BETA


2014/0107(COD) Cableway installations

Progress: Procedure completed

RoleCommitteeRapporteurShadows
Lead IMCO LÓPEZ-ISTÚRIZ WHITE Antonio (icon: PPE PPE) ANDERSON Lucy (icon: S&D S&D), TREBESIUS Ulrike (icon: ECR ECR), CHARANZOVÁ Dita (icon: ALDE ALDE), DURAND Pascal (icon: Verts/ALE Verts/ALE)
Former Responsible Committee IMCO
Committee Opinion ITRE
Committee Opinion TRAN
Former Committee Opinion ITRE
Former Committee Opinion TRAN
Lead committee dossier:
Legal Basis:
TFEU 114

Events

2016/03/31
   Final act published in Official Journal
Details

PURPOSE: to update internal market rules applicable to cableway installations in order to ensure that these installations conform to requirements guaranteeing a high level of protection of the health and safety of persons and ensuring the proper functioning of the internal market for subsystems of cableway installations and safety components.

LEGISLATIVE ACT: Regulation (EU) 2016/424 of the European Parliament and of the Council on cableway installations and repealing Directive 2000/9/EC.

CONTENT: the new Regulation replaces Directive 2000/9/EC. It lays down rules on the making available on the market and the free movement of subsystems and safety components for cableway installations. It also contains rules on the design, construction and entry into service of new cableway installations.

Scope: the Regulation applies to cableway installations designed to transport persons used in particular in high-altitude tourist resorts, in urban transport facilities or in sports facilities. Cableway installations are mainly lift systems, such as funicular railways, aerial ropeways (cable cars, gondolas, chairlifts) and drag lifts.

Excluded from the scope of the Regulation are : lifts; cableway installations that are categorised by Member States as historic, cultural or heritage installations, that entered into service before 1 January 1986 and that are still in operation; installations intended for agricultural or forestry purposes; cableway installations for the service of mountain shelters.

The Regulation applies to new cableway installations, to modifications of cableway installations requiring a new authorisation and covers subsystems and safety components that are new to the Union market when they are placed on it.

Safety analysis, entry into service, authorisation and operation of cableway installations : the new Regulation specifies the following:

Member States should take the necessary steps to ensure that cableway installations enter into service only if they comply with the Regulation and are not liable to endanger the health or safety of persons or property when properly installed, maintained and operated in accordance with their intended purpose; the person responsible for the cableway installation, determined by a Member State, shall carry out a safety analysis of the planned cableway installation . The safety analysis shall ensure that the design and configuration of the cableway installation takes account of the local surroundings and the most adverse situations in order to ensure satisfactory safety conditions. The safety analysis shall also cover the safety devices. The result of the safety analysis shall be included in a safety report; each Member State shall lay down procedures for authorising the construction and the entry into service of cableway installations which are located within its territory.

Obligations of economic operators (manufacturers, importers, distributors ): all economic operators intervening in the supply and distribution chain should take appropriate measures to ensure that they only make available on the market subsystems and safety components which are in conformity with the Regulation.

In particular, manufacturers shall ensure, when placing their subsystems or safety components on the market or when incorporating them into a cableway installation, that the former have been designed and manufactured in accordance with the essential requirements on health and safety set out in Annex II. They must:

implement the conformity assessment procedures established by the Regulation; draw up an EU declaration of conformity and affix the CE marking; keep the technical documentation and the EU declaration of conformity for 30 years after the subsystem or the safety component has been placed on the market; carry out sample testing of subsystems or safety components made available on the market, investigate, and, if necessary, keep a register of complaints, of non-conforming subsystems and safety components and recalls of such subsystems and safety components, and shall keep distributors informed of any such monitoring; ensure that subsystems or safety components bear a type, batch or serial number or other element allowing their identification; indicate on the subsystem or the safety component their name, registered trade name or registered trade mark and the postal address at which they can be contacted or, where that is not possible, on the packaging or in a document accompanying the subsystem or safety component; ensure that instructions and safety information , as well as any labelling, is clear, understandable, intelligible and legible; further to a reasoned request from a competent national authority , provide it with all the information and documentation necessary to demonstrate the conformity of the subsystem or the safety component with this Regulation, in a language which can be easily understood by that authority immediately take the corrective measures necessary to bring that subsystem or safety component into conformity, to withdraw it or recall it, if appropriate.

For their part, importers must make sure that the subsystems or safety components they place on the market comply with the essential requirements and which do not present a risk. They must also make sure that conformity assessment procedures have been carried out and that subsystem and safety component marking and documentation drawn up by manufacturers are available for inspection by the competent national authorities.

CE marking : before the subsystem or the safety component is placed on the market, the CE marking shall be affixed visibly, legibly and indelibly to the subsystem or the safety component or to its data plate, or where that is not possible, it shall be affixed to the packaging and to the accompanying documents. The CE marking and the identification number may be followed by any other mark indicating a special risk or use. Member States shall take appropriate action in the event of improper use of that marking.

Notifying authorities : the Regulation sets requirements for notifying authorities responsible for conformity assessment bodies. These bodies must apply the conformity assessment procedures without creating unnecessary burdens for economic operators. Interested parties have the right to appeal against the result of a conformity assessment carried out by a notified body.

Market surveillance : in the context of aligning the legislation on subsystems and safety components with the new legislative framework for the marketing of products, and in order to ensure legal certainty, the rules on Union market surveillance and control of products entering the Union market provided for in Regulation (EC) No 765/2008 apply to subsystems or safety components referred to in the Regulation.

The new Regulation also contains provisions regarding procedures at national level for dealing with subsystems or safety components presenting a risk, Union safeguard procedures, and compliant subsystems or safety components which present a risk to health and safety.

Transitional provisions : Member States shall not impede the making available on the market of subsystems or safety components which are in conformity with Directive 2009/9/EC and which were placed on the market before 21 April 2018.

ENTRY INTO FORCE: 20.4.2016.

APPLICATION: from 21.4.2018, with the exception on certain provisions which are applicable from 21.10.2016 or from 21.3.2018.

2016/03/16
   EC - Commission response to text adopted in plenary
Documents
2016/03/09
   CSL - Draft final act
Documents
2016/03/09
   CSL - Final act signed
2016/02/12
   EP/CSL - Act adopted by Council after Parliament's 1st reading
2016/02/12
   EP - End of procedure in Parliament
2016/02/12
   CSL - Council Meeting
2016/01/20
   EP - Results of vote in Parliament
2016/01/20
   EP - Decision by Parliament, 1st reading
Details

The European Parliament adopted by 639 votes to 69, with 2 abstentions, a legislative resolution on the proposal for a regulation of the European Parliament and of the Council on cableway installations.

Parliament’s position, adopted at first reading following the ordinary legislative procedure, amended the Commission proposal as follows:

Subject matter and scope : this Regulation:

lays down rules on the making available on the market and the free movement of subsystems and safety components for cableway installations ; contains rules on the design, construction and entry into service of new cableway installations; applies to new cableway installations designed to transport persons, to modifications of cableway installations requiring a new authorisation, and to subsystems and safety components for cableway installations.

Cableway installations are mainly lift systems, such as funicular railways, aerial ropeways (cable cars, gondolas, chairlifts) and drag lift.

The Regulation does not apply to the following:

lifts covered by Directive 2014/33/EU; cableway installations that are categorised by Member States as historic, cultural or heritage installations, that entered into service before 1 January 1986 and that are still in operation, and that have not had any significant changes in design or construction, including subsystems and safety components specifically designed for them; installations intended for agricultural or forestry purposes; cableway installations for the service of mountain shelters and huts intended only for the transport of goods and specifically authorised persons;

Entry into service of cableway installations : Member States shall take all appropriate measures to determine the procedures for ensuring that the subsystems and safety components are incorporated into cableway installations only if they enable the construction of cableway installations which comply with this Regulation and are not liable to endanger the health or safety of persons or property when properly installed, maintained and operated in accordance with their intended purpose.

Safety analysis : the person responsible for the cableway installation, determined by a Member State in accordance with national law , shall carry out a safety analysis of the planned cableway installation or have such a safety analysis carried out. The safety analysis required for each cableway installation shall take into account all modes of operation envisaged and ensure that the design and configuration of the cableway installation takes account of the local surroundings and the most adverse situations in order to ensure satisfactory safety conditions.

The analysis shall also cover the safety devices and their effects on the cableway installation and related subsystems that they bring into action so that the safety devices are capable of reacting to an initial breakdown or failure detected so as to remain either in a state that guarantees safety, in a lower operating mode or in a fail-safe state.

The result of the safety analysis shall be included in a safety report .

Each Member State shall lay down procedures for authorising the construction and the entry into service of cableway installations which are located within its territory.

Consistency with the New Legislative Framework (NLF) : Parliament approved the alignment of the provisions to the goods package adopted in 2008 and in particular to the Decision No 768/2008/EC on a common framework for the marketing of products. The framework set out by the NLF consists of provisions which are commonly used in EU product legislation.

The amendments seek to improve the consistency of the text with the NLF. They state inter alia that:

manufacturers shall indicate on the subsystem or the safety component their name, registered trade name or registered trade mark and the postal address at which they can be contacted or, where that is not possible, on the packaging or in a document accompanying the subsystem or safety component. Where the manufacturer indicates a website address, he shall ensure that the information on that website is accessible and kept updated; where a large number of subsystems or safety components are delivered to a single economic operator or user, the batch or consignment concerned may be accompanied by a single copy of the EU declaration of conformity; the CE marking shall be affixed visibly, legibly and indelibly to the subsystem or the safety component or to its data plate. Where that is not possible or not warranted on account of the nature of the subsystem or the safety component, it shall be affixed to the packaging and to the accompanying documents.

Right to appeal : interested parties should have the right to appeal against the result of a conformity assessment carried out by a notified body. For that reason, Members proposed that notified bodies shall ensure that an appeal procedure against their decisions is available.

Market surveillance : Parliament proposed the addition of a new provisions on the Union market surveillance and control of subsystems and safety components entering the Union market and the Union safeguard procedure.

Penalties : the penalties provided for shall be effective, proportionate and dissuasive and may be increased where the relevant economic operator has previously committed a similar infringement of this Regulation.

