduction of commitment appropriations in 2024 by EUR 175.7 million is proposed.
  • Artificial Intelligence Act (AI Office)
  • Additionally, DAB 1 includes an adjustment to the budget remarks of the budget line for support expenditure of the Digital Europe Programme following the political agreement reached in December 2023 by the European Parliament and the Council on the establishment of the Artificial Intelligence Office.
  • The establishment of the Artificial Intelligence Office necessitates a larger set of tasks and responsibilities as initially set out. Therefore, increased staffing levels, and subsequently costs, are required to be able to effectively deliver on those tasks.
  • Financing
  • Overall, the net impact of DAB 1 on expenditure amounts to an increase of EUR 5 833.7 million in commitment appropriations and EUR 4 143.6 million of payment appropriations.
committees/0
type
Responsible Committee
body
EP
committee_full
Budgets
committee
BUDG
associated
False
rapporteur
name: MUREŞAN Siegfried date: 2024-02-05T00:00:00 group: Group of European People's Party abbr: EPP
shadows
committees/0
type
Responsible Committee
body
EP
committee_full
Budgets
committee
BUDG
associated
False
rapporteur
name: MUREŞAN Siegfried date: 2024-02-05T00:00:00 group: Group of European People's Party abbr: EPP
shadows
committees/5/opinion
False
committees/6/opinion
False
docs/0
date
2024-02-29T00:00:00
docs
type
Commission draft budget
body
EC
events/0/summary
  • PURPOSE: presentation of draft amending budget 1/2024 (DAB 1/2024) reflecting the impact of the revision of the Multiannual Financial Framework (MFF) on the 2024 financial year.
  • CONTENT: the purpose of Draft Amending Budget No 1 for the year 2024 is to introduce the necessary changes to the 2024 budget stemming from the revision of the Multiannual Financial Framework.
  • The revision of the MFF Regulation applies retroactively as of 1st January 2024 and includes inter alia amendments to the MFF ceilings.
  • In order to reflect the impact of the MFF revision on the financial year 2024, DAB 1 covers the following elements:
  • Ukraine Facility
  • The revised Multiannual Financial Framework Regulation creates a new special instrument - the Ukraine Reserve - for the period 2024-2027 for the sole purpose of financing the new Ukraine Facility. The latter aims to support Ukraine's efforts to sustain macro-financial stability, support reconstruction as well as modernise the country whilst implementing key reforms on its EU accession track.
  • The Commission proposes to make the necessary adjustments to the budget nomenclature and budget remarks and proposes to mobilise the Ukraine facility in this DAB. This includes creating eight new budget lines. It is proposed to mobilise an amount of EUR 4 767.5 million of commitment appropriations and EUR 3 754.8 million of payment appropriations.
  • European Defence Fund (EDF) within the Strategic Technologies for Europe Platform (STEP)
  • In order to boost the defence investment capacity contributing to the STEP objectives, the revision of the Multiannual Financial Framework includes an increase of EUR 1.5 billion for the remainder of the MFF, for which an increase of EUR 376 million of commitment appropriations in 2024 is proposed, split between both strands of the programme (i.e. defence research, and capability development).
  • European Solidarity Reserve and Emergency Aid Reserve
  • Following the revision of the Multiannual Financial Framework, the Solidary and Emergency Aid Reserve (SEAR) has been split in two separate instruments retroactively as of 1st January 2024:
  • - the European Solidarity Reserve (ESR) with an annual amount of EUR 1 016 million (in 2018 prices, corresponding to EUR 1 144.2 million in 2024 prices) for assistance to respond to emergency situations covered by the European Union Solidarity Fund (EUSF);
  • - the Emergency Aid Reserve (EAR) with an annual amount of EUR 508 million (in 2018 prices, corresponding to EUR 572.1 million in 2024 prices) for rapid responses to specific emergency needs within the Union or in third countries.
  • Reform and Growth Facility for the Western Balkans
  • The revision of the MFF includes the additional allocation for Western Balkans, which will be implemented through a new Reform and Growth Facility for the Western Balkans.
