BETA

23 Amendments of Markus PIEPER related to 2023/0081(COD)

Amendment 273 #
Proposal for a regulation
Recital 32
(32) The weighting of criteria on the sustainability and resilience contribution of the tender in relation to public procurement procedures is without prejudice to the possibility for ca minimum threshold. Within this minimum threshold, the contracting authorities and contracting entities may freely differentiate the weighting of the individual criteria, without ignoring one completely. Contracting authorities and contracting entities tomay always set a higher threshold for the criteria relating to environmental sustainability and innovation, in line with Article 41 (3) and Recital 64 of Directive 2014/23/EU of the European Parliament and of the Council50 , Article 67 (5) of Directive 2014/24/EU and Article 82 (5) of Directive 2014/25/EU. _________________ 50 Directive 2014/23/EU of the European Parliament and of the Council of 26 February 2014 on the award of concession contracts (OJ L 94, 28.3.2014, p. 1)one or several relevant criteria on the sustainability and resilience contribution. Given the importance of increasing the resilience of the Union’s energy system, the contracting authorities and contracting entities should pay significant attention to the resilience contribution.
2023/06/23
Committee: ITRE
Amendment 461 #
Proposal for a regulation
Article 1 – paragraph 3 a (new)
3a. The Commission shall, where appropriate, review and update the list of net-zero technologies by …[2 years after the date of entry into force of this Regulation], and thereafter periodically every two years.
2023/06/23
Committee: ITRE
Amendment 511 #
Proposal for a regulation
Article 3 – paragraph 1 – point a
(a) ‘net-zero technologies’ means renewable energy technologies66 ; electricity and heat storage technologies; heat pumps; grid technologies; renewable fuels of non-biological origin technologies; sustainable alternative fuels technologies67 ; electrolysers and fuel cells; advanced technologies to produce energy from nuclear processes with minimal waste from the fuel cycle, small modular reactors, and related best-in-class fuels; carbon capture, utilisation, and storage technologies; and energy-system related energy efficiency technologies. They refer to the final products, specific components and specific machinery primarily used for the production of those products. They shall have reached a technology readiness level of at least 8. _________________ 66 ‘renewable energy' means ‘renewable energy’ as defined in Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the promotion of the use of energy from renewable sources 67 ‘sustainable alternative fuels’ means fuels covered by the Proposal for a Regulation of the European Parliament and of the Council on ensuring a level playing field for sustainable air transport, COM/2021/561 final and by the Proposal for a Regulation of the European Parliament and Council on the use of renewable and low-carbon fuels in maritime transport COM/2021/562 final.
2023/06/23
Committee: ITRE
Amendment 526 #
Proposal for a regulation
Article 3 – paragraph 1 – point b
(b) ‘component’ means a small part of a net- zero technology that is manufactured and traded by a company starting from processed material, including materials and intermediate products;
2023/06/23
Committee: ITRE
Amendment 670 #
Proposal for a regulation
Article 6 – paragraph 1 – introductory part
1. The permit-granting process for net-zero technology manufacturing projects shall not exceed any of the following time limits:
2023/06/23
Committee: ITRE
Amendment 686 #
Proposal for a regulation
Article 6 – paragraph 1 – point a
(a) 125 months for the construction of net-zero technology manufacturing projects with a yearly manufacturing capacity of less than 1 GW;
2023/06/23
Committee: ITRE
Amendment 695 #
Proposal for a regulation
Article 6 – paragraph 1 – point b
(b) 185 months for the construction of net-zero technology manufacturing projects, with a yearly manufacturing capacity of more than 1 GW.
2023/06/23
Committee: ITRE
Amendment 702 #
Proposal for a regulation
Article 6 – paragraph 2
2. For net-zero technology manufacturing projects for which a yearly manufacturing capacity is not measured in GW, the permit-granting process shall not exceed a time limit of 185 months.
2023/06/23
Committee: ITRE
Amendment 723 #
Proposal for a regulation
Article 6 – paragraph 9 a (new)
9a. The duration of the permit- granting process shall not include the time for administrative steps required for significant upgrades and expansions of the grid necessary to ensure grid stability, reliability, and safety.
2023/06/23
Committee: ITRE
Amendment 724 #
9b. National competent authorities shall ensure that the lack of reply of the relevant administrative bodies within the applicable time limits referred to in this Article results in the specific intermediary steps to be considered as approved, except where the specific project is subject to an environmental impact assessment pursuant to Council Directive 92/43/EEC or Directive 2000/60/EC, Directive 2008/98/EC, Directive 2009/147/EC, Directive 2010/75/EU, 2011/92/EU or Directive 2012/18/EU or a determination of whether such environmental impact assessment is necessary and the relevant assessments concerned have not yet been carried out, or where the principle of administrative tacit approval does not exist in the national legal system. In any of these cases, the administrative tacit approval period shall not exceed two months. All decisions shall be made publicly available.