Documents
2016/01/19
   EP - Debate in Parliament
2015/11/10
   EP - Approval in committee of the text agreed at 1st reading interinstitutional negotiations
Documents
2015/10/12
   CSL - Coreper letter confirming interinstitutional agreement
2015/03/25
   EP - Committee report tabled for plenary, 1st reading
Details

The Committee on the Internal Market and Consumer Protection adopted the report by Antonio LÓPEZ-ISTÚRIZ WHITE (EPP, ES) on the proposal for a regulation of the European Parliament and of the Council on cableway installations.

The committee recommended that the European Parliament’s position at first reading following the ordinary legislative procedure should amend the Commission proposal as follows:

Purpose and scope of the proposal : this Regulation applies to new cableway installations and covers subsystems and safety components which are new to the Union market when they are placed on the market; that is to say they are either new subsystem and safety components made by a manufacturer established in the Union or subsystems and safety components, whether new or second-hand, imported from a third country.

Cableway installations are mainly lift systems, such as funicular railways, aerial ropeways, cable cars, gondolas, chairlifts drag lifts and other installations for tourism or sport purpose.

The provisions of this Regulation are based on the precautionary principle . The Regulation shall not apply to:

cableway installations of historical construction, including cable-operated tramways, funicular railways and cliff railways, as identified by national law, including subsystems and safety components specifically designed for them; installations intended for agricultural or forestry purposes; cableway installations for the service of mountain shelters and huts intended only for the transport of goods and specifically authorised persons; on-site or mobile equipment exclusively designed for leisure and amusement purposes and not as a means for transporting persons.

Entry into service of cableway installations : the subsystems and safety components should be incorporated into cableway installations only if they enable the construction of cableway installations which satisfy the requirements of this Regulation and are not liable to endanger the health or safety of persons or property when properly incorporated, maintained and operated in accordance with their intended purpose.

Safety analysis : the person responsible for the cableway installation, determined by a Member State in accordance with national law, shall submit the safety report.

The safety analysis required for every cableway installation shall take into account every mode of operation envisaged taking into account the local surroundings and the most adverse situations in order to ensure satisfactory safety conditions. The safety analysis shall also cover the safety devices and their effect on the cableway installation and related subsystems that they bring into action.

Consistency with the New Legislative Framework (NLF) : Members supported the alignment of the provisions to the goods package adopted in 2008 and in particular to the Decision No 768/2008/EC on a common framework for the marketing of products. The framework set out by the NLF consists of provisions which are commonly used in EU product legislation.

Following the adoption of nine proposals which together form the "alignment package", the report proposed amendments seek to improve the consistency of the text with the NLF in particular as regards the obligations of economic operators, the EU declaration of conformity, rules on affixing the CE marking requirements, the information obligation incumbent on notifying authorities, the presumption of conformity of the notified bodies and the information obligation on notified bodies.

Market surveillance : Members proposed the addition of a new Chapter IV on the Union market surveillance and control of subsystems and safety components entering the Union market and the Union safeguard procedure.

In order to increase transparency and to reduce processing time, it is necessary to improve the existing safeguard procedure, with a view to making it more efficient and drawing on the expertise available in the Member States. The existing system should:

be supplemented by a procedure under which interested parties are informed of measures intended to be taken with regard to subsystems and safety components presenting a risk to the health or safety of persons; allow market surveillance authorities, in cooperation with the relevant economic operators, to act at an earlier stage in respect of such subsystems and safety components.

When matters relating to this Regulation, other than its implementation or infringements, are being examined, the European Parliament should in line with existing practice receive full information and documentation and an invitation to attend such meetings.

Documents
2015/03/17
   EP - Vote in committee, 1st reading
2015/03/17
   EP - Committee decision to open interinstitutional negotiations with report adopted in committee
2015/01/16
   EP - Amendments tabled in committee
Documents
2014/12/04
   CSL - Debate in Council
Documents
2014/12/04
   CSL - Council Meeting
2014/11/27
   EP - Committee draft report
Documents
2014/10/20
   EP - Committee referral announced in Parliament, 1st reading
2014/07/17
   EP - LÓPEZ-ISTÚRIZ WHITE Antonio (PPE) appointed as rapporteur in IMCO
2014/07/09
   ESC - Economic and Social Committee: opinion, report
Documents
2014/05/19
   ES_PARLIAMENT - Contribution
Documents
2014/04/02
   EP - Committee referral announced in Parliament, 1st reading
2014/03/27
   EC - Document attached to the procedure
2014/03/27
   EC - Document attached to the procedure
2014/03/27
   EC - Legislative proposal published
Details

PURPOSE: to revise Directive 2000/9/EC in order to ensure that cableway installations fulfil the requirements providing for a high level protection of and safety of users while guaranteeing the functioning of the internal market for subsystems and safety components.

PROPOSED ACT: Regulation of the European Parliament and the Council.

ROLE OF THE EUROPEAN PARLIAMENT: the European Parliament decides in accordance with the ordinary legislative procedure and on an equal footing with the Council.

BACKGROUND: Directive 2000/9/EC relating to cableway installations designed to carry persons became applicable on 3 May 2002. It sets out essential requirements with which cableway installations, their infrastructure, subsystems and safety components must comply in order to be safe. The main types of cableway installations covered by Directive 2000/9/EC are funiculars, gondolas, detachable chair lifts, fixed-grip chair lifts, aerial tramways, funitels, combined installations (made of several cableway types, such as those of gondolas and chairlifts) and drag lifts.

Experience from the implementation of Directive 2000/9/EC showed the need to modify some of its provisions in order to clarify and update them and ensure thus legal certainty mainly as regards the: (i) scope, in particular with regard to new types of cableway installations; (ii) lack of an appropriate range of conformity assessment procedures for subsystems, which has led to divergent interpretations and implementation of the conformity assessment of subsystems.

It is also necessary to align Directive 2000/9/EC to the “goods package” adopted in 2008 and in particular to the NLF Decision EC No 768/2008 establishing a common framework for the marketing of products (NLF Decision). The Commission has already proposed the alignment of nine other Directives to the NLF Decision within an “alignment package” adopted on 21 November 2011.

IMPACT ASSESSMENT: the preferred solution consists of combining two options : (i) amending Directive 2000/9/EC; (ii) providing more extensive guidance on the implementation of Directive 2000/9/EC with regard to its scope and of recommending the application of specific conformity assessment procedures for the assessment of subsystems.

CONTENT: the proposal intends to replace Directive 2000/9/EC on cableway installations designed to carry persons by a Regulation. It lays down rules on the design and construction of cableway installations designed to transport persons and on the making available on the market and the free movement of subsystems and safety components for such installations.

The proposal intends to align Directive 2000/9/EC to the “goods package” adopted in 2008 and in particular to the NLF Decision EC No 768/2008.

Scope : the proposal clarifies and updates the existing scope:

in light of the development of new types of cableway installations, it is clarified that the exclusion of cableway installations used for leisure purposes in fairgrounds or amusement parks does not apply to cableway installations that are intended for a dual function, namely of transporting persons and for leisure activities; the exclusion of certain cableway installations intended for agricultural or industrial purposes is maintained, but it clarifies that it also covers cableway installations intended for the service of mountain shelters or huts that are not intended for the transport of the public; the current exclusion of cable-operated ferries is also updated to all cable-operated installations where the users or carriers are water-borne, such as cable-operated water ski installations; the exclusions provided for in Directive 2000/9/EC relating to rack-and-pinion railways and chain-driven installations are not reintroduced.

Obligations of economic operators : the proposal contains, with regard to subsystems and safety components, the typical provisions for product-related Union harmonisation legislation and sets out the obligations of the relevant economic operators (manufacturers, authorised representatives, importers and distributors), in accordance with the NLF Decision.

Harmonised standards : Regulation (EU) No 1025/2012 sets out a horizontal legal framework for European standardisation. Consequently the provisions of Directive 2000/9/EC which cover the same aspects have not been reintroduced in this proposal for reasons of legal certainty.

Conformity assessment : the proposal keeps the requirement for a notified body intervention in the design and production phase of all subsystems and safety components. It introduces a range of conformity assessment procedures for subsystems based on the conformity assessment modules of the NLF Decision. In this framework, it also introduces the CE marking for subsystems.

Notified bodies : in line with the NLF Decision, the proposal reinforces the notification criteria for notified bodies and introduces specific requirements for notifying authorities.

Application : the proposed Regulation will become applicable two years after its entry into force to allow manufacturers, notified bodies and Member States time to adapt to the new requirements. However, the designation of notified bodies pursuant to the new requirements and process needs to start shortly after the entry into force of this Regulation.

A transitional provision is foreseen for the certificates issued by notified bodies under Directive 2000/9/EC with regard to subsystems and safety components so as to allow stocks to be absorbed and ensure a smooth transition to the new requirements.

Documents

Activities

Votes

A8-0063/2015 - Antonio López-Istúriz White - Résolution législative #

2016/01/20 Outcome: +: 639, -: 69, 0: 2
DE IT ES PL RO FR GB BE PT CZ NL EL AT BG HU SE SK FI HR LT LV DK IE SI LU CY MT EE
Total
86
70
50
46
32
73
71
20
19
20
25
21
16
17
21
19
13
12
11
8
8
13
9
7
6
6
6
4
icon: PPE PPE
210

Finland PPE

2
2

Denmark PPE

For (1)

1

Luxembourg PPE

3

Estonia PPE

For (1)

1
icon: S&D S&D
180

Netherlands S&D

3

Croatia S&D

2

Latvia S&D

1

Ireland S&D

For (1)

1

Slovenia S&D

For (1)

1

Luxembourg S&D

For (1)

1

Cyprus S&D

2

Malta S&D

3
icon: ALDE ALDE
62

Romania ALDE

3

United Kingdom ALDE

1

Croatia ALDE

2
2

Latvia ALDE

1

Denmark ALDE

3

Ireland ALDE

For (1)

1

Luxembourg ALDE

For (1)

1

Estonia ALDE

3
icon: ECR ECR
70

Italy ECR

2

Romania ECR

For (1)

1

Czechia ECR

2

Netherlands ECR

2

Greece ECR

For (1)

1

Bulgaria ECR

Against (1)

2
2

Croatia ECR

For (1)

1

Lithuania ECR

1

Latvia ECR

For (1)

1
icon: Verts/ALE Verts/ALE
47

Belgium Verts/ALE

2

Netherlands Verts/ALE

2

Austria Verts/ALE

3

Hungary Verts/ALE

2

Sweden Verts/ALE

3

Finland Verts/ALE

For (1)