  • The Commission proposes to make the necessary adjustments to the budget nomenclature, budget remarks and level of appropriations in this DAB 1. Three new budget lines are to be created.
  • Additionally, it is proposed to include and allocate an amount of EUR 501 million of commitment appropriations and EUR 23.9 million of payment appropriations in reserve pending the adoption of the legal basis.
  • European Globalisation Adjustment Fund
  • The revision of the MFF foresees a reduction of the annual allocation of EGF for the period 2024-27, which should not exceed a maximum amount of EUR 30 million (in 2018 prices, corresponding to EUR 33.8 million in 2024 prices). Consequently, a reduction of commitment appropriations in 2024 by EUR 175.7 million is proposed.
  • Artificial Intelligence Act (AI Office)
  • Additionally, DAB 1 includes an adjustment to the budget remarks of the budget line for support expenditure of the Digital Europe Programme following the political agreement reached in December 2023 by the European Parliament and the Council on the establishment of the Artificial Intelligence Office.
  • The establishment of the Artificial Intelligence Office necessitates a larger set of tasks and responsibilities as initially set out. Therefore, increased staffing levels, and subsequently costs, are required to be able to effectively deliver on those tasks.
  • Financing
  • Overall, the net impact of DAB 1 on expenditure amounts to an increase of EUR 5 833.7 million in commitment appropriations and EUR 4 143.6 million of payment appropriations.
committees/0
type
Responsible Committee
body
EP
committee_full
Budgets
committee
BUDG
associated
False
rapporteur
name: MUREŞAN Siegfried date: 2024-02-05T00:00:00 group: Group of European People's Party abbr: EPP
shadows
committees/0
type
Responsible Committee
body
EP
committee_full
Budgets
committee
BUDG
associated
False
rapporteur
name: MUREŞAN Siegfried date: 2024-02-05T00:00:00 group: Group of European People's Party abbr: EPP
shadows
committees/5/opinion
False
committees/6/opinion
False
docs/0
date
2024-02-29T00:00:00
docs
type
Commission draft budget
body
EC
events/0/summary
  • PURPOSE: presentation of draft amending budget 1/2024 (DAB 1/2024) reflecting the impact of the revision of the Multiannual Financial Framework (MFF) on the 2024 financial year.
  • CONTENT: the purpose of Draft Amending Budget No 1 for the year 2024 is to introduce the necessary changes to the 2024 budget stemming from the revision of the Multiannual Financial Framework.
  • The revision of the MFF Regulation applies retroactively as of 1st January 2024 and includes inter alia amendments to the MFF ceilings.
  • In order to reflect the impact of the MFF revision on the financial year 2024, DAB 1 covers the following elements:
  • Ukraine Facility
  • The revised Multiannual Financial Framework Regulation creates a new special instrument - the Ukraine Reserve - for the period 2024-2027 for the sole purpose of financing the new Ukraine Facility. The latter aims to support Ukraine's efforts to sustain macro-financial stability, support reconstruction as well as modernise the country whilst implementing key reforms on its EU accession track.
  • The Commission proposes to make the necessary adjustments to the budget nomenclature and budget remarks and proposes to mobilise the Ukraine facility in this DAB. This includes creating eight new budget lines. It is proposed to mobilise an amount of EUR 4 767.5 million of commitment appropriations and EUR 3 754.8 million of payment appropriations.
  • European Defence Fund (EDF) within the Strategic Technologies for Europe Platform (STEP)
  • In order to boost the defence investment capacity contributing to the STEP objectives, the revision of the Multiannual Financial Framework includes an increase of EUR 1.5 billion for the remainder of the MFF, for which an increase of EUR 376 million of commitment appropriations in 2024 is proposed, split between both strands of the programme (i.e. defence research, and capability development).