2023/06/23
Committee: ITRE
Amendment 749 #
Proposal for a regulation
Article 8 – paragraph 1
1. When preparing plans, including zoning, spatial plans and land use plans, national, regional and local authorities shall, where appropriate, include in those plans provisions for the development of net-zero technology manufacturing projects, including net-zero strategic projects and their necessary infrastructure. Priority shall be given to artificial and built surfaces, industrial sites, brownfield sites, and, where appropriate, greenfield sites not usable for agriculture and forestry.
2023/06/23
Committee: ITRE
Amendment 811 #
Proposal for a regulation
Article 10 – paragraph 1 – point b – point iv a (new)
(iva) it supports the increase of SME competitiveness
2023/06/23
Committee: ITRE
Amendment 906 #
Proposal for a regulation
Article 13
Duration of the permit-granting process for net-zero strategic projects 1. The permit-granting process for net- zero strategic projects shall not exceed any of the following time limits: (a) 9 months for the construction of net- zero strategic projects with a yearly manufacturing capacity of less than 1 GW; (b) 12 months for the construction of net- zero strategic projects, with a yearly manufacturing capacity of more than 1 GW; (c) 18 months for all necessary permits to operate a storage site in accordance with Directive 2009/31/EC. 2. For net-zero strategic technologies for which a yearly manufacturing capacity is not measured in GW, the permit-granting process shall not exceed a time limit of 12 months. 3. For the expansion of manufacturing capacity in existing manufacturing facilities, the time limits referred to in paragraphs 1 and 2 shall be halved. 4. National competent authorities shall ensure that the lack of reply of the relevant administrative bodies within the applicable time limits referred to in this Article results in the specific intermediary steps to be considered as approved, except where the specific project is subject to an environmental impact assessment pursuant to Council Directive 92/43/EEC or Directive 2000/60/EC, Directive 2008/98/EC, Directive 2009/147/EC, Directive 2010/75/EU, 2011/92/EU or Directive 2012/18/EU or a determination of whether such environmental impact assessment is necessary and the relevant assessments concerned have not yet been carried out, or where the principle of administrative tacit approval does not exist in the national legal system. This provision shall not apply to final decisions on the outcome of the process, which are to be explicit. All decisions shall be made publicly available.Article 13 deleted
2023/06/23
Committee: ITRE
Amendment 953 #
Proposal for a regulation
Article 14 – paragraph 2 – introductory part
2. Member States may provide administrative support to net-zero strategic, involving SMEs, projects to facilitate their rapid and effective implementation, including by providing:
2023/06/23
Committee: ITRE
Amendment 1163 #
Proposal for a regulation
Article 19
[...]deleted
2023/06/23
Committee: ITRE
Amendment 1213 #
Proposal for a regulation
Article 19 – paragraph 2 a (new)
2a. The tender’s resilience contribution shall be based on the following cumulative criteria which shall be objective, transparent and non- discriminatory: (a) where applicable, the tender’s contribution to the energy security of the Union; (b) the tender’s contribution to the resilience of the Union, taking into account the diversification of supplies by considering the proportion of the products originating from a single source of supply, as determined in accordance with Regulation (EU) No 952/2013 of the European Parliament and of the Council1a. The supply shall be deemed insufficiently diversified where a single source supplied outside the European Economic Area, in the last year for which data is available, more than 65% of the total demand within the European Union for a specific net-zero technology or the components primarily used for the production of these technologies. _________________ 1a Regulation (EU) No 952/2013 of the European Parliament and of the Council of 9 October 2013 laying down the Union Customs Code (OJ L 269, 10.10.2013, p. 1).
2023/06/23
Committee: ITRE
Amendment 1222 #
Proposal for a regulation
Article 19 – paragraph 3
3. Contracting authorities and contracting entities shall give the tender’s sustainability and resilience contribution a weight between 15% and 30of at least 15% of the award criteria, without prejudice of the application of Article 41 (3) of Directive 2014/23/EU, Article 67 (5) of Directive 2014/24/EU or Article 82 (5) of Directive 2014/25/EU for giving a higher weighting to the criteria referred to in paragraph 2, points (a) and (b)taking into account cumulatively all relevant sustainability and resilience criteria.