1

Croatia Verts/ALE

For (1)

1

Lithuania Verts/ALE

For (1)

1

Latvia Verts/ALE

1

Denmark Verts/ALE

For (1)

1

Slovenia Verts/ALE

For (1)

1

Luxembourg Verts/ALE

For (1)

1
icon: GUE/NGL GUE/NGL
46

United Kingdom GUE/NGL

1
3

Czechia GUE/NGL

2

Netherlands GUE/NGL

3

Sweden GUE/NGL

Abstain (1)

1

Finland GUE/NGL

For (1)

1

Denmark GUE/NGL

Abstain (1)

1

Ireland GUE/NGL

Against (1)

3

Cyprus GUE/NGL

2
icon: NI NI
15

Germany NI

2

Poland NI

Against (1)

1

France NI

3

United Kingdom NI

For (1)

1
3
icon: EFDD EFDD
44

Poland EFDD

1

France EFDD

1

Czechia EFDD

Against (1)

1

Sweden EFDD

2
icon: ENF ENF
35

Poland ENF

Against (1)

1

Romania ENF

1

United Kingdom ENF

Against (1)

1

Belgium ENF

For (1)

1

Netherlands ENF

4
AmendmentsDossier
42 2014/0107(COD)
2015/01/13 IMCO 42 amendments...
source: 544.306

History

(these mark the time of scraping, not the official date of the change)