  • European Solidarity Reserve and Emergency Aid Reserve
  • Following the revision of the Multiannual Financial Framework, the Solidary and Emergency Aid Reserve (SEAR) has been split in two separate instruments retroactively as of 1st January 2024:
  • - the European Solidarity Reserve (ESR) with an annual amount of EUR 1 016 million (in 2018 prices, corresponding to EUR 1 144.2 million in 2024 prices) for assistance to respond to emergency situations covered by the European Union Solidarity Fund (EUSF);
  • - the Emergency Aid Reserve (EAR) with an annual amount of EUR 508 million (in 2018 prices, corresponding to EUR 572.1 million in 2024 prices) for rapid responses to specific emergency needs within the Union or in third countries.
  • Reform and Growth Facility for the Western Balkans
  • The revision of the MFF includes the additional allocation for Western Balkans, which will be implemented through a new Reform and Growth Facility for the Western Balkans.
  • The Commission proposes to make the necessary adjustments to the budget nomenclature, budget remarks and level of appropriations in this DAB 1. Three new budget lines are to be created.
  • Additionally, it is proposed to include and allocate an amount of EUR 501 million of commitment appropriations and EUR 23.9 million of payment appropriations in reserve pending the adoption of the legal basis.
  • European Globalisation Adjustment Fund
  • The revision of the MFF foresees a reduction of the annual allocation of EGF for the period 2024-27, which should not exceed a maximum amount of EUR 30 million (in 2018 prices, corresponding to EUR 33.8 million in 2024 prices). Consequently, a reduction of commitment appropriations in 2024 by EUR 175.7 million is proposed.
  • Artificial Intelligence Act (AI Office)
  • Additionally, DAB 1 includes an adjustment to the budget remarks of the budget line for support expenditure of the Digital Europe Programme following the political agreement reached in December 2023 by the European Parliament and the Council on the establishment of the Artificial Intelligence Office.
  • The establishment of the Artificial Intelligence Office necessitates a larger set of tasks and responsibilities as initially set out. Therefore, increased staffing levels, and subsequently costs, are required to be able to effectively deliver on those tasks.
  • Financing
  • Overall, the net impact of DAB 1 on expenditure amounts to an increase of EUR 5 833.7 million in commitment appropriations and EUR 4 143.6 million of payment appropriations.
committees/0
type
Responsible Committee
body
EP
committee_full
Budgets
committee
BUDG
associated
False
rapporteur
name: MUREŞAN Siegfried date: 2024-02-05T00:00:00 group: Group of European People's Party abbr: EPP
shadows
committees/0
type
Responsible Committee
body
EP
committee_full
Budgets
committee
BUDG
associated
False
rapporteur
name: MUREŞAN Siegfried date: 2024-02-05T00:00:00 group: Group of European People's Party abbr: EPP
shadows
committees/6/opinion
False
committees/0
type
Responsible Committee
body
EP
committee_full
Budgets
committee
BUDG
associated
False
rapporteur
name: MUREŞAN Siegfried date: 2024-02-05T00:00:00 group: Group of European People's Party abbr: EPP
shadows
committees/0
type
Responsible Committee
body
EP
committee_full
Budgets
committee
BUDG
associated
False
rapporteur
name: MUREŞAN Siegfried date: 2024-02-05T00:00:00 group: Group of European People's Party abbr: EPP
shadows
docs/1
date
2024-03-13T00:00:00
docs
url: https://www.europarl.europa.eu/doceo/document/BUDG-PR-759895_EN.html title: PE759.895
type
Committee draft report
body
EP
committees/3/opinion
False
forecasts
  • date: 2024-04-22T00:00:00 title: Indicative plenary sitting date
forecasts
  • date: 2024-04-22T00:00:00 title: Indicative plenary sitting date
forecasts
  • date: 2024-04-22T00:00:00 title: Indicative plenary sitting date
forecasts
  • date: 2024-04-22T00:00:00 title: Indicative plenary sitting date
forecasts
  • date: 2024-04-22T00:00:00 title: Indicative plenary sitting date
forecasts
  • date: 2024-04-22T00:00:00 title: Indicative plenary sitting date
forecasts
  • date: 2024-04-22T00:00:00 title: Indicative plenary sitting date
forecasts
  • date: 2024-04-22T00:00:00 title: Indicative plenary sitting date