2023/06/23
Committee: ITRE
Amendment 1236 #
Proposal for a regulation
Article 19 – paragraph 4
4. TBy derogation from paragraph 3, the contracting authority or the contracting entity shall not be obliged to apply the considerations relating to themay decide to lower the weight of the tender’s sustainability and resilience contribution of net-zero technologies where their application would clearly oblige that authority or entity to acquire equipment having disproportionate costs, or technical characteristics different from those of existing equipment, resulting in incompatibility, technical difficulties in operation and maintenance. Cost differences above 10%, compared to a tender without the sustainability and resilience contribution, may be presumed by contracting authorities and contracting entities to be disproportionate. This provision shall be without prejudice of the possibility to exclude abnormally low tenders under Article 69 of Directive 2014/24/EU and Article 84 of Directive 2014/25/EU, and without prejudice to other contract award and exclusion criteria according to the EU legislation, including social aspects according to Articles 30 (3) and 36 (1), second intent of Directive 2014/23/EU, Articles 18 (2) and 67 (2) of Directive 2014/24/EU and Articles 36 (2) and 82 (2) of Directive 2014/24/EU.
2023/06/23
Committee: ITRE
Amendment 1247 #
Proposal for a regulation
Article 20
Auctions to deploy renewable energy 1. Without prejudice to Article 4 of Directive (EU) 2018/2001 and Articles 107 and 108 the Treaty, and to the Union’s international commitments including the GPA and other international agreements by which the Union is bound, Member States, regional or local authorities, bodies governed by public law or associations formed by one or more such authorities or one or more such bodies governed by public law, shall assess the sustainability and resilience contribution as referred to in Article 19(2) of this Regulation when designing the criteria used for ranking bids in the framework of auctions, the aim of which is to support the production or consumption of energy from renewable sources as defined in Article 2, point (1) of Directive (EU) 2018/2001. 2. The sustainability and resilience contribution shall be given a weight between 15% and 30% of the award criteria, without prejudice of the possibility to give a higher weighting to the criteria in Article 19(2), points (a) and (b), where applicable under Union legislation, and of any limit for non-price criteria set under State aid rules. 3. The Member States, regional or local authorities, bodies governed by public law or associations formed by one or more such authorities or one or more such bodies governed by public law shall not be obliged to apply the considerations relating to the sustainability and resilience contribution of net-zero technologies where their application would oblige those entities to acquire equipment having disproportionate costs, or technical characteristics different from those of existing equipment, resulting in incompatibility, technical difficulties in operation and maintenance. Cost differences above 10% may be presumed by contracting authorities and contracting entities to be disproportionate.rticle 20 deleted sources
2023/06/23
Committee: ITRE
Amendment 1311 #
Proposal for a regulation
Article 23
European Net Zero Industry Academies 1. The Commission shall support, including through the provision of seed- funding, the establishment of European Net Zero Industry Academies, which have as their objectives to: (a) develop learning programmes, content and learning and training materials for training and education on developing, producing, installing, commissioning, operating, maintaining and recycling net- zero technologies, on raw materials, as well as to support the capacities of public authorities competent to issue permits and authorisations referred to in Chapter II and contracting authorities referred to in Chapter IV of this Regulation; (b) enable and promote the use of the learning programmes, content and materials by education and training providers in the Member States, among others by training trainers and develop mechanisms to ensure the quality of the training offered by education and training providers in the Member States based on the above learning programmes, content and materials; (c) develop and deploy credentials, including micro-credentials, to facilitate the transparency of skills acquired and enhance the transferability between jobs and the cross-border mobility of the workforce, and to promote matching with relevant jobs through tools such as the European Employment Services (EURES) network and EURAXESS. 2. European Net Zero Industry Academies shall counter gender stereotypes and pay particular attention to the need to activate more women and young people, who are not in education, employment or training for the labour market.Article 23 deleted
2023/06/23
Committee: ITRE
Amendment 1388 #
Proposal for a regulation
Article 27 – paragraph 1 – point c
(c) where appropriate, establish a dedicated channel for communication with small and medium enterprises to provide guidance and respond to queries about the implementation of Article 26.
2023/06/23
Committee: ITRE
Amendment 1500 #
Proposal for a regulation
Article 31 – paragraph 2 – point h a (new)
(ha) participation of SMEs in net-zero technology manufacturing
2023/06/23
Committee: ITRE
Amendment 1535 #
Proposal for a regulation
Annex I – table 1
1. Solar photovoltaic and solar thermal technologies 2. Onshore wind and offshore renewable technologies 3. Battery/storage technologies 4. Heat pumps and geothermal energy technologies 5. Electrolysers and fuel cells 6. Sustainable biogas/biomethane technologies 7. Carbon Capture and storage (CCS) technologies 8. Grid technologies 8a. Biomass
2023/06/23
Committee: ITRE