docs/2/docs/0/url
Old
https://dm.eesc.europa.eu/EESCDocumentSearch/Pages/redresults.aspx?k=(documenttype:AC)(documentnumber:2911)(documentyear:2014)(documentlanguage:EN)
New
https://dmsearch.eesc.europa.eu/search/public?k=(documenttype:AC)(documentnumber:2911)(documentyear:2014)(documentlanguage:EN)
docs/3/docs/0/url
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=COMPARL&mode=XML&language=EN&reference=PE537.493
New
https://www.europarl.europa.eu/doceo/document/IMCO-PR-537493_EN.html
docs/4/docs/0/url
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=COMPARL&mode=XML&language=EN&reference=PE544.306
New
https://www.europarl.europa.eu/doceo/document/IMCO-AM-544306_EN.html
events/1/type
Old
Committee referral announced in Parliament, 1st reading/single reading
New
Committee referral announced in Parliament, 1st reading
events/2/type
Old
Committee referral announced in Parliament, 1st reading/single reading
New
Committee referral announced in Parliament, 1st reading
events/4/type
Old
Vote in committee, 1st reading/single reading
New
Vote in committee, 1st reading
events/6
date
2015-03-25T00:00:00
type
Committee report tabled for plenary, 1st reading
body
EP
docs
url: https://www.europarl.europa.eu/doceo/document/A-8-2015-0063_EN.html title: A8-0063/2015
summary
events/6
date
2015-03-25T00:00:00
type
Committee report tabled for plenary, 1st reading/single reading
body
EP
docs
url: http://www.europarl.europa.eu/doceo/document/A-8-2015-0063_EN.html title: A8-0063/2015
summary
events/8/docs
  • url: http://www.europarl.europa.eu/sides/getDoc.do?secondRef=TOC&language=EN&reference=20160119&type=CRE title: Debate in Parliament
events/10
date
2016-01-20T00:00:00
type
Decision by Parliament, 1st reading
body
EP
docs
url: https://www.europarl.europa.eu/doceo/document/TA-8-2016-0014_EN.html title: T8-0014/2016
summary
events/10
date
2016-01-20T00:00:00
type
Decision by Parliament, 1st reading/single reading
body
EP
docs
url: http://www.europarl.europa.eu/doceo/document/TA-8-2016-0014_EN.html title: T8-0014/2016
summary
events/14/docs/2/url
Old
https://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexapi!prod!CELEXnumdoc&lg=EN&model=guicheti&numdoc=32016R0424R(01)
New
https://eur-lex.europa.eu/LexUriServ/LexUriServ.do?uri=CELEX:[%SECTOR]2016[%DESCRIPTOR]3042401:EN:NOT
procedure/Modified legal basis
Rules of Procedure EP 159
procedure/Other legal basis
Rules of Procedure EP 159
committees/0
type
Responsible Committee
body
EP
associated
False
committee_full
Internal Market and Consumer Protection
committee
IMCO
rapporteur
name: LÓPEZ-ISTÚRIZ WHITE Antonio date: 2014-07-17T00:00:00 group: European People's Party (Christian Democrats) abbr: PPE
shadows
committees/0
type
Responsible Committee
body
EP
associated
False
committee_full
Internal Market and Consumer Protection
committee
IMCO
date
2014-07-17T00:00:00
rapporteur
name: LÓPEZ-ISTÚRIZ WHITE Antonio group: European People's Party (Christian Democrats) abbr: PPE
shadows
committees/1/date
    committees/4/date
      committees/5/date
        docs/7/body
        EC
        events/6/docs/0/url
        Old
        http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A8-2015-0063&language=EN
        New
        http://www.europarl.europa.eu/doceo/document/A-8-2015-0063_EN.html
        events/10/docs/0/url
        Old
        http://www.europarl.europa.eu/sides/getDoc.do?type=TA&language=EN&reference=P8-TA-2016-0014
        New
        http://www.europarl.europa.eu/doceo/document/TA-8-2016-0014_EN.html
        committees/0
        type
        Responsible Committee
        body
        EP
        associated
        False
        committee_full
        Internal Market and Consumer Protection
        committee
        IMCO
        date
        2014-07-17T00:00:00
        rapporteur
        name: LÓPEZ-ISTÚRIZ WHITE Antonio group: European People's Party (Christian Democrats) abbr: PPE
        shadows
        committees/0
        type
        Responsible Committee
        body
        EP
        associated
        False
        committee_full
        Internal Market and Consumer Protection
        committee
        IMCO
        date
        2014-07-17T00:00:00
        rapporteur
        name: LÓPEZ-ISTÚRIZ WHITE Antonio group: Group of European People's Party abbr: EPP
        shadows
        activities
        • date: 2014-03-27T00:00:00 docs: url: http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2014&nu_doc=0187 title: COM(2014)0187 type: Legislative proposal published celexid: CELEX:52014PC0187:EN body: EC commission: DG: url: http://ec.europa.eu/dgs/transport/index_en.htm title: Mobility and Transport Commissioner: BULC Violeta type: Legislative proposal published
        • date: 2014-04-02T00:00:00 body: EP type: Committee referral announced in Parliament, 1st reading/single reading committees: body: EP responsible: True committee_full: Internal Market and Consumer Protection committee: IMCO body: EP responsible: True committee: IMCO date: 2014-07-17T00:00:00 committee_full: Internal Market and Consumer Protection rapporteur: group: EPP name: LÓPEZ-ISTÚRIZ WHITE Antonio body: EP responsible: False committee_full: Industry, Research and Energy committee: ITRE body: EP responsible: False committee_full: Transport and Tourism committee: TRAN
        • date: 2014-10-20T00:00:00 body: EP type: Committee referral announced in Parliament, 1st reading/single reading committees: body: EP responsible: True committee_full: Internal Market and Consumer Protection committee: IMCO body: EP responsible: True committee: IMCO date: 2014-07-17T00:00:00 committee_full: Internal Market and Consumer Protection rapporteur: group: EPP name: LÓPEZ-ISTÚRIZ WHITE Antonio body: EP responsible: False committee_full: Industry, Research and Energy committee: ITRE body: EP responsible: False committee_full: Transport and Tourism committee: TRAN
        • body: CSL meeting_id: 3353 docs: url: http://register.consilium.europa.eu/content/out?lang=EN&typ=SET&i=SMPL&ROWSPP=25&RESULTSET=1&NRROWS=500&DOC_LANCD=EN&ORDERBY=DOC_DATE+DESC&CONTENTS=3353*&MEET_DATE=04/12/2014 type: Debate in Council title: 3353 council: Competitiveness (Internal Market, Industry, Research and Space) date: 2014-12-04T00:00:00 type: Council Meeting
        • date: 2015-03-17T00:00:00 body: unknown type: Committee decision to open interinstitutional negotiations with report adopted in committee
        • date: 2015-03-17T00:00:00 body: EP type: Vote in committee, 1st reading/single reading committees: body: EP responsible: True committee_full: Internal Market and Consumer Protection committee: IMCO body: EP responsible: True committee: IMCO date: 2014-07-17T00:00:00 committee_full: Internal Market and Consumer Protection rapporteur: group: EPP name: LÓPEZ-ISTÚRIZ WHITE Antonio body: EP responsible: False committee_full: Industry, Research and Energy committee: ITRE body: EP responsible: False committee_full: Transport and Tourism committee: TRAN
        • body: EP docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A8-2015-0063&language=EN type: Committee report tabled for plenary, 1st reading/single reading title: A8-0063/2015 type: Committee report tabled for plenary, 1st reading/single reading committees: body: EP responsible: True committee_full: Internal Market and Consumer Protection committee: IMCO body: EP responsible: True committee: IMCO date: 2014-07-17T00:00:00 committee_full: Internal Market and Consumer Protection rapporteur: group: EPP name: LÓPEZ-ISTÚRIZ WHITE Antonio body: EP responsible: False committee_full: Industry, Research and Energy committee: ITRE body: EP responsible: False committee_full: Transport and Tourism committee: TRAN date: 2015-03-25T00:00:00
        • date: 2016-01-19T00:00:00 docs: url: http://www.europarl.europa.eu/sides/getDoc.do?secondRef=TOC&language=EN&reference=20160119&type=CRE type: Debate in Parliament title: Debate in Parliament body: EP type: Debate in Parliament
        • date: 2016-01-20T00:00:00 docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=TA&language=EN&reference=P8-TA-2016-0014 type: Decision by Parliament, 1st reading/single reading title: T8-0014/2016 body: EP type: Decision by Parliament, 1st reading/single reading
        • date: 2016-02-12T00:00:00 body: CSL type: Council Meeting council: Economic and Financial Affairs ECOFIN meeting_id: 3445
        • date: 2016-02-12T00:00:00 body: EP/CSL type: Act adopted by Council after Parliament's 1st reading
        • date: 2016-03-09T00:00:00 body: CSL type: Final act signed
        • date: 2016-03-31T00:00:00 docs: url: http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!CELEXnumdoc&lg=EN&numdoc=32016R0424 title: Regulation 2016/424 url: http://eur-lex.europa.eu/legal-content/EN/TXT/?uri=OJ:L:2016:081:TOC title: OJ L 081 31.03.2016, p. 0001 type: Final act published in Official Journal
        commission
        • body: EC dg: Mobility and Transport commissioner: BULC Violeta
        committees/0
        type
        Responsible Committee
        body
        EP
        associated
        False
        committee_full
        Internal Market and Consumer Protection
        committee
        IMCO
        date
        2014-07-17T00:00:00
        rapporteur
        name: LÓPEZ-ISTÚRIZ WHITE Antonio group: Group of European People's Party abbr: EPP
        shadows
        committees/0
        body
        EP
        responsible
        True
        committee_full
        Internal Market and Consumer Protection
        committee
        IMCO
        committees/1
        type
        Former Responsible Committee
        body
        EP
        associated
        False
        committee_full
        Internal Market and Consumer Protection
        committee
        IMCO
        date
        committees/1
        body
        EP
        responsible
        True
        committee
        IMCO
        date
        2014-07-17T00:00:00
        committee_full
        Internal Market and Consumer Protection
        rapporteur
        group: EPP name: LÓPEZ-ISTÚRIZ WHITE Antonio
        committees/2
        type
        Committee Opinion
        body
        EP
        associated
        False
        committee_full
        Industry, Research and Energy
        committee
        ITRE
        opinion
        False
        committees/2
        body
        EP
        responsible
        False
        committee_full
        Industry, Research and Energy
        committee
        ITRE
        committees/3
        type
        Committee Opinion
        body
        EP
        associated
        False
        committee_full
        Transport and Tourism
        committee
        TRAN
        opinion
        False
        committees/3
        body
        EP
        responsible
        False
        committee_full
        Transport and Tourism
        committee
        TRAN
        committees/4
        type
        Former Committee Opinion
        body
        EP
        associated
        False
        committee_full
        Industry, Research and Energy
        committee
        ITRE
        date
        committees/5
        type
        Former Committee Opinion
        body
        EP
        associated
        False
        committee_full
        Transport and Tourism
        committee
        TRAN
        date
        council
        • body: CSL type: Council Meeting council: Economic and Financial Affairs ECOFIN meeting_id: 3445 url: http://register.consilium.europa.eu/content/out?lang=EN&typ=SET&i=SMPL&ROWSPP=25&RESULTSET=1&NRROWS=500&DOC_LANCD=EN&ORDERBY=DOC_DATE+DESC&CONTENTS=3445*&MEET_DATE=12/02/2016 date: 2016-02-12T00:00:00
        • body: CSL type: Council Meeting council: Competitiveness (Internal Market, Industry, Research and Space) meeting_id: 3353 url: http://register.consilium.europa.eu/content/out?lang=EN&typ=SET&i=SMPL&ROWSPP=25&RESULTSET=1&NRROWS=500&DOC_LANCD=EN&ORDERBY=DOC_DATE+DESC&CONTENTS=3353*&MEET_DATE=04/12/2014 date: 2014-12-04T00:00:00
        docs
        • date: 2014-03-27T00:00:00 docs: url: https://eur-lex.europa.eu/LexUriServ/LexUriServ.do?uri=SWD:2014:0116:FIN:EN:PDF title: EUR-Lex title: SWD(2014)0116 type: Document attached to the procedure body: EC
        • date: 2014-03-27T00:00:00 docs: url: https://eur-lex.europa.eu/LexUriServ/LexUriServ.do?uri=SWD:2014:0117:FIN:EN:PDF title: EUR-Lex title: SWD(2014)0117 type: Document attached to the procedure body: EC
        • date: 2014-07-09T00:00:00 docs: url: https://dm.eesc.europa.eu/EESCDocumentSearch/Pages/redresults.aspx?k=(documenttype:AC)(documentnumber:2911)(documentyear:2014)(documentlanguage:EN) title: CES2911/2014 type: Economic and Social Committee: opinion, report body: ESC
        • date: 2014-11-27T00:00:00 docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=COMPARL&mode=XML&language=EN&reference=PE537.493 title: PE537.493 type: Committee draft report body: EP
        • date: 2015-01-16T00:00:00 docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=COMPARL&mode=XML&language=EN&reference=PE544.306 title: PE544.306 type: Amendments tabled in committee body: EP
        • date: 2015-10-12T00:00:00 docs: title: GEDA/A/(2015)010803 type: Coreper letter confirming interinstitutional agreement body: CSL
        • date: 2016-03-09T00:00:00 docs: url: http://register.consilium.europa.eu/content/out?lang=EN&typ=SET&i=ADV&RESULTSET=1&DOC_ID=[%n4]%2F16&DOC_LANCD=EN&ROWSPP=25&NRROWS=500&ORDERBY=DOC_DATE+DESC title: 00057/2015/LEX type: Draft final act body: CSL
        • date: 2016-03-16T00:00:00 docs: url: /oeil/spdoc.do?i=25494&j=0&l=en title: SP(2016)191 type: Commission response to text adopted in plenary
        • date: 2014-05-19T00:00:00 docs: url: http://www.connefof.europarl.europa.eu/connefof/app/exp/COM(2014)0187 title: COM(2014)0187 type: Contribution body: ES_PARLIAMENT
        events
        • date: 2014-03-27T00:00:00 type: Legislative proposal published body: EC docs: url: https://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2014&nu_doc=0187 title: EUR-Lex title: COM(2014)0187 summary: PURPOSE: to revise Directive 2000/9/EC in order to ensure that cableway installations fulfil the requirements providing for a high level protection of and safety of users while guaranteeing the functioning of the internal market for subsystems and safety components. PROPOSED ACT: Regulation of the European Parliament and the Council. ROLE OF THE EUROPEAN PARLIAMENT: the European Parliament decides in accordance with the ordinary legislative procedure and on an equal footing with the Council. BACKGROUND: Directive 2000/9/EC relating to cableway installations designed to carry persons became applicable on 3 May 2002. It sets out essential requirements with which cableway installations, their infrastructure, subsystems and safety components must comply in order to be safe. The main types of cableway installations covered by Directive 2000/9/EC are funiculars, gondolas, detachable chair lifts, fixed-grip chair lifts, aerial tramways, funitels, combined installations (made of several cableway types, such as those of gondolas and chairlifts) and drag lifts. Experience from the implementation of Directive 2000/9/EC showed the need to modify some of its provisions in order to clarify and update them and ensure thus legal certainty mainly as regards the: (i) scope, in particular with regard to new types of cableway installations; (ii) lack of an appropriate range of conformity assessment procedures for subsystems, which has led to divergent interpretations and implementation of the conformity assessment of subsystems. It is also necessary to align Directive 2000/9/EC to the “goods package” adopted in 2008 and in particular to the NLF Decision EC No 768/2008 establishing a common framework for the marketing of products (NLF Decision). The Commission has already proposed the alignment of nine other Directives to the NLF Decision within an “alignment package” adopted on 21 November 2011. IMPACT ASSESSMENT: the preferred solution consists of combining two options : (i) amending Directive 2000/9/EC; (ii) providing more extensive guidance on the implementation of Directive 2000/9/EC with regard to its scope and of recommending the application of specific conformity assessment procedures for the assessment of subsystems. CONTENT: the proposal intends to replace Directive 2000/9/EC on cableway installations designed to carry persons by a Regulation. It lays down rules on the design and construction of cableway installations designed to transport persons and on the making available on the market and the free movement of subsystems and safety components for such installations. The proposal intends to align Directive 2000/9/EC to the “goods package” adopted in 2008 and in particular to the NLF Decision EC No 768/2008. Scope : the proposal clarifies and updates the existing scope: in light of the development of new types of cableway installations, it is clarified that the exclusion of cableway installations used for leisure purposes in fairgrounds or amusement parks does not apply to cableway installations that are intended for a dual function, namely of transporting persons and for leisure activities; the exclusion of certain cableway installations intended for agricultural or industrial purposes is maintained, but it clarifies that it also covers cableway installations intended for the service of mountain shelters or huts that are not intended for the transport of the public; the current exclusion of cable-operated ferries is also updated to all cable-operated installations where the users or carriers are water-borne, such as cable-operated water ski installations; the exclusions provided for in Directive 2000/9/EC relating to rack-and-pinion railways and chain-driven installations are not reintroduced. Obligations of economic operators : the proposal contains, with regard to subsystems and safety components, the typical provisions for product-related Union harmonisation legislation and sets out the obligations of the relevant economic operators (manufacturers, authorised representatives, importers and distributors), in accordance with the NLF Decision. Harmonised standards : Regulation (EU) No 1025/2012 sets out a horizontal legal framework for European standardisation. Consequently the provisions of Directive 2000/9/EC which cover the same aspects have not been reintroduced in this proposal for reasons of legal certainty. Conformity assessment : the proposal keeps the requirement for a notified body intervention in the design and production phase of all subsystems and safety components. It introduces a range of conformity assessment procedures for subsystems based on the conformity assessment modules of the NLF Decision. In this framework, it also introduces the CE marking for subsystems. Notified bodies : in line with the NLF Decision, the proposal reinforces the notification criteria for notified bodies and introduces specific requirements for notifying authorities. Application : the proposed Regulation will become applicable two years after its entry into force to allow manufacturers, notified bodies and Member States time to adapt to the new requirements. However, the designation of notified bodies pursuant to the new requirements and process needs to start shortly after the entry into force of this Regulation. A transitional provision is foreseen for the certificates issued by notified bodies under Directive 2000/9/EC with regard to subsystems and safety components so as to allow stocks to be absorbed and ensure a smooth transition to the new requirements.
        • date: 2014-04-02T00:00:00 type: Committee referral announced in Parliament, 1st reading/single reading body: EP
        • date: 2014-10-20T00:00:00 type: Committee referral announced in Parliament, 1st reading/single reading body: EP
        • date: 2014-12-04T00:00:00 type: Debate in Council body: CSL docs: url: http://register.consilium.europa.eu/content/out?lang=EN&typ=SET&i=SMPL&ROWSPP=25&RESULTSET=1&NRROWS=500&DOC_LANCD=EN&ORDERBY=DOC_DATE+DESC&CONTENTS=3353*&MEET_DATE=04/12/2014 title: 3353
        • date: 2015-03-17T00:00:00 type: Vote in committee, 1st reading/single reading body: EP
        • date: 2015-03-17T00:00:00 type: Committee decision to open interinstitutional negotiations with report adopted in committee body: EP
        • date: 2015-03-25T00:00:00 type: Committee report tabled for plenary, 1st reading/single reading body: EP docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A8-2015-0063&language=EN title: A8-0063/2015 summary: The Committee on the Internal Market and Consumer Protection adopted the report by Antonio LÓPEZ-ISTÚRIZ WHITE (EPP, ES) on the proposal for a regulation of the European Parliament and of the Council on cableway installations. The committee recommended that the European Parliament’s position at first reading following the ordinary legislative procedure should amend the Commission proposal as follows: Purpose and scope of the proposal : this Regulation applies to new cableway installations and covers subsystems and safety components which are new to the Union market when they are placed on the market; that is to say they are either new subsystem and safety components made by a manufacturer established in the Union or subsystems and safety components, whether new or second-hand, imported from a third country. Cableway installations are mainly lift systems, such as funicular railways, aerial ropeways, cable cars, gondolas, chairlifts drag lifts and other installations for tourism or sport purpose. The provisions of this Regulation are based on the precautionary principle . The Regulation shall not apply to: cableway installations of historical construction, including cable-operated tramways, funicular railways and cliff railways, as identified by national law, including subsystems and safety components specifically designed for them; installations intended for agricultural or forestry purposes; cableway installations for the service of mountain shelters and huts intended only for the transport of goods and specifically authorised persons; on-site or mobile equipment exclusively designed for leisure and amusement purposes and not as a means for transporting persons. Entry into service of cableway installations : the subsystems and safety components should be incorporated into cableway installations only if they enable the construction of cableway installations which satisfy the requirements of this Regulation and are not liable to endanger the health or safety of persons or property when properly incorporated, maintained and operated in accordance with their intended purpose. Safety analysis : the person responsible for the cableway installation, determined by a Member State in accordance with national law, shall submit the safety report. The safety analysis required for every cableway installation shall take into account every mode of operation envisaged taking into account the local surroundings and the most adverse situations in order to ensure satisfactory safety conditions. The safety analysis shall also cover the safety devices and their effect on the cableway installation and related subsystems that they bring into action. Consistency with the New Legislative Framework (NLF) : Members supported the alignment of the provisions to the goods package adopted in 2008 and in particular to the Decision No 768/2008/EC on a common framework for the marketing of products. The framework set out by the NLF consists of provisions which are commonly used in EU product legislation. Following the adoption of nine proposals which together form the "alignment package", the report proposed amendments seek to improve the consistency of the text with the NLF in particular as regards the obligations of economic operators, the EU declaration of conformity, rules on affixing the CE marking requirements, the information obligation incumbent on notifying authorities, the presumption of conformity of the notified bodies and the information obligation on notified bodies. Market surveillance : Members proposed the addition of a new Chapter IV on the Union market surveillance and control of subsystems and safety components entering the Union market and the Union safeguard procedure. In order to increase transparency and to reduce processing time, it is necessary to improve the existing safeguard procedure, with a view to making it more efficient and drawing on the expertise available in the Member States. The existing system should: be supplemented by a procedure under which interested parties are informed of measures intended to be taken with regard to subsystems and safety components presenting a risk to the health or safety of persons; allow market surveillance authorities, in cooperation with the relevant economic operators, to act at an earlier stage in respect of such subsystems and safety components. When matters relating to this Regulation, other than its implementation or infringements, are being examined, the European Parliament should in line with existing practice receive full information and documentation and an invitation to attend such meetings.
        • date: 2015-11-10T00:00:00 type: Approval in committee of the text agreed at 1st reading interinstitutional negotiations body: EP docs: url: http://www.europarl.europa.eu/RegData/commissions/imco/inag/2015/10-12/IMCO_AG(2015)610758_EN.pdf title: PE610.758
        • date: 2016-01-19T00:00:00 type: Debate in Parliament body: EP docs: url: http://www.europarl.europa.eu/sides/getDoc.do?secondRef=TOC&language=EN&reference=20160119&type=CRE title: Debate in Parliament
        • date: 2016-01-20T00:00:00 type: Results of vote in Parliament body: EP docs: url: https://oeil.secure.europarl.europa.eu/oeil/popups/sda.do?id=25494&l=en title: Results of vote in Parliament
        • date: 2016-01-20T00:00:00 type: Decision by Parliament, 1st reading/single reading body: EP docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=TA&language=EN&reference=P8-TA-2016-0014 title: T8-0014/2016 summary: The European Parliament adopted by 639 votes to 69, with 2 abstentions, a legislative resolution on the proposal for a regulation of the European Parliament and of the Council on cableway installations. Parliament’s position, adopted at first reading following the ordinary legislative procedure, amended the Commission proposal as follows: Subject matter and scope : this Regulation: lays down rules on the making available on the market and the free movement of subsystems and safety components for cableway installations ; contains rules on the design, construction and entry into service of new cableway installations; applies to new cableway installations designed to transport persons, to modifications of cableway installations requiring a new authorisation, and to subsystems and safety components for cableway installations. Cableway installations are mainly lift systems, such as funicular railways, aerial ropeways (cable cars, gondolas, chairlifts) and drag lift. The Regulation does not apply to the following: lifts covered by Directive 2014/33/EU; cableway installations that are categorised by Member States as historic, cultural or heritage installations, that entered into service before 1 January 1986 and that are still in operation, and that have not had any significant changes in design or construction, including subsystems and safety components specifically designed for them; installations intended for agricultural or forestry purposes; cableway installations for the service of mountain shelters and huts intended only for the transport of goods and specifically authorised persons; Entry into service of cableway installations : Member States shall take all appropriate measures to determine the procedures for ensuring that the subsystems and safety components are incorporated into cableway installations only if they enable the construction of cableway installations which comply with this Regulation and are not liable to endanger the health or safety of persons or property when properly installed, maintained and operated in accordance with their intended purpose. Safety analysis : the person responsible for the cableway installation, determined by a Member State in accordance with national law , shall carry out a safety analysis of the planned cableway installation or have such a safety analysis carried out. The safety analysis required for each cableway installation shall take into account all modes of operation envisaged and ensure that the design and configuration of the cableway installation takes account of the local surroundings and the most adverse situations in order to ensure satisfactory safety conditions. The analysis shall also cover the safety devices and their effects on the cableway installation and related subsystems that they bring into action so that the safety devices are capable of reacting to an initial breakdown or failure detected so as to remain either in a state that guarantees safety, in a lower operating mode or in a fail-safe state. The result of the safety analysis shall be included in a safety report . Each Member State shall lay down procedures for authorising the construction and the entry into service of cableway installations which are located within its territory. Consistency with the New Legislative Framework (NLF) : Parliament approved the alignment of the provisions to the goods package adopted in 2008 and in particular to the Decision No 768/2008/EC on a common framework for the marketing of products. The framework set out by the NLF consists of provisions which are commonly used in EU product legislation. The amendments seek to improve the consistency of the text with the NLF. They state inter alia that: manufacturers shall indicate on the subsystem or the safety component their name, registered trade name or registered trade mark and the postal address at which they can be contacted or, where that is not possible, on the packaging or in a document accompanying the subsystem or safety component. Where the manufacturer indicates a website address, he shall ensure that the information on that website is accessible and kept updated; where a large number of subsystems or safety components are delivered to a single economic operator or user, the batch or consignment concerned may be accompanied by a single copy of the EU declaration of conformity; the CE marking shall be affixed visibly, legibly and indelibly to the subsystem or the safety component or to its data plate. Where that is not possible or not warranted on account of the nature of the subsystem or the safety component, it shall be affixed to the packaging and to the accompanying documents. Right to appeal : interested parties should have the right to appeal against the result of a conformity assessment carried out by a notified body. For that reason, Members proposed that notified bodies shall ensure that an appeal procedure against their decisions is available. Market surveillance : Parliament proposed the addition of a new provisions on the Union market surveillance and control of subsystems and safety components entering the Union market and the Union safeguard procedure. Penalties : the penalties provided for shall be effective, proportionate and dissuasive and may be increased where the relevant economic operator has previously committed a similar infringement of this Regulation.
        • date: 2016-02-12T00:00:00 type: Act adopted by Council after Parliament's 1st reading body: EP/CSL
        • date: 2016-02-12T00:00:00 type: End of procedure in Parliament body: EP
        • date: 2016-03-09T00:00:00 type: Final act signed body: CSL
        • date: 2016-03-31T00:00:00 type: Final act published in Official Journal summary: PURPOSE: to update internal market rules applicable to cableway installations in order to ensure that these installations conform to requirements guaranteeing a high level of protection of the health and safety of persons and ensuring the proper functioning of the internal market for subsystems of cableway installations and safety components. LEGISLATIVE ACT: Regulation (EU) 2016/424 of the European Parliament and of the Council on cableway installations and repealing Directive 2000/9/EC. CONTENT: the new Regulation replaces Directive 2000/9/EC. It lays down rules on the making available on the market and the free movement of subsystems and safety components for cableway installations. It also contains rules on the design, construction and entry into service of new cableway installations. Scope: the Regulation applies to cableway installations designed to transport persons used in particular in high-altitude tourist resorts, in urban transport facilities or in sports facilities. Cableway installations are mainly lift systems, such as funicular railways, aerial ropeways (cable cars, gondolas, chairlifts) and drag lifts. Excluded from the scope of the Regulation are : lifts; cableway installations that are categorised by Member States as historic, cultural or heritage installations, that entered into service before 1 January 1986 and that are still in operation; installations intended for agricultural or forestry purposes; cableway installations for the service of mountain shelters. The Regulation applies to new cableway installations, to modifications of cableway installations requiring a new authorisation and covers subsystems and safety components that are new to the Union market when they are placed on it. Safety analysis, entry into service, authorisation and operation of cableway installations : the new Regulation specifies the following: Member States should take the necessary steps to ensure that cableway installations enter into service only if they comply with the Regulation and are not liable to endanger the health or safety of persons or property when properly installed, maintained and operated in accordance with their intended purpose; the person responsible for the cableway installation, determined by a Member State, shall carry out a safety analysis of the planned cableway installation . The safety analysis shall ensure that the design and configuration of the cableway installation takes account of the local surroundings and the most adverse situations in order to ensure satisfactory safety conditions. The safety analysis shall also cover the safety devices. The result of the safety analysis shall be included in a safety report; each Member State shall lay down procedures for authorising the construction and the entry into service of cableway installations which are located within its territory. Obligations of economic operators (manufacturers, importers, distributors ): all economic operators intervening in the supply and distribution chain should take appropriate measures to ensure that they only make available on the market subsystems and safety components which are in conformity with the Regulation. In particular, manufacturers shall ensure, when placing their subsystems or safety components on the market or when incorporating them into a cableway installation, that the former have been designed and manufactured in accordance with the essential requirements on health and safety set out in Annex II. They must: implement the conformity assessment procedures established by the Regulation; draw up an EU declaration of conformity and affix the CE marking; keep the technical documentation and the EU declaration of conformity for 30 years after the subsystem or the safety component has been placed on the market; carry out sample testing of subsystems or safety components made available on the market, investigate, and, if necessary, keep a register of complaints, of non-conforming subsystems and safety components and recalls of such subsystems and safety components, and shall keep distributors informed of any such monitoring; ensure that subsystems or safety components bear a type, batch or serial number or other element allowing their identification; indicate on the subsystem or the safety component their name, registered trade name or registered trade mark and the postal address at which they can be contacted or, where that is not possible, on the packaging or in a document accompanying the subsystem or safety component; ensure that instructions and safety information , as well as any labelling, is clear, understandable, intelligible and legible; further to a reasoned request from a competent national authority , provide it with all the information and documentation necessary to demonstrate the conformity of the subsystem or the safety component with this Regulation, in a language which can be easily understood by that authority immediately take the corrective measures necessary to bring that subsystem or safety component into conformity, to withdraw it or recall it, if appropriate. For their part, importers must make sure that the subsystems or safety components they place on the market comply with the essential requirements and which do not present a risk. They must also make sure that conformity assessment procedures have been carried out and that subsystem and safety component marking and documentation drawn up by manufacturers are available for inspection by the competent national authorities. CE marking : before the subsystem or the safety component is placed on the market, the CE marking shall be affixed visibly, legibly and indelibly to the subsystem or the safety component or to its data plate, or where that is not possible, it shall be affixed to the packaging and to the accompanying documents. The CE marking and the identification number may be followed by any other mark indicating a special risk or use. Member States shall take appropriate action in the event of improper use of that marking. Notifying authorities : the Regulation sets requirements for notifying authorities responsible for conformity assessment bodies. These bodies must apply the conformity assessment procedures without creating unnecessary burdens for economic operators. Interested parties have the right to appeal against the result of a conformity assessment carried out by a notified body. Market surveillance : in the context of aligning the legislation on subsystems and safety components with the new legislative framework for the marketing of products, and in order to ensure legal certainty, the rules on Union market surveillance and control of products entering the Union market provided for in Regulation (EC) No 765/2008 apply to subsystems or safety components referred to in the Regulation. The new Regulation also contains provisions regarding procedures at national level for dealing with subsystems or safety components presenting a risk, Union safeguard procedures, and compliant subsystems or safety components which present a risk to health and safety. Transitional provisions : Member States shall not impede the making available on the market of subsystems or safety components which are in conformity with Directive 2009/9/EC and which were placed on the market before 21 April 2018. ENTRY INTO FORCE: 20.4.2016. APPLICATION: from 21.4.2018, with the exception on certain provisions which are applicable from 21.10.2016 or from 21.3.2018. docs: title: Regulation 2016/424 url: https://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!CELEXnumdoc&lg=EN&numdoc=32016R0424 title: OJ L 081 31.03.2016, p. 0001 url: https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=OJ:L:2016:081:TOC title: Corrigendum to final act 32016R0424R(01) url: https://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexapi!prod!CELEXnumdoc&lg=EN&model=guicheti&numdoc=32016R0424R(01) title: OJ L 266 30.09.2016, p. 0008 url: https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=OJ:L:2016:266:TOC
        links/Research document
        title
        Briefing
        url
        http://www.europarl.europa.eu/thinktank/en/document.html?reference=EPRS_BRI(2016)583797
        other
        • body: CSL type: Council Meeting council: Former Council configuration
        • body: EC dg: url: http://ec.europa.eu/dgs/transport/index_en.htm title: Mobility and Transport commissioner: BULC Violeta
        otherinst
        • name: European Economic and Social Committee
        procedure/Mandatory consultation of other institutions
        Economic and Social Committee
        procedure/Modified legal basis
        Old
        Rules of Procedure of the European Parliament EP 150
        New
        Rules of Procedure EP 159
        procedure/dossier_of_the_committee
        Old
        IMCO/8/00405
        New
        • IMCO/8/00405
        procedure/final/url
        Old
        http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!CELEXnumdoc&lg=EN&numdoc=32016R0424
        New
        https://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!CELEXnumdoc&lg=EN&numdoc=32016R0424
        procedure/instrument
        Old
        Decision
        New
        • Decision
        • Repealing Directive 2000/9/EC 1994/0011(COD) Amended by 2017/0353(COD)
        procedure/other_consulted_institutions
        European Economic and Social Committee
        procedure/subject
        Old
        • 2.10.03 Standardisation, EC/EU standards and trade mark, certification, compliance
        • 3.20 Transport policy in general
        • 3.40.03 Motor industry, cycle and motorcycle, commercial and agricultural vehicles
        • 4.60.08 Safety of products and services, product liability
        New
        2.10.03
        Standardisation, EC/EU standards and trade mark, certification, compliance
        3.20
        Transport policy in general
        3.40.03
        Motor industry, cycle and motorcycle, commercial and agricultural vehicles
        4.60.08
        Safety of products and services, product liability
        procedure/summary
        • Repealing Directive 2000/9/EC
        activities/12
        date
        2016-03-31T00:00:00
        docs
        type
        Final act published in Official Journal
        procedure/final
        url
        http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!CELEXnumdoc&lg=EN&numdoc=32016R0424
        title
        Regulation 2016/424
        procedure/stage_reached
        Old
        Procedure completed, awaiting publication in Official Journal
        New
        Procedure completed
        activities/11
        date
        2016-03-09T00:00:00
        body
        CSL
        type
        Final act signed
        procedure/stage_reached
        Old
        Awaiting signature of act
        New
        Procedure completed, awaiting publication in Official Journal
        activities/1/committees/0
        body
        EP
        shadows
        responsible
        True
        committee
        IMCO
        date
        2014-07-17T00:00:00
        committee_full
        Internal Market and Consumer Protection
        rapporteur
        group: EPP name: LÓPEZ-ISTÚRIZ WHITE Antonio
        activities/2/committees/0
        body
        EP
        shadows
        responsible
        True
        committee
        IMCO
        date
        2014-07-17T00:00:00
        committee_full
        Internal Market and Consumer Protection
        rapporteur
        group: EPP name: LÓPEZ-ISTÚRIZ WHITE Antonio
        activities/5/committees/0
        body
        EP
        shadows
        responsible
        True
        committee
        IMCO
        date
        2014-07-17T00:00:00
        committee_full
        Internal Market and Consumer Protection
        rapporteur
        group: EPP name: LÓPEZ-ISTÚRIZ WHITE Antonio
        activities/6/committees/0
        body
        EP
        shadows
        responsible
        True
        committee
        IMCO
        date
        2014-07-17T00:00:00
        committee_full
        Internal Market and Consumer Protection
        rapporteur
        group: EPP name: LÓPEZ-ISTÚRIZ WHITE Antonio
        committees/0
        body
        EP
        shadows
        responsible
        True
        committee
        IMCO
        date
        2014-07-17T00:00:00
        committee_full
        Internal Market and Consumer Protection
        rapporteur
        group: EPP name: LÓPEZ-ISTÚRIZ WHITE Antonio
        activities/9
        date
        2016-02-12T00:00:00
        body
        CSL
        type
        Council Meeting
        council
        Economic and Financial Affairs ECOFIN
        meeting_id
        3445
        other/0
        body
        CSL
        type
        Council Meeting
        council
        Former Council configuration
        activities/9
        date
        2016-02-12T00:00:00
        body
        EP/CSL
        type
        Act adopted by Council after Parliament's 1st reading
        procedure/stage_reached
        Old
        Political agreement in Council on its 1st reading position
        New
        Awaiting signature of act
        activities/8/docs/0/text
        • The European Parliament adopted by 639 votes to 69, with 2 abstentions, a legislative resolution on the proposal for a regulation of the European Parliament and of the Council on cableway installations.

          Parliament’s position, adopted at first reading following the ordinary legislative procedure, amended the Commission proposal as follows:

          Subject matter and scope: this Regulation:

          • lays down rules on the making available on the market and the free movement of subsystems and safety components for cableway installations ;
          • contains rules on the design, construction and entry into service of new cableway installations;
          • applies to new cableway installations designed to transport persons, to modifications of cableway installations requiring a new authorisation, and to subsystems and safety components for cableway installations.

          Cableway installations are mainly lift systems, such as funicular railways, aerial ropeways (cable cars, gondolas, chairlifts) and drag lift.

          The Regulation does not apply to the following:

          • lifts covered by Directive 2014/33/EU;
          • cableway installations that are categorised by Member States as historic, cultural or heritage installations, that entered into service before 1 January 1986 and that are still in operation, and that have not had any significant changes in design or construction, including subsystems and safety components specifically designed for them;
          • installations intended for agricultural or forestry purposes;
          • cableway installations for the service of mountain shelters and huts intended only for the transport of goods and specifically authorised persons;

          Entry into service of cableway installations: Member States shall take all appropriate measures to determine the procedures for ensuring that the subsystems and safety components are incorporated into cableway installations only if they enable the construction of cableway installations which comply with this Regulation and are not liable to endanger the health or safety of persons or property when properly installed, maintained and operated in accordance with their intended purpose.

          Safety analysis: the person responsible for the cableway installation, determined by a Member State in accordance with national law, shall carry out a safety analysis of the planned cableway installation or have such a safety analysis carried out. The safety analysis required for each cableway installation shall take into account all modes of operation envisaged and ensure that the design and configuration of the cableway installation takes account of the local surroundings and the most adverse situations in order to ensure satisfactory safety conditions.

          The analysis shall also cover the safety devices and their effects on the cableway installation and related subsystems that they bring into action so that the safety devices are capable of reacting to an initial breakdown or failure detected so as to remain either in a state that guarantees safety, in a lower operating mode or in a fail-safe state.

          The result of the safety analysis shall be included in a safety report.

          Each Member State shall lay down procedures for authorising the construction and the entry into service of cableway installations which are located within its territory.

          Consistency with the New Legislative Framework (NLF): Parliament approved the alignment of the provisions to the goods package adopted in 2008 and in particular to the Decision No 768/2008/EC on a common framework for the marketing of products. The framework set out by the NLF consists of provisions which are commonly used in EU product legislation.

          The amendments seek to improve the consistency of the text with the NLF. They state inter alia that:

          • manufacturers shall indicate on the subsystem or the safety component their name, registered trade name or registered trade mark and the postal address at which they can be contacted or, where that is not possible, on the packaging or in a document accompanying the subsystem or safety component. Where the manufacturer indicates a website address, he shall ensure that the information on that website is accessible and kept updated;
          • where a large number of subsystems or safety components are delivered to a single economic operator or user, the batch or consignment concerned may be accompanied by a single copy of the EU declaration of conformity;
          • the CE marking shall be affixed visibly, legibly and indelibly to the subsystem or the safety component or to its data plate. Where that is not possible or not warranted on account of the nature of the subsystem or the safety component, it shall be affixed to the packaging and to the accompanying documents.

          Right to appeal: interested parties should have the right to appeal against the result of a conformity assessment carried out by a notified body. For that reason, Members proposed that notified bodies shall ensure that an appeal procedure against their decisions is available.

          Market surveillance: Parliament proposed the addition of a new provisions on the Union market surveillance and control of subsystems and safety components entering the Union market and the Union safeguard procedure.

          Penalties: the penalties provided for shall be effective, proportionate and dissuasive and may be increased where the relevant economic operator has previously committed a similar infringement of this Regulation.

        activities/1/committees/2
        body
        EP
        responsible
        True
        committee
        IMCO
        date
        2014-07-17T00:00:00
        committee_full
        Internal Market and Consumer Protection
        rapporteur
        group: EPP name: LÓPEZ-ISTÚRIZ WHITE Antonio
        activities/2/committees/2
        body
        EP
        responsible
        True
        committee
        IMCO
        date
        2014-07-17T00:00:00
        committee_full
        Internal Market and Consumer Protection
        rapporteur
        group: EPP name: LÓPEZ-ISTÚRIZ WHITE Antonio
        activities/5/committees/2
        body
        EP
        responsible
        True
        committee
        IMCO
        date
        2014-07-17T00:00:00
        committee_full
        Internal Market and Consumer Protection
        rapporteur
        group: EPP name: LÓPEZ-ISTÚRIZ WHITE Antonio
        activities/6/committees/2
        body
        EP
        responsible
        True
        committee
        IMCO
        date
        2014-07-17T00:00:00
        committee_full
        Internal Market and Consumer Protection
        rapporteur
        group: EPP name: LÓPEZ-ISTÚRIZ WHITE Antonio
        activities/7/docs
        • url: http://www.europarl.europa.eu/sides/getDoc.do?secondRef=TOC&language=EN&reference=20160119&type=CRE type: Debate in Parliament title: Debate in Parliament
        activities/7/type
        Old
        Debate scheduled
        New
        Debate in Parliament
        activities/8/docs
        • url: http://www.europarl.europa.eu/sides/getDoc.do?type=TA&language=EN&reference=P8-TA-2016-0014 type: Decision by Parliament, 1st reading/single reading title: T8-0014/2016
        activities/8/type
        Old
        Vote in plenary scheduled
        New
        Decision by Parliament, 1st reading/single reading
        committees/2
        body
        EP
        responsible
        True
        committee
        IMCO
        date
        2014-07-17T00:00:00
        committee_full
        Internal Market and Consumer Protection
        rapporteur
        group: EPP name: LÓPEZ-ISTÚRIZ WHITE Antonio
        procedure/stage_reached
        Old
        Awaiting Parliament 1st reading / single reading / budget 1st stage
        New
        Political agreement in Council on its 1st reading position
        activities/7/type
        Old
        Debate in plenary scheduled
        New
        Debate scheduled
        procedure/subject/0
        Old
        2.10.03 Standardisation, EC standards and trademark, certification, compliance
        New
        2.10.03 Standardisation, EC/EU standards and trade mark, certification, compliance
        activities/7/type
        Old
        Indicative plenary sitting date, 1st reading/single reading
        New
        Debate in plenary scheduled
        activities/8
        date
        2016-01-20T00:00:00
        body
        EP
        type
        Vote in plenary scheduled
        activities/0/docs/0/celexid
        CELEX:52014PC0187:EN
        activities/4
        date
        2015-03-17T00:00:00
        body
        unknown
        type
        Committee decision to open interinstitutional negotiations with report adopted in committee
        activities/7/date
        Old
        2015-10-27T00:00:00
        New
        2016-01-19T00:00:00
        activities/6/date
        Old
        2015-09-08T00:00:00
        New
        2015-10-27T00:00:00
        activities/0/docs/0/celexid
        CELEX:52014PC0187:EN
        activities/0/docs/0/celexid
        CELEX:52014PC0187:EN
        activities/0/docs/0/celexid
        CELEX:52014PC0187:EN
        activities/5/docs/0/text
        • The Committee on the Internal Market and Consumer Protection adopted the report by Antonio LÓPEZ-ISTÚRIZ WHITE (EPP, ES) on the proposal for a regulation of the European Parliament and of the Council on cableway installations.

          The committee recommended that the European Parliament’s position at first reading following the ordinary legislative procedure should amend the Commission proposal as follows:

          Purpose and scope of the proposal: this Regulation applies to new cableway installations and covers subsystems and safety components which are new to the Union market when they are placed on the market; that is to say they are either new subsystem and safety components made by a manufacturer established in the Union or subsystems and safety components, whether new or second-hand, imported from a third country.

          Cableway installations are mainly lift systems, such as funicular railways, aerial ropeways, cable cars, gondolas, chairlifts drag lifts and other installations for tourism or sport purpose.

          The provisions of this Regulation are based on the precautionary principle. The Regulation shall not apply to:

          • cableway installations of historical construction, including cable-operated tramways, funicular railways and cliff railways, as identified by national law, including subsystems and safety components specifically designed for them;
          • installations intended for agricultural or forestry purposes;
          • cableway installations for the service of mountain shelters and huts intended only for the transport of goods and specifically authorised persons;
          • on-site or mobile equipment exclusively designed for leisure and amusement purposes and not as a means for transporting persons.

          Entry into service of cableway installations: the subsystems and safety components should be incorporated into cableway installations only if they enable the construction of cableway installations which satisfy the requirements of this Regulation and are not liable to endanger the health or safety of persons or property when properly incorporated, maintained and operated in accordance with their intended purpose.

          Safety analysis: the person responsible for the cableway installation, determined by a Member State in accordance with national law, shall submit the safety report.

          The safety analysis required for every cableway installation shall take into account every mode of operation envisaged taking into account the local surroundings and the most adverse situations in order to ensure satisfactory safety conditions. The safety analysis shall also cover the safety devices and their effect on the cableway installation and related subsystems that they bring into action.

          Consistency with the New Legislative Framework (NLF): Members supported the alignment of the provisions to the goods package adopted in 2008 and in particular to the Decision No 768/2008/EC on a common framework for the marketing of products. The framework set out by the NLF consists of provisions which are commonly used in EU product legislation.

          Following the adoption of nine proposals which together form the "alignment package", the report proposed amendments seek to improve the consistency of the text with the NLF in particular as regards the obligations of economic operators, the EU declaration of conformity, rules on affixing the CE marking requirements, the information obligation incumbent on notifying authorities, the presumption of conformity of the notified bodies and the information obligation on notified bodies.

          Market surveillance: Members proposed the addition of a new Chapter IV on the Union market surveillance and control of subsystems and safety components entering the Union market and the Union safeguard procedure.

          In order to increase transparency and to reduce processing time, it is necessary to improve the existing safeguard procedure, with a view to making it more efficient and drawing on the expertise available in the Member States. The existing system should:

          • be supplemented by a procedure under which interested parties are informed of measures intended to be taken with regard to subsystems and safety components presenting a risk to the health or safety of persons;
          • allow market surveillance authorities, in cooperation with the relevant economic operators, to act at an earlier stage in respect of such subsystems and safety components.

          When matters relating to this Regulation, other than its implementation or infringements, are being examined, the European Parliament should in line with existing practice receive full information and documentation and an invitation to attend such meetings.

        links/European Commission/title
        Old
        PreLex
        New
        EUR-Lex
        procedure/instrument
        Old
        Regulation
        New
        Decision
        activities/5/docs
        • url: http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A8-2015-0063&language=EN type: Committee report tabled for plenary, 1st reading/single reading title: A8-0063/2015
        activities/6
        date
        2015-09-08T00:00:00
        body
        EP
        type
        Indicative plenary sitting date, 1st reading/single reading
        activities/5
        date
        2015-03-25T00:00:00
        body
        EP
        type
        Committee report tabled for plenary, 1st reading/single reading
        committees
        procedure/stage_reached
        Old
        Awaiting committee decision
        New
        Awaiting Parliament 1st reading / single reading / budget 1st stage
        activities/4
        date
        2015-03-17T00:00:00
        body
        EP
        type
        Vote in committee, 1st reading/single reading
        committees
        procedure/Modified legal basis
        Rules of Procedure of the European Parliament EP 150
        activities/0
        date
        2014-03-27T00:00:00
        docs
        url: http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2014&nu_doc=0187 title: COM(2014)0187 type: Legislative proposal published celexid: CELEX:52014PC0187:EN
        body
        EC
        type
        Legislative proposal published
        commission
        DG: url: http://ec.europa.eu/dgs/transport/index_en.htm title: Mobility and Transport Commissioner: BULC Violeta
        activities/0/body
        Old
        EP
        New
        EC
        activities/0/commission
        • DG: url: http://ec.europa.eu/dgs/transport/index_en.htm title: Mobility and Transport Commissioner: BULC Violeta
        activities/0/date
        Old
        2015-04-28T00:00:00
        New
        2014-03-27T00:00:00
        activities/0/docs
        • url: http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2014&nu_doc=0187 celexid: CELEX:52014PC0187:EN type: Legislative proposal published title: COM(2014)0187
        activities/0/type
        Old
        Indicative plenary sitting date, 1st reading/single reading
        New
        Legislative proposal published
        activities/0/commission/0/Commissioner
        Old
        TAJANI Antonio
        New
        BULC Violeta
        activities/0/commission/0/DG/title
        Old
        Enterprise and Industry
        New
        Mobility and Transport
        activities/0/commission/0/DG/url
        Old
        http://ec.europa.eu/enterprise/
        New
        http://ec.europa.eu/dgs/transport/index_en.htm
        other/0/commissioner
        Old
        TAJANI Antonio
        New
        BULC Violeta
        other/0/dg/title
        Old
        Enterprise and Industry
        New
        Mobility and Transport
        other/0/dg/url
        Old
        http://ec.europa.eu/enterprise/
        New
        http://ec.europa.eu/dgs/transport/index_en.htm
        activities/4
        date
        2015-04-28T00:00:00
        body
        EP
        type
        Indicative plenary sitting date, 1st reading/single reading
        activities/1/committees/0/shadows/3
        group
        Verts/ALE
        name
        DURAND Pascal
        activities/2/committees/0/shadows/3
        group
        Verts/ALE
        name
        DURAND Pascal
        activities/3
        body
        CSL
        meeting_id
        3353
        docs
        url: http://register.consilium.europa.eu/content/out?lang=EN&typ=SET&i=SMPL&ROWSPP=25&RESULTSET=1&NRROWS=500&DOC_LANCD=EN&ORDERBY=DOC_DATE+DESC&CONTENTS=3353*&MEET_DATE=04/12/2014 type: Debate in Council title: 3353
        council
        Competitiveness (Internal Market, Industry, Research and Space)
        date
        2014-12-04T00:00:00
        type
        Council Meeting
        committees/0/shadows/3
        group
        Verts/ALE
        name
        DURAND Pascal
        activities/1/committees/0/shadows/2/mepref
        Old
        53b2ddd5b819f205b00000cf
        New
        53b2d83ab819f205b0000036
        activities/1/committees/0/shadows/2/name
        Old
        VAN MILTENBURG Matthijs
        New
        CHARANZOVÁ Dita
        activities/2/committees/0/shadows/2/mepref
        Old
        53b2ddd5b819f205b00000cf
        New
        53b2d83ab819f205b0000036
        activities/2/committees/0/shadows/2/name
        Old
        VAN MILTENBURG Matthijs
        New
        CHARANZOVÁ Dita
        committees/0/shadows/2/mepref
        Old
        53b2ddd5b819f205b00000cf
        New
        53b2d83ab819f205b0000036
        committees/0/shadows/2/name
        Old
        VAN MILTENBURG Matthijs
        New
        CHARANZOVÁ Dita
        activities/1/committees/0/shadows/2/mepref
        Old
        545fcac4d1d1c51903000000
        New
        53b2ddd5b819f205b00000cf
        activities/2/committees/0/shadows/2/mepref
        Old
        545fcac4d1d1c51903000000
        New
        53b2ddd5b819f205b00000cf
        committees/0/shadows/2/mepref
        Old
        545fcac4d1d1c51903000000
        New
        53b2ddd5b819f205b00000cf
        activities/1/committees/0/shadows/2/mepref
        545fcac4d1d1c51903000000
        activities/2/committees/0/shadows/2/mepref
        545fcac4d1d1c51903000000
        committees/0/shadows/2/mepref
        545fcac4d1d1c51903000000
        activities/1/committees/0
        body
        EP
        shadows
        responsible
        True
        committee
        IMCO
        date
        2014-07-17T00:00:00
        committee_full
        Internal Market and Consumer Protection
        rapporteur
        group: EPP name: LÓPEZ-ISTÚRIZ WHITE Antonio
        activities/2
        date
        2014-10-20T00:00:00
        body
        EP
        type
        Committee referral announced in Parliament, 1st reading/single reading
        committees
        committees/0
        body
        EP
        shadows
        responsible
        True
        committee
        IMCO
        date
        2014-07-17T00:00:00
        committee_full
        Internal Market and Consumer Protection
        rapporteur
        group: EPP name: LÓPEZ-ISTÚRIZ WHITE Antonio
        procedure/subject/0
        Old
        2.10.03 Standardisation, EC standards and trade mark, certification, compliance
        New
        2.10.03 Standardisation, EC standards and trademark, certification, compliance
        procedure/dossier_of_the_committee
        Old
        IMCO/7/15572
        New
        IMCO/8/00405
        activities/0/docs/0/text
        • PURPOSE: to revise Directive 2000/9/EC in order to ensure that cableway installations fulfil the requirements providing for a high level protection of and safety of users while guaranteeing the functioning of the internal market for subsystems and safety components.

          PROPOSED ACT: Regulation of the European Parliament and the Council.

          ROLE OF THE EUROPEAN PARLIAMENT: the European Parliament decides in accordance with the ordinary legislative procedure and on an equal footing with the Council.

          BACKGROUND: Directive 2000/9/EC relating to cableway installations designed to carry persons became applicable on 3 May 2002. It sets out essential requirements with which cableway installations, their infrastructure, subsystems and safety components must comply in order to be safe. The main types of cableway installations covered by Directive 2000/9/EC are funiculars, gondolas, detachable chair lifts, fixed-grip chair lifts, aerial tramways, funitels, combined installations (made of several cableway types, such as those of gondolas and chairlifts) and drag lifts.

          Experience from the implementation of Directive 2000/9/EC showed the need to modify some of its provisions in order to clarify and update them and ensure thus legal certainty mainly as regards the: (i) scope, in particular with regard to new types of cableway installations; (ii) lack of an appropriate range of conformity assessment procedures for subsystems, which has led to divergent interpretations and implementation of the conformity assessment of subsystems.

          It is also necessary to align Directive 2000/9/EC to the “goods package” adopted in 2008 and in particular to the NLF Decision EC No 768/2008 establishing a common framework for the marketing of products (NLF Decision). The Commission has already proposed the alignment of nine other Directives to the NLF Decision within an “alignment package” adopted on 21 November 2011.

          IMPACT ASSESSMENT: the preferred solution consists of combining two options: (i) amending Directive 2000/9/EC; (ii) providing more extensive guidance on the implementation of Directive 2000/9/EC with regard to its scope and of recommending the application of specific conformity assessment procedures for the assessment of subsystems.

          CONTENT: the proposal intends to replace Directive 2000/9/EC on cableway installations designed to carry persons by a Regulation. It lays down rules on the design and construction of cableway installations designed to transport persons and on the making available on the market and the free movement of subsystems and safety components for such installations.

          The proposal intends to align Directive 2000/9/EC to the “goods package” adopted in 2008 and in particular to the NLF Decision EC No 768/2008.

          Scope: the proposal clarifies and updates the existing scope:

          • in light of the development of new types of cableway installations, it is clarified that the exclusion of cableway installations used for leisure purposes in fairgrounds or amusement parks does not apply to cableway installations that are intended for a dual function, namely of transporting persons and for leisure activities;
          • the exclusion of certain cableway installations intended for agricultural or industrial purposes is maintained, but it clarifies that it also covers cableway installations intended for the service of mountain shelters or huts that are not intended for the transport of the public;
          • the current exclusion of cable-operated ferries is also updated to all cable-operated installations where the users or carriers are water-borne, such as cable-operated water ski installations;
          • the exclusions provided for in Directive 2000/9/EC relating to rack-and-pinion railways and chain-driven installations are not reintroduced.

          Obligations of economic operators: the proposal contains, with regard to subsystems and safety components, the typical provisions for product-related Union harmonisation legislation and sets out the obligations of the relevant economic operators (manufacturers, authorised representatives, importers and distributors), in accordance with the NLF Decision.

          Harmonised standards: Regulation (EU) No 1025/2012 sets out a horizontal legal framework for European standardisation. Consequently the provisions of Directive 2000/9/EC which cover the same aspects have not been reintroduced in this proposal for reasons of legal certainty.

          Conformity assessment: the proposal keeps the requirement for a notified body intervention in the design and production phase of all subsystems and safety components. It introduces a range of conformity assessment procedures for subsystems based on the conformity assessment modules of the NLF Decision. In this framework, it also introduces the CE marking for subsystems.

          Notified bodies: in line with the NLF Decision, the proposal reinforces the notification criteria for notified bodies and introduces specific requirements for notifying authorities.

          Application: the proposed Regulation will become applicable two years after its entry into force to allow manufacturers, notified bodies and Member States time to adapt to the new requirements. However, the designation of notified bodies pursuant to the new requirements and process needs to start shortly after the entry into force of this Regulation.

          A transitional provision is foreseen for the certificates issued by notified bodies under Directive 2000/9/EC with regard to subsystems and safety components so as to allow stocks to be absorbed and ensure a smooth transition to the new requirements.

        activities
        • date: 2014-03-27T00:00:00 docs: url: http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2014&nu_doc=0187 title: COM(2014)0187 type: Legislative proposal published celexid: CELEX:52014PC0187:EN body: EC type: Legislative proposal published commission: DG: url: http://ec.europa.eu/enterprise/ title: Enterprise and Industry Commissioner: TAJANI Antonio
        • date: 2014-04-02T00:00:00 body: EP type: Committee referral announced in Parliament, 1st reading/single reading committees: body: EP responsible: True committee_full: Internal Market and Consumer Protection committee: IMCO body: EP responsible: False committee_full: Industry, Research and Energy committee: ITRE body: EP responsible: False committee_full: Transport and Tourism committee: TRAN
        committees
        • body: EP responsible: True committee_full: Internal Market and Consumer Protection committee: IMCO
        • body: EP responsible: False committee_full: Industry, Research and Energy committee: ITRE
        • body: EP responsible: False committee_full: Transport and Tourism committee: TRAN
        links
        European Commission
        other
        • body: EC dg: url: http://ec.europa.eu/enterprise/ title: Enterprise and Industry commissioner: TAJANI Antonio
        procedure
        dossier_of_the_committee
        IMCO/7/15572
        Mandatory consultation of other institutions
        Economic and Social Committee
        reference
        2014/0107(COD)
        subtype
        Legislation
        legal_basis
        Treaty on the Functioning of the EU TFEU 114
        stage_reached
        Awaiting committee decision
        summary
        Repealing Directive 2000/9/EC
        instrument
        Regulation
        title
        Cableway installations
        type
        COD - Ordinary legislative procedure (ex-codecision procedure)
        